Method, device and equipment for evaluating availability of water and electricity plant building leakage drainage pump group
By establishing an object model and point-to-point semantic intelligent agent mapping technology, the redundancy status and startup response status of the leakage drainage pump group in the hydropower plant are evaluated, which solves the problem of insufficient evaluation in the existing technology and improves the reliability and efficiency of the drainage system.
Patent Information
- Application Number
- CN202611305927.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-20
AI Technical Summary
In the existing technology, the redundancy capacity assessment of the leakage drainage pump set in the hydropower plant is lacking, the start-up response diagnosis is insufficient, and it is impossible to effectively assess the remaining automatic drainage capacity and start-up response quality of the pump set.
By establishing a pump group object model, the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point of each pump are associated. The point semantic intelligent agent is used to parse the original point name and map it to the object model to obtain status data, determine the automatic start-up conditions of each pump, evaluate the redundancy status of the pump group, and determine the start-up response status when the water level in the collection well rises, and generate a diagnostic report.
It enables direct assessment of pump set redundancy and startup response quality, reduces the workload of operators manually summarizing data across multiple screens, detects startup failures or feedback loop anomalies in advance, and improves the reliability of the drainage system.
Smart Images

Figure CN123134053A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of condition monitoring and diagnosis technology for auxiliary equipment in hydropower stations, and in particular to a method, apparatus and equipment for assessing the availability of leakage drainage pump sets in hydropower plant buildings. Background Technology
[0002] The powerhouse leakage drainage system is a typical auxiliary equipment system, mainly used to collect and drain leakage water, maintenance drainage, or localized water accumulation. This system typically consists of two or more leakage drainage pumps, relying on automatic operation, start-up feedback, running feedback, fault signals, control power supply, and water level signals to ensure drainage capacity.
[0003] Existing monitoring systems can typically display the automatic mode, operation, faults, and startup feedback of each leakage drainage pump, as well as high water level or related liquid level alarms in the sump. After operators discover a high water level or pump failure, they need to manually determine how many pumps can be automatically started, whether the startup command has formed a valid operation, and whether there are situations where both pumps are not automatic or both pumps are faulty.
[0004] Existing technologies rely on single pump operation status, single pump failure status, or excessive water level in the sump as alarm criteria. While this technology can detect pump failure or abnormal water level, it lacks sufficient support for issues such as pump redundancy, startup response quality, risk changes after single pump failure, and whether the pump set provides an effective drainage response after water level rises. Summary of the Invention
[0005] This invention provides a method, apparatus, and equipment for assessing the availability of a hydropower plant leakage drainage pump set, aiming to solve technical problems such as the lack of pump set redundancy assessment and insufficient diagnosis of the start-up response process in the prior art.
[0006] According to one aspect of the present invention, a method for assessing the availability of a hydropower plant leakage drainage pump set is provided, comprising: Establish an object model for the pump group, which is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point, and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well. The semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model based on the parsing results. Acquire the status data of each point within the diagnostic time window, and determine whether each pump has the conditions for automatic start-up based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point and the status data of the operation feedback point, and evaluate the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up. If a rise in the water level of the collection well is detected based on the status data of the water level alarm point of the collection well, the start-up response status is determined based on the time relationship between the status data of the start-up feedback point, the operation feedback point and the fault point within the diagnostic time window. A diagnostic report containing the redundant state and the startup response state is generated by the reporting agent.
[0007] According to another aspect of the present invention, a device for assessing the availability of a hydropower plant leakage drainage pump set is provided, comprising: The model building module is used to establish an object model of the pump group. The object model is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well. The point mapping module is used to parse the semantic information in the original point names through the point semantic agent, and map each original point to the corresponding point in the object model according to the parsing result; The redundancy assessment module is used to acquire the status data of each point within the diagnostic time window, and to determine whether each pump has the conditions for automatic start-up based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point and the status data of the operation feedback point, and to assess the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up. The response status determination module is used to determine the start response status based on the time relationship between the status data of the start feedback point, the operation feedback point, and the fault point within the diagnostic time window when the rise in water level of the water collection well is identified based on the status data of the start feedback point, the operation feedback point, and the fault point. The report generation module is used to generate a diagnostic report containing the redundant state and the startup response state through a report agent.
[0008] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising: At least one processor; and a memory communicatively connected to the at least one processor; The memory stores a computer program that can be executed by the at least one processor, which is then executed by the at least one processor to enable the at least one processor to perform the availability assessment method for the hydropower plant leakage drainage pump set according to any embodiment of the present invention.
[0009] According to another aspect of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium storing computer instructions for causing a processor to execute and implement the availability assessment method for a hydropower plant leakage drainage pump set according to any embodiment of the present invention.
[0010] The technical solution of this invention establishes an object model of the pump group, which associates the automatic mode point, operation feedback point, fault point, start-up feedback point, control power point, and water level alarm point of each pump. A point semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model. Status data of each point within the diagnostic time window is obtained. Based on the status data of the automatic mode point, fault point, control power point, and operation feedback point, it is determined whether each pump has the conditions for automatic start-up, and the redundancy status of the pump group is evaluated based on the judgment result. When a rise in water level is detected based on the water level alarm point in the water collection well, the start-up response status is determined based on the temporal relationship of the status data of the start-up feedback point, operation feedback point, and fault point within the diagnostic time window. A reporting agent generates a diagnostic report containing the redundancy status and the start-up response status. To address the technical problems of insufficient assessment of pump set redundancy capacity and inadequate startup response diagnosis in existing technologies, this invention combines static redundancy assessment and dynamic startup response diagnosis within the same analytical framework through a multi-agent collaborative approach. This directly provides the remaining automatic drainage capacity and startup response quality of the pump set, thereby reducing the workload of operators manually summarizing data across multiple screens and enabling early detection of startup failures or feedback loop anomalies.
