A river online flow measurement and flood reporting method based on multi-source sensing fusion and adaptive decision

By establishing a corrected benchmark during the stable period and switching the measuring equipment during the flood season, and combining the rough set algorithm for data interpolation, the problem of decreased accuracy and missing flow measurement data in the existing technology is solved, and high-precision flow measurement with full process coverage is achieved.

CN123135014APending Publication Date: 2026-11-20YANGTZE RIVER WATER CONSERVANCY COMMISSION HYDROLOGY BUREAU UPPER YANGTZE RIVER HYDROLOGY & WATER RESOURCES SURVEY BUREAU
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611365630.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-04
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies lack a mechanism for adaptively switching measurement equipment according to different hydrological conditions, lack the ability to establish correction benchmarks using high-precision data from stable periods, and lack a method for interpolating flow velocity data based on vertical point riverbed characteristics and using rough set algorithms, resulting in decreased accuracy or loss of flow measurement data in complex environments.

Method used

By establishing a corrected benchmark using a dual-camera system and a mechanical current meter during the stable period, switching to a radar current meter during the flood season, and using a rough set algorithm based on riverbed characteristics to interpolate when data is missing, combined with a rough set rule base for intelligent interpolation.

Benefits of technology

It achieves high-precision flow measurement under complex hydrological conditions, solves the problem that a single device cannot cope with all scenarios, improves the accuracy and robustness of flow measurement during the flood season, and ensures the reliability of the system under extreme conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123135014A_ABST
    Figure CN123135014A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of hydrological monitoring, in particular to a river online flow measurement and flood reporting method based on multi-source sensing fusion and adaptive decision-making. The method comprises: a stable period benchmark establishment step, starting a dual-camera system and a mechanical flow meter synchronously, obtaining first measurement three-dimensional flow velocity information and first water surface measurement flow velocity information, and establishing correction benchmark information by correcting the latter with the former; a rising water period adaptive correction step, starting a radar flow meter to obtain second measurement three-dimensional flow velocity information when water surface floating objects reach a threshold, verifying the effectiveness of the correction benchmark information, correcting the second measurement three-dimensional flow velocity information with the correction benchmark information if the correction benchmark information is effective, and obtaining second correction three-dimensional flow velocity information; a missing data intelligent interpolation step, when vertical point data is missing, obtaining riverbed characteristic data corresponding to the missing vertical point, and interpolating the flow velocity data of the missing vertical point based on a rough set algorithm with the riverbed characteristic data as a judgment factor. The present application solves the technical problems of single device unable to cover all scenes, measurement precision decline and data loss in the rising water process through the time sequence coordination strategy of stable period high-precision calibration, rising water period adaptive correction and rough set intelligent interpolation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of hydrological monitoring technology, and in particular to an online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making. Background Technology

[0002] River flow monitoring is a fundamental task for hydrological forecasting, water resource management, and flood control and disaster reduction. Traditional river flow measurement methods mainly rely on single types of sensor equipment, such as mechanical current meters, acoustic Doppler current profilers (ADCP), or radar current meters.

[0003] Mechanical current meters (such as propeller current meters and cup current meters) are technologically mature and provide reliable measurement results, often used as accuracy benchmarks. However, as they are contact-based measurements, they are easily entangled by aquatic plants and floating debris, resulting in low measurement efficiency and unsuitability for high-velocity or large flood scenarios. ADCP utilizes the acoustic Doppler effect to quickly obtain cross-sectional velocity distribution, but it is sensitive to water conditions, experiencing severe signal attenuation in environments with high sediment content and abundant foam. Radar current meters employ non-contact measurement, making them suitable for harsh environments such as floods and high sediment concentrations. However, they can only measure surface velocity and cannot measure when the water surface is calm, and their accuracy is significantly affected by environmental factors.

