Falling film evaporator, method of operation and air conditioning unit
By installing multi-stage flash evaporation and vapor-liquid separation devices in the falling film evaporator, the problems of space occupation by the flash evaporator and the influence of gas-liquid mixing are solved, achieving efficient separation and uniform distribution of refrigerant, and improving the operating stability and heat exchange efficiency of the evaporator.
Patent Information
- Application Number
- CN202611459674.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-20
- Publication Date
- 2026-11-20
AI Technical Summary
Existing falling film evaporators suffer from problems such as large space occupied by the flash evaporator, gas-liquid mixing of refrigerant affecting liquid distribution uniformity, liquid carryover during suction leading to instability in the compression system, and insufficient liquid supply near the edge of the heat exchange tube arrangement area.
The falling film evaporator is equipped with primary and secondary flash evaporation units, a vapor-liquid separation device, and a liquid distribution device. Through multi-layer separation and turbulence structures, the refrigerant is separated and distributed, reducing the influence of the gas-liquid mixed refrigerant and ensuring uniform distribution and effective reflux of the liquid refrigerant.
It achieves efficient separation and distribution of refrigerant, reduces the space occupied by the flash evaporator, improves the operational stability and heat exchange efficiency of the evaporator, avoids liquid carryover during suction, and ensures uniform liquid supply in the heat exchange tube area.
Smart Images

Figure CN123134633A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of refrigeration equipment technology, specifically relating to a falling film evaporator, a method for operating the falling film evaporator, and an air conditioning unit. Background Technology
[0002] In some refrigeration systems with gas injection capabilities, the refrigerant, after heat exchange in the condenser, needs to pass through a first-stage throttling process, flash separation, and a second-stage throttling process before entering the falling film evaporator. Specifically, the gaseous refrigerant formed during flash separation is separated and transported to the compressor's gas injection port, while the separated liquid refrigerant enters the falling film evaporator after a second-stage throttling process.
[0003] The liquid refrigerant entering the falling film evaporator is distributed to the heat exchange tubes via a liquid distribution device and flows along the outer surface of the heat exchange tubes. After exchanging heat with the heat exchange medium in the heat exchange tubes, the liquid refrigerant is at least partially converted into gaseous refrigerant. The gaseous refrigerant is discharged from the evaporator's suction port and returned to the compressor, where it continues to participate in the refrigeration cycle.
[0004] Existing refrigeration systems typically have a separate flash evaporator between the primary and secondary throttling positions. This separate flash evaporator occupies internal installation space and requires connection to the throttling components, falling film evaporator, and compressor via corresponding piping, potentially increasing the complexity of internal piping layout and assembly of other components.
[0005] Because the compressor's gas injection process has specific pressure requirements for the gaseous refrigerant, the flash evaporator is usually placed before the second-stage throttling. The liquid refrigerant separated by the flash evaporator may still generate gaseous refrigerant during the second-stage throttling. This gaseous refrigerant may enter the liquid distribution device of the falling film evaporator together with the liquid refrigerant, resulting in the refrigerant entering the liquid distribution device being in a gas-liquid mixed state.
[0006] When the gas-liquid mixed refrigerant is distributed from the liquid distribution device to the heat exchange tubes, the gaseous refrigerant may affect the flow and distribution of the liquid refrigerant, and may form bubbles or foams during the process of the liquid refrigerant reaching the heat exchange tubes. As a result, the distribution of liquid refrigerant on some heat exchange tube surfaces may not be uniform, which in turn affects the contact between the liquid refrigerant and the heat exchange tubes and the falling film heat transfer process.
[0007] Furthermore, during operation, falling film evaporators may experience liquid carryover during suction, where gaseous refrigerant flowing towards the suction port carries some liquid refrigerant into the compression system. Liquid carryover during suction can affect the operational stability of the compression system and may adversely impact the unit's operating efficiency.
[0008] In existing technologies, baffles or filters made of materials such as stainless steel wire mesh are typically installed near the intake port to separate the refrigerant flowing towards the intake port from liquid. However, the baffles have limited ability to separate liquid refrigerant from the airflow; the liquid refrigerant separated by the filters is not easy to return to the area where the heat exchange tubes are located and may still flow back towards the intake port under the action of the airflow.
[0009] Meanwhile, due to factors such as the liquid distribution range, installation location, and heat exchange tube arrangement of the liquid distribution device, there may be relatively less liquid refrigerant near the edge of the heat exchange tube arrangement area in a falling film evaporator. Especially in the area near the tube sheets at both ends, the contact between some heat exchange tubes and the liquid refrigerant may be insufficient, thus affecting the heat exchange in the corresponding area.
[0010] Therefore, existing falling film evaporators and their refrigeration systems still have problems such as flash evaporators occupying a lot of space and piping, gaseous refrigerant generated by secondary throttling may affect liquid distribution, liquid refrigerant may be entrained during the suction process, and insufficient liquid supply at the edge of the heat exchange tube arrangement area, which need to be further improved. Summary of the Invention
[0011] To address the aforementioned problems in the prior art, this invention provides a falling film evaporator, a method for operating the falling film evaporator, and an air conditioning unit, in which two-stage flash evaporation, suction-side vapor-liquid separation, and separation liquid reflux are incorporated into the refrigerant treatment path of the falling film evaporator.
[0012] A first aspect of the present invention provides a falling film evaporator. The falling film evaporator includes a shell, a flash evaporation device, a vapor-liquid separation device, a liquid distribution device, and a heat exchange tube disposed within the shell, as well as a liquid inlet pipe, a gas supply pipe, and a gas suction pipe.
[0013] The flash evaporation device includes a primary flash evaporation unit and a secondary flash evaporation unit. The primary flash evaporation unit performs primary flash evaporation and vapor-liquid separation on the liquid refrigerant entering through the liquid inlet pipe, outputs the gaseous refrigerant through the gas makeup pipe, and delivers the liquid refrigerant to the secondary flash evaporation unit.
[0014] The secondary flash unit performs secondary flash evaporation and vapor-liquid separation on the liquid refrigerant output from the primary flash unit. The gaseous refrigerant separated by the secondary flash evaporation is released into the housing, while the separated liquid refrigerant is delivered to the liquid distribution device.
[0015] The liquid distribution device is positioned above the heat exchange tubes to distribute the liquid refrigerant separated by the secondary flash evaporation onto the surface of the heat exchange tubes. The liquid refrigerant forms a falling film along the surface of the heat exchange tubes and exchanges heat within the heat exchange area containing the heat exchange tubes to form gaseous refrigerant.
[0016] The vapor-liquid separator is connected to the suction pipe and performs vapor-liquid separation on the gaseous refrigerant released from the secondary flash unit and the gaseous refrigerant formed in the heat exchange area. The separated gaseous refrigerant is output through the suction pipe, while the separated liquid refrigerant returns to the heat exchange area to continue participating in heat exchange.
[0017] Optionally, the flash evaporation device includes a housing and a cover plate disposed on the top of the housing. The interior of the housing is divided into a primary flash evaporation unit and a secondary flash evaporation unit. The flash evaporation device is provided with a primary flash throttling orifice, a secondary flash throttling orifice, a gaseous refrigerant diffusion port, a liquid outlet, and a gas supply port, each orifice being connected to the corresponding refrigerant flow path.
[0018] The primary flash throttling orifice connects the liquid inlet pipe to the primary flash unit, and the secondary flash throttling orifice connects the primary flash unit to the secondary flash unit. The gaseous refrigerant diffusion port connects the secondary flash unit to the interior of the housing, the liquid outlet connects the secondary flash unit to the liquid distribution device, and the gas supply port connects the primary flash unit to the gas supply pipe.
[0019] Optionally, the primary flash unit includes a corrugated plate, a flow guide baffle, a primary corrugated separation plate, a primary grooved orifice plate, a primary orifice plate, and a primary micro liquid-blocking structure. The corrugated plate is arranged opposite to the primary flash throttling orifice, and the flow guide baffle is located between the corrugated plate and the primary corrugated separation plate.
[0020] The primary corrugated separation plate, the primary grooved perforated plate, and the primary perforated plate are arranged sequentially from bottom to top within the primary flash unit, with a primary micro-liquid baffle structure positioned on the primary grooved perforated plate. These structures collectively separate the vapor-liquid mixture of refrigerant generated during the primary flash unit and provide different flow paths for the gaseous and liquid refrigerants.
[0021] Optionally, the secondary flash evaporation unit includes a secondary corrugated separation plate, a secondary grooved orifice plate, a secondary orifice plate, a secondary micro-liquid-blocking structure, and a rectangular orifice plate. The rectangular orifice plate is arranged opposite to the secondary flash evaporation throttling orifice.
[0022] The secondary corrugated separation plate, the secondary grooved perforated plate, and the secondary perforated plate are arranged sequentially from bottom to top within the secondary flash evaporation unit, with a secondary micro-liquid baffle structure positioned on the secondary grooved perforated plate. The gaseous refrigerant generated during the secondary flash evaporation flows towards the gaseous refrigerant diffusion port, while the separated liquid refrigerant flows towards the liquid outlet.
[0023] Optionally, the primary corrugated separation plate is provided with a primary turbulence separation structure, which includes multiple turbulence separation structures. The side of the turbulence structure facing the direction of refrigerant flow has an arc-shaped surface, and the secondary corrugated separation plate is provided with a secondary turbulence separation structure of the same construction.
[0024] The primary slotted perforated plate is equipped with a primary venting and drainage structure. The primary venting and drainage structure includes vent holes, flow channels, and drip holes. The vent holes are corresponding to the turbulence structures in the primary turbulence separation structure, and the drip holes are connected to the flow channels.
[0025] The secondary slotted perforated plate is equipped with a secondary ventilation and drainage structure that is identical in construction to the primary ventilation and drainage structure. The air passages in the secondary ventilation and drainage structure correspond to the turbulence structures in the secondary turbulence separation structure, enabling the two-stage flash unit to employ appropriate vapor-liquid separation and drainage structures.
[0026] Optionally, the primary micro liquid-blocking structure includes a liquid-inlet section and a liquid-blocking section. Both the liquid-inlet section and the liquid-blocking section are provided with vent holes, and the vent holes on the liquid-inlet section and the vent holes on the liquid-blocking section are staggered to change the local flow direction when the gaseous refrigerant passes through.
[0027] The liquid inlet section is equipped with a liquid inlet groove, and the primary micro liquid-blocking structure is also equipped with an annular groove. The liquid-blocking section is equipped with a baffle. The liquid inlet groove is connected to the annular groove, and a connecting gap is formed between the bottom of the baffle and the annular groove. The annular groove is connected to the liquid drain groove.
[0028] The outlet of the drain tank is set to correspond to the flow channel in the primary ventilation and drain structure. The secondary micro liquid-blocking structure has the same staggered ventilation and liquid-guiding drainage structure as the primary micro liquid-blocking structure, allowing the liquid refrigerant separated from the gaseous refrigerant to be discharged along the corresponding channel.
[0029] Optionally, the vapor-liquid separator includes a lower cover plate, a baffle plate, a separation plate, small baffles, inclined baffles, a gas equalization plate, an upper cover plate, and a drainage pipe. The baffle plate is horizontally disposed in the lower part of the lower cover plate, forming a gap between it and the edge of the lower cover plate for liquid refrigerant to pass through; the small baffles are vertically disposed on both sides above the baffle plate, forming a gap between them and the separation plate for gaseous refrigerant to pass through.
[0030] Along the flow direction of the gaseous refrigerant, inclined baffles, separation plates, and gas equalization plates are sequentially arranged on the gas flow path of the vapor-liquid separator. The inclined baffles cause the gas and liquid refrigerants to deflect and collide. The separation plates utilize the density and inertia differences between the gaseous and liquid refrigerants to separate them. The gas equalization plates are used to equalize the flow distribution of the gaseous refrigerant as it passes through different areas of the separation plates.
[0031] The bottom of the lower cover plate has a small hole communicating with the drainage pipe, the upper cover plate has an air intake hole communicating with the interior of the shell, and the side of the lower cover plate has an air outlet hole communicating with the air intake pipe. The gaseous refrigerant carrying liquid refrigerant inside the shell enters the vapor-liquid separator through the air intake hole, and passes through the inclined baffle and the separation plate in sequence; the gaseous refrigerant separated by the separation plate passes through the gas equalization plate, and is output through the air outlet and the air intake pipe in sequence.
[0032] Optionally, the total flow area of the suction port is larger than the flow cross-sectional area of the suction pipe. The separation plate is provided with multiple semi-enclosed turbulence structures, multiple through holes, and multiple inclined ramps. The semi-enclosed turbulence structures are located above the through holes, and the inclined ramps are located on the side of the semi-enclosed turbulence structures facing the gaseous refrigerant flow and extend towards the through holes.
[0033] The gaseous refrigerant changes its flow direction along the extension of the separation plate at the gap formed between the small baffle and the separation plate, and passes through the gap between the semi-enclosed turbulence structures. The liquid refrigerant entrained in the gaseous refrigerant flows towards the through hole under the action of inertia, and falls to the baffle plate through the through hole; the semi-enclosed turbulence structure covers the through hole, which helps to reduce the possibility of the liquid refrigerant that has entered the through hole being sucked out again by the airflow.
[0034] Optionally, the liquid refrigerant separated by the separator falls onto the baffle and flows through the gap between the baffle edge and the lower cover plate to the bottom of the lower cover plate, then enters the drain pipe through small holes. The baffle plate is used to reduce the possibility of the liquid refrigerant collected at the bottom of the lower cover plate being carried away again by the suction airflow. The outlet of the drain pipe is located above the heat exchange tubes in the heat exchange area to deliver the separated liquid refrigerant to the surface of the heat exchange tubes.
[0035] A second aspect of the present invention provides an operating method for a falling film evaporator, the operating method being applied to the aforementioned falling film evaporator. Liquid refrigerant sequentially undergoes a first-stage flash evaporation, a first-stage vapor-liquid separation, a second-stage flash evaporation, a second-stage vapor-liquid separation, liquid distribution, and falling film heat exchange; the resulting gaseous refrigerant undergoes vapor-liquid separation again before being output.
[0036] Optionally, the liquid refrigerant enters the first-stage flash unit through the first-stage flash throttling orifice, the gaseous refrigerant separated from the first-stage flash enters the gas supply pipe through the gas supply port, and the liquid refrigerant separated from the first-stage flash enters the second-stage flash unit through the second-stage flash throttling orifice.
[0037] The gaseous refrigerant separated by the second-stage flash evaporation enters the shell through the gaseous refrigerant diffusion port, while the liquid refrigerant separated by the second-stage flash evaporation enters the liquid distribution device through the liquid outlet. The gaseous refrigerant inside the shell enters the vapor-liquid separator through the suction port, and the separated gaseous refrigerant enters the suction pipe through the exhaust port. The separated liquid refrigerant returns to the surface of the heat exchange tube through small holes and a guide pipe.
[0038] A third aspect of the present invention provides an air conditioning unit. The air conditioning unit includes a compressor, a condenser, a throttling component, and the aforementioned falling film evaporator. The compressor's exhaust port, the condenser, the throttling component, and the liquid inlet pipe are connected in sequence. The gas supply pipe is connected to the compressor's gas supply port, and the suction pipe is connected to the compressor's suction port.
[0039] Compared with the prior art, the beneficial effects of the present invention include at least the following.
[0040] 1. The falling film evaporator provided by the present invention, by setting a primary flash unit, a secondary flash unit, a liquid distribution device and a vapor-liquid separation device in the shell, facilitates the integration of refrigerant flashing, liquid distribution, heat exchange and suction-side vapor-liquid separation processes, and reduces the installation space occupied by independent flashing components.
[0041] 2. The falling film evaporator provided by the present invention forms corresponding flow paths through the housing, cover plate, primary flash throttling orifice, secondary flash throttling orifice, gaseous refrigerant diffusion port, liquid outlet and gas inlet, which is beneficial to allow the gaseous refrigerant and liquid refrigerant after the two-stage flash to enter the corresponding output paths respectively.
[0042] 3. The falling film evaporator provided by the present invention, by setting relatively arranged corrugated plates, flow guide baffles and multi-layer separation structures arranged from bottom to top in the first-stage flash evaporation unit, is beneficial to extending the contact path between the vapor-liquid mixed refrigerant and the separation structure and reducing the possibility of droplets being output with the airflow.
[0043] 4. The falling film evaporator provided by the present invention, by setting a rectangular perforated plate and a secondary corrugated separation plate, a secondary grooved perforated plate and a secondary perforated plate arranged from bottom to top in the secondary flash unit, is beneficial to the dispersion and separation of the vapor-liquid mixture refrigerant generated in the secondary flash.
[0044] 5. The falling film evaporator provided by the present invention facilitates the passage of gaseous refrigerant and discharges the separated liquid refrigerant back to the lower region by matching the arc-shaped surface of the turbulence structure with the air passage, flow channel and drip hole of the grooved perforated plate.
[0045] 6. The falling film evaporator provided by the present invention, by setting staggered air passages and interconnected liquid inlet grooves, annular grooves and drain grooves in the micro liquid-blocking structure, is conducive to increasing the opportunity for droplets to contact the liquid-blocking structure and orderly discharging the accumulated liquid refrigerant.
[0046] 7. The falling film evaporator provided by the present invention causes the gas and liquid refrigerant to flow back and collide through the inclined baffle. The airflow direction at the separation plate is changed through the gap between the small baffle and the separation plate. The separation plate and the gas equalization plate respectively perform gas-liquid separation and flow equalization, which helps to increase the chance of droplet collision and separation from the airflow, and reduces the possibility of gaseous refrigerant concentrating in the local area of the separation plate.
[0047] 8. The falling film evaporator provided by the present invention, by setting the suction port on the upper cover plate and making the total flow area of the suction port larger than the flow cross-sectional area of the suction pipe, helps to reduce the airflow velocity at the suction port and reduce the possibility of suction force directly acting on the liquid refrigerant below; by setting a semi-enclosed turbulence structure, through holes and inclined ramps on the separation plate, the liquid refrigerant can be guided to the through holes and the possibility of the liquid refrigerant entering the through holes being drawn out again by the airflow can be reduced.
