A method for exploiting a shale silt type hydrate reservoir by first solidifying and then fracturing

By adopting a customized low-temperature high-pressure solidification system and segmented fracturing process, the compatibility problem of solidification and fracturing in marine silty mud hydrate reservoirs has been solved, enabling efficient and safe exploitation of the reservoirs. This technology is applicable to silty mud hydrate reservoirs in the South China Sea and other sea areas.

CN123133751APending Publication Date: 2026-11-20INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611334188.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Marine silty mud hydrate reservoirs have low mechanical strength, and conventional fracturing can easily lead to reservoir collapse and sand production. Furthermore, the special temperature and pressure environment of the ocean results in poor compatibility between solidification materials and fracturing processes, making it difficult for existing technologies to achieve rapid solidification and efficient fracturing under low temperature and high pressure.

Method used

By adopting a customized low-temperature high-pressure curing system and segmented fracturing process, reservoir parameters are accurately detected through offshore drilling and logging technology. Suitable curing materials are prepared and rapidly cured in situ in the reservoir to form a dense curing layer. Then, segmented fracturing is carried out to form a stable high-conductivity fracture channel.

Benefits of technology

It significantly improves reservoir mechanical stability, reduces sand production and seabed subsidence, increases gas production efficiency, ensures construction safety and environmental protection, and is highly adaptable, suitable for the exploitation of silty mudstone hydrate reservoirs in the South China Sea and other sea areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133751A_ABST
    Figure CN123133751A_ABST
Patent Text Reader

Abstract

The present application relates to a kind of argillaceous silt type hydrate reservoir first solidification after fracturing mining method, mainly includes the following steps: (1) reservoir parameter accurate detection, (2) solidification system customization preparation, (3) reservoir in situ solidification construction, (4) solidification effect detection and evaluation, (5) customized fracturing construction, (6) fracturing after liquid discharge and gas production mining;By optimizing solidification material formula and construction technology, on the premise of not damaging hydrate stable state, quickly improve the mechanical strength of reservoir, then carry out targeted subsection fracturing process precise control crack propagation, form stable high conductivity fracture channel, effectively improve reservoir percolation capacity, solve the problem of argillaceous silt reservoir permeability is extremely low, compared with conventional fracturing, cumulative gas production can be increased by more than 50%, realize reservoir efficient, safe gas production.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of marine natural gas hydrate extraction technology, specifically to a method for pre-solidification followed by fracturing extraction of silty mudstone hydrate reservoirs, which is applicable to the efficient and safe extraction of deep-sea silty mudstone hydrate reservoirs. Background Technology

[0002] Natural gas hydrates, as a clean and efficient new energy source, have enormous reserves and hold significant strategic importance in the global energy structure transformation. Marine silty mudstone hydrate reservoirs are the main form of hydrate occurrence in the South China Sea and other sea areas of my country. These reservoirs are characterized by complex mineral composition, pore structure dominated by micro- and nano-scale biofossil pores and clay intercrystalline pores, extremely low permeability, and strong heterogeneity. Furthermore, the reservoir particles are loose, poorly cemented, and have low mechanical strength. They are also located in the unique temperature and pressure environment of the deep sea (seafloor temperature 2–6°C, pressure increasing with depth, and the bottom boundary of the hydrate stability zone reaching depths of 150–250 m). The phase transition behavior of the hydrates is strictly controlled by the temperature and pressure field, exhibiting a significant hysteresis effect.

[0003] Currently, the main methods for exploiting marine hydrate reservoirs include depressurization, thermal injection, chemical inhibitors, and fracturing. Among these, fracturing, by creating high-permeability fracture channels within the reservoir, can effectively improve reservoir flow capacity and increase gas production efficiency, making it one of the core technologies for the stimulation of low-permeability reservoirs. However, for silty clay hydrate reservoirs, due to their extremely low mechanical strength and loose particle structure, conventional fracturing processes are prone to problems such as fracture closure, proppant embedding, and sand blockage, making it difficult to form stable, high-conductivity fracture channels. This can even lead to risks such as reservoir collapse, seafloor subsidence, and a surge in sand production, severely restricting the effectiveness of fracturing and the safety of exploitation operations.

