Method of cleaning a clean system having a particulate blocking transition device

By setting up soft curtain components and airflow regulation mechanisms in the cleanroom system, a preset positive pressure difference is formed, which solves the problem of particle migration between clean areas, achieves a more efficient particle blocking effect, and improves the stability and cleanliness of the clean area.

CN123134550APending Publication Date: 2026-11-20SUZHOU PURIFYING AIR CONDITIONER SYST EQUIP MOUNTING DEPT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611401965.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-10
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing cleanroom systems have difficulty effectively blocking the migration of 0.1μm particles in the transition zone between low-grade areas and ISO 1 cleanrooms. Especially when doors are opened and personnel move, particles can easily enter the ISO 1 cleanroom from the low-grade area, leading to cleanroom contamination.

Method used

A particulate blocking transition device is adopted, including a soft curtain assembly and an air volume regulating mechanism. By setting a first curtain and a second curtain at the partition door and adjusting the air pressure difference through the air volume regulating mechanism, a preset positive pressure difference is formed to hinder particulate migration.

Benefits of technology

It effectively reduces air exchange between clean areas, inhibits the migration of particles from low-level areas to high-level areas, improves the stability and cleanliness of clean areas, and reduces the risk of particulate contamination.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123134550A_ABST
    Figure CN123134550A_ABST
Patent Text Reader

Abstract

The application discloses a clean method of a clean system with a particle blocking transition device, and the clean system comprises a wind volume adjusting mechanism and the particle blocking transition device; at least one wind volume adjusting mechanism is arranged below a grating floor of a second-grade clean area and a first-grade clean area, and the wind volume adjusting mechanism is a structural member for adjusting an effective ventilation area of the corresponding grating floor; the clean method comprises the following steps: S1, controlling air supply mechanisms of the two clean areas to respectively send airflows into the corresponding clean areas, so that the airflows pass through the corresponding grating floors from top to bottom, and the particles in the corresponding clean areas are guided to migrate downward; the application implements physical blocking of the partition door through the first curtain and the second curtain, and keeps a positive pressure difference between the second-grade clean area and the first-grade clean area through the wind volume adjusting mechanism, so that the physical blocking effect of the soft curtain assembly is coordinated with the directional airflow formed by the pressure difference.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of cleanroom transition buffer technology, and more specifically to a cleanroom method for a cleanroom system with a particulate blocking transition device. Background Technology

[0002] ISO Class 1 cleanrooms are ultra-high-level controlled clean environments, typically used in processes highly sensitive to airborne particles, such as semiconductor manufacturing, precision optics, and micro / nano fabrication. These cleanrooms have extremely high requirements for controlling particles as small as 0.1 μm. Personnel, materials, and airflow disturbances generated during door opening can all become pathways for external particles to enter the Class 2 cleanroom. Therefore, setting up a transition zone between the lower-level area and the ISO Class 1 cleanroom is a crucial measure to reduce the risk of particle entrainment during personnel or material entry and exit, and to maintain the stable operation of the Class 2 cleanroom.

[0003] Currently, the transition between lower-level clean areas and ISO Class 1 clean areas typically uses dedicated air showers or simple buffer rooms. Dedicated air showers generally use fans, filters, nozzles, and control systems to create a high-speed clean airflow to clean the surfaces of personnel or materials, reducing surface dust. Simple buffer rooms usually have two interlocked doors, creating an intermediate isolation space between the lower-level and second-level clean areas by restricting both doors from opening simultaneously. A few solutions add FFU (Fan-Filter Unit) fans to the top of the buffer room to improve the air cleanliness inside.

[0004] like Figure 7 The image shown is a physical diagram of a cleanroom system in the prior art. The cleanroom system includes two cleanrooms: a second-level cleanroom (11) and a first-level cleanroom (12). The two cleanrooms are arranged adjacent to each other and are separated by a partition wall (13). The partition wall (13) is equipped with a partition door (131). The partition door (131) seals and separates the two cleanrooms when closed and connects them when open. Both cleanrooms are equipped with air supply mechanisms (14) at the top and grid floor (15) at the bottom. The area between the air supply mechanism (14) and the grid floor (15) serves as a passageway for personnel. Each air supply mechanism (14) is used to supply airflow from top to bottom to the cleanroom it is in, so as to guide particles to migrate downward from the passageway corresponding to the air supply mechanism (14) and pass through the corresponding grid floor (15) into the area below the grid floor (15).

[0005] However, since existing simple buffer rooms mainly rely on two interlocked doors for spatial isolation, when personnel or materials enter from lower-level clean areas, 0.1μm particles from their clothing, shoe soles, material surfaces, and the surrounding air can be brought into the buffer room. Because 0.1μm particles are small and settle slowly, they tend to remain suspended for extended periods after entering the buffer room and continue to diffuse into the second-level clean area due to personnel movement, door opening, and pressure fluctuations. Therefore, interlocked doors can only prevent direct connection between the two spaces; they cannot remove or block particles that have already entered the buffer room.

[0006] Furthermore, while the addition of FFUs to the top of the buffer room can improve the average cleanliness inside, its air supply mainly affects the interior of the room, making it difficult to form a stable directional airflow barrier at the doorways of the low-level side entrance and the high-level side exit. Actual contamination intrusion often occurs at the moment the door opens, personnel cross the doorway, or material carts pass through. At this time, door movement, personnel movement, and changes in pressure difference between the two sides can cause localized entrainment, eddies, and cross-flow of air, allowing dust near the entrance or suspended particles in the buffer room to enter the ISO 1 clean area with the airflow.

[0007] Furthermore, the control range of traditional buffer zones is usually limited to the interior of the buffer zone. The area near the entrance in low-level areas remains an open space, making it impossible to block the particle entrainment path at the source before pollutants enter the buffer zone.

[0008] Therefore, how to overcome the shortcomings of the existing technology is the subject of this invention. Summary of the Invention

[0009] The purpose of this invention is to provide a cleaning method for a clean system with a particulate blocking transition device.

[0010] To achieve the above objectives, the technical solution adopted by the present invention is as follows:

[0011] A cleaning method for a clean system with a particulate blocking transition device, the clean system including an airflow regulating mechanism and a particulate blocking transition device;

[0012] At least one airflow adjustment mechanism is provided under the grid floor of both the second-level clean area and the first-level clean area. The airflow adjustment mechanism is a structural component that adjusts the effective ventilation area of ​​the corresponding grid floor.

[0013] The particulate blocking transition device includes a soft curtain assembly that is correspondingly installed to the partition door and positioned and connected to the partition wall;

[0014] Along the direction of personnel passage, at least one of the soft curtain components is provided on one side of the partition door, or at least one of the soft curtain components is provided on both sides of the partition door; each soft curtain component includes a first curtain and a second curtain, the first curtain and the second curtain together define a cover structure for personnel passage, the first curtain and the second curtain are openable and closable connected on the side of the cover structure away from the partition wall, the side of the cover structure close to the partition wall is positioned and connected to the partition wall, and the internal space of each cover structure correspondingly forms a particle blocking area; the first curtain and the second curtain have a closed state and a passage state;

[0015] Cleaning methods include:

[0016] S1. Control the air supply mechanism of the two clean areas to send airflow into the corresponding clean areas respectively, so that the airflow passes through the corresponding grid floor from top to bottom, and guides the particles in the corresponding clean areas to migrate downward.

