Electromagnetic valve leak test apparatus

By designing a solenoid valve sealing performance testing device, and utilizing a combination of upstream and downstream pipelines and flow meters, the problems of slow speed and unintuitive results in existing testing methods are solved. This enables a quantitative assessment of the sealing and flow performance of solenoid valves, improving the accuracy and reliability of the testing.

CN123135348APending Publication Date: 2026-11-20HUBEI CHUANGSINUO ELECTRICAL TECH CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611539137.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing methods for testing the sealing performance of solenoid valves are slow, the results are not intuitive or easy to quantify, and it is difficult to quickly determine the flow effect.

Method used

A solenoid valve sealing performance testing device was designed, including an upstream pipe, a downstream pipe, a flow meter, and a water circulation mechanism. The flow meter monitors the upstream and downstream flow rates to compare and quantitatively evaluate the sealing and flow performance of the solenoid valve.

Benefits of technology

This technology enables quantitative testing of the sealing and flow performance of solenoid valves, improving testing accuracy and traceability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123135348A_ABST
    Figure CN123135348A_ABST
Patent Text Reader

Abstract

The present application belongs to the technical field of electromagnetic valve performance detection, and particularly relates to a kind of electromagnetic valve sealing test equipment, including test cabinet and the test bench located in test cabinet side;It also includes: upstream pipeline, is installed on test bench by support assembly, and upstream pipeline is connected with flowmeter;Downstream pipeline is also installed on test bench by support assembly, and downstream pipeline is also connected with flowmeter;Test fixture is also installed on test bench by support assembly, for fixing the electromagnetic valve to be tested, and makes the inlet pipe of electromagnetic valve and upstream pipeline sealed communication, and the outlet pipe of electromagnetic valve and downstream pipeline sealed communication;And water circulation mechanism is installed on test cabinet, for transporting fluid to upstream pipeline, and the fluid flowing out of downstream pipeline is collected and circulated into upstream pipeline;The test equipment of the present application can change the detection of electromagnetic valve sealing performance and flow performance from traditional manual judgment to quantitative data judgment, improve detection accuracy and traceability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of electromagnetic valve performance testing technology, and in particular relates to an electromagnetic valve sealing performance testing device. Background Technology

[0002] Solenoid valves are automatic valves controlled by electrical signals. The core principle is: energizing / de-energizing → the electromagnetic coil generates magnetic force → driving the valve core to move → opening or closing the fluid passage, used to control the flow and switching of gas and liquid. Solenoid valves used in new energy vehicles are mainly thermal management water circuit solenoid valves + heat pump refrigerant valves + EHB brake solenoid valves.

[0003] The flow and sealing performance of a solenoid valve are usually related to whether there is leakage when the valve is closed. Therefore, the performance of the solenoid valve needs to be tested before it leaves the factory. Some existing testing methods mainly rely on pressure changes or manual observation, which have problems such as slow testing speed, unintuitive results or difficulty in quantification, making it difficult to quickly and directly judge the flow effect of the solenoid valve. Summary of the Invention

[0004] To solve the above-mentioned technical problems, the present invention is achieved through the following technical solution: This invention relates to a solenoid valve sealing performance testing device, comprising a test cabinet and a test platform located on one side of the test cabinet; further comprising: an upstream pipe, mounted on the test platform via a support assembly, and connected to a flow meter; a downstream pipe, also mounted on the test platform via a support assembly, positioned opposite to the upstream pipe, and also connected to a flow meter; a test fixture, also mounted between the upstream and downstream pipes via a support assembly, for fixing the solenoid valve to be tested, and ensuring a sealed connection between the inlet pipe and the upstream pipe, and a sealed connection between the outlet pipe and the downstream pipe; and a water circulation mechanism, mounted on the test cabinet, for supplying fluid to the upstream pipe and collecting and circulating the fluid flowing out of the downstream pipe back into the upstream pipe.

[0005] Furthermore, the support assembly includes a support block, a guide rod, a slide, a sleeve, a support base plate, and a pipe support; The test bench is equipped with at least four symmetrical support blocks, and a guide rod is installed between each pair of symmetrical support blocks. At least four slides are movably connected to each guide rod, and a sleeve is installed on each slide that fits onto the guide rod. A locking screw that abuts against the guide rod is installed on the sleeve. The same support base plate is installed on each pair of symmetrical slides, and a pipe bracket for supporting the upstream and downstream pipes is installed on each support base plate.