[0048] 9. The falling film evaporator provided by the present invention allows the separated liquid refrigerant to return to the surface of the heat exchange tube through small holes and guide pipes, which is beneficial for replenishing the liquid refrigerant in the heat exchange area with the separated liquid and reduces the possibility of liquid refrigerant accumulating in the vapor-liquid separation device.
[0049] 10. The operation method of the falling film evaporator provided by the present invention, by sequentially performing two-stage flash evaporation and vapor-liquid separation, liquid distribution, falling film heat exchange and suction-side vapor-liquid separation, is beneficial to make the refrigerant in different states flow continuously along the corresponding path.
[0050] 11. The operation method of the falling film evaporator provided by the present invention, by connecting each processing process through a primary flash throttling orifice, a gas inlet, a secondary flash throttling orifice, a gaseous refrigerant diffusion port, a liquid outlet, a suction port, a gas outlet, and a small hole, is beneficial to clarifying the flow paths of gaseous refrigerant, liquid refrigerant, and separation liquid.
[0051] 12. The air conditioning unit provided by the present invention, by connecting the compressor, condenser, throttling component and the falling film evaporator with integrated two-stage flash evaporation function, helps to shorten the connection path between flash treatment and evaporative heat exchange within the unit and form a continuous refrigerant cycle. Attached Figure Description
[0052] Figure 1 This is a schematic diagram of the overall structure of a falling film evaporator according to one embodiment of the present invention; Figure 2 This is a schematic diagram showing the division of a primary flash unit and a secondary flash unit in a flash device according to one embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of a flashing device according to one embodiment of the present invention; Figure 4 This is a schematic diagram of the structure of a vapor-liquid separation device according to one embodiment of the present invention; Figure 5 This is a schematic diagram of a wave-shaped separation plate and a turbulence structure according to one embodiment of the present invention; Figure 6 This is a schematic diagram of a micro liquid-blocking structure according to one embodiment of the present invention; Figure 7 This is a schematic diagram of a grooved perforated plate and a ventilation and drainage structure according to one embodiment of the present invention. Figure 8 This is a schematic diagram of a separation plate and a semi-enclosed turbulence structure according to one embodiment of the present invention; Figure 9 This is a schematic diagram illustrating a drainage tube according to one embodiment of the present invention, employing both top-drip and side-replenishment methods. Figure 10 This is a schematic diagram of the refrigerant flow path inside a vapor-liquid separation device according to one embodiment of the present invention.
[0053] The reference numerals in the attached figures are explained below.
[0054] 1. Flash emission device; 1-1, Box body; 1-2, First-stage flash throttling orifice; 1-3, Secondary flash throttling orifice; 1-4, Gaseous refrigerant diffusion port; 1-5, liquid outlet; 1-6, wave board; 1-7, flow deflectors; 1-8a, Level 1 corrugated separation plate; 1-8b, Secondary corrugated separation plate; 1-8-1, turbulence structure; 1-9a, Level 1 slotted perforated plate; 1-9b, Secondary slotted perforated plate; 1-9-1, Vent hole; 1-9-2, flow channel; 1-9-3, drip hole; 1-10a, Level 1 perforated plate; 1-10b, secondary perforated plate; 1-11a, primary micro liquid-blocking structure; 1-11b, two-stage micro liquid-blocking structure; 1-11-1, Vent hole; 1-11-2, Liquid inlet tank; 1-11-3, Annular groove; 1-11-4, baffle; 1-11-5, drain tank; 1-12, Rectangular perforated plate; 1-13, Cover plate; 1-14, replenish air inlet; 2. Vapor-liquid separation device; 2-1, Lower cover plate; 2-2, partition; 2-3, Separation plate; 2-3-1, semi-enclosed spoiler structure; 2-3-2, through hole; 2-3-3, sloping ramp; 2-4, small baffle; 2-5, slanted baffle; 2-6, air distribution plate; 2-7, Top cover plate; 2-8, Drainage tube; 2-9, small holes; 2-10, Intake port; 2-11, Vent hole; 3. Liquid distribution device; 4. Heat exchanger tubes; 5. Liquid inlet pipe; 6. Intake tube; 7. Inhalation tube; 8. Shell. Detailed Implementation
[0055] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of this invention. The described embodiments are merely some embodiments of this invention, and not all embodiments. Based on the spirit of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this invention.
[0056] The technical solution of the present invention will now be described in conjunction with the accompanying drawings. It should be understood that the described embodiments are used to illustrate the structural composition, connection relationship, and working process of the present invention, and are not intended to unnecessarily limit the scope of protection of the present invention.
[0057] The technical features described in this embodiment can be combined with each other without contradiction. The number of components, structural dimensions, plate spacing and installation position, which are not specifically limited, can be set according to the refrigerant flow rate, allowable flow resistance, heat exchange requirements and internal installation space of the equipment.
[0058] The terms "upper," "lower," "inner," and "outer" used in this embodiment are based on the structure shown in the attached drawings and the normal installation state of the falling film evaporator, and are only used to clearly describe the relative positional relationships between the components. When the specific installation direction of the falling film evaporator is adjusted adaptively, the components can still be set according to the corresponding refrigerant flow relationship.
[0059] In this embodiment, gaseous and liquid refrigerants are generalizations of the main states of the refrigerant during the corresponding processing stages. During flashing, separation, and heat exchange, the refrigerant can exist in a gas-liquid coexistence state, with the gaseous and liquid phases continuing to flow along their respective flow paths.
[0060] The corresponding boards in the first-level flash unit and the second-level flash unit are distinguished by a and b, respectively, and the common detailed structures on each board are described by the same lower-level labels.
[0061] Example 1 This embodiment provides a falling film evaporator. For example... Figure 1 As shown, the falling film evaporator includes a shell 8 and a flash evaporation device 1, a vapor-liquid separation device 2, a liquid distribution device 3 and a heat exchange tube 4 disposed within the shell 8. It also includes a liquid inlet pipe 5 and a gas supply pipe 6 connected to the flash evaporation device 1, and a suction pipe 7 connected to the vapor-liquid separation device 2.
[0062] The shell 8 provides installation space for the various refrigerant handling components in the falling film evaporator and forms the internal space for refrigerant flashing, distribution, heat exchange, and vapor-liquid separation. The structural dimensions of the shell 8 can be determined based on the number of heat exchange tubes 4, the space required for the flashing device 1 and the vapor-liquid separation device 2, and the refrigerant handling flow rate.
[0063] The heat exchange tube 4 is disposed inside the shell 8, and the outer surface of the heat exchange tube 4 constitutes the main heat exchange surface for the falling film evaporation heat exchange of the liquid refrigerant. After the liquid refrigerant is distributed to the outer surface of the heat exchange tube 4 by the liquid distribution device 3, it flows along the outer surface of the heat exchange tube 4 and exchanges heat with the heat exchange medium inside the heat exchange tube 4.
[0064] The liquid distribution device 3 is positioned above the heat exchange tube 4 to receive the liquid refrigerant output from the secondary flash unit and distribute it to the area where the heat exchange tube 4 is located. The relative position between the liquid distribution device 3 and the heat exchange tube 4 facilitates the liquid refrigerant reaching the outer surface of the heat exchange tube 4 under the influence of gravity.
[0065] The liquid distribution device 3 can be adapted to the arrangement range of the heat exchange tubes 4, so that the liquid refrigerant can reach the heat exchange tubes 4 at different positions. The specific dimensions and distribution positions of the liquid distribution device 3 can be set according to the number and arrangement of the heat exchange tubes 4 and the required refrigerant flow rate.
[0066] After the liquid refrigerant reaches the heat exchange tube 4, it forms a downward-flowing liquid film on the outer surface of the heat exchange tube 4. During the flow process, the liquid film exchanges heat with the heat exchange medium inside the heat exchange tube 4, causing at least a portion of the liquid refrigerant to be converted into gaseous refrigerant.
[0067] By covering the outer surface of the heat exchange tube 4 with a liquid film, the contact range between the liquid refrigerant and the heat exchange tube 4 can be increased, which helps to reduce the possibility of insufficient liquid supply to the surface of the heat exchange tube in certain areas. Liquid refrigerant that has not completely evaporated at the current heat exchange location can continue to flow downwards along the outer surface of the heat exchange tube 4.
[0068] The vapor-liquid separator 2 is located inside the housing 8 and is connected to the suction pipe 7. The vapor-liquid separator 2 is used to separate the refrigerant flowing from the housing 8 to the suction pipe 7, so that the gaseous refrigerant is discharged from the suction pipe 7 and the liquid refrigerant separated from the gas flow re-enters the area where the heat exchange tube 4 is located.
[0069] The vapor-liquid separator 2 and the liquid distribution device 3 form different paths for the liquid refrigerant to enter the heat exchange zone. The liquid distribution device 3 is used to receive the liquid refrigerant that has undergone two-stage flash evaporation treatment, while the vapor-liquid separator 2 is used to return the liquid refrigerant that flows with the gaseous refrigerant to the separation zone.
[0070] The two liquid supply paths described above work together to ensure that both the liquid refrigerant entering the housing 8 and the liquid refrigerant separated from the suction air flow can be used for heat exchange. This arrangement helps reduce the possibility of liquid refrigerant leaving the evaporator with the suction air flow and allows for the reuse of the separated liquid refrigerant.
[0071] The flash evaporation device 1 is used to perform two-stage flash evaporation and vapor-liquid separation on the refrigerant input through the liquid inlet pipe 5. Before entering the liquid distribution device 3, the refrigerant passes through the flash evaporation device 1, which allows the gaseous refrigerant formed by flash evaporation and the liquid refrigerant that continues to be used for falling film heat exchange to flow along their respective flow paths.
[0072] like Figure 2 and Figure 3 As shown, the flash evaporation device 1 includes a primary flash evaporation unit and a secondary flash evaporation unit. The primary flash evaporation unit and the secondary flash evaporation unit are connected in the order of refrigerant processing, and the secondary flash evaporation unit is also connected to the housing 8 and the liquid distribution device 3, respectively.
[0073] Specifically, Figure 2 The adjacent arrangement of the primary flash evaporation unit and the secondary flash evaporation unit within housing 1-1 is shown, and they are connected along the refrigerant processing sequence. The primary flash evaporation unit receives the refrigerant input through the liquid inlet pipe 5 and performs primary flash evaporation and primary vapor-liquid separation on the refrigerant. The gaseous refrigerant formed by the primary flash evaporation is output through the gas supply pipe 6, while the liquid refrigerant separated by the primary flash evaporation enters the secondary flash evaporation unit.
[0074] The secondary flash unit receives the liquid refrigerant output from the primary flash unit and performs secondary flash evaporation and secondary vapor-liquid separation on the liquid refrigerant. The gaseous refrigerant formed by the secondary flash evaporation enters the housing 8, and the liquid refrigerant separated by the secondary flash evaporation enters the liquid distribution device 3.
[0075] The two-stage flash unit is arranged along the refrigerant flow sequence, so that the refrigerant undergoes two flash and vapor-liquid separation processes before entering the liquid distribution device 3. This arrangement allows the gaseous refrigerant formed in different processing stages to enter the gas supply path and the gas intake path respectively, and helps to reduce the amount of gaseous refrigerant entering the liquid distribution device 3.
[0076] like Figure 3 As shown, the flash emitting device 1 includes a housing 1-1 and a cover plate 1-13 covering the housing 1-1. The housing 1-1 and the cover plate 1-13 together form a space for setting up the primary flash emitting unit and the secondary flash emitting unit.
[0077] The cover plate 1-13 is used to close the corresponding openings of the enclosure 1-1 and provides an operating position for the installation and maintenance of the internal panels of the enclosure 1-1. The cover plate 1-13 and the enclosure 1-1 can be connected in a manner that is compatible with the equipment's sealing requirements.
[0078] The housing 1-1 is equipped with a primary flash throttling orifice 1-2, a secondary flash throttling orifice 1-3, a gaseous refrigerant diffusion port 1-4, a liquid outlet 1-5, and a gas supply port 1-14. Each orifice is connected to either the primary or secondary flash unit to form a path for refrigerant entry, interstage flow, and classified output.
[0079] The first-stage flash throttling orifice 1-2 is connected to the liquid inlet pipe 5. The refrigerant transported by the liquid inlet pipe 5 enters the first-stage flash unit through the first-stage flash throttling orifice 1-2 and undergoes first-stage flash evaporation after the flow cross-section changes.
[0080] The primary flash throttling orifice 1-2 forms the refrigerant inlet between the liquid inlet pipe 5 and the primary flash unit. The position of the primary flash throttling orifice 1-2 can correspond to the corrugated plate 1-6 in the primary flash unit, so that the refrigerant entering the primary flash unit first reaches the area where the corrugated plate 1-6 is located.
[0081] The dimensions of the primary flash throttling orifice 1-2 can be determined based on the inlet flow rate, the required processing capacity of the primary flash unit, and the allowable flow resistance. Unless specific values are provided, the orifice diameter or flow area of the primary flash throttling orifice 1-2 is not fixed.
[0082] The secondary flash throttling orifice 1-3 is located between the primary flash unit and the secondary flash unit, allowing the liquid refrigerant separated from the primary flash unit to enter the secondary flash unit through the secondary flash throttling orifice 1-3. The liquid refrigerant undergoes secondary flash evaporation after passing through the secondary flash throttling orifice 1-3.
[0083] The secondary flash throttling orifices 1-3 form the refrigerant channel between the two flash units. By further processing the liquid refrigerant after the first-stage flash through the secondary flash throttling orifices 1-3, the gaseous refrigerant formed in the second-stage flash can be separated from the liquid refrigerant before it enters the liquid distribution device 3.
[0084] Gas inlet 1-14 is connected to the first-stage flash evaporation unit and to the gas inlet of the external compressor via gas inlet pipe 6. The gaseous refrigerant separated in the first-stage flash evaporation unit enters the gas inlet pipe 6 through gas inlet 1-14.
[0085] The gas inlets 1-14 are positioned to facilitate the outflow of gaseous refrigerant during the first-stage flash evaporation. Each separation plate in the first-stage flash evaporation unit can separate the liquid refrigerant entrained in the gas flow stage by stage before the gaseous refrigerant reaches the gas inlets 1-14.
[0086] The gaseous refrigerant diffusion port 1-4 is connected to the internal space of the secondary flash unit and the shell 8. The gaseous refrigerant formed and separated by the secondary flash enters the shell 8 through the gaseous refrigerant diffusion port 1-4, and flows together with the gaseous refrigerant formed in the heat exchange area to the vapor-liquid separator 2.
[0087] The gaseous refrigerant diffusion ports 1-4 allow the gaseous refrigerant output from the secondary flash unit to disperse into the housing 8, reducing the impact on the distribution of nearby liquid refrigerant when the gaseous refrigerant flows out from a single local location. The arrangement range of the gaseous refrigerant diffusion ports 1-4 can be determined based on the internal space of the housing 8 and the refrigerant flow rate.
[0088] The liquid outlet 1-5 is connected to the secondary flash evaporation unit and the liquid distribution device 3. The liquid refrigerant separated from the secondary flash evaporation unit leaves the flash evaporation device 1 through the liquid outlet 1-5 and enters the liquid distribution device 3.
[0089] The liquid outlets 1-5 are located at the bottom of the secondary flash unit to accommodate the upward flow of gaseous refrigerant and the downward convergence of liquid refrigerant. This arrangement facilitates the discharge of liquid refrigerant from the secondary flash unit and reduces the possibility of gaseous refrigerant formed during the secondary flash entering the liquid distribution device 3 along with the liquid refrigerant.
[0090] Within the primary flash unit, gaseous refrigerant mainly flows towards the gas inlet 1-14, while liquid refrigerant mainly flows towards the secondary flash throttling orifice 1-3. Within the secondary flash unit, gaseous refrigerant mainly flows towards the gaseous refrigerant diffusion port 1-4, while liquid refrigerant mainly flows towards the liquid outlet 1-5.
[0091] By utilizing the different flow states of gaseous and liquid refrigerants in the flash evaporation unit, vapor-liquid separation can be achieved through the coordination of plate layers, orifice positions, and flow space. This separation process is formed by the changes in the refrigerant state and the relative positions between various structures, eliminating the need to add a non-standard drive mechanism within the flash evaporation device 1.
[0092] like Figure 2 and Figure 3 As shown, the primary flash unit includes wave plates 1-6, flow guide baffles 1-7, primary wave-shaped separation plates 1-8a, primary grooved perforated plates 1-9a, primary perforated plates 1-10a, and primary micro liquid-blocking structures 1-11a.
[0093] The corrugated plate 1-6 is positioned opposite to the primary flash throttling orifice 1-2. After the refrigerant enters the primary flash unit through the primary flash throttling orifice 1-2, its flow direction and local flow state change upon reaching the corrugated plate 1-6.
[0094] The corrugated plate 1-6 provides a contact surface for the refrigerant through its undulating surface structure. After the gas and liquid refrigerant come into contact with the corrugated plate 1-6, the liquid refrigerant can flow along the surface of the corrugated plate 1-6, while the gaseous refrigerant can continue to flow towards the upper part of the first-stage flash unit.
[0095] The distance between the corrugated plate 1-6 and the primary flash throttling orifice 1-2 can be determined based on the refrigerant outflow range of the primary flash throttling orifice 1-2, the refrigerant flow rate, and the installation space within the housing 1-1. This distance should not deviate from the basic fit relationship where the refrigerant can reach the corrugated plate 1-6 and undergo a change in flow direction.
[0096] A flow guide baffle 1-7 is disposed between the corrugated plate 1-6 and the primary corrugated separation plate 1-8a. The flow guide baffle 1-7 is used to limit the refrigerant flow channel from the area where the corrugated plate 1-6 is located to the area where the primary corrugated separation plate 1-8a is located.