[0011] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of the present invention, nor is it intended to limit the scope of the invention. Other features of the invention will become readily apparent from the following description. Attached Figure Description
[0012] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0013] Figure 1 A flowchart of a method for assessing the availability of a hydropower plant leakage drainage pump set provided in an embodiment of the present invention; Figure 2 A flowchart of another method for assessing the availability of a hydropower plant leakage drainage pump set provided in an embodiment of the present invention; Figure 3 This invention provides an intelligent architecture diagram of a hydropower plant seepage drainage pump group. Figure 4 A flowchart for pump unit availability assessment provided in an embodiment of the present invention; Figure 5 This is a flowchart of the activation response diagnosis process under a high water level scenario provided in an embodiment of the present invention; Figure 6 This is a schematic diagram of the structure of a drainage pump set diagnostic report provided in an embodiment of the present invention; Figure 7 A schematic diagram of the availability assessment device for a hydropower plant leakage drainage pump set provided in an embodiment of the present invention; Figure 8 This is a schematic diagram of the structure of an electronic device for performing an availability assessment method for a hydropower plant leakage drainage pump set, as provided in an embodiment of the present invention. Detailed Implementation
[0014] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0015] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0016] Figure 1 This is a flowchart illustrating a method for assessing the availability of a hydropower plant seepage drainage pump set, provided by an embodiment of the present invention. This embodiment is applicable to scenarios involving automatic drainage capacity assessment and startup response diagnosis of hydropower plant seepage drainage pump sets. The method can be executed by a device for assessing the availability of a hydropower plant seepage drainage pump set, which can be implemented in hardware and / or software and can be configured in an electronic device. Figure 1 As shown, the method specifically includes the following steps: S110. Establish an object model of the pump group, wherein the object model is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point and control power supply point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well.
[0017] In this context, a pump set refers to the collective term for two or more seepage drainage pumps and their associated control equipment configured in a hydropower station powerhouse. An object model can be understood as a data structure used to describe the equipment composition and signal relationships of a pump set.
[0018] In this embodiment of the invention, the automatic mode point refers to a signal measurement point that characterizes whether the pump is in automatic control mode; the operation feedback point is used to reflect whether the pump has been successfully started and running; the fault point is used to indicate whether the pump has a fault state; the start feedback point is used to reflect whether the control system has issued a start command to the pump; and the control power point is used to indicate whether the pump's control circuit is powered normally. The sump water level alarm point refers to a signal measurement point that reflects whether the sump water level has reached the alarm threshold.
[0019] Specifically, an object model of the pump set can be established. This object model is constructed based on information such as equipment model, plant area and pump number. In the object model, five signal measurement points are associated with each pump: automatic mode point, operation feedback point, fault point, start-up feedback point and control power supply point. At the same time, the water level alarm point of the collection well is also associated.
[0020] In some possible implementations, establishing the object model of the pump group includes: establishing the object model of the pump group based on the equipment model, plant area, and pump number; associating the automatic mode point, operation feedback point, fault point, start-up feedback point, and control power point corresponding to each pump to the object model; and associating the water level alarm point of the sump well to the object model.
[0021] The equipment model refers to the specific model information of the leakage drainage pump and control cabinet. Different models of equipment may correspond to different signal definitions and parameter configurations. The plant area is used to distinguish different plants or drainage areas within the hydropower station; pump sets in different areas may have different operating logics. The pump number is used to uniquely identify each pump in the pump set, for example, using a numbering system like "#1 pump" and "#2 pump".
[0022] In practical applications, when establishing an object model, a framework for the pump group object can be created based on three dimensions: equipment model, plant area, and pump number, ensuring that the model accurately reflects the hierarchical relationship of the field equipment. Furthermore, within this framework, five key signal measurement points are associated with each pump: automatic mode point, operation feedback point, fault point, start-up feedback point, and control power point.
[0023] In addition, the water level alarm point of the sump can be associated with the pump group object. The object model established in this way can completely describe the signal chain of a pump from meeting the start-up conditions to receiving the start-up command and then to successful operation.
[0024] S120. The semantic information in the original point names is parsed by the point semantic agent, and each original point is mapped to the corresponding point in the object model according to the parsing result.
[0025] Among them, the point semantic agent is used to parse the semantic information in the original point name and map points with different naming conventions to a standardized object model.
[0026] After the above object model is established, the original name of each point can be read by the point semantic agent, and then the semantic information can be parsed from it. Based on the parsing results, the original points with different names under different power stations and different equipment models can be uniformly mapped to the corresponding standard points in the object model.
[0027] In some possible implementations, the step of parsing the semantic information in the original point names through the point semantic agent includes: obtaining the original name of each point in the pump group; identifying the pump number, point type, and state polarity of each point based on the original name; and writing the identification results into a mapping table, which is used to map each original point to the corresponding point in the object model.
[0028] The original name refers to the original name of each signal point in the monitoring system. Naming rules may vary significantly between different power plants or equipment manufacturers. For example, the automatic mode signal for the same pump might be named "#1 Pump Automatic Mode," "Pump1_AutoMode," or "1#ZLFS" in different systems. Point type distinguishes the functional category of the signal, such as automatic mode, operation feedback, fault, etc. Status polarity indicates whether the signal's valid state is "1 valid" or "0 valid," and different devices may use different polarity definitions.