[0006] Furthermore, the test fixture includes a connecting support plate, a valve body bracket, a first clamping plate, a second clamping plate, a quick-change plug, and a quick-change connector; A connecting support plate connects the two supporting base plates, and a valve body bracket for supporting the solenoid valve is installed on the connecting support plate. A first clamping plate is installed on the pipe fitting bracket on one of the supporting base plates connected to the connecting support plate, and a second clamping plate is installed on the pipe fitting bracket on the other supporting base plate connected to the connecting support plate. A quick-connect plug communicating with the upstream pipe is installed on the first clamping plate, and a quick-connect coupling communicating with the downstream pipe is installed on the second clamping plate. The quick-connect plug is inserted into the inlet pipe of the solenoid valve in a plugged-in state, and the quick-connect coupling fits into the outlet pipe of the solenoid valve.

[0007] Furthermore, the quick-connect plug includes a connecting ring detachably mounted on the first clamp and communicating with the port of the upstream pipe, and a mating tube mounted on the connecting ring and inserted into the inlet of the solenoid valve.

[0008] Furthermore, the quick-connect coupling includes a docking ring that is detachably mounted on the second clamp and communicates with the port of the downstream pipe. The docking ring has a countersunk hole for docking with the outlet of the solenoid valve. A notched support ring is detachably mounted on the docking ring, and the notched support ring has a U-shaped notch with the groove facing upward. The U-shaped notch is used to support the outlet pipe of the solenoid valve.

[0009] Furthermore, a pushing guide assembly is installed between the first clamping plate and the second clamping plate, and the pushing guide assembly includes a hinge ball, a guide rod, a connecting block, a fixing block, a nut, and an adjusting screw. The downstream pipe is movably mounted on one of the pipe fitting supports, and the second clamping plate is movably mounted on the pipe fitting support. Both the first and second clamping plates have notches at their ends. A hinge ball is rotatably mounted on the notch of the first clamping plate, and a guide rod passing through the notch of the second clamping plate is mounted on the hinge ball. A connecting block is mounted on the top of the second clamping plate, and a fixed block is mounted on the top of the pipe fitting support near the second clamping plate. A nut threadedly connected to an adjusting screw is mounted on the fixed block, and the rod of the adjusting screw passes through the fixed block and connects to the connecting block.

[0010] Furthermore, the second clamping plate is equipped with a lifting and limiting assembly for limiting the guide rod. The lifting and limiting assembly includes a U-shaped bracket, an L-shaped bracket, a bottom pad, a first internal threaded sleeve, a threaded connecting rod, and an elastic element. The second clamping plate has a downward-facing U-shaped bracket movably mounted on its side near the pipe fitting support. The vertical bars on both sides of the U-shaped bracket have notches and grooves that mate with the guide rod. An L-shaped bracket is mounted on the crossbar of the U-shaped bracket. The horizontal frame of the L-shaped bracket extends to one side of the connecting block. A bottom pad is mounted on the second clamping plate on the side of the connecting block. A first internal threaded sleeve is installed inside the bottom pad. The threaded connecting rod moves through the horizontal frame of the L-shaped bracket and is threadedly connected to the first internal threaded sleeve. An elastic element for lifting the U-shaped bracket is connected between the bottom pad and the horizontal frame of the L-shaped bracket.

[0011] Furthermore, the lifting and limiting assembly also includes a second internal threaded sleeve. The connecting support block is equipped with a second internal threaded sleeve that is threadedly connected to the adjusting screw. An annular groove is provided at the connection between the adjusting screw and the second internal threaded sleeve. A notch limiting groove that mates with the annular groove is provided on the crossbar of the U-shaped bracket. The width of the annular groove is the same as the thickness of the U-shaped bracket.

[0012] Furthermore, the water circulation mechanism includes a collection tank, a guide pipe, a water pump, a delivery pipe, a filter tank, and a connecting pipe; Below the test bench is a collection tank for collecting fluid discharged from the downstream pipeline. The bottom of the collection tank is connected to a water pump installed inside the test cabinet through a guide pipe. The outlet of the water pump is connected to the inlet of the filter tank through a delivery pipe. The outlet of the filter tank is connected to the outlet of the upstream pipeline through a connecting pipe.

[0013] Furthermore, a sensor is installed on the upstream pipeline via a tee, and both the upstream and downstream pipelines are equipped with on / off valves.

[0014] The present invention has the following beneficial effects: This invention utilizes an upstream pipe, flow meter, test fixture, and downstream pipe mounted on a test bench. The test fixture can hold and fix different models of solenoid valves under test. The flow meter, connected to the upstream and downstream pipes respectively, can monitor the flow rate of the fluid in the upstream and downstream pipes. By comparing the upstream and downstream flow rates, the sealing and flow performance of the solenoid valve can be evaluated more comprehensively. This invention enables the testing equipment of this invention to transform the detection of the sealing and flow performance of solenoid valves from traditional manual judgment to quantitative data judgment, improving the accuracy and traceability of the detection.

