A real-time correction method for logging lithology profile while drilling under the condition of side leakage and drilling
By correcting the delayed arrival time of the cuttings-carrying return flow rate under the condition of drilling while leakage, the problem of inaccurate lithology depth positioning in traditional methods was solved, achieving accurate positioning of cuttings logging and improving logging quality and exploration efficiency.
Patent Information
- Application Number
- CN202611134546.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-29
- Publication Date
- 2026-11-20
AI Technical Summary
Under the condition of drilling while leakage occurs, the traditional method of calculating the late arrival time fails to take into account the diversion effect of well leakage on the amount of sand carried back and discharged, resulting in a lag in the return of cuttings and failing to meet the accuracy requirements of lithological depth positioning. Especially under complex geological conditions, the lithological depth division and profile consistency rate is low.
The volumetric method formula is used to correct the sand-carrying backflow rate. Using the formula T=[π(D²-d²)/4Q]×H, combined with the change in circulation flow rate caused by well leakage, the delay time under the condition of drilling while leakage is present is calculated, and model formulas for different leakage types are established to correct the lithological profile depth.
Ensuring accurate placement of cuttings logging improves the accuracy of lithological depth placement, providing high-quality technical support for exploration operations and meeting logging needs under complex working conditions.
Smart Images

Figure CN123133784A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of logging technology in oil and gas exploration and development, and in particular to a method for real-time correction of lithological profiles during drilling while the system is leaking. Background Technology
[0002] Cuttings logging is the most direct and economical technique for understanding the lithology of downhole formations during oil and gas exploration and development. By analyzing the cuttings returned to the surface during drilling, key geological information such as the lithology and hydrocarbon potential of the encountered formations can be determined in real time, providing a basis for decision-making regarding geological steering, reservoir evaluation, and drilling safety. Its application spans the entire drilling process, from exploration wells to appraisal wells and development wells, and it plays an irreplaceable role in the efficient and low-cost discovery and development of oil and gas resources.
[0003] In recent years, as oil exploration and development have entered deeper and ultra-deep formations, the geological conditions at well sites have become increasingly complex. Well leakage caused by faults, fracture zones, fissures, and weak layers has become a frequent occurrence, making drilling while leakage occurs increasingly common. Under these conditions, the amount of proppant returned to the well site is diverted due to leakage, resulting in a delay in cuttings return. Using conventionally delayed cuttings retrieval methods leads to errors in lithological depth positioning, failing to meet the requirements for accurate lithological profile division in well site logging.
[0004] Delay time, as the most important parameter in cuttings logging, is fundamental to ensuring the depth of cuttings retrieval. In recent years, with the comprehensive advancement of exploration and development in the eastern South China Sea into the "dual deep, dual ancient" (deep water, deep layers, Paleogene, pre-Paleogene) field, deep fault-block oil and gas reservoirs have become the primary target. Deep fault-block oil and gas reservoirs often have abnormally developed fractures, leading to frequent complex well leakage during drilling operations, and drilling while leakage is gradually becoming the norm, posing a significant challenge to on-site geological logging operations. This is mainly manifested in the delayed return of cuttings due to well leakage, making it extremely difficult to determine the depth of formation lithology on-site, thus hindering accurate identification of formation lithology and stratigraphic division. In particular, the profile consistency rate is extremely low for the division of thin interbedded sand and mud layers in Paleogene, seriously affecting the evaluation of deep formations.
[0005] Currently, for drilling with leakage, logging mainly attempts to increase the number of sand retrievals to obtain as much cuttings as possible and maintain the continuity of the cuttings profile. Then, it measures the arrival time using physical materials such as calcium carbide and rice to ensure the accuracy of cuttings return to their original position. However, this method has low timeliness. Traditional methods for calculating arrival time and pump stroke counts only consider changes in wellbore size and depth, treating the amount of sand carried back as a fixed constant. They fail to account for the impact of leakage on the diversion of sand carried back to the original position, thus failing to provide accurate arrival times and cannot meet the requirements for cuttings return to their original position under drilling with leakage conditions. Furthermore, research indicates that there is currently no systematic and professional quantitative research in the industry regarding lithological profile correction, especially the calculation and correction of arrival time, under drilling with leakage conditions. Summary of the Invention
[0006] In view of this, the present invention aims to propose a real-time correction method for lithological profiles during drilling while leakage occurs. Focusing on the core element of logging delay time, it corrects the sand-carrying backflow rate using a volumetric formula, utilizing the formula T=[π(D 2 -d 2 [(4Q]×H) (where: H is the length from bottom of well to wellhead, m; T is the delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; Q is the circulation displacement, m³ / 4) 2 The leakage in the well ( / min) will cause a change in Q. This change in Q can be obtained by subtracting the average drilling fluid leakage rate q per minute. This relationship allows for the accurate calculation of the delay time under the condition of drilling while leakage occurs, thereby enabling real-time correction of the logging lithology profile under the condition of drilling while leakage occurs.