[0097] The flow guide baffle 1-7, together with the inner wall of the housing 1-1 and adjacent plates, forms a corresponding flow space. The refrigerant, after being treated by the corrugated plate 1-6, continues to flow along this flow space, thereby allowing the refrigerant to reach the first-stage corrugated separation plate 1-8a in the order of the internal structure of the first-stage flash unit.
[0098] By limiting the flow path of the refrigerant through the flow guide baffles 1-7, the flow path of the gas-liquid two-phase refrigerant in the first-stage flash unit can be extended, and it is beneficial for the liquid refrigerant to gradually separate from the gaseous refrigerant before reaching the upper separation structure.
[0099] The primary wave-shaped separation plate 1-8a, the primary grooved perforated plate 1-9a, and the primary perforated plate 1-10a are arranged sequentially from bottom to top within the primary flash unit. The primary micro liquid-blocking structure 1-11a is located on the primary grooved perforated plate 1-9a.
[0100] The first-stage corrugated separator 1-8a first receives the refrigerant flowing from the area where the corrugated plate 1-6 and the flow guide baffle 1-7 are located. The first-stage corrugated separator 1-8a changes the local flow state of the gas-liquid two-phase refrigerant through its corrugated surface and the first-stage turbulence separation structure.
[0101] The primary corrugated separation plate 1-8a allows the gaseous refrigerant to continue flowing upwards, while simultaneously allowing some of the liquid refrigerant entrained in the airflow to come into contact with the plate surface or the turbulence structure. The liquid refrigerant in contact with the plate surface can flow along the primary corrugated separation plate 1-8a in the corresponding drainage direction.
[0102] like Figure 5 As shown, the primary wave-shaped separation plate 1-8a is provided with a primary turbulence separation structure, which includes multiple turbulence structures 1-8-1. The multiple turbulence structures 1-8-1 can be arranged at intervals along the surface of the primary wave-shaped separation plate 1-8a.
[0103] The turbulence structure 1-8-1 has an arc-shaped surface on the side facing the incoming gaseous refrigerant. When the gaseous refrigerant passes over the arc-shaped surface, its flow direction changes, and the entrained liquid refrigerant, due to its different flow state from the gaseous refrigerant, can come into contact with the curved surface or adjacent plate surfaces.
[0104] The aforementioned curved surface can increase the contact and redirection process between the airflow and the plate without sealing the gaseous refrigerant channel, which is beneficial for improving the separation degree between the gaseous refrigerant and entrained droplets. The specific form of the curved surface can be set according to the plate processing method and the flow space.
[0105] The number and spacing of the turbulence structures 1-8-1 can be determined based on the plate dimensions of the primary corrugated separation plate 1-8a, the gaseous refrigerant flow rate, and the allowable flow resistance. Space is reserved between each turbulence structure 1-8-1 for the gaseous refrigerant to pass through.
[0106] The gaseous refrigerant treated by the primary corrugated separation plate 1-8a continues to flow towards the primary slotted perforated plate 1-9a. The liquid refrigerant separated from the gaseous refrigerant can flow downwards along the surface of the primary corrugated separation plate 1-8a, thereby reducing the possibility of the liquid refrigerant continuing to rise with the airflow.
[0107] The primary slotted perforated plate 1-9a is positioned above the primary corrugated separation plate 1-8a. The primary slotted perforated plate 1-9a is equipped with a primary ventilation and drainage structure to form a channel for gaseous refrigerant and a path for liquid refrigerant discharge.
[0108] like Figure 7 As shown, the primary ventilation and drainage structure includes an air passage 1-9-1, a flow channel 1-9-2, and a dripping hole 1-9-3. The air passage 1-9-1 corresponds to the turbulence structure 1-8-1 on the primary corrugated separation plate 1-8a.
[0109] The vent 1-9-1 is used to allow the gaseous refrigerant, after being processed by the primary corrugated separator 1-8a, to pass through the primary slotted perforated plate 1-9a. The number and total flow area of the vent 1-9-1 can be determined based on the gaseous refrigerant flow rate and the allowable flow resistance of the primary flash unit.
[0110] The correspondence between the air passage 1-9-1 and the turbulence structure 1-8-1 allows the gaseous refrigerant, whose flow direction has been changed by the turbulence structure 1-8-1, to enter the corresponding air passage 1-9-1. This arrangement helps to maintain the continuity of the airflow path between the plates.
[0111] Flow channel 1-9-2 is disposed on the primary grooved perforated plate 1-9a to receive liquid refrigerant discharged from the primary micro liquid-retaining structure 1-11a. Flow channel 1-9-2 is connected to drip hole 1-9-3, so that the liquid refrigerant entering flow channel 1-9-2 can leave the primary grooved perforated plate 1-9a through drip hole 1-9-3.
[0112] The drip hole 1-9-3 forms a drainage channel that penetrates the primary grooved perforated plate 1-9a. Through the cooperation of the flow channel 1-9-2 and the drip hole 1-9-3, the liquid refrigerant separated by the primary micro liquid-blocking structure 1-11a can be discharged downwards from the primary grooved perforated plate 1-9a.
[0113] Gaseous refrigerant flows upward through the vent 1-9-1, while liquid refrigerant is discharged downward through the flow channel 1-9-2 and the drip hole 1-9-3. The separate gas and liquid paths help reduce the possibility of the separated liquid refrigerant re-entering the upward airflow.
[0114] The primary perforated plate 1-10a is positioned above the primary slotted perforated plate 1-9a. The primary perforated plate 1-10a is used to allow gaseous refrigerant to pass through and to further distribute the airflow in the upper part of the primary flash unit.
[0115] The number and position of the openings on the primary perforated plate 1-10a can be set according to the position of the air inlet 1-14 and the airflow distribution of the primary flash unit. After passing through the primary perforated plate 1-10a, the gaseous refrigerant flows to the air inlet 1-14 and is output through the air inlet pipe 6.
[0116] A corresponding flow space is maintained between the primary perforated plate 1-10a and the primary grooved perforated plate 1-9a. This flow space provides a channel for gaseous refrigerant to flow from the gas passage 1-9-1 to the primary perforated plate 1-10a, and also provides space for the installation of the primary micro liquid baffle structure 1-11a.
[0117] The primary micro liquid-blocking structure 1-11a is used to further separate the gaseous refrigerant from the gaseous refrigerant that has passed through the primary grooved perforated plate 1-9a. The primary micro liquid-blocking structure 1-11a is installed on the primary grooved perforated plate 1-9a, so that the separated liquid refrigerant can directly enter the drainage path on the primary grooved perforated plate 1-9a.
[0118] like Figure 6 As shown, the primary micro liquid-blocking structure 1-11a includes a liquid-inlet section and a liquid-blocking section. Both the liquid-inlet section and the liquid-blocking section are provided with vent holes 1-11-1, and the vent holes 1-11-1 on the liquid-inlet section and the vent holes 1-11-1 on the liquid-blocking section are staggered.
[0119] After the gaseous refrigerant passes through the vent hole 1-11-1 on the liquid inlet section, it needs to change its flow direction to pass through the vent hole 1-11-1 on the liquid baffle section. When the airflow turns between the two sets of staggered vent holes 1-11-1, some of the liquid refrigerant entrained in the airflow can come into contact with the liquid baffle section.
[0120] By staggering the two sets of vent holes 1-11-1, the reversal process of gaseous refrigerant in the primary micro liquid baffle structure 1-11a can be increased. This arrangement facilitates the separation of liquid refrigerant from the airflow while maintaining a flow channel for gaseous refrigerant.
[0121] The liquid inlet section is equipped with a liquid inlet groove 1-11-2 and an annular slot 1-11-3, and the liquid blocking section is equipped with a baffle 1-11-4. The liquid inlet groove 1-11-2 is connected to the annular slot 1-11-3.
[0122] The baffle 1-11-4 corresponds to the annular slot 1-11-3, and a gap is formed between the bottom of the baffle 1-11-4 and the annular slot 1-11-3 to allow the flow of liquid refrigerant. Liquid refrigerant in contact with the baffle 1-11-4 can enter the annular slot 1-11-3 through this gap.
[0123] The liquid inlet trough 1-11-2 is used to guide the liquid refrigerant separated from the primary micro liquid-blocking structure 1-11a to the annular slot 1-11-3. The annular slot 1-11-3 is used to collect the liquid refrigerant entering from around the baffle 1-11-4.
[0124] The annular slot 1-11-3 is connected to the drain trough 1-11-5, and the outlet of the drain trough 1-11-5 corresponds to the flow channel 1-9-2 on the primary slotted perforated plate 1-9a. After the liquid refrigerant enters the drain trough 1-11-5 through the annular slot 1-11-3, it can continue to enter the flow channel 1-9-2.
[0125] The primary micro liquid-blocking structure 1-11a, the flow channel 1-9-2, and the drip hole 1-9-3 together form a continuous drainage path. This drainage path allows the liquid refrigerant separated from the airflow to leave the area where the primary micro liquid-blocking structure 1-11a is located.
[0126] By directly mounting the primary micro liquid-blocking structure 1-11a on the primary grooved perforated plate 1-9a, the distance between the liquid-blocking part and the liquid-draining structure can be shortened. After separation, the liquid refrigerant can promptly enter the drain tank 1-11-5 and the flow channel 1-9-2, which helps reduce the possibility of liquid refrigerant accumulating in the airflow channel.
[0127] The external contour of the primary micro liquid-blocking structure 1-11a can be adjusted according to the plate size and installation space of the primary grooved perforated plate 1-9a. When adjusting the external contour, the staggered relationship between the two sets of air holes 1-11-1 and the drainage relationship between the liquid inlet groove 1-11-2, the annular groove 1-11-3, the liquid outlet groove 1-11-5 and the flow channel 1-9-2 should be maintained.
[0128] When the primary flash unit is working, the refrigerant enters the housing 1-1 through the primary flash throttling orifice 1-2 from the liquid inlet pipe 5. After the refrigerant reaches the corrugated plate 1-6, its flow direction changes, and the gaseous and liquid refrigerants continue to flow along the space defined by the corrugated plate 1-6 and the guide baffle 1-7.
[0129] The liquid refrigerant flows downwards into the lower part of the primary flash unit under the influence of gravity and the surface of the plates, and gradually converges into the area where the secondary flash throttling orifice 1-3 is located. The gaseous refrigerant flows upwards through the primary corrugated separation plate 1-8a, the primary grooved perforated plate 1-9a, the primary micro liquid-blocking structure 1-11a, and the primary perforated plate 1-10a.
[0130] Each time the gaseous refrigerant passes through a separation structure, its flow direction changes accordingly or it comes into contact with the surface of the panel. The liquid refrigerant entrained in the airflow separates at each layer of the structure and is discharged downwards along the panel surface, drain groove, or drip hole.
[0131] The gaseous refrigerant, after primary vapor-liquid separation, enters the gas supply pipe 6 through the gas supply port 1-14. The liquid refrigerant, after primary vapor-liquid separation, enters the secondary flash unit through the secondary flash throttling orifice 1-3.
[0132] Therefore, the primary flash unit can simultaneously complete primary flash evaporation of refrigerant, gas-liquid separation, gaseous refrigerant output, and interstage transport of liquid refrigerant. The corrugated plates 1-6, the flow guide baffles 1-7, and the multi-layer separation plates work together to facilitate the formation of a continuous refrigerant processing path within the limited enclosure space.
[0133] like Figure 2 and Figure 3 As shown, the secondary flash unit includes a secondary wave-shaped separation plate 1-8b, a secondary grooved perforated plate 1-9b, a secondary perforated plate 1-10b, a secondary micro liquid-blocking structure 1-11b, and a rectangular perforated plate 1-12.
[0134] The rectangular perforated plate 1-12 is positioned opposite to the secondary flash throttling orifice 1-3. The liquid refrigerant output from the primary flash unit enters the secondary flash unit through the secondary flash throttling orifice 1-3 and then reaches the area where the rectangular perforated plate 1-12 is located.
[0135] The rectangular perforated plate 1-12 is used to allow the refrigerant entering the secondary flash unit to flow into the interior of the secondary flash unit through its openings. The rectangular perforated plate 1-12 can disperse the refrigerant flowing out of the secondary flash throttling orifice 1-3, reducing the possibility of refrigerant concentrating in a local area of the secondary flash unit.
[0136] The number of openings, the distribution of openings, and the plate size of the rectangular perforated plate 1-12 can be determined based on the outflow range of the secondary flash throttling orifice 1-3 and the processing flow rate of the secondary flash unit. Space is reserved between the rectangular perforated plate 1-12 and the secondary flash throttling orifice 1-3 for refrigerant flow and flashing.
[0137] After passing through the secondary flash throttling orifice 1-3, the refrigerant forms a gas-liquid two-phase refrigerant. The rectangular perforated plate 1-12 allows the gas-liquid two-phase refrigerant to enter the area where the secondary corrugated separation plate 1-8b is located, and provides a more dispersed inflow state for subsequent gas-liquid separation.
[0138] The secondary corrugated separation plate 1-8b, the secondary grooved perforated plate 1-9b, and the secondary perforated plate 1-10b are arranged sequentially from bottom to top within the secondary flash evaporation unit. The secondary micro liquid-blocking structure 1-11b is disposed on the secondary grooved perforated plate 1-9b.
[0139] The basic structure of the secondary wave-shaped separation plate 1-8b can be the same as that of the primary wave-shaped separation plate 1-8a. The secondary wave-shaped separation plate 1-8b is provided with a secondary turbulence separation structure, which includes multiple turbulence structures 1-8-1.
[0140] The gaseous refrigerant formed by the secondary flash passes upward through the secondary corrugated separation plate 1-8b. When the airflow passes through the turbulence structure 1-8-1, the flow direction changes, and the entrained liquid refrigerant can come into contact with the arc-shaped surface of the turbulence structure 1-8-1 or the plate surface of the secondary corrugated separation plate 1-8b.
[0141] The liquid refrigerant separated from the gas flow downwards along the secondary corrugated separation plate 1-8b and eventually flows to the area where the liquid outlet 1-5 is located. The gaseous refrigerant processed by the secondary corrugated separation plate 1-8b continues to flow towards the secondary grooved perforated plate 1-9b.
[0142] The secondary slotted perforated plate 1-9b is equipped with a secondary ventilation and drainage structure. The secondary ventilation and drainage structure can use the same air passage 1-9-1, flow channel 1-9-2, and drip hole 1-9-3 as the primary ventilation and drainage structure.
[0143] The air passage 1-9-1 on the secondary slotted perforated plate 1-9b corresponds to the turbulence structure 1-8-1 on the secondary corrugated separation plate 1-8b, allowing the gaseous refrigerant to flow from the area of the secondary corrugated separation plate 1-8b to the area above the secondary slotted perforated plate 1-9b.
[0144] The secondary micro liquid-blocking structure 1-11b can adopt the same liquid-inlet and liquid-blocking structure as the primary micro liquid-blocking structure 1-11a. The vent holes 1-11-1 on the liquid-inlet and liquid-blocking sections are staggered, so that the gaseous refrigerant formed by the secondary flashing is deflected when passing through the secondary micro liquid-blocking structure 1-11b.
[0145] The liquid refrigerant separated by the secondary micro liquid-blocking structure 1-11b flows into the flow channel 1-9-2 on the secondary grooved perforated plate 1-9b via the liquid inlet trough 1-11-2, the annular slot 1-11-3, and the drain trough 1-11-5. The liquid refrigerant then drains below the secondary grooved perforated plate 1-9b through the drip hole 1-9-3.
[0146] The secondary perforated plate 1-10b is positioned above the secondary grooved perforated plate 1-9b. The gaseous refrigerant, after being processed by the secondary micro liquid-blocking structure 1-11b, passes through the secondary perforated plate 1-10b and flows to the gaseous refrigerant diffusion port 1-4.
[0147] The secondary perforated plate 1-10b can distribute the airflow before it enters the gaseous refrigerant diffusion port 1-4. This arrangement facilitates the entry of the gaseous refrigerant formed by the secondary flash into the gaseous refrigerant diffusion port 1-4 from the appropriate range.
[0148] The corresponding panels in the primary and secondary flash evaporation units can adopt the same basic structure to facilitate panel fabrication and installation. Since the refrigerant state and flow rate handled by the two flash evaporation units can differ, the spacing between the corresponding panels and their actual installation positions can be set separately.
[0149] Specifically, the distance between the primary corrugated separation plate 1-8a and the primary grooved perforated plate 1-9a can differ from the distance between the secondary corrugated separation plate 1-8b and the secondary grooved perforated plate 1-9b. Each spacing can be determined based on the gaseous refrigerant flow rate, liquid refrigerant entrainment, allowable flow resistance, and available space in the corresponding flash unit.
[0150] The corresponding panels use the same basic structure while maintaining adjustable spacing, allowing the two-stage flash units to share the corresponding panel design, while adapting the internal space of each stage to the actual processing conditions. This setup does not require all dimensions in the two-stage flash units to be exactly the same.
[0151] When the secondary flash unit is working, the liquid refrigerant separated from the primary flash unit enters the secondary flash unit through the secondary flash throttling orifice 1-3. After being dispersed by the rectangular perforated plate 1-12, the refrigerant reaches the area where the secondary corrugated separation plate 1-8b is located.
[0152] The gaseous refrigerant generated by the secondary flash flowes upward through the secondary corrugated separation plate 1-8b, the secondary grooved perforated plate 1-9b, the secondary micro liquid-blocking structure 1-11b, and the secondary perforated plate 1-10b. The liquid refrigerant entrained in the airflow gradually separates at different plates and flows towards the lower part of the secondary flash unit.
[0153] The separated gaseous refrigerant enters the housing 8 through the gaseous refrigerant diffusion port 1-4. The separated liquid refrigerant enters the liquid distribution device 3 through the liquid outlet 1-5.
[0154] By setting the gaseous refrigerant diffusion port 1-4 and the liquid outlet 1-5 in positions adapted to the flow states of the gaseous and liquid refrigerants respectively, the gaseous and liquid phases after the secondary flash can be output along different paths. This arrangement helps reduce the possibility of the gaseous refrigerant directly entering the liquid distribution device 3.
