A well arrangement method for extracting coal bed gas in a waste coal mine goaf
By precisely deploying extraction wells at the uplifted end of the goaf, the problem of low coalbed methane extraction efficiency in abandoned coal mine goaf areas has been solved, achieving efficient coalbed methane resource recovery and clean energy utilization.
Patent Information
- Application Number
- CN202611644209.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-22
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies result in low efficiency in coalbed methane extraction from abandoned coal mine goaf areas, leading to significant resource waste. Furthermore, the inaccurate well location deployment makes efficient coalbed methane extraction difficult.
Avoiding areas with abnormal water accumulation at the uplifted end of the goaf, select areas in the fracture preservation zone or partially compacted zone to lay extraction wells, drill to the top surface of the fracture zone to form a first-stage and second-stage well section, lower screen pipes and connect wellhead devices to extract coalbed methane.
This has improved the targeting and efficiency of coalbed methane extraction in goaf areas, reduced resource waste, and enabled the efficient development and utilization of clean energy from abandoned coal mines.
Smart Images

Figure CN123133757A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of abandoned coal mine development and utilization technology, and in particular to a well layout method for coalbed methane extraction in abandoned coal mine goaf areas. Background Technology
[0002] The area of goaf areas resulting from long-term, high-intensity coal mining is constantly increasing, containing abundant coalbed methane resources. Coalbed methane is a clean energy source that can be used as fuel and chemical feedstock. Extracting coalbed methane from abandoned coal mine goaf areas can alleviate natural gas shortages and provide new fields, new energy sources, and new economic growth points for coal-depleted cities and coal enterprises undergoing economic transformation. However, current research on coalbed methane in abandoned coal mine goaf areas is underdeveloped, a complete theoretical system has not yet been formed, and the deployment of surface extraction wells and the determination of stratigraphic positions are too broad, making efficient extraction of coalbed methane from abandoned coal mine goaf areas difficult. Summary of the Invention
[0003] To address the above technical problems, this invention provides a well layout method for coalbed methane extraction in abandoned coal mine goaf areas, which improves the targeting of coalbed methane extraction in goaf areas and overcomes the shortcomings of low extraction efficiency and serious resource waste in abandoned coal mine goaf areas.
[0004] To achieve the above objectives, the present invention provides the following solution: This invention provides a well layout method for coalbed methane extraction in abandoned coal mine goaf areas, comprising the following steps: Step 1: Conduct water accumulation detection in the goaf area and delineate the abnormal water accumulation zone; detect the interface locations of the bending subsidence zone, fracture zone, and collapse zone, as well as the distribution locations of the goaf fracture preservation zone, the goaf partially compacted zone, and the goaf recompacted zone; based on the detection results, select the location for the extraction wells, and place the extraction wells at the uplift end of the goaf, avoiding the abnormal water accumulation zone, and the extraction wells are located in the goaf fracture preservation zone or the goaf partially compacted zone; Step 2: Perform initial drilling, drilling to a predetermined distance above the top surface of the fracture zone to form an initial well section; Step 3: Based on the first well section, continue drilling for the second well section until drilling reaches the bottom of the goaf, forming the second well section. The first well section and the second well section together form the extraction well. Step 4: Lower a screen pipe into the extraction well, so that the lower end of the screen pipe reaches the bottom of the second well section, and the top end of the screen pipe is located above the top surface of the fracture zone. Step 5: Install a wellhead device at the wellhead of the extraction well. One side of the wellhead device is connected to the coalbed methane extraction equipment to realize the extraction of coalbed methane from the goaf.
[0005] In some implementations, in step one, multiple extraction wells are arranged in a linear, spaced manner at the uplifted end of the goaf, avoiding areas with abnormal water accumulation.
[0006] In some embodiments, the arrangement of the plurality of extraction wells is perpendicular to the inclination direction of the goaf floor.
[0007] In some embodiments, the distance between any two adjacent extraction wells is 400m to 600m.
[0008] In some implementations, in step one, transient electromagnetic methods are used to detect water accumulation in the goaf and delineate areas of abnormal water accumulation.
[0009] In some implementations, in step one, three-dimensional seismic exploration or electromagnetic sounding is used to detect the interface locations of the bending subsidence zone, the fracture zone, and the caving zone, as well as the distribution locations of the goaf fracture retention zone, the goaf partially compacted zone, and the goaf recompacted zone.