[0015] Of course, any product implementing this invention does not necessarily need to achieve all of the advantages described above at the same time. Attached Figure Description

[0016] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 This is a schematic diagram of the overall structure of the testing equipment according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the internal structure of the test cabinet according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of the support assembly on the test bench according to an embodiment of the present invention; Figure 4 This is a first-view view of the test fixture according to an embodiment of the present invention; Figure 5 This is a second-view view of the test fixture according to an embodiment of the present invention; Figure 6 This is a schematic diagram of the structure of the quick-change plug according to an embodiment of the present invention; Figure 7 This is an exploded view of the assembly of the pipe fitting bracket and the second clamping plate according to an embodiment of the present invention; Figure 8 This is a schematic diagram of the structure of the quick-connect coupling according to an embodiment of the present invention.

[0018] In the diagram: 1. Test cabinet; 2. Test bench; 3. Upstream pipelines; 4. Flow meter; 5. Downstream pipelines; 6. Bracket assembly; 61. Support block; 62. Guide rod; 63. Slide table; 64. Sleeve; 65. Support base plate; 66. Pipe fitting bracket; 7. Test fixture; 71. Connecting support plate; 72. Valve body bracket; 73. First clamping plate; 74. Second clamping plate; 75. Quick-change plug; 751. Connecting ring; 752. Butt fitting tube; 76. Quick-change connector; 761. Butt fitting ring; 762. Butt countersunk hole; 763. Notched support ring; 764. U-shaped notch; 8. Push guide assembly; 81. Hinge ball; 82. Guide rod; 83. Connecting block; 84. Fixing block; 85. Nut; 86. Adjusting screw; 861. Annular groove; 9. Lifting limit assembly; 91. U-shaped bracket; 911. Notch groove; 912. Notch limiting groove; 92. L-shaped bracket; 93. Bottom pad; 94. First internal threaded sleeve; 95. Threaded connecting rod; 96. Elastic element; 97. Second internal threaded sleeve; 10. Water circulation mechanism; 101. Collection tank; 102. Guide pipe; 103. Water pump; 104. Delivery pipe; 105. Filter tank; 106. Connecting pipe. Detailed Implementation

[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] In the description of this invention, it should be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inner", "around", etc., which indicate orientation or positional relationship, are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the components or elements referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as limiting this invention.

[0021] Please see Figures 1-8 As shown, the present invention is a solenoid valve sealing performance testing device, including a test cabinet 1 and a test platform 2 located on one side of the test cabinet 1; it also includes: an upstream pipe 3, which is mounted on the test platform 2 via a bracket assembly 6, and a flow meter 4 is connected to the upstream pipe 3; a downstream pipe 5, which is also mounted on the test platform 2 via a bracket assembly 6, and is opposite to the upstream pipe 3, and a flow meter 4 is also connected to the downstream pipe 5; a test fixture 7, which is also mounted between the upstream pipe 3 and the downstream pipe 5 via a bracket assembly 6, for fixing the solenoid valve to be tested, and sealing the inlet pipe of the solenoid valve with the upstream pipe 3 and the outlet pipe of the solenoid valve with the downstream pipe 5; and a water circulation mechanism 10, which is mounted on the test cabinet 1, for conveying fluid to the upstream pipe 3 and collecting and circulating the fluid flowing out of the downstream pipe 5 back to the upstream pipe 3; More specifically, a sensor is installed on the upstream pipe 3 via a tee pipe, and both the upstream pipe 3 and the downstream pipe 5 are equipped with on / off valves; It should be noted that the test cabinet 1 is equipped with a control valve group, a data acquisition module and a control system, and the test bench 2 is equipped with a switch button, which is connected to the control system via an electrical signal; the sensor is preferably either a pressure sensor or a temperature sensor; the flow meter 4 on the upstream pipe 3 can be directly connected to the upstream pipe 3, while the flow meter 4 on the downstream pipe 5 can be connected via a flexible hose; and the switch valve can be either an electromagnetic switch valve or a handle switch valve. Specifically, the working principle of the solenoid valve sealing performance testing equipment of the present invention is as follows: First, adjust the structure of the test fixture 7 according to the size of the solenoid valve to be tested. Then, clamp the solenoid valve to be tested onto the test bench 2 through the test fixture 7, and connect the inlet pipe of the solenoid valve to the upstream pipe 3 and the outlet pipe to the downstream pipe 5. Connect the water inlet of the upstream pipe 3 to the water circulation mechanism 10, and connect the drain outlet of the downstream pipe 5 to the recovery end of the water circulation mechanism 10. Second, when it is necessary to test whether the solenoid valve has leakage or poor sealing, the solenoid valve should be closed first, then the switch valve on the upstream pipe 3 should be opened, and then the water circulation mechanism 10 should be turned on. At this time, the water circulation mechanism 10 will transport fluid to the upstream pipe 3. The flow meter 4 will monitor the flow rate of the fluid in the upstream pipe 3, and the pressure sensor can monitor the pressure in the upstream pipe 3. Since the solenoid valve is in the closed state, theoretically no fluid should enter the downstream pipe 5, and the flow meter 4 connected to the downstream pipe 5 will not be able to detect the flow. If the flow meter 4 on the downstream pipe 5 detects a flow rate exceeding the threshold, it indicates that the solenoid valve has leakage or poor sealing. Third, when it is necessary to test whether the solenoid valve is unobstructed, whether there is a blockage or abnormal throttling, the solenoid valve needs to be opened, and then the switch valves on the upstream pipe 3 and the downstream pipe 5 need to be opened. Then the water circulation mechanism 10 is turned on, so that the fluid enters the solenoid valve through the upstream pipe 3 and then exits through the downstream pipe 5. At this time, the flow meter 4 on the upstream pipe 3 and the flow meter 4 on the downstream pipe 5 will monitor the flow rate of the fluid entering the solenoid valve and the flow rate of the fluid exiting the solenoid valve, respectively. Then, by comparing the upstream flow rate and the downstream flow rate, it can be determined whether the internal passage of the solenoid valve is unobstructed, whether there is a blockage or abnormal throttling. Fourth, the control system installed in the test cabinet 1 can collect data from the upstream and downstream flow meters 4 and output qualified or unqualified results according to the preset judgment rules. The test results can be displayed on the operation interface installed on the test cabinet 1 and can be stored in association with the product number. Fifth, after the solenoid valve has been tested, the fluid in the upstream pipe 3 and the downstream pipe 5 should be drained first, then the water circulation mechanism 10 should be stopped, and then the test fixture 7 should be opened so that the solenoid valve that has been tested can be quickly removed from the test bench 2.