[0155] The secondary flash gaseous refrigerant entering the shell 8 can flow together with the gaseous refrigerant generated on the outer surface of the heat exchange tube 4 to the vapor-liquid separator 2. The liquid refrigerant entering the liquid distribution device 3 is distributed to the outer surface of the heat exchange tube 4 by the liquid distribution device 3.
[0156] From the perspective of the overall refrigerant path, the liquid inlet pipe 5, the first-stage flash throttling orifice 1-2, the first-stage flash unit, the second-stage flash throttling orifice 1-3, the second-stage flash unit, the liquid outlet 1-5, and the liquid distribution device 3 sequentially form the main processing and transportation path of the liquid refrigerant.
[0157] Observing the path of the gaseous refrigerant in the first-stage flash unit, the gaseous refrigerant passes sequentially through the first-stage corrugated separation plate 1-8a, the first-stage grooved perforated plate 1-9a, the first-stage micro liquid-blocking structure 1-11a, and the first-stage perforated plate 1-10a, and is then output through the gas inlet 1-14 and the gas inlet pipe 6.
[0158] Observing the path of the secondary flash gaseous refrigerant, the gaseous refrigerant in the secondary flash unit passes sequentially through the secondary wave-shaped separation plate 1-8b, the secondary grooved perforated plate 1-9b, the secondary micro liquid-blocking structure 1-11b, and the secondary perforated plate 1-10b, and then enters the shell 8 through the gaseous refrigerant diffusion port 1-4.
[0159] Observing the path of the liquid refrigerant, the liquid refrigerant separated after the first-stage flash evaporation enters the second-stage flash evaporation unit, and the liquid refrigerant separated after the second-stage flash evaporation enters the liquid distribution device 3. After being distributed by the liquid distribution device 3, the liquid refrigerant reaches the heat exchange tube 4 and forms a liquid film along the outer surface of the heat exchange tube 4.
[0160] The multi-layered panels in the flash evaporation device 1 provide a continuous passage path for the gaseous refrigerant and a contact and drainage path for the entrained liquid refrigerant. The functions of each panel are interconnected, allowing the liquid refrigerant separated from the previous layer to drain downwards, and allowing the processed gaseous refrigerant to continue into the next layer.
[0161] like Figure 4 and Figure 10 As shown, the vapor-liquid separation device 2 includes a lower cover plate 2-1, a partition plate 2-2, a separation plate 2-3, a small baffle 2-4, an inclined baffle 2-5, a gas equalization plate 2-6, an upper cover plate 2-7, and a diversion pipe 2-8. Figure 10 The arrows in the diagram indicate the flow directions of the two-phase refrigerant, the gaseous refrigerant after vapor-liquid separation, and the separated liquid refrigerant, respectively.
[0162] The lower cover plate 2-1 has an open-top, trough-shaped structure, including a bottom wall and side walls extending upwards from both sides of the bottom wall; the upper cover plate 2-7 covers the upper part of the lower cover plate 2-1, and together with the lower cover plate 2-1, forms a space for the flow of gaseous refrigerant and for vapor-liquid separation. After the gaseous refrigerant enters the vapor-liquid separator 2, it flows in the flow space defined by the lower cover plate 2-1, the upper cover plate 2-7, and the internal plates.
[0163] The upper cover plate 2-7 is provided with multiple air intake holes 2-10, which are connected to the internal space of the shell 8. The gaseous refrigerant in the shell 8 enters the vapor-liquid separator 2 through the air intake holes 2-10.
[0164] The total flow area of the suction port 2-10 is larger than the flow cross-sectional area of the suction pipe 7. With the same suction flow rate, increasing the total flow area when the gaseous refrigerant enters the vapor-liquid separator 2 helps reduce the airflow velocity at the suction port 2-10. The suction port 2-10 is located on the upper cover plate 2-7 and faces upwards, which helps prevent the suction airflow from directly facing the downward-facing liquid refrigerant, thereby reducing the possibility of the liquid refrigerant being entrained by the suction airflow.
[0165] Multiple suction holes 2-10 can be arranged according to the size of the upper cover plate 2-7 and the airflow distribution in the housing 8. All suction holes 2-10 together form the inlet area for the gaseous refrigerant to enter the vapor-liquid separator 2.
[0166] The side wall of the lower cover plate 2-1 is provided with an air outlet 2-11, which is connected to the suction pipe 7. The gaseous refrigerant processed by the vapor-liquid separator 2 enters the suction pipe 7 through the air outlet 2-11.
[0167] The suction port 2-10 and the outlet port 2-11 are located at different positions in the vapor-liquid separator 2, so that the gaseous refrigerant passes through the separation plates inside the vapor-liquid separator 2 before entering the suction pipe 7. This arrangement can extend the processing path of the airflow in the vapor-liquid separator 2.
[0168] A partition 2-2 is disposed inside the lower cover plate 2-1 and spaced apart from the bottom wall of the lower cover plate 2-1. A gap is formed between the edge of the partition 2-2 and the side wall of the lower cover plate 2-1 for the flow of liquid refrigerant. The liquid refrigerant formed by vapor-liquid separation falls onto the partition 2-2 and flows through the gap to the bottom of the lower cover plate 2-1.
[0169] The partition 2-2 separates the liquid collection area at the bottom of the lower cover plate 2-1 from the gaseous refrigerant flow area above, which helps to reduce the possibility that the liquid refrigerant collected at the bottom of the lower cover plate 2-1 will be carried away by the suction airflow again.
[0170] Small baffles 2-4 are vertically arranged on both sides above the partition 2-2, forming a gap between them and the separation plate 2-3 for the gaseous refrigerant to pass through. This gap can extend the flow path of the gaseous refrigerant in the gas-liquid separator 2 and change the airflow direction at the separation plate 2-3 to the direction extending along the separation plate 2-3.
[0171] Along the direction of gaseous refrigerant flow from suction port 2-10 to discharge port 2-11, inclined baffle 2-5, separation plate 2-3, and gas equalization plate 2-6 are arranged sequentially. Inclined baffle 2-5 is used to cause the gas and liquid refrigerant to flow back and forth and collide, separation plate 2-3 is used to further separate the liquid refrigerant entrained in the gaseous refrigerant, and gas equalization plate 2-6 is used to equalize the flow distribution of gaseous refrigerant when it passes through different areas of separation plate 2-3.
[0172] like Figure 10 As shown, the inclined baffle 2-5 in this embodiment includes two inclined baffles spaced apart vertically. The flow ends of the two inclined baffles are staggered, causing the gas-liquid two-phase refrigerant entering through the suction port 2-10 to flow back along the flow channel formed by the two inclined baffles. During the backflow process, the gas-liquid two-phase refrigerant collides with the inclined baffle 2-5, causing some of the suspended small droplets to aggregate and separate from the airflow.
[0173] The gaseous refrigerant, after being processed by the inclined baffle 2-5, enters between the inclined baffle 2-5 and the separation plate 2-3 and flows along the extension direction of the separation plate 2-3.
[0174] A gas equalization plate 2-6 is positioned between the separator 2-3 and the outlet 2-11. The gas equalization plate 2-6 reduces the likelihood of gaseous refrigerant passing only through a localized area of the separator 2-3 near the outlet 2-11, allowing the gaseous refrigerant to pass through different areas of the separator 2-3. The number and distribution of openings in the gas equalization plate 2-6 can be determined based on the width of the airflow channel and the gaseous refrigerant flow rate of the vapor-liquid separator 2.
[0175] Separation plates 2-3 are used for further vapor-liquid separation of the gaseous refrigerant after it has been processed by inclined baffles 2-5. For example... Figure 8 and Figure 10 As shown, the separation plate 2-3 is provided with multiple semi-enclosed turbulence structures 2-3-1, multiple through holes 2-3-2, and multiple inclined ramps 2-3-3.
[0176] The semi-enclosed flow-disrupting structure 2-3-1 is positioned above the through hole 2-3-2. The inclined ramp 2-3-3 is positioned on the side of the semi-enclosed flow-disrupting structure 2-3-1 facing the gaseous refrigerant flow and extends toward the through hole 2-3-2.
[0177] After being processed by the inclined baffle 2-5, the small droplets entrained in the gaseous refrigerant can aggregate to form droplets with corresponding mass. Since gaseous and liquid refrigerants differ in density and inertia, the gaseous refrigerant flows along the extension direction of the separation plate 2-3 under suction and passes through the gap between adjacent semi-enclosed turbulence structures 2-3-1.
[0178] As the liquid refrigerant passes through the inclined ramp 2-3-3, it flows towards the through-hole 2-3-2 under the guidance of inertia and the inclined ramp 2-3-3, and then falls below the separation plate 2-3 through the through-hole 2-3-2. The semi-enclosed flow-deflecting structure 2-3-1 covers the through-hole 2-3-2, which helps to reduce the possibility of the liquid refrigerant that has entered the through-hole 2-3-2 being carried out again by the intake airflow.
[0179] Multiple semi-enclosed flow-disrupting structures 2-3-1, through holes 2-3-2, and inclined ramps 2-3-3 can be spaced out on the separation plate 2-3 to treat the refrigerant flowing through different areas of the separation plate 2-3. Their number and spacing can be determined based on the gaseous refrigerant flow rate, the plate size of the separation plate 2-3, and the allowable flow resistance.
[0180] The bottom of the lower cover plate 2-1 is provided with a small hole 2-9, which is connected to the drainage pipe 2-8. The liquid refrigerant separated by the inclined baffle 2-5 and the separation plate 2-3 falls to the partition 2-2, and flows through the gap between the edge of the partition 2-2 and the side wall of the lower cover plate 2-1 to the bottom of the lower cover plate 2-1, and then enters the drainage pipe 2-8 through the small hole 2-9.
[0181] When the vapor-liquid separator 2 is working, the gaseous refrigerant carrying liquid refrigerant in the shell 8 enters the vapor-liquid separator 2 through multiple suction holes 2-10 and flows along the deflection channel formed by the inclined baffle 2-5. After colliding with the inclined baffle 2-5, the refrigerant enters between the inclined baffle 2-5 and the separation plate 2-3 and flows along the extension direction of the separation plate 2-3.
[0182] At the separation plate 2-3, gaseous refrigerant passes through the gap between the semi-enclosed turbulence structure 2-3-1, while liquid refrigerant enters the through hole 2-3-2 along the inclined ramp 2-3-3 and falls onto the partition plate 2-2. After separation, the gaseous refrigerant passes through the gas equalization plate 2-6 and then enters the suction pipe 7 through the air outlet 2-11.
[0183] The separated liquid refrigerant flows through the gap between the partition 2-2 and the lower cover plate 2-1 to the bottom of the lower cover plate 2-1, and is then transported to the outer surface of the heat exchange tube 4 through the small hole 2-9 and the guide pipe 2-8. Thus, the vapor-liquid separation device 2 forms a gaseous refrigerant output path and a liquid refrigerant return path, respectively.
[0184] By installing a vapor-liquid separator 2 before the suction pipe 7, the possibility of liquid refrigerant entering the suction pipe 7 along with gaseous refrigerant can be reduced. The separated liquid refrigerant can also be returned through the drainage pipes 2-8, allowing this portion of the liquid refrigerant to re-participate in the falling film heat exchange.
[0185] like Figure 9 As shown, the outlet of the drainage pipe 2-8 can be configured in different ways depending on the arrangement of the heat exchange pipe 4 and the installation space inside the shell 8. Figure 9 The box in the figure is used to simplify the heat exchange area where the heat exchange tube 4 is located, and does not represent a box or other independent component set outside the heat exchange tube 4; the arrow in the figure is used to indicate the flow direction of the liquid refrigerant.
[0186] Figure 9 The left side shows the case where the drain pipe 2-8 is in the form of an upward drip. The drain pipe 2-8 extends from the vapor-liquid separator 2 to the area where the heat exchange tube 4 is located, and its outlet is located above and towards the heat exchange tube 4, so that the liquid refrigerant can drip down from above the heat exchange tube 4.
[0187] When the liquid is dispensed from above, the liquid refrigerant separated from the vapor-liquid separator 2 enters the guide pipe 2-8 through the small hole 2-9, and is then transported to the top of the heat exchange tube 4 by the guide pipe 2-8. After flowing out of the outlet of the guide pipe 2-8, the liquid refrigerant reaches the outer surface of the heat exchange tube 4 under the action of gravity.
[0188] After the liquid refrigerant reaches the higher-positioned heat exchange tube 4, it can continue to flow downwards along the outer surface of the heat exchange tube 4 and participate in falling film heat exchange. This arrangement is beneficial for utilizing the gravity of the liquid refrigerant to form a top-to-bottom replenishment path.
[0189] Figure 9 The right side shows the case where drainage tubes 2-8 are used in a side-mounted fluid replenishment configuration. For simplicity, the accompanying drawings are omitted. Figure 9 The right side mainly shows the liquid outlet end of the drainage pipes 2-8 and the heat exchange area where the heat exchange pipe 4 is located.
[0190] In the side-filled liquid configuration, the outlet of the drain pipe 2-8 is located on the side of the area where the heat exchange tube 4 is located and faces the heat exchange tube 4. The liquid refrigerant can flow out from the side under the liquid pressure inside the drain pipe 2-8 and reach the outer surface of the heat exchange tube 4.
[0191] The side-mounted refrigerant supply can be used when the installation space above the heat exchange tubes 4 is limited, or when liquid refrigerant needs to be supplied from the side of the area where the heat exchange tubes 4 are arranged. The outlet height and orientation of the drain pipes 2-8 can be determined based on the arrangement of the heat exchange tubes 4, the delivery status of the liquid refrigerant, and the available space within the casing 8.
[0192] Figure 9The above-dropping and side-filling liquid forms shown are both used to transport the liquid refrigerant separated by the vapor-liquid separator 2 to the area where the heat exchange tube 4 is located. Neither of them changes the basic transport relationship between the vapor-liquid separator 2, the diversion pipe 2-8 and the heat exchange tube 4.
[0193] Optionally, the top dripping method and the side replenishment method can be combined, so that a portion of the liquid refrigerant drips from the top of the heat exchange tube 4, while another portion of the liquid refrigerant is replenished from the side of the area where the heat exchange tube 4 is located. When combined, the number of drainage pipes 2-8 and the outlet position can be determined according to the amount of separated liquid, the arrangement range of the heat exchange tubes 4, and the installation space.
[0194] When the falling film evaporator is in full operation, the refrigerant first enters the flash evaporation unit 1 through the liquid inlet pipe 5. The refrigerant then enters the first-stage flash evaporation unit through the first-stage flash throttling orifice 1-2, where it undergoes first-stage flash evaporation and first-stage vapor-liquid separation.
[0195] The gaseous refrigerant formed by the first-stage flash evaporation flows upward through the first-stage corrugated separation plate 1-8a, the first-stage grooved perforated plate 1-9a, the first-stage micro liquid-blocking structure 1-11a, and the first-stage perforated plate 1-10a. The separated gaseous refrigerant then enters the gas supply pipe 6 through the gas supply port 1-14.
[0196] The liquid refrigerant separated from the primary flash evaporation flows to the secondary flash evaporation throttling orifice 1-3 and enters the secondary flash evaporation unit through the secondary flash evaporation throttling orifice 1-3. After being dispersed by the rectangular perforated plate 1-12, the liquid refrigerant undergoes secondary flash evaporation and secondary vapor-liquid separation.
[0197] The gaseous refrigerant formed by the secondary flash evaporation flows upward through the secondary wave-shaped separation plate 1-8b, the secondary grooved perforated plate 1-9b, the secondary micro liquid-blocking structure 1-11b, and the secondary perforated plate 1-10b. The separated gaseous refrigerant then enters the housing 8 through the gaseous refrigerant diffusion port 1-4.
[0198] The liquid refrigerant separated by the secondary flash evaporation flows to the outlet 1-5 and enters the liquid distribution device 3 from the outlet 1-5. The liquid distribution device 3 distributes the liquid refrigerant to the outer surface of the heat exchange tube 4.
[0199] The liquid refrigerant forms a downward-flowing liquid film along the outer surface of the heat exchange tube 4 and exchanges heat with the heat exchange medium inside the heat exchange tube 4. The gaseous refrigerant formed by heat exchange enters the gas phase space inside the shell 8 and flows together with the secondary flash gaseous refrigerant to the vapor-liquid separator 2.
[0200] The gaseous refrigerant enters the vapor-liquid separator 2 through the suction port 2-10, first undergoes flow reversal and collision treatment by the inclined baffle 2-5, and then undergoes vapor-liquid separation by the separation plate 2-3; the separated gaseous refrigerant passes through the gas equalization plate 2-6 and enters the suction pipe 7 through the gas outlet 2-11.
[0201] The liquid refrigerant separated by the vapor-liquid separator 2 falls onto the partition 2-2 and flows through the gap between the partition 2-2 and the lower cover 2-1 to the bottom of the lower cover 2-1. Then it enters the drain pipe 2-8 through the small hole 2-9 and returns to the area where the heat exchange tube 4 is located.
[0202] Thus, the flash evaporation device 1, the liquid distribution device 3, the heat exchange tube 4, and the vapor-liquid separation device 2 form an interconnected refrigerant treatment path. The refrigerant sequentially undergoes two-stage flash evaporation, two-stage flash vapor-liquid separation, liquid distribution, falling film heat exchange, and pre-suction vapor-liquid separation.
[0203] The two-stage flash unit can separate the gaseous refrigerant formed during flashing before the liquid refrigerant enters the liquid distribution device 3, which is beneficial for the liquid distribution device 3 to mainly receive the liquid refrigerant that has undergone two-stage flash treatment. The vapor-liquid separation device 2 can further separate the liquid refrigerant before the gaseous refrigerant enters the suction pipe 7.
[0204] The drain structure in the flash evaporation unit 1 and the guide pipes 2-8 in the vapor-liquid separator 2 respectively handle the liquid refrigerant separated at different locations. The former causes the liquid refrigerant in the flash evaporation unit to flow downwards, while the latter causes the liquid refrigerant separated in the intake airflow to return to the heat exchange area.