[0029] Specifically, the point-to-point semantic agent can read the original name strings of each point in the pump group. Then, it parses these strings to identify three key pieces of information: which pump the point belongs to (pump number), what the function type of the point is (point type), and whether the valid state value of the point is active high or active low (state polarity).
[0030] After the above analysis is completed, the identification results can be written into a mapping table. The purpose of the mapping table is to establish a correspondence between the original point names and the standard points in the object model, so that data reading and subsequent analysis steps can uniformly obtain the data of each point through the mapping table, without needing to care about the specific naming method of the original points.
[0031] S130. Obtain the status data of each point within the diagnostic time window. Based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point, and the status data of the operation feedback point, determine whether each pump has the conditions for automatic start-up, and evaluate the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up.
[0032] The diagnostic time window refers to a set of state data within a continuous time period used for analysis.
[0033] Specifically, the status data of each point within the diagnostic time window can be obtained, and the status data of automatic mode point, fault point, control power point and operation feedback point can be used to comprehensively determine whether each pump has the conditions for automatic start-up, and then the redundancy status of the entire pump group can be evaluated based on the judgment results of each pump.
[0034] In some embodiments, after acquiring the status data of each point within the diagnostic time window, the method further includes: performing a quality check on the status data; and marking the missing points as uncertain items in the case of missing status data of key points.
[0035] Quality inspection refers to verifying the integrity of the read status data. Key points refer to signal measurement points that play a decisive role in determining pump unit availability and diagnosing startup response, such as automatic mode points and operation feedback points. Uncertain items refer to points whose true status cannot be determined due to missing data; these need to be marked in subsequent diagnostics.
[0036] Specifically, after acquiring the status data within the diagnostic time window, a quality check is performed on the acquired data. The check includes checking for missing values, duplicate records, and out-of-order records. If data for a key location is missing or unavailable within the diagnostic time window, that location can be marked as an uncertain item. Uncertain items are recorded and reflected in the final report, indicating to operators that this information could not be obtained and that related judgments may be based on incomplete information.
[0037] S140. When the water level in the collection well is identified as rising based on the status data of the water level alarm point in the collection well, the start-up response status is determined based on the time relationship between the status data of the start-up feedback point, the operation feedback point, and the fault point within the diagnostic time window.
[0038] In this embodiment of the invention, it can be determined whether a rise in water level has occurred based on the status data of the water level alarm point in the collection well. If a rise in water level is detected, the start-up response status of the pump unit can be determined based on the temporal relationship of the status data of the start-up feedback point, the operation feedback point, and the fault point within the diagnostic time window.
[0039] S150. Generate a diagnostic report containing the redundant state and the startup response state through the reporting agent.
[0040] The reporting agent is used to organize the analysis results into a structured diagnostic report.
[0041] In this embodiment of the invention, the reporting agent can obtain the redundant status and startup response status generated by the aforementioned steps, as well as other relevant evidence information, and generate a structured diagnostic report for operators to refer to.
[0042] It should be noted that this method does not output any control commands such as pump start-up, pump stop-up, switching between primary and backup, or modification of setpoints; it only performs data reading and analysis, and is a read-only auxiliary diagnostic method.
[0043] In some possible implementations, generating a diagnostic report containing the redundancy status and the startup response status through a reporting agent includes: acquiring the redundancy status of the pump group, the scenario of rising water level in the collection well, the startup response status, status evidence at each point, reasons for failure, and uncertainties; generating a diagnostic report based on the acquired information, the diagnostic report including evidence points, a ranking of suspected causes, and inspection recommendations.
[0044] The "rising water level scenario" refers to the situation where the water level alarm point in the collection well is triggered and the water level continues to rise. "Status evidence" refers to the specific status values and timestamps of each point used during the diagnostic process within the diagnostic time window. "Suspicious cause ranking" refers to the possible causes of the fault inferred based on the diagnostic logic, ranked from highest to lowest probability. "Inspection recommendations" refers to the specific investigation directions and maintenance items given for each suspected cause.
[0045] Specifically, when generating a diagnostic report, the reporting agent can collect the analysis results generated in the aforementioned steps, including the redundancy status of the pump group, the scenario of rising water level in the sump well, the start-up response status, the status evidence of each point, the reasons for the failure of each pump, and the uncertainties generated by the data quality check.
[0046] Furthermore, a structured diagnostic report is generated based on the collected information. The report includes at least the evidence points (i.e., the specific signal measurement points and status values upon which the diagnosis is based), a ranking of suspected causes (possible fault causes arranged from highest to lowest probability according to logical inference), and inspection recommendations (specific maintenance suggestions given for each suspected cause). The output report serves only as a basis for operational assistance and troubleshooting, and does not replace on-site procedures and protection logic.
