High-pressure hydrogen storage pressure-stabilizing mutual backup hydrogen supply system and control method

By designing a high-pressure hydrogen storage and stabilization system and control method, and utilizing backup connection devices and detection devices, mutual backup hydrogen supply is achieved in the event of a single-sided anomaly, ensuring the normal operation of the dual-engine hydrogen-powered aircraft. This solves the problem that existing technologies cannot achieve mutual backup hydrogen supply and closed-loop control, and improves the safety and reliability of the system.

CN123134358APending Publication Date: 2026-11-20BEIJING HYDROGEN ENERGY GENERAL AVIATION INNOVATION RESEARCH INSTITUTE +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611019566.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-09
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing high-pressure gaseous hydrogen storage and supply systems cannot provide backup hydrogen supply or achieve closed-loop control when one side is abnormal. They lack operating mode switching rules suitable for dual-engine hydrogen-powered aircraft and cannot solve the problems of whether backup is allowed on the abnormal side, differentiated handling of leakage areas, and safety boundaries.

Method used

Design a high-pressure hydrogen storage and stabilization mutual backup hydrogen supply system, including two hydrogen supply systems, a backup connection device and a detection device. The control device determines whether the mutual backup permission conditions are met based on the working status of the detection device, controls the abnormal side hydrogen supply system to shut down and starts the backup connection device to supply hydrogen to the hydrogen-using device, ensuring that the normal side hydrogen supply system continues to supply hydrogen.

Benefits of technology

This system enables the normal hydrogen supply system to continue supplying hydrogen to both hydrogen-consuming units even when one side experiences an anomaly, ensuring the normal operation of the hydrogen-consuming units. It solves the problem of the inability to perform mutual backup hydrogen supply and closed-loop control in existing technologies, and improves the safety and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123134358A_ABST
    Figure CN123134358A_ABST
Patent Text Reader

Abstract

The application provides a high-pressure hydrogen storage pressure stabilizing mutual backup hydrogen supply system and a control method, which comprises two hydrogen supply systems, a backup communication device, a detection device and a control device; the two hydrogen supply systems are connected with two hydrogen using devices one by one; the backup communication device is connected with the two hydrogen supply systems and is arranged between the first-stage pressure reduction units and the second-stage pressure reduction units of the two hydrogen supply systems; the detection device detects the working conditions of the two hydrogen supply systems and the backup communication device; and the control device is used for controlling the hydrogen supply system on the abnormal side to be closed and controlling the backup communication device to be started to supply hydrogen to the two hydrogen using devices when it is determined that it is a single-side upstream abnormality belonging to mutual backup permission. In the application, the normal-side hydrogen supply system can supply hydrogen to the two hydrogen using devices when one side is abnormal, mutual backup hydrogen supply is realized, and the working conditions detected by the detection device can provide a basis for the control device to judge whether it is a single-side upstream abnormality belonging to mutual backup permission, so that closed-loop control of the control device is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of high-pressure hydrogen supply technology, and more specifically, to a high-pressure hydrogen storage, stabilization, and backup hydrogen supply system and its control method. Background Technology

[0002] Existing high-pressure gaseous hydrogen storage and supply systems typically include: high-pressure hydrogen storage cylinders, cylinder valve combinations, filters, pressure reducing valves, isolation valves, pressure sensors, temperature sensors, hydrogen concentration sensors, safety relief devices, venting pipelines, and controllers. When the hydrogen users are two engines, two hydrogen power units, or two hydrogen-consuming devices in a twin-engine hydrogen-powered aircraft, the common practice is to supply hydrogen to multiple devices via a main pipe or manifold from a single cylinder group. While this can achieve basic hydrogen supply, it typically does not consider maintaining hydrogen supply capability in the event of a single-side failure of the twin-engine hydrogen-powered aircraft platform, adapting to backup hydrogen supply pressure, handling differentiated leak areas, safe venting, and fuselage section installation constraints as a whole system design. Therefore, existing systems have the following drawbacks: First, existing dual- or multi-channel hydrogen supply schemes mostly remain at the level of main pipe hydrogen supply or simple backup hydrogen supply, lacking suitable operating mode switching rules for twin-engine hydrogen-powered aircraft, and failing to address safety boundary issues such as whether backup is allowed on the abnormal side, whether the abnormal side has pressure stabilization conditions, and whether hydrogen replenishment is prohibited in the leak area. Second, existing pressure, temperature, hydrogen concentration, and valve position feedback are usually only used as alarm or shut-off criteria. Differentiated actions are not established for hydrogen storage cylinder / cylinder valve area, medium-pressure connection path, abnormal side secondary pressure reduction unit, engine interface area, maintenance opening, and venting path, making it impossible to achieve closed-loop control. Summary of the Invention

[0003] In view of this, the present invention proposes a high-pressure hydrogen storage and stabilization system with mutual backup hydrogen supply, aiming to solve the problem that existing high-pressure gaseous hydrogen storage and supply systems cannot provide mutual backup hydrogen supply and cannot achieve closed-loop control when one side is abnormal. The present invention also proposes a high-pressure hydrogen storage and stabilization system with mutual backup hydrogen supply control method.

[0004] In one aspect, the present invention proposes a high-pressure hydrogen storage and stabilization mutual backup hydrogen supply system, which includes: two hydrogen supply systems, a backup connection device, a detection device, and a control device; wherein, the two hydrogen supply systems are respectively connected to two hydrogen-consuming devices in a one-to-one correspondence to supply hydrogen to the corresponding hydrogen-consuming devices, and each hydrogen supply system includes: a first-stage pressure reduction unit and a second-stage pressure reduction unit; the backup connection device is connected to both hydrogen supply systems and is located between the first-stage pressure reduction units and the second-stage pressure reduction units of the two hydrogen supply systems; the detection device is used to detect the operating status of the two hydrogen supply systems and the backup connection device; the control device is electrically connected to the detection device, the two hydrogen supply systems, and the backup connection device, and is used to control the hydrogen supply system on the abnormal side to shut down and control the backup connection device to start to supply hydrogen to the two hydrogen-consuming devices when it is determined that the abnormality belongs to a single upstream abnormality permitted by mutual backup, based on the detected operating status of the two hydrogen supply systems and the backup connection device.

