A method for collaborative operation of open-pit mining-construction-discharge-reclamation and carbon storage

By dividing the open-pit mine working face into continuous advancing units and adopting stepped staggered construction, the optimal layout of CO₂ storage tanks was determined, and a composite load-bearing structure and seepage-proof covering system were constructed. This solved the problem of insufficient connection between CO₂ storage facilities and the dynamic advancing process of the open-pit mine, and achieved efficient CO₂ sealing and mine resource utilization.

CN123133801APending Publication Date: 2026-11-20CHINA UNIV OF MINING & TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611647860.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing CO₂ storage facilities are not well integrated with the dynamic development process during open-pit mining, occupy internal drainage space, cause interference with mining and drainage equipment operation and delay reclamation, and lack flexibility in space utilization and functional integration.

Method used

The open-pit mine working face is divided into multiple continuously advancing operation units. A stepped spatial staggered construction method is adopted. The optimal layout volume and replacement rate of CO₂ storage tanks are determined by formula derivation. A composite load-bearing structure is constructed and combined with an anti-seepage covering system to achieve coordinated operation of mining, soil dumping, reclamation and CO₂ storage.

Benefits of technology

It achieves a high degree of spatiotemporal coordination between mining, spoil disposal, reclamation and CO₂ storage, improves the overall operational efficiency of open-pit mines, ensures maximum space utilization and mechanical balance, prevents spoil heap subsidence and slope instability, and realizes the long-term safe storage of CO₂ and the resource utilization and ecological restoration of abandoned mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123133801A_ABST
    Figure CN123133801A_ABST
Patent Text Reader

Abstract

The application discloses a method for open-pit mine mining-construction-reclamation-reclamation and carbon storage cooperation, and belongs to the field of open-pit mine mining and carbon storage. The working face is divided into multiple continuous advancing operation units, so that mining, construction, backfilling and reclamation are carried out in a staggered space simultaneously. A target construction area is determined in the current construction unit, the maximum allowable total volume, the number and the spacing of the CO2 storage boxes are determined according to the available geometric space volume and the bearing capacity constraints. A composite anti-seepage coating system is constructed on the side and top of the CO2 storage box, and the surrounding and top layer is piled with stripped materials to form an overlying pile layer. After the design thickness is reached, the reclamation isolation layer, the improved soil layer and the topsoil layer are sequentially laid and vegetation reconstruction is carried out. The application realizes the cooperation of carbon storage and land ecological restoration, and effectively utilizes the waste mine space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of open-pit mining and carbon sequestration, specifically relating to a method for coordinated operation of open-pit mining-construction-drainage-recovery and carbon storage. Background Technology

[0002] During open-pit mining, the mining face continuously advances, creating a dynamically changing mining pit space. Simultaneously, the overburden, after being disposed of in layers, forms artificial strata in the inner or outer spoil heaps, which can be leveled, compacted, and reused. Currently, mining, spoil disposal, and reclamation operations are typically organized separately as different processes. The location of CO2 storage facilities is often limited to the mining pit or fixed storage space. This lack of full utilization of the artificial strata formed by the disposed materials in the spoil heaps easily leads to problems such as increased spoil disposal distances, secondary handling of overburden, slow post-mining space turnover, and untimely phased reclamation.

[0003] Existing technologies also disclose schemes for setting up CO2 storage spaces within mine pits, spoil heaps, or goaf areas. For example, prior art publication CN117403624A discloses a method for constructing an internal spoil heap using a carbon dioxide storage tank based on fly ash-based cementitious materials. This method utilizes the cementitious properties of fly ash from mine-fired power plants to prepare ultra-high-content fly ash-based cementitious materials. These high-strength materials are used to construct the carbon dioxide storage tank, and low-strength, cement-free fly ash-based cementitious materials are used to backfill the open-pit mine, achieving resource utilization and efficient co-processing of fly ash solid waste. The carbon dioxide storage tank is constructed within the internal spoil heap space. However, this method suffers from insufficient construction sequence and spatial coordination, poor space utilization flexibility, imprecise load-bearing capacity assessment and verification methods, low functional integration, and a lack of dynamic feedback and adjustment mechanisms. These schemes only address how CO2 is stored or how the storage facilities support it, but do not fully solve the problem of how to integrate CO2 storage facilities into the continuous operation process of open-pit mines. If the storage facilities are laid out as an independent project, they are likely to occupy internal drainage space, interfere with the operation of mining and drainage equipment, and cause waiting between construction, soil dumping and reclamation. Summary of the Invention