[0007] To achieve the above objectives, the technical solution of the present invention is as follows: a method for real-time correction of lithological profiles during drilling while leakage occurs, comprising the following steps: Step S1: Collect relevant logging parameters, including well structure, casing size, casing inner and outer diameters, drill bit depth, circulation flow rate, logging cuttings, and gas logging parameters, and initially establish a logging lithology profile while drilling. Step S2: Collect drilling-related parameters to determine if there is any well leakage; Step S3: Analyze and determine the type of leakage, distinguishing between point leakage and segmental leakage; Step S4: Under the condition of drilling while leaking, establish different model formulas according to different types of leakage encountered, and calculate the cuttings logging delay time. That is, when encountering the first point leakage, the second point leakage, the Nth point leakage, and the segmental leakage, establish model formulas to calculate the cuttings logging delay time respectively. Step S5: Based on the delay time calculated in Step S4 under the condition of drilling while leaking, perform well logging lithology profile depth correction.
[0008] Furthermore, in step S2, the wellhead return and the change in the fluid level in the active pool are used to determine whether well leakage has occurred. If leakage occurs, the depth of the leakage point / length of the leakage section, the leakage velocity, and the circulation discharge rate under the condition of drilling while leakage occur are collected. Furthermore, in step S3, the leakage type with a leakage segment length ≤ 1m is point leakage, and the leakage type with a leakage segment length > 1m is segment leakage; where the leakage segment length refers to the distance from the top to the bottom of the leakage segment.
[0009] Furthermore, in step S4, when a single point-like leakage is encountered, the formula for calculating the delay time T1 of the logging cuttings below that leakage point is as follows: T1=T 11 +T 12 T 11 =[π(D 2 -d 2 ) / 4Q]×H 11 T 12 =[π(D 2 -d 2 ) / 4(Qq)]×H 12 Where: H 11 H is the length from the leak point to the bottom of the well, in meters (m). 12 T is the length from the leakage point to the wellhead, in meters. 11 T is the drilling fluid delay time from the bottom of the well to the point of loss, in minutes. 12 T1 is the drilling fluid delay time from the leakage point to the wellhead, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in meters. 2 / min; q is the mud loss velocity, m 2 / min.
[0010] Furthermore, in step S4, when a second point-like loss is encountered, the formula for calculating the delay time T2 of the logging cuttings below that loss point is as follows: T2=T 21 +T 22 +T 23 T 21 =[π(D 2 -d 2 ) / 4Q]×H 21 T 22 =[π(D 2 -d 2 ) / 4(Q-q2)]×H 22 T 23 =[π(D2 -d 2 ) / 4(Q-q1-q2)]×H 23 Where: H 21 H is the length from leak point 2 to the bottom of the well, in meters. 22 H represents the length from leak point 1 to leak point 2, in meters. 23 T is the length from leak point 1 to the wellhead, in meters. 21 T represents the drilling fluid delay time from the bottom of the well to leak point 2, in minutes. 22 T represents the drilling fluid delay time from leak point 1 to leak point 2, in minutes. 23 T1 is the drilling fluid delay time from leak point 1 to the wellhead, in minutes; T2 is the corrected drilling fluid delay time, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in cubic meters per second. 2 / min; q1 is the mud loss velocity at leak point 1, m 2 / min; q2 is the mud loss velocity at leak point 2, m 2 / min.
[0011] Furthermore, in step S4, when the nth point-like leakage is encountered, the late arrival time T of the logging cuttings below that leakage point is... n The calculation formula is:
[0012]
[0013]
[0014] In the formula: n is a natural number ≥ 3; H i To divide the wellbore into sections according to the leak points, number them from the bottom of the well to the top in ascending order. The length of the i-th section is in meters (m). i To divide the wellbore into sections based on leakage points, number them from bottom to top in ascending order. The drilling fluid delay time for section i is given in minutes; T is the corrected drilling fluid delay time in minutes; D is the drill bit diameter in meters; d is the drill pipe outer diameter in meters; and Q is the circulation rate in meters per second. 2 / min; q i Let m be the leakage velocity at the i-th leakage point, numbered from the wellhead to the bottom of the well in ascending order. 2 / min.