[0004] In recent years, with the development of computer vision technology, image-based flow measurement methods (such as LSPIV) have gradually attracted attention. These methods calculate flow velocity by analyzing the motion trajectory of water ripples or tracers in videos, offering advantages such as non-contact and visualization. However, they are highly dependent on water surface texture and lighting conditions. While dual-camera stereo vision systems can reconstruct the three-dimensional morphology of the water surface and obtain three-dimensional flow velocity information, visual obstruction is severe during periods of high water levels when floating objects increase significantly, leading to a sharp decrease in measurement accuracy.

[0005] During floods, the rapid rise and fall of water levels, drastic increases in flow velocity, a significant increase in floating debris, and elevated sediment content often prevent single sensors from operating effectively throughout the entire period, leading to missing flow measurement data or a severe decrease in measurement accuracy. While existing technologies have proposed multi-sensor fusion schemes, these are mostly data-level fusions at the same time point or simple weighted fusions, failing to achieve adaptive sensor switching and time-series reference correction based on different hydrological conditions. For example, CN121881262A discloses a method for online river flow measurement using multi-source data fusion, employing a Bayesian neural network to interpolate data during sensor failure periods. However, its data fusion and interpolation are performed at the same time level, without addressing strategies for phased collaboration of multiple devices and "time-series reference correction" under different hydrological conditions.

[0006] Furthermore, when measurement data is missing, existing technologies mostly employ mean imputation, linear interpolation, or machine learning methods for interpolation, but rarely consider using vertical riverbed characteristics (such as vertical depth, riverbed topography, etc.) as judgment factors for interpolation. Rough set theory, as an effective data analysis tool for handling fuzzy and uncertain information, can extract decision rules from incomplete information, but its application in the field of river flow measurement data interpolation is still lacking.

[0007] In summary, the existing technology has the following shortcomings: 1. There is a lack of a mechanism for adaptively switching measurement equipment according to different hydrological conditions; 2. There is a lack of a "time series benchmark correction" strategy that utilizes high-precision data from the stable period to establish a correction benchmark and correct measurement data during the flood season; 3. There is a lack of methods for velocity data interpolation based on the characteristics of the vertical riverbed and using rough set algorithms. Summary of the Invention

[0008] On the one hand, this invention discloses an online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making. It is implemented through the following technical solution: S1, Steady-state period benchmark establishment steps: When the hydrological conditions are in a steady-state period, the dual-camera system and the mechanical current meter are started simultaneously to acquire the first three-dimensional flow velocity information and the first water surface flow velocity information; based on the first water surface flow velocity information, the first three-dimensional flow velocity information is corrected to establish the corrected benchmark information; S2, Adaptive correction step during rising water period: When the hydrological conditions enter the rising water period and the number and area of ​​floating objects on the water surface reach a preset threshold, the radar current meter is activated to acquire the second three-dimensional flow velocity information; the validity of the correction reference information is verified, and if valid, the second three-dimensional flow velocity information is corrected using the correction reference information to obtain the second corrected three-dimensional flow velocity information; S3, Intelligent imputation step for missing data: When the vertical point data of the second measured three-dimensional flow velocity information is missing, the riverbed characteristic data corresponding to the missing vertical point is obtained, and the flow velocity data of the missing vertical point is imputed based on the rough set algorithm, using the riverbed characteristic data as the judgment factor; wherein, the riverbed characteristic data includes at least the vertical point depth and the vertical point landform features. The interpolated flow velocity data is uploaded to the database in real time to enable water information dissemination.

[0009] Furthermore, the specific steps in S1 of "correcting the first measured three-dimensional flow velocity information based on the first water surface flow velocity information" include: From the first three-dimensional flow velocity information acquired by the dual-camera system, the three-dimensional flow velocity component along the same vertical line corresponding to the measurement position of the mechanical flow meter is extracted and denoted as... ,in Indicates the first One speed measuring vertical line; Obtain the mechanical flow meter at the corresponding vertical line Flow velocity measured at the location And calculate the velocity amplitude measured by the dual-camera system at the same vertical line. Then, the correction factor for the vertical line is calculated using the following formula. : Using the correction coefficient The three-dimensional flow velocity information of the entire field is corrected, and the corrected three-dimensional flow velocity of each point in the corrected reference information is obtained by the following formula. : in, This represents the three-dimensional flow velocity vector measured by the dual-camera system at any location across the entire field. Take the correction factor of the effective perpendicular line closest to the measurement point.

