A high-efficiency drilling and cracking integrated machine
By integrating drilling and fracturing components, and combining thermal shock and hydraulic fracturing, the problems of high energy consumption and rapid wear of vulnerable parts in existing technologies have been solved, achieving efficient and energy-saving mining results.
Patent Information
- Application Number
- CN202611355044.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-03
- Publication Date
- 2026-11-20
AI Technical Summary
The existing construction method of drilling and splitting in separate processes has problems such as frequent idle operation of equipment, high energy consumption, rapid wear of vulnerable parts, and poor construction continuity, making it difficult to achieve both energy saving and high efficiency in mining.
The drilling and fracturing components are integrated into the same drilling and fracturing base frame and share the same axis. The frictional heat of the drill bit is used to heat the borehole wall, and the cooling component delivers cold water to perform thermal shock pre-fracturing. Combined with the hydraulic fracturing component, water wedge stress is formed, which reduces equipment power loss and wear of vulnerable parts.
Significantly reduce overall machine energy consumption, extend the replacement cycle of vulnerable parts, improve construction continuity, reduce mud pollution, and achieve efficient and energy-saving mining.
Smart Images

Figure CN123133791A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mining equipment technology, specifically to a high-efficiency drilling and fracturing integrated machine. Background Technology
[0002] In rock mining operations, static hydraulic splitting technology, with its advantages of no blasting impact, high safety, and strong construction controllability, is widely used in scenarios such as hard rock stripping, ore body excavation, and roadway expansion, effectively avoiding the safety hazards and environmental disturbances of traditional blasting mining. Current static splitting construction generally adopts a split process, that is, first, drilling is completed using independent drilling equipment, and then the splitting tool is moved and aligned with the hole for hydraulic splitting. This operation mode is suitable for conventional mining conditions and can achieve stepwise rock fracturing, making it the mainstream technology in non-blasting mining.
[0003] The existing drilling, splitting, and repositioning fracturing method has many technical defects and energy consumption shortcomings in practical applications: First, the drilling and fracturing mechanisms are arranged in different positions, requiring frequent switching, repositioning, and alignment of the drilling and fracturing tools through the power mechanism during operation. This results in many no-load actions and long ineffective strokes, generating a large amount of no-load power loss and high overall energy consumption. Second, conventional pure mechanical fracturing methods rely solely on the extrusion force of wedges to break the rock mass without pre-weakening the rock mass. For dense hard rock, the hydraulic system needs to maintain a high-pressure state for a long time, resulting in large hydraulic overflow losses and high wear and tear on wedges and fracturing blades. This not only further increases mining energy consumption but also shortens the replacement cycle of vulnerable parts and reduces the continuity of construction, making it difficult to meet the energy-saving and high-efficiency requirements of mining.
[0004] Therefore, a high-efficiency drilling and fracturing integrated machine was proposed to solve the above problems. Summary of the Invention
[0005] In view of the shortcomings of the prior art, the present invention provides a high-efficiency drilling and fracturing integrated machine to solve the problems mentioned in the background art.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a high-efficiency drilling and fracturing integrated machine, comprising... A drilling and fracturing base frame, wherein a protective cavity is provided inside the drilling and fracturing base frame; The drilling assembly and the first feed assembly are both disposed in a protective cavity, and the first feed assembly can drive the drilling assembly to feed the drilling operation. The drilling assembly includes a first drive member, an output shaft and a drill bit. The output end of the first drive member is connected to the drill bit through the output shaft. The splitting assembly and the second feed assembly are both disposed within a protective cavity. The second feed assembly can drive the splitting assembly to be inserted into the borehole for splitting operations. The splitting assembly includes a splitting housing, in which symmetrical splitting blades are disposed. A wedge is disposed between two of the splitting blades. A second driving member is disposed within the splitting housing. The second driving member is used to drive the wedge to squeeze the splitting blades and split the borehole. A first through-hole coaxial with the output shaft is opened in the middle of the wedge. A cold cracking assembly is disposed on a splitting shell and is used to deliver cooling fluid to the inner wall of the borehole. At the same time, it utilizes the heat generated by the friction between the drill bit and the borehole to form a thermal shock.