[0015] Furthermore, in step S4, when a segmented lost circulation section is encountered, in the case of a vertical well, the method for calculating the late arrival time T of the logging cuttings below the lost circulation section is as follows: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3
[0016] In the formula: H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, min; T2 is the drilling fluid delay time in the lost circulation section, min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q is the mud loss velocity in the lost circulation section, m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leakage point, in meters; a is the dimensionless positive correlation coefficient between the leakage rate and the depth of the leakage point; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0017] Furthermore, in step S4, when a segmented lost circulation section is encountered during drilling, in the case of a non-vertical well, well deviation correction is required. For the case of a non-vertical well, the formula for calculating the delay time is: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3
[0018] In the formula: H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, min; T2 is the drilling fluid delay time in the lost circulation section, min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q is the mud loss velocity in the lost circulation section, m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leak point, m; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0019] Compared with existing technologies, the real-time correction method for lithological profiles in drilling while leaking is described in this invention has the following advantages: The method described in this invention can ensure that every bag of cuttings in the drilling cuttings logging "returns" to the true well depth, providing reliable "first-hand" physical evidence for stratigraphic division and correlation, and ensuring that every "oil slick" and "bubble" is recorded at the true depth, thereby improving the accuracy of lithological depth positioning in the drilling logging and providing higher quality technical support for exploration operations.
[0020] (1) This invention significantly improves the accuracy of lithological depth positioning by correcting the late arrival time under the condition of drilling while leaking, thus providing high-quality technical support for exploration operations; (2) By correcting the late arrival time under the condition of drilling while leaking, this invention improves the operational basis of logging projects under this complex condition, and provides technical support for the high-quality development of professional logging projects such as gas logging, isotope logging, and geochemical logging. (3) The accurate calculation of the late time under the condition of drilling while leaking provides a method and data basis for the accurate calculation of the oil and gas surge speed under this condition, and provides a basis for ensuring well control safety and calculating the safe operation time of the open hole; (4) The accurate correction of the late time under the condition of drilling while leaking in this invention provides certain support for promoting drilling while leaking under controllable conditions, without special leak plugging, and saving operation time. Attached Figure Description
[0021] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. In the drawings: Figure 1 A flowchart of a method for real-time correction of lithological profiles during drilling while the well is leaking is provided by the present invention; Figure 2 This is a schematic diagram illustrating the correction principle for the late arrival time of a single leak point in this invention. Figure 3 This is a schematic diagram illustrating the correction principle for the late arrival time of the two leakage points in this invention; Figure 4 This is a schematic diagram illustrating the correction principle for the late arrival time of n leakage points in this invention; Figure 5This is a schematic diagram illustrating the correction principle for the delayed arrival time of the vertical well leakage section in this invention; Figure 6 This is a schematic diagram illustrating the correction principle for the delayed arrival time of the non-vertical well leakage section in this invention.
[0022] Figure 7 Logging chart for Well A (before correction); Figure 8 Logging chart for Well A (after correction); Figure 9 Logging chart for Well B (before correction); Figure 10 Logging chart for Well B (after correction); Figure 11 Logging chart for well C (before correction); Figure 12 This is the logging chart for well C (after correction). Detailed Implementation
[0023] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other.
[0024] The present invention will now be described in detail with reference to the accompanying drawings and embodiments.
[0025] This application provides a real-time correction method for lithological profiles in drilling while the system is leaking, ensuring that every bag of cuttings logged during drilling "returns" to the true well depth. This provides reliable first-hand physical evidence for stratigraphic division and correlation, ensuring that every "oil slick" and "bubble" is recorded at the true depth, improving the accuracy of lithological depth localization in drilling while the system is leaking, and providing higher-quality technical support for exploration operations. Specifically, a real-time correction method for lithological profiles in drilling while the system is leaking, such as... Figures 1-6 As shown, it includes the following steps: Step S1: Collect relevant logging parameters and establish a preliminary logging lithology profile. The collected parameters include wellbore structure, casing size, casing inner and outer diameters, drill bit depth, circulation flow rate, logging cuttings, and gas logging parameters.
[0026] Step S2: Collect drilling-related parameters to determine if there is well leakage (determine whether well leakage has occurred based on wellhead return and changes in fluid level in the active pool; if well leakage occurs, collect data such as the depth of the leakage point / length of the leakage section, leakage velocity, and circulation discharge rate under the condition of drilling while leakage occurs). Step S3: Analyze and determine the type of leakage, distinguishing between point leakage and segmental leakage. Under conditions of drilling while leakage occurs, the leakage rate of point leakage does not increase with drilling depth, while the leakage rate of segmental leakage does increase with drilling depth. This invention defines leakage types with a leakage segment length ≤ 1m as point leakage, and leakage types with a leakage segment length > 1m as segmental leakage; where the leakage segment length refers to the distance from the top of the leakage segment to the bottom.
[0027] Step S4: Under the condition of drilling while leakage occurs, establish different model formulas according to different leakage types encountered, and calculate the cuttings logging delay time. Specifically, establish model formulas to calculate the cuttings logging delay time when encountering the first point leakage, the second point leakage, the Nth point leakage, and the segmental leakage; The actual sand-carrying backflow rate under the condition of simultaneous drilling and leakage was corrected using the volumetric method formula, and T=[π(D 2 -d 2 [(4Q]×H) (where: H is the length from bottom of well to wellhead, m; T is the delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; Q is the circulation displacement, m³ / 4) 2 Well leakage ( / min) will cause changes in the circulating displacement Q. The change in circulating displacement Q can be obtained by subtracting the average drilling fluid leakage rate q per minute. This relationship can be used to derive and calculate the delay time under the condition of drilling while leakage.