[0005] Furthermore, in the aforementioned high-pressure hydrogen storage and stabilization mutual backup hydrogen supply system, the control device is used to first determine whether the prohibited mutual backup conditions are met based on the detected operating status of the two hydrogen supply systems and the backup connection device. If the prohibited mutual backup conditions are not met, the control device is used to determine whether it is a single-sided upstream anomaly. If it is a single-sided upstream anomaly, the control device is used to determine whether the mutual backup permission conditions are met. If the mutual backup permission conditions are met, the control device is used to shut down the hydrogen supply system on the abnormal side and start the backup connection device to supply hydrogen to the two hydrogen-consuming devices. The control device is also used to shut down the hydrogen supply system on the abnormal side and shut down the backup connection device when it is determined that the prohibited mutual backup conditions are met or the mutual backup permission conditions are not met.

[0006] Furthermore, in the aforementioned high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system, the backup connection device includes: a main pipeline, two first branch pipelines, two second branch pipelines, and two backup modules; wherein, the first end of the main pipeline is connected to the hydrogen supply pipeline between the first-stage pressure reducing unit and the second-stage pressure reducing unit in the two hydrogen supply systems through the two first branch pipelines respectively, and the second end of the main pipeline is connected to the hydrogen supply pipeline between the first-stage pressure reducing unit and the second-stage pressure reducing unit in the two hydrogen supply systems through the two second branch pipelines respectively, and the second branch pipelines are closer to the second-stage pressure reducing unit than the first branch pipelines; the two backup modules are correspondingly arranged on the two first branch pipelines to control the opening and closing of the corresponding first branch pipelines, and both backup modules are electrically connected to the control device.

[0007] Furthermore, in the aforementioned high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system, each backup module includes: a backup connecting valve and a check structure; wherein, the backup connecting valve and the check structure are connected in series in the first branch pipeline.

[0008] Furthermore, in the aforementioned high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system, each hydrogen supply system also includes: a hydrogen supply pipeline, a bottle valve, and a filter unit; wherein, the bottle valve, filter unit, first-stage pressure reducing unit, and second-stage pressure reducing unit are sequentially connected in series in the hydrogen supply pipeline; the bottle valve is electrically connected to the control device.

[0009] Furthermore, in the aforementioned high-pressure hydrogen storage and stabilization mutual backup hydrogen supply system, the control device is also used to control the cylinder valve of the abnormal side hydrogen supply system to close when it is determined that the mutual backup permission conditions are met, and to control the corresponding backup module of the normal side hydrogen supply system to start so that the normal side hydrogen supply system supplies hydrogen to the second-stage pressure reducing unit of the normal side hydrogen supply system and the abnormal side hydrogen supply system respectively through the corresponding backup module; the control device is also used to control the cylinder valve of the abnormal side hydrogen supply system to close and shut down the two backup modules when it is determined that the mutual backup prohibition conditions are met or the mutual backup permission conditions are not met.

[0010] Furthermore, in the aforementioned high-pressure hydrogen storage and stabilization mutual backup hydrogen supply system, the mutual backup permitting conditions include: no leakage in the interface area of ​​the hydrogen-using device corresponding to the abnormal side of the hydrogen supply system; no leakage and usability of the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the abnormal side of the hydrogen supply system; no leakage in the backup connecting device; the hydrogen storage margin of the normal side of the hydrogen supply system meets the requirements; the venting path is available or confirmed; the backup connecting device is normal; the maintenance opening is in a safe state; and the detection device and communication status are reliable. The mutual backup prohibiting conditions include: leakage in the interface area of ​​the hydrogen-using device corresponding to the abnormal side of the hydrogen supply system; leakage in the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the abnormal side of the hydrogen supply system; leakage in the backup connecting device; unconfirmed abnormality of the venting path; temperature and pressure exceeding design requirements; the second-stage pressure reducing unit in the abnormal side of the hydrogen supply system is unavailable; the hydrogen storage margin of the normal side of the hydrogen supply system is insufficient; the backup connecting device is abnormal; the maintenance opening is in an abnormal state; and the detection device and communication status are unreliable.

[0011] In this invention, two hydrogen supply systems independently supply hydrogen to two hydrogen-using devices. A backup connecting device is connected to the two hydrogen supply systems and located in the medium-pressure pipe section between the first-stage and second-stage pressure-reducing units of the two hydrogen supply systems. When the control device determines that a single-sided upstream anomaly is permissible under mutual backup conditions based on the operating status of the two hydrogen supply systems and the backup connecting device detected by the detection device, it controls the hydrogen supply system on the abnormal side to shut down and controls the backup connecting device to start supplying hydrogen to the two hydrogen-using devices. In this way, when one side is abnormal, the hydrogen supply system on the normal side can still supply hydrogen to the two hydrogen-using devices, ensuring the normal operation of the hydrogen-using devices and realizing mutual backup hydrogen supply. Furthermore, the operating status detected by the detection device can provide a basis for the control device to determine whether it is a single-sided upstream anomaly permissible under mutual backup conditions, which facilitates the closed-loop control of the control device. This solves the problem in the prior art that high-pressure gaseous hydrogen storage and supply systems cannot perform mutual backup hydrogen supply and cannot achieve closed-loop control when one side is abnormal.

[0012] On the other hand, the present invention also proposes a high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method for any of the above-mentioned high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply systems. The method includes the following steps: a data acquisition step, acquiring the operating status of the two hydrogen supply systems and the backup connection device; a mutual backup prohibition condition judgment step, judging whether the mutual backup prohibition condition is met; a single-sided upstream anomaly judgment step, judging whether the single-sided upstream anomaly is met when it is determined that the mutual backup prohibition condition is not met; a mutual backup permission condition judgment step, judging whether the mutual backup permission condition is met when it is determined that the mutual backup permission condition is met; and a control step, when it is determined that the mutual backup permission condition is met, shutting down the hydrogen supply system on the abnormal side and controlling the backup connection device to start to supply hydrogen to the two hydrogen-consuming devices.

[0013] Furthermore, in the above-mentioned high-pressure hydrogen storage and stabilization mutual backup hydrogen supply control method, between the acquisition step and the step of determining the prohibition of mutual backup conditions, the following steps are also included: pre-storing the fault area, determining the abnormal area based on the working status of the two hydrogen supply systems and the backup connection device, and determining the abnormality level.