[0010] Furthermore, the specific steps in S2 for "verifying the validity of the corrected benchmark information" include: Obtain the cross-sectional average flow velocity measured by the current radar current meter. And obtain the cross-sectional average flow velocity from the corrected reference information. Calculate the deviation rate using the following formula. : like If so, the corrected reference information is deemed valid; like If the correction reference information is invalid, an emergency calibration process is triggered, and a backup strategy is used to rebuild the correction reference information. in, This is the preset deviation rate threshold.

[0011] Furthermore, the specific steps in S2 of "correcting the second measured three-dimensional flow velocity information using the corrected reference information" include: Obtain the velocity vector of any measuring point in the second three-dimensional velocity information measured by the radar velocimeter. And obtain the corrected three-dimensional flow velocity at the corresponding position in the corrected reference information. ; The second corrected three-dimensional flow velocity information is calculated using the following formula. : in, This is the initial measured flow velocity vector of the radar flowmeter under the operating conditions corresponding to the corrected reference information. The preset correction weight coefficient has a value range of [value range missing]. .

[0012] Furthermore, the specific steps in S3, "based on the rough set algorithm, using the riverbed characteristic data as a judgment factor, to interpolate the flow velocity data of the missing vertical points," include: S31. Construct a decision table: Obtain historical hydrological data, using the riverbed characteristic data as the set of conditional attributes. Using measured flow velocity as the decision attribute Construct a quadruple decision table ,in For the domain, For attribute value range, For information functions; S32. Attribute Reduction: Indistinguishable Relations Based on Rough Set Theory For the set of conditional attributes Perform attribute reduction, eliminate redundant attributes, and obtain the minimum set of attributes after reduction. ; S33. Rule extraction and interpolation: Based on the aforementioned minimum attribute set Generate decision rules ,in For the first equivalence classes In attribute set The description above, Describe the corresponding flow velocity value; obtain the riverbed characteristic data of the missing vertical point, match it with the decision rule, and output the corresponding interpolated flow velocity value.

[0013] Furthermore, the attribute reduction employs a method based on attribute importance, calculating the attribute using the following formula. Relative to decision attributes Importance : in, Indicates in the attribute set Next pair of decision attributes The positive domain, The cardinality of a set; Based on the importance Select attributes in descending order of size until the classification ability of the subset matches that of the complete attribute set, thus obtaining the minimum attribute set. .

[0014] Furthermore, in S1, the dual-camera system is a binocular stereo vision system that reconstructs the three-dimensional shape of the water surface using the parallax method; the mechanical current meter is a propeller-type current meter or a cup-type current meter.

[0015] Further, in S2, the preset threshold is a combined threshold of floating object area coverage and floating object number density. When the area coverage of floating objects on the water surface... And the number density of floating objects When the preset threshold is reached, the radar flow meter is triggered to start measurement and switch to the flood season measurement mode.

[0016] Furthermore, in S3, the riverbed characteristic data also includes riverbed substrate type and cross-sectional morphological characteristics; the vertical geomorphological characteristics include riverbed slope and local concavity / convexity.

[0017] On the other hand, this invention also discloses a river flow measurement system based on multi-source sensor fusion and adaptive decision-making, which is implemented through the following technical solution, including: A dual-camera system is used to acquire the first measurement of three-dimensional flow velocity information when hydrological conditions are stable. Mechanical current meter is used to obtain flow velocity information at the first water surface when hydrological conditions are stable. A radar current meter is used to acquire second-dimensional flow velocity information when hydrological conditions enter the flood season and the number and area of ​​floating objects on the water surface reach a preset threshold. The data fusion and decision module is used to execute the above method steps. It also includes a rough set interpolation unit. The rough set interpolation unit has a built-in rough set rule library. The rough set rule library is trained and generated using riverbed characteristic data in historical hydrological data as conditional attributes and measured flow velocity as decision attributes.