[0022] See Figure 3 and Figure 4 As shown, in a preferred embodiment of the present invention, the bracket assembly 6 includes a support block 61, a guide rod 62, a slide table 63, a sleeve 64, a support base plate 65, and a pipe bracket 66. The test bench 2 is equipped with at least four symmetrical support blocks 61, and a guide rod 62 is installed between each pair of symmetrical support blocks 61. At least four slides 63 are movably sleeved on each guide rod 62, and a sleeve 64 is installed on each slide 63, which is sleeved on the guide rod 62. A locking screw that abuts against the guide rod 62 is installed on the sleeve 64. The same support base plate 65 is installed on each pair of symmetrical slides 63, and a pipe bracket 66 that supports the upstream pipe 3 and the downstream pipe 5 is installed on each support base plate 65. It should be noted that the support blocks 61, which are symmetrical along the length (left and right) of the test platform 2, are installed at the end of the test platform 2 by screws, while the two guide rods 62 are symmetrically arranged along the width (front and back) of the test platform 2. The support base plate 65 is connected to the two sliding tables 63, which are symmetrical in front and back, by screws. The pipe fitting bracket 66 has through holes for the installation of the upstream pipe 3 and the downstream pipe 5, and a narrow notch is vertically opened on one side of the through hole. When the pipe passes through the through hole, the upstream pipe 3 can be fixed on the pipe fitting bracket 66 through the countersunk hole vertically opened at the narrow notch on the pipe fitting bracket 66. Specifically, by twisting the locking screw on the sleeve 64, the locking screw can be released from its contact with the guide rod 62, thereby facilitating the movement of the slide table 63 on the guide rod 62. This makes it easier to adjust the position of the support base plate 65 on the guide rod 62, and thus facilitates the multiple pipe fitting supports 66 to support the upstream pipe 3 and the downstream pipe 5. By twisting the locking screw against the guide rod 62, the support base plate 65 can be fixed.