[0047] The technical solution of this invention establishes an object model of the pump group, which associates the automatic mode point, operation feedback point, fault point, start-up feedback point, control power point, and water level alarm point of each pump. A point semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model. Status data of each point within the diagnostic time window is obtained. Based on the status data of the automatic mode point, fault point, control power point, and operation feedback point, it is determined whether each pump has the conditions for automatic start-up, and the redundancy status of the pump group is evaluated based on the judgment result. When a rise in water level is detected based on the water level alarm point in the water collection well, the start-up response status is determined based on the temporal relationship of the status data of the start-up feedback point, operation feedback point, and fault point within the diagnostic time window. A reporting agent generates a diagnostic report containing the redundancy status and the start-up response status. To address the technical problems of insufficient assessment of pump set redundancy capacity and inadequate startup response diagnosis in existing technologies, this invention combines static redundancy assessment and dynamic startup response diagnosis within the same analytical framework through a multi-agent collaborative approach. This directly provides the remaining automatic drainage capacity and startup response quality of the pump set, thereby reducing the workload of operators manually summarizing data across multiple screens and enabling early detection of startup failures or feedback loop anomalies.
[0048] Figure 2 This is a flowchart illustrating another method for assessing the availability of a hydropower station powerhouse leakage drainage pump set, provided as an embodiment of the present invention. Based on the above embodiments, this embodiment refines the specific conditions for judging the availability of a single pump and the three-level classification rules for pump set redundancy. Technical terms that are the same as or corresponding to those in the above embodiments will not be repeated here. Figure 2 As shown, the method specifically includes the following steps: S210. Establish an object model of the pump group, wherein the object model is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well.
[0049] S220. The semantic information in the original point names is parsed by the point semantic agent, and each original point is mapped to the corresponding point in the object model according to the parsing result.
[0050] S230: Obtain the status data of each point within the diagnostic time window.
[0051] S240. If the status data at the automatic mode point of the pump indicates automatic mode, the status data at the fault point indicates no fault, the status data at the control power point indicates normal power supply, and the status data at the operation feedback point indicates no abnormal operation feedback, then the pump is deemed to have the conditions for automatic start-up.
[0052] The automatic start-up conditions refer to the preconditions that must be met for the pump to automatically start and operate based on the water level signal without human intervention. Automatic mode means the pump's control mode switch is in the "automatic" position, at which point the pump can receive automatic start commands from the control system. Abnormal operation feedback means the pump has received a start command but failed to operate normally, or the operation feedback signal itself has a loop fault.
[0053] Specifically, when determining whether each pump meets the conditions for automatic start-up, the status of four signal points is comprehensively examined. The first scenario: if the pump's automatic mode indicator is set to automatic, the fault indicator shows no fault, the control power indicator shows normal power, and the operation feedback indicator shows no abnormal operation feedback, then the pump is determined to meet the conditions for automatic start-up.
[0054] S250. If the status data of the pump's automatic mode point indicates non-automatic mode, the status data of the fault point indicates a fault, the status data of the control power point indicates abnormal power supply, or the status data of the operation feedback point indicates abnormal operation feedback, it is determined that the pump does not meet the conditions for automatic start-up and the reason for the failure is recorded.
[0055] The second scenario: If any one or more of the following occur: the automatic mode indicator shows non-automatic mode, the fault point indicates a fault, the control power point indicates an abnormal power supply, or the operation feedback point indicates an abnormal operation feedback, then the pump is determined not to meet the conditions for automatic start-up, and the specific reason for the failure is recorded. This dual-basis judgment method clearly defines whether each pump is "available" or "unavailable," along with the specific reason for its unavailability.
[0056] S260. Evaluate the redundancy status of the pump set.
[0057] In some possible implementations, the assessment of the redundancy status of the pump unit includes: Based on whether each pump has the capability to automatically start, count the number of pumps that have the capability to automatically start; if the number is greater than or equal to two, determine the redundancy status as normal redundancy; if the number is equal to one, determine the redundancy status as single-pump guarantee and generate a yellow warning; if the number is equal to zero or all pumps are in non-automatic mode, determine the redundancy status as insufficient automatic capability and generate a red warning.
[0058] The redundancy status reflects the overall automatic drainage capacity reserve of the pump set. Normal redundancy means the pump set has complete backup capacity, single pump guarantee means only one pump is available, posing a single point of failure risk, and insufficient automatic capacity means the pump set has lost its automatic drainage capability.
[0059] Specifically, the number of pumps that meet the automatic start-up conditions can be counted based on the judgment results of the aforementioned steps. When the number of pumps that meet the automatic start-up conditions is greater than or equal to two, the redundancy status can be determined as normal redundancy. When the number is equal to one, the redundancy status can be determined as single-pump guarantee, and a yellow warning message will be generated to remind the operators that only one pump can be automatically started at present, and if this pump fails, the automatic drainage capability will be lost.
[0060] When this number equals zero, or when all available pumps are in non-automatic mode, the redundancy status is determined to be insufficient automatic capacity, and a red warning message is generated, indicating that the automatic drainage capacity of the plant is insufficient and immediate intervention is required. Through this three-level classification method, operators can intuitively understand the current risk level of the pump set.
[0061] S270. When the water level in the collection well is identified as rising based on the status data of the water level alarm point in the collection well, the start-up response status is determined based on the time relationship between the status data of the start-up feedback point, the operation feedback point, and the fault point within the diagnostic time window.
[0062] In some possible implementations, determining the startup response state includes: if the status data at the startup feedback point indicates that startup feedback has occurred, the status data at the operation feedback point indicates that operation feedback has not occurred within a set time window, and the status data at the fault point indicates that no fault is present, then determining the startup response state as startup unsuccessful or operation feedback loop abnormal; if the status data at the startup feedback point indicates that startup feedback has not occurred and the pump does not have the conditions for automatic start-up, then determining the startup response state as insufficient control conditions.