[0014] Furthermore, in the aforementioned high-pressure hydrogen storage and stabilization mutual backup hydrogen supply control method, the mutual backup prohibition condition judgment step includes the following conditions: leakage in the interface area of ​​the hydrogen-using device corresponding to the abnormal side's hydrogen supply system; leakage in the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the abnormal side's hydrogen supply system; leakage in the backup connection device; unconfirmed abnormal venting path; temperature and pressure exceeding design requirements; unusable second-stage pressure reducing unit in the abnormal side's hydrogen supply system; insufficient hydrogen storage margin in the normal side's hydrogen supply system; abnormal backup connection device; maintenance opening in an abnormal state; and unreliable detection device and communication status. In the mutual backup permission condition judgment step, the mutual backup permission conditions... The components include: no leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; no leakage and usability of the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connection device; the hydrogen storage margin of the hydrogen supply system on the normal side meets the requirements; the venting path is available or confirmed; the backup connection device is normal; the maintenance opening is in a safe state; and the detection device and communication status are reliable. When it is determined that the mutual backup is prohibited or the mutual backup permission conditions are not met, the valves of the hydrogen supply system on the abnormal side are closed, and the backup connection device is closed. After the venting path status is confirmed, the backup connection device is controlled to vent the residual hydrogen in a controlled manner.

[0015] In this invention, the operating status of two hydrogen supply systems and a backup connection device is first collected. Then, it is determined whether the prohibition of mutual backup is met. If the prohibition of mutual backup is not met, it is determined whether it is a single-sided upstream anomaly. If it is determined to be a single-sided upstream anomaly, it is determined whether the mutual backup permission condition is met. If the mutual backup permission condition is met, the hydrogen supply system on the abnormal side is shut down, and the backup connection device is started to supply hydrogen to the two hydrogen-consuming devices. In this way, when one side is abnormal, the hydrogen supply system on the normal side can still supply hydrogen to the two hydrogen-consuming devices, ensuring the normal operation of the hydrogen-consuming devices and realizing mutual backup hydrogen supply. Furthermore, the collected operating status of the two hydrogen supply systems and the backup connection device can provide a basis for subsequent judgments, realizing closed-loop control. Attached Figure Description

[0016] Various other advantages and benefits will become apparent to those skilled in the art upon reading the following detailed description of preferred embodiments. The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Furthermore, the same reference numerals denote the same parts throughout the drawings. In the drawings: Figure 1 This is a structural block diagram of a high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system provided in an embodiment of the present invention. Figure 2 This is a schematic diagram of the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the installed structure of the high-pressure hydrogen storage, stabilization, and backup hydrogen supply system provided in an embodiment of the present invention. Figure 4 A schematic diagram of the backup connection device in the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system provided in this embodiment of the invention; Figure 5 A schematic diagram of the backup connection device in the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system provided in this embodiment of the invention; Figure 6 A schematic diagram of the hydrogen supply system in the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system provided in this embodiment of the invention; Figure 7 A flowchart of the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method provided in this embodiment of the invention; Figure 8 This is another flowchart of the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method provided in the embodiments of the present invention. Detailed Implementation

[0017] Exemplary embodiments of the present disclosure will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the disclosure to those skilled in the art. It should be noted that, unless otherwise specified, the embodiments and features described herein can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0018] System Implementation Example: See Figures 1 to 6 The figure shows a preferred structure of the high-pressure hydrogen storage, stabilizing, and mutually redundant hydrogen supply system in this embodiment. As shown, the high-pressure hydrogen storage, stabilizing, and mutually redundant hydrogen supply system includes: two hydrogen supply systems 1, a backup connection device 2, a detection device 3, and a control device 4. The two hydrogen supply systems 1 are respectively connected to two hydrogen-consuming devices 5 in a one-to-one correspondence to supply hydrogen to the corresponding hydrogen-consuming device 5. Specifically, the two hydrogen supply systems 1 correspond one-to-one with the two hydrogen-consuming devices 5, and each hydrogen supply system 1 supplies hydrogen to the corresponding hydrogen-consuming device 5. One end of each hydrogen supply system 1 is connected to a hydrogen storage cylinder or a hydrogen storage cylinder group 7, and the other end of each hydrogen supply system 1 is connected to the corresponding hydrogen-consuming device 5.

[0019] Each hydrogen supply system 1 includes a first-stage pressure reduction unit 11 and a second-stage pressure reduction unit 12, which are connected in series.

[0020] See Figure 2 Each hydrogen supply system 1 further includes: a hydrogen supply pipeline 13, a bottle neck valve 14, and a filter unit 15. The bottle neck valve 14, filter unit 15, first-stage pressure reducing unit 11, and second-stage pressure reducing unit 12 are sequentially connected in series in the hydrogen supply pipeline 13. The second-stage pressure reducing unit 12 is connected to the hydrogen-using device 5 to supply hydrogen to it. Specifically, the bottle neck valve 14 can also be a combination bottle neck valve. The hydrogen storage cylinder or hydrogen storage cylinder group 7 is connected to the corresponding hydrogen-using device 5 via the hydrogen supply pipeline 13. The hydrogen supply pipeline 13 is sequentially equipped with a bottle neck valve 14 or a combination bottle neck valve, a filter unit 15, a first-stage pressure reducing unit 11, a second-stage pressure reducing unit 12, a branch isolation valve, a main hydrogen valve, and an engine inlet pressure detection point located between the second-stage pressure reducing unit 12 and the inlet of the corresponding hydrogen-using device 5.

[0021] The backup connection device 2 is connected to both hydrogen supply systems 1. The backup connection device 2 is located between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12 of the two hydrogen supply systems 1. Specifically, the backup connection device 2 is connected after the first-stage pressure reducing unit 11 and before the second-stage pressure reducing unit 12. Thus, the backup connection device 2 is located in the medium-pressure pipe section after the first-stage pressure reducing unit 11 and before the second-stage pressure reducing unit 12, so as to reduce the pressure rating of the backup connection device 2 and retain the secondary pressure stabilization capability on the abnormal side.

[0022] See Figure 2 , Figure 4 and Figure 5 In the above embodiment, the backup connection device 2 includes: a main pipeline 22, two first branch pipelines 23, two second branch pipelines 24, and two backup modules 21. The first end of the main pipeline 22 is connected to the hydrogen supply pipeline 13 between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12 in the two hydrogen supply systems 1 via the two first branch pipelines 23. The second end of the main pipeline 22 is connected to the hydrogen supply pipeline 13 between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12 in the two hydrogen supply systems 1 via the two second branch pipelines 24. Furthermore, the second branch pipelines 24 are closer to the second-stage pressure reducing unit 12 than the first branch pipelines 23. Specifically, the first end of the main pipeline 22 is connected to the first end of each of the two first branch pipelines 23. Each of the two first branch pipelines 23 corresponds one-to-one with one of the two hydrogen supply systems 1. The second end of each first branch pipeline 23 is connected to the corresponding hydrogen supply pipeline 13 in the hydrogen supply system 1 and is positioned between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12.

