River water and sediment synchronous monitoring and sediment concentration inversion processing method
By synchronously acquiring data from multiple sources and registering it in time and space, combined with a semi-empirical and semi-mechanistic model and dynamic calibration, the problems of time asynchrony, spatial mismatch and sensor drift in river sediment monitoring have been solved, achieving high-precision sediment concentration inversion and distribution monitoring, supporting river management and flood control scheduling.
Patent Information
- Application Number
- CN202611365027.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-04
- Publication Date
- 2026-11-20
AI Technical Summary
Existing river sediment monitoring technologies suffer from problems such as time asynchrony, spatial mismatch, low accuracy of single sensor parameters, large environmental interference, and sensor zero-point drift, resulting in large errors and poor reliability of water and sediment data, making it difficult to meet the needs of hydrological process monitoring.
By employing multi-source sensor synchronous acquisition and data spatiotemporal registration technology, combined with a semi-empirical and semi-mechanistic model and a dynamic calibration mechanism, the synchronous acquisition and calibration of hydrodynamic, optical, and environmental parameters are achieved, and a sediment concentration inversion model is constructed to dynamically adapt to changes in river hydrology.
It achieves time synchronization of multiple sensors, reduces water and sediment data errors, improves the accuracy and reliability of sediment concentration inversion, and enables continuous monitoring of river water and sediment distribution around the clock, providing refined data support for river management.
Smart Images

Figure QLYQS_1 
Figure QLYQS_2 
Figure QLYQS_5
Abstract
Description
Technical Field
[0001] A method for simultaneous monitoring of river water and sediment and inversion of sediment concentration is disclosed. This invention belongs to the field of hydrological monitoring and river dynamics technology, specifically relating to the technical field of methods for simultaneous monitoring of river water and sediment and inversion of sediment concentration. Background Technology
[0002] River sediment concentration is a core hydrological parameter reflecting river sediment transport characteristics and supporting flood control, reservoir operation, river management, and aquatic ecological protection. Current river sediment monitoring technologies are mainly divided into four categories: manual sampling, optical turbidity measurement, acoustic sediment measurement, and remote sensing inversion. Each technology has significant limitations: manual sampling and weighing, as a traditional standard method, offers high measurement accuracy but has a long sampling cycle and is labor-intensive, typically allowing only 1-2 samplings per day, making it unable to capture the peak processes of sudden increases and decreases in sediment concentration during floods; spatially, it only obtains data from single points, making it difficult to represent the average sediment transport characteristics of the entire cross-section; furthermore, there is a significant time lag between hydrodynamic parameters and sediment sampling, resulting in low matching degree between water and sediment data.
[0003] Optical turbidimeters can achieve continuous online monitoring, but their measurement principle is based on the light scattering effect. The inversion results are easily affected by multiple factors such as sediment particle size, mineral composition, water color, bubbles, and plankton. The sediment concentration corresponding to the same turbidity value can vary by more than 30% in different river environments. Furthermore, the sensor is prone to window contamination and zero drift when immersed in water for a long time. It also lacks an effective automatic calibration mechanism, resulting in poor long-term operational reliability.
[0004] Acoustic sediment measurement can monitor profile flow velocity and sediment distribution, but it is significantly affected by air bubbles in the water, sediment particle size distribution, and changes in water sound velocity. It has a low signal-to-noise ratio and large measurement error at low sediment content, and the equipment and maintenance costs are high, making it difficult to deploy on a large scale in small and medium-sized rivers.