[0004] Meanwhile, the unique temperature and pressure conditions of marine hydrate reservoirs place stringent demands on reservoir stimulation materials and processes: conventional solidification materials exhibit slow reaction rates and poor solidification effects under the low-temperature and high-pressure environment of the deep sea, making it difficult to rapidly improve the mechanical strength of the reservoir; conventional fracturing fluids easily disrupt the stable state of hydrates, leading to premature decomposition of hydrates and causing problems such as decreased reservoir permeability and wellbore instability. Therefore, there is an urgent need for a method adapted to the unique temperature and pressure environment of marine silty mud hydrate reservoirs, capable of first improving reservoir mechanical stability and then achieving efficient fracturing stimulation, while balancing safety and efficiency in extraction, to solve the technical challenges of reservoir collapse, poor fracturing effect, and high extraction risk in existing technologies. Summary of the Invention

[0005] This addresses the technical problems of low mechanical strength in silty mud hydrate reservoirs, the tendency of conventional fracturing to cause reservoir collapse and sand production, and the poor compatibility between solidification materials and fracturing processes caused by the special temperature and pressure environment of the ocean.

[0006] This invention provides a method for the exploitation of silty mudstone hydrate reservoirs by first solidifying and then fracturing. By optimizing the solidification material formula and construction process, the mechanical strength of the reservoir can be rapidly improved without destroying the stable state of the hydrate. Then, targeted fracturing is carried out to form stable high-conductivity fracture channels, thereby achieving efficient and safe exploitation of the reservoir.

[0007] Specifically, the present invention provides a method for the exploitation of silty clay hydrate reservoirs by first solidifying and then fracturing, characterized by the following steps: (1) Precise detection of reservoir parameters: Through offshore drilling, logging and seismic exploration technologies, the thickness, burial depth, hydrate saturation, porosity, permeability, mineral composition, formation temperature, formation pressure and pore fluid salinity of the target silty mudstone hydrate reservoir are accurately obtained; among them, the formation temperature is controlled at 2~15℃, and the formation pressure is positively correlated with the water depth; (2) Customized preparation of solidification system: Based on the reservoir parameters detected in step (1), a reservoir solidification system adapted to the low temperature and high pressure environment of the ocean is prepared. The solidification system consists of reaction base liquid A, reaction base liquid B, low temperature coagulant, reinforcing agent, viscosity reducer and clay stabilizer. The mass percentage of each component is as follows: reaction base liquid A 10~25%, reaction base liquid B 10~20%, low temperature coagulant 0.5~2%, reinforcing agent 0.3~2%, viscosity reducer 5~10%, clay stabilizer 1~5%, and the remainder is seawater adapted to the salinity of the reservoir pore fluid. (3) In-situ solidification construction of reservoir: Using offshore high-pressure pump sets, the solidification system is injected into the target reservoir at a discharge rate of 1~3 m³ / min. The injection pressure is lower than the reservoir fracture pressure, and the reservoir temperature fluctuation does not exceed ±1℃. After the injection is completed, the displacement fluid is injected, the pump is stopped, the well is shut in, and the pressure is held up for 12~24 hours to allow the solidification system to fully polymerize, cross-link and solidify in the in-situ low temperature and high pressure environment of the reservoir, forming a dense and tough solidified layer with the reservoir particles. (4) Solidification effect detection and evaluation: After the well is shut in and pressure is applied, the solidification range, solidification layer thickness, mechanical strength and hydrate decomposition rate of the reservoir are detected by logging, core sampling and pressure testing. After solidification, the reservoir compressive strength is ≥3MPa, shear strength is ≥0.8MPa and hydrate decomposition rate is ≤5%. If the requirements are not met, the solidification system is injected again and step (3) is repeated. (5) Customized fracturing construction: Prepare low temperature fracturing fluid, adopt segmented fracturing process, inject fracturing fluid into the reservoir at a pressure 5~10MPa higher than the fracture pressure after reservoir solidification, add proppant at the same time, control the direction and length of fracture propagation, and stabilize the pressure for 30~60min after each segment of fracturing is completed; (6) Fluid drainage and gas production after fracturing: After all fracturing operations are completed, the fracturing equipment is shut down and left to stand for 4 to 8 hours. After the fracturing fluid has fully broken down, the broken fluid in the wellbore and fractures is slowly discharged by pumping. The drainage rate is controlled at 0.5 to 1 m³ / min to avoid proppant backflow and reservoir disturbance caused by excessively fast drainage. After the drainage is completed, the gas production equipment is started and the depressurization production method is adopted. The depressurization rate is controlled at 0.1 to 0.3 MPa / d to allow the hydrate to decompose slowly. The decomposed natural gas enters the wellbore through the high conductivity fracture channel formed by fracturing to achieve efficient gas production.