[0023] See Figures 4-8 As shown, in a preferred embodiment of the present invention, the test fixture 7 includes a connecting support plate 71, a valve body bracket 72, a first clamping plate 73, a second clamping plate 74, a quick-change plug 75, and a quick-change connector 76. A connecting support plate 71 connects the two supporting base plates 65. A valve body bracket 72 for supporting the solenoid valve is installed on the connecting support plate 71. A first clamping plate 73 is installed on the pipe fitting bracket 66 on one of the supporting base plates 65 connected to the connecting support plate 71. A second clamping plate 74 is installed on the pipe fitting bracket 66 on the other supporting base plate 65 connected to the connecting support plate 71. A quick-change plug 75 communicating with the pipe opening of the upstream pipe 3 is installed on the first clamping plate 73. A quick-change connector 76 communicating with the pipe opening of the downstream pipe 5 is installed on the second clamping plate 74. The quick-change plug 75 is inserted into the inlet pipe of the solenoid valve in a plugged-in state. The quick-change connector 76 is attached to the pipe opening of the outlet pipe of the solenoid valve. It should be noted that the connecting support plate 71 can be integrally formed with the two adjacent support base plates 65, and the valve body bracket 72 can be installed on the connecting support plate 71 by screws. The valve body bracket 72 is provided with a groove for the valve body of the solenoid valve to move. The first clamping plate 73 and the second clamping plate 74 are both installed on the pipe fitting bracket 66 by screws. Specifically, when the solenoid valve to be tested needs to be installed between the upstream pipe 3 and the downstream pipe 5, the valve body of the solenoid valve can be placed on the groove of the valve body bracket 72 first. At this time, the outlet of the solenoid valve will first align and fit with the quick-connect connector 76. Then, the second clamp 74 is moved, which will move the inlet of the solenoid valve toward the quick-connect connector 75, so that the quick-connect connector 75 can be inserted into the inlet of the solenoid valve in a plug-in manner. Then, through the cooperation of the first clamp 73, the second clamp 74 and the valve body bracket 72, the solenoid valve can be stably clamped at the pipe openings of the upstream pipe 3 and the downstream pipe 5, so that the fluid flowing in the upstream pipe 3 can stably enter the solenoid valve, and then enter the downstream pipe 5 through the opened solenoid valve. After the solenoid valve test is completed, move the second clamp 74 away from the first clamp 73 to disengage the quick-connect connector 76 from the solenoid valve's outlet pipe. Move the solenoid valve to disengage its inlet pipe from the quick-connect connector 75, thus making it easier to remove the tested solenoid valve from the valve body bracket 72.

[0024] See Figures 4-8 As shown, in a preferred embodiment of the present invention, the quick-change plug 75 includes a connecting ring 751 detachably mounted on the first clamping plate 73 and communicating with the port of the upstream pipe 3, and a docking tube 752 mounted on the connecting ring 751 and inserted into the inlet of the solenoid valve. Specifically, the connecting ring 751 is installed on the first clamping plate 73 through the countersunk hole and screws, and a sealing ring is installed between the connecting ring 751 and the first clamping plate 73. The inner ring of the connecting ring 751 is connected to the pipe opening of the upstream pipe 3. The mating tube 752 is integrally formed with the connecting ring 751, which facilitates the replacement of different sizes of the mating tube 752 to facilitate the testing of different models of solenoid valves. Similarly, the pipe opening of the mating tube 752 is chamfered to facilitate the insertion of the mating tube 752 into the inlet pipe of the solenoid valve.

[0025] See Figures 4-8As shown, in a preferred embodiment of the present invention, the quick-connect coupling 76 includes a docking ring 761 detachably mounted on the second clamping plate 74 and communicating with the pipe opening of the downstream pipe 5. The docking ring 761 has a docking countersunk hole 762 for docking with the outlet of the solenoid valve. A notched support ring 763 is detachably mounted on the docking ring 761. The notched support ring 763 has a U-shaped notch 764 with the groove facing upward. The U-shaped notch 764 is used to support the outlet pipe of the solenoid valve. It should be noted that a sealing ring is also installed between the docking ring 761 and the second clamping plate 74. The docking ring 761 is also detachably installed on the second clamping plate 74 by means of screws and countersunk holes on its surface. The pipe opening of the downstream pipe 5 extends into the docking ring 761. The notched support ring 763 is also detachably installed on the docking ring 761 by means of screws and countersunk holes on its surface. The bottom of the U-shaped notch 764 is arc-shaped and concentric with the docking countersunk hole 762. Specifically, when the solenoid valve is placed between the first clamping plate 73 and the second clamping plate 74, the outlet pipe of the solenoid valve needs to be aligned with the upward-opening U-shaped notch 764 first. Then, the solenoid valve is moved downward so that the wall of its outlet pipe is inserted into the bottom of the U-shaped notch 764. At this time, the outlet pipe opening will be aligned with the mating countersunk hole 762. Then, when the second clamping plate 74 moves, the outlet pipe will first be inserted into the mating countersunk hole 762 and aligned with the opening of the downstream pipe 5. Then, when the second clamping plate 74 continues to move, the second clamping plate 74 will push the solenoid valve towards the first clamping plate 73 through the quick-connect coupling 76, so that the quick-connect plug 75 can be inserted into the inlet pipe of the solenoid valve. Since the U-shaped notch 764 limits the outlet pipe of the solenoid valve, it can prevent the inlet pipe of the solenoid valve from becoming skewed when the solenoid valve moves and mates with the quick-connect plug 75.