[0063] The startup response status reflects the actual response of the pump unit to the startup command after the water level rises. Startup feedback indicates that the control system has issued a startup command to the pump. Operational feedback not appearing within the set time window indicates that the pump failed to start successfully within a reasonable time after receiving the startup command. The set time window is a configurable time threshold used to determine whether the time between issuing the startup command and the pump successfully starting has exceeded the normally required time.
[0064] Specifically, when the water level in the collection well rises, the time sequence of the status data of the start-up feedback point, operation feedback point, and fault point can be checked.
[0065] The first scenario: If the status data at the start feedback point indicates that start feedback has occurred, but the status data at the running feedback point indicates that running feedback has not occurred within the set time window, and the status data at the fault point indicates that no fault signal is present, then the start response status is determined to be "start unsuccessful or running feedback loop abnormal." In this case, the pump received the start command but failed to operate normally, which could be due to a problem with the pump itself or a problem with the running feedback signal loop.
[0066] The second scenario: If the status data at the start feedback point indicates that start feedback has not occurred, and the judgment results of the aforementioned steps indicate that the pump does not meet the conditions for automatic start-up, then the start response status is determined to be "insufficient control conditions." In this case, the pump has not received a start command at all, because the pump itself does not meet the preconditions for automatic start-up, such as being in non-automatic mode or having a malfunction. This method allows for rapid identification of whether the problem after the water level rises is due to "the pump not receiving a command" or "the pump receiving a command but not operating," providing a clear direction for subsequent maintenance.
[0067] S280. Generate a diagnostic report containing the redundant state and the startup response state through the reporting agent.
[0068] The technical solution of this invention establishes an object model of the pump group, which associates the automatic mode point, operation feedback point, fault point, start-up feedback point, control power point, and water level alarm point of each pump. A point semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model. Status data of each point within the diagnostic time window is obtained. Based on the status data of the automatic mode point, fault point, control power point, and operation feedback point, it is determined whether each pump has the conditions for automatic start-up, and the redundancy status of the pump group is evaluated based on the judgment result. When a rise in water level is detected based on the water level alarm point in the water collection well, the start-up response status is determined based on the temporal relationship of the status data of the start-up feedback point, operation feedback point, and fault point within the diagnostic time window. A reporting agent generates a diagnostic report containing the redundancy status and the start-up response status. To address the technical problems of insufficient assessment of pump set redundancy capacity and inadequate startup response diagnosis in existing technologies, this invention combines static redundancy assessment and dynamic startup response diagnosis within the same analytical framework through a multi-agent collaborative approach. This directly provides the remaining automatic drainage capacity and startup response quality of the pump set, thereby reducing the workload of operators manually summarizing data across multiple screens and enabling early detection of startup failures or feedback loop anomalies.
[0069] Figure 3 The intelligent agent architecture diagram of the hydropower plant leakage drainage pump group provided in the embodiment of the present invention is as follows: Figure 3As shown, this invention adopts a multi-agent collaborative architecture. The system includes eight agents: a point semantic agent, a data quality agent, a single pump availability agent, a startup response agent, a water level scenario agent, a redundancy risk agent, a knowledge retrieval agent, and a reporting agent. The data flow relationship between each agent is as follows: The point semantic agent reads the original names of each signal point from the data source layer, completes semantic parsing and mapping, and then outputs the standardized point data to the data quality agent; the data quality agent performs quality checks on the data within the diagnostic time window and outputs the valid data to the single pump availability agent and the water level scenario agent respectively; the single pump availability agent determines whether each pump has the conditions for automatic start-up based on point data such as automatic mode, fault, control power supply, and operation feedback, and outputs the judgment result to the redundancy risk agent and the startup response agent; the water level scenario agent... The system identifies whether the water level has risen based on the data from the water level alarm points in the collection wells and outputs the water level scenario to the startup response agent. The redundancy risk agent assesses the redundancy status of the pump group based on the availability results of individual pumps and generates corresponding warning information. The startup response agent determines the startup response status based on the water level scenario, the availability results of individual pumps, and the timing relationship between startup feedback, operation feedback, and fault signals. The knowledge retrieval agent matches inspection items from maintenance records based on equipment model and anomaly type. The reporting agent summarizes the redundancy status, startup response status, evidence points, inspection suggestions, and uncertainties to generate a structured diagnostic report.
[0070] Figure 4 A flowchart for pump unit availability assessment provided in an embodiment of the present invention. Figure 4 As shown, the pump set availability assessment process is as follows: The system establishes leakage drainage pump set objects according to equipment model, plant area, and pump number. Each pump is associated with at least an automatic mode point, an operation feedback point, a fault point, a start-up feedback point, and a control power point. The point semantic agent parses the original point name and writes different names into a unified point mapping table. The data quality agent reads the time-series data within the diagnostic time window and performs quality checks. The single-pump availability agent calculates the availability status of each pump—if a pump is in automatic mode, has no fault, has normal control power, and no abnormal operation feedback, it is determined to be automatically activated; if it is not automatic, has a fault, has an abnormal power supply, or has abnormal operation feedback, it is determined to be unavailable and the reason is recorded. The redundancy risk agent calculates pump set redundancy based on the single-pump availability results—if both pumps are available, it outputs "redundancy normal"; if only one pump is available, it outputs a yellow warning; if both are unavailable or neither is automatic, it outputs a red warning.