[0023] The second end of the main pipe 22 is connected to the first ends of both second branch pipes 24. The two second branch pipes 24 correspond one-to-one with the two hydrogen supply systems 1. The second end of each second branch pipe 24 is connected to the hydrogen supply pipe 13 in the corresponding hydrogen supply system 1 and is also located between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12. However, the second branch pipe 24 is closer to the second-stage pressure reducing unit 12 than the first branch pipe 23.

[0024] Two backup modules 21 correspond one-to-one with two first branch pipes 23. Each backup module 21 is set on the corresponding first branch pipe 23, and each backup module 21 is used to control the opening and closing of the corresponding first branch pipe 23.

[0025] Preferably, each backup module 21 includes a backup connecting valve 211 and a check structure 212. The backup connecting valve 211 and the check structure 212 are connected in series on the first branch pipe 23. Specifically, there can be two check structures 212, connected in series.

[0026] In practice, each first branch pipeline 23 is also equipped with a connecting path venting interface 213, a pressure or differential pressure detection point, a valve position feedback unit, and necessary pipeline fixing and vibration damping installation structures.

[0027] The detection device 3 is used to detect the operating status of the two hydrogen supply systems 1 and the backup connection device 2. Specifically, the detection device 3 may include: a high-pressure sensor, a pressure sensor after the first-stage pressure reduction unit, a pressure sensor after the second-stage pressure reduction unit, a hydrogen consumption unit inlet pressure detection unit, a temperature sensor, a zoned hydrogen concentration sensor, a valve position feedback unit, a communication status detection unit, a maintenance opening status detection unit, and an venting path status detection unit.

[0028] The control device 4 is electrically connected to the detection device 3, the two hydrogen supply systems 1 and the backup connection device 2. Specifically, the control device 4 is electrically connected to the backup connection valve 211 in the two backup modules 21, and the control device 4 is electrically connected to the bottle valve 14 in the two hydrogen supply systems 1.

[0029] The control device 4 is used to receive the operating status of the two hydrogen supply systems 1 and the backup connection device 2 detected by the detection device 3, and when it is determined that there is a single-sided upstream anomaly under mutual backup permission based on the detected operating status of the two hydrogen supply systems 1 and the backup connection device 2, it controls the hydrogen supply system 1 on the abnormal side to shut down and controls the backup connection device 2 to start to supply hydrogen to the two hydrogen-consuming devices 5.

[0030] In specific implementation, the backup connecting valve 211 can be a solenoid valve, electric valve, pneumatic valve, or redundant valve group. The check structure 212 can be configured as a pair of one-way valves, a two-way anti-backflow valve group, or an equivalent anti-backflow structure according to the mutual backup direction. It is used to release medium-pressure hydrogen on the normal side in the permitted mutual backup direction and prevent abnormal side gas, venting main gas, or abnormal side pressure from entering the normal side hydrogen supply branch in reverse.

[0031] In practice, the control device 4 communicates wirelessly with the detection device 3, the two hydrogen supply systems 1 and the backup communication device 2. Specifically, the communication method can be CAN, RS485, ARINC, Ethernet or other communication methods allowed by the aviation platform.

[0032] In practice, the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system can be applied to dual-engine hydrogen-powered aircraft or other fields; this example does not impose any restrictions on it.

[0033] As can be seen, in this embodiment, the two hydrogen supply systems 1 independently supply hydrogen to the two hydrogen-using devices 5. The backup connecting device 2 is connected to the two hydrogen supply systems 1 and is located in the medium-pressure pipe section between the first-stage pressure reducing unit 11 and the second-stage pressure reducing unit 12 of the two hydrogen supply systems 1. When the control device 4 determines that a single-sided upstream anomaly is permitted under mutual backup conditions based on the working status of the two hydrogen supply systems 1 and the backup connecting device 2 detected by the detection device 3, it controls the hydrogen supply system 1 on the abnormal side to shut down and controls the backup connecting device 2 to start to supply hydrogen to the two hydrogen-using devices 5. In this way, when one side is abnormal, the hydrogen supply system 1 on the normal side can still supply hydrogen to the two hydrogen-using devices 5, ensuring the normal operation of the hydrogen-using devices 5 and realizing mutual backup hydrogen supply. Furthermore, the working status detected by the detection device 3 can provide a basis for the control device 4 to determine whether it is a single-sided upstream anomaly permitted under mutual backup conditions, which facilitates the closed-loop control of the control device 4 and solves the problem in the prior art that the high-pressure gaseous hydrogen storage and supply system cannot perform mutual backup hydrogen supply and cannot achieve closed-loop control when one side is abnormal.

[0034] See Figure 1 In the above embodiment, the control device 4 is used to first determine whether the prohibited mutual backup condition is met based on the detected operating status of the two hydrogen supply systems 1 and the backup connection device 2. If the prohibited mutual backup condition is not met, it is determined whether it is a single-sided upstream anomaly. If it is determined to be a single-sided upstream anomaly, it is then determined whether the mutual backup permission condition is met. If the mutual backup permission condition is met, the control device 4 controls the hydrogen supply system 1 on the abnormal side to shut down and controls the backup connection device 2 to start to supply hydrogen to the two hydrogen-consuming devices 5. Specifically, when the control device 4 determines that the mutual backup permission condition is met, it controls the bottle valve 14 of the hydrogen supply system 1 on the abnormal side to close and controls the backup connection valve 211 in the backup module 21 corresponding to the hydrogen supply system 1 on the normal side to start, so that the hydrogen supply system 1 on the normal side supplies hydrogen to the second-stage pressure reducing unit 12 of the hydrogen supply system 1 on the normal side and the hydrogen supply system 1 on the abnormal side through the corresponding backup module 21.

[0035] The control device 4 is also used to shut down the hydrogen supply system 1 on the abnormal side and close the backup connection device 2 when it is determined that the conditions for prohibiting mutual backup are met or the conditions for mutual backup are not met. Specifically, when it is determined that the conditions for prohibiting mutual backup are met or the conditions for mutual backup are not met, the control device 4 controls the cylinder valve 14 of the hydrogen supply system 1 on the abnormal side to close and closes the backup connection valve 211 in the two backup modules 21.

[0036] In practice, the detection device 3 does not only display alarms, but also directly participates in the judgment of mutual backup permission, mutual backup prohibition and unilateral isolation.