[0008] Compared with the prior art, the present invention has the following significant advantages: Adapted to the unique temperature and pressure environment of the ocean: The customized curing system, with the addition of a low-temperature accelerator, can quickly complete the curing reaction under low temperature (2~15℃) and high pressure environment in the deep sea, solving the problem of slow reaction and poor curing effect of conventional curing materials in the low temperature environment of the deep sea; at the same time, the temperature and pressure fluctuations are strictly controlled during the curing and fracturing process to ensure the stability of hydrates and avoid reservoir damage and energy loss caused by premature decomposition, which is in line with the temperature and pressure characteristics of marine muddy silt hydrate reservoirs.

[0009] Significantly improves reservoir mechanical stability: Through in-situ solidification construction, the solidification system is fully integrated with the reservoir silty clay particles to form a dense and tough solidified layer, which effectively improves the reservoir's compressive and shear strength. It solves the problems of looseness and poor cementation in silty clay reservoirs and avoids risks such as fracture closure, proppant embedding, reservoir collapse, and sand production surge that occur during conventional fracturing. According to relevant test data, it can reduce reservoir sand production by more than 60% and control seabed subsidence to within 10cm.

[0010] Significant fracturing effect and high gas production efficiency: The mechanical strength of the reservoir is improved after solidification, providing a stable foundation for fracturing operations. The customized low-temperature fracturing fluid is adapted to the temperature and pressure conditions of the reservoir, and the segmented fracturing process can precisely control the fracture propagation, forming a stable high-conductivity fracture channel, effectively improving the reservoir's permeability, and solving the problem of extremely low permeability in silty clay reservoirs. Compared with conventional fracturing, the cumulative gas production can be increased by more than 50%, achieving efficient gas production from the reservoir.

[0011] The construction process is safe, controllable, and highly adaptable: the entire construction process requires no complex equipment, and both the solidification and fracturing processes use conventional offshore drilling equipment, making the construction process simple and convenient to operate; the solidification system and fracturing fluid are both adapted to the mineral composition and pore characteristics of silty clay reservoirs, and the formula and construction parameters can be flexibly adjusted according to different reservoir parameters, making it highly adaptable and widely applicable to the exploitation of silty clay hydrate reservoirs in sea areas such as the South China Sea.

[0012] Green and environmentally friendly, with minimal reservoir damage: Both the solidification system and fracturing fluid use environmentally friendly components. The solidified layer formed after solidification is a porous environmentally friendly material that is non-toxic and harmless to the marine environment and organisms. The fracturing fluid completely breaks down the gel, and the flowback fluid can be discharged in compliance with standards after simple treatment. In addition, the addition of clay stabilizers effectively inhibits clay expansion, minimizing reservoir damage and extending the reservoir exploitation cycle. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of a mining method for a silty mudstone hydrate reservoir that involves solidification followed by fracturing, according to an embodiment of this invention. Detailed Implementation

[0014] The principles and features of the present invention are described below with reference to the accompanying drawings. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention.

[0015] This embodiment focuses on a silty mudstone-type hydrate reservoir in the Shenhu area of ​​the northern South China Sea. The reservoir has a burial depth of 180-220 m, a formation temperature of approximately 10°C, a formation pressure of approximately 18 MPa, a pore fluid salinity of 3.5%, a hydrate saturation of 45%, a porosity of 32%, a permeability of 8 mD, and its mineral composition is mainly clay and quartz. The reservoir particles are loosely packed, with a compressive strength of 0.8 MPa and a shear strength of 0.2 MPa. The method of this invention is used for extraction, as shown in the attached diagram. Figure 1 As shown, the specific steps are as follows: (1) Accurate detection of reservoir parameters: The above reservoir parameters were accurately obtained through offshore drilling, logging and seismic exploration technologies. It was confirmed that the reservoir temperature and pressure conditions were 10℃ and 18MPa, the hydrate was in good stability and there were no obvious abnormalities.