[0010] In some implementations, in step two, casing is run into the well section and cement is injected to cement the well.
[0011] In some implementations, in step two, the distance between the bottom surface of the well section and the top surface of the fracture zone is 10m to 20m.
[0012] In some embodiments, in step four, the distance between the top surface of the sieve tube and the top surface of the fissure zone is 10m to 20m.
[0013] In some embodiments, in step five, the coalbed methane extraction equipment is a drainage gas extraction equipment.
[0014] The present invention achieves the following technical effects compared to the prior art: The well layout method for coalbed methane extraction in abandoned coal mine goaf areas of this invention places the extraction wells at the uplifted end of the goaf, avoiding areas with abnormal water accumulation, and located in the fracture preservation zone or part of the compacted zone of the goaf. This precisely selects favorable areas for coalbed methane enrichment, effectively avoiding the problem of gas migration obstruction in the recompacted zone of the goaf, and improving the targeting of coalbed methane extraction in the goaf. This invention ensures that the lower end of the screen pipe reaches the bottom of the second-stage well section, and the top end of the screen pipe is located above the top surface of the fracture zone, fully conducting the coalbed methane contained in the fracture zone and caving zone. Continuous and stable gas extraction is achieved through the wellhead device and coalbed methane extraction equipment. The process is simple and highly adaptable. This method effectively improves the shortcomings of low extraction efficiency and serious resource waste in abandoned coal mine goaf areas, increases the coalbed methane recovery rate in abandoned coal mine goaf areas, and realizes the efficient development and utilization of clean energy in abandoned coal mines. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 A schematic diagram of the layout of extraction wells in the well layout method for coalbed methane extraction in abandoned coal mine goaf provided for some embodiments of the present invention. Figure 2 This is a schematic diagram of the installation of extraction wells in a well layout method for coalbed methane extraction in abandoned coal mine goaf areas provided for some embodiments of the present invention.
[0017] Explanation of reference numerals in the attached diagram: 1. Recompacted goaf area; 2. Partially compacted goaf area; 3. Fractured goaf area; 4. Upward end of goaf; 5. Goaf boundary; 6. Extraction well; 7. Goaf floor; 8. Collapse zone; 9. Fractured zone; 10. Bend and subsidence zone; 11. Surface; 12. Stress concentration zone; 13. Residual coal seam; 14. First-stage well section; 15. Casing; 16. Cement sheath; 17. Second-stage well section; 18. Screen pipe; 19. Wellhead equipment; 20. Coalbed methane extraction equipment. Detailed Implementation
[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] The purpose of this invention is to provide a well layout method for extracting coalbed methane from abandoned coal mine goaf areas, thereby improving the targeting of coalbed methane extraction in goaf areas and overcoming the shortcomings of low extraction efficiency and serious resource waste in abandoned coal mine goaf areas.
[0020] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0021] like Figures 1-2 As shown, most coal seams are inclined rather than horizontally distributed. After the inclined coal seam is mined, the original coal seam floor is exposed, forming the goaf floor 7. The inclination direction of the goaf floor 7 is the same as the dip direction of the coal seam. The goaf is inclined with the original dip angle of the original coal seam floor. The goaf space has a higher elevation at one end and a lower elevation at the other end. The side with a relatively higher elevation is the uplift end 4 of the goaf, and the side with a relatively lower elevation is the plunging end of the goaf.
[0022] The overlying strata of the goaf, from bottom to top, consist of a caving zone 8, a fracture zone 9, and a flexural subsidence zone 10, forming the "upper three zones" of the goaf. The caving zone 8 is located above the goaf floor 7, and the ground surface 11 is located above the flexural subsidence zone 10. During mining operations, pressure is released within the goaf, and the overlying load is transferred to the periphery, forming a stress concentration zone 12 around the goaf. The boundary 5 of the goaf is between the goaf and the stress concentration zone 12. Residual coal seams 13 are also distributed between the stress concentration zone 12 and the goaf floor 7 around the goaf.
[0023] The overlying rock in the middle of the goaf is gradually compacted and closed. Based on the "O-shaped ring" theory, the goaf plane consists of three horizontal zones from the inside to the outside: goaf recompaction zone 1, goaf partial compaction zone 2, and goaf fracture preservation zone 3.