[0026] See Figures 4-8 As shown, in a preferred embodiment of the present invention, a pushing guide assembly 8 is installed between the first clamping plate 73 and the second clamping plate 74, and the pushing guide assembly 8 includes a hinge ball 81, a guide rod 82, a connecting block 83, a fixing block 84, a nut 85 and an adjusting screw 86. The downstream pipe 5 is movably mounted on one of the pipe fitting supports 66, and the second clamping plate 74 is movably mounted on the pipe fitting support 66. The ends of the first clamping plate 73 and the second clamping plate 74 are provided with notches and slots. The notch and slot on the first clamping plate 73 is rotatably mounted with a hinge ball 81. The hinge ball 81 is mounted with a guide rod 82 that passes through the notch and slot on the second clamping plate 74. The top of the second clamping plate 74 is mounted with a connecting support block 83. The top of the pipe fitting support 66 near the second clamping plate 74 is mounted with a fixed support block 84. The fixed support block 84 is mounted with a nut 85 that is threadedly connected to the adjusting screw 86. The rod of the adjusting screw 86 passes through the fixed support block 84 and is connected to the connecting support block 83. It should be noted that the notch is opened outward on the front and rear sides of the first clamping plate 73 and the second clamping plate 74. The hinge ball 81 is rotatably installed on the notch on the first clamping plate 73 by means of a pin or bolt. The thread of the adjusting screw 86 passes through the nut 85 and is connected to the connecting support block 83. The second clamping plate 74 is fixedly connected to the pipe opening of the downstream pipe 5, and the pipe opening of the downstream pipe 5 extends into the docking ring 761. Specifically, after the solenoid valve body is placed on the valve body bracket 72 and the outlet pipe is inserted into the U-shaped notch 764, the operator can rotate the guide rod 82 so that the rod of the guide rod 82 is inserted into the notch groove on the second clamping plate 74. Then, the adjusting screw 86 is turned so that it pushes the second clamping plate 74 towards the first clamping plate 73 through the connecting block 83. Due to the support of the symmetrical guide rods 82, the moving second clamping plate 74 can be limited and supported, preventing the second clamping plate 74 from tilting or swinging during movement, which would cause the inlet pipe of the solenoid valve to be unable to be accurately fitted onto the quick-connect plug 75, or its outlet pipe to be unable to be precisely fitted and connected with the quick-connect connector 76. By reversing the adjustment screw 86, the connecting support block 83 is moved closer to the fixed support block 84, thereby moving the second clamping plate 74 away from the first clamping plate 73. This facilitates the disconnection of the two ends of the solenoid valve from the quick-change plug 75 and quick-change connector 76 after the test is completed. At this time, the guide rod 82 located in the notch continues to guide and support the second clamping plate 74. Pushing the guide rod 82 outward allows its body to quickly exit from the notch, facilitating the disassembly and replacement of the quick-change plug 75 or quick-change connector 76.

[0027] See Figures 4-8 As shown, in a preferred embodiment of the present invention, a lifting and limiting assembly 9 for limiting the guide rod 82 is installed on the second clamping plate 74. The lifting and limiting assembly 9 includes a U-shaped bracket 91, an L-shaped bracket 92, a bottom pad 93, a first internal threaded sleeve 94, a threaded connecting rod 95, and an elastic element 96. The second clamping plate 74 is movably mounted with a U-shaped bracket 91 facing downwards on the side near the pipe bracket 66. The vertical bars on both sides of the U-shaped bracket 91 are provided with notches and grooves 911 that cooperate with the guide rod 82. An L-shaped bracket 92 is mounted on the horizontal bar of the U-shaped bracket 91. The horizontal frame of the L-shaped bracket 92 extends to one side of the connecting block 83. A bottom pad 93 is mounted on the second clamping plate 74 on the side of the connecting block 83. A first internal threaded sleeve 94 is installed in the bottom pad 93. The threaded connecting rod 95 moves through the horizontal frame of the L-shaped bracket 92 and is threadedly connected to the first internal threaded sleeve 94. An elastic element 96 for lifting the U-shaped bracket 91 is connected between the bottom pad 93 and the horizontal frame of the L-shaped bracket 92. It should be noted that the U-shaped bracket 91 slides against the side of the second clamping plate 74 away from the first clamping plate 73, and its vertical strips on both sides extend to the notch groove. The elastic element 96 adopts a spring structure and is sleeved on the threaded connecting rod 95. The threaded connecting rod 95 adopts a semi-threaded rod shape, and the threaded connection length between the threaded rod of the threaded connecting rod 95 and the first internal threaded sleeve 94 is greater than the vertical length of the notch groove 911. Specifically, to prevent the guide rod 82 from disengaging from the notch when the second clamping plate 74 moves along the guide rod 82, the threaded connecting rod 95 can be twisted after the guide rod 82 swings and engages in the notch. This twists the threaded connecting rod 95 into the first internal threaded sleeve 94, compressing the elastic element 96. The large head of the threaded connecting rod 95 then presses down on the L-shaped bracket 92, causing the U-shaped bracket 91 to move downwards. This allows the downward-opening notch groove 911 to movably engage with the guide rod 82, facilitating engagement. The guide rod 82 in the notch groove is limited in the front and rear directions to prevent the guide rod 82 from disengaging from the notch groove. When the adjusting screw 86 is turned to push the second clamping plate 74 towards the first clamping plate 73, the threaded connecting rod 95 connects the L-shaped bracket 92 and the bottom pad 93, so that the U-shaped bracket 91 can move synchronously with the second clamping plate 74. The notch groove 911 will move synchronously on the guide rod 82, so that the guide rod 82 can normally guide and limit the support of the second clamping plate 74. When testing the same batch of solenoid valves, simply reverse the adjustment screw 86 to move the second clamp 74 horizontally, remove the solenoid valve that has been tested, and then clamp the solenoid valve to be tested for normal testing. There is no need to adjust the height of the U-shaped bracket 91. When testing other batches of solenoid valves, the threaded connecting rod 95 needs to be twisted in the opposite direction to release it from the downward pressure on the L-shaped bracket 92. The elastic restoring force of the elastic element 96 will push the L-shaped bracket 92 to rise vertically, and the U-shaped bracket 91 will also rise simultaneously on the side of the second clamping plate 74. As a result, the notch groove 911 will disengage from the guide rod 82, making it easier for the guide rod 82 to be disengaged from the notch groove of the second clamping plate 74, which facilitates the disassembly and replacement of the quick-change plug 75 or quick-change connector 76.