[0004] To address the shortcomings of existing technologies, this invention provides a method for the coordinated operation of open-pit mining, construction, drainage, and reclamation with carbon storage. This method solves problems such as insufficient integration between existing CO2 storage facilities and the dynamic progress of open-pit mining, storage facilities occupying internal drainage space, waiting between different processes, and delayed reclamation. The optimal layout volume and replacement rate are derived through formula derivation, solving the fundamental problem of ensuring long-term safety under conditions of limited solid waste carrying capacity. To achieve the above objectives, this invention discloses a method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations, comprising the following steps: S1. Divide the open-pit mine working face into multiple continuously advancing operation units along the strike, and carry out the construction of multiple adjacent operation units in a stepped spatial staggered manner. S2. Select the target construction area within the current construction operation unit and determine the effective layout space for the CO2 storage tank; S3. Determine the maximum allowable total volume of CO2 storage tanks based on the available geometric space volume and bearing capacity constraints of the target construction area; S4. Based on the maximum allowable total volume and box size, determine the number of CO2 storage boxes to be installed and the spacing between adjacent boxes, and construct a composite anti-seepage covering system on the sides and top of the boxes; S5. Layer the stripped material around and on top of the CO2 storage tank to form an overburden layer. After the designed cover thickness is reached, lay the reclamation isolation layer, improved soil layer and topsoil layer in sequence and carry out vegetation reconstruction.

[0005] Furthermore, in S1, the current construction unit is the (N-1)th construction unit; N represents the sequence number of the current construction unit, and N is an integer greater than or equal to 4; the staggered spatial construction method for multiple adjacent construction units is to ensure that the mining of the Nth construction unit, the construction of the N-1th construction unit, the backfilling of the N-2th construction unit, and the reclamation of the N-3th construction unit are carried out simultaneously.

[0006] Furthermore, in S2, based on the spatial elevation status of the mining task operation unit, under the premise of meeting the conditions of leveling, hoisting, drainage, bearing or slope stability, one or more of the following are selected as the target construction area: the direct bottom plate area of ​​the mine pit, the slope toe area of ​​the internal spoil heap, and the area between the artificial spoil heap steps, thereby determining the effective geometric spatial boundary and location of the pre-deployed CO2 storage box. The effective geometric space boundary for the CO2 storage tanks pre-installed in the target construction area needs to be determined by deducting the operating turning radius of excavators and trucks, the reserved width of transport platforms, the volume occupied by drainage ditches and slope safety retaining walls, in order to obtain the usable geometric space volume of the target construction area. .

[0007] Furthermore, the specific steps of S3 are as follows: CO2 storage tanks are deployed at intervals or continuously within the target construction area, and the total allowable deployment volume of the CO2 storage tanks is... Take the upper limit of spatial constraints With upper limit of bearing constraint The smaller of the values ​​is used as the maximum allowable total volume of CO2 storage tanks within the target construction area to prevent exceeding the physical space and load-bearing limits. Among them, the upper limit of spatial constraints With upper limit of bearing constraint Determined in the following manner: Upper limit of spatial constraints: ; Upper limit of load-bearing constraints: ; in, The available geometrical volume of the target construction area. The additional waste disposal space volume released after the box structure is installed at the toe of the inner waste disposal slope to raise the inner waste disposal slope angle. The looseness coefficient of the stripped material. This represents the actual volume of the stripped material that needs to be discharged internally during the current operation unit. To reserve volume for topsoil reclamation and cover layer, Reserved volume for transportation, hoisting, and drainage channels. The volume reduction is due to the excavation of slopes and unusable corner spaces. This represents the maximum permissible area replacement ratio. Using the calculated upper limit of spatial constraints and upper limit of load constraint Determine the total allowable layout volume The total volume allowed for layout The sum of the outer contour volumes of all CO2 storage tanks within the target construction area is limited, and the total outer contour volume must not exceed the allowable total volume. This is to ensure that carbon storage operations do not damage the overall slope stability and soil bearing capacity of the open-pit mine.

[0008] Furthermore, the maximum permissible area replacement ratio The following load-bearing requirements must be met: ; In the formula, Vertical compressive strength of a single CO2 storage tank; The design allowable bearing capacity after long-term deformation is considered for the support strip between adjacent boxes to compact and discharge waste materials. Safety factor for composite structures; The average bulk density of the overlying waste layer; The total design thickness of the overlying waste removal layer.