[0018] Due to the adoption of the above technical solutions, the present invention has the following beneficial effects: 1. The invention implements a "time-series reference correction" mechanism: The invention utilizes a dual-camera system during the stable period to work in conjunction with a mechanical current meter to establish high-precision correction reference information. During the flood season when the mechanical current meter can still operate, this reference is used to correct the measurement data of the radar current meter, effectively solving the problem of accuracy drift of the radar current meter in complex environments and significantly improving the accuracy of flow measurement during the flood season.

[0019] 2. Achieved adaptive switching of multiple devices: Based on hydrological conditions (stable period / flood period) and floating object quantity / area threshold, this invention automatically switches measurement devices and measurement strategies, achieving full-process coverage from "high-precision calibration during the stable period" to "adaptive correction during the flood period" and then to "intelligent interpolation in case of extreme missing data", solving the industry pain point that a single device cannot cope with all scenarios.

[0020] 3. A flow velocity interpolation method based on rough set theory and riverbed characteristics is proposed: This invention introduces rough set theory into the field of river flow measurement data interpolation, and constructs decision rules using riverbed characteristic data such as vertical point depth and vertical point topography as judgment factors. When measurement data is missing, intelligent interpolation is performed, filling the technical gap in this field.

[0021] 4. A dynamic verification mechanism for benchmark validity is introduced: This invention dynamically verifies the validity of the corrected benchmark information by calculating and judging the deviation rate in real time, and automatically triggers the emergency calibration process when the benchmark fails, thus ensuring the robustness and reliability of the system under complex hydrological conditions.

[0022] Other advantages, objectives, and features of the invention will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination, or may be learned from practice of the invention. The objectives and other advantages of the invention can be realized and obtained through the following description. Attached Figure Description

[0023] The accompanying drawings of this invention are described below.

[0024] Figure 1 This is a flowchart illustrating the overall process of the online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to the present invention. Figure 2 This is a flowchart illustrating the steps for establishing the stationary period benchmark in this invention. Figure 3 This is a flowchart illustrating the adaptive correction steps during the flood season of the present invention. Figure 4 This is a flowchart illustrating the steps of intelligent imputation of missing data based on the rough set algorithm of this invention. Detailed Implementation The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0025] Example 1: This embodiment provides a method for online river flow measurement and flood reporting based on multi-source sensor fusion and adaptive decision-making. The following equipment is deployed at an appropriate location upstream of a certain river flow measurement section (avoiding obstacles such as bridges and bends that affect the flow pattern): Dual-camera system: Industrial cameras are installed on both banks of the river to form a binocular stereo vision system. The baseline distance between the two cameras is determined based on the river width, typically 1 / 10 to 1 / 5 of the river width. The optical axes of the cameras are pointed towards the area of ​​the water surface to be measured, ensuring that the fields of view of the two cameras overlap and cover the entire flow measurement section. The dual-camera system reconstructs the three-dimensional morphology of the water surface using the parallax method to obtain full-field three-dimensional surface velocity information.

[0026] Mechanical current meter: A propeller-type current meter or a cup-type current meter is set up on several key vertical lines of the flow measurement section (such as the position of the main flow line, near the left and right banks, etc.) to obtain high-precision flow velocity values ​​at a single point.

[0027] Radar current meter: A side-scanning radar or fixed-point radar current meter is installed on one or both banks of the river channel for non-contact measurement of water surface velocity during high water periods. In this embodiment, the radar current meter uses a phased array radar with multi-beam combining capability to acquire three-dimensional flow velocity information.

[0028] Data fusion and decision-making module: Located in the data processing center on the shore, it connects to the above-mentioned devices via wired or wireless communication to receive and process measurement data.

[0029] like Figure 1 As shown, the specific flow measurement steps are as follows: S1. Establishment of a benchmark during a stable period When hydrological conditions are stable (i.e., non-flood season, with gentle changes in water level and flow, and few floating objects on the water surface), the dual-camera system and mechanical current meter are activated simultaneously, such as... Figure 2 As shown.