[0205] The various structures are coordinated according to the actual refrigerant flow direction, which can reduce the possibility of liquid refrigerant being retained in the gaseous refrigerant output path or being discharged with the airflow, and is conducive to maintaining the continuous delivery of liquid refrigerant from the flash evaporation device 1 to the liquid distribution device 3 and from the vapor-liquid separation device 2 to the heat exchange tube 4.
[0206] This embodiment does not impose fixed limits on the specific dimensions of each orifice, plate, and pipe. Each dimension can be determined based on the equipment capacity, refrigerant flow rate, allowable pressure drop, and internal space of the casing 8, while maintaining the above-mentioned connectivity, relative positional relationships, and working process.
[0207] The plates in this embodiment can be plate-shaped structures suitable for the refrigerant working environment and meeting structural strength requirements. The specific materials and processing methods of the plates should be selected according to the actual equipment requirements. This embodiment does not add material types or processing parameters not provided in the material list.
[0208] Application Example 1 This application example is suitable for a falling film evaporator with a relatively compact internal installation space (shell 8). The flash evaporation unit 1, vapor-liquid separation unit 2, liquid distribution unit 3, and heat exchange tubes 4 are arranged according to... Figure 1 The relative positions shown are arranged to form a continuous refrigerant flow path within the housing 8.
[0209] When installation space is limited, the external dimensions of the enclosure 1-1 and the spacing between corresponding panels can be adjusted without changing the processing order of the primary and secondary flash units. After adjustment, the refrigerant should still be able to enter the primary flash unit through the primary flash throttling orifice 1-2 and enter the secondary flash unit through the secondary flash throttling orifice 1-3.
[0210] The primary corrugated separation plate 1-8a, the primary slotted perforated plate 1-9a, and the primary perforated plate 1-10a are arranged sequentially from bottom to top. The secondary corrugated separation plate 1-8b, the secondary slotted perforated plate 1-9b, and the secondary perforated plate 1-10b are also arranged sequentially from bottom to top.
[0211] By appropriately adjusting the spacing between adjacent plates, the space occupied by the two-stage flash unit can be adapted to the internal dimensions of the enclosure 1-1. The selection of the spacing should simultaneously consider the space required for the gaseous refrigerant to pass through, the space required for the separated liquid refrigerant to be discharged, and the allowable flow resistance.
[0212] In this application example, the refrigerant input through the inlet pipe 5 still passes through the primary flash throttling orifice 1-2 first. After reaching the corrugated plate 1-6, the refrigerant flows to the primary corrugated separation plate 1-8a through the path defined by the guide baffle 1-7.
[0213] The gaseous refrigerant formed in the first-stage flash evaporation enters the gas supply pipe 6 after being separated by multiple layers of plates. The liquid refrigerant separated in the first-stage flash evaporation enters the second-stage flash evaporation unit through the second-stage flash evaporation throttling orifices 1-3. The gaseous refrigerant after the second-stage flash evaporation enters the housing 8, and the liquid refrigerant enters the liquid distribution device 3.
[0214] The liquid distribution device 3 delivers liquid refrigerant to the heat exchange tube 4, while the vapor-liquid separation device 2 separates the gaseous refrigerant flowing towards the suction pipe 7 after heat exchange. The liquid refrigerant separated by the vapor-liquid separation device 2 returns to the area where the heat exchange tube 4 is located through the drainage pipes 2-8.
[0215] Even if the spacing between adjacent plates is adjusted, the ventilation and drainage relationship between the vent hole 1-9-1, the flow channel 1-9-2, and the drip hole 1-9-3 is still retained. The misaligned holes and drainage paths in the primary micro liquid-blocking structure 1-11a and the secondary micro liquid-blocking structure 1-11b are also retained.
[0216] The above configuration allows the falling film evaporator to complete two-stage flash evaporation, liquid distribution, falling film heat exchange, and pre-suction vapor-liquid separation within a relatively compact internal space. Adaptive adjustments to the structural dimensions do not alter the sequence of refrigerant treatment stages.
[0217] Application Example 2 This application example is suitable for falling film evaporators with different refrigerant flow rates or different numbers of heat exchange tubes. When the equipment capacity changes, the plate size, number of openings, and flow area can be adjusted according to the corresponding refrigerant flow rate.
[0218] When handling smaller flow rates, the number or size of the primary flash throttling orifice 1-2, secondary flash throttling orifice 1-3, air passage orifice 1-9-1, air passage orifice 1-11-1, and suction orifice 2-10 can be set according to the actual flow rate. After adjustment, the components to which each orifice belongs and their connection relationships should remain unchanged.
[0219] When handling increased flow rates, the effective flow range of the panels can be increased accordingly, or more air passages 1-9-1 and suction holes 2-10 can be added. The specific number is determined based on the refrigerant flow rate, allowable pressure drop, and installation space; fixed values without material basis are not set.
[0220] When the refrigerant flow rate changes, the primary flash unit continues to separate and output the primary flash gaseous refrigerant, while the secondary flash unit continues to separate the secondary flash gaseous refrigerant and output liquid refrigerant to the liquid distribution device 3. The basic functions of the two-stage flash units do not change due to changes in the processing flow rate.
[0221] The gaseous refrigerant formed by the first-stage flash evaporation passes through the first-stage corrugated separation plate 1-8a, the first-stage grooved perforated plate 1-9a, the first-stage micro liquid-blocking structure 1-11a, and the first-stage perforated plate 1-10a before entering the gas supply pipe 6. When the refrigerant flow rate changes, the plates still work together to form a layer-by-layer separation path.
[0222] The gaseous refrigerant formed by the secondary flash evaporation passes through the secondary corrugated separation plate 1-8b, the secondary grooved perforated plate 1-9b, the secondary micro liquid-blocking structure 1-11b, and the secondary perforated plate 1-10b before entering the housing 8. The liquid refrigerant separated by the secondary flash evaporation continues to enter the liquid distribution device 3 through the liquid outlet 1-5.
[0223] As the number of heat exchange tubes 4 increases, the liquid distribution range of the liquid distribution device 3 can be adjusted accordingly so that the liquid refrigerant can reach the increased area of the heat exchange tubes 4. The arrangement of the suction port 2-10 and the guide pipe 2-8 of the vapor-liquid separator 2 can also be adapted to the corresponding airflow range and the arrangement range of the heat exchange tubes 4 within the shell 8.
[0224] At different flow rates, the vapor-liquid separator 2 is located before the gaseous refrigerant enters the suction pipe 7. After entering through the suction port 2-10, the gaseous refrigerant flows back along the flow channel formed by the inclined baffle 2-5, and then undergoes vapor-liquid separation through the separation plate 2-3; the separated gaseous refrigerant passes through the gas equalization plate 2-6 and is discharged through the gas outlet 2-11.
[0225] By adjusting the corresponding flow structure according to the processing flow rate, the refrigerant flow capacity can be matched with the equipment capacity. The adjustment process does not change the main flow direction of the gaseous and liquid refrigerants, nor does it alter the functional connections between the various components.
[0226] Application Example 3 This application example addresses different return methods for the liquid refrigerant separated by the vapor-liquid separator 2. Depending on the arrangement of the heat exchange tubes 4 inside the shell 8 and the installation space of the drainage pipes 2-8, top dripping, side replenishment, or a combination of both can be selected.
[0227] like Figure 9 As shown on the left, when using the top dripping method, the outlet of the drain pipe 2-8 is located above the heat exchange tube 4. The liquid refrigerant collected at the bottom of the vapor-liquid separator 2 enters the drain pipe 2-8 through the small hole 2-9 and drips downwards from above the heat exchange tube 4.
[0228] The liquid refrigerant first reaches the higher-positioned heat exchange tube 4, and then can continue to flow downwards along the outer surface of the heat exchange tube 4. This arrangement can utilize the space above the heat exchange tube 4 and facilitates the subsequent distribution of the liquid refrigerant along the direction of gravity.
[0229] like Figure 9 As shown on the right, when using the side-feed method, the outlet of the drain pipe 2-8 faces the side of the area where the heat exchange tubes 4 are arranged. The liquid refrigerant enters the area where the heat exchange tubes 4 are located from the side and reaches the outer surface of the corresponding heat exchange tubes 4.
[0230] The side-mounted refrigerant supply method can be used when there is limited installation space above the heat exchanger tubes 4, or when liquid refrigerant needs to be supplied to the side of the area where the heat exchanger tubes 4 are arranged. The outlet height and orientation of the drainage pipes 2-8 can be set according to the position of the heat exchanger tubes 4 and the delivery status of the separated liquid.
[0231] When using a combined configuration, drainage pipes 2-8 at different outlet positions can be installed, allowing some liquid refrigerant to drip from above the heat exchange tubes 4, while another portion of liquid refrigerant is replenished from the side of the area where the heat exchange tubes 4 are arranged. Both return paths work together to transport the separated liquid refrigerant to the heat exchange area.
[0232] The number of drain pipes 2-8 and the distribution of outlets in the combined configuration can be determined based on the drain location of the vapor-liquid separator 2, the arrangement length of the heat exchange tubes 4, and the available space inside the shell 8. Each outlet is designed so that the liquid refrigerant can reach the outer surface of the heat exchange tubes 4.
[0233] Regardless of the return method used, the gaseous refrigerant in the casing 8 first enters the vapor-liquid separator 2 through the suction port 2-10. After being processed by the internal plates, the gaseous refrigerant enters the suction pipe 7 through the exhaust port 2-11, while the liquid refrigerant enters the drain pipe 2-8 through the small hole 2-9.
[0234] After the liquid refrigerant returns to the area where the heat exchange tube 4 is located, it can reach the corresponding heat exchange positions along with the liquid refrigerant output from the liquid distribution device 3. This arrangement increases the available path for the separated liquid and helps reduce the possibility of the separated liquid accumulating at the bottom of the vapor-liquid separator 2.
[0235] Adjusting the outlet configuration of the drain pipes 2-8 does not alter the two-stage flashing process of the flashing device 1, nor does it change the distribution process of the liquid refrigerant by the liquid distribution device 3 for the two-stage flashing process. Its main purpose is to ensure that the liquid refrigerant separated by the vapor-liquid separator 2 is compatible with the specific arrangement of the heat exchange tubes 4.
[0236] Example 2 This embodiment provides an operating method for a falling film evaporator, which can be implemented using the falling film evaporator described in Embodiment 1. The refrigerant treatment sequence in the operating method corresponds to the connection relationship of each component in the falling film evaporator.
[0237] The operating method includes processes such as primary flash evaporation and vapor-liquid separation, secondary flash evaporation and vapor-liquid separation, liquid refrigerant distribution, falling film heat exchange, pre-suction vapor-liquid separation, and separation liquid return. Each process is sequentially connected along the actual flow path of the refrigerant.
[0238] During operation, refrigerant can exist in liquid, gaseous, or a combination of both. The terms "gase refrigerant" and "liquid refrigerant" below refer to the refrigerant that primarily flows along the gaseous and liquid phase paths during the corresponding processing stages, respectively.
[0239] Step 1: The refrigerant enters the primary flash unit through the liquid inlet pipe 5 and the primary flash throttling orifice 1-2, and primary flash evaporation and vapor-liquid separation are carried out in the primary flash unit.
[0240] After the refrigerant is delivered to the flash evaporation device 1 through the liquid inlet pipe 5, it first passes through the first-stage flash evaporation throttling orifice 1-2. The refrigerant then enters the first-stage flash evaporation unit inside the housing 1-1 through the first-stage flash evaporation throttling orifice 1-2, and undergoes first-stage flash evaporation during its entry into the first-stage flash evaporation unit.
[0241] The gas-liquid two-phase refrigerant formed by the first-stage flash evaporation first reaches the corrugated plate 1-6, which is positioned opposite the first-stage flash throttling orifice 1-2. After the refrigerant comes into contact with the corrugated plate 1-6, its local flow direction changes.
[0242] Liquid refrigerant can flow along the surface of the corrugated plate 1-6, while gaseous refrigerant can continue to flow along the space formed by the corrugated plate 1-6 and the housing 1-1. The undulating surface of the corrugated plate 1-6 increases the change in refrigerant flow direction and the process of contact with the plate surface.
[0243] The refrigerant treated by the corrugated plate 1-6 flows along the flow space defined by the guide baffle 1-7 to the primary corrugated separation plate 1-8a. The guide baffle 1-7 is disposed between the corrugated plate 1-6 and the primary corrugated separation plate 1-8a to connect the flow path of the refrigerant between the two components.
[0244] By cooperating with the corrugated plate 1-6 and the flow guide baffle 1-7, the refrigerant can undergo a corresponding change in flow direction before entering the first-stage corrugated separation plate 1-8a. This process facilitates the gradual separation of gaseous and liquid refrigerant in the first-stage flash unit.
[0245] The gaseous refrigerant formed by the first-stage flash flows in the direction of the first-stage corrugated separation plate 1-8a. Multiple turbulence structures 1-8-1 on the first-stage corrugated separation plate 1-8a cause the gaseous refrigerant to undergo local deflection.
[0246] When the liquid refrigerant entrained in the airflow passes over the arc-shaped surface of the turbulence structure 1-8-1, it can come into contact with the surface of the turbulence structure 1-8-1 or the first-stage corrugated separation plate 1-8a. The liquid refrigerant in contact with the plate surface flows towards the lower part of the first-stage flash unit under the action of gravity.
[0247] The gaseous refrigerant, after being processed by the primary corrugated separation plate 1-8a, continues to flow upwards to the primary slotted perforated plate 1-9a. The gaseous refrigerant passes through the air passage 1-9-1 on the primary slotted perforated plate 1-9a.
[0248] The air passage 1-9-1 corresponds to the turbulence structure 1-8-1 on the primary corrugated separation plate 1-8a, allowing the gaseous refrigerant to enter the corresponding air passage 1-9-1 after passing through the turbulence structure 1-8-1. This correspondence helps maintain the continuity of the airflow path between adjacent plates.
[0249] After passing through the vent hole 1-9-1, the gaseous refrigerant enters the first-stage micro liquid-blocking structure 1-11a. The gaseous refrigerant then passes through the staggered vent holes 1-11-1 on the liquid-inlet section and the liquid-blocking section.
[0250] Because the two sets of air passages 1-11-1 are staggered, the gaseous refrigerant changes its flow direction within the primary micro liquid-blocking structure 1-11a. The liquid refrigerant entrained in the airflow can come into contact with the baffle 1-11-4 and adjacent surfaces and separate from the airflow.
[0251] The separated liquid refrigerant flows into the annular slot 1-11-3 along the liquid inlet trough 1-11-2. The liquid refrigerant can also enter the annular slot 1-11-3 through the gap between the bottom of the baffle 1-11-4 and the annular slot 1-11-3.
[0252] The liquid refrigerant entering the annular slot 1-11-3 flows through the drain trough 1-11-5 to the flow channel 1-9-2 on the primary slotted perforated plate 1-9a. The liquid refrigerant is then discharged downwards through the drip hole 1-9-3, which is connected to the flow channel 1-9-2.
[0253] The above-described drainage process allows the liquid refrigerant separated by the first-stage micro-liquid-blocking structure 1-11a to leave the area where the gaseous refrigerant flows upward. After being discharged through the dripping holes 1-9-3, the liquid refrigerant can continue to flow towards the lower part of the first-stage flash unit.
[0254] The gaseous refrigerant, after being processed by the first-stage micro liquid-retaining structure 1-11a, continues to pass through the first-stage perforated plate 1-10a. The first-stage perforated plate 1-10a allows the gaseous refrigerant to flow through its openings to the gas inlet 1-14.
[0255] After primary flash evaporation and multi-layer vapor-liquid separation, the gaseous refrigerant enters the gas supply pipe 6 through gas supply ports 1-14. The gas supply pipe 6 then delivers this portion of gaseous refrigerant to the external components it connects to.
[0256] The liquid refrigerant retained after the first-stage flash evaporation, as well as the liquid refrigerant separated from each layer of the separation structure, flows to the lower part of the first-stage flash evaporation unit and then to the second-stage flash throttling orifices 1-3. Thus, the first-stage flash evaporation unit forms both a gaseous refrigerant output path and a liquid refrigerant inter-stage transport path.
[0257] Step 1 utilizes the primary flash throttling orifice 1-2, corrugated plate 1-6, flow guide baffle 1-7, and multiple separation plates to enable the refrigerant to complete primary flash evaporation and primary vapor-liquid separation. This process facilitates the separation of the gaseous refrigerant formed during the primary flash evaporation before the liquid refrigerant enters the secondary flash evaporation unit, and its output via the gas supply pipe 6.
[0258] Optionally, the distance between the primary corrugated separation plate 1-8a, the primary grooved perforated plate 1-9a, and the primary perforated plate 1-10a can be determined based on the flow rate of the gaseous refrigerant formed by the primary flash, the entrainment state of the liquid refrigerant in the airflow, and the allowable flow resistance.
[0259] Optionally, the external contour of the primary micro liquid-blocking structure 1-11a can be adjusted according to the installation space on the primary grooved perforated plate 1-9a. During adjustment, the staggered relationship of the vent holes 1-11-1 and the drainage path from the liquid inlet groove 1-11-2 to the drip hole 1-9-3 are preserved.
[0260] Step 2: The liquid refrigerant separated from the primary flash unit enters the secondary flash unit through the secondary flash throttling orifice 1-3, where secondary flashing and vapor-liquid separation take place.
[0261] The liquid refrigerant in the primary flash unit collects at the location of the secondary flash throttling orifice 1-3, and then flows into the secondary flash unit through the secondary flash throttling orifice 1-3. Secondary flash evaporation occurs after the refrigerant passes through the secondary flash throttling orifice 1-3.
[0262] The gas-liquid two-phase refrigerant formed by the secondary flash evaporation reaches the rectangular perforated plate 1-12, which is positioned opposite the secondary flash throttling orifice 1-3. The refrigerant enters the corresponding region of the secondary flash evaporation unit through multiple openings in the rectangular perforated plate 1-12.