[0009] Furthermore, in S4, based on the maximum allowable total volume and container dimensions, the number of CO2 storage containers and the spacing between adjacent containers are determined. The specific process is as follows: When CO2 storage tanks are arranged in a regular grid pattern, the longitudinal spacing is: The horizontal spacing is At that time, the actual area replacement rate for: ;in The length of the CO2 storage tank. Width of the CO2 storage tank; by As constraints, the longitudinal layout spacing is calculated based on the set upper limit of the actual area replacement rate and the preset spacing relationship. Or horizontal spacing According to the formula Determine the theoretical maximum number of deployments ,in The final number of CO2 storage tanks deployed is determined by the outer contour volume of a single CO2 storage tank. satisfy , It is a positive integer; When backfilling and compacting waste materials between adjacent CO2 storage tanks, the spacing between them is the net width of the support strip; when there is no space between adjacent CO2 storage tanks, the spacing between them is the tank spacing.

[0010] Furthermore, when the target construction area is selected as the toe area of ​​the internal spoil heap, the upper limit of the spatial constraint is... In Perform the following specific calculations: Setting the slope stability safety factor Provided that the slope is not less than the design allowable value, the maximum slope angle that meets the stability requirements is taken as the check allowable slope angle based on the geomechanical parameters of the target construction area, the vertical load of the CO2 storage tank, and the gravity load of the overlying waste layer. ; The slope angle was changed from the original design slope angle. Increase to the allowable slope angle for verification For simplifying a single slope, the additional volume of soil removal space released Determine using the following formula: ; in, The original design slope angle, To verify the allowable slope angle, Because of the slope height, The length to be laid along the toe of the slope.

[0011] Furthermore, when the target construction area is located in the area of ​​the direct bottom slab of the mine pit or the area between artificial spoil steps, a bearing area is formed by a spaced layout. A support strip formed by compacted spoil material is retained between adjacent CO2 storage tanks. At this time, the longitudinal and transverse layout spacings correspond to the net width of the longitudinal support strip and the net width of the transverse support strip, respectively. The support strip and the CO2 storage tank share the vertical load of the overlying spoil layer, and differential settlement is controlled by adjusting the width and compaction degree of the support strip. In determining the number of CO2 storage tanks and the spacing between adjacent CO2 storage tanks, slope stability monitoring data and settlement monitoring data are obtained. Based on the monitoring data, the layout parameters are adjusted until the actual total volume of CO2 storage tanks, actual area replacement rate, slope stability safety factor, differential settlement and equipment operating space all meet the design requirements.

[0012] Furthermore, the composite seepage-proof cladding system consists of a protective layer, a seepage-proof isolation layer, and a top overlay waste disposal layer sequentially installed on the top of the CO2 storage tank. When the CO2 storage tank faces the outer side of the slope, a lateral cladding layer is also required. The permeability coefficient of the seepage-proof isolation layer in the composite seepage-proof cladding system... The outer compacted protective layer is thicker than the sum of the local maximum frost depth and maximum scour depth, and the covered CO2 storage box must not be directly exposed on the surface of the spoil heap slope to ensure the airtightness and long-term safety of carbon sequestration; in S5, the backfill thickness and vegetation reconstruction method of the reclamation isolation layer, improved soil layer and topsoil layer are determined according to the reclamation vegetation type of the current operation unit to ensure the effective combination of surface ecological restoration and carbon storage operation.

[0013] An open-pit mine mining-construction-drainage-reclamation and carbon storage collaborative operation system includes: a mining subsystem, a construction subsystem, a carbon storage subsystem, and a reclamation subsystem; The mining subsystem is used to divide and advance multiple continuous operation units along the direction of the open-pit mine working face, with adjacent operation units being spatially staggered in a stepped manner; The carbon storage subsystem includes a target construction area located within the current construction operation unit, and multiple CO2 storage tanks arranged at intervals or continuously within the target construction area, with a compacted material discharge support strip maintained between adjacent CO2 storage tanks; The composite anti-seepage coating system includes a protective layer and an anti-seepage isolation layer set on the top of the CO2 storage tank, and a lateral coating layer set on the side of the CO2 storage tank body; The construction subsystem is used to form an overlying disposal layer by layering and dumping waste above the CO2 storage tank and the composite impermeable covering system. The reclamation subsystem is used to sequentially lay a reclamation isolation layer, an improved soil layer, and a topsoil layer on top of the overlying spoil layer.