[0007] Preferably, the first feeding assembly includes a feeding member fixedly installed in the protective cavity, a movable seat provided on the feeding member, and the first driving member fixedly installed on the movable seat, which can be driven to slide along the output shaft axis by the feeding member.
[0008] Preferably, the second feed assembly includes a limiting slide, which is fixedly installed inside the protective cavity. The splitting shell is slidably installed on the limiting slide via a connecting seat. A third driving member is also fixedly installed on the limiting slide, and the movable end of the third driving member is fixedly connected to the connecting seat.
[0009] Preferably, the side of the drilling and fracturing base frame is provided with a viewing window for observing the operation of the structure inside the protective cavity, and the inner diameter of the first through-hole is larger than the outer diameter of the output shaft.
[0010] Preferably, a bearing housing is fixedly installed on the split housing, and the bearing housing is movably fitted with the output shaft to radially constrain the output shaft and limit the radial displacement of the output shaft end.
[0011] Preferably, the cold cracking assembly includes an infusion pipe and a connecting pipe formed on the wedge, wherein the infusion pipe and the connecting pipe are connected, the output end of the connecting pipe is provided with an atomizing nozzle, the input end of the infusion pipe is connected to a first pump through a first flexible tube, the first pump is fixedly installed on the cracking housing, and the input end of the first pump is connected to an external cooling fluid source.
[0012] Preferably, the atomizing nozzles are symmetrically distributed on both sides of the wedge, and the atomizing nozzles and the splitting blades are arranged in a cross shape on the horizontal plane.
[0013] Preferably, the splitting assembly is further provided with a fracturing assembly, which includes a disc frame. The disc frame and the wedge are connected by an elastic telescopic member. The disc frame is also provided with a sealing mechanism and a fracturing mechanism. The sealing mechanism is used to seal the gaps between the disc frame and the output shaft and between the disc frame and the borehole wall. The fracturing mechanism is used to inject fluid into the lower part of the disc frame to increase the internal pressure of the borehole. The middle part of the disc frame is also provided with a second through hole that is the same as the axis of the output shaft. A hose clamp is also fixedly provided on the wedge.
[0014] Preferably, the sealing mechanism includes a second pump fixed on the split housing, sealing bladders are provided on both the inner and outer sides of the disc frame, a first through pipe is provided in the disc frame, the output end of the second pump is connected to the two sealing bladders in sequence through a solenoid valve, a second hose, and the first through pipe, the input end of the second pump is connected to an external water source, and the hose clamp is used to clamp and limit the second hose.
[0015] Preferably, the fracturing mechanism includes a third pump component fixedly installed on the fracturing shell, a second through pipe is provided on the plate frame, the third pump component and the second through pipe are connected by a third flexible hose, the input end of the third pump component is connected to an external water source, and the hose clamp is used to clamp and limit the third flexible hose.
[0016] Compared with the prior art, the present invention provides a high-efficiency drilling and fracturing integrated machine, which has the following beneficial effects: This invention integrates the drilling assembly and splitting assembly into the same drilling and splitting base frame and shares the same axis. After drilling is completed, there is no need for two sets of feed mechanisms to shift and align over a large range, saving the no-load power loss caused by the replacement of drilling tools and splitting tools, and greatly reducing the basic energy consumption of the whole machine. Unlike the structure of split equipment with separate sliding feed devices, the whole machine structure is more compact and has stronger adaptability to narrow mine roadways and foundation pit working conditions.
[0017] This invention utilizes the self-generated heat from the friction of the drill bit during drilling to heat the borehole wall, while the cold cracking component immediately delivers cold water to chill the rock wall. The surface of the rock mass shrinks rapidly, generating dense network microcracks, which reduces the tensile strength of the rock in advance. The peak oil pressure required for subsequent wedge splitting is significantly reduced, shortening the high-pressure holding time and reducing the overflow heat loss of the hydraulic system. At the same time, it reduces the friction and wear of the splitting blades and wedges, and extends the replacement cycle of vulnerable parts.