[0071] Figure 5 The flowchart for initiating response diagnosis under high water level scenario provided in the embodiments of the present invention is as follows: Figure 5As shown, when the water level scenario agent detects a rise in the water level of the collection well, the activation response diagnostic process is initiated. The process first acquires the timing data of activation feedback, operational feedback, and fault signals. Then, it determines whether activation feedback has occurred, forming two branches. The left branch corresponds to the scenario where activation feedback has occurred: it further determines whether operational feedback has occurred within a set time. If it has, the activation response is considered normal; if it has not, it further determines whether a fault signal has accompanied it. If a fault signal has accompanied it, the pump is considered faulty; if a fault signal has not accompanied it, the activation was unsuccessful or the operational feedback loop is abnormal.
[0072] The right branch corresponds to the situation where start-up feedback does not appear: further determine whether the pump has the conditions for automatic start-up. If the pump does not have the conditions for automatic start-up, it is determined that the control conditions are insufficient; if the pump has the conditions for automatic start-up but start-up feedback still does not appear, it is determined that the control system is abnormal.
[0073] Figure 6 This is a schematic diagram of the structure of the drainage pump set diagnostic report provided in an embodiment of the present invention, as shown below. Figure 6 As shown, the drainage pump unit diagnostic report contains structured information such as redundancy status, water level scenario, startup response, evidence points, possible causes, inspection recommendations, and uncertainties.
[0074] The following example illustrates the implementation process of the present invention.
[0075] Taking the #1 and #2 leakage drainage pump sets of a hydropower station as an example. At 09:20:00, the system read that the automatic mode of pump #1 was 1, the fault was 0, and the operation feedback was 0; the automatic mode of pump #2 was 0, the fault was 0, and the operation feedback was 0. At 09:21:10, the high water level signal of the sump changed from 0 to 1 and lasted for 60 seconds. At 09:21:15, the start feedback of pump #1 was 1, but at 09:21:30, no operation feedback of pump #1 was read. The system output the following diagnostic report: "Only pump #1 has the conditions for automatic start-up, and the current system is single-pump protection; after the high water level occurred, pump #1 had start-up feedback but no operation feedback was generated. Prioritize checking the operation feedback loop, contactor, and start-up link of pump #1, and at the same time confirm the non-automatic reason of pump #2."
[0076] The knowledge retrieval agent searches for corresponding inspection items based on pump model, control cabinet model, historical maintenance records, and anomaly type, such as automatic mode switches, contactors, thermal relays, soft starters, level switches, operating feedback contacts, and control power circuits. These inspection items are included in the suggestion section of the diagnostic report for maintenance personnel to refer to.
[0077] Figure 7 This is a schematic diagram of the availability assessment device for a hydropower plant leakage drainage pump set provided in an embodiment of the present invention. Figure 7 As shown, the device includes: The model building module 710 is used to establish an object model of the pump group. The object model is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well. The point mapping module 720 is used to parse the semantic information in the original point names through the point semantic agent, and map each original point to the corresponding point in the object model according to the parsing result; The redundancy assessment module 730 is used to acquire the status data of each point within the diagnostic time window, and to determine whether each pump has the conditions for automatic start-up based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point and the status data of the operation feedback point, and to assess the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up. The response status determination module 740 is used to determine the start response status based on the time relationship between the status data of the start feedback point, the operation feedback point and the fault point within the diagnostic time window when the rise in water level of the water collection well is identified based on the status data of the water collection well alarm point. The report generation module 750 is used to generate a diagnostic report containing the redundant state and the startup response state through a report agent.
[0078] The technical solution of this invention establishes an object model of the pump group, which associates the automatic mode point, operation feedback point, fault point, start-up feedback point, control power point, and water level alarm point of each pump. A point semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model. Status data of each point within the diagnostic time window is obtained. Based on the status data of the automatic mode point, fault point, control power point, and operation feedback point, it is determined whether each pump has the conditions for automatic start-up, and the redundancy status of the pump group is evaluated based on the judgment result. When a rise in water level is detected based on the water level alarm point in the water collection well, the start-up response status is determined based on the temporal relationship of the status data of the start-up feedback point, operation feedback point, and fault point within the diagnostic time window. A reporting agent generates a diagnostic report containing the redundancy status and the start-up response status. To address the technical problems of insufficient assessment of pump set redundancy capacity and inadequate startup response diagnosis in existing technologies, this invention combines static redundancy assessment and dynamic startup response diagnosis within the same analytical framework through a multi-agent collaborative approach. This directly provides the remaining automatic drainage capacity and startup response quality of the pump set, thereby reducing the manual workload of operators compiling data across multiple screens and enabling early detection of startup failures or feedback loop anomalies. In some possible implementations, the model building module 710 includes: The model building submodule is used to build an object model of the pump set based on the equipment model, factory area and pump number; The point association submodule is used to associate the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point corresponding to each pump with the object model, and to associate the water level alarm point of the collection well with the object model.
[0079] In some possible implementations, the point mapping module 720 includes: The name acquisition submodule is used to acquire the original name of each point in the pump group; The semantic recognition submodule is used to identify the pump number, location type, and status polarity of each location based on the original name. The mapping establishment submodule is used to write the recognition results into a mapping table, which is used to map each original point to the corresponding point in the object model.
[0080] In some possible implementations, the apparatus further includes a data preprocessing module, the data preprocessing module being used for: After acquiring the status data of each point within the diagnostic time window, the status data is subjected to quality checks. In cases where key location status data is missing, the missing locations will be marked as uncertain items.