[0024] The elevated end 4 of the goaf has a relatively high elevation, causing coalbed methane to accumulate and remain there due to buoyancy. This area has abundant coalbed methane and low groundwater content. Numerous mining-induced fractures are preserved in the partially compacted zone 2 and the fracture preservation zone 3 of the goaf, resulting in good connectivity of gas transport channels. Coalbed methane can flow smoothly within this fracture network, providing favorable gas production conditions for the extraction well 6. Therefore, the partially compacted zone 2 and the fracture preservation zone 3 at the elevated end 4 of the goaf are favorable locations for coalbed methane accumulation, and in this embodiment, they are selected as the preferred locations for the extraction well 6.
[0025] This embodiment provides a well layout method for coalbed methane extraction in abandoned coal mine goaf areas, including the following steps: Step 1: Conduct water accumulation detection in the goaf and delineate the abnormal water accumulation area; detect the interface positions of the curved subsidence zone 10, the fracture zone 9, and the collapse zone 8, as well as the distribution positions of the goaf fracture preservation zone 3, the goaf partial compaction zone 2, and the goaf recompactment zone 1; based on the detection results, select the location for the extraction well 6, and place the extraction well 6 at the uplift end 4 of the goaf, avoiding the abnormal water accumulation area, and the extraction well 6 is located in the goaf fracture preservation zone 3 or the goaf partial compaction zone 2.
[0026] Step 2: Perform initial drilling, drilling to a predetermined distance above the top surface of fracture zone 9 to form initial well section 14.
[0027] Step 3: Continue drilling from the first well section 14 until drilling reaches the bottom plate 7 of the goaf, forming the second well section 17. The first well section 14 and the second well section 17 form the extraction well 6.
[0028] Step 4: Lower the screen pipe 18 into the extraction well 6, so that the lower end of the screen pipe 18 reaches the bottom of the second well section 17, and the top end of the screen pipe 18 is located above the top surface of the fracture zone 9.
[0029] Step 5: Install wellhead device 19 at the wellhead of extraction well 6. One side of wellhead device 19 is connected to coalbed methane extraction equipment 20, thereby realizing the extraction of coalbed methane from the goaf.
[0030] In this embodiment, the extraction well 6 is positioned at the uplifted end 4 of the goaf, avoiding areas with abnormal water accumulation, and located in the fracture preservation zone 3 or the partially compacted zone 2 of the goaf. This precisely selects favorable areas for coalbed methane enrichment, effectively avoiding the problem of gas migration obstruction in the recompacted zone 1 of the goaf, thus improving the targeting of coalbed methane extraction in the goaf. In this embodiment, the lower end of the screen pipe 18 reaches the bottom of the second-stage well section 17, and the top end of the screen pipe 18 is located above the top surface of the fracture zone 9, fully guiding the coalbed methane stored in the fracture zone 9 and the caving zone 8. Continuous and stable gas extraction is achieved through the wellhead device 19 and the coalbed methane extraction equipment 20. The process is simple and highly adaptable. This method effectively improves the shortcomings of low extraction efficiency and serious resource waste in the goaf of abandoned coal mines, increases the coalbed methane recovery rate in the goaf of abandoned coal mines, and realizes the efficient development and utilization of clean energy in abandoned coal mines.
[0031] In some embodiments of this example, in step one, multiple extraction wells 6 are arranged in a linear, spaced manner at the upward end 4 of the goaf, avoiding areas with abnormal water accumulation.
[0032] In some embodiments of this example, the arrangement direction of multiple extraction wells 6 is perpendicular to the inclination direction of the goaf floor 7. This arrangement allows multiple extraction wells 6 to cut across the coalbed methane moving along the inclination direction of the goaf floor 7, laterally covering the favorable enrichment areas of coalbed methane at the upturned end 4 of the goaf, effectively avoiding extraction blind spots and abnormal water accumulation areas, increasing the extraction control range, and achieving efficient extraction through multi-well coordination.
[0033] In some embodiments of this example, the distance between any two adjacent extraction wells 6 is 400m to 600m. This effectively avoids interference between wells, ensures independent and stable gas production of each extraction well 6, avoids extraction blind spots, maximizes the advantages of multi-well linear coordinated extraction, and improves the overall extraction efficiency and resource utilization rate of coalbed methane in abandoned goaf areas.