[0018] The fracturing assembly of this invention seals the upper space of the borehole through a sealing bladder, and the third pump injects high-pressure water into the sealed cavity to form radial water wedge stress throughout the entire area. The water seeps into the micro-cracks generated by thermal shock to assist in the expansion of the cracks, which are bidirectionally coupled with the mechanical extrusion force of the wedge block, further reducing mining energy consumption.
[0019] This invention achieves three functions simultaneously: hot and cold pre-fracture of the rock wall, gentle cooling of the drill bit, and source dust suppression inside the fracture by cooling clean water. It eliminates the need for an additional independent external spray dust suppression device, reduces the need for supporting water pumps and pipeline layout, and lowers equipment manufacturing costs and the problem of messy pipelines on site. The water is confined inside the borehole, resulting in lower water consumption and preventing large-scale mud pollution on the working face. Attached Figure Description
[0020] Figure 1 This is a perspective view of the main structure of the present invention; Figure 2 This is a side view of the main structure of the present invention; Figure 3 This is a three-dimensional view of the relevant structures within the drilling and fracturing base frame of the present invention; Figure 4 These are structural diagrams of the splitting assembly and the second feed assembly of the present invention. Figure 5 This is a three-dimensional schematic diagram of the relevant structures within the splitting assembly of the present invention; Figure 6 This is a cross-sectional view of the relevant structures within the splitting assembly of the present invention; Figure 7 For the present invention Figure 6 Enlarged view of the structure of region A in the middle; Figure 8 This is a perspective view of the related structures of the cold cracking component and the fracturing component of the present invention; Figure 9 This is a cross-sectional view of the relevant structure of the fracturing component of the present invention.
[0021] Figure label: 1. Drilling and splitting base frame; 11. Protective cavity; 12. Viewing window; 2. Drilling assembly; 21. First drive component; 22. Output shaft; 23. Drill bit; 3. First feed assembly; 31. Feed component; 32. Moving seat; 4. Splitting assembly; 41. Splitting housing; 42. Splitting blade; 43. Wedge; 44. Second drive component; 45. First through-shaft hole; 46. Bearing seat; 5. Second feed assembly; 51. Limiting slide; 52. Third drive component; 53. Connecting seat; 6. Cold cracking assembly 61. Infusion tube; 62. Connecting tube; 63. Atomizing nozzle; 64. First hose; 65. First pump component; 7. Fracturing assembly; 71. Disc frame; 72. Elastic telescopic component; 73. Sealing mechanism; 74. Fracturing mechanism; 75. Second through-shaft hole; 76. Hose clamp; 731. Second pump component; 732. Sealing bladder; 733. First connecting tube; 734. Solenoid valve; 735. Second hose; 741. Third pump component; 742. Second connecting tube; 743. Third hose. Detailed Implementation
[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0023] In the description of this invention, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0024] In addition, a fixed connection refers to a connection in which parts or components are fixed and there is no relative movement; a transmission connection refers to a connection in which mechanical motion or torque is transmitted to other working parts through a transmission component; a sliding connection refers to a connection in which two objects are in contact but not fixed and can slide relative to each other; and a rotational connection refers to a connection in which two objects are in contact but not fixed and can rotate relative to each other.
[0025] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.
[0026] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments.