[0263] The rectangular perforated plates 1-12 disperse the refrigerant entering from the secondary flash throttling orifice 1-3, allowing the refrigerant to pass through the corresponding plate surface area of the rectangular perforated plates 1-12. This process helps reduce the possibility of refrigerant concentrating and flowing to localized locations on the secondary corrugated separation plates 1-8b.
[0264] The gas-liquid two-phase refrigerant passing through the rectangular perforated plate 1-12 enters the area where the secondary corrugated separation plate 1-8b is located. The gaseous refrigerant formed in the secondary flash mainly flows upward, while the liquid refrigerant mainly flows downward to the lower part of the secondary flash unit.
[0265] When the gaseous refrigerant passes through the turbulence structure 1-8-1 on the secondary corrugated separation plate 1-8b, it undergoes a partial deflection. The liquid refrigerant entrained in the airflow can come into contact with the arc-shaped surface of the turbulence structure 1-8-1 or the plate surface of the secondary corrugated separation plate 1-8b.
[0266] The liquid refrigerant in contact with the plate surface flows downward along the secondary corrugated separation plate 1-8b. The gaseous refrigerant, after preliminary vapor-liquid separation, continues to flow towards the secondary grooved perforated plate 1-9b.
[0267] The gaseous refrigerant passes through the air passage 1-9-1 on the secondary grooved perforated plate 1-9b and enters the secondary micro liquid baffle structure 1-11b. The air passage 1-9-1 on the secondary grooved perforated plate 1-9b corresponds to the turbulence structure 1-8-1 on the secondary corrugated separation plate 1-8b.
[0268] The gaseous refrigerant passes sequentially through the liquid inlet and the vent 1-11-1 on the liquid baffle of the two-stage micro liquid baffle structure 1-11b. The two sets of vent 1-11-1 are staggered, causing the gaseous refrigerant to change direction within the two-stage micro liquid baffle structure 1-11b.
[0269] After the liquid refrigerant carried in the airflow comes into contact with the baffle 1-11-4, it flows through the corresponding gaps at the bottom of the liquid inlet trough 1-11-2 and the baffle 1-11-4 to the annular slot 1-11-3. The liquid refrigerant then enters the drain trough 1-11-5 through the annular slot 1-11-3.
[0270] The drain trough 1-11-5 drains the liquid refrigerant into the flow channel 1-9-2 on the secondary grooved perforated plate 1-9b. The liquid refrigerant enters the drip hole 1-9-3 through the flow channel 1-9-2 and is drained from the drip hole 1-9-3 to the bottom of the secondary grooved perforated plate 1-9b.
[0271] The gaseous refrigerant, after being processed by the secondary micro-liquid-blocking structure 1-11b, continues to pass through the secondary perforated plate 1-10b. The gaseous refrigerant then enters the housing 8 through the gaseous refrigerant diffusion port 1-4.
[0272] The gaseous refrigerant diffusers 1-4 allow the gaseous refrigerant output from the secondary flash unit to enter the internal space of the housing 8. This portion of the gaseous refrigerant then flows together with the gaseous refrigerant generated on the outer surface of the heat exchange tube 4 to the vapor-liquid separator 2.
[0273] The liquid refrigerant retained after the second-stage flash evaporation, as well as the liquid refrigerant separated from the second-stage gas flow, flows to the lower part of the second-stage flash evaporation unit. The liquid refrigerant leaves the second-stage flash evaporation unit through outlets 1-5 and enters the liquid distribution device 3.
[0274] Step 2 involves re-flashing the liquid refrigerant after the first-stage flash through the secondary flash throttling orifices 1-3, and then performing secondary vapor-liquid separation through the rectangular perforated plates 1-12 and multi-layer separation plates. This process separates the gaseous refrigerant formed during the secondary flash before the liquid refrigerant enters the liquid distribution device 3.
[0275] The primary and secondary flash evaporation units process the refrigerant sequentially, allowing the primary flash gaseous refrigerant and the secondary flash gaseous refrigerant to enter the make-up gas path and the intake gas path inside the casing 8, respectively. The liquid refrigerant remaining after the two-stage flash evaporation is then used for falling film heat exchange.
[0276] Optionally, the secondary corrugated separation plate 1-8b, the secondary slotted perforated plate 1-9b, and the secondary perforated plate 1-10b can adopt the same basic structure as the corresponding plates in the primary flash unit. The spacing between the plates in the two-stage flash unit can be determined separately according to the refrigerant state of each stage.
[0277] Optionally, the surface dimensions and perforation distribution of the rectangular perforated plate 1-12 can be set according to the outflow range of the secondary flash throttling orifice 1-3 and the processing flow rate of the secondary flash unit. This adjustment does not change the relative arrangement between the rectangular perforated plate 1-12 and the secondary flash throttling orifice 1-3.
[0278] Step 3: The liquid refrigerant separated from the secondary flash unit enters the liquid distribution device 3 through the liquid outlet 1-5, and the liquid distribution device 3 distributes the liquid refrigerant to the outer surface of the heat exchange tube 4.
[0279] The liquid refrigerant in the secondary flash evaporation unit flows towards the outlet 1-5. The liquid refrigerant leaves the flash evaporation device 1 through the outlet 1-5 and enters the distribution device 3, which is connected to the outlet 1-5.
[0280] Liquid distribution device 3 receives the liquid refrigerant after two-stage flash evaporation and vapor-liquid separation. Since the first-stage flash gaseous refrigerant and the second-stage flash gaseous refrigerant have already been output along their respective gaseous refrigerant paths, the refrigerant entering liquid distribution device 3 is mainly liquid refrigerant that will continue to be used for heat exchange.
[0281] The liquid distribution device 3 distributes the liquid refrigerant to the area where the heat exchange tubes 4 are arranged. The liquid refrigerant flows downward from the corresponding position of the liquid distribution device 3 and reaches the heat exchange tubes 4 at different positions.
[0282] When the liquid distribution range of the liquid distribution device 3 is adapted to the arrangement range of the heat exchange tubes 4, the liquid refrigerant can reach multiple locations within the arrangement area of the heat exchange tubes 4. This arrangement helps to reduce the possibility of liquid refrigerant flowing to a localized area of the heat exchange tubes 4.
[0283] The liquid refrigerant path from the secondary flash evaporation unit to the liquid distribution device 3 sequentially includes the lower part of the secondary flash evaporation unit, liquid outlets 1-5, and the liquid distribution device 3. This path utilizes the flow state of the liquid refrigerant to complete the refrigerant transport, without altering the path of the secondary flash gaseous refrigerant output through the gaseous refrigerant diffusion ports 1-4.
[0284] Step 3 connects the liquid refrigerant output process of flash evaporation device 1 with the falling film liquid supply process of heat exchange tube 4. The liquid distribution device 3 distributes the liquid refrigerant, which has undergone two-stage flash evaporation, into the area where heat exchange tube 4 is located.
[0285] Optionally, the size, location, and range of the liquid distribution device 3 can be determined based on the number and arrangement length of the heat exchange tubes 4 and the required refrigerant flow rate. When the material is not limited to a specific size, there is no fixed restriction on the number of openings or the spacing between liquid distribution holes in the liquid distribution device 3.
[0286] Step 4: The liquid refrigerant output from the liquid distribution device 3 forms a liquid film along the outer surface of the heat exchange tube 4, and the liquid refrigerant exchanges heat with the heat exchange medium inside the heat exchange tube 4, so that at least part of the liquid refrigerant is converted into gaseous refrigerant.
[0287] After the liquid refrigerant flows from the liquid distribution device 3 to the heat exchange tube 4, it comes into contact with the outer surface of the heat exchange tube 4. The liquid refrigerant flows downward along the outer surface of the heat exchange tube 4 and forms a liquid film on the corresponding heat exchange surface.
[0288] The heat exchange medium inside the heat exchange tube 4 exchanges heat with the liquid refrigerant on the outer surface of the heat exchange tube 4 through the heat exchange tube wall. After absorbing heat, at least part of the liquid refrigerant evaporates and forms gaseous refrigerant.
[0289] After the gaseous refrigerant formed during heat exchange leaves the outer surface of the heat exchange tube 4, it enters the internal space of the shell 8. The liquid refrigerant that has not completely evaporated at its current position continues to flow downward along the outer surface of the heat exchange tube 4 and can reach the lower-positioned heat exchange tube 4 or the heat exchange area.
[0290] The liquid distribution device 3 and the heat exchange tube 4 work together vertically, allowing the liquid refrigerant to flow along the surface of the heat exchange tube 4 using gravity. This arrangement can create a falling film heat exchange path without adding an unfounded liquid refrigerant driving structure.
[0291] The liquid refrigerant flows in the form of a liquid film on the surface of heat exchange tube 4, which increases the contact area between the liquid refrigerant and the outer surface of heat exchange tube 4. When the liquid distribution position and the liquid refrigerant flow rate are properly matched, it helps to reduce the possibility of insufficient liquid refrigerant on some surfaces of heat exchange tube 4.
[0292] As the liquid refrigerant flows along the surface of the heat exchange tube 4, its state can gradually change from being predominantly liquid to a mixture of gas and liquid or predominantly gas. The resulting gaseous refrigerant enters the gas phase space of the shell 8 and flows to the vapor-liquid separator 2.
[0293] Step 4 completes the conversion of the liquid refrigerant from a liquid distribution state to a falling film heat exchange state, and converts at least a portion of the liquid refrigerant into a gaseous state. This step constitutes the main process for heat exchange between the falling film evaporator and the outside world.
[0294] Optionally, the number, spacing, and range of heat exchange tubes 4 can be determined based on the equipment capacity, heat exchange requirements, and internal space of the shell 8. When adjusting the arrangement of heat exchange tubes 4, the outlet positions of the liquid distribution device 3 and the guide pipes 2-8 can be set accordingly so that the liquid refrigerant can reach the outer surface of the heat exchange tubes 4.
[0295] Step 5: The gaseous refrigerant output from the secondary flash unit and the gaseous refrigerant generated on the outer surface of the heat exchange tube 4 flow into the vapor-liquid separator 2 within the shell 8.
[0296] The gaseous refrigerant formed by the secondary flash and separated enters the shell 8 through the gaseous refrigerant diffusion ports 1-4. The gaseous refrigerant generated on the outer surface of the heat exchange tube 4 enters the gas phase space inside the shell 8 through the heat exchange area.
[0297] Although the two gaseous refrigerants mentioned above are formed in different processing stages, they both flow to the vapor-liquid separator 2 before entering the suction pipe 7. The secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange can merge in the shell 8, or they can enter the common suction flow area from their respective positions.
[0298] The gaseous refrigerant diffusion port 1-4 allows the secondary flash gaseous refrigerant to enter the housing 8 from the secondary flash unit. The gaseous refrigerant flows through the suction port 2-10 on the upper cover plate 2-7 inside the housing 8.
[0299] After the gaseous refrigerant formed by heat exchange leaves the surface of the heat exchange tube 4, it also flows towards the area where the suction port 2-10 is located. The gaseous refrigerant may contain a small amount of liquid refrigerant output by the liquid distribution device 3 or returned by the drainage pipe 2-8.
[0300] Step 5 connects the secondary flash gaseous refrigerant path and the falling film heat exchange gaseous refrigerant path to a common vapor-liquid separation path. This setup allows the two gaseous refrigerant components to share the vapor-liquid separator 2 for pre-treatment before intake.
[0301] By placing the vapor-liquid separator 2 before the suction pipe 7, it is unnecessary to install separate end-of-line separation devices for the secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange. This structure facilitates the formation of a relatively concentrated suction processing path within the housing 8.
[0302] Step 6: The gaseous refrigerant flowing to the suction pipe 7 enters the vapor-liquid separator 2 through the suction port 2-10, and is separated into vapor and liquid by the vapor-liquid separator 2. The separated gaseous refrigerant then enters the suction pipe 7 through the outlet port 2-11.
[0303] The gaseous refrigerant containing liquid refrigerant inside the casing 8 enters the vapor-liquid separator 2 through multiple suction holes 2-10 located on the upper cover plate 2-7. The total flow area of the suction holes 2-10 is larger than the flow cross-sectional area of the suction pipe 7, allowing the gaseous refrigerant to enter the vapor-liquid separator 2 from a larger inlet range and helping to reduce the airflow velocity at the suction holes 2-10.
[0304] like Figure 10 As shown, after the gas-liquid two-phase refrigerant enters the gas-liquid separator 2, it flows back along the flow channel formed by the two inclined baffles 2-5, and collides with the inclined baffles 2-5 during the flow. Some small droplets entrained in the gas flow aggregate after the collision and separate from the gas flow.
[0305] The gaseous refrigerant, after being processed by the inclined baffle 2-5, enters between the inclined baffle 2-5 and the separation plate 2-3. A gap is formed between the small baffle 2-4 and the separation plate 2-3 to allow the gaseous refrigerant to pass through, causing the airflow direction at the separation plate 2-3 to change to the direction extending along the separation plate 2-3.
[0306] Under suction, the gaseous refrigerant passes through the gap between the adjacent semi-enclosed turbulence structures 2-3-1. Due to its greater inertia, the liquid refrigerant entrained in the gaseous refrigerant flows towards the through hole 2-3-2 when passing through the inclined ramp 2-3-3, and falls below the separation plate 2-3 through the through hole 2-3-2.
[0307] The semi-enclosed flow-disrupting structure 2-3-1 covers the through hole 2-3-2, which helps to reduce the possibility of liquid refrigerant that has entered the through hole 2-3-2 being carried out again by the intake airflow.
[0308] The gaseous refrigerant, after being processed by the separation plate 2-3, passes through the gas distribution plate 2-6. The gas distribution plate 2-6 equalizes the flow distribution of the gaseous refrigerant to reduce the possibility that the gaseous refrigerant only passes through a localized area of the separation plate 2-3 near the outlet 2-11. The gaseous refrigerant then enters the suction pipe 7 through the outlet 2-11 and exits the falling film evaporator through the suction pipe 7.
[0309] Step 6 involves the coordinated action of inclined baffle 2-5, small baffle 2-4, separation plate 2-3, and gas equalization plate 2-6, which causes the gas and liquid refrigerant to undergo sequential back-and-forth collision, airflow direction adjustment, vapor-liquid separation, and flow equalization. This helps to reduce the possibility of liquid refrigerant entering the suction pipe 7 along with the gaseous refrigerant.
[0310] Step 7: The liquid refrigerant separated by the vapor-liquid separator 2 enters the guide pipe 2-8 through the small hole 2-9, and the liquid refrigerant is transported to the outer surface of the heat exchange tube 4 by the guide pipe 2-8.
[0311] The liquid refrigerant separated by the collision with the inclined baffle 2-5 and by the separation plate 2-3 falls onto the baffle 2-2 and flows through the gap between the edge of the baffle 2-2 and the side wall of the lower cover 2-1 to the bottom of the lower cover 2-1. The baffle 2-2 helps to reduce the possibility that the liquid refrigerant collected at the bottom of the lower cover 2-1 will be carried away again by the intake airflow.
[0312] The small hole 2-9 at the bottom of the lower cover plate 2-1 forms the outlet for the separated liquid. The collected liquid refrigerant enters the drainage pipe 2-8, which is connected to the small hole 2-9, through the small hole 2-9.
[0313] The inlet pipe 2-8 delivers liquid refrigerant from the bottom of the vapor-liquid separator 2 to the area where the heat exchange tubes 4 are located. After the liquid refrigerant reaches the outlet of the inlet pipe 2-8, it enters the area where the heat exchange tubes 4 are arranged from the corresponding position.
[0314] like Figure 9 As shown on the left, the outlet of the drain pipe 2-8 is located above the heat exchange tube 4. Liquid refrigerant drips down from the outlet of the drain pipe 2-8 and reaches the outer surface of the heat exchange tube 4.
[0315] When using the top-drop method, the liquid refrigerant can flow downwards from the higher heat exchange tube 4. This method is advantageous in utilizing gravity to continue distributing the separated liquid along the arrangement direction of the heat exchange tubes 4.
[0316] like Figure 9 As shown on the right, the outlet of the drain pipe 2-8 is located on the side of the area where the heat exchange tubes 4 are arranged. Liquid refrigerant reaches the outer surface of the heat exchange tubes 4 from the side to replenish the corresponding side heat exchange area.
[0317] When using the side-mounted refrigerant replenishment method, the outlet position of the drain pipes 2-8 can be determined based on the liquid refrigerant delivery status, the arrangement of the heat exchange tubes 4, and the internal space of the shell 8. This method can be used when the available space above the heat exchange tubes 4 is limited.
[0318] In another embodiment, a combination of top dripping and side replenishment methods can be used. Different drainage pipes 2-8 or different outlets of drainage pipes 2-8 deliver the separated liquid refrigerant to different positions in the heat exchange tube 4 arrangement area.
[0319] The liquid refrigerant returned to the surface of heat exchange tube 4 can re-participate in falling film heat exchange. The gaseous refrigerant formed after the liquid refrigerant evaporates re-enters the shell 8 and flows to the vapor-liquid separator 2.
[0320] Step 7 connects the liquid discharge process of the vapor-liquid separator 2 with the liquid supply process of the heat exchange tube 4. This process allows for the reuse of the liquid refrigerant separated from the intake gas flow and helps reduce the possibility of liquid refrigerant accumulating at the bottom of the vapor-liquid separator 2.
[0321] Steps 1 to 7 are sequentially connected according to the refrigerant processing order in the falling film evaporator. After the refrigerant is introduced through the liquid inlet pipe 5, it sequentially undergoes primary flash evaporation, secondary flash evaporation, liquid distribution, falling film heat exchange, gaseous refrigerant confluence, pre-suction vapor-liquid separation, and separation liquid return.
[0322] Observing the state changes of the liquid refrigerant, after two stages of flash evaporation, the portion of the refrigerant that remains liquid enters the liquid distribution device 3. After being distributed, the liquid refrigerant forms a liquid film on the surface of the heat exchange tube 4, and at least partially transforms into gaseous refrigerant during the heat exchange process.