[0028] See Figures 4-8 As shown, in a preferred embodiment of the present invention, the lifting and limiting assembly 9 further includes a second internal threaded sleeve 97. The connecting support block 83 is equipped with a second internal threaded sleeve 97 that is threadedly connected to the adjusting screw 86. An annular groove 861 is provided at the connection between the adjusting screw 86 and the second internal threaded sleeve 97. A notch limiting groove 912 that cooperates with the annular groove 861 is provided on the crossbar of the U-shaped bracket 91. The groove width of the annular groove 861 is the same as the thickness of the U-shaped bracket 91. Specifically, when the U-shaped bracket 91 descends vertically along the second clamping plate 74, causing the notch groove 911 to fit onto the guide rod 82, the notch limiting groove 912 in the middle of the U-shaped bracket 91 will engage with the annular groove 861. Therefore, when the adjusting screw 86 is turned, the adjusting screw 86 will only rotate within the second internal threaded sleeve 97 and will not be screwed into the second internal threaded sleeve 97 (because the notch limiting groove 912 limits the left and right movement of the adjusting screw 86 through the annular groove 861, but will not interfere with the rotation of the adjusting screw 86). This facilitates the adjusting screw 86 to push the connecting block 83 so that the second clamping plate 74 is towards the first clamping plate 73. To facilitate the removal of the second clamping plate 74 from the pipe fitting support 66 or the separation of the second clamping plate 74 from the downstream pipe 5 for replacement and maintenance of its components, when the threaded connecting rod 95 is loosened, causing the elastic element 96 to push the U-shaped support 91 upward, the notch grooves 911 on both sides disengage from the guide support rod 82, and the notch limiting groove 912 also disengages from the annular groove 861. When the adjusting screw 86 is turned again, the rod of the adjusting screw 86 disengages from the second threaded sleeve, thus facilitating the separation of the connecting support block 83 and the fixed support block 84 connected by the adjusting screw 86. This allows for the removal of the second clamping plate 74 or adjustment of its distance from the pipe fitting support 66, thereby adjusting the distance between the first clamping plate 73 and the second clamping plate 74 to make it suitable for clamping and testing different types of solenoid valves.

[0029] See Figure 1 and Figure 2As shown, in a preferred embodiment of the present invention, the water circulation mechanism 10 includes a collection tank 101, a guide pipe 102, a water pump 103, a delivery pipe 104, a filter tank 105, and a connecting pipe 106. Below the test bench 2 is a collection tank 101 for collecting the fluid discharged from the downstream pipe 5. The bottom of the collection tank 101 is connected to the water pump 103 installed in the test cabinet 1 through the guide pipe 102. The outlet of the water pump 103 is connected to the inlet of the filter tank 105 through the delivery pipe 104. The outlet of the filter tank 105 is connected to the pipe opening of the upstream pipe 3 through the connecting pipe 106. Specifically, the bottom of the collection pool 101 is conical, and the outlet of the downstream pipe 5 is freely inserted into the collection pool 101. The opening of the collection pool 101 is slightly smaller than the surface of the test bench 2. The filter tank 105 is used to filter the flowing fluid. By starting the water pump 103, the fluid collected in the collection pool 101 is transported to the filter tank 105 through the guide pipe 102, and then transported to the upstream pipe 3 through the connecting pipe 106. The fluid will then enter the downstream pipe 5 through the opened solenoid valve. The outlet of the downstream pipe 5 will discharge the fluid into the collection pool 101 to achieve the circulation and use of the fluid.