[0014] Beneficial Effects: This invention divides the open-pit mine working face into continuously advancing units and utilizes the spatially staggered operation of each unit to achieve a high degree of spatiotemporal coordination between mining, spoil disposal, reclamation, and CO2 sequestration. This eliminates the waiting time of independent operation of each link in traditional processes, significantly improving the overall operational efficiency of open-pit mines. This invention accurately calculates the allowable total volume and uses the "area replacement ratio" formula for layout control under this constraint. It constructs a composite load-bearing structure of "storage box + compacted spoil disposal support belt," maximizing space utilization and balancing the mechanical properties of the overlying load. This effectively prevents spoil heap settlement and slope instability caused by excessive load, especially ensuring the stability of the slope toe area. This invention targets different areas such as the mine pit floor, slope toe, and steps. It employs a composite seepage-proof covering system with a buffer deformation layer, a seepage-proof isolation layer, and an outer compacted protective layer. This system effectively absorbs differential settlement caused by material compaction and soil removal. Furthermore, the seepage-proof isolation layer has a permeability coefficient as low as 1.0 × 10⁻⁷ cm / s, ensuring long-term safe CO₂ sequestration and eliminating the risk of leakage. After carbon sequestration operations are completed and the design elevation is reached, this invention sequentially lays a reclamation isolation layer, an improved soil layer, and a topsoil layer. The backfill thickness and planting method are precisely determined based on plant type, achieving an organic combination of resource utilization and land ecological restoration in abandoned mine spaces, resulting in significant carbon reduction and environmental benefits. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the process of the open-pit mine mining-construction-drainage-reclamation and carbon storage collaborative operation method of the present invention.

[0016] Figure 2 This is a schematic diagram illustrating the coordinated advancement of adjacent work units in the mining-construction-drainage-recovery embodiments of the present invention.

[0017] Figure 3 This is a schematic diagram of the spatial constraints and slope toe expansion at different construction locations in the embodiments of the present invention; (a) in the figure is a schematic diagram of the spatial layout of the direct bottom plate of the mine pit and the slope toe construction area; (b) is a schematic diagram of the construction area between artificial soil dumping steps and the released additional soil dumping space.

[0018] Figure 4 This is a schematic diagram of the structural layout of the CO2 storage tank in an embodiment of the present invention; (a) is a top view of the tank layout; (b) is a cross-sectional view of the composite load-bearing calculation unit; and (c) is an enlarged schematic diagram of the composite anti-seepage coating system. Detailed Implementation

[0019] The invention will be further explained below with reference to an application scenario in an open-pit coal mine.

[0020] Example: Figure 1 As shown, this invention discloses a method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations, comprising the following steps: Step 1, Division of work units and determination of target construction area: According to the mining plan, the working face is divided into continuous advancing operation units of 50m in length along the advancing direction. These adjacent operation units are further divided into mining operation area (Nth operation unit), construction operation area (N-1th operation unit), spoil disposal operation area (N-2nd operation unit), and reclamation operation area (N-3rd operation unit), as follows: Figure 2 As shown, a dynamic production line is formed that combines mining, construction, soil removal, and reclamation in a staggered and parallel manner. The weight of a single CO2 storage tank does not exceed the allowable lifting weight of the on-site lifting equipment within its design working radius, and its dimensions are determined based on the transport vehicles, lifting equipment, and the dimensions of the target construction area.

[0021] like Figure 3 As shown in (a) and (b), after the current Nth unit is excavated, if the direct bottom slab of the pit is suitable for leveling, hoisting, drainage, and bearing capacity, it will be used as the construction preparation area for the pit bottom slab. When the inner spoil heap forms a stable slope toe boundary and has a continuous strip space, it will be used as the slope toe area of ​​the inner spoil heap. After the spoil heap is layered and compacted, the compacted lower pit bottom direct bottom slab will be used as the bearing foundation. A box-shaped trench will be reserved or excavated above the compacted lower pit bottom direct bottom slab as the artificial spoil heap step layer. Based on the spatial elevation of the target construction area, the layout layer of the CO2 storage box will be determined, namely the pit bottom slab layer, the layer between the artificial spoil heap steps, or the slope toe layer of the inner spoil heap.

[0022] Step 2, Calculation of upper limits for spatial and load-bearing constraints: Calculate the total allowable layout volume Among them, the upper limit of spatial constraints The upper limit of the bearing constraint is determined based on the available geometric space volume of the target construction area. Determined based on the composite load-bearing balance condition. The composite load-bearing balance condition is based on... Figure 4 The composite load-bearing calculation unit shown in (a) and (b) is established. The composite load-bearing calculation unit includes a CO2 storage tank and the corresponding support strip or spacing space of the tank.

[0023] The total area of ​​the composite load-bearing calculation unit is set as The horizontal projected area of ​​the CO2 storage tank is .

[0024] The composite load-bearing balance condition satisfies the following formula: in, The design area replacement ratio (i.e., the maximum allowable area replacement ratio). The vertical compressive strength of a single CO2 storage tank. The design allowable load-bearing capacity of the support strip between adjacent boxes after long-term deformation is considered for the compaction and disposal of waste materials. For the safety factor of the composite structure, The average bulk density of the overlying waste layer. This refers to the total design thickness of the overlying waste layer.