[0017] S2. Adjust the air volume adjustment mechanism of the two clean areas respectively to change the effective ventilation area of ​​the grid floor corresponding to each air volume adjustment mechanism, so that the air pressure of the second-level clean area is higher than that of the first-level clean area, so as to achieve a preset positive pressure difference between the two clean areas.

[0018] S3. Using each of the aforementioned hood structures to guide the airflow delivered by the corresponding air supply mechanism, so that the airflow flows from top to bottom toward the corresponding grid floor in the corresponding particulate blocking area, while adjusting the airflow adjustment mechanism located below the grid floor corresponding to each of the aforementioned hood structures, so that there is a set pressure difference between the air pressure in each of the aforementioned hood structures and the air pressure in its corresponding clean area.

[0019] S4. When people pass through, open the soft curtain components and partition doors in sequence according to the arrangement of each soft curtain component and partition door on the personnel passage path;

[0020] S5. After the personnel have passed through, the corresponding first curtain and second curtain are reconnected to close the passage opening, and the partition door is closed after the personnel have passed through the partition door.

[0021] In the above solution, the soft curtain assembly and the air volume adjustment mechanism can work together to restrict particle migration.

[0022] Unlike existing technologies that primarily rely on interlocking two doors for spatial isolation or simply improve the average cleanliness of transition spaces through air supply mechanisms, this solution installs a first curtain and a second curtain along the personnel passageway corresponding to the partition door. An airflow regulation mechanism adjusts the effective ventilation area of ​​the airflow passing through the grid floor, creating a preset positive pressure difference between the second-level and first-level clean areas. On one hand, the first and second curtains can close the passageway openings of the enclosure structure when no personnel are passing through, and reduce the open area around the passageway when personnel are passing through, minimizing direct air exchange between the first and second-level clean areas. On the other hand, the preset positive pressure difference between the second and first-level clean areas creates a directional airflow trend from the second-level clean area to the first-level clean area when the partition door is open, preventing particles in the first-level clean area from migrating back to the second-level clean area.

[0023] In summary, this application uses a first curtain and a second curtain to physically block the partition door, and maintains a positive pressure difference between the second-level clean area and the first-level clean area through an airflow regulation mechanism. This allows the physical blocking effect of the soft curtain assembly to work in conjunction with the directional airflow formed by the pressure difference. When there is no personnel passage, the first curtain, the second curtain, and the partition door together close the personnel passage path, reducing air exchange between the two clean areas. When personnel pass through or the partition door is opened, the first curtain and the second curtain can reduce the open area and weaken the local airflow disturbance caused by door movement and personnel movement. The directional airflow formed by the preset positive pressure difference can suppress the migration of particles from the first-level clean area to the second-level clean area.

[0024] In a further technical solution, when there is one soft curtain assembly, the soft curtain assembly is located in one of the two clean areas and is set with a corresponding partition door; when there are multiple soft curtain assemblies, each clean area has at least one soft curtain assembly.

[0025] With the above design, the soft curtain assembly can meet different needs, namely, one or more soft curtain assemblies can be installed on either side of the partition door, or soft curtain assemblies can be installed on both sides of the partition door, with at least one on each side. When in use, one of these two options can be selected as needed.

[0026] In a further technical solution, in S3, when a cover structure is installed in the first-level clean area, the air pressure inside the cover structure is greater than the air pressure inside the first-level clean area; when a cover structure is installed in the second-level clean area, the air pressure inside the cover structure is less than the air pressure inside the second-level clean area.

[0027] With the above design, when the hood structure is set in different clean areas, the required air pressure in each hood structure is different, so as to always keep the particles pushed towards the clean area with lower cleanliness requirements (i.e., the first level clean area).

[0028] A further technical solution, wherein S4 specifically comprises:

[0029] When a person needs to pass through the partition door, the soft curtain components along the path of the person and the partition door are arranged in sequence to switch the soft curtain component that the person is about to pass through to the passage state, or to switch the partition door that the person is about to pass through from the closed state to the open state.

[0030] When people pass through the soft curtain assembly, the openable edges of the first curtain and the second curtain separate from each other, and an opening for people to enter and exit is formed on the side of the cover structure away from the partition wall, so that the first curtain and the second curtain can enter the passage state.

[0031] With the above design, when the operator passes through the soft curtain assembly, they can pass through by guiding the openable and closable edges of the first curtain and the second curtain to separate from each other.

[0032] It is important to note that if both clean areas are equipped with enclosure structures, when personnel pass through, they will generally follow the direction of the first-level clean area, the enclosure structure within the first-level clean area, the partition door, the enclosure structure within the second-level clean area, and back to the second-level clean area, and vice versa.

[0033] A further technical solution is to provide a quick-release component between the first curtain and the second curtain to enable them to be opened and closed.

[0034] The quick-release mechanism is a magnetic closure, zipper, Velcro, or snap fastener.

[0035] The above design allows people to quickly open the passageway between the first and second curtains, and also makes it relatively easy to close.

[0036] In a further technical solution, the cross-section of the cover structure is U-shaped;

[0037] The cover structure is installed in both the second-level clean area and the first-level clean area.

[0038] Generally, soft curtain assemblies can be installed only in the second-level clean area, only in the first-level clean area, or as designed above, in both the first-level and second-level clean areas.

[0039] The above design can improve the physical barrier effect.

[0040] A further technical solution is that the grid floor includes multiple floor bodies, multiple support columns, multiple first crossbeams and multiple first longitudinal beams, wherein the multiple first crossbeams and the multiple first longitudinal beams are arranged in a longitudinal and transverse manner and are cross-connected to form a floor skeleton with multiple rectangular mounting holes.

[0041] Multiple floor bodies are provided in a one-to-one correspondence with multiple rectangular mounting holes and are positioned and connected to the floor frame, and the upper surfaces of all the floor bodies are coplanar;

[0042] The lower end of each of the soft curtain components is positioned and connected to the floor frame, and the projection of each particle blocking area in the vertical direction covers at least one of the floor bodies;

[0043] Each of the first crossbeams and the first longitudinal beams has a support column below it. The lower end of each support column is positioned and connected to the bottom surface of the corresponding clean area, and the upper end of each support column is positioned and connected to the corresponding crossbeam to support the floor frame. The floor frame and the multiple floor bodies are spaced apart from the bottom surface of the corresponding clean area. Each floor body has multiple grid holes that penetrate its upper and lower surfaces.

[0044] With the above design, the airflow in the passage area can be directed under the main floor structure through the grille holes.

[0045] A further technical solution is that an airflow adjustment mechanism is positioned and connected to the lower surface of each of the aforementioned floor panels.

[0046] At least one airflow regulating mechanism is matched below the same particulate blocking area, and multiple airflow regulating mechanisms corresponding to the same particulate blocking area are configured to operate synchronously.

[0047] The air volume regulating mechanism is either a blade-type air volume regulating mechanism or a sliding baffle-type air volume regulating mechanism.

[0048] The working principle of the blade-type airflow regulating mechanism is to adjust the airflow rate by changing the opening of the airflow channel and the ventilation resistance by adjusting the rotation angle of the blades. The working principle of the sliding baffle-type airflow regulating mechanism is to adjust the airflow rate by driving the baffle to slide relative to the vent, thereby changing the effective ventilation area of ​​the vent.