[0037] The conditions for mutual backup include: no leakage in the interface area of ​​the hydrogen-using device 5 corresponding to the hydrogen supply system on the abnormal side; no leakage and usability of the second-stage pressure reducing unit 12 and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connecting device 2; hydrogen storage margin of the hydrogen supply system on the normal side meets the requirements; the venting path is available or confirmed; the backup connecting device 2 is normal; the maintenance opening is in a safe state; and the detection device 3 and communication status are reliable.

[0038] The conditions under which mutual backup is prohibited include: leakage in the interface area of ​​hydrogen-using device 5 corresponding to the hydrogen supply system on the abnormal side; leakage in the second-stage pressure reducing unit 12 and its upstream medium-pressure pipe section in the hydrogen supply system on the abnormal side; leakage in backup connecting device 2; unconfirmed abnormality of the venting path; temperature and pressure exceeding design requirements; unavailability of the second-stage pressure reducing unit 12 in the hydrogen supply system on the abnormal side; insufficient hydrogen storage margin in the hydrogen supply system on the normal side; abnormality of backup connecting device 2; maintenance opening in an abnormal state; and unreliable status of detection device 3 and communication.

[0039] In specific implementation, if the hydrogen supply system on the abnormal side leaks at the interface area of ​​the hydrogen-using device 5, the backup connection path leaks, the second-stage pressure reducing unit or its front-end medium-pressure pipe section on the normal side leaks, the venting path is not confirmed, TPRD / overpressure / overtemperature triggering occurs, the second-stage pressure reducing unit on the abnormal side is unavailable, the hydrogen supply margin on the normal side is insufficient, the backup connection valve 211 feedback is abnormal, the maintenance opening is abnormal or its status is unreliable, etc., the control device 4 will prohibit the mutual backup hydrogen replenishment to the relevant area and will execute the prohibition of the two backup connection valves 211, controlled venting, or maintaining isolation pending confirmation.

[0040] Permissible upstream anomalies with mutual backup refer to isolable insufficient supply, insufficient pressure, valve closure failure, or a decrease in non-leakage hydrogen supply capacity before the first-stage pressure reducing unit. If the anomaly is accompanied by leakage, over-temperature, over-pressure, safety venting, or TPRD triggering in the hydrogen storage cylinder area, cylinder valve area, high-pressure section before the first-stage pressure reducing unit, medium-pressure section from the first-stage pressure reducing unit to the second-stage pressure reducing unit, the normal-side second-stage pressure reducing unit body, or the interface area of ​​the normal-side hydrogen consumption unit, then it is not considered a permissible upstream anomaly with mutual backup.

[0041] Two hydrogen supply systems 1 are designated as the first-side hydrogen supply system and the second-side hydrogen supply system, respectively. When an upstream anomaly occurs in the first-side hydrogen supply system that allows for mutual backup, if there is no leakage in the interface area of ​​the first-side hydrogen-using device, no leakage and usability in the second-stage pressure reducing unit 12 and its upstream medium-pressure pipe section, no leakage in the medium-pressure backup connection path, the hydrogen supply margin of the second-side hydrogen supply system meets the requirements, the venting path status has been confirmed, the backup connection valve 211 and its valve position feedback are normal, the maintenance opening is in a safe state, and the key sensors and communication status are reliable, then the control device 4 closes the bottle valve 14 in the first-side hydrogen supply system and opens the corresponding backup connection valve 211 in the second-side hydrogen supply system. This allows the hydrogen gas after the first-stage pressure reduction in the second-side hydrogen supply system to enter the second-stage pressure reducing unit 12 in the first-side hydrogen supply system, and then provides backup or downgraded hydrogen supply to the hydrogen-using device corresponding to the first-side hydrogen supply system, while simultaneously supplying hydrogen normally to the hydrogen-using device corresponding to the second-side hydrogen supply system. The same process can be followed when the second-side hydrogen supply system experiences an anomaly.

[0042] Under normal conditions, both backup connecting valves 211 are closed, and the two hydrogen supply systems 1 independently supply hydrogen to their respective hydrogen-consuming devices 5. In the event of a non-leakage anomaly on one upstream side and the mutual backup permission conditions are met, the cylinder valve 14 of the hydrogen supply system on the abnormal side is closed, the backup connecting valve 211 of the hydrogen supply system on the normal side is opened, backup or downgraded hydrogen supply is performed, and the venting interface 213 of the connecting path and related venting valves are kept closed.

[0043] If there is a leak in the interface area of ​​the hydrogen unit 5, a leak in the backup connection path, a leak in the second-stage pressure reducing unit body or its front-end medium-pressure pipe section in the abnormal side hydrogen supply system, an unconfirmed abnormal venting path, a TPRD trigger, or an unreliable status determination, then it is forbidden to replenish hydrogen to the relevant area. The relevant valves should be closed and a controlled venting path should be introduced after the venting path is confirmed, or isolation should be maintained and confirmation should be awaited.

[0044] In specific implementation, the control device 4 sets the backup connecting valve 211 and the connecting path venting interface 213 in each backup module 21 to be interlocked to prevent the normal hydrogen supply path and the safety venting path from being connected at the same time.

[0045] To prevent mutual backup from working, keep backup connection valve 211 closed, close the cylinder valve of the abnormal side hydrogen supply system, keep the normal side hydrogen supply system supplying hydrogen independently, start maintenance purging or wait for maintenance confirmation.

[0046] In practical implementation, the high-pressure hydrogen storage and stabilization backup hydrogen supply system 1 may further include: an installation device 6. The two hydrogen supply systems 1 and the backup connection device 2 are all installed on the installation device 6.

[0047] In practical implementation, the installation device 6 serves as a support for the hydrogen supply system 1 and may include: cylinder support brackets, pipeline fixing clamps, maintenance openings, and installation references that align with the compartment structure. The installation device 6 is used to support the maintainable installation of the two hydrogen supply systems 1, their interconnection, and the venting path.

[0048] In this embodiment, under normal conditions, the hydrogen supply pipelines 13 in the two hydrogen supply systems 1 operate independently. If there is a fault on one side of the upstream and the fault is not triggered, the hydrogen supply path on the other side can remain in independent operation, thereby avoiding the fault on one side from directly expanding into a double failure.