[0081] In some possible implementations, the redundancy assessment module 730 includes an automatic condition determination submodule, which is used for: If the status data at the automatic mode point of the pump indicates automatic mode, the status data at the fault point indicates no fault, the status data at the control power point indicates normal power supply, and the status data at the operation feedback point indicates no abnormal operation feedback, then the pump is deemed to have the conditions for automatic start-up. If the status data at the automatic mode point indicates non-automatic mode, the status data at the fault point indicates a fault, the status data at the control power point indicates an abnormal power supply, or the status data at the operation feedback point indicates an abnormal operation feedback, the pump is determined to be unable to automatically start and the reason for the failure is recorded.
[0082] In some possible implementations, the redundancy assessment module 730 further includes a redundancy state determination submodule, which is used for: Based on whether each pump has the capability to automatically start, count the number of pumps that have the capability to automatically start. If the number is greater than or equal to two, the redundancy state is determined to be redundancy normal; When the quantity is equal to one, the redundancy state is determined to be single-pump protection and a yellow warning is generated; If the number is zero or all pumps are in non-automatic mode, the redundancy state is determined to be insufficient for automatic operation, and a red warning is generated.
[0083] In some possible implementations, the response state determination module 740 is used to: If the status data at the start feedback point indicates that start feedback has occurred, the status data at the run feedback point indicates that run feedback has not occurred within the set time window, and the status data at the fault point indicates that there is no accompanying fault, the start response status is determined to be start failure or run feedback loop abnormal. If the status data at the start-up feedback point indicates that start-up feedback has not occurred and the pump does not meet the conditions for automatic start-up, the start-up response status is determined to be insufficient control conditions.
[0084] In some possible implementations, the report generation module 750 is used for: The redundancy status of the pump set, the scenario of rising water level in the sump, the start-up response status, the status evidence of each point, the cause of failure and the uncertainty items are obtained. A diagnostic report is generated based on the information obtained. The diagnostic report includes evidence points, a ranking of suspected causes, and recommendations for further examination.
[0085] The availability assessment device for hydropower plant leakage drainage pump sets provided in this embodiment of the invention can execute the availability assessment method for hydropower plant leakage drainage pump sets provided in any embodiment of the invention, and has the corresponding functional modules and beneficial effects of the method.
[0086] Figure 8 This is a schematic diagram of an electronic device for performing an availability assessment method for a hydropower plant seepage drainage pump set, provided as an embodiment of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptops, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframes, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital assistants, cellular phones, smartphones, wearable devices (e.g., helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely illustrative and are not intended to limit the implementation of the invention described and / or claimed herein.
[0087] like Figure 8As shown, the electronic device 80 includes at least one processor 81 and a memory, such as a read-only memory (ROM) 82 or a random access memory (RAM) 83, communicatively connected to the at least one processor 81. The memory stores computer programs executable by the at least one processor. The processor 81 can perform various appropriate actions and processes based on the computer program stored in the ROM 82 or loaded from storage unit 88 into the RAM 83. The RAM 83 can also store various programs and data required for the operation of the electronic device 80. The processor 81, ROM 82, and RAM 83 are interconnected via a bus 84. An input / output (I / O) interface 85 is also connected to the bus 84.
[0088] Multiple components in electronic device 80 are connected to I / O interface 85, including: input unit 86, such as keyboard, mouse, etc.; output unit 87, such as various types of monitors, speakers, etc.; storage unit 88, such as disk, optical disk, etc.; and communication unit 89, such as network card, modem, wireless transceiver, etc. Communication unit 89 allows electronic device 80 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.
[0089] Processor 81 can be a variety of general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of processor 81 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special-purpose artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, digital signal processors (DSPs), and any suitable processor, controller, microcontroller, etc. Processor 81 performs the various methods and processes described above, such as the availability assessment method for a hydroelectric power plant seepage drainage pump set.
[0090] In some embodiments, the availability assessment method for the hydropower plant seepage drainage pump set can be implemented as a computer program tangibly contained in a computer-readable storage medium, such as storage unit 88. In some embodiments, part or all of the computer program can be loaded and / or installed on electronic device 80 via ROM 82 and / or communication unit 89. When the computer program is loaded into RAM 83 and executed by processor 81, one or more steps of the availability assessment method for the hydropower plant seepage drainage pump set described above can be performed. Alternatively, in other embodiments, processor 81 can be configured to perform the availability assessment method for the hydropower plant seepage drainage pump set by any other suitable means (e.g., by means of firmware).
[0091] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific integrated circuits (ASICs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.
[0092] Computer programs used to implement the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when executed by the processor, the computer programs cause the functions / operations specified in the flowcharts and / or block diagrams to be performed. The computer programs may be executed entirely on a machine, partially on a machine, or as a standalone software package, partially on a machine and partially on a remote machine, or entirely on a remote machine or server.
[0093] In the context of this invention, a computer-readable storage medium can be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, apparatus, or device. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fibers, compact disc read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0094] To provide interaction with a user, the systems and techniques described herein can be implemented on an electronic device having: a display device (e.g., a cathode ray tube (CRT) or liquid crystal display (LCD) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the electronic device. Other types of devices can also be used to provide interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including sound input, voice input, or tactile input).
[0095] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or middleware components (e.g., application servers), or frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include local area networks (LANs), wide area networks (WANs), blockchain networks, and the Internet.
[0096] A computing system can include clients and servers. Clients and servers are generally located far apart and typically interact through communication networks. The client-server relationship is created by computer programs running on the respective computers and having a client-server relationship with each other. The server can be a cloud server, also known as a cloud computing server or cloud host, which is a hosting product within the cloud computing service system to address the shortcomings of traditional physical hosts and Virtual Private Server (VPS) services, such as high management difficulty and weak business scalability.