[0049] In a further technical solution, the particulate barrier area within the second-level clean area serves as a second buffer zone, and the particulate barrier area within the first-level clean area serves as a first buffer zone.

[0050] The area within the passageway of the second-level clean zone, and located outside the second buffer zone, is designated as the second-level zone.

[0051] The area within the passageway of the first-level clean zone, and located outside the first buffer zone, is designated as the first-level zone.

[0052] The air pressure gradients of the first-level zone, the first buffer zone, the second buffer zone, and the second-level zone are regulated by the airflow regulation mechanism below each zone.

[0053] The air pressure control of the first-level zone, the first buffer zone, the second-level zone, and the second buffer zone is mainly achieved by the air volume regulation mechanism.

[0054] In a further technical solution, both the partition door and the soft curtain assembly are equipped with closure sensors on their quick-release parts. The air volume adjustment mechanism, the air supply mechanism, and all closure sensors are electrically connected to the same PLC control system to form a linkage control structure.

[0055] With the above design, the air volume adjustment mechanism, the air supply mechanism, and all closed sensors can be controlled by a PLC control system to work together.

[0056] Due to the application of the above-mentioned solution, the technical solution of this application has the following advantages and effects compared with the prior art:

[0057] In this invention, the soft curtain assembly and the air volume adjustment mechanism can work together to restrict particle migration.

[0058] Specifically, when no one is passing through the partition door, the first and second curtains are closed to seal the passage opening on the side of the enclosure structure away from the partition wall, and the partition door is closed.

[0059] At this point, the air supply mechanisms located in the second-level and first-level clean areas are controlled to deliver airflow to the corresponding clean areas. This airflow flows downwards from the top of the corresponding clean area, passing through the corresponding grid floor and entering the area below the grid floor, thus guiding the particles within the corresponding clean area downwards. Simultaneously, the airflow regulation mechanisms in the second-level and first-level clean areas are adjusted to regulate the effective ventilation area of ​​the airflow passing through the corresponding grid floor, ensuring that the air pressure in the second-level clean area is higher than that in the first-level clean area.

[0060] When personnel need to pass between the Class II and Class I clean areas, the first and second curtains located along the personnel passage path are switched from a closed state to a passable state to open the passage opening. The partition door is then opened, allowing personnel to pass between the Class II and Class I clean areas via the passage opening, the particulate barrier area, and the partition door. After personnel have passed, the first and second curtains are returned to their closed state, and the partition door is closed.

[0061] In the above process, the first and second curtains can reduce the open area formed when people pass through and block air exchange around the passage path. At the same time, when the partition door is open and a preset positive pressure difference is maintained between the second-level clean area and the first-level clean area, the airflow tends to flow from the second-level clean area to the first-level clean area under the action of the pressure difference. Thus, the physical barrier effect of the soft curtain assembly, combined with the directional airflow formed by the pressure difference, inhibits the migration of particles from the first-level clean area to the second-level clean area through the partition door.

[0062] Unlike existing technologies that primarily rely on interlocking two doors for spatial isolation or simply improve the average cleanliness of transition spaces through air supply mechanisms, this solution installs a first curtain and a second curtain along the personnel passageway corresponding to the partition door. An airflow regulation mechanism adjusts the effective ventilation area of ​​the airflow passing through the grid floor, creating a preset positive pressure difference between the second-level and first-level clean areas. On one hand, the first and second curtains can close the passageway openings of the enclosure structure when no personnel are passing through, and reduce the open area around the passageway when personnel are passing through, minimizing direct air exchange between the first and second-level clean areas. On the other hand, the preset positive pressure difference between the second and first-level clean areas creates a directional airflow trend from the second-level clean area to the first-level clean area when the partition door is open, preventing particles in the first-level clean area from migrating back to the second-level clean area.

[0063] In summary, this application uses the first and second curtains to physically block the partition door, and maintains a positive pressure difference between the second-level clean area and the first-level clean area through an airflow regulation mechanism. This allows the physical barrier effect of the soft curtain assembly to work in conjunction with the directional airflow formed by the pressure difference. When there is no personnel passage, the first curtain, the second curtain, and the partition door together close the personnel passage path, reducing air exchange between the two clean areas. When personnel pass through or the partition door is opened, the first and second curtains can reduce the open area and weaken the local airflow disturbance caused by door movement and personnel movement. The directional airflow formed by the preset positive pressure difference can suppress the migration of particles from the first-level clean area to the second-level clean area. Attached Figure Description

[0064] Figure 1 This is a schematic diagram of the overall structure in an embodiment of the present invention;

[0065] Figure 2 This is a structural diagram of the suspension component fixing the air outlet mechanism in an embodiment of the present invention;

[0066] Figure 3 This is a schematic diagram of the air supply mechanism structure in an embodiment of the present invention;

[0067] Figure 4This is a schematic diagram of the structure of the second-level clean area and the first-level clean area in an embodiment of the present invention;

[0068] Figure 5 This is a schematic diagram of the soft curtain assembly structure in an embodiment of the present invention;

[0069] Figure 6 This is a schematic diagram of the grid floor structure in an embodiment of the present invention;

[0070] Figure 7 A physical image of a cleanroom system in the prior art;

[0071] Figure 8 A photograph of a grid floor in the prior art (with an airflow regulation mechanism installed).

[0072] Figure 9 This is a physical image of a blade-type airflow regulating mechanism in the prior art;

[0073] Figure 10 This is a physical image of a sliding baffle-type airflow regulating mechanism in the prior art.

[0074] In the attached diagrams above: 1. Cleanroom system;

[0075] 11. Class II clean area; 12. Class I clean area; 13. Partition wall; 14. Air supply system; 15. Grille floor; 16. Return air shaft;

[0076] 111. Second buffer zone; 112. Second-level zone;

[0077] 121. First buffer zone; 122. First-level zone;

[0078] 131. Partition door;

[0079] 141. Air outlet mechanism; 142. Second crossbeam; 143. Second longitudinal beam; 144. Rectangular positioning hole; 145. Suspension component;

[0080] 151. Floor body; 152. Support column; 153. First crossbeam; 154. First longitudinal beam; 155. Rectangular mounting hole; 156. Grille hole; 157. Air volume adjustment mechanism;

[0081] 1571. Blade-type air volume regulating mechanism;

[0082] 2. Particulate blocking transition device;

[0083] 21. Soft curtain assembly;

[0084] 211. First curtain; 212. Second curtain; 213. Quick-release parts. Detailed Implementation

[0085] To make the above-mentioned objectives, features, and advantages of this application more apparent and understandable, the specific embodiments of this application are described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of this application. However, this application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of this application. Therefore, this application is not limited to the specific embodiments disclosed below.

[0086] The terms "first," "second," etc., used in this article do not specifically refer to order or sequence, nor are they intended to limit this case; they are merely used to distinguish components or operations described using the same technical terms.

[0087] The terms "connection" or "positioning" as used in this article can refer to two or more components or devices making direct physical contact with each other, or making indirect physical contact with each other, or to two or more components or devices operating or moving with each other.

[0088] The terms “include,” “including,” and “have” used in this article are all open-ended, meaning they include but are not limited to.