[0030] The dual-camera system simultaneously captures images of the water surface, reconstructs the three-dimensional morphology of the water surface using the parallax method, and obtains the first three-dimensional flow velocity information at each point of the flow measurement section.

[0031] Mechanical flow meter in the first A velocity measuring vertical line measures the flow velocity value. .

[0032] From the first three-dimensional velocity information acquired by the dual-camera system, the three-dimensional velocity component along the same vertical line corresponding to the measurement position of the mechanical flow meter is extracted. Calculate the velocity amplitude measured by the dual-camera system at this vertical line. The correction factor for the vertical line is calculated using the following formula. : In this embodiment, five velocity measurement vertical lines are evenly arranged on the flow measurement cross section (located on the left bank, left-middle, main stream, right-middle, and right bank, respectively), and the correction coefficient for each vertical line is calculated. , , , , .

[0033] The three-dimensional flow velocity information across the entire field is corrected using a correction factor. For any location in the entire field, the correction factor of the nearest valid perpendicular line is taken. The corrected three-dimensional flow velocity is obtained by using the following formula. : This establishes corrected baseline information, including the corrected three-dimensional velocity distribution across the entire field and related operating parameters (water level, flow rate, water temperature, etc.), which is then stored in a database.

[0034] S2, Adaptive Correction During High Water Levels As water levels rise and the flood season begins, the system monitors the number and area of ​​floating debris on the water surface in real time. For example... Figure 3 As shown, when the area coverage of floating objects on the water surface... (In this embodiment) (Take 15%) and the number density of floating objects (In this embodiment) When 5 samples are taken per 100m², the preset threshold is reached, triggering the radar flow meter to start measurement and switching to the flood season measurement mode.

[0035] Radar velocimeter acquires second-dimensional flow velocity information .

[0036] Before using the corrected baseline information for correction, the validity of the corrected baseline information must first be verified. Specifically: Obtain the cross-sectional average flow velocity measured by the current radar current meter. And retrieve the cross-sectional average flow velocity from the corrected reference information in the database. Calculate the deviation rate using the following formula. : In this embodiment, a preset deviation rate threshold is used. Take 5%.

[0037] like If the baseline information is found to be valid, the correction process will proceed.

[0038] like If the error occurs, the corrected baseline information is deemed invalid, triggering an emergency calibration process. The emergency calibration process includes: using a radar current meter mounted on a UAV for rapid cross-sectional scanning measurements, or temporarily reconstructing the corrected baseline information using historical data from similar hydrological conditions.

[0039] After the baseline information is verified to be valid, the second measurement of three-dimensional flow velocity information is corrected using the corrected baseline information. For any measurement point measured by the radar current meter, the flow velocity vector... Obtain the reference velocity vector at the corresponding location from the corrected reference information. The second corrected three-dimensional flow velocity information is calculated using the following formula: in, This is the initial measured velocity vector of the radar current meter under the working conditions corresponding to the corrected reference information (i.e., the measured value of the radar current meter at the same position when the reference is established). These are preset correction weighting coefficients. In this embodiment, Take 0.7.

[0040] S3, Intelligent Imputation of Missing Data When the second measurement of three-dimensional flow velocity information by the radar current meter results in missing vertical point data (e.g., due to signal obstruction, equipment failure, extreme water flow conditions, etc., resulting in the inability to obtain valid data for one or more vertical lines), the rough set intelligent interpolation module is triggered, such as... Figure 4 As shown.

[0041] S31. Constructing a decision table Obtain historical hydrological data for the target river channel. Use riverbed characteristic data as the conditional attribute set. Using measured flow velocity as the decision attribute Construct a quadruple decision table .