[0034] In some implementations of this embodiment, in step one, transient electromagnetic method is used to detect water accumulation in the goaf and delineate the abnormal water accumulation area.
[0035] In some embodiments of this example, in step one, three-dimensional seismic exploration or electromagnetic sounding is used to detect the interface locations of the bending subsidence zone 10, the fracture zone 9, and the caving zone 8, as well as the distribution locations of the goaf fracture retention zone 3, the goaf partial compaction zone 2, and the goaf recompactment zone 1.
[0036] In some embodiments of this example, four extraction wells 6 are provided, with two extraction wells 6 located in the goaf fracture preservation zone 3 and two extraction wells 6 located in the goaf partial compaction zone 2.
[0037] The fracture preservation zone 3 in the goaf has intact fractures and high permeability, and can be used as the main gas-producing zone to ensure stable coalbed methane production. Although the partially compacted zone 2 in the goaf has undergone a certain degree of compaction of the overlying rock, the fractures have not been completely closed, and it still has the conditions for gas migration, and can collect coalbed methane diffused from the surrounding area.
[0038] The two types of well locations are combined to cover both the main gas-producing areas with high permeability and the peripheral transitional enrichment areas, avoiding the coverage limitations caused by concentrating all well locations in a single fracture section. After being arranged linearly along the uplift end of the goaf, the well group can completely cover the favorable enrichment range of the "O-shaped circle," which not only leverages the high-yield advantage of the fracture preservation zone 3 in the goaf, but also fully harvests the coalbed methane in part of the compacted zone 2 in the goaf, reduces resource leakage, further improves the overall coalbed methane recovery rate in the goaf, and achieves the effect of multi-well coordinated extraction.
[0039] It should be noted that during on-site production, the spatial morphology of different goaf areas varies considerably, and the distribution pattern of the three horizontal zones may not necessarily be as described. Figure 1 The rules shown are as follows: When the range of the goaf fracture preservation zone 3 is large, the extraction well 6 can be preferentially arranged within the goaf fracture preservation zone 3; when the range of the goaf fracture preservation zone 3 is small, the extraction well 6 can be arranged within the partially compacted zone 2 of the goaf.
[0040] In some embodiments of this example, in step two, casing 15 is run into the well section 14 and cement is injected to cement the well.
[0041] The first well section 14 is the upper wellbore formed by drilling downwards from the ground 11. It passes through the curved sinking zone 10 and is the wellbore space formed by the first well operation. It is the carrier for arranging the casing 15 and cement sheath 16.
[0042] After the casing 15 is lowered, there is an annular gap between the outer wall of the casing 15 and the well wall of the first well section 14. Cement is poured into the annular gap and solidifies to form a cement ring 16.
[0043] The casing 15 is fixed inside the first well section 14 by the cement ring 16, which effectively supports the upper loose strata of the curved subsidence zone 10, and can prevent the upper well wall rock mass from collapsing and falling, and maintain the long-term stability of the structure of the first well section 14.
[0044] The formed cement ring 16 completely fills the gap between the casing 15 and the well wall of the first well section 14, achieving formation isolation, preventing groundwater and formation gas in the curved subsidence zone 10 from entering the well, preventing external water and gas from mixing in, avoiding dilution of coalbed methane produced in the goaf, and preventing coalbed methane in the well from escaping and leaking.
[0045] In some embodiments of this example, in step two, the distance between the bottom surface of the first well section 14 and the top surface of the fracture zone 9 is 10m to 20m. That is, the final hole position of the first well section 14 is located inside the curved sinking zone 10, with a rock layer gap of 10m to 20m reserved between it and the top surface of the fracture zone 9. This ensures that there are sufficiently intact rock layers above to guarantee the construction quality of the first well cementing and cement sheath 16, avoids cement slurry from damaging the fracture zone 9 below, and at the same time, reasonably controls the drilling footage, reserving reasonable operating conditions for subsequent second-stage drilling.
[0046] In some embodiments of this example, in step three, after completing the first drilling operation, the second drilling continues downward from the bottom of the first drilling section 14, drilling through the reserved rock layer of the curved subsidence zone 10, the fracture zone 9 and the collapse zone 8 in sequence, and finally drilling to the bottom plate 7 of the goaf to terminate the drilling.