[0028] The formula for calculating the lateness time of point-based omissions is: T = T1 + T2, T1 = [π(D 2 -d 2 ) / 4Q]×H1,T2=[π(D 2 -d 2 ) / 4(Qq)]×H2 In the formula: H1 is the length from the leakage point to the bottom of the well, m; H2 is the length from the leakage point to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the well to the leakage point, min; T2 is the drilling fluid delay time from the leakage point to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; Q is the circulation displacement, m³ / h. 2 / min; q is the mud loss velocity, m 2 / min The formula for calculating the lateness time of segmented omissions is: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3
[0029] In the formula: H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, min; T2 is the drilling fluid delay time in the lost circulation section, min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q is the mud loss velocity in the lost circulation section, m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leakage point, in meters; a is the dimensionless positive correlation coefficient between the leakage rate and the depth of the leakage point; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0030] Step S5: Based on the accurate late time calculated in Step S4 under the condition of drilling while leaking, perform well logging lithology profile depth correction.
[0031] In step S4, the formula for calculating the correction of the lateness time of a single leak point is: T1=T 11 +T 12 T 11 =[π(D 2 -d 2 ) / 4Q]×H 11 T 12 =[π(D 2 -d 2 ) / 4(Qq)]×H 12 Where: H 11 H is the length from the leak point to the bottom of the well, in meters (m). 12 T is the length from the leakage point to the wellhead, in meters. 11 T is the drilling fluid delay time from the bottom of the well to the point of loss, in minutes. 12 T1 is the drilling fluid delay time from the leakage point to the wellhead, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in meters. 2 / min; q is the mud loss velocity, m 2 / min.
[0032] In step S4, the formula for calculating the correction of the late arrival time of the two leak points is as follows: T2=T 21 +T 22 +T 23 T 21 =[π(D 2 -d 2 ) / 4Q]×H 21 T 22 =[π(D 2 -d 2 ) / 4(Q-q2)]×H 22 T 23 =[π(D 2 -d 2 ) / 4(Q-q1-q2)]×H 23 Where: H 21 H is the length from leak point 2 to the bottom of the well, in meters. 22 H represents the length from leak point 1 to leak point 2, in meters. 23 T is the length from leak point 1 to the wellhead, in meters. 21 T represents the drilling fluid delay time from the bottom of the well to leak point 2, in minutes. 22 T represents the drilling fluid delay time from leak point 1 to leak point 2, in minutes. 23 T1 is the drilling fluid delay time from leak point 1 to the wellhead, in minutes; T2 is the corrected drilling fluid delay time, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in cubic meters per second. 2 / min; q1 is the mud loss velocity at leak point 1, m 2 / min; q2 is the mud loss velocity at leak point 2, m 2 / min.
[0033] Similarly, based on the above single-leak-point and two-leak-point correction ideas, if there are n leak points, the wellbore is divided into n+1 segments according to the leakage points. The late time is calculated and accumulated for each segment to achieve accurate correction of late time under multiple leak point conditions.
[0034] In step S4, the formula for calculating the correction of the late arrival time of the n leak points is:
[0035]
[0036]
[0037] In the formula: n is a natural number ≥ 3; H i To divide the wellbore into sections according to the leak points, number them from the bottom of the well to the top in ascending order. The length of the i-th section is in meters (m).i To divide the wellbore into sections based on leakage points, number them from bottom to top in ascending order. The drilling fluid delay time for section i is given in minutes; T is the corrected drilling fluid delay time in minutes; D is the drill bit diameter in meters; d is the drill pipe outer diameter in meters; and Q is the circulation rate in meters per second. 2 / min; q i Let m be the leakage velocity at the i-th leakage point, numbered from the wellhead to the bottom of the well in ascending order. 2 / min.
[0038] In step S4, the formula for calculating the correction of segmented leakage delay time is as follows: T = T1 + T2 + T3 T1=[π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3 Where: H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, min; T2 is the drilling fluid delay time from the bottom of the lost circulation section, min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; Q is the circulation displacement, m³ / h. 2 / min; q is the mud loss velocity in the leakage section, m 2 / min.
[0039] Calculating the leakage rate during the delayed time of a wellbore loss requires considering both structural factors (such as fractures, faults, and unconformities) and engineering parameters (the relationship between wellbore pressure and formation pressure, drilling fluid viscosity, and drilling fluid density). However, the time constraints of field logging, with logging windows measured in minutes, make it difficult to capture key data instantly and require lengthy interpretation, contradicting the "judgment as drilling progresses" rhythm of field logging. Therefore, this invention reasonably simplifies the relevant parameters, retains the main control variables, and eliminates variables with minor impact, allowing the determination of delayed time to meet the rhythm of field logging.