[0089] Unless otherwise specified, the terms used herein generally have their ordinary meaning in the context of the art, the subject matter, and the specific context. Certain terms used to describe this case will be discussed below or elsewhere in this specification to provide additional guidance to those skilled in the art in describing this case.

[0090] The terms “front,” “back,” “up,” “down,” “left,” and “right” used in this article are directional terms. In this case, they are only used to describe the positional relationship between the structures and are not intended to limit the specific direction of the protection scheme or its actual implementation.

[0091] The terminology used herein is for the purpose of describing specific embodiments only and is not intended to limit the scope of this work. Singular forms such as “a,” “this,” “this,” “the,” and “the” as used herein also include plural forms.

[0092] See Figure 1 - Figure 10 As shown, a cleaning method for a clean system with a particulate blocking transition device is provided. The clean system 1 includes an airflow regulating mechanism 157 and a particulate blocking transition device 2.

[0093] At least one airflow adjustment mechanism 157 is provided under the grid floor 15 of the second-level clean area 11 and the first-level clean area 12. The airflow adjustment mechanism 157 is a structural component that adjusts the effective ventilation area of ​​the corresponding grid floor 15.

[0094] The particulate blocking transition device 2 includes a soft curtain assembly 21 that is correspondingly provided to the partition door 131 and positioned and connected to the partition wall 13;

[0095] Along the direction of personnel passage, at least one of the soft curtain components 21 is provided on one side of the partition door 131, or at least one of the soft curtain components 21 is provided on both sides of the partition door 131 respectively; each soft curtain component 21 includes a first curtain 211 and a second curtain 212, the first curtain 211 and the second curtain 212 together define a cover structure for personnel passage, the first curtain 211 and the second curtain 212 are openable and closable on the side of the cover structure away from the partition wall 13, the side of the cover structure close to the partition wall 13 is positioned and connected to the partition wall 13, and the internal space of each cover structure forms a corresponding particle blocking area; the first curtain 211 and the second curtain 212 have a closed state and a passage state.

[0096] Cleaning methods include:

[0097] S1. Control the air supply mechanism 14 of the two clean areas to send airflow into the corresponding clean areas respectively, so that the airflow passes through the corresponding grid floor 15 from top to bottom, and guides the particles in the corresponding clean areas to migrate downward.

[0098] S2. Adjust the air volume adjustment mechanism 157 of the two clean areas respectively to change the effective ventilation area of ​​the grid floor 15 corresponding to each air volume adjustment mechanism 157, so that the air pressure of the second-level clean area 11 is higher than the air pressure of the first-level clean area 12, so as to achieve a preset positive pressure difference between the two clean areas.

[0099] S3. Using each of the aforementioned hood structures to guide the airflow delivered by the corresponding air supply mechanism 14, so that the airflow flows from top to bottom toward the corresponding grid floor 15 in the corresponding particulate blocking area, while adjusting the airflow adjustment mechanism 157 located below the grid floor 15 corresponding to each of the aforementioned hood structures, so that there is a set pressure difference between the air pressure in each of the aforementioned hood structures and the air pressure in its corresponding clean area.

[0100] S4. When people pass through, the soft curtain assembly 21 and the partition door 131 are opened in sequence according to the arrangement order of each soft curtain assembly 21 and the partition door 131 on the personnel passage path.

[0101] S5. After the personnel pass through, the corresponding first curtain 211 and second curtain 212 are reconnected to close the passage opening, and the partition door 131 is closed after the personnel pass through the partition door 131.

[0102] In this invention, the soft curtain assembly 21 can be made of antistatic PVC transparent soft board (or film).

[0103] In this invention, positive pressure difference refers to the difference between the air pressure in the second-level clean area 11 and the air pressure in the first-level clean area 12 being greater than zero.

[0104] In this invention, the effective coverage of the particulate blocking area should completely cover the movement trajectory of the partition door 131 during the opening process, and leave an appropriate safety margin to prevent the partition door 131 from having areas that the particulate blocking area cannot cover during the opening process, causing particulate infiltration and pollution.

[0105] In this invention, the air supply mechanism 14, the second-level clean area 11, the first-level clean area 12, and the partition door 131 can all be selected from existing technologies, such as... Figures 7-10 Alternatively, a specific mechanism can be replaced, for example, the partition door 131 can be replaced from a sliding type to a rotating type.

[0106] In this invention, the soft curtain assembly 21 and the air volume adjustment mechanism 157 can work together to restrict particle migration.

[0107] Specifically, when no one is passing through the partition door 131, the first curtain 211 and the second curtain 212 are closed to seal the passage opening on the side of the enclosure structure away from the partition wall 13, and the partition door 131 is closed.

[0108] At this time, the air supply mechanisms 14 installed in the second-level clean zone 11 and the first-level clean zone 12 are controlled to deliver airflow to the corresponding clean zones, causing the airflow to flow downwards from the top of the corresponding clean zone and pass through the corresponding grid floor 15 into the area below the grid floor 15, thereby guiding the particles in the corresponding clean zone to migrate downwards. Simultaneously, the airflow regulating mechanisms in the second-level clean zone 11 and the first-level clean zone 12 are adjusted to regulate the effective ventilation area of ​​the airflow passing through the corresponding grid floor 15, ensuring that the air pressure in the second-level clean zone 11 is higher than the air pressure in the first-level clean zone 12.

[0109] When personnel need to pass between the second-level clean area 11 and the first-level clean area 12, the first curtain 211 and the second curtain 212 located on the personnel passage path are switched from a closed state to a passage state to open the passage opening and the partition door 131, allowing personnel to pass between the second-level clean area 11 and the first-level clean area 12 through the passage opening, the particle barrier area, and the partition door 131. After personnel have passed, the first curtain 211 and the second curtain 212 are returned to the closed state, and the partition door 131 is closed.

[0110] During the above process, the first curtain 211 and the second curtain 212 can reduce the open area formed when people pass through and block the air exchange around the passage path. At the same time, when the partition door 131 is open and a preset positive pressure difference is maintained between the second-level clean area 11 and the first-level clean area 12, the airflow tends to flow from the second-level clean area 11 to the first-level clean area 12 under the action of the pressure difference. Thus, the physical barrier effect of the soft curtain assembly 21, together with the directional airflow formed by the pressure difference, inhibits the migration of particles from the first-level clean area 12 to the second-level clean area 11 through the partition door 131.

[0111] Unlike existing technologies that primarily rely on interlocking two doors for spatial isolation or simply improve the average cleanliness of the transition space by setting up an air supply mechanism 14, this solution sets up a first curtain 211 and a second curtain 212 on the personnel passage path corresponding to the partition door 131. An airflow regulation mechanism adjusts the effective ventilation area of ​​the airflow passing through the grid floor 15, creating a preset positive pressure difference between the second-level clean zone 11 and the first-level clean zone 12. On one hand, the first curtain 211 and the second curtain 212 can close the passage opening of the enclosure structure when no personnel are passing through, and reduce the open area around the passage path when personnel are passing through, thus reducing direct air exchange between the first-level clean zone 12 and the second-level clean zone 11. On the other hand, the preset positive pressure difference between the second-level clean zone 11 and the first-level clean zone 12 can create a directional airflow trend from the second-level clean zone 11 towards the first-level clean zone 12 when the partition door 131 is open, thus preventing particles in the first-level clean zone 12 from migrating back to the second-level clean zone 11.