[0042] In this embodiment, the condition attribute set ,in: Vertical point depth (discretized into three levels: "shallow", "medium", and "deep") Vertical landform features (discretized into three levels: "flat", "gentle slope", and "steep slope") Riverbed sediment type (discretized into three levels: "silt", "gravel", and "bedrock") Riverbed slope (discretized into three levels: "gentle", "medium", and "steep") Local concavity / convexity (discretized into three levels: "concave", "flat", and "convex") Decision attributes The measured flow velocity is discretized into three levels: "slow", "medium" and "fast".

[0043] Domain It consists of a sample of perpendicular points from various historical measurements. Information function. Map the values ​​of each sample on each attribute to the corresponding attribute values.

[0044] S32, Attribute Reduction Indistinguishable relations based on rough set theory For the set of conditional attributes Perform attribute reduction.

[0045] The attribute importance-based method is used to calculate the attribute using the following formula. Relative to decision attributes Importance : in, Indicates in the attribute set Next pair of decision attributes The positive domain.

[0046] Based on the importance Select attributes in descending order of size until the classification ability of the subset matches that of the complete attribute set, thus obtaining the minimum attribute set. .

[0047] In this embodiment, the minimum set of attributes is determined after attribute reduction. In other words, the three attributes of vertical depth, vertical geomorphological features, and riverbed slope play a decisive role in flow velocity decision, while riverbed substrate type and local unevenness are considered redundant attributes.

[0048] S33, Rule Extraction and Interpolation Based on the minimum attribute set Generate decision rules .

[0049] The typical decision rules extracted in this embodiment include: Rule 1: If (vertical point depth = "deep") and (vertical point topography = "flat") and (riverbed slope = "gentle"), then (flow velocity = "slow").

[0050] Rule 2: If (vertical point depth = "shallow") and (vertical point topography = "steep slope") and (riverbed slope = "steep"), then (flow velocity = "fast").

[0051] Rule 3: If (vertical point depth = "medium") and (vertical point topography = "gentle slope") and (riverbed slope = "medium"), then (flow velocity = "medium").

[0052] When flow velocity data for a certain vertical point is missing, the riverbed characteristic data (vertical point depth, vertical point geomorphological features, riverbed slope, etc.) of the missing vertical point are obtained and matched with the above decision rules. If a unique rule is matched, the flow velocity value corresponding to that rule is directly output as the interpolation result; if multiple rules are matched, the final interpolated flow velocity value is determined by voting or averaging.

[0053] In this embodiment, the riverbed characteristic data lacking vertical points prioritizes the use of the latest water depth profile data measured by the mobile ADCP before or during the rise in water level, as well as real-time water surface morphology information derived from dual-camera system or radar current meter data, to ensure the timeliness and accuracy of the input data.

[0054] A verification test was conducted on a river channel. The test channel was approximately 160m wide, and five velocity measuring vertical lines were set at the flow measurement cross-section. The test results showed that: During the stable period, after correction by the mechanical flow meter, the accuracy of the overall flow velocity measurement of the dual-camera system was improved by about 35% compared with that before the correction, and the average relative error after correction was less than 3%.

[0055] During the flood season, after the correction of the reference information, the measurement accuracy of the radar current meter improved by about 28% compared with the uncorrected version, effectively solving the problem of accuracy drift of the radar current meter in complex environments.

[0056] When radar current meter data is missing, the average relative error between the interpolation result based on rough set algorithm and the measured value is 6.8%, which meets the accuracy requirements of hydrological flow measurement.

[0057] Example 2: This embodiment provides a river flow measurement system based on multi-source sensor fusion and adaptive decision-making, including: A dual-camera system is used to acquire initial three-dimensional flow velocity information when hydrological conditions are stable. The dual-camera system is a binocular stereo vision system, consisting of two industrial cameras and their synchronization triggers. The two cameras are respectively installed on both banks of the river, with their optical axes pointing towards the area of ​​the water surface to be measured. The three-dimensional morphology of the water surface is reconstructed using the parallax method.

[0058] Mechanical current meters are used to obtain flow velocity information at the first water surface during periods of stable hydrological conditions. These mechanical current meters are propeller-type current meters, installed at each velocity measurement vertical line on the flow measurement section, and suspended at the predetermined measurement depth by lead weights.