[0040] Offshore exploration wells are typically vertical wells with a small inclination (inclination angle ≤ 3°). Under these conditions, the correction for drilling fluid delay time (T2) in the lost circulation section can be considered as the section consisting of numerous leakage points. Assuming the lost circulation section is homogeneous, according to the Bernoulli effect equation in fluid mechanics, the local static pressure in the lost circulation section will change. Since the mud circulation rate Q >> the mud leakage velocity q in the lost circulation section (drilling while leaking can meet operational conditions, the leakage velocity is slow and does not interfere with normal drilling), local changes can be ignored, and the mud pressure can be simplified to equal the mud static pressure. The leakage velocity at each leakage point is positively correlated with the difference between the mud pressure and the formation fluid pressure. Under the condition of constant mud and fluid density, the leakage velocity at each leakage point is positively correlated with the depth of the leakage point. That is: q 漏点 ∝(ρ 泥浆 -ρ 流体 )gh q 漏点 ∝h In the formula: q 漏点 Let m be the leakage velocity at depth h. 2 / min; g is the acceleration due to gravity, m / s² 2 h is the depth of the leak point, in meters; ρ 泥浆 The density of the mud is kg / m³. 3 ;ρ 流体 The density of the formation fluid in the lost zone is kg / m³. 3 .
[0041] The total mud loss velocity is equal to the sum of the loss velocities at each leak point. Let 'a' be the positive correlation coefficient between the loss velocity at each leak point and the depth of the leak point, i.e.:
[0042] In the formula: H2 is the length of the leakage section, m; H3 is the length from the top of the leakage section to the wellhead, m; q 漏点 Let m be the leakage velocity at depth h. 2 / min; q is the mud loss velocity in the leakage section, m 2 / min.
[0043] Using the above formula, the positive correlation coefficient 'a' between the leakage rate and the leakage depth at the leakage point can be calculated, i.e.:
[0044] Then, the amount of sand carried back and discharged is corrected using the volumetric method formula, thereby correcting the delay time of the leakage section.
[0045] in,
[0046] Where: H2 is the length of the lost section, m; H3 is the length from the top of the lost section to the wellhead, m; T2 is the drilling fluid delay time of the lost section, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leakage point, in meters; a is the dimensionless positive correlation coefficient between the leakage rate and the depth of the leakage point; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0047] In non-vertical wells, considering that there is no fixed relationship between sounding depth and vertical depth, the vertical depth at the rear of the wellbore trajectory may even be less than that at the front. Therefore, for non-vertical wells (well inclination angle > 3°), the drilling fluid delay time (T2) correction for the lost circulation section can be considered as consisting of numerous leakage points. Assuming the lost circulation section is homogeneous, the leakage amount at each leakage point can be roughly considered to be the same. That is:
[0048] In the formula: H2 is the length of the lost section, m; H3 is the length from the top of the lost section to the wellhead, m; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leak point, m; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min. Then, the sand-carrying backflow rate is corrected using the volumetric method formula, thereby correcting the late arrival time of the leakage section in non-vertical wells, i.e.:
[0049] in,
[0050] Where: H2 is the length of the lost section, m; H3 is the length from the top of the lost section to the wellhead, m; T2 is the drilling fluid delay time of the lost section, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leak point, m; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m2 / min.
[0051] By correcting the delayed time under the condition of drilling while leakage, the accuracy of lithological depth positioning is significantly improved, providing high-quality technical support for exploration operations.
[0052] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0053] Example 1
[0054] In a domestic oilfield, the normal drilling mud circulation rate of exploration well A is 2.1 m³ / s. 3 At a drilling depth of 4527m from a borehole diameter of 215.90mm, the pump pressure decreased, the return flow reduced, the fluid level in the active pool dropped, and well leakage occurred. Under these conditions of continuous drilling while leakage occurred, the leakage rate was 12.0m / min. 3 / h (0.2m) 3 The leakage rate was 0.1 m / min (<1 m, therefore classified as point leakage); later, at 4550 m, the leakage rate increased, reaching 18.0 m / min under the condition of drilling while leaking. 3 / h (0.3m) 3 The leakage rate was 0.1m / min (<1m, therefore determined to be point leakage), and the drill pipe outer diameter was 139.70mm. Ultimately, two point leakage points were identified.
[0055] If the late arrival time of the leakage point is not corrected starting from 4527m, and the volumetric method is used directly to determine the late arrival time for cuttings relocation, the lithology relocated by this method at 4567m is brownish-gray mudstone. However, the logging curve shows the characteristics of "three lows and one high", which is a typical feature of coal seams. Figure 7 This indicates that the uncorrected drilling from the point of leakage has lithological misalignment. The longer the drilling length, the greater the error. At 4567m, the error reached 7.5m, which seriously affected the quality of the logging data.