[0025] In this embodiment, the average bulk density of the waste is taken. The thickness of the overlying waste disposal layer is designed to be [thickness missing]. Calculate the safety factor Example: Long-term equivalent allowable vertical stress of a single CO2 storage tank. The allowable bearing stress of the compacted waste disposal support belt The design load of the overlying waste layer is 444 kPa. Substituting this into the composite bearing capacity calculation, we obtain... Therefore, under the above example operating conditions, the maximum allowable area replacement ratio is... Take 22.4%. This result only corresponds to the adopted bearing parameters and 20m overburden thickness. When the target construction area is located in the direct floor area of ​​the mine pit, such as Figure 3 As shown in (a), there is no slope volume increase or additional soil removal space at this time. Set to 0, upper limit of spatial constraints Each CO2 storage tank measures 6m × 2.5m × 3m, and its horizontal projected area is 15m². 2 The outer contour volume is 45m³. 3 Taking a 100m × 12m effective construction zone within a 100m advance operation unit as a calculation example, its effective area is 1200m². 2 If the design height of the effective construction zone is set at 3m, then the usable geometric space volume of the target construction area is... for In this embodiment, the volume reduction caused by excavating slopes and unusable corner spaces is considered. Neglectable, take 0.

[0026] The upper limit of the bearing constraint calculated based on the aforementioned composite bearing constraint. According to the formula: Calculate, where, The available geometrical volume of the target construction area. The volume reduction is due to the excavation of slopes and unusable corner spaces. The maximum permissible area replacement rate is set to 22.4% in this embodiment.

[0027] Substituting the numerical values, we get: .

[0028] Set the outer contour volume of a single CO2 storage tank 45m 3 Theoretical maximum number of deployments According to the formula Calculation, substituting the numerical values, yields: Rounded down to 17.

[0029] Taking into account hoisting, transportation channels, and boundary safety distances, this embodiment actually deploys 16 CO2 storage tanks, with a total volume of for The horizontal projected area of ​​a single CO2 storage tank is known. 15m 3 Actual area replacement rate .

[0030] because Therefore, the composite bearing constraint is satisfied under the above example working condition.

[0031] Step 3, Zoned Layout and Parameter Verification: When deploying in zones, for the mine floor or artificial strata areas: a 2×8 array grid layout (i.e., 2 rows horizontally and 8 columns vertically) is adopted, such as... Figure 3 As shown in (b), after the spoil heap is layered and compacted, the compacted lower pit bottom slab is used as the bearing foundation. A box-shaped trench is reserved or excavated above this compacted lower pit bottom slab as an artificial spoil heap step. Based on the above... The area of ​​a single composite load-bearing computing unit The formula should be satisfied: .

[0032] in, The area of ​​a single composite load-bearing calculation unit, i.e. Figure 4 The area shown in the dashed box in (a) is... The horizontal projected area of ​​a single CO2 storage tank is taken as 15m² in this embodiment. 2 , The maximum permissible area replacement rate is set at 22.4%.

[0033] Substituting the numerical values, we get: , Set the longitudinal spacing between adjacent CO2 storage tanks as follows: The horizontal spacing is In this embodiment, the longitudinal spacing The selected range is 10m~12m, with a horizontal spacing. The selected range is 4m to 6m.

[0034] Combination Figure 4 As shown in (a) and (b) above, the area of ​​the composite load-bearing calculation unit Calculate using the following formula: , in The length of a single CO2 storage tank. The width of a single CO2 storage tank. Vertical spacing This refers to the horizontal spacing. Figure 4 The “total width of the calculation unit” marked in (b) is the total width of the calculation unit. It is composed of the width of a single CO2 storage tank and the width of the support strip (or spacing space) between adjacent tanks.

[0035] The spacing between adjacent enclosures is determined based on the actual layout of the target construction area. Specifically, for example... Figure 4 As shown in (a) and (b), if the backfilled and compacted waste material between adjacent boxes forms a support strip, then the spacing represents the net width of the support strip; if only gaps are left between adjacent boxes, then the spacing represents the box spacing. When calculating the area replacement rate, the longitudinal spacing is uniformly adopted. and horizontal spacing Perform geometric calculations, and the spacing between the supports is equal to the net width of the support strip or the spacing between the boxes.

[0036] like Figure 4 As shown in (a), the longitudinal arrangement direction (i.e., the array direction) in the 2×8 array grid layout is arranged along the working surface, and can be extended further according to the length of the working unit in actual layout.