[0112] In summary, this application physically isolates the partition door 131 through the first curtain 211 and the second curtain 212, and maintains a positive pressure difference between the second-level clean area 11 and the first-level clean area 12 through the airflow regulation mechanism, so that the physical barrier effect of the soft curtain assembly 21 and the directional airflow formed by the pressure difference work together. When there is no personnel passage, the first curtain 211, the second curtain 212 and the partition door 131 jointly close the personnel passage path, reducing the air exchange between the two clean areas; when personnel pass through and the partition door 131 is opened, the first curtain 211 and the second curtain 212 can reduce the open area, weaken the local airflow disturbance caused by door movement and personnel movement, and the directional airflow formed by the preset positive pressure difference can suppress the migration of particles from the first-level clean area 12 to the second-level clean area 11.

[0113] It is important to note that the term "clean area" includes Class II clean area 11 and Class I clean area 12, both of which are functional areas located within the same cleanroom but with different cleanliness requirements. Class II clean area 11 has higher cleanliness requirements than Class I clean area 12, representing an ultra-high clean environment with strict control over the concentration of airborne particles. It is typically used in processes highly sensitive to particles, such as semiconductor manufacturing, precision optics, and micro / nano fabrication. For example, Class II clean area 11 can be an ISO Class 1 clean area. According to ISO 14644-1, within an ISO Class 1 clean area, the maximum concentration of airborne particles with a diameter of not less than 0.1 μm is 10 particles per cubic meter; that is, when testing 1 cubic meter of air, a maximum of 10 particles with a diameter of not less than 0.1 μm can be detected.

[0114] Class 1 clean area 12 is a clean controlled area with lower cleanliness requirements than Class 2 clean area 11. Its upper limit for the concentration of airborne particles is relatively higher, but it still needs to meet the corresponding cleanliness level requirements. For example, Class 1 clean area 12 can be an ISO Class 5 clean area. According to ISO 14644-1 standard, in an ISO Class 5 clean area, the upper limit for the concentration of airborne particles with a diameter of not less than 0.5 μm is 3520 particles per cubic meter.

[0115] In addition, such as Figure 7 As shown, in some specific embodiments, the top of the clean area is not only equipped with an air supply mechanism 14, but also with an exhaust vent (installed and used only when needed).

[0116] Preferably, when there is one soft curtain assembly 21, the soft curtain assembly 21 is located in one of the two clean areas and is set in relation to the partition door 131. When there are multiple soft curtain assemblies 21, each clean area has at least one soft curtain assembly 21.

[0117] With the above design, the soft curtain assembly 21 can meet different situations, that is, one or more soft curtain assemblies 21 can be set on either side of the partition door 131, or soft curtain assemblies 21 can be set on both sides of the partition door 131, with at least one on each side. When in use, one of these two situations can be selected as needed.

[0118] Preferably, in step S3, when a cover structure is installed in the first-level clean area 12, the air pressure inside the cover structure is greater than the air pressure inside the first-level clean area 12; when a cover structure is installed in the second-level clean area 11, the air pressure inside the cover structure is less than the air pressure inside the second-level clean area 11.

[0119] With the above design, when the hood structure is set in different clean areas, the air pressure in each hood structure is different, so as to always maintain the state of pushing the particles towards the clean area with lower cleanliness requirements (i.e., from the second-level clean area 11 to the first-level clean area 12).

[0120] Preferably, S4 specifically includes:

[0121] When a person needs to pass through the partition door 131, the arrangement order of each soft curtain assembly 21 and the partition door 131 along the person's passage path will sequentially switch the soft curtain assembly 21 that the person is about to pass through to the passage state, or switch the partition door 131 that the person is about to pass through from the closed state to the open state.

[0122] When personnel pass through the soft curtain assembly 21, the openable edges of the first curtain 211 and the second curtain 212 separate from each other, and a passage opening for personnel to enter and exit is formed on the side of the cover structure away from the partition wall 13, so that the first curtain 211 and the second curtain 212 can enter the passage state.

[0123] With the above design, when the operator passes through the soft curtain assembly 21, the openable and closable side edges of the first curtain 211 and the second curtain 212 can be separated to allow passage.

[0124] It should be noted that if both clean areas are equipped with enclosure structures, when personnel pass through, the forward passage will generally follow the direction of the first-level clean area 12, the enclosure structure within the first-level clean area 12, the partition door 131, the enclosure structure within the second-level clean area 11, and back to the second-level clean area 11. The reverse passage can be adjusted accordingly.

[0125] Preferably, a quick-release member 213 is provided between the first curtain 211 and the second curtain 212 to enable the two to be connected in an openable manner;

[0126] The quick-release component 213 is a magnetic closure, zipper, Velcro, or snap fastener.

[0127] The above design allows people to quickly open the passageway between the first curtain 211 and the second curtain 212, and also makes it relatively easy to close.

[0128] It should be noted that quick-release parts 213 are generally magnetic, so that personnel do not need to manually close the passage opening.

[0129] Preferably, the cross-section of the cover structure is U-shaped;

[0130] The cover structure is provided in both the second-level clean area 11 and the first-level clean area 12.

[0131] Generally, the soft curtain assembly 21 can be installed only in the second-level clean area 11, or only in the first-level clean area 12, or as designed above, in both the first-level clean area 12 and the second-level clean area 11.

[0132] The above design can improve the physical barrier effect.

[0133] Preferably, the grid floor 15 includes a plurality of floor bodies 151, a plurality of support columns 152, a plurality of first crossbeams 153 and a plurality of first longitudinal beams 154, wherein the plurality of first crossbeams 153 and the plurality of first longitudinal beams 154 are arranged in a longitudinal and transverse manner and are cross-connected to form a floor skeleton with a plurality of rectangular mounting holes 155.

[0134] Multiple floor bodies 151 are provided in a one-to-one correspondence with multiple rectangular mounting holes 155 and are positioned and connected to the floor frame, and the upper surfaces of all floor bodies 151 are coplanar;

[0135] The lower end of each of the soft curtain components 21 is positioned and connected to the floor frame, and the projection of each particle blocking area in the vertical direction covers at least one of the floor bodies 151.

[0136] Each of the first crossbeams 153 and the first longitudinal beams 154 has a support column 152 below it. The lower end of each support column 152 is positioned and connected to the bottom surface of the corresponding clean area, and the upper end of each support column 152 is positioned and connected to the corresponding crossbeam to support the floor frame and to space the floor frame and the multiple floor bodies 151 from the bottom surface of the corresponding clean area. Each floor body 151 has multiple grid holes 156 penetrating its upper and lower surfaces.

[0137] The grating floor 15 is existing technology.

[0138] With the above design, the airflow flowing through the passage area can be directed under the floor body 151 through the grille holes 156.

[0139] During assembly, such as Figure 7 and Figure 8 First, multiple first crossbeams 153 and multiple first longitudinal beams 154 are arranged in a longitudinal and transverse manner and cross-connected to form a floor frame with multiple rectangular mounting holes 155. Then, the floor frame is supported and fixed by support columns 152 so that the floor frame and multiple floor bodies 151 are spaced apart from the bottom surface of the corresponding second-level clean area 11 or first-level clean area 12, and subsequent airflow will enter this interval.