[0056] In the face of such multiple omissions, the standard formula for calculating lateness time on-site is as follows: T a =[π(D 2 -d 2 ) / 4(Q-q1-q2)]×H = [3.14×(0.2159 2 -0.1397 2 ) / 4×(2.1-0.2-0.3)]×4567=60.72min The calculation formula for correcting the late arrival time of the two leak points using the present invention is as follows: T 21 =[π(D 2 -d 2 ) / 4Q]×H 21= [3.14×(0.2159 2 -0.1397 2 ) / (4×2.1)]×17=0.17min T 22 =[π(D 2 -d 2 ) / 4(Q-q2)]×H 22= [3.14×(0.2159 2 -0.1397 2 ) / (4×(2.1-0.3))]×23=0.27min T 23 =[π(D 2 -d 2 ) / 4(Q-q1-q2)]×H 23= [3.14×(0.2159 2 -0.1397 2 ) / (4×1.6)]×4527=60.18min T2=T 21 +T 22 +T 23 =0.17+0.27+60.18=60.62min Error before and after correction: 4567 × (60.72 - 60.62) / 60.62 = 7.5m In the formula: H is the length from the bottom of the well to the wellhead, in meters; T a H represents the time of late arrival of drilling fluid at the site, in minutes. 21 H is the length from leak point 2 to the bottom of the well, in meters. 22 H represents the length from leak point 1 to leak point 2, in meters. 23 T is the length from leak point 1 to the wellhead, in meters. 21 T represents the drilling fluid delay time from the bottom of the well to leak point 2, in minutes. 22 T represents the drilling fluid delay time from leak point 1 to leak point 2, in minutes. 23 T1 is the drilling fluid delay time from leak point 1 to the wellhead, in minutes; T2 is the corrected drilling fluid delay time, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in cubic meters per second. 2 / min; q1 is the mud loss velocity at leak point 1, m 2 / min; q2 is the mud loss velocity at leak point 2, m 2 / min.
[0057] By correcting for the late arrival time, the brownish-gray mudstone at 4567m, which had never undergone late arrival time correction, was transformed into a coal seam with corrected late arrival time, consistent with the characteristics of well logging and drilling parameters. After correction, the lithological profile was shifted downwards by 7.5m. Figure 8 The data is highly consistent with the logging data and drilling parameters, meeting the requirements for the quality of field logging data.
[0058] Example 2
[0059] A vertical exploration well (Well B) in a domestic oilfield has a mud circulation discharge rate of 2.1 m³ / s during normal drilling. 3 At a drilling depth of 5177m (215.90mm), the pump pressure decreased, the return flow reduced, and the fluid level in the active pool dropped, resulting in well leakage. The leakage length was 15m (>1m, therefore classified as segmental leakage), and the leakage velocity was 30.0m / min. 3 / h (0.5m) 3 / min), and the outer diameter of the drill pipe is 139.70mm.
[0060] Starting from the 5177m loss point, if the late arrival time of the loss point is not corrected, and the volumetric method is used directly to determine the late arrival time for cuttings relocation, the lithology relocated by this method at 5200m is brownish-gray mudstone. However, the logging curve shows a "three lows and one high" characteristic, which is a typical feature of coal seams (e.g., Figure 9 (As shown). This indicates that the uncorrected drilling from the point of leakage has lithological misalignment. The longer the drilling length, the greater the error. At 5200m, the error reaches 3.8m, which seriously affects the quality of logging data.
[0061] In the face of this type of omission, the standard formula for calculating lateness time on-site is as follows: T a =[π(D 2 -d 2 ) / 4(Qq)]×H = [3.14×(0.2159 2 -0.1397 2 ) / 4×(2.1-0.5)]×5200=69.13min The calculation formula for correcting the segmented leakage delay time using the present invention is as follows:
[0062] Where: H is the length from the bottom of the well to the wellhead, in meters; H2 is the length of the lost circulation section, in meters; H3 is the length from the top of the lost circulation section to the wellhead, in meters; q 漏点 Let m be the leakage velocity at depth h. 2 / min; q is the mud loss velocity in the leakage section, m 2 / min.