[0049] In this embodiment, the backup connection device 2 located on the medium-pressure side allows the hydrogen gas after the first-stage pressure reduction unit in the normal-side hydrogen supply system to enter the second-stage pressure reduction unit in both the normal-side and abnormal-side hydrogen supply systems. This reduces the pressure requirements of the two backup connection valves 211 and the connection pipelines (which include the main pipeline 22, two first branch pipelines 23, and two second branch pipelines 24) while retaining the secondary pressure stabilization capability at the inlet side of the hydrogen-using device corresponding to the abnormal-side hydrogen supply system.

[0050] In this embodiment, determining whether the problem is a single-sided upstream anomaly and meets the mutual backup permission conditions can prevent the continued replenishment of hydrogen to the leaking area when there is a leak in the interface area of ​​the hydrogen-using device or the medium-pressure connection path.

[0051] In summary, in this embodiment, when one side experiences an anomaly, the hydrogen supply system 1 on the normal side can still supply hydrogen to both hydrogen-consuming devices 5, ensuring the normal operation of the hydrogen-consuming devices 5. This achieves degraded, mutually redundant hydrogen supply without increasing leakage risk, bypassing the secondary pressure stabilization capability of the abnormal side's hydrogen supply system, or weakening the safe venting capability. Furthermore, the operating status detected by the detection device 3 provides a basis for the control device 4 to determine whether it constitutes a permissible, single-sided upstream anomaly, facilitating closed-loop control by the control device 4.

[0052] Method Implementation Examples: This embodiment also proposes a high-pressure hydrogen storage, stabilization, and backup hydrogen supply control method for any of the above-mentioned high-pressure hydrogen storage, stabilization, and backup hydrogen supply systems. The specific implementation process of the high-pressure hydrogen storage, stabilization, and backup hydrogen supply system can be found in the above description, and will not be repeated here.

[0053] See Figure 7 The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method includes the following steps: In step S1, the operating status of the two hydrogen supply systems and the backup connection device is collected.

[0054] Specifically, see Figures 1 to 6The detection device 3 collects the operating status of the two hydrogen supply systems 1 and the backup connection device 2, specifically collecting pressure, temperature, hydrogen concentration, valve position feedback, communication status, maintenance opening status, venting path status, and the requirements of the hydrogen-using device 5.

[0055] Step S2, which determines whether the condition prohibiting mutual backup is met, is used to determine whether the condition prohibiting mutual backup is met.

[0056] Specifically, the conditions under which mutual backup is prohibited include: leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; leakage in the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the hydrogen supply system on the abnormal side; leakage in the backup connecting device; unconfirmed abnormality in the venting path; temperature and pressure exceeding design requirements; unavailability of the second-stage pressure reducing unit in the hydrogen supply system on the abnormal side; insufficient hydrogen storage margin in the hydrogen supply system on the normal side; abnormality in the backup connecting device; maintenance opening in an abnormal state; and unreliable detection device and communication status.

[0057] In specific implementation, the conditions under which mutual backup is prohibited include at least the following: leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; leakage in the second-stage pressure reducing unit or its upstream medium-pressure pipe section in the hydrogen supply system on the abnormal side; leakage in the medium-pressure backup connection path; unconfirmed abnormality in the venting path; TPRD / overpressure / overtemperature triggering; unavailability of the second-stage pressure reducing unit in the hydrogen supply system on the abnormal side; insufficient hydrogen supply margin in the hydrogen supply system on the normal side; abnormal feedback of critical valve positions; abnormal status of maintenance openings; and unreliable status of critical sensors or communications. Prohibiting mutual backup does not equate to stopping all hydrogen supply, but rather to implement single-sided isolation on the abnormal side, maintain independent hydrogen supply on the normal side, and implement controlled venting or await maintenance confirmation.

[0058] Step S3 for judging anomalies on one side: If it is determined that the condition for prohibiting mutual backup is not met, it is determined whether it is an anomaly on one side of the upstream.

[0059] Specifically, when the condition of prohibiting mutual backup is determined, the valve of the hydrogen supply system on the abnormal side is closed, and the backup connection device 2 is closed. More specifically, the cylinder valve 14 of the hydrogen supply system on the abnormal side is closed, and the backup connection valve 211 in the two backup modules 21 is closed. After the venting path status is confirmed, the backup connection device 2 is controlled to vent the residual hydrogen in a controlled manner.

[0060] In the mutual backup license condition judgment step S4, if it is determined that the anomaly belongs to a single upstream side, it is determined whether the mutual backup license condition is met.

[0061] Specifically, when it is determined that the anomaly is caused by a single upstream component, it is determined whether the mutual backup permission conditions are met. When it is determined that the anomaly is not caused by a single upstream component, the two hydrogen supply systems 1 supply hydrogen independently and operate independently, while ensuring that the backup connection valves 211 of the two backup modules 21 are closed.

[0062] The conditions for mutual backup licenses include: no leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; no leakage and usability of the second-stage pressure reducing unit and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connecting device; hydrogen storage margin of the hydrogen supply system on the normal side meets the requirements; the venting path is available or confirmed; the backup connecting device is normal; the maintenance opening is in a safe state; and the detection device and communication status are reliable.

[0063] In specific implementation, the mutual backup licensing conditions include at least the following: no leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; no leakage and usability of the second-stage pressure reducing unit and its upstream medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connecting device 2 and its connecting path on the medium-pressure side; the hydrogen storage pressure, pressure after the first-stage pressure reducing unit, available flow rate, temperature status, and valve opening of the hydrogen supply system on the normal side are sufficient to provide predetermined backup or downgraded hydrogen supply to the hydrogen supply system on the abnormal side while maintaining the safe operation of the hydrogen-using device corresponding to the hydrogen supply system on the normal side; the venting path is available or confirmed; the backup connecting valve 211, check structure 212, valve position feedback, key sensors, and communication status are reliable; and the maintenance opening is closed, locked, or in a safe state confirmed by the control device. In specific implementation, pressure, temperature, hydrogen concentration, response time, and margin criteria can be confirmed based on the aircraft platform, engine requirements, and test data.

[0064] In control step S5, when it is determined that the mutual backup permission conditions are met, the hydrogen supply system on the abnormal side is shut down, and the backup connection device is started to supply hydrogen to the two hydrogen-consuming devices.

[0065] Specifically, when the mutual backup permit conditions are met, the cylinder valve 14 in the hydrogen supply system on the abnormal side is closed, and the backup connection valve 211 in the backup connection device 2 corresponding to the normal side hydrogen supply system is opened, allowing the normal side hydrogen supply system to supply hydrogen to both hydrogen-consuming devices. When the mutual backup permit conditions are not met, mutual backup is prohibited, the cylinder valve 14 in the hydrogen supply system on the abnormal side is closed, and both backup connection valves 211 in the backup connection device 2 are closed.