[0323] Observing the flow path of the gaseous refrigerant, the primary flash gaseous refrigerant is output through the gas supply pipe 6, and the secondary flash gaseous refrigerant enters the shell 8 through the gaseous refrigerant diffusion ports 1-4. The secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange pass through the vapor-liquid separator 2 and are output through the suction pipe 7.
[0324] Observing the flow path of the separated liquid, the liquid refrigerant separated from each plate of the flash evaporation device 1 flows downward and continues into the subsequent liquid refrigerant processing path. The liquid refrigerant separated from the vapor-liquid separation device 2 returns to the area where the heat exchange tube 4 is located via the guide pipes 2-8.
[0325] The above operating method ensures that the gaseous and liquid refrigerants formed at different stages flow along their respective paths. Each processing step has a relatively independent refrigerant processing function, yet they are continuously connected through orifices, pipelines, and internal spaces.
[0326] Application Example 4 This application example illustrates the operation of a falling film evaporator during the start-up phase. The structural relationships between the components described in Example 1 do not need to be changed during the start-up phase.
[0327] After the refrigerant circulation begins, the refrigerant enters the flash evaporation device 1 through the liquid inlet pipe 5. The initially entering refrigerant reaches the area where the corrugated plate 1-6 is located through the first-stage flash evaporation throttling orifice 1-2, and undergoes first-stage flash evaporation in the first-stage flash evaporation unit.
[0328] The gaseous refrigerant formed by the first-stage flash evaporation passes sequentially through the first-stage corrugated separation plate 1-8a, the first-stage grooved perforated plate 1-9a, the first-stage micro liquid-blocking structure 1-11a, and the first-stage perforated plate 1-10a. The gaseous refrigerant enters the gas supply pipe 6 through the gas supply port 1-14.
[0329] The liquid refrigerant formed during the primary flash evaporation flows to the secondary flash throttling orifice 1-3 and enters the secondary flash evaporation unit. After being dispersed by the rectangular perforated plate 1-12, the refrigerant undergoes secondary flash evaporation and vapor-liquid separation within the secondary flash evaporation unit.
[0330] The gaseous refrigerant formed by the secondary flash evaporation enters the shell 8 through the gaseous refrigerant diffusion port 1-4, and the liquid refrigerant formed by the secondary flash evaporation enters the liquid distribution device 3 through the liquid outlet 1-5. As the liquid refrigerant continues to enter the liquid distribution device 3, the liquid distribution device 3 gradually supplies liquid to the area where the heat exchange tubes 4 are arranged.
[0331] After the liquid refrigerant reaches the heat exchange tube 4, it flows downward along the outer surface of the heat exchange tube 4 and forms a liquid film. The gaseous refrigerant formed during the start-up phase enters the gas phase space of the shell 8 and flows to the vapor-liquid separator 2.
[0332] Gaseous refrigerant enters the vapor-liquid separator 2 through the suction port 2-10, first undergoes flow reversal and collision treatment by the inclined baffle 2-5, and then undergoes vapor-liquid separation by the separation plate 2-3; the separated gaseous refrigerant passes through the gas equalization plate 2-6 and enters the suction pipe 7 through the gas outlet 2-11.
[0333] During the start-up phase, the amount of liquid refrigerant separated in the vapor-liquid separator 2 can vary depending on the flow state of the gaseous refrigerant within the shell 8. The separated liquid refrigerant is then returned to the area where the heat exchange tube 4 is located via the orifice 2-9 and the guide pipe 2-8.
[0334] The refrigerant path during startup is the same as the basic refrigerant path during stable operation. The installation positions of all panels and piping do not need to be changed due to variations in the operational phase.
[0335] By performing two-stage flash evaporation and vapor-liquid separation before the refrigerant enters the liquid distribution device 3, the flash gaseous refrigerant formed during the start-up phase can be output along the corresponding gaseous refrigerant path. This arrangement facilitates the refrigerant entering the liquid distribution device 3 to primarily flow along the liquid refrigerant path.
[0336] Application Example 5 This application example illustrates the refrigerant handling process of a falling film evaporator during its stable operation phase. During stable operation, the refrigerant continuously passes through the inlet pipe 5, flash evaporation device 1, liquid distribution device 3, and heat exchange tube 4.
[0337] The refrigerant continuously enters the first-stage flash unit through the first-stage flash throttling orifice 1-2. The corrugated plate 1-6 and the flow guide baffle 1-7 direct the refrigerant to flow along the corresponding path to the first-stage corrugated separation plate 1-8a.
[0338] The first-stage flash gaseous refrigerant continuously passes through the first-stage corrugated separation plate 1-8a, the first-stage grooved perforated plate 1-9a, the first-stage micro liquid-blocking structure 1-11a, and the first-stage perforated plate 1-10a. The liquid refrigerant separated from each layer flows downward along the corresponding drainage path.
[0339] The liquid refrigerant after the first-stage flash evaporation enters the second-stage flash evaporation unit through the second-stage flash evaporation throttling orifice 1-3. The gaseous refrigerant formed in the second-stage flash evaporation flows towards the gaseous refrigerant diffusion port 1-4, and the liquid refrigerant flows towards the liquid outlet 1-5.
[0340] The liquid distribution device 3 continuously receives the liquid refrigerant output from the secondary flash unit and distributes the liquid refrigerant to the heat exchange tube 4. The liquid refrigerant continuously forms a liquid film on the outer surface of the heat exchange tube 4.
[0341] The gaseous refrigerant generated during heat exchange and the secondary flash gaseous refrigerant enter the vapor-liquid separator 2 together. The separated gaseous refrigerant is output through the suction pipe 7, and the separated liquid refrigerant is returned to the heat exchange tube 4 through the drainage pipes 2-8.
[0342] During stable operation, the ventilation path and drainage path inside the flash evaporation device 1 work simultaneously. The gaseous refrigerant flows upward through the corresponding openings, while the separated liquid refrigerant flows downward through the flow channel 1-9-2, the drip hole 1-9-3, and the surface of the plate.
[0343] The gas-liquid separator 2 also has a gaseous refrigerant output path and a liquid refrigerant return path. The gaseous refrigerant enters through the suction port 2-10 and exits through the discharge port 2-11, while the liquid refrigerant enters the drain pipe 2-8 through the small hole 2-9.
[0344] By continuously executing the above process, the input refrigerant can enter the injection path, falling film heat exchange path, and suction path according to their respective states. The separation liquid return path allows the liquid refrigerant separated before suction to participate in heat exchange again.
[0345] Application Example 6 This application example illustrates the operation process when the refrigerant flow rate changes. Changes in flow rate can be caused by variations in the operating status of the refrigeration system containing the falling film evaporator; this embodiment does not add specific control thresholds or adjustment algorithms.
[0346] When the refrigerant flow rate entering the inlet pipe 5 changes, the refrigerant still passes through the first-stage flash throttling orifice 1-2 and the second-stage flash throttling orifice 1-3 in sequence. The refrigerant processing sequence of the two-stage flash evaporation units remains unchanged.
[0347] The gaseous refrigerant from the first-stage flash evaporation still passes through the multi-layer separation structure in the first-stage flash evaporation unit before entering the gas supply pipe 6. The liquid refrigerant from the first-stage flash evaporation still enters the second-stage flash evaporation unit through the second-stage flash evaporation throttling orifices 1-3.
[0348] The secondary flash gaseous refrigerant still enters the casing 8 through the gaseous refrigerant diffusion port 1-4, and the secondary flash liquid refrigerant still enters the liquid distribution device 3 through the liquid outlet 1-5. The change in flow rate does not change the basic output direction of the two parts of refrigerant.
[0349] When the amount of liquid refrigerant entering the liquid distribution device 3 changes, the liquid distribution device 3 continues to distribute the liquid refrigerant to the area where the heat exchange tubes 4 are arranged. The actual flow state of the liquid film can vary with the liquid refrigerant flow rate and heat exchange conditions.
[0350] When the amount of gaseous refrigerant generated by heat exchange changes, the gaseous refrigerant still enters the vapor-liquid separator 2 through multiple suction holes 2-10. The total flow area of the suction holes 2-10 is larger than the flow cross-sectional area of the suction pipe 7, which facilitates the entry of gaseous refrigerant from the corresponding area of the upper cover plate 2-7.
[0351] The amount of liquid refrigerant separated in the vapor-liquid separator 2 can also vary depending on the entrainment state of the airflow. This portion of the liquid refrigerant still returns to the area where the heat exchange tube 4 is located through the small hole 2-9 and the guide pipe 2-8.
[0352] During equipment design, the dimensions and quantity of the primary flash throttling orifices 1-2, secondary flash throttling orifices 1-3, various air passages, and suction orifices 2-10 can be determined based on the expected processing flow rate. The distance between adjacent plates can also be set according to the corresponding flow rate and allowable flow resistance.
[0353] The above configuration enables the falling film evaporator to maintain a predetermined refrigerant treatment path under different flow rates. Each component is adapted to the flow rate through its structural dimensions and flow area, without changing the basic technical concept of two-stage flash evaporation, liquid distribution, heat exchange, and vapor-liquid separation.
[0354] Example 3 This embodiment provides an air conditioning unit. The air conditioning unit includes a compressor, a condenser, a throttling component, and the falling film evaporator described in Embodiment 1.
[0355] The compressor's discharge port, condenser, throttling assembly, and the liquid inlet pipe 5 of the falling film evaporator are connected in sequence. The gas supply pipe 6 is connected to the compressor's gas supply port, and the suction pipe 7 is connected to the compressor's suction port.
[0356] The compressor compresses the gaseous refrigerant and delivers the compressed refrigerant from the exhaust port to the condenser. The condenser exchanges heat with the refrigerant discharged from the compressor, causing the refrigerant to change into a state suitable for subsequent throttling processing.
[0357] The refrigerant, after being processed by the condenser, enters the throttling assembly. After the throttling assembly throttles the refrigerant, it is delivered to the liquid inlet pipe 5 of the falling film evaporator.
[0358] The throttling component and the first-stage flash throttling orifice 1-2 are both located on the flow path of the refrigerant before it enters the first-stage flash unit. The throttling component is used to complete the throttling process in the refrigeration cycle of the air conditioning unit, and the first-stage flash throttling orifice 1-2 is used to allow the refrigerant to enter the first-stage flash unit and undergo the corresponding first-stage flash evaporation.
[0359] The refrigerant introduced through the inlet pipe 5 enters the first-stage flash evaporation unit through the first-stage flash evaporation throttling orifice 1-2. The refrigerant then passes sequentially through the corrugated plate 1-6, the flow guide baffle 1-7, and the various separation plates in the first-stage flash evaporation unit.
[0360] The gaseous refrigerant formed by the first-stage flash refrigerant undergoes first-stage vapor-liquid separation and then enters the gas supply pipe 6 through gas supply ports 1-14. Gas supply pipe 6 delivers the first-stage flash gaseous refrigerant to the gas supply port of the compressor.
[0361] By delivering the gaseous refrigerant from the first-stage flash evaporation to the compressor's gas supply port, this portion of the gaseous refrigerant can enter the compressor's gas supply path. The liquid refrigerant remaining after the first-stage flash evaporation continues into the second-stage flash evaporation unit, without leaving the flash evaporation device 1 with the gas supply flow.
[0362] The liquid refrigerant output from the primary flash unit enters the secondary flash unit through the secondary flash throttling orifice 1-3. The gaseous refrigerant formed in the secondary flash enters the housing 8, and the liquid refrigerant formed in the secondary flash enters the liquid distribution device 3.
[0363] The liquid distribution device 3 distributes the liquid refrigerant to the outer surface of the heat exchange tube 4. The liquid refrigerant undergoes falling film heat exchange on the surface of the heat exchange tube 4 and is at least partially converted into gaseous refrigerant.
[0364] The secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange flow together to the vapor-liquid separator 2. The vapor-liquid separator 2 separates the liquid refrigerant entrained in the gaseous refrigerant.
[0365] The separated gaseous refrigerant enters the suction pipe 7 through the outlet 2-11 and returns to the compressor's suction port via the suction pipe 7. The compressor compresses the gaseous refrigerant entering through the suction port, allowing the refrigerant to continue participating in the air conditioning unit's refrigeration cycle.
[0366] The liquid refrigerant separated by the vapor-liquid separator 2 returns to the area where the heat exchange tube 4 is located through the guide pipe 2-8. After this portion of liquid refrigerant returns to the outer surface of the heat exchange tube 4, it can continue to perform falling film heat exchange.
[0367] From the overall refrigerant path of the air conditioning unit, the refrigerant discharged from the compressor passes sequentially through the condenser, throttling device, and inlet pipe 5 into the falling film evaporator. After undergoing flash evaporation, liquid distribution, and heat exchange in the falling film evaporator, the refrigerant returns to the compressor through suction pipe 7.
[0368] From the perspective of the gas supply path, the gaseous refrigerant output from the first-stage flash unit enters the compressor's gas supply port through the gas supply pipe 6. The gas supply path is distinct from the suction path formed by the vapor-liquid separator 2, the suction pipe 7, and the compressor's suction port.
[0369] From the intake path, both the secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange first pass through the vapor-liquid separator 2. The gaseous refrigerant that has undergone vapor-liquid separation then returns to the compressor via the intake pipe 7.
[0370] Observing the liquid refrigerant path, the liquid refrigerant retained after the first-stage flash evaporation enters the second-stage flash evaporation unit, and the liquid refrigerant retained after the second-stage flash evaporation enters the liquid distribution device 3. The liquid refrigerant separated before suction returns to the heat exchange area through the drainage pipes 2-8.
[0371] When the air conditioning unit is running, the compressor, condenser, and throttling components provide refrigerant in the appropriate state to the falling film evaporator. The falling film evaporator classifies, transports, and processes the refrigerant entering it through two-stage flash evaporation and multiple vapor-liquid separations.
[0372] The flash evaporation device 1 works in conjunction with the compressor's gas supply port, allowing the first-stage flash gaseous refrigerant to enter the compressor's gas supply path. The vapor-liquid separation device 2 works in conjunction with the compressor's suction port, ensuring that the refrigerant entering the suction pipe 7 undergoes vapor-liquid separation before returning to the compressor.
[0373] The above connection can reduce the possibility of liquid refrigerant entering the compressor through the suction pipe 7, and ensure that the first-stage flash gaseous refrigerant, the second-stage flash gaseous refrigerant, and the gaseous refrigerant formed by falling film heat exchange return to the compressor along the corresponding paths.
[0374] The specific structure of the condenser and throttling assembly can be selected according to the cooling requirements of the air conditioning unit. This embodiment does not impose any limitations on the condenser type, throttling assembly type, compressor model, or control parameters other than materials.
[0375] The specific locations of the compressor's gas inlet and suction inlet can be determined based on the compressor's structure. The gas inlet pipe 6 and suction pipe 7 are connected to their respective interfaces, maintaining a distinction between the primary flash gaseous refrigerant path and the suction gaseous refrigerant path.
[0376] When the capacity of the air conditioning unit changes, the dimensions of the shell 8, the number of heat exchange tubes 4, the plate dimensions, and the orifice flow area of the falling film evaporator can be adjusted accordingly. This adjustment does not change the basic connection sequence between the compressor, condenser, throttling assembly, and falling film evaporator.
[0377] Application Example 7 This application example illustrates the operation of an air conditioning unit in a single-unit refrigeration loop. A compressor, a condenser, a throttling assembly, and a falling film evaporator are connected as described in Example 3.
[0378] The refrigerant discharged from the compressor enters the condenser and undergoes heat exchange. After being processed by the condenser, the refrigerant passes through the throttling assembly and then enters the falling film evaporator through the liquid inlet pipe 5.
[0379] The refrigerant entering the falling film evaporator first undergoes primary flash evaporation and vapor-liquid separation in the primary flash evaporation unit. The gaseous refrigerant formed in the primary flash evaporation enters the compressor's gas inlet through the gas supply pipe 6.
[0380] The liquid refrigerant remaining after the first-stage flash evaporation enters the second-stage flash evaporation unit. The gaseous refrigerant formed during the second-stage flash evaporation enters the housing 8 through the gaseous refrigerant diffusion port 1-4, and the liquid refrigerant remaining after the second-stage flash evaporation enters the liquid distribution device 3 through the liquid outlet 1-5.
[0381] The liquid distribution device 3 distributes the liquid refrigerant to the heat exchange tube 4. The liquid refrigerant forms a liquid film along the outer surface of the heat exchange tube 4 and performs heat exchange.
[0382] The gaseous refrigerant formed by heat exchange and the secondary flash gaseous refrigerant enter the vapor-liquid separator 2 together. The gaseous refrigerant after vapor-liquid separation returns to the compressor's suction port through the suction pipe 7.
[0383] The liquid refrigerant separated by the vapor-liquid separator 2 is returned to the area where the heat exchange tube 4 is located through the guide pipes 2-8. The returned liquid refrigerant continues to participate in falling film heat exchange.
[0384] During stand-alone operation, the make-up gas pipe 6 and the suction pipe 7 are connected to the make-up gas port and suction port of the same compressor, respectively. The first-stage flash gaseous refrigerant and the suction gaseous refrigerant enter the compressor through different interfaces.
[0385] This application example forms a continuous refrigerant cycle from compressor discharge, condensation, throttling, two-stage flash evaporation, falling film heat exchange, pre-suction vapor-liquid separation, to compressor suction. Each stage is sequentially connected through piping and internal flow channels.
[0386] Application Example 8 This application example illustrates the application method when multiple air conditioning units or multiple refrigeration circuits are connected in parallel. Each air conditioning unit or each refrigeration circuit can be equipped with the falling film evaporator described in Example 1.
[0387] In multiple refrigeration circuits, each falling film evaporator is connected to its corresponding compressor, condenser, and throttling device. Each refrigeration circuit maintains a sequential connection between the compressor discharge port, condenser, throttling device, and liquid inlet pipe 5.