[0016] (2) Customized preparation of curing system: The curing system is prepared according to the mass percentage. The amount of each component is as follows: reaction base liquid A (polymethylene polyphenyl isocyanate) 18%, reaction base liquid B (polyether polyol) 15%, low temperature coagulant (triethylenediamine and stannous octoate composite system) 1.2%, reinforcing agent (trimethylolpropane) 1.0%, viscosity reducer (ethyl acetate and diesel oil mixed at 1:2) 8%, clay stabilizer (KCl and NH4Cl mixed at 3:1) 3%, and the balance is seawater with a salinity of 3.5%. After stirring evenly, the viscosity of this curing system is 280 mPa·s at 25℃, which is suitable for a low temperature environment of 10℃.

[0017] (3) In-situ solidification construction of reservoir: The offshore high-pressure pump set is used to inject the solidification system into the target reservoir through the drilling wellbore at a discharge rate of 2m³ / min. During the injection process, real-time monitoring is carried out to control the wellbore pressure at 15MPa (lower than the reservoir fracture pressure of 17MPa) and the reservoir temperature fluctuation is controlled at 3.5~4.5℃. After the injection is completed, seawater is injected as a displacement fluid to push all the remaining solidification system in the wellbore into the reservoir. The pump is stopped, the well is shut in, and the pressure is held for 18 hours to allow the solidification system to be fully solidified in the reservoir at 4℃ and 18MPa.

[0018] (4) Solidification effect detection and evaluation: After the well shut-in and pressure test, the thickness of the solidified layer was 38m, covering the entire target reservoir. After solidification, the reservoir compressive strength was 4.2MPa, shear strength was 1.1MPa, and hydrate decomposition rate was 3.2%, which met the requirements of subsequent fracturing construction.

[0019] (5) Customized fracturing operation: Low-temperature fracturing fluid is prepared, with the base fluid being a composite system of seawater and guar gum (guar gum mass fraction 0.5%), and 0.5% low-temperature breaker (potassium isooctanoate), 0.8% anti-swelling agent (polyquaternary ammonium salt), and 0.3% drainage aid (fluorocarbon surfactant) are added; a horizontal well segmented fracturing process is adopted, with the horizontal well trajectory parallel to the reservoir strike, divided into 4 fracturing segments with a segment spacing of 12m, and each segment fracturing pressure of 23MPa (higher than the reservoir fracturing pressure after solidification by 18MPa). 20~40 mesh high-strength ceramic particles are selected as proppant, with a proppant concentration of 20kg / m³; after each segment fracturing is completed, the pump is stopped and the pressure is stabilized for 45min to ensure uniform distribution of proppant. The segmented fracturing process can precisely control fracture propagation, forming a stable high-conductivity fracture channel, effectively improving the reservoir permeability, solving the problem of extremely low permeability in silty clay reservoirs, and compared with conventional fracturing, the cumulative gas production can be increased by more than 50%, achieving efficient gas production in the reservoir.

[0020] (6) Fluid drainage and gas production after fracturing: After fracturing, the mixture is left to stand for 6 hours. After the fracturing fluid is fully broken down, the fluid is pumped out at a rate of 0.8 m³ / min. During the drainage process, a small amount of resin-coated sand control agent is injected. After the drainage is completed, the pressure reduction mining method is adopted, and the pressure reduction rate is controlled at 0.2 MPa / d. The reservoir parameters are continuously monitored, and the mining process is safe and stable.

[0021] The above embodiments demonstrate that the method of the present invention can be adapted to the special temperature and pressure conditions of marine silty mud hydrate reservoirs, effectively improve the mechanical strength of the reservoir, avoid many problems of conventional fracturing, and achieve efficient and safe exploitation of the reservoir, thus having good engineering application value.