[0140] Preferably, an airflow adjustment mechanism 157 is positioned and connected to the lower surface of each of the floor panels 151.

[0141] At least one airflow regulating mechanism 157 is matched below the same particulate blocking area, and multiple airflow regulating mechanisms 157 corresponding to the same particulate blocking area are configured to operate synchronously.

[0142] The air volume regulating mechanism 157 is either a blade-type air volume regulating mechanism 1571 or a sliding baffle-type air volume regulating mechanism.

[0143] The air volume regulating mechanism 157 can also be selected from existing technologies, such as... Figure 9 and Figure 10 The images show actual pictures of the blade-type air volume regulating mechanism 1571 and the sliding baffle-type air volume regulating mechanism.

[0144] Multiple airflow regulating mechanisms 157 corresponding to the same particulate blocking area are configured to operate synchronously. "Synchronous operation" does not mean that the multiple airflow regulating mechanisms 157 must operate at exactly the same time, but rather that each airflow regulating mechanism 157 completes its operation within a preset time range. For example, multiple airflow regulating mechanisms 157 can be activated successively between the first and third second, and all of them can be fully activated and in working condition by the fourth second.

[0145] The working principle of the blade-type airflow regulating mechanism 1571 is that by adjusting the rotation angle of the blades, the opening of the airflow channel and the ventilation resistance are changed, thereby regulating the airflow rate. This application's... Figure 1 and Figure 2 The models shown are all blade-type air volume regulating mechanisms 1571.

[0146] The working principle of a sliding baffle-type airflow regulating mechanism is as follows: by driving the baffle to slide relative to the vent, the effective ventilation area of ​​the vent is changed, thereby regulating the airflow. For example... Figure 10 By sliding the baffle on top, you can adjust the airflow.

[0147] Preferably, the air supply mechanism 14 includes a plurality of air outlet mechanisms 141, a plurality of second crossbeams 142 and a plurality of second longitudinal beams 143;

[0148] Multiple second crossbeams 142 are intersected with multiple second longitudinal beams 143 to form an installation frame with multiple rectangular positioning holes 144.

[0149] At least a portion of the multiple rectangular positioning holes 144 on the mounting frame are positioned and connected to an air outlet mechanism 141. The projection of each particle blocking area in the vertical direction covers at least one of the rectangular positioning holes 144, and the air outlet mechanism 141 is positioned and installed in the at least one rectangular positioning hole 144 covered.

[0150] The upper end of each of the soft curtain components 21 is positioned and connected to the corresponding mounting frame;

[0151] Above each of the longitudinal and transverse intersections of the plurality of second crossbeams 142 and the plurality of second longitudinal beams 143, a suspension member 145 is provided. The upper end of each suspension member 145 is positioned and connected to the top surface of its corresponding clean area, and the lower end of each suspension member 145 is positioned and connected to the corresponding longitudinal and transverse intersection to suspend the mounting frame and to set the distance between the mounting frame and the plurality of air outlet mechanisms 141 and the top surface of the corresponding second-level clean area 11 or first-level clean area 12.

[0152] The suspension component 145 can be a rod-like structure similar to the support column 152, or it can be a rope or other structure, depending on the usage requirements.

[0153] The air outlet mechanism 141 can be selected from existing technologies such as a fan filter unit (FFU) consisting of a fan and a high-efficiency filter.

[0154] The above design is used to fix the air supply mechanism 14.

[0155] Specifically, in use, multiple second crossbeams 142 and multiple second longitudinal beams 143 are first connected in a crisscross pattern to form an installation frame with multiple rectangular positioning holes 144. Then, the installation frame is suspended by a suspension member 145.

[0156] Subsequently, an air outlet mechanism 141 is at least partially positioned and connected in one of the multiple rectangular positioning holes 144 on the mounting frame. That is to say, the air outlet mechanism 141 will not completely fill the rectangular positioning hole 144, but the air outlet mechanism 141 is installed in the rectangular positioning hole 144 corresponding to the soft curtain assembly 21.

[0157] The rectangular positioning hole 144, where the air outlet mechanism 141 is not installed, can be fitted with a cover plate (smoke exhaust), such as... Figure 7 .

[0158] Preferably, the clean system 1 further includes at least one return air shaft 16, and the return air shaft 16 is provided in at least one of the second-level clean area 11 and the first-level clean area 12.

[0159] The return air shaft 16 extends vertically and has vents at both its upper and lower ends. The vent at the lower end of the return air shaft 16 is connected to the area below the grille floor 15, and the vent at the upper end of the return air shaft 16 is connected to the air inlet side of the air supply mechanism 14. In the second-level clean area 11 or the first-level clean area 12, the corresponding air supply mechanism 14, the passage area, the area below the grille floor 15, and the return air shaft 16 are sequentially connected and combined to form a circulation loop for airflow.

[0160] The setting of return air shaft 16, such as Figure 1 , Figure 2 and Figure 7 Its main function is to guide the airflow circulation. This is existing technology, so it will not be discussed in detail.

[0161] Preferably, the particulate barrier region within the second-level clean area 11 serves as the second buffer zone 111, and the particulate barrier region within the first-level clean area 12 serves as the first buffer zone 121.

[0162] The area within the passageway of the second-level clean zone 11, and located outside the second buffer zone 111, is designated as the second-level zone 112.

[0163] The area within the passageway of the first-level clean zone 12, and located outside the first buffer zone 121, is designated as the first-level zone 122.

[0164] The air pressure gradients of the first-level zone 122, the first buffer zone 121, the second buffer zone 111, and the second-level zone 112 are controlled by the air volume regulating mechanism 157 below each zone.

[0165] It should be noted that in this invention, there is a set pressure difference between the air pressure inside each of the hood structures and the air pressure in its corresponding clean area. Specifically, the air pressure in the first-level zone 122 is defined as X Pa.

[0166] The air pressure of the first buffer zone 121 is X+5 Pa; the air pressure of the second buffer zone 111 is X+10 Pa; and the air pressure of the second zone 112 is X+13 Pa.

[0167] The air pressure control of the first-level zone 122, the first buffer zone 121, the second-level zone 112, and the second buffer zone 111 is mainly achieved by the air volume regulating mechanism 157.

[0168] In the above scheme, X represents the local real-time atmospheric pressure in Pa, and the relative pressure of each region is based on X Pa. The relative pressure of the first-level zone 122 is 0 Pa, i.e., the air pressure is X Pa; the relative pressure of the first buffer zone 121 is +5 Pa, i.e., the air pressure is (X+5) Pa; the relative pressure of the second buffer zone 111 is +10 Pa, i.e., the air pressure is (X+10) Pa; and the theoretical relative pressure of the second-level zone 112 is +13 Pa, i.e., the air pressure is (X+13) Pa. In practical applications, the relative pressure of the second-level zone 112 can be selected within the range of +10 Pa to +13 Pa, i.e., the air pressure can be selected within the range of (X+10) Pa to (X+13) Pa. To maintain a preset positive pressure difference between the internal space air pressure of the second-level clean zone 11 and the first-level clean zone 12, the relative pressure of the second-level zone 112 is usually set to +13 Pa, i.e., the air pressure is (X+13) Pa.