[0027] Example 1, please refer to Figures 1 to 7 As shown: To address the problems mentioned in the technical solutions, this application provides a high-efficiency drilling and fracturing integrated machine, including a drilling and fracturing base frame 1. A protective cavity 11 is provided inside the drilling and fracturing base frame 1. The drilling and fracturing base frame 1 is a rectangular closed frame structure, and the overall weight is suitable for hoisting and installation on small and medium-sized mining tunneling trolleys. The protective cavity 11 is enclosed on all sides, with only the front end open for drilling and splitting operations, preventing mine flying rocks and mud from entering the internal feed and transmission components. A drilling assembly 2 and a first feed assembly 3 are both located within the protective cavity 11, and the first feed assembly 3 can drive the drilling assembly 2 to perform drilling operations. The drilling assembly 2 includes a first drive component 21, an output shaft 22, and a drill bit 23. The output end of the first drive component 21 is connected to the drill bit 23 through the output shaft 22. The first drive component 21 uses a low-speed, high-torque hydraulic rotary mechanism. A rotary motor; a splitting assembly 4 and a second feed assembly 5, both of which are located within the protective cavity 11. The second feed assembly 5 can drive the splitting assembly 4 to be inserted into the borehole for splitting operations. The splitting assembly 4 includes a splitting housing 41, in which symmetrical splitting blades 42 are provided. A wedge block 43 is provided between the two splitting blades 42. A second driving member 44 is provided within the splitting housing 41. The second driving member 44 is used to drive the wedge block 43 to squeeze the splitting blades 42 and split the borehole. A first through-hole 45 coaxial with the output shaft 22 is opened in the middle of the wedge block 43. The second driving member 44 is a high-pressure hydraulic cylinder; a cold splitting assembly 6, which is located on the splitting housing 41 and is used to deliver cooling fluid to the inner wall of the borehole. At the same time, it uses the heat generated by the friction between the drill bit 23 and the borehole to form a thermal shock. During actual drilling operations, the drill bit 23 continuously cuts the rock wall, generating heat through friction. The temperature of the rock mass rises, and the cold cracking component 6 delivers low-temperature water, which is then sprayed onto the high-temperature rock wall. This causes the surface of the rock mass to rapidly contract, creating a large temperature gradient and generating a network of microcracks within the rock mass, thus reducing the rock's tensile strength beforehand. The first feed component 3 includes a feed element 31 fixedly installed within the protective cavity 11. A movable seat 32 is mounted on the feed element 31, and the first drive element 21 is fixedly installed on the movable seat 32. The feed element 31 drives the movable seat 32 to slide axially along the output shaft 22. The feed element 31 is a conventional feed guide rail device. A telescopic bellows dust cover is fitted around the movable seat 32 where it mates with the guide rail. During drilling operations, the dust cover extends and retracts synchronously with the movable seat 32, preventing rock dust and mud generated during drilling from entering the guide rail sliding gap and avoiding guide rail jamming and wear. The second feed assembly 5 includes a limiting slide 51, which is fixedly installed inside the protective cavity 11. The splitting housing 41 is slidably installed on the limiting slide 51 via a connecting seat 53. A third drive component 52 is also fixedly installed on the limiting slide 51. The movable end of the third drive component 52 is fixedly connected to the connecting seat 53. The third drive component 52 is a push-pull hydraulic cylinder. After drilling is completed, the cylinder extends, driving the entire splitting assembly 4 to feed along the output shaft 22 and extend into the borehole. After splitting is completed, the cylinder retracts, realizing the automatic withdrawal of the splitting assembly 4.
[0028] Preferably, the cold cracking assembly 6 includes an infusion pipe 61 and a connecting pipe 62 opened on the wedge block 43, and the infusion pipe 61 and the connecting pipe 62 are connected. The output end of the connecting pipe 62 is provided with an atomizing nozzle 63. The input end of the infusion pipe 61 is connected to a first pump 65 through a first hose 64. The first pump 65 is fixedly installed on the cracking housing 41, and the input end of the first pump 65 is connected to an external cooling fluid source.
[0029] Among them, the first pump component 65 is a small high-pressure water pump with three plungers, with an output water pressure of 20MPa; the infusion pipe 61 and the connecting pipe 62 are fluid channels integrally cast inside the wedge block 43, eliminating the risk of leakage from external pipelines; the first flexible hose 64 is a high-pressure, bend-resistant rubber water pipe, suitable for reciprocating feed motion; secondly, the atomizing nozzle 63 sprays low-temperature fluid toward the borehole wall, where the low-temperature fluid first comes into full contact with the high-temperature borehole wall, absorbing heat from the rock wall to complete heat exchange, and the heated fluid flows down along the inner wall of the borehole to the surface of the drill bit 23, achieving gentle cooling of the drill bit 23; after the fluid absorbs heat from the rock wall in advance, the temperature difference is greatly reduced, avoiding the direct impact of the low-temperature fluid on the high-temperature drill bit 23 to produce violent hot and cold changes, effectively preventing the carbide cutting teeth of the drill bit 23 from becoming brittle and chipped due to thermal shock.
[0030] Preferably, the atomizing nozzles 63 are symmetrically distributed on both sides of the wedge block 43, and the atomizing nozzles 63 and the split blades 42 are arranged in a cross shape on the horizontal plane.