[0097] It should be understood that the various forms of processes shown above can be used, with steps reordered, added, or deleted. For example, the steps described in this invention can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution of this invention can be achieved, and this is not limited herein.
[0098] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.
Claims
1. A method for assessing the availability of a hydropower station powerhouse leakage drainage pump set, characterized in that, include: Establish an object model for the pump group, which is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point, and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well. The semantic agent parses the semantic information in the original point names and maps each original point to the corresponding point in the object model based on the parsing results. Acquire the status data of each point within the diagnostic time window, and determine whether each pump has the conditions for automatic start-up based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point and the status data of the operation feedback point, and evaluate the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up. If a rise in the water level of the collection well is detected based on the status data of the water level alarm point of the collection well, the start-up response status is determined based on the time relationship between the status data of the start-up feedback point, the operation feedback point and the fault point within the diagnostic time window. A diagnostic report containing the redundant state and the startup response state is generated by the reporting agent.
2. The method according to claim 1, characterized in that, The establishment of the object model for the pump set includes: Establish an object model of the pump set based on the equipment model, factory area, and pump number; Associate the automatic mode point, operation feedback point, fault point, start-up feedback point, and control power point corresponding to each pump with the object model; Associate the water level alarm points of the collection well with the object model.
3. The method according to claim 1, characterized in that, The step of parsing the semantic information in the original point name through a point semantic agent includes: Obtain the original name of each point in the pump set; Based on the original name, identify the pump number, location type, and status polarity of each location; The recognition results are written into a mapping table, which is used to map each original point to the corresponding point in the object model.
4. The method according to claim 1, characterized in that, After acquiring the status data of each point within the diagnostic time window, the method further includes: Perform a quality check on the status data; In cases where key location status data is missing, the missing locations will be marked as uncertain items.
5. The method according to claim 1, characterized in that, The determination of whether each pump meets the conditions for automatic start-up includes: If the status data at the automatic mode point of the pump indicates automatic mode, the status data at the fault point indicates no fault, the status data at the control power point indicates normal power supply, and the status data at the operation feedback point indicates no abnormal operation feedback, then the pump is deemed to have the conditions for automatic start-up. If the status data at the automatic mode point indicates non-automatic mode, the status data at the fault point indicates a fault, the status data at the control power point indicates an abnormal power supply, or the status data at the operation feedback point indicates an abnormal operation feedback, the pump is determined to be unable to automatically start and the reason for the failure is recorded.
6. The method according to claim 5, characterized in that, The assessment of the redundancy status of the pump set includes: Based on whether each pump has the capability to automatically start, count the number of pumps that have the capability to automatically start. If the number is greater than or equal to two, the redundancy state is determined to be redundancy normal; When the quantity is equal to one, the redundancy state is determined to be single-pump protection and a yellow warning is generated; If the number is zero or all pumps are in non-automatic mode, the redundancy state is determined to be insufficient for automatic operation, and a red warning is generated.
7. The method according to claim 5, characterized in that, Determining the startup response status includes: If the status data at the start feedback point indicates that start feedback has occurred, the status data at the run feedback point indicates that run feedback has not occurred within the set time window, and the status data at the fault point indicates that there is no accompanying fault, the start response status is determined to be start failure or run feedback loop abnormal. If the status data at the start-up feedback point indicates that start-up feedback has not occurred and the pump does not meet the conditions for automatic start-up, the start-up response status is determined to be insufficient control conditions.
8. The method according to claim 1, characterized in that, The step of generating a diagnostic report containing the redundancy state and the startup response state through the reporting agent includes: The redundancy status of the pump set, the scenario of rising water level in the sump, the start-up response status, the status evidence of each point, the cause of failure and the uncertainty items are obtained. A diagnostic report is generated based on the information obtained. The diagnostic report includes evidence points, a ranking of suspected causes, and recommendations for further examination.
9. A device for assessing the availability of a hydropower station powerhouse leakage drainage pump set, characterized in that, include: The model building module is used to establish an object model of the pump group. The object model is associated with the automatic mode point, operation feedback point, fault point, start-up feedback point and control power point corresponding to each pump in the pump group, as well as the water level alarm point of the sump well. The point mapping module is used to parse the semantic information in the original point names through the point semantic agent, and map each original point to the corresponding point in the object model according to the parsing result; The redundancy assessment module is used to acquire the status data of each point within the diagnostic time window, and to determine whether each pump has the conditions for automatic start-up based on the status data of the automatic mode point, the status data of the fault point, the status data of the control power point and the status data of the operation feedback point, and to assess the redundancy status of the pump group based on whether each pump has the conditions for automatic start-up. The response status determination module is used to determine the start response status based on the time relationship between the status data of the start feedback point, the operation feedback point, and the fault point within the diagnostic time window when the rise in water level of the water collection well is identified based on the status data of the start feedback point, the operation feedback point, and the fault point. The report generation module is used to generate a diagnostic report containing the redundant state and the startup response state through a report agent.
10. An electronic device, characterized in that, The electronic device includes: At least one processor; and a memory communicatively connected to the at least one processor; The memory stores a computer program that can be executed by the at least one processor, which is then executed by the at least one processor to enable the at least one processor to perform the availability assessment method for the hydropower plant leakage drainage pump set as described in any one of claims 1-8.