[0066] When the backup connecting device 2 starts supplying hydrogen, the connecting path venting port 213 and its corresponding venting valve remain closed.

[0067] When the conditions for mutual backup are determined to be prohibited or the conditions for mutual backup permission are not met, the cylinder valve 14 of the hydrogen supply system on the abnormal side is closed, and the two backup connecting valves 211 in the backup connecting device 2 are closed. After the venting path status is confirmed, the backup connecting device 2 is controlled to vent the residual hydrogen in a controlled manner. However, this does not mean that the secondary pressure-stabilized hydrogen supply path of the normal side hydrogen supply system, which has been permitted, is vented. Specifically, after closing the cylinder valve 14 of the hydrogen supply system on the abnormal side and closing the backup connecting device 2, it is determined whether the venting path status is confirmed. After confirming the venting path status, the backup connecting device 2 is controlled to vent the residual hydrogen in a controlled manner, and continuous monitoring is performed. More specifically, after the backup connecting valve 211 is closed, the cylinder valve 14 of the hydrogen supply system on the abnormal side is closed, and the venting path status is confirmed, the connecting path venting interface 213 is opened to vent the residual hydrogen in the medium-pressure connecting path or the isolated pipe section in a controlled manner.

[0068] After closing the cylinder valve 14 of the hydrogen supply system on the abnormal side and closing the backup connection device 2, determine whether continued isolation is required. If continued isolation is required, control the cylinder valve 14 of the hydrogen supply system on the abnormal side to remain closed, keep the hydrogen supply system on the abnormal side isolated, and continuously monitor it.

[0069] As can be seen from this embodiment, the operating status of the two hydrogen supply systems and the backup connection device is first collected. Then, it is determined whether the mutual backup prohibition condition is met. If the mutual backup prohibition condition is not met, it is determined whether it is a single-sided upstream anomaly. If it is determined that it is a single-sided upstream anomaly, it is determined whether the mutual backup permission condition is met. If the mutual backup permission condition is met, the hydrogen supply system on the abnormal side is shut down, and the backup connection device is started to supply hydrogen to the two hydrogen-consuming devices. In this way, when one side is abnormal, the hydrogen supply system on the normal side can still supply hydrogen to the two hydrogen-consuming devices, ensuring the normal operation of the hydrogen-consuming devices and realizing mutual backup hydrogen supply. Furthermore, the collected operating status of the two hydrogen supply systems and the backup connection device can provide a basis for subsequent judgments, realizing closed-loop control.

[0070] See Figure 8 The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method includes the following steps: In step S1, the operating status of the two hydrogen supply systems and the backup connection device is collected.

[0071] Step S6: Pre-store the fault area, determine the abnormal area based on the working status of the two hydrogen supply systems and the backup connection device, and determine the abnormality level.

[0072] Specifically, the fault area includes at least: the valve area of ​​the hydrogen storage cylinder or hydrogen supply system, the high-pressure section before the first-stage pressure reducing unit, the medium-pressure section from the first-stage pressure reducing unit to the second-stage pressure reducing unit, the connection path, the second-stage pressure reducing unit, the interface area of ​​the hydrogen-using device, the maintenance opening, the venting path, the communication status, and the sensor status.

[0073] The control device 4 pre-stores fault areas. The control device 4 determines the abnormal areas based on the working status of the two hydrogen supply systems 1 and the backup connection device 2, and judges the abnormal level of the abnormal areas.

[0074] Step S2, which determines whether the condition prohibiting mutual backup is met, is used to determine whether the condition prohibiting mutual backup is met.

[0075] Step S3 for judging anomalies on one side: If it is determined that the condition for prohibiting mutual backup is not met, it is determined whether it is an anomaly on one side of the upstream.

[0076] In the mutual backup license condition judgment step S4, if it is determined that the anomaly belongs to a single upstream side, it is determined whether the mutual backup license condition is met.

[0077] In control step S5, when it is determined that the mutual backup permission conditions are met, the hydrogen supply system on the abnormal side is shut down, and the backup connection device is started to supply hydrogen to the two hydrogen-consuming devices.

[0078] In summary, in this embodiment, when one side is abnormal, the hydrogen supply system on the normal side can still supply hydrogen to both hydrogen-using devices, ensuring the normal operation of the hydrogen-using devices and realizing mutual backup hydrogen supply. Furthermore, the collected operating status of the two hydrogen supply systems and the backup connection device can provide a basis for subsequent judgment, realizing closed-loop control.

[0079] It should be noted that the high-pressure hydrogen storage and stabilization system and the high-pressure hydrogen storage and stabilization system control method in this invention are based on the same principle, and related aspects can be referred to each other.

[0080] It should be noted that in the description of this invention, the terms "upper", "lower", "left", "right", "inner", "outer", etc., which indicate the direction or positional relationship, are based on the direction or positional relationship shown in the drawings. This is only for the convenience of description and is not intended to indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation of this invention.

[0081] Furthermore, it should be noted that, in the description of this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0082] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system, characterized in that, include: Two hydrogen supply systems (1), a backup connection device (2), a detection device (3), and a control device (4); among which, The two hydrogen supply systems (1) are respectively connected to the two hydrogen-using devices (5) in a one-to-one correspondence to supply hydrogen to the corresponding hydrogen-using devices (5), and each of the hydrogen supply systems (1) includes: a first-stage pressure reduction unit (11) and a second-stage pressure reduction unit (12). The backup connection device (2) is connected to both hydrogen supply systems (1) and is located between the first-stage depressurization unit (11) and the second-stage depressurization unit (12) of the two hydrogen supply systems (1); The detection device (3) is used to detect the working status of the two hydrogen supply systems (1) and the backup connection device (2); The control device (4) is electrically connected to the detection device (3), the two hydrogen supply systems (1) and the backup connection device (2), and is used to control the hydrogen supply system on the abnormal side to shut down and control the backup connection device (2) to start to supply hydrogen to the two hydrogen-using devices (5) when it is determined that the abnormality belongs to a single upstream abnormality of mutual backup permission based on the detected working status of the two hydrogen supply systems (1) and the backup connection device (2).

2. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 1, characterized in that, The control device (4) is used to first determine whether the prohibition of mutual backup is met based on the detected working status of the two hydrogen supply systems (1) and the backup connection device (2), and when it is determined that the prohibition of mutual backup is not met, it determines whether it is a single-sided upstream anomaly. When it is determined that it is a single-sided upstream anomaly, it determines whether the mutual backup permission is met, and when it is determined that the mutual backup permission is met, it controls the hydrogen supply system on the abnormal side to shut down and controls the backup connection device (2) to start to supply hydrogen to the two hydrogen-using devices (5). The control device (4) is also used to control the hydrogen supply system on the abnormal side to shut down and shut down the backup connection device (2) when it is determined that the mutual backup prohibition condition is met or the mutual backup permission condition is not met.

3. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 1 or 2, characterized in that, The backup connection device (2) includes: a main pipeline (22), two first branch pipelines (23), two second branch pipelines (24), and two backup modules (21); wherein, The first end of the main pipeline (22) is connected to the hydrogen supply pipeline between the first-stage pressure reducing unit (11) and the second-stage pressure reducing unit (12) in the two hydrogen supply systems (1) through two first branch pipelines (23), and the second end of the main pipeline (22) is connected to the hydrogen supply pipeline between the first-stage pressure reducing unit (11) and the second-stage pressure reducing unit (12) in the two hydrogen supply systems (1) through two second branch pipelines (24), and the second branch pipelines (24) are closer to the second-stage pressure reducing unit (12) than the first branch pipelines (23). The two backup modules (21) are respectively installed on the two first branch pipes (23) to control the opening and closing of the corresponding first branch pipes (23), and both backup modules (21) are electrically connected to the control device (4).

4. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 3, characterized in that, Each of the backup modules (21) includes: a backup connection valve (211) and a check valve (212); wherein, The backup connecting valve (211) and the check valve (212) are connected in series in the first branch pipeline (23).

5. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 3, characterized in that, Each of the hydrogen supply systems (1) further includes: a hydrogen supply pipeline (13), a bottle valve (14), and a filter unit (15); wherein, The bottle valve (14), the filter unit (15), the first-stage pressure reducing unit (11) and the second-stage pressure reducing unit (12) are connected in series in the hydrogen supply pipeline (13). The bottle neck valve (14) is electrically connected to the control device (4).

6. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 5, characterized in that, The control device (4) is also used to control the bottle valve (14) of the hydrogen supply system on the abnormal side to close when it is determined that the mutual backup permission conditions are met, and to control the corresponding backup module (21) of the hydrogen supply system on the normal side to start so that the hydrogen supply system (1) on the normal side can supply hydrogen to the second-stage pressure reducing unit (12) of the hydrogen supply system on the normal side and the hydrogen supply system on the abnormal side through the corresponding backup module (21). The control device (4) is also used to control the bottle valve (14) of the hydrogen supply system on the abnormal side to close and shut down the two backup modules (21) when it is determined that the mutual backup prohibition condition is met or the mutual backup permission condition is not met.

7. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system according to claim 2, characterized in that, The mutual backup license conditions include: no leakage in the interface area of ​​the hydrogen-using device (5) corresponding to the hydrogen supply system on the abnormal side; no leakage and usable in the second-level pressure reducing unit (12) and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connecting device (2); hydrogen storage margin of the hydrogen supply system on the normal side meets the requirements; the venting path is available or confirmed; the backup connecting device (2) is normal; the maintenance opening is in a safe state; and the detection device (3) and communication status are reliable. The conditions prohibiting mutual backup include: leakage in the interface area of ​​the hydrogen-using device (5) corresponding to the hydrogen supply system on the abnormal side; leakage in the second-stage pressure reducing unit (12) and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; leakage in the backup connecting device (2); unconfirmed abnormality of the venting path; temperature and pressure exceeding design requirements; unavailability of the second-stage pressure reducing unit (12) in the hydrogen supply system on the abnormal side; insufficient hydrogen storage margin in the hydrogen supply system on the normal side; abnormality of the backup connecting device (2); abnormality of the maintenance opening; and unreliable detection device (3) and communication status.

8. A method for controlling the high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply system as described in any one of claims 1 to 7, characterized in that, Includes the following steps: The data collection process involves collecting data on the operational status of the two hydrogen supply systems and the backup connection device. The step for determining whether mutual backup is prohibited is to check whether the conditions for prohibiting mutual backup are met. The single-sided upstream anomaly judgment step is to determine whether it is a single-sided upstream anomaly when it is determined that the prohibition of mutual backup is not met. The mutual backup license condition judgment step is to determine whether the mutual backup license condition is met when it is determined that the anomaly belongs to a single upstream side. The control steps involve shutting down the hydrogen supply system on the abnormal side when the mutual backup permission conditions are met, and controlling the backup connection device to start up to supply hydrogen to the two hydrogen-using devices.

9. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method according to claim 8, characterized in that, Between the data acquisition step and the step of determining the condition for prohibiting mutual backup, the following is also included: The fault areas are pre-stored, and the abnormal areas are determined based on the operating status of the two hydrogen supply systems and the backup connection device, and the level of abnormality is judged.

10. The high-pressure hydrogen storage, stabilization, and mutual backup hydrogen supply control method according to claim 8, characterized in that, In the step of determining the prohibition of mutual backup, the prohibition of mutual backup conditions includes: leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; leakage in the second-stage pressure reducing unit and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; leakage in the backup connecting device; unconfirmed abnormality of the venting path; temperature and pressure exceeding design requirements; unusable second-stage pressure reducing unit in the hydrogen supply system on the abnormal side; insufficient hydrogen storage margin in the hydrogen supply system on the normal side; abnormality of the backup connecting device; maintenance opening in an abnormal state; and unreliable detection device and communication status. In the mutual backup permission condition judgment step, the mutual backup permission conditions include: no leakage in the interface area of ​​the hydrogen-using device corresponding to the hydrogen supply system on the abnormal side; no leakage and usable in the second-level pressure reducing unit and its front-end medium-pressure pipe section in the hydrogen supply system on the abnormal side; no leakage in the backup connection device; the hydrogen storage margin of the hydrogen supply system on the normal side meets the requirements; the venting path is available or confirmed; the backup connection device is normal; the maintenance opening is in a safe state; and the detection device and communication status are reliable. When the conditions for mutual backup are determined to be prohibited or the conditions for mutual backup permission are not met, the valves of the hydrogen supply system on the abnormal side are closed, the backup connection device is closed, and after the venting path status is confirmed, the backup connection device is controlled to vent the residual hydrogen in a controlled manner.