[0063] Using the above formula, the positive correlation coefficient 'a' between the leakage rate and the leakage depth at the leakage point can be calculated, i.e.:
[0064] Then, the amount of sand carried back and discharged is corrected using the volumetric method formula, thereby correcting the delay time of the leakage section, i.e.:
[0065] in,
[0066] T1=[π(D 2 -d 2 ) / 4Q]×H 1= [3.14×(0.2159 2 -0.1397 2 ) / (4×2.1)]×8=0.08min T3=[π(D 2 -d 2 ) / 4(Qq)]×H 3= [3.14×(0.2159 2 -0.1397 2 ) / (4×1.6)]×5177=68.82min T2 = 0.18 min T=T1+T2+T3=0.08+0.18+68.82=69.08min Error before and after correction: 5200 × (69.13 - 69.08) / 69.08 = 3.8m Where: H is the length from the bottom of the well to the wellhead, m; Ta is the on-site drilling fluid delay time, min; H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T2 is the drilling fluid delay time of the lost circulation section, min; T is the corrective drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leakage point, in meters; a is the dimensionless positive correlation coefficient between the leakage rate and the depth of the leakage point; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0067] By correcting for the late arrival time, the brownish-gray mudstone at 5200m that had never undergone late arrival time correction was transformed into a coal seam with late arrival time correction, which is consistent with the characteristics of well logging and drilling parameters. After correction, the lithological profile was shifted downwards by 3.8m. Figure 10 It is consistent with the logging data and drilling parameters, and meets the requirements for the quality of field logging data.
[0068] Example 3
[0069] A domestic oilfield has an exploratory well, well C, which is an inclined well. During normal drilling, the mud circulation discharge rate is 2.1 m³ / s. 3 At a drilling speed of 100 m / min, the well reached 4475 m with a borehole diameter of 215.90 mm. Pump pressure decreased, return flow reduced, and the fluid level in the active pool dropped, resulting in well leakage. The leakage length was 12 m (>1 m, therefore classified as segmental leakage), with a leakage rate of 12.0 m / min while drilling continued. 3 / h (0.2m) 3 / min).
[0070] If the delayed arrival time of the lost section is not corrected, and the volumetric method is used directly to determine the delayed arrival time for cuttings relocation, the lithology relocated by this method at 4487m~4488m is mudstone. However, the logging curve shows a "three lows and one high" characteristic, which is a typical feature of coal seams (e.g., Figure 11 (As shown). This indicates that the uncorrected drilling from the beginning of the lost section resulted in lithological misalignment. The longer the drilling length, the greater the error. After 4487m, the error reached 4.5m, which seriously affected the quality of the logging data.
[0071] In the face of this kind of omission, the formula for calculating the lateness time on site is as follows: T a =[π(D 2 -d 2 ) / 4(Qq)]×H = [3.14×(0.2159 2 -0.1397 2 ) / 4×(2.1-0.2)]×4487=69.13min The calculation formula for correcting the delayed arrival time of the lost circulation section in non-vertical wells using the present invention is as follows: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1=[3.14×(0.2159 2 -0.1397 2 ) / (4×2.1)]×8=0.08min T3=[π(D 2 -d 2) / 4(Qq)]×H3=[3.14×(0.2159 2 -0.1397 2 ) / (4×1.9)]×4475=min
[0072] =0.17min T=T1+T2+T3=0.08+0.17+68.82=69.07min Error before and after correction: 5200 × (69.13 - 69.07) / 69.07 = 4.5m In the formula: H is the length from the bottom of the well to the wellhead, m; H1 is the length from the bottom of the lost circulation section to the bottom of the well, m; H2 is the length of the lost circulation section, m; H3 is the length from the top of the lost circulation section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, min; T2 is the drilling fluid delay time in the lost circulation section, min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, min; T is the correction drilling fluid delay time, min; D is the drill bit diameter, m; d is the drill pipe outer diameter, m; q is the mud loss velocity in the lost circulation section, m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leak point, m; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
[0073] By correcting for the late arrival time, the mudstone at 4487m~4488m that was not corrected for late arrival time was transformed into a coal seam with corrected late arrival time (e.g., Figure 12 As shown in the figure, it conforms to the characteristics of logging and drilling parameters and meets the requirements for the quality of field logging data.
[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for real-time correction of lithological profiles during drilling while the system is leaking, characterized in that, Includes the following steps: Step S1: Collect relevant logging parameters, including well structure, casing size, casing inner and outer diameters, drill bit depth, circulation flow rate, logging cuttings, and gas logging parameters, and initially establish a logging lithology profile while drilling. Step S2: Collect drilling-related parameters to determine if there is any well leakage; Step S3: Analyze and determine the type of leakage, distinguishing between point leakage and segmental leakage; Step S4: Under the condition of drilling while leaking, establish different model formulas according to different types of leakage encountered, and calculate the cuttings logging delay time. That is, when encountering the first point leakage, the second point leakage, the Nth point leakage, and the segmental leakage, establish model formulas to calculate the cuttings logging delay time respectively. Step S5: Based on the delay time calculated in Step S4 under the condition of drilling while leaking, perform well logging lithology profile depth correction.
2. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S2, the wellhead return and the change in the liquid level in the active pool are used to determine whether well leakage has occurred. If well leakage has occurred, the depth of the leakage point / length of the leakage section, the leakage velocity, and the circulation discharge rate under the condition of drilling while leakage are collected.
3. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S3, the leakage type with a leakage segment length ≤ 1m is point leakage, and the leakage type with a leakage segment length > 1m is segment leakage; where the leakage segment length refers to the distance from the top to the bottom of the leakage segment.
4. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S4, when a single point-like loss is encountered, the formula for calculating the late arrival time T1 of the logging cuttings below that loss point is as follows: T1=T 11 +T 12 T 11 =[π(D 2 -d 2 ) / 4Q]×H 11 T 12 =[π(D 2 -d 2 ) / 4(Q-q)]×H 12 Where: H 11 H is the length from the leak point to the bottom of the well, in meters (m). 12 The distance from the leakage point to the wellhead is in meters (m). T 11 T is the drilling fluid delay time from the bottom of the well to the point of loss, in minutes. 12 T1 is the drilling fluid delay time from the leakage point to the wellhead, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in meters. 2 / min; q is the mud loss velocity, m 2 / min.
5. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S4, when a second point-like loss is encountered, the formula for calculating the delay time T2 of the logging cuttings below that loss point is as follows: T2=T 21 +T 22 +T 23 T 21 =[π(D 2 -d 2 ) / 4Q]×H 21 T 22 =[π(D 2 -d 2 ) / 4(Q-q2)]×H 22 T 23 =[π(D 2 -d 2 ) / 4(Q-q1-q2)]×H 23 Where: H 21 H is the length from leak point 2 to the bottom of the well, in meters. 22 H represents the length from leak point 1 to leak point 2, in meters. 23 The distance from leak point 1 to the wellhead is in meters (m). T 21 T represents the drilling fluid delay time from the bottom of the well to leak point 2, in minutes. 22 T represents the drilling fluid delay time from leak point 1 to leak point 2, in minutes. 23 T1 is the drilling fluid delay time from leak point 1 to the wellhead, in minutes; T2 is the corrected drilling fluid delay time, in minutes; D is the drill bit diameter, in meters; d is the drill pipe outer diameter, in meters; Q is the circulation displacement, in cubic meters per second. 2 / min; q1 is the mud loss velocity at leak point 1, m 2 / min; q2 is the mud loss velocity at leak point 2, m 2 / min.
6. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S4, when the nth point-like loss is encountered, the late arrival time T of the logging cuttings below that point is... n The calculation formula is: In the formula: n is a natural number ≥ 3; H i To divide the wellbore into sections according to the leak points, number them from the bottom of the well to the top of the well in ascending order. The length of the i-th section is m. T i To divide the wellbore into sections based on leakage points, number them from bottom to top in ascending order. The drilling fluid delay time for section i is given in minutes; T is the corrected drilling fluid delay time in minutes; D is the drill bit diameter in meters; d is the drill pipe outer diameter in meters; and Q is the circulation rate in meters per second. 2 / min; q i Let m be the leakage velocity at the i-th leakage point, numbered from the wellhead to the bottom of the well in ascending order. 2 / min.
7. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S4, when a segmented lost circulation section is encountered, in the case of a vertical well, the method for calculating the late arrival time T of the logging cuttings below the lost circulation section is as follows: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3 In the formula: H1 is the length from the bottom of the leakage section to the bottom of the well, m; H2 is the length of the leakage section, m; H3 is the length from the top of the leakage section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, in min; T2 is the drilling fluid delay time in the lost circulation section, in min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, in min; T is the correction drilling fluid delay time, in min; D is the drill bit diameter, in m; d is the drill pipe outer diameter, in m; q is the mud loss velocity in the lost circulation section, in m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leakage point, in meters; a is the dimensionless positive correlation coefficient between the leakage rate and the depth of the leakage point; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
8. The method for real-time correction of lithological profiles during drilling while leakage occurs, as described in claim 1, is characterized in that: In step S4, when a segmented lost circulation section is encountered during drilling, in the case of a non-vertical well, well deviation correction is required. For non-vertical wells, the formula for calculating the delay time is: T = T1 + T2 + T3 T1=π(D 2 -d 2 ) / 4Q]×H1 T3=[π(D 2 -d 2 ) / 4(Qq)]×H3 In the formula: H1 is the length from the bottom of the leakage section to the bottom of the well, m; H2 is the length of the leakage section, m; H3 is the length from the top of the leakage section to the wellhead, m; T1 is the drilling fluid delay time from the bottom of the lost circulation section to the bottom of the well, in min; T2 is the drilling fluid delay time in the lost circulation section, in min; T3 is the drilling fluid delay time from the top of the lost circulation section to the wellhead, in min; T is the correction drilling fluid delay time, in min; D is the drill bit diameter, in m; d is the drill pipe outer diameter, in m; q is the mud loss velocity in the lost circulation section, in m. 2 / min; q 漏点 Let m be the leakage velocity at depth h. 2 / min; h is the depth of the leak point, m; q 漏失段 Let m be the leakage velocity from depth h to the bottom of the leakage section. 2 / min; Q 校正 Let m be the circulating displacement at the leakage point h. 2 / min; Q is the cycle displacement, m 2 / min.