[0031] Specifically, the two sets of atomizing nozzles 63 pre-crack the holes by thermal expansion and contraction on both sides of the hole wall. Due to the embrittlement of the holes on both sides, the cracks can be split in a relatively fixed direction to improve the safety of mining operations.
[0032] Preferably, the side of the drilling base frame 1 is provided with a viewing window 12 for observing the operation of the structure inside the protective cavity 11, and the inner diameter of the first through hole 45 is larger than the outer diameter of the output shaft 22.
[0033] Preferably, a bearing housing 46 is fixedly installed on the split housing 41, and the bearing housing 46 is movably fitted with the output shaft 22 to radially constrain the output shaft 22 and limit the radial displacement of the end of the output shaft 22.
[0034] Specifically, the inner ring of the bearing housing 46 is tightly fitted to the outer wall of the output shaft 22; throughout the drilling operation, the bearing forms a remote auxiliary support at the end of the output shaft 22 away from the first driving component 21, constraining the radial displacement of the end of the output shaft 22, greatly reducing the eccentric vibration generated by the high-speed rotation of the long drill rod, reducing the impact wear of the drill bit 23, and improving the straightness of the drilling.
[0035] For a further embodiment two, please refer to Figure 1 , Figures 4 to 6 , Figure 8 and Figure 9 As shown: The splitting assembly 4 is also equipped with a fracturing assembly 7, which includes a disc frame 71. The disc frame 71 is connected to the wedge block 43 by an elastic telescopic member 72. The disc frame 71 is also equipped with a sealing mechanism 73 and a fracturing mechanism 74. The sealing mechanism 73 is used to seal the gap between the disc frame 71 and the output shaft 22 and between the disc frame 71 and the borehole wall. The fracturing mechanism 74 is used to inject fluid into the lower part of the disc frame 71 to increase the internal pressure of the borehole. The middle part of the disc frame 71 is also provided with a second through hole 75 that is the same as the axis of the output shaft 22. A hose clamp 76 is also fixedly installed on the wedge block 43. The sealing mechanism 73 includes a second pump component 731 fixed to the fracturing housing 41. Sealing bladders 732 are provided on both the inner and outer sides of the frame 71. A first through pipe 733 is provided inside the frame 71. The output end of the second pump component 731 is connected to the two sealing bladders 732 sequentially via a solenoid valve 734, a second flexible hose 735, and the first through pipe 733. The input end of the second pump component 731 is connected to an external water source. A hose clamp 76 is used to clamp and limit the second flexible hose 735. The fracturing mechanism 74 includes a third pump component 741 fixedly installed on the fracturing housing 41. A second through pipe 742 is provided on the frame 71. The third pump component 741 is connected to the second through pipe 742 via a third flexible hose 743. The input end of the third pump component 741 is connected to an external water source, and the hose clamp 76 is used to clamp and limit the third flexible hose 743.
[0036] Among them, the elastic telescopic component 72 is composed of a telescopic rod and a spring. When the splitting component 4 extends into the borehole and the two sealing bladders 732 are in the state of sealing the borehole, the elastic telescopic component 72 can adaptively extend and retract as the second driving component 44 drives the wedge block 43 to move. The hose clamp 76 is an elastic U-shaped buckle that neatly stores each water supply hose, avoiding pipe entanglement, squeezing and damage during the feeding process.
[0037] The sealing bladder 732 is made of thickened aramid fiber reinforced rubber. After inflation, its inner side fits against the outer wall of the output shaft 22 and its outer side fits against the inner wall of the borehole, forming a completely sealed high-pressure water chamber under the frame 71. The solenoid valve 734 is linked with the hydraulic control system of the whole machine. It automatically starts filling water during the sealing and filling stage and automatically depressurizes after the operation is completed, making it convenient for the equipment to exit the borehole. The second pump 731 is a low-pressure water pump, which is only used for filling the sealing bladder 732 and has extremely low energy consumption.