[0005] Remote sensing inversion can obtain the distribution of sediment on a large water surface, but its spatial resolution is low and it is severely limited by weather, lighting and water surface reflection. It cannot achieve all-weather monitoring and cannot obtain the vertical distribution of sediment in the water body. Its temporal resolution is also difficult to meet the needs of hydrological process monitoring. Summary of the Invention
[0006] The technical problem this invention aims to solve is to overcome existing deficiencies and provide a method for synchronous monitoring of river water and sediment and inversion of sediment concentration, specifically addressing four major technical issues: first, resolving the error in water and sediment data caused by time asynchrony and spatial mismatch of multiple source sensors; second, resolving the problem of low accuracy and susceptibility to environmental interference in inverting sediment concentration using a single sensor parameter; third, resolving the problem that fixed empirical models cannot adapt to the spatiotemporal changes in river hydrological conditions and sediment characteristics; and fourth, resolving the problem of zero-point drift of sensors during long-term operation and the decline in data reliability over time.
[0007] To achieve the above objectives, the present invention provides the following technical solution:
[0008] A method for synchronous monitoring of river water and sediment and sediment concentration inversion processing includes the following five core steps: S1 Synchronous acquisition of multi-source water and sediment parameters: Select a straight and stable representative monitoring section in the target river channel, deploy multi-source sensing units and data acquisition terminals, and realize the synchronous acquisition of hydrodynamic parameters, optical parameters and environmental parameters through a unified high-precision time reference.
[0009] Cross-section site selection requirements: avoid bends, shoals, and tributary confluences to ensure uniform distribution of water flow and sediment and stable cross-section topography;
[0010] Monitoring point layout rules: 3 to 5 monitoring vertical lines are laid out at equal intervals along the transverse section. The distance between the left and right vertical lines and the bank is 1 / 5 to 1 / 4 of the total width of the section, and the middle vertical line is located at the middle channel line. Three layers of monitoring points are laid out on each vertical line according to the relative water depth: the surface point is located 0.3 to 0.8m below the water surface, the middle point is located at a relative water depth of 0.5 to 0.6m, and the bottom point is located 0.3 to 1.0m above the riverbed to avoid siltation on the riverbed from obstructing the sensors.
[0011] Sensing unit configuration: Each monitoring point integrates a turbidity sensor, a miniature hyperspectral probe, and a point-type three-dimensional flow velocity sensor; a water level sensor and a data acquisition terminal are installed on the benchmark piles on the bank of the cross section, and all sensors are connected to the terminal through shielded cables;
[0012] Synchronous triggering mechanism: The data acquisition terminal has a built-in GPS / BeiDou dual-mode time synchronization module, which outputs PPS second pulse signal to synchronously trigger all sensors, with time synchronization accuracy better than ±1ms; the acquisition frequency can be dynamically configured according to the hydrological situation: one set of data is collected every 5 to 10 minutes during the normal hydrological period, one set of data is collected every 1 to 3 minutes during the flood season, and one set of data is collected every 30 seconds to 1 minute during the flood process.
[0013] Data collected: water level, three-dimensional point flow velocity, turbidity, hyperspectral reflectance in the 350–1100 nm band, and water temperature.
[0014] S2 Multi-Source Data Spatiotemporal Registration and Preprocessing performs spatiotemporal registration and standardization preprocessing on heterogeneous, asynchronous, and heterogeneous frequency raw data from different sensors to eliminate time bias, spatial bias, and system noise, resulting in a standardized dataset with strict spatiotemporal matching.
[0015] Time registration: Based on the BeiDou standard time axis, the asynchronous output data of each sensor is resampled using cubic spline interpolation and uniformly aligned to the preset standard timestamp; for sensors with different acquisition frequencies, the data is first downsampled by low-pass filtering and then aligned to ensure that the time synchronization error of all parameters is ≤0.5 seconds.