[0047] The second well section 17 is a complete connection between the fracture zone 9 and the caving zone 8, which can fully connect the fracture network developed in the goaf. Drilling to the goaf floor 7 allows the subsequently lowered screen pipe 18 to directly reach the bottom of the goaf. The screen pipe 18 completely covers the entire gas-producing space of the fracture zone 9 and the caving zone 8. Coalbed methane gathered at different heights in the goaf can smoothly enter the screen pipe 18, avoiding the inability to extract coalbed methane at the bottom, fully releasing the gas-producing capacity of the goaf, and ensuring the extraction range and efficiency of coalbed methane.
[0048] In some embodiments of this example, in step four, the distance between the top surface of the screen pipe 18 and the top surface of the fracture zone 9 is 10m to 20m. The upper part of the screen pipe 18 is located in a relatively intact rock stratum, which can protect the upper end of the screen pipe 18 and reduce the damage and blockage of the screen pipe 18 by the collapsed rock mass. At the same time, the screen pipe 18 completely covers the fracture zone 9 and the collapse zone 8, ensuring that the coalbed methane from each layer in the goaf can smoothly enter the interior of the screen pipe 18, taking into account both the service life of the screen pipe 18 and the coalbed methane diversion and extraction effect.
[0049] In some embodiments of this example, in step five, the coalbed methane extraction equipment 20 is a drainage gas extraction equipment. Using a drainage gas extraction equipment enables simultaneous drainage and gas extraction operations, promptly draining accumulated water from the wellbore, eliminating the negative impact of liquid column pressure, and promoting the continuous flow and production of coalbed methane from the fracture zone 9 and the collapse zone 8 into the wellbore. This adapts to the water-bearing conditions in the goaf and ensures the long-term stable operation of the entire extraction system.
[0050] This specification uses specific examples to illustrate the principles and implementation methods of the present invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of the present invention. Furthermore, those skilled in the art will recognize that, based on the ideas of the present invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of the present invention.
Claims
1. A well layout method for coalbed methane extraction in abandoned coal mine goaf areas, characterized in that, Includes the following steps: Step 1: Conduct water accumulation detection in the goaf area and delineate the abnormal water accumulation zone; detect the interface locations of the bending subsidence zone, fracture zone, and collapse zone, as well as the distribution locations of the goaf fracture preservation zone, the goaf partially compacted zone, and the goaf recompacted zone; based on the detection results, select the location for the extraction wells, and place the extraction wells at the uplift end of the goaf, avoiding the abnormal water accumulation zone, and the extraction wells are located in the goaf fracture preservation zone or the goaf partially compacted zone; Step 2: Perform initial drilling, drilling to a predetermined distance above the top surface of the fracture zone to form an initial well section; Step 3: Based on the first well section, continue drilling for the second well section until drilling reaches the bottom of the goaf, forming the second well section. The first well section and the second well section together form the extraction well. Step 4: Lower a screen pipe into the extraction well, so that the lower end of the screen pipe reaches the bottom of the second well section, and the top end of the screen pipe is located above the top surface of the fracture zone. Step 5: Install a wellhead device at the wellhead of the extraction well. One side of the wellhead device is connected to the coalbed methane extraction equipment to realize the extraction of coalbed methane from the goaf.
2. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step one, multiple extraction wells are arranged in a linear, spaced manner at the uplifted end of the goaf, avoiding areas with abnormal water accumulation.
3. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 2, characterized in that, The arrangement of the multiple extraction wells is perpendicular to the inclination direction of the goaf floor.
4. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 2, characterized in that, The distance between any two adjacent extraction wells is 400m to 600m.
5. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step one, the transient electromagnetic method is used to detect water accumulation in the goaf and delineate the abnormal water accumulation area.
6. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step one, three-dimensional seismic exploration or electromagnetic sounding is used to detect the interface locations of the bending subsidence zone, fracture zone, and caving zone, as well as the distribution locations of the fracture preservation zone, the partially compacted zone, and the recompacted zone in the goaf.
7. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step two, casing is run into the well section and cement is injected to cement the well.
8. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step two, the distance between the bottom surface of the first well section and the top surface of the fracture zone is 10m to 20m.
9. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step four, the distance between the top surface of the sieve tube and the top surface of the fissure zone is 10m to 20m.
10. The well layout method for coalbed methane extraction in abandoned coal mine goaf areas according to claim 1, characterized in that, In step five, the coalbed methane extraction equipment is a drainage gas extraction equipment.