[0038] The third pump component 741 is a high-flow-rate, high-pressure water pump. After the sealing bladder 732 completes the sealing, the third pump component 741 continuously delivers high-pressure clean water to the sealed cavity, forming a full-area radial water pressure inside the borehole. The high-pressure water penetrates the micro-cracks generated by thermal shock, forming a hydraulic wedge expansion force, which works in tandem with the outward mechanical extrusion force of the wedge block 43, significantly reducing the hydraulic load required for splitting and achieving energy-saving mining of the whole machine. Furthermore, as the cracks enlarge, clean water is filled in, further reducing the generation of splitting dust.
[0039] The working principle of all the content in the above embodiments is as follows: Step 1: Fix the drilling frame 1 to the front end of the mining tunneling equipment and align it with the rock mass to be mined; start the first drive component 21 to drive the output shaft 22 and drill bit 23 to rotate, and the first feed component 3 drives the drilling component 2 to move forward axially as a whole. The drill bit 23 cuts the rock mass to form a borehole; the bearing inside the bearing seat 46 throughout the drilling process radially constrains the far end of the output shaft 22, suppresses the eccentric vibration of the drill rod, and ensures that the borehole is straight.
[0040] Step 2: After the borehole reaches the preset depth, keep the entire set of equipment in place without retracting the drill rod or moving to change tools; start the third drive unit 52 to drive the entire splitting assembly 4 to feed along the output shaft 22 into the borehole; start the first pump unit 65, and cold water is sprayed from the atomizing nozzle 63 through the infusion pipe 61 and the connecting pipe 62, spraying onto the high-temperature borehole wall. The rock wall cools and contracts rapidly, generating a large number of microcracks; the cold water flows downwards to simultaneously and gently cool the drill bit 23, preventing the drill bit 23 from breaking due to thermal shock, and at the same time initially wetting the rock powder to suppress the internal dust dispersion.
[0041] Step 3: Start the second pump 731, solenoid valve 734 is turned on, and clean water is introduced into the inner and outer sealing bladders 732. The sealing bladders 732 expand the gap between the sealing disc frame 71 and the output shaft 22 and the hole wall, forming a closed water cavity below the disc frame 71. Then start the third pump 741, and high-pressure clean water is introduced into the closed water cavity, applying radial water pressure to the rock mass. The water seeps into the micro-cracks generated by the previous thermal shock, forming a hydraulic wedge-assisted expansion.
[0042] Step 4: While the hydraulic wedge assists in the expansion in step 3, the second drive component 44 is activated. The hydraulic cylinder drives the wedge block 43 downward, and the conical surface of the wedge block 43 squeezes the two side splitting blades 42 to expand outward. The mechanical splitting force and the deep high-pressure water wedge stress are coupled in both directions, and the rock mass is rapidly penetrated and cracked along the pre-fabricated micro-cracks. During the cracking process, the continuously introduced cold water fills the newly formed cracks and encapsulates the broken rock powder into mud, eliminating dry dust from the source without the need for additional external spraying devices.
[0043] Step 5: After the rock mass is completely cracked, the third pump component 741 and the first pump component 65 stop, the solenoid valve 734 reverses to release pressure, and the sealing bladder 732 contracts to release the hole seal; the second drive component 44 drives the wedge block 43 to retract upwards, and the splitting blade 42 retracts; the third drive component 52 pulls the entire splitting assembly 4 backwards to reset; finally, the first feed assembly 3 drives the drilling assembly 2 to retract, the whole machine resets, and the single drilling and splitting operation is completed, and the machine can directly switch to the next hole position for continuous construction.
[0044] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0045] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A high-efficiency drilling and fracturing integrated machine, characterized in that: include A drilling and fracturing base frame (1) is provided with a protective cavity (11). The drilling assembly (2) and the first feed assembly (3) are both located in the protective cavity (11), and the first feed assembly (3) can drive the drilling assembly (2) to feed the drilling operation. The drilling assembly (2) includes a first drive member (21), an output shaft (22) and a drill bit (23). The output end of the first drive member (21) is connected to the drill bit (23) through the output shaft (22). The splitting assembly (4) and the second feed assembly (5) are both located in the protective cavity (11). The second feed assembly (5) can drive the splitting assembly (4) to be inserted into the borehole for splitting operations. The splitting assembly (4) includes a splitting housing (41). Symmetrical splitting blades (42) are provided in the splitting housing (41). A wedge (43) is provided between the two splitting blades (42). A second driving member (44) is provided in the splitting housing (41). The second driving member (44) is used to drive the wedge (43) to squeeze the splitting blades (42) and split the borehole. A first through hole (45) coaxial with the output shaft (22) is opened in the middle of the wedge (43). The cold cracking assembly (6) is disposed on the splitting shell (41) and is used to deliver cooling fluid to the inner wall of the borehole. At the same time, it uses the heat generated by the friction between the drill bit (23) and the borehole to form a thermal shock.
2. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: The first feed assembly (3) includes a feed member (31) fixedly installed in the protective cavity (11). A movable seat (32) is provided on the feed member (31). The first drive member (21) is fixedly installed on the movable seat (32). The feed member (31) can drive the movable seat (32) to slide axially along the output shaft (22).
3. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: The second feed assembly (5) includes a limiting slide (51), which is fixedly installed in the protective cavity (11). The splitting shell (41) is slidably installed on the limiting slide (51) via a connecting seat (53). A third driving member (52) is also fixedly installed on the limiting slide (51), and the movable end of the third driving member (52) is fixedly connected to the connecting seat (53).
4. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: The side of the drilling and fracturing base frame (1) is provided with a viewing window (12) for observing the operation of the structure inside the protective cavity (11). The inner diameter of the first through-hole (45) is larger than the outer diameter of the output shaft (22).
5. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: A bearing seat (46) is fixedly installed on the split housing (41). The bearing seat (46) is movably fitted with the output shaft (22) to constrain the output shaft (22) radially and limit the radial displacement of the end of the output shaft (22).
6. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: The cold cracking assembly (6) includes an infusion pipe (61) and a connecting pipe (62) opened on the wedge (43), and the infusion pipe (61) and the connecting pipe (62) are connected. The output end of the connecting pipe (62) is provided with an atomizing nozzle (63). The input end of the infusion pipe (61) is connected to a first pump (65) through a first hose (64). The first pump (65) is fixedly installed on the cracking housing (41), and the input end of the first pump (65) is connected to an external cooling fluid source.
7. The high-efficiency drilling and fracturing integrated machine according to claim 6, characterized in that: The atomizing nozzles (63) are symmetrically distributed on both sides of the wedge (43), and the atomizing nozzles (63) and the split blades (42) are arranged in a cross shape on the horizontal plane.
8. The high-efficiency drilling and fracturing integrated machine according to claim 1, characterized in that: The splitting assembly (4) is also provided with a fracturing assembly (7), which includes a disc frame (71). The disc frame (71) and the wedge (43) are connected by an elastic telescopic member (72). The disc frame (71) is also provided with a sealing mechanism (73) and a fracturing mechanism (74). The sealing mechanism (73) is used to seal the gap between the disc frame (71) and the output shaft (22) and between the disc frame (71) and the borehole wall. The fracturing mechanism (74) is used to inject fluid into the lower part of the disc frame (71) to increase the internal pressure of the borehole. The middle part of the disc frame (71) is also provided with a second through hole (75) with the same axis as the output shaft (22). The wedge (43) is also fixedly provided with a hose clamp (76).
9. The high-efficiency drilling and fracturing integrated machine according to claim 8, characterized in that: The sealing mechanism (73) includes a second pump (731) fixed on the split housing (41). Sealing bladders (732) are provided on both the inner and outer sides of the disc frame (71). A first through pipe (733) is provided inside the disc frame (71). The output end of the second pump (731) is connected to the two sealing bladders (732) in sequence through a solenoid valve (734), a second hose (735), and the first through pipe (733). The input end of the second pump (731) is connected to an external water source. The hose clamp (76) is used to clamp and limit the second hose (735).
10. The high-efficiency drilling and fracturing integrated machine according to claim 8, characterized in that: The fracturing mechanism (74) includes a third pump (741) fixedly installed on the fracturing housing (41). A second through pipe (742) is provided on the plate frame (71). The third pump (741) and the second through pipe (742) are connected by a third hose (743). The input end of the third pump (741) is connected to an external water source, and the hose clamp (76) is used to clamp and limit the third hose (743).