[0169] With the above design, particles are further prevented from entering the first buffer zone 121 from the first-level zone 122. That is, when in use, the air pressure of the second-level zone 112 can be selected to be greater than or equal to the air pressure of the second buffer zone 111, the air pressure of the second buffer zone 111 is greater than the air pressure of the first buffer zone 121, and the air pressure of the first buffer zone 121 is greater than the air pressure of the first-level zone 122.

[0170] In some specific embodiments, the air outlet speed of the air outlet mechanism 141 can also be controlled to assist in regulating the air pressure.

[0171] With the above design, the air pressure of the first-level zone 122, the first buffer zone 121, the second-level zone 112, and the second buffer zone 111 is kept within a preset air pressure difference range.

[0172] Working principle: Specifically, when no one has passed through the partition door 131, the first curtain 211 and the second curtain 212 are closed to seal the passage opening on the side of the enclosure structure away from the partition wall 13, and the partition door 131 is closed.

[0173] At this time, the air supply mechanisms 14 installed in the second-level clean zone 11 and the first-level clean zone 12 are controlled to deliver airflow to the corresponding clean zones, causing the airflow to flow downwards from the top of the corresponding clean zone and pass through the corresponding grid floor 15 into the area below the grid floor 15, thereby guiding the particles in the corresponding clean zone to migrate downwards. Simultaneously, the airflow regulating mechanisms in the second-level clean zone 11 and the first-level clean zone 12 are adjusted to regulate the effective ventilation area when the airflow passes through the corresponding grid floor 15, ensuring that the air pressure in the second-level clean zone 11 is higher than the air pressure in the first-level clean zone 12.

[0174] When personnel need to pass between the second-level clean area 11 and the first-level clean area 12, the first curtain 211 and the second curtain 212 located on the personnel passage path are switched from a closed state to a passage state to open the passage opening and the partition door 131, allowing personnel to pass between the second-level clean area 11 and the first-level clean area 12 through the passage opening, the particle barrier area, and the partition door 131. After personnel have passed, the first curtain 211 and the second curtain 212 are returned to the closed state, and the partition door 131 is closed.

[0175] Preferably, both the partition door 131 and the quick-release piece 213 of the soft curtain assembly 21 are equipped with closure sensors. The air volume adjustment mechanism 157, the air supply mechanism 14, and all closure sensors are electrically connected to the same PLC control system to form a linkage control structure. (The closure sensors and PLC control system are existing technologies and will not be described in detail here.)

[0176] In some specific embodiments, based on the strict control requirements for particle introduction in the second-level clean area 11, this solution adds dynamic control of airflow and pressure difference to the original structure to further improve the particle blocking and clean transition effect. The FFUs (fan filter units composed of fans and HEPA filters) in the first buffer zone 121 and the second buffer zone 111 are configured according to high-level cleanliness requirements and are independently connected to the control system (the control system is existing technology and is mainly used to control the opening and closing of each structure); an airflow regulating mechanism 157 is installed at the grid floor 15, the airflow regulating mechanism 157 is equipped with a fast electric actuator (this fast electric actuator is existing technology) and is connected to the control system; closure sensors are installed at the magnetic snap positions on the soft curtain assembly 21 and at the partition door 131, and these closure sensors are connected to the control system.

[0177] When personnel enter the first-level zone 122 of the first-level clean area 12, the control system controls the FFU in the first-level clean area 12 to run at a high speed of 0.55 m / s, and at the same time controls the air volume adjustment mechanism 157 in the first buffer zone 121 to work, so as to reduce the effective ventilation area of ​​the airflow passing through the grid floor 15 in the first buffer zone 121. At this time, the first buffer zone 121 is in the maximum air supply state, so that the first buffer zone 121 forms a positive pressure relative to the first-level zone 122. Then the airflow sent into the first buffer zone 121 mainly flows out of the first-level zone 122 through the opened soft curtain assembly 21 (in the first-level clean area 12), and forms a purge airflow towards the first-level zone 122 for the personnel entering, thereby reducing the particles in the first-level clean area 12 from entering the first buffer zone 121 with the personnel.

[0178] Personnel enter the first buffer zone 121 and close the soft curtain assembly 21 in the first-level clean area 12. At this time, the closure sensor on the soft curtain assembly 21 in the first-level clean area 12 closes again and sends a signal to control the FFU of the first-level clean area 12 to run at a constant speed of 0.45 m / s. At the same time, the air volume regulating mechanism 157 in the first buffer zone 121 is opened, so that the airflow flows downward from the top of the first buffer zone 121 and passes through the grid floor 15 to perform a preset time (designed by the user in practice, but generally not less than 2 seconds) of air shower purification on the personnel and guide the particles to migrate downward.

[0179] When personnel open the partition door 131, the closing sensor at the magnetic latch of the partition door 131 is released and a trigger signal is sent, controlling the FFU of the second-level clean area 11 to run at a high speed of 0.55 m / s. At the same time, the air volume regulating mechanism 157 in the second buffer zone 111 is closed (that is, the effective ventilation area of ​​the second-level clean area 11 is reduced to near zero), so that the second buffer zone 111 is in the maximum air supply state.

[0180] As the effective ventilation area of ​​the airflow passing through the grid floor 15 in the second buffer zone 111 decreases (approaching zero), the airflow entering the second buffer zone 111 mainly flows out towards the first buffer zone 121 through the open partition door 131, creating a positive pressure in the second buffer zone 111 relative to the first buffer zone 121, and forming a purge airflow towards the first buffer zone 121 for personnel entering, thereby further reducing the entry of particles from the first buffer zone 121 into the second buffer zone 111.

[0181] After personnel enter the second buffer zone 111 and close the partition door 131, the closure sensor of the partition door 131 closes again and sends a signal to the control system. The control system controls the FFU in the second buffer zone 111 to run at a constant speed of 0.45 m / s, and at the same time controls the air volume adjustment mechanism 157 in the second buffer zone 111 to open, so that the airflow flows downward from the top of the second buffer zone 111 and passes through the grid floor 15, so as to perform a preset duration of air shower purification on the personnel and guide the particles to migrate downward.

[0182] When personnel open the soft curtain assembly 21 of the second-level clean area 11, the closure sensor on the soft curtain assembly 21 of the second-level clean area 11 trips and sends a trigger signal to the control system. The control system controls the FFU in the second buffer zone 111 to operate at a low speed of 0.35 m / s. Since the cleanliness level of the second buffer zone 111 is compatible with that of the second-level zone 112, the air supply volume of the FFU in the second buffer zone 111 and the effective ventilation area of ​​the air volume regulating mechanism 157 are adjusted to maintain a slight negative pressure in the second buffer zone 111 relative to the second-level zone 112 (that is, the air pressure in the second buffer zone 111 is slightly lower than that in the second-level zone 112, for example, the difference is 3 Pa in practice). This allows personnel to enter the second-level zone 112 from the second buffer zone 111 and reduces the risk of residual particles in the second buffer zone 111 migrating to the second-level zone 112.