[0016] Spatial registration: Establish a local coordinate system for the cross-section, with the left bank reference pile as the origin, the X-axis along the direction of water flow as the X-axis, the transverse direction of the cross-section as the Y-axis, and the vertical direction as the Z-axis; transform the installation coordinates of each sensor to a unified coordinate system, and dynamically correct the actual vertical elevation of each monitoring point according to the real-time water level to eliminate the position deviation of the measuring points caused by the rise and fall of the water level;
[0017] Data preprocessing:
[0018] General denoising: A 5-point moving average filter is used to remove high-frequency random noise from all time series data, and the window size is adjusted synchronously with the acquisition frequency;
[0019] Outlier removal: Outliers are removed by using the 3σ criterion combined with hydrological rationality verification. Data exceeding three times the standard deviation are judged as statistical outliers. At the same time, physical rationality verification is performed by combining the correlation between water level and flow velocity and turbidity and flow velocity to remove abrupt values caused by bubble interference and sensor jamming.
[0020] Sensor-specific calibration: Dark current correction and water background correction are performed on hyperspectral data to remove the effects of probe window contamination and water background absorption; temperature correction is performed on turbidity data to eliminate the effects of water temperature changes on optical components; installation tilt correction is performed on flow velocity data to correct flow velocity component errors caused by sensor installation tilt.
[0021] Data normalization: The min-max normalization method is used to map parameters of different dimensions and magnitudes to the [0,1] interval, eliminating the impact of dimension differences on subsequent modeling.
[0022] The S3 multi-parameter fusion sediment concentration initial inversion model is based on the theoretical foundation of sediment optical scattering mechanism and hydrodynamic suspension mechanism. It constructs a multiplicative semi-empirical semi-mechanistic inversion model, which integrates turbidity, hyperspectral and hydrodynamic multi-dimensional parameters to correct the effects of total concentration, particle size composition and water flow turbulence.
[0023] The model's basic structure uses a power function as the fundamental relationship between turbidity and sediment concentration, multiplied sequentially by a particle size correction factor and a hydrodynamic correction factor. The overall structure is multiplicative, as shown in the following formula:
[0024] C=a× ×F(D)×F(V)
[0025] In the formula: C is the sediment concentration (unit: kg / m³); T is the turbidity (unit: NTU); F(D) is the particle size correction factor; F(V) is the hydrodynamic correction factor.
[0026] Particle size correction factor construction: The reflectance of three near-infrared characteristic bands (680nm, 760nm, and 830nm) was selected, and the band reflectance ratio was calculated. / and / Construct the particle size correction factor:
[0027] F(D) = ( / ×( /
[0028] Where c and d are particle size correction factors; the ratio of this band is related to the median particle size of sediment. It shows a significant negative correlation and can effectively correct the corresponding deviation between turbidity and concentration under different sediment particle size compositions.
[0029] Construction of hydrodynamic correction factors: Introducing the flow velocity v at the measuring point and the Froude number Fr = v / (where h is water depth and g is gravitational acceleration), construct the hydrodynamic correction factor:
[0030] F(v) = ( / ×(Fr /
[0031] in , These are the average flow velocity and average Froude number during the calibration period, respectively, and e and f are hydrodynamic correction coefficients. This factor reflects the influence of water flow turbulence intensity on sediment suspension capacity and corrects concentration inversion bias at different flow rates.
[0032] Initial model calibration: Using at least 20 sets of historical field synchronous observation data with different flow rates and different sediment concentrations, the six model parameters a, b, c, d, e, and f are solved by fitting using the nonlinear least squares method to obtain the initial inversion model.
[0033] S4 Model Dynamic Adaptive Calibration
[0034] Establish a regular on-site calibration mechanism and use the exponential decay weighted recursive least squares method to achieve rolling updates of model parameters, while correcting sensor zero-point drift, so that the model can continuously adapt to the current river water and sediment characteristics.
[0035] Calibration frequency design: The calibration cycle is set according to the hydrological rhythm of the river. During the non-flood season (dry season), calibration is performed once every 30 days. During the flood season, calibration is performed once every 10 days. During special water conditions such as floods and water and sediment regulation, calibration is performed more frequently every 3 to 5 days.