[0388] Each falling film evaporator's gas supply pipe 6 is connected to the gas supply port of its corresponding compressor. Each falling film evaporator's suction pipe 7 is connected to the suction port of its corresponding compressor.
[0389] The refrigerant undergoes condensation, throttling, two-stage flash evaporation, liquid distribution, falling film heat exchange, and pre-suction vapor-liquid separation in each refrigeration circuit. The refrigerant treatment path in each circuit is consistent with the path described in Example 3.
[0390] In one of the refrigeration circuits, the refrigerant enters the first-stage flash unit through the liquid inlet pipe 5. The first-stage flash gaseous refrigerant enters the corresponding compressor through the make-up gas pipe 6, and the first-stage flash liquid refrigerant enters the second-stage flash unit.
[0391] Secondary flash gaseous refrigerant enters the shell 8 of the corresponding falling film evaporator, while secondary flash liquid refrigerant enters the corresponding liquid distribution device 3. After being distributed, the liquid refrigerant undergoes falling film heat exchange on the surface of the heat exchange tube 4.
[0392] After being processed by the corresponding vapor-liquid separator 2, the gaseous refrigerant enters the corresponding compressor through the suction pipe 7. The separated liquid refrigerant returns to the area where the corresponding heat exchange tube 4 is located through the corresponding drain pipes 2-8.
[0393] Other refrigeration circuits handle the refrigerant in the same way. Different refrigeration circuits can be equipped with different numbers of heat exchange tubes 4 or different sizes of flash evaporation devices 1, depending on their respective equipment capacity.
[0394] When multiple refrigeration circuits are used in parallel, each falling film evaporator still performs its own two-stage flash evaporation, liquid distribution, heat exchange, and vapor-liquid separation of the refrigerant. This application method does not require that the specific structural dimensions of different refrigeration circuits be exactly the same.
[0395] The number and operating status of each refrigeration circuit can be determined according to the actual needs of the air conditioning system.
[0396] When using multiple refrigeration circuits, each falling film evaporator can be arranged according to the installation space. The plate spacing, orifice flow area, and number of heat exchange tubes inside each falling film evaporator can be determined based on the processing flow rate of the corresponding refrigeration circuit.
[0397] This application example demonstrates that falling film evaporators can be used in a single refrigeration loop or installed in multiple parallel refrigeration loops. The refrigerant handling principle and basic structural relationships within each falling film evaporator remain unchanged regardless of the number of applications.
[0398] Application Example 9 This application example illustrates how air conditioning units can be adapted to different equipment capacities and installation spaces. When equipment capacity changes, the structural dimensions of the falling film evaporator can be adjusted accordingly.
[0399] When the required heat exchange capacity increases, the number of heat exchange tubes 4 can be increased or the arrangement range of heat exchange tubes 4 can be expanded according to the heat exchange demand. The liquid distribution range of the liquid distribution device 3 can be adapted to the adjusted arrangement range of the heat exchange tubes 4.
[0400] As the arrangement range of heat exchange tubes 4 increases, the outlet positions of the drainage tubes 2-8 can be set accordingly. The separated liquid can be returned to the heat exchange area from above, side, or multiple positions of the heat exchange tubes 4.
[0401] The dimensions of the enclosure 1-1 of the flash evaporation unit 1 can be set according to the refrigerant processing flow rate and installation space. The primary flash evaporation unit and the secondary flash evaporation unit are still connected in the refrigerant processing sequence.
[0402] The panel dimensions and spacing in the primary flash unit can be determined based on the primary flash gas refrigerant flow rate. The panel dimensions and spacing in the secondary flash unit can be determined separately based on the secondary flash gas refrigerant flow rate.
[0403] The dimensions of the upper cover plate 2-7 and lower cover plate 2-1 of the gas-liquid separator 2 can be adapted to the suction area inside the housing 8. The number and distribution of the suction holes 2-10 can be determined according to the flow rate of the gaseous refrigerant to be processed.
[0404] When the installation space is relatively tight, the external dimensions and relative distances of each component can be adjusted. After adjustment, it should still be ensured that the gaseous refrigerant can pass through each separation structure and that the separated liquid refrigerant can be discharged along the corresponding drainage path.
[0405] When there is relatively ample installation space, the flow space between the plates can be appropriately set according to the allowable flow resistance. The specific distance is determined by the equipment design conditions and should not be limited to a fixed range without a basis.
[0406] Regardless of adjustments to equipment capacity and installation space, the refrigerant still enters the two-stage flash unit through the liquid inlet pipe 5. The first-stage flash gaseous refrigerant enters the make-up gas pipe 6, while the second-stage flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange enter the suction pipe 7 via the vapor-liquid separator 2.
[0407] The liquid refrigerant remaining after the secondary flash evaporation is still transported to the heat exchange tube 4 by the liquid distribution device 3, while the liquid refrigerant separated from the intake airflow returns to the heat exchange area through the guide pipes 2-8. This maintains a complete refrigerant handling and circulation path.
[0408] The falling film evaporator, operating method, and air conditioning unit provided by the present invention flash and separate the refrigerant into gas and liquid phases in sequence through a primary flash unit and a secondary flash unit, so that the gaseous refrigerant and liquid refrigerant formed in different processing stages flow along corresponding paths.
[0409] The first-stage flash gaseous refrigerant is output through the gas supply pipe 6, the second-stage flash gaseous refrigerant enters the shell 8, and the liquid refrigerant remaining after the second-stage flash is transported to the heat exchange tube 4 through the liquid distribution device 3. The above path enables the flash treatment and falling film heat exchange process to be interconnected.
[0410] The vapor-liquid separator 2 is installed before the suction pipe 7 to separate the gaseous refrigerant from the secondary flash gaseous refrigerant and the gaseous refrigerant formed by heat exchange. The separated gaseous refrigerant is output through the suction pipe 7, and the separated liquid refrigerant is returned to the area where the heat exchange tube 4 is located through the drainage pipes 2-8.
[0411] The number of components, structural dimensions, plate spacing, number of openings, and installation positions in each implementation method and application example can be determined based on the processing flow rate, allowable pressure drop, heat exchange requirements, and installation space, while maintaining the corresponding technical characteristics and refrigerant flow relationship.
[0412] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the protection scope of the claims of the present invention.
Claims
1. A falling film evaporator, characterized in that, include: The housing (8), the flash evaporation device (1), the vapor-liquid separation device (2), the liquid distribution device (3) and the heat exchange tube (4) disposed in the housing (8), as well as the liquid inlet pipe (5), the gas supply pipe (6) and the air intake pipe (7); The flashing device (1) includes a primary flashing unit and a secondary flashing unit; The first-stage flash unit is used to perform first-stage flashing and vapor-liquid separation on the liquid refrigerant entering through the liquid inlet pipe (5), output the separated gaseous refrigerant through the gas replenishment pipe (6), and transport the separated liquid refrigerant to the second-stage flash unit; The secondary flash unit is used to perform secondary flashing and vapor-liquid separation on the input liquid refrigerant, release the separated gaseous refrigerant into the housing (8), and transport the separated liquid refrigerant to the liquid distribution device (3). The liquid distribution device (3) is located above the heat exchange tube (4) and is used to distribute the liquid refrigerant separated by the secondary flash unit to the surface of the heat exchange tube (4), so that the liquid refrigerant forms a falling film along the surface of the heat exchange tube (4) and forms gaseous refrigerant in the heat exchange area where the heat exchange tube (4) is located. The vapor-liquid separation device (2) is connected to the suction pipe (7) and is used to separate the gaseous refrigerant released by the secondary flash unit and the gaseous refrigerant formed in the heat exchange area. The separated gaseous refrigerant is output through the suction pipe (7), and the separated liquid refrigerant is transported to the heat exchange area to participate in heat exchange again.
2. A falling film evaporator according to claim 1, characterized in that: The flash emitting device (1) includes a housing (1-1) and a cover plate (1-13) disposed on the top of the housing (1-1). The interior of the housing (1-1) is divided into the first-level flash emitting unit and the second-level flash emitting unit. The flash device (1) is provided with a primary flash throttling orifice (1-2), a secondary flash throttling orifice (1-3), a gaseous refrigerant diffusion port (1-4), a liquid outlet (1-5), and a gas supply port (1-14). The first-stage flash throttling orifice (1-2) connects the liquid inlet pipe (5) to the first-stage flash unit, the second-stage flash throttling orifice (1-3) connects the first-stage flash unit to the second-stage flash unit, the gaseous refrigerant diffusion port (1-4) connects the second-stage flash unit to the interior of the housing (8), the liquid outlet (1-5) connects the second-stage flash unit to the liquid distribution device (3), and the gas supply port (1-14) connects the first-stage flash unit to the gas supply pipe (6).
3. A falling film evaporator according to claim 2, characterized in that: The primary flash unit includes a wave plate (1-6), a flow guide baffle (1-7), a primary wave-shaped separation plate (1-8a), a primary grooved perforated plate (1-9a), a primary perforated plate (1-10a), and a primary micro liquid-blocking structure (1-11a). The wave plate (1-6) is disposed opposite to the first-stage flash throttling orifice (1-2), and the flow guide baffle (1-7) is disposed between the wave plate (1-6) and the first-stage wave-shaped separation plate (1-8a); The first-stage wave-shaped separation plate (1-8a), the first-stage grooved perforated plate (1-9a), and the first-stage perforated plate (1-10a) are arranged sequentially from bottom to top in the first-stage flash unit, and the first-stage micro liquid-blocking structure (1-11a) is disposed on the first-stage grooved perforated plate (1-9a).
4. A falling film evaporator according to claim 3, characterized in that: The secondary flash unit includes a secondary wave-shaped separation plate (1-8b), a secondary grooved perforated plate (1-9b), a secondary perforated plate (1-10b), a secondary micro liquid-blocking structure (1-11b), and a rectangular perforated plate (1-12). The rectangular perforated plate (1-12) is disposed opposite to the secondary flash throttling orifice (1-3); The secondary wave-shaped separation plate (1-8b), the secondary grooved perforated plate (1-9b), and the secondary perforated plate (1-10b) are arranged sequentially from bottom to top in the secondary flash unit, and the secondary micro liquid-blocking structure (1-11b) is disposed on the secondary grooved perforated plate (1-9b).
5. A falling film evaporator according to claim 4, characterized in that: The primary wave-shaped separation plate (1-8a) is provided with a primary turbulence separation structure, which includes multiple turbulence structures (1-8-1). The turbulence structure (1-8-1) has an arc-shaped surface on the side facing the direction of refrigerant flow. The secondary wave-shaped separation plate (1-8b) is provided with a secondary turbulence separation structure that has the same structure as the primary turbulence separation structure; The primary slotted perforated plate (1-9a) is provided with a primary ventilation and drainage structure, which includes an air passage (1-9-1), a flow channel (1-9-2), and a dripping hole (1-9-3). The air passage (1-9-1) is correspondingly provided with the turbulence structure (1-8-1) in the primary turbulence separation structure, and the dripping hole (1-9-3) is connected to the flow channel (1-9-2). The secondary slotted perforated plate (1-9b) is provided with a secondary ventilation and drainage structure that has the same structure as the primary ventilation and drainage structure. The air passage in the secondary ventilation and drainage structure is provided with a corresponding turbulence structure in the secondary turbulence separation structure.
6. A falling film evaporator according to claim 5, characterized in that: The first-level micro liquid-blocking structure (1-11a) includes a liquid-guiding part and a liquid-blocking part. Both the liquid-guiding part and the liquid-blocking part are provided with vent holes (1-11-1), and the vent holes (1-11-1) on the liquid-guiding part and the vent holes (1-11-1) on the liquid-blocking part are staggered. The liquid-guiding part is provided with a liquid-guiding groove (1-11-2), and the first-stage micro liquid-blocking structure (1-11a) is also provided with an annular groove (1-11-3). The liquid-blocking part is provided with a baffle (1-11-4). The liquid-guiding groove (1-11-2) and the annular groove (1-11-3) are connected. A communication gap is formed between the bottom of the baffle (1-11-4) and the annular groove (1-11-3). The annular slot (1-11-3) is connected to the drain trough (1-11-5), and the outlet of the drain trough (1-11-5) is correspondingly set with the flow channel (1-9-2) in the first-stage ventilation and drain structure. The secondary micro liquid-blocking structure (1-11b) has the same staggered ventilation structure and liquid guiding and drainage structure as the primary micro liquid-blocking structure (1-11a).
7. A falling film evaporator according to claim 2, characterized in that: The vapor-liquid separation device (2) includes a lower cover plate (2-1), a partition plate (2-2), a separation plate (2-3), a small baffle (2-4), an inclined baffle (2-5), a gas equalization plate (2-6), an upper cover plate (2-7), and a drainage pipe (2-8). The partition (2-2) is horizontally disposed in the lower part of the lower cover plate (2-1) and forms a gap between it and the edge of the lower cover plate (2-1) for liquid refrigerant to pass through. The small baffle (2-4) is vertically disposed on both sides above the partition (2-2) and forms a gap between it and the separation plate (2-3) for gaseous refrigerant to pass through. Along the flow direction of the gaseous refrigerant, the inclined baffle (2-5), the separation plate (2-3), and the gas equalization plate (2-6) are sequentially arranged on the gas flow path of the gas-liquid separation device (2). The inclined baffle (2-5) is used to change the flow direction of the gas-liquid two-phase refrigerant and cause the liquid refrigerant to collide and aggregate. The separation plate (2-3) is used to separate the liquid refrigerant entrained in the gaseous refrigerant. The gas equalization plate (2-6) is used to equalize the flow distribution of the gaseous refrigerant. The bottom of the lower cover plate (2-1) is provided with a small hole (2-9) communicating with the drainage pipe (2-8), the upper cover plate (2-7) is provided with an air intake hole (2-10) communicating with the interior of the shell (8), and the side of the lower cover plate (2-1) is provided with an air outlet hole (2-11) communicating with the air intake pipe (7). The gaseous refrigerant released through the gaseous refrigerant diffusion port (1-4) and the gaseous refrigerant formed in the heat exchange area enter the vapor-liquid separation device (2) through the suction port (2-10), change the flow direction through the inclined baffle (2-5), and undergo vapor-liquid separation through the separation plate (2-3); after separation, the gaseous refrigerant passes through the gas equalization plate (2-6) and is then output through the gas outlet (2-11) and the suction pipe (7) in sequence.
8. A falling film evaporator according to claim 7, characterized in that: The total flow area of the air intake holes (2-10) is greater than the flow cross-sectional area of the air intake pipe (7); The separation plate (2-3) is provided with multiple semi-enclosed turbulence structures (2-3-1), multiple through holes (2-3-2), and multiple inclined ramps (2-3-3). The semi-enclosed flow disturbance structure (2-3-1) is disposed above the through hole (2-3-2), and the inclined ramp (2-3-3) is disposed on the side of the semi-enclosed flow disturbance structure (2-3-1) facing the gaseous refrigerant flow and extends toward the through hole (2-3-2).
9. A falling film evaporator according to claim 8, characterized in that: The liquid refrigerant separated by the separation plate (2-3) is collected at the bottom of the lower cover plate (2-1) and enters the drainage pipe (2-8) through the small hole (2-9). The outlet of the drain pipe (2-8) is located above the heat exchange pipe (4) in the heat exchange area to deliver the liquid refrigerant to the surface of the heat exchange pipe (4).
10. A method for operating a falling film evaporator, applied to a falling film evaporator according to any one of claims 1 to 9, characterized in that, include: Liquid refrigerant enters the first-stage flash unit through the liquid inlet pipe (5) for first-stage flash and vapor-liquid separation. The gaseous refrigerant separated by the first-stage flash is output through the gas supply pipe (6), and the liquid refrigerant separated by the first-stage flash enters the second-stage flash unit. The liquid refrigerant separated by the first-stage flash evaporation undergoes secondary flash evaporation and vapor-liquid separation in the secondary flash evaporation unit. The gaseous refrigerant separated by the secondary flash evaporation is released into the housing (8), and the liquid refrigerant separated by the secondary flash evaporation enters the liquid distribution device (3). The liquid refrigerant separated by the secondary flash evaporation is distributed to the surface of the heat exchange tube (4) through the liquid distribution device (3) and forms a falling film. The liquid refrigerant exchanges heat in the heat exchange area to form gaseous refrigerant. The gaseous refrigerant separated by the secondary flash evaporation and the gaseous refrigerant formed by heat exchange enter the vapor-liquid separation device (2) for vapor-liquid separation. The separated gaseous refrigerant is output through the suction pipe (7), and the separated liquid refrigerant is transported to the heat exchange area to participate in heat exchange again.
11. The method for operating a falling film evaporator according to claim 10, characterized in that: Liquid refrigerant enters the first-stage flash unit through the first-stage flash throttling orifice (1-2), gaseous refrigerant separated from the first-stage flash enters the gas supply pipe (6) through the gas supply port (1-14), and liquid refrigerant separated from the first-stage flash enters the second-stage flash unit through the second-stage flash throttling orifice (1-3). The gaseous refrigerant separated by the secondary flash evaporation enters the housing (8) through the gaseous refrigerant diffusion port (1-4), and the liquid refrigerant separated by the secondary flash evaporation enters the liquid distribution device (3) through the liquid outlet (1-5). The gaseous refrigerant separated by the secondary flash evaporation and the gaseous refrigerant formed by heat exchange enter the vapor-liquid separator (2) through the suction port (2-10). The separated gaseous refrigerant enters the suction pipe (7) through the outlet port (2-11). The separated liquid refrigerant enters the guide pipe (2-8) through the small hole (2-9) and is transported to the surface of the heat exchange tube (4) by the guide pipe (2-8).
12. An air conditioning unit, characterized in that, Includes a compressor, a condenser, a throttling assembly, and a falling film evaporator according to any one of claims 1 to 9; The compressor's exhaust port, the condenser, the throttling assembly, and the liquid inlet pipe (5) are connected in sequence. The gas supply pipe (6) is connected to the compressor's gas supply port, and the suction pipe (7) is connected to the compressor's suction port.