[0037] When selecting vertical spacing =12m、 When the height is 6m, the area of ​​a single composite load-bearing calculation unit is... Corresponding local area replacement rate According to the formula Calculate, substitute into numerical values ​​to obtain Since 20.83% is less than 22.4%, 12m × 6m can be used as the center-to-center distance combination in this embodiment. Conversely, if the longitudinal spacing is 10m and the transverse spacing is 4m, the area of ​​a single composite load-bearing calculation unit is 40m². 2 The corresponding local area replacement rate is 15m. 2 / 40m 2 =37.5%, which exceeds the allowable value in this embodiment and should not be used.

[0038] A 0.3m to 0.5m thick buffer deformation layer is installed on the outside of the container. This buffer deformation layer is made of fly ash-based low-strength material and absorbs the differential settlement between the container and the surrounding waste through its own compression deformation.

[0039] When the target construction area is located at the toe of the inner spoil heap, such as Figure 3 As shown in (b), by arranging box-shaped structures along the toe of the slope to form a retaining zone, the existing slope is raised by 3° to 8° compared to the original slope, thereby releasing additional space for soil removal. Additional waste disposal space released. Only when the slope stability after the slope toe retaining meets the design requirements can it be included. .

[0040] With local internal drainage slope height Support Layout Length For example; the original slope angle was confirmed through stability calculation. It can be increased to the allowable slope angle. Then, based on the simplified slope geometry, additional soil removal space is added. Calculate according to the following formula: ,in, For localized internal drainage slopes, The length to be laid along the toe of the slope, This refers to the original design slope angle (i.e., the original slope angle of the slope). To verify the allowable slope angle (i.e. the slope angle of the existing slope). Let be the cotangent function. Substituting into the numerical calculation, we get: .

[0041] The above The results of geometric calculations are for informational purposes only and do not necessarily indicate that the slope angle naturally meets safety requirements. Slope stability calculations must be performed during formal implementation; if the stability check fails to meet the requirements, then... Set the value to 0 and maintain the original design slope angle.

[0042] like Figure 4 As shown in (c), a composite seepage-proof covering system is constructed on the side and top of the CO2 storage tank facing the outside of the slope. From the inside out, it consists of: a fly ash-based low-strength buffer deformation layer with a thickness of 0.3m to 0.5m (used to absorb differential settlement); and an intermediate layer with a thickness of not less than 1.0m and a permeability coefficient ≤1.0×10⁻⁶. −7 A compacted clay or geomembrane seepage barrier layer with a speed of cm / s is applied; an outermost compacted protective layer with a thickness of 1.5m to 2.0m is then laid. The thickness of the outer compacted protective layer is ensured to be greater than the sum of the local maximum frost depth and maximum scour depth, ensuring that the casing is not directly exposed on the surface of the spoil heap slope. Figure 4 As shown in (c), the outer side of the composite seepage-proof covering system is the surrounding waste material, and on the side facing the exposed slope toe, the thickness of the outer compacted protective layer should ensure that the box body is not directly exposed to the slope surface of the waste dump.

[0043] Step 4, Soil Covering and Ecological Reclamation: After the CO2 storage tank and composite seepage prevention system are installed, the stripped material is dumped in layers with 10m high steps, forming the subsequent overburden layer (i.e., the overburden layer) above the artificial dumping steps. After the dumping reaches the designed internal dumping elevation, the temporary topsoil is immediately backfilled and a combination of trees, shrubs, and grasses is constructed to achieve timely reclamation of the current work unit.

[0044] Different functional configurations can be made for target construction areas at different spatial depths: shallow equipment and material storage construction areas should retain access for transport vehicles, hoisting equipment, and maintenance personnel; mid-level warehouse and energy storage construction areas should be equipped with ventilation, drainage, and safety isolation conditions; deep military storage construction areas should prioritize artificial earthmoving terraces between layers with larger coverage thickness, less external disturbance, and emergency closure conditions.

[0045] Step 5, Spacing and Coordinated Load Bearing: When CO2 storage tanks are spaced out, such as Figure 4 As shown in (a), a compacted material support strip is maintained between adjacent containers, and a buffer deformation layer is installed on the outside of the containers. The buffer deformation layer absorbs differential settlement through compression deformation, and the support strip and the containers jointly bear the vertical load of the overlying waste layer.

[0046] Step 6, Top enclosure and vegetation restoration: After the container is laid out, a protective layer, an impermeable isolation layer, and an overlying spoil disposal layer are sequentially installed on top. When the container is located at the toe of a slope, a lateral covering layer is also installed on the exposed side of the container to prevent it from being directly exposed to the surface of the spoil disposal slope. After reaching the stage design elevation or target cover thickness, the reclamation isolation layer, improved soil layer, topsoil layer, and vegetation reconstruction are carried out sequentially.