[0036] True value acquisition during calibration: Parallel water samples were collected simultaneously at each layer of the monitoring vertical line for each calibration. Two parallel samples were collected at each monitoring point. The actual sediment concentration was determined by weighing after drying at 105℃ for 6 hours and used as the true value. Samples with a relative deviation of more than 5% were discarded to ensure the reliability of the calibration data.
[0037] Weighted recursive parameter update: An exponential decay weighting strategy is adopted, with higher weights for recent calibration data and progressively lower weights for older data. The weight calculation formula is as follows: =exp(-k× ),in For the first The weight of the secondary calibration data For the first The number of days since the last calibration, where k is the decay coefficient, ranging from 0.02 to 0.05 per day; each time, the data from the most recent 4 to 6 calibrations are incorporated for parameter fitting to achieve rolling updates;
[0038] Zero drift correction: The system deviation of the current model is calculated during each calibration. If the system deviation is greater than 10%, zero drift correction is triggered to perform bias correction on the original turbidity data of the sensor and eliminate the zero-point offset caused by sensor contamination and aging.
[0039] The S5 sediment concentration spatiotemporal distribution inversion and result output is based on the calibrated inversion model to calculate the instantaneous sediment concentration at each point. The cross-sectional two-dimensional sediment concentration distribution is generated by spatial interpolation with physical constraints. Various water and sediment characteristic quantities are further calculated and output.
[0040] Point-by-point concentration calculation: Input the pre-processed turbidity, hyperspectral, flow velocity, and water level data into the calibrated inversion model to calculate the instantaneous sediment concentration at each monitoring point.
[0041] Two-dimensional cross-sectional distribution interpolation: Based on the concentration data of each monitoring point and combined with the cross-sectional topographic data, the Kriging interpolation method with water and sediment regularity constraints is used to generate a two-dimensional sediment concentration distribution field in the transverse and vertical directions of the cross-section; the variogram adopts a spherical model with a spatial resolution of 0.5m in the transverse direction and 0.2m in the vertical direction; physical constraints are added to the interpolation process: the concentration at the bottom layer is higher than that at the surface layer, and the concentration in the middle channel is higher than that at the bank, which conforms to the general distribution law of water and sediment movement in natural river channels;
[0042] Calculation of water and sediment characteristic quantities:
[0043] Average sediment concentration at cross-section: calculated using the area-weighted method, multiplying the concentration at each interpolation point on the cross-section by the corresponding area element, summing the results, and then dividing by the total cross-sectional area; Sediment transport rate at cross-section: calculated using the velocity-concentration area integral method, the formula is as follows: = ,in The two-dimensional sediment concentration distribution is shown. It is a two-dimensional velocity distribution. The cross-sectional area is in yuan.
[0044] Sediment transport statistics: Daily sediment transport, monthly sediment transport, and annual sediment transport are calculated based on hourly sediment transport rate integrals;
[0045] Results output: Output hourly and point-by-point concentration data, cross-sectional average sediment concentration process line, sediment transport rate process line, and sediment transport statistical report; at the same time, output cross-sectional concentration distribution characteristics in text form, including average concentration of surface, middle and bottom layers, average concentration of left, middle and right vertical lines, location and value of maximum concentration, etc.
[0046] Compared with the prior art, the beneficial effects of the present invention are:
[0047] By employing PPS second-pulse hard synchronization triggering combined with cubic spline time interpolation algorithm, millisecond-level time synchronization of multi-source sensors is achieved. Combined with dynamic spatial coordinate correction, the problem of spatiotemporal mismatch between hydrodynamic and sediment data in traditional methods is completely solved, and the time synchronization error is reduced by an order of magnitude compared with traditional methods.
[0048] By integrating multiple parameters such as turbidity, hyperspectral data, and hydrodynamics, the inversion results are systematically corrected from three levels: total concentration, particle size composition, and water flow turbulence. Compared with the single turbidity inversion method, the average relative error of sediment concentration inversion is reduced from 15% to 20% to less than 8%, with particularly significant improvements in accuracy during low sediment concentration and flood season.