[0183] The above embodiments are only for illustrating the technical concept and features of the present invention, and are intended to enable those skilled in the art to understand the content of the present invention and implement it accordingly. They should not be construed as limiting the scope of protection of the present invention. All equivalent changes or modifications made in accordance with the spirit and essence of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A cleaning method for a clean system with a particle blocking transition device, characterized in that: The clean system (1) includes an air volume regulating mechanism (157) and a particulate blocking transition device (2); At least one air volume adjustment mechanism (157) is provided below the grid floor (15) of the second-level clean area (11) and the first-level clean area (12). The air volume adjustment mechanism (157) is a structural component that adjusts the effective ventilation area of ​​the corresponding grid floor (15). The particle blocking transition device (2) includes a soft curtain assembly (21) that is correspondingly provided to the partition door (131) and positioned and connected to the partition wall (13). Along the direction of personnel passage, at least one of the soft curtain components (21) is provided on one side of the partition door (131), or at least one of the soft curtain components (21) is provided on both sides of the partition door (131); each soft curtain component (21) includes a first curtain (211) and a second curtain (212), the first curtain (211) and the second curtain (212) together define a cover structure for personnel passage, the first curtain (211) and the second curtain (212) can be opened and closed connected on the side of the cover structure away from the partition wall (13), the side of the cover structure close to the partition wall (13) is positioned and connected to the partition wall (13), and the internal space of each cover structure forms a particle blocking area accordingly; The first curtain (211) and the second curtain (212) have a closed state and a passable state; Cleaning methods include: S1. Control the air supply mechanism (14) of the two clean areas to send airflow into the corresponding clean areas respectively, so that the airflow passes through the corresponding grid floor (15) from top to bottom, and guides the particles in the corresponding clean areas to migrate downward. S2. Adjust the air volume adjustment mechanism (157) of the two clean areas respectively to change the effective ventilation area of ​​the grid floor (15) corresponding to each air volume adjustment mechanism (157), so that the air pressure of the second-level clean area (11) is higher than the air pressure of the first-level clean area (12), so as to achieve a preset positive pressure difference between the two clean areas. S3. Using each of the hood structures to guide the airflow delivered by the corresponding air supply mechanism (14), the airflow flows from top to bottom toward the corresponding grid floor (15) in the corresponding particulate blocking area. At the same time, the air volume adjustment mechanism (157) located below the grid floor (15) corresponding to each of the hood structures is adjusted so that there is a set pressure difference between the air pressure in each hood structure and the air pressure in its corresponding clean area. S4. When people pass through, the soft curtain assembly (21) and the partition door (131) are opened in sequence according to the arrangement order of each soft curtain assembly (21) and the partition door (131) on the passage path. S5. After the personnel pass through, the corresponding first curtain (211) and second curtain (212) are reconnected to close the passage opening, and the partition door (131) is closed after the personnel pass through the partition door (131).

2. The cleaning method of the clean system with a particle blocking transition device according to claim 1, characterized in that: When there is one soft curtain assembly (21), the soft curtain assembly (21) is located in one of the two clean areas and is set with a corresponding partition door (131). When there are multiple soft curtain assemblies (21), each clean area has at least one soft curtain assembly (21).

3. The cleaning method of the clean system with a particle blocking transition device according to claim 1 or 2, characterized in that: In step S3, ensuring a predetermined pressure difference between the air pressure inside each of the enclosure structures and the air pressure in its corresponding clean area specifically involves: When a cover structure is installed in the first-level clean area (12), the air pressure inside the cover structure is greater than the air pressure inside the first-level clean area (12). When a cover structure is installed in the second-level clean area (11), the air pressure inside the cover structure is less than the air pressure inside the second-level clean area (11).

4. The cleaning method of the clean system with a particle blocking transition device according to claim 1, characterized in that: Specifically, S4 is: When a person needs to pass through the partition door (131), the soft curtain assembly (21) that the person is about to pass through is switched to the passage state in sequence with the partition door (131) along the personnel passage path, or the partition door (131) that the person is about to pass through is switched from the closed state to the open state. When a person passes through the soft curtain assembly (21), the openable edges of the first curtain (211) and the second curtain (212) are separated from each other, and an opening for the person to enter and exit is formed on the side of the cover structure away from the partition wall (13), so that the soft curtain assembly (21) can enter the passage state.

5. The cleaning method of the clean system with a particle blocking transition device according to claim 1, characterized in that: A quick-release piece (213) is provided between the first curtain (211) and the second curtain (212) to enable them to be opened and closed. The quick-release component (213) is a magnetic closure, zipper, Velcro, or snap fastener.

6. The cleaning method of the clean system with a particle blocking transition device according to claim 1, characterized in that: The cross-section of the cover structure is U-shaped; The cover structure is provided in both the second-level clean area (11) and the first-level clean area (12).

7. The cleaning method of the clean system with a particle blocking transition device according to claim 1, characterized in that: The grid floor (15) includes multiple floor bodies (151), multiple support columns (152), multiple first crossbeams (153) and multiple first longitudinal beams (154). The multiple first crossbeams (153) and the multiple first longitudinal beams (154) are arranged in a longitudinal and transverse manner and are cross-connected to form a floor skeleton with multiple rectangular mounting holes (155). Multiple floor bodies (151) are provided in a one-to-one correspondence with multiple rectangular mounting holes (155) and are positioned and connected to the floor frame, and the upper surfaces of all floor bodies (151) are coplanar; The lower end of each of the soft curtain components (21) is positioned and connected to the floor frame, and the projection of each of the particle blocking areas in the vertical direction covers at least one of the floor bodies (151). Each of the first crossbeams (153) and the first longitudinal beams (154) is provided with a support column (152) below each intersection. The lower end of each support column (152) is positioned and connected to the bottom surface of the corresponding clean area, and the upper end of each support column (152) is positioned and connected to the corresponding intersection to support the floor frame and to space the floor frame and the multiple floor bodies (151) from the bottom surface of the corresponding clean area. Each floor body (151) is provided with multiple grid holes (156) penetrating its upper and lower surfaces.

8. The cleaning method of the clean system with a particle blocking transition device according to claim 7, characterized in that: Each floor body (151) has an airflow adjustment mechanism (157) positioned and connected to its lower surface. At least one airflow regulating mechanism (157) is matched below the same particulate blocking area, and multiple airflow regulating mechanisms (157) corresponding to the same particulate blocking area are configured to operate synchronously. The air volume regulating mechanism (157) is a blade-type air volume regulating mechanism (1571) or a sliding baffle-type air volume regulating mechanism.

9. The cleaning method of the clean system with a particle blocking transition device according to claim 6, characterized in that: The particulate barrier area in the second-level clean area (11) serves as the second buffer zone (111), and the particulate barrier area in the first-level clean area (12) serves as the first buffer zone (121). Within the passage area of ​​the second-level clean zone (11), and outside the second buffer zone (111), the area is designated as the second-level zone (112). The area within the passageway of the first-level clean zone (12) and located outside the first buffer zone (121) is designated as the first-level zone (122). The pressure gradients of the first-level zone (122), the first buffer zone (121), the second buffer zone (111), and the second-level zone (112) are controlled by the air volume regulating mechanism (157) below each zone.

10. The cleaning method of the clean system with a particle blocking transition device according to claim 5, characterized in that: Both the partition door (131) and the quick-release piece (213) of the soft curtain assembly (21) are equipped with closure sensors. The air volume adjustment mechanism (157), the air supply mechanism (14) and all closure sensors are electrically connected to the same PLC control system to form a linkage control structure.