Claims

1. A method for exploiting silty clay hydrate reservoirs by first solidifying and then fracturing, characterized in that: Includes the following steps: (1) Precise detection of reservoir parameters: Through offshore drilling, logging and seismic exploration technologies, the thickness, burial depth, hydrate saturation, porosity, permeability, mineral composition, formation temperature, formation pressure and pore fluid salinity of the target silty mudstone hydrate reservoir are accurately obtained; among them, the formation temperature is controlled at 2~15℃, and the formation pressure is positively correlated with the water depth; (2) Customized preparation of solidification system: Based on the reservoir parameters detected in step (1), a reservoir solidification system adapted to the low temperature and high pressure environment of the ocean is prepared. The solidification system consists of reaction base liquid A, reaction base liquid B, low temperature coagulant, reinforcing agent, viscosity reducer and clay stabilizer. The mass percentage of each component is as follows: reaction base liquid A 10~25%, reaction base liquid B 10~20%, low temperature coagulant 0.5~2%, reinforcing agent 0.3~2%, viscosity reducer 5~10%, clay stabilizer 1~5%, and the remainder is seawater adapted to the salinity of the reservoir pore fluid. (3) In-situ solidification construction of reservoir: The offshore high-pressure pump group is used to inject the solidification system into the target reservoir at a discharge rate of 1~3m³ / min. The injection pressure is lower than the reservoir fracture pressure and the reservoir temperature fluctuation does not exceed ±1℃. After injection, the displacement fluid is injected, the pump is stopped, the well is shut in, and the pressure is held for 12-24 hours to allow the solidification system to fully polymerize, cross-link, and solidify in the reservoir under low temperature and high pressure, forming a dense and resilient solidified layer with the reservoir particles; (4) Solidification effect detection and evaluation: After the well is shut in and pressure is applied, the solidification range, solidification layer thickness, mechanical strength and hydrate decomposition rate of the reservoir are detected by logging, core sampling and pressure testing. After solidification, the reservoir compressive strength is ≥3MPa, shear strength is ≥0.8MPa and hydrate decomposition rate is ≤5%. If the requirements are not met, the solidification system is injected again and step (3) is repeated. (5) Customized fracturing construction: Prepare low temperature fracturing fluid, adopt segmented fracturing process, inject fracturing fluid into the reservoir at a pressure 5~10MPa higher than the fracture pressure after reservoir solidification, add proppant at the same time, control the direction and length of fracture propagation, and stabilize the pressure for 30~60min after each segment of fracturing is completed; (6) Fluid drainage and gas production after fracturing: After all fracturing operations are completed, the fracturing equipment is shut down and left to stand for 4 to 8 hours. After the fracturing fluid has fully broken down, the broken fluid in the wellbore and fractures is slowly discharged by pumping. The drainage rate is controlled at 0.5 to 1 m³ / min to avoid proppant backflow and reservoir disturbance caused by excessively fast drainage. After the drainage is completed, the gas production equipment is started and the depressurization production method is adopted. The depressurization rate is controlled at 0.1 to 0.3 MPa / d to allow the hydrate to decompose slowly. The decomposed natural gas enters the wellbore through the high conductivity fracture channel formed by fracturing to achieve efficient gas production.

2. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (2), the reaction base liquid A is polymethylene polyphenyl isocyanate with an NCO mass fraction of 30.0%~32.0%, an average functional group ≥2.7, and a viscosity of 100~400 mPa·s at 25℃; the reaction base liquid B is polyether polyol with a hydroxyl value of 350~650 KOH / g, an average functional group ≥3, and a viscosity of 100~10000 mPa·s at 25℃.

3. The method for exploiting silty clay hydrate reservoirs by first solidifying and then fracturing, as described in claim 1, is characterized in that: In step (2), the low-temperature coagulant is a composite coagulant of tertiary amine and organometallic compounds; the reinforcing agent is one or more of trimethylolpropane and glycerol; the viscosity reducer is a composite system of ethyl acetate and diesel oil; and the clay stabilizer is a composite system of KCl and NH4Cl.

4. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (2), the curing system is further enhanced with 0.1-0.5% by mass of an organosilicon defoamer.

5. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (3), the solidification system adopts a layered injection method. Based on the reservoir thickness and hydrate saturation distribution, the target reservoir is divided into multiple injection layers, which are injected sequentially from top to bottom. The injection amount of each layer is calculated and determined based on the porosity and thickness of that layer.

6. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (5), the cryogenic fracturing fluid is composed of a base fluid, a cryogenic breaker, an anti-swelling agent, and a flow aid. The base fluid is a composite system of seawater and guar gum. The cryogenic breaker has a mass fraction of 0.3-0.8%, the anti-swelling agent has a mass fraction of 0.5-1.2%, and the flow aid has a mass fraction of 0.2-0.5%. The proppant is 20-40 mesh high-strength ceramic granules with a concentration of 10-30 kg / m³.

7. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (5), a horizontal well segmented fracturing process is adopted. The horizontal well trajectory is parallel to the reservoir strike, the spacing between fracturing segments is 10~15m, the length of each fracture segment is controlled at 5~8m, and the fracture permeability is controlled at 0.1~1D.

8. The method for mining silty clay hydrate reservoirs by first solidifying and then fracturing according to claim 1, characterized in that: In step (6), during the drainage process, resin-coated sand control agent is injected into the wellbore to suppress sand production from the reservoir.