[0049] Through an exponential decay weighted progressive dynamic calibration mechanism, it automatically adapts to seasonal hydrological changes in the river channel, changes in sediment particle size, and sensor zero-point drift, eliminating the need for frequent manual adjustments; its annual operating accuracy and stability are improved by more than 40% compared to a fixed model, and it can operate continuously and stably for a long time.
[0050] It can output two-dimensional water and sediment distribution in both horizontal and vertical directions along a cross-section, showing a continuous process over the entire time period. This overcomes the spatial and temporal limitations of single-point monitoring and manual sampling, and can fully capture the sediment rise and fall process and cross-sectional distribution characteristics during flood season, providing refined data support for river evolution analysis, flood control scheduling, and reservoir sediment discharge. Detailed Implementation
[0051] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0052] Example 1: Application in alluvial channels in plains
[0053] This embodiment is applied to a hydrological monitoring section of an alluvial river in a plain. The section is 120m wide, 2-5m deep, has a flow velocity of 0.2-1.5m / s, and the median particle size of the sediment is about 0.03-0.1mm, belonging to a fine sandy riverbed.
[0054] Monitoring Deployment and Synchronous Data Acquisition: Three vertical lines (left, center, and right) are laid out transversely along the cross-section. The left and right vertical lines are 20m from the bank, approximately 1 / 6 of the cross-section width, while the center vertical line is located in the middle of the river channel. Each vertical line has three monitoring points: 0.5m below the surface water, 0.6m below the middle water, and 0.5m above the bottom water, for a total of nine monitoring points. Each point integrates a turbidity sensor (range 0–200 NTU), a miniature hyperspectral probe (350–1000 nm), and an acoustic point current meter. A water level gauge and data acquisition terminal are installed on the bank. All equipment is synchronously triggered via BeiDou time synchronization and PPS pulses. The data acquisition frequency is 5 minutes per acquisition during normal periods and 1 minute per acquisition during the flood season.
[0055] Data preprocessing: Cubic spline interpolation alignment was performed based on BeiDou standard time, with a time synchronization error ≤0.4 seconds; a local coordinate system for the cross-section was established, and the vertical coordinates of the measuring points were dynamically corrected according to the real-time water level; 5-point moving average filtering was used for noise reduction, and the 3σ criterion combined with the velocity-turbidity correlation was used to remove bubble anomalies; after completing hyperspectral dark current correction, turbidity temperature correction, and velocity inclination angle correction, the data was normalized.
[0056] Initial model construction: 22 sets of historical synchronous calibration data were selected, and the initial model parameters were obtained by fitting: a=0.082, b=1.03, c=-0.41, d=-0.28, e=0.15, f=0.22.
[0057] Dynamic calibration: Calibrate once a month during the non-flood season and once every 10 days during the flood season; the attenuation coefficient k is 0.03 / day, and the model parameters are updated by weighting the data from the most recent 5 calibrations each time; the turbidity zero point is automatically corrected when the system deviation exceeds 10%.
[0058] Results output: Instantaneous sediment concentration was calculated point-by-point, and constrained kriging interpolation was used to generate cross-sectional concentration distributions with a resolution of 0.5m × 0.2m; the average sediment concentration, sediment transport rate, and daily and monthly sediment transport were calculated. Field verification showed that the average relative error of sediment concentration inversion in this embodiment was ≤7.8%, meeting the requirements of national hydrological monitoring standards.
[0059] Example 2: Application in mountain canyon river channels
[0060] This embodiment is applied to a monitoring section of a canyon river in a mountainous area. The section is 60m wide, with a water depth of 1-3m, a large riverbed slope, a flow velocity of 0.5-3m / s, and relatively coarse sediment particles, with a median particle size of about 0.2-0.5mm. The sediment content rises and falls sharply during the flood season.