[0059] A radar current meter is used to acquire three-dimensional flow velocity information when hydrological conditions enter the rising water period and the number and area of ​​floating objects on the water surface reach a preset threshold. The radar current meter is a phased array radar current meter with multi-beam synthesis capability, capable of acquiring three-dimensional flow velocity components and flow direction angle.

[0060] The data fusion and decision-making module is communicatively connected to the dual-camera system, the mechanical current meter, and the radar current meter, and includes: Reference establishment unit: used to receive measurement data from the dual-camera system and mechanical current meter during the stationary period, perform correction coefficient calculation and full-field flow velocity correction, and establish and store correction reference information; Adaptive correction unit: used to receive measurement data from radar current meter during the flood season, perform validity verification of correction reference information, and correct the measurement data of radar current meter using correction reference information when valid; Rough set interpolation unit: It has a built-in rough set rule library, which is trained and generated using riverbed characteristic data in historical hydrological data as conditional attributes and measured flow velocity as decision attributes. When the measurement data of the radar current meter has missing vertical points, the rough set interpolation unit obtains the riverbed characteristic data of the missing vertical points, matches the decision rules in the rough set rule library, and outputs the interpolated flow velocity value.

[0061] The online river flow measurement and flood reporting method and system based on multi-source sensor fusion and adaptive decision-making provided by this invention can be widely applied to hydrological monitoring stations, flood early warning systems, water resource management platforms, and other scenarios for various rivers. This invention effectively solves the technical problems of single-device inability to cover the entire scene, decreased measurement accuracy, and data loss during rising water levels through the temporal coordination of multi-source sensors and adaptive decision-making. It has significant practical value and promising prospects for widespread application.

[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for online river flow measurement and flood reporting based on multi-source sensor fusion and adaptive decision-making, characterized in that, Includes the following steps: S1, Steady-state period benchmark establishment steps: When the hydrological conditions are in a steady-state period, the dual-camera system and the mechanical current meter are started simultaneously to acquire the first three-dimensional flow velocity information and the first water surface flow velocity information; based on the first water surface flow velocity information, the first three-dimensional flow velocity information is corrected to establish the corrected benchmark information; S2, Adaptive correction step during rising water period: When the hydrological conditions enter the rising water period and the number and area of ​​floating objects on the water surface reach a preset threshold, the radar current meter is activated to acquire the second three-dimensional flow velocity information; the validity of the correction reference information is verified, and if valid, the second three-dimensional flow velocity information is corrected using the correction reference information to obtain the second corrected three-dimensional flow velocity information; S3, Intelligent imputation step for missing data: When the vertical point data of the second measured three-dimensional flow velocity information is missing, the riverbed characteristic data corresponding to the missing vertical point is obtained, and the flow velocity data of the missing vertical point is imputed based on the rough set algorithm, using the riverbed characteristic data as the judgment factor; wherein, the riverbed characteristic data includes at least the vertical point depth and the vertical point landform features. The interpolated flow velocity data is uploaded to the database in real time to enable water information dissemination.

2. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, The specific steps in S1, "correcting the first measured three-dimensional flow velocity information based on the first water surface flow velocity information," include: From the first measured three-dimensional flow velocity information acquired by the dual-camera system, the three-dimensional flow velocity component along the same vertical line corresponding to the measurement position of the mechanical flow meter is extracted and denoted as... ,in Indicates the first One speed measuring vertical line; Obtain the mechanical flow meter at the corresponding vertical line Flow velocity measured at the location And calculate the velocity amplitude measured by the dual-camera system at the same vertical line. Then, the correction factor for the vertical line is calculated using the following formula. : Using the correction coefficient The three-dimensional flow velocity information of the entire field is corrected, and the corrected three-dimensional flow velocity of each point in the corrected reference information is obtained by the following formula. : in, This represents the three-dimensional flow velocity vector measured by the dual-camera system at any location across the entire field. Take the correction factor of the effective perpendicular line closest to the measurement point.

3. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, The specific steps in S2 for "verifying the validity of the corrected benchmark information" include: Obtain the cross-sectional average flow velocity measured by the current radar current meter. And obtain the cross-sectional average flow velocity from the corrected reference information. Calculate the deviation rate using the following formula. : like If so, the corrected reference information is deemed valid; like If the correction reference information is invalid, an emergency calibration process is triggered, and a backup strategy is used to rebuild the correction reference information. in, This is the preset deviation rate threshold.

4. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, The specific steps in S2 of "correcting the second measured three-dimensional flow velocity information using the corrected reference information" include: Obtain the velocity vector of any measuring point in the second three-dimensional velocity information measured by the radar velocimeter. And obtain the corrected three-dimensional flow velocity at the corresponding position in the corrected reference information. ; The second corrected three-dimensional flow velocity information is calculated using the following formula. : in, This is the initial measured flow velocity vector of the radar flowmeter under the operating conditions corresponding to the corrected reference information. The preset correction weight coefficient has a value range of [value range missing]. .

5. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, The specific steps in S3, "based on the rough set algorithm, using the riverbed characteristic data as a judgment factor, to interpolate the flow velocity data of the missing vertical points," include: S31. Construct a decision table: Obtain historical hydrological data, using the riverbed characteristic data as the set of conditional attributes. Using measured flow velocity as the decision attribute Construct a quadruple decision table ,in For the domain, For attribute value range, For information functions; S32. Attribute Reduction: Indistinguishable Relations Based on Rough Set Theory For the set of conditional attributes Perform attribute reduction, eliminate redundant attributes, and obtain the minimum set of attributes after reduction. ; S33. Rule extraction and interpolation: Based on the aforementioned minimum attribute set Generate decision rules ,in For the first equivalence classes In attribute set The description above, Describe the corresponding flow velocity value; obtain the riverbed characteristic data of the missing vertical point, match it with the decision rule, and output the corresponding interpolated flow velocity value.

6. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 5, characterized in that, The attribute reduction uses a method based on attribute importance, and the attributes are calculated using the following formula. Relative to decision attributes Importance : in, Indicates in the attribute set Next Decision Attributes The positive domain, The cardinality of a set; Based on the importance Select attributes in descending order of size until the classification ability of the subset matches that of the complete attribute set, thus obtaining the minimum attribute set. .

7. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, In S1, the dual-camera system is a binocular stereo vision system that reconstructs the three-dimensional shape of the water surface using the parallax method; the mechanical current meter is a propeller-type current meter or a cup-type current meter.

8. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, In step S2, the preset threshold is a combined threshold of floating object area coverage and floating object number density. When the area coverage of floating objects on the water surface... And the number density of floating objects When the preset threshold is reached, the radar flow meter is triggered to start measurement and switch to the flood season measurement mode.

9. The online river flow measurement and flood reporting method based on multi-source sensor fusion and adaptive decision-making according to claim 1, characterized in that, In S3, the riverbed characteristic data also includes riverbed substrate type and cross-sectional morphological characteristics; The vertical geomorphological features include riverbed slope and local unevenness.

10. A river flow measurement system based on multi-source sensor fusion and adaptive decision-making, characterized in that, include: A dual-camera system is used to acquire the first measurement of three-dimensional flow velocity information when hydrological conditions are stable. Mechanical current meter is used to obtain flow velocity information at the first water surface when hydrological conditions are stable. A radar current meter is used to acquire second-dimensional flow velocity information when hydrological conditions enter the flood season and the number and area of ​​floating objects on the water surface reach a preset threshold. The data fusion and decision module is used to perform the steps of the method as described in any one of claims 1 to 9, and further includes a rough set interpolation unit, wherein the rough set interpolation unit has a built-in rough set rule base, which is trained and generated using riverbed characteristic data in historical hydrological data as conditional attributes and measured flow velocity as decision attributes.

Citation Information

Patent Citations

  • River flow online measuring and calculating method based on multi-source data fusion

    CN121881262A