[0047] After the current work unit is reclaimed, the work unit rolls forward, repeating steps 1 to 6 above, and enters the next cycle, realizing the cyclical rolling advancement.

[0048] The core of this invention does not lie in the box material or the seepage prevention material itself, but in the coordinated advancement of carbon storage facilities or underground space units with the mining, construction, dumping and reclamation processes by adapting space, function, load-bearing capacity and process sequence control to different target construction areas formed during open-pit mining and dumping.

[0049] The above description is merely one embodiment of the present invention and is not intended to limit the present invention. Any minor modifications, equivalent substitutions, and improvements made to the above embodiment based on the technical essence of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations, characterized in that, Includes the following steps: S1. Divide the open-pit mine working face into multiple continuously advancing operation units along the strike, and carry out the construction of multiple adjacent operation units in a stepped spatial staggered manner. S2. Select the target construction area within the current construction operation unit and determine the effective layout space for the CO2 storage tank; S3. Determine the maximum allowable total volume of CO2 storage tanks based on the available geometric space volume and bearing capacity constraints of the target construction area; S4. Based on the maximum allowable total volume and box size, determine the number of CO2 storage boxes to be installed and the spacing between adjacent boxes, and construct a composite anti-seepage covering system on the sides and top of the boxes; S5. Layer the stripped material around and on top of the CO2 storage tank to form an overburden layer. After the designed cover thickness is reached, lay the reclamation isolation layer, improved soil layer and topsoil layer in sequence and carry out vegetation reconstruction.

2. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 1, characterized in that, In S1, the current construction unit is the (N-1)th construction unit; N represents the sequence number of the current construction unit, and N is an integer greater than or equal to 4; the staggered spatial construction method for multiple adjacent construction units is to make the excavation of the Nth construction unit, the construction of the N-1th construction unit, the backfilling of the N-2th construction unit, and the reclamation of the N-3th construction unit proceed simultaneously.

3. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 2, characterized in that, In S2, based on the spatial elevation status of the mining task operation unit, under the premise of meeting the conditions of leveling, hoisting, drainage, bearing or slope stability, one or more of the following can be selected as the target construction area: the direct bottom plate area of ​​the mine pit, the slope toe area of ​​the internal spoil dump, and the area between the artificial spoil dump steps, so as to determine the effective geometric spatial boundary and location of the pre-deployed CO2 storage box. The effective geometric space boundary for the CO2 storage tanks pre-installed in the target construction area needs to be determined by deducting the operating turning radius of excavators and trucks, the reserved width of transport platforms, the volume occupied by drainage ditches and slope safety retaining walls, in order to obtain the usable geometric space volume of the target construction area. .

4. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 3, characterized in that, The specific steps of S3 are as follows: CO2 storage tanks are deployed at intervals or continuously within the target construction area, and the total allowable volume of the CO2 storage tanks is specified. Take the upper limit of spatial constraints With upper limit of bearing constraint The smaller of the values ​​is used as the maximum allowable total volume of CO2 storage tanks within the target construction area to prevent exceeding the physical space and load-bearing limits. Among them, the upper limit of spatial constraints With upper limit of bearing constraint Determined in the following manner: Upper limit of spatial constraints: ; Upper limit of load constraint: ; in, The available geometrical volume of the target construction area. The additional waste disposal space volume released after the box structure is installed at the toe of the inner waste disposal slope to raise the inner waste disposal slope angle. The looseness coefficient of the stripped material. This represents the actual volume of the stripped material that needs to be discharged internally during the current operation unit. To reserve volume for topsoil reclamation and cover layer, Reserved volume for transportation, hoisting, and drainage channels. The volume reduction is due to the excavation of slopes and unusable corner spaces. This represents the maximum permissible area replacement ratio. Using the calculated upper limit of spatial constraints and upper limit of load constraint Determine the total allowable layout volume The total volume allowed for layout The sum of the outer contour volumes of all CO2 storage tanks within the target construction area is limited, and the total outer contour volume must not exceed the allowable total volume. This is to ensure that carbon storage operations do not damage the overall slope stability and soil bearing capacity of the open-pit mine.

5. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 4, characterized in that, The maximum allowable area replacement ratio The following load-bearing requirements must be met: ; In the formula, Vertical compressive strength of a single CO2 storage tank; The design allowable bearing capacity after long-term deformation is considered for the support strip between adjacent boxes to compact and discharge waste materials. Safety factor for composite structures; The average bulk density of the overlying waste layer; The total design thickness of the overlying waste removal layer.

6. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 5, characterized in that, In S4, based on the maximum allowable total volume and container dimensions, the number of CO2 storage containers and the spacing between adjacent containers are determined. The specific process is as follows: When CO2 storage tanks are arranged in a regular grid pattern, the longitudinal spacing is: The horizontal spacing is At that time, the actual area replacement rate for: ;in The length of the CO2 storage tank. Width of the CO2 storage tank; by As constraints, the longitudinal layout spacing is calculated based on the set upper limit of the actual area replacement rate and the preset spacing relationship. Or horizontal spacing According to the formula Determine the theoretical maximum number of deployments ,in The final number of CO2 storage tanks deployed is determined by the outer contour volume of a single CO2 storage tank. satisfy , It is a positive integer; When backfilling and compacting waste materials between adjacent CO2 storage tanks, the spacing between them is the net width of the support strip; when there is no space between adjacent CO2 storage tanks, the spacing between them is the tank spacing.

7. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 6, characterized in that, When the target construction area is selected as the toe area of ​​the internal spoil heap, the upper limit of the spatial constraint value is... In Perform the following specific calculations: Setting the slope stability safety factor Provided that the slope is not less than the design allowable value, the maximum slope angle that meets the stability requirements is taken as the check allowable slope angle based on the geomechanical parameters of the target construction area, the vertical load of the CO2 storage tank, and the gravity load of the overlying waste layer. ; The slope angle was changed from the original design slope angle. Increase to the allowable slope angle for verification For simplifying a single slope, the additional volume of soil removal space released Determine using the following formula: ; in, The original design slope angle, To verify the allowable slope angle, Because of the slope height, The length to be laid along the toe of the slope.

8. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 7, characterized in that, When the target construction area is located in the area of ​​the direct bottom slab of the mine pit or the area between artificial spoil steps, a bearing area is formed by the intermittent layout. A support strip formed by the compacted spoil material is retained between adjacent CO2 storage tanks. At this time, the longitudinal and transverse layout spacings correspond to the net width of the longitudinal support strip and the net width of the transverse support strip, respectively. The support strip and the CO2 storage tank share the vertical load of the overlying spoil layer, and differential settlement is controlled by adjusting the width and compaction degree of the support strip. In determining the number of CO2 storage tanks and the spacing between adjacent CO2 storage tanks, slope stability monitoring data and settlement monitoring data are obtained. Based on the monitoring data, the layout parameters are adjusted until the actual total volume of CO2 storage tanks, actual area replacement rate, slope stability safety factor, differential settlement and equipment operating space all meet the design requirements.

9. The method for coordinated open-pit mining-construction-drainage-reclamation and carbon storage operations according to claim 8, characterized in that, The composite seepage-proof cladding system consists of a protective layer, a seepage-proof isolation layer, and a top overlay waste disposal layer sequentially installed on the top of the CO2 storage tank. When the CO2 storage tank faces the outer side of the slope, a lateral cladding layer is also required. The permeability coefficient of the seepage-proof isolation layer in the composite seepage-proof cladding system... The outer compacted protective layer is thicker than the sum of the local maximum frost depth and maximum scour depth, and the covered CO2 storage box must not be directly exposed on the surface of the spoil heap slope to ensure the airtightness and long-term safety of carbon sequestration; in S5, the backfill thickness and vegetation reconstruction method of the reclamation isolation layer, improved soil layer and topsoil layer are determined according to the reclamation vegetation type of the current operation unit to ensure the effective combination of surface ecological restoration and carbon storage operation.

10. A system for the coordinated operation method of open-pit mining-construction-drainage-reclamation and carbon storage as described in any one of claims 1-9, characterized in that, include: Mining subsystem, construction subsystem, carbon storage subsystem, and reclamation subsystem; The mining subsystem is used to divide and advance multiple continuous operation units along the direction of the open-pit mine working face, with adjacent operation units being spatially staggered in a stepped manner; The carbon storage subsystem includes a target construction area located within the current construction operation unit, and multiple CO2 storage tanks arranged at intervals or continuously within the target construction area, with a compacted material discharge support strip maintained between adjacent CO2 storage tanks; The composite anti-seepage covering system includes a protective layer and an anti-seepage isolation layer set on the top of the CO2 storage tank, and a lateral covering layer set on the side of the CO2 storage tank body; The construction subsystem is used to form an overlying disposal layer by layering and dumping waste above the CO2 storage tank and the composite impermeable covering system. The reclamation subsystem is used to sequentially lay a reclamation isolation layer, an improved soil layer, and a topsoil layer on top of the overlying spoil layer.