[0061] 1. Monitoring deployment: Three monitoring vertical lines are set up along the cross section, with three layers of measuring points on each vertical line, for a total of nine monitoring points; the turbidity range is selected from 0 to 1000 NTU, and the flow velocity range is selected from 0 to 5 m / s; the sampling frequency is increased to 30 seconds / time during the flood season and 5 minutes / time during the non-flood season.
[0062] 2. Model calibration: The model parameters were fitted using 25 sets of field calibration data. Due to the coarser particle size of the sediment, the absolute values of the particle size correction coefficients c and d are greater than those of the plain river channel; the hydrodynamic correction coefficients e and f are taken to be larger to adapt to the large variation in flow velocity.
[0063] 3. Dynamic calibration: Calibrate once every 7 days during the flood season, once a month during the non-flood season, and calibrate more frequently every 3 days during flood processes; the attenuation coefficient k is set to 0.04 / day to accelerate the parameter update speed to adapt to rapidly changing water and sediment conditions.
[0064] 4. Application effect: Through comparative verification, the average relative error of sediment concentration inversion in this embodiment is ≤9%, and the tracking error of peak flood sediment concentration is ≤12%, which can accurately capture the rapid change of sediment in mountainous rivers during flood season.
[0065] Example 3: Application in the backwater section of a reservoir
[0066] This embodiment is applied to a monitoring section at the end of the backwater of a large reservoir. The section is 180m wide, 3-8m deep, with a slow flow velocity of 0.1-0.8m / s, extremely fine sediment particles with a median particle size of about 0.02-0.08mm, large water level fluctuations, and significant sediment settling effect.
[0067] 1. Monitoring setup: Four vertical lines are laid out transversely along the cross section, with three layers of measuring points on each line, for a total of 12 monitoring points; the turbidity range is selected from 0 to 200 NTU, and a high-precision flow velocity sensor is used; the acquisition frequency is set to 10 minutes / time.
[0068] 2. Model calibration: The model was fitted using 30 sets of calibration data at different water levels. Due to the fineness of the sediment particles, the particle size correction term coefficient was relatively small. The hydrodynamic correction term mainly considered the influence of water depth caused by water level changes, and the Froude number correction had a higher weight.
[0069] 3. Dynamic calibration: Calibrate once every 40 days during the non-flood season and once every 15 days during the flood season; the attenuation coefficient k is set to 0.02 / day to retain calibration data for a longer period of time, adapting to the relatively stable sediment characteristics of the backwater section.
[0070] 4. Application effect: The average relative error of the inversion under low sediment content in this embodiment is ≤7%, and the vertical concentration stratification characteristics are accurately inverted, which can effectively reflect the dynamic process of sediment deposition and siltation in the backwater section of the reservoir.
[0071] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for simultaneous monitoring of river water and sediment and inversion of sediment concentration, characterized in that: Includes the following steps: S1 deploys multi-source sensing units at the target river monitoring section to synchronously collect hydrodynamic parameters, optical parameters, and environmental parameters through a unified time reference. The hydrodynamic parameters include water level and three-dimensional flow velocity at each measuring point of the section, and the optical parameters include water turbidity and hyperspectral reflectance in the 350–1100 nm band. S2 performs time alignment and spatial coordinate unification on multi-source raw data, completes filtering and noise reduction, outlier removal, sensor-specific calibration and data normalization, and obtains a standardized dataset with spatiotemporal matching. S3 uses the power function relationship between turbidity and sediment concentration as the basic term, introduces the ratio of hyperspectral characteristic bands as a particle size correction factor, and couples flow velocity and Froude number as hydrodynamic correction factors to construct a multiplicative semi-empirical semi-mechanistic initial inversion model of sediment concentration. The initial model parameters are obtained by training with historical calibration data. S4 periodically collects on-site synchronous water samples and uses the measured sediment concentration as the true value. Combined with the current hydrological situation changes, the model parameters are dynamically updated using the exponential decay weighted recursive least squares method, while correcting the sensor zero-point drift. S5 calculates the instantaneous sediment concentration at each monitoring point of the cross section based on the calibrated inversion model. It obtains the two-dimensional sediment concentration distribution of the cross section in both the transverse and vertical directions through constrained spatial interpolation, and calculates and outputs the average sediment concentration, sediment transport rate, and sediment transport statistics of the cross section.
2. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S1, the unified time reference uses the PPS second pulse output by the GPS / BeiDou dual-mode time synchronization module to synchronously trigger all sensors, with a time synchronization accuracy better than ±1ms; the acquisition frequency can be configured as follows: 5-10 minutes / set during the normal hydrological period, 1-3 minutes / set during the flood season, and 30 seconds to 1 minute / set during the flood process.
3. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S1, 3 to 5 monitoring vertical lines are laid out along the transverse direction of the monitoring section. The distance between the left and right vertical lines and the bank is 1 / 5 to 1 / 4 of the total width of the section, and the middle vertical line is located in the middle channel of the river. Three layers of monitoring points are laid out on each vertical line according to the relative water depth: the surface point is located 0.3 to 0.8m below the water surface, the middle point is located at a relative water depth of 0.5 to 0.6m, and the bottom point is located 0.3 to 1.0m above the riverbed.
4. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S2, time registration uses cubic spline interpolation to resample and align sensor data of different frequencies to the standard timestamp, with a time synchronization error of ≤0.5 seconds; spatial registration establishes a local coordinate system for the cross section and dynamically corrects the vertical coordinates of each monitoring point according to the real-time water level.
5. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S2, the sensor-specific calibration includes: performing dark current correction and water background correction on hyperspectral data, temperature correction on turbidity data, and installation tilt angle correction on flow velocity data; outlier removal adopts the 3σ criterion combined with hydrological rationality verification to remove abrupt values caused by bubble interference and sensor anomalies.
6. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S3, the specific form of the initial inversion model is as follows: C=a× ×( / ×( / ×( / )×(Fr / In the formula: C is the sediment concentration; Turbidity; , , The reflectance values for the 680nm, 760nm, and 830nm wavelength bands are respectively. The velocity at the measuring point is Fr, where Fr is the Froude number. , , respectively, represent the average flow velocity and average Froude number during the calibration period, and a, b, c, d, e, and f are the model parameters to be estimated.
7. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S4, the on-site calibration frequency is: once every 30 days during the non-flood season, once every 10 days during the flood season, and once every 3 to 5 days during floods and water and sediment regulation periods. For each calibration, parallel water samples are collected simultaneously at all monitoring points, and the measured sediment concentration is determined by the drying and weighing method as the true value.
8. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S4, the weight calculation formula for the exponentially decaying weighted recursion is as follows: =exp(-k× ),in For the first The weight of the secondary calibration data For the first The number of days since the last calibration, where k is the decay coefficient, ranging from 0.02 to 0.05 per day; each time, the parameters are fitted using data from the most recent 4 to 6 calibrations to achieve rolling updates.
9. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S5, spatial interpolation adopts the Kriging interpolation method with water and sediment regularity constraints, and the variogram adopts a spherical model to generate a two-dimensional concentration distribution field with a horizontal resolution of 0.5m and a vertical resolution of 0.2m. The interpolation constraints include the distribution regularity that the bottom layer concentration is higher than the surface layer and the mid-water concentration is higher than the shore.
10. The method for simultaneous monitoring of river water and sediment and inversion of sediment concentration according to claim 1, characterized in that: In step S5, the cross-sectional sediment transport rate is calculated using the velocity-concentration area integral method: = ,in The two-dimensional sediment concentration distribution is shown. It is a two-dimensional velocity distribution. The cross-sectional area is represented by a unit; the daily, monthly, and annual sediment transport statistics are obtained based on the hourly sediment transport rate integral.