[0030] In the description of this specification, references to terms such as "an embodiment," "example," "specific example," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0031] The preferred embodiments of the present invention disclosed above are merely illustrative of the invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the invention to the specific implementations described. Clearly, many modifications and variations can be made based on the content of this specification. This specification selects and specifically describes these embodiments to better explain the principles and practical applications of the invention, thereby enabling those skilled in the art to better understand and utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims

1. A solenoid valve sealing performance testing device, comprising a test cabinet and a test platform located on one side of the test cabinet; characterized in that, Also includes: The upstream pipeline is mounted on the test bench via a bracket assembly, and a flow meter is connected to the upstream pipeline; The downstream pipeline is also mounted on the test bench via a support assembly, and it is positioned opposite to the upstream pipeline. A flow meter is also connected to the downstream pipeline. The test fixture, also mounted between the upstream and downstream pipes via a bracket assembly, is used to secure the solenoid valve to be tested and to ensure a sealed connection between the solenoid valve's inlet pipe and the upstream pipe, and a sealed connection between the solenoid valve's outlet pipe and the downstream pipe; and The water circulation mechanism, installed on the test cabinet, is used to deliver fluid to the upstream pipeline and collect and circulate the fluid flowing out of the downstream pipeline back to the upstream pipeline.

2. The solenoid valve sealing performance testing device according to claim 1, characterized in that, The support assembly includes a support block, a guide rod, a slide, a sleeve, a support base plate, and a pipe support. The test bench is equipped with at least four symmetrical support blocks, and a guide rod is installed between each pair of symmetrical support blocks. At least four slides are movably connected to each guide rod, and a sleeve is installed on each slide that fits onto the guide rod. A locking screw that abuts against the guide rod is installed on the sleeve. The same support base plate is installed on each pair of symmetrical slides, and a pipe bracket for supporting the upstream and downstream pipes is installed on each support base plate.

3. The solenoid valve sealing performance testing device according to claim 2, characterized in that, The test fixture includes a connecting support plate, a valve body bracket, a first clamping plate, a second clamping plate, a quick-change plug, and a quick-change connector; A connecting support plate connects the two supporting base plates, and a valve body bracket for supporting the solenoid valve is installed on the connecting support plate. A first clamping plate is installed on the pipe fitting bracket on one of the supporting base plates connected to the connecting support plate, and a second clamping plate is installed on the pipe fitting bracket on the other supporting base plate connected to the connecting support plate. A quick-connect plug communicating with the upstream pipe is installed on the first clamping plate, and a quick-connect coupling communicating with the downstream pipe is installed on the second clamping plate. The quick-connect plug is inserted into the inlet pipe of the solenoid valve in a plugged-in state, and the quick-connect coupling fits into the outlet pipe of the solenoid valve.

4. The solenoid valve sealing performance testing device according to claim 3, characterized in that, The quick-connect plug includes a connecting ring that is detachably mounted on the first clamp and communicates with the port of the upstream pipe, and a mating tube mounted on the connecting ring and inserted into the inlet of the solenoid valve.

5. The solenoid valve sealing performance testing device according to claim 3, characterized in that, The quick-connect coupling includes a docking ring that is detachably mounted on the second clamp and communicates with the port of the downstream pipe. The docking ring has a countersunk hole for docking with the outlet of the solenoid valve. A notched support ring is detachably mounted on the docking ring. The notched support ring has a U-shaped notch with the groove facing upward. The U-shaped notch is used to support the outlet pipe of the solenoid valve.

6. The solenoid valve sealing performance testing device according to claim 3, characterized in that, A pushing guide assembly is installed between the first clamping plate and the second clamping plate, and the pushing guide assembly includes a hinge ball, a guide rod, a connecting block, a fixing block, a nut, and an adjusting screw. The downstream pipe is movably mounted on one of the pipe fitting supports, and the second clamping plate is movably mounted on the pipe fitting support. Both the first and second clamping plates have notches at their ends. A hinge ball is rotatably mounted on the notch of the first clamping plate, and a guide rod passing through the notch of the second clamping plate is mounted on the hinge ball. A connecting block is mounted on the top of the second clamping plate, and a fixed block is mounted on the top of the pipe fitting support near the second clamping plate. A nut threadedly connected to an adjusting screw is mounted on the fixed block, and the rod of the adjusting screw passes through the fixed block and connects to the connecting block.

7. The solenoid valve sealing performance testing device according to claim 6, characterized in that, The second clamp is equipped with a lifting and limiting assembly for limiting the guide rod. The lifting and limiting assembly includes a U-shaped bracket, an L-shaped bracket, a bottom pad, a first internal threaded sleeve, a threaded connecting rod, and an elastic element. The second clamping plate has a downward-facing U-shaped bracket movably mounted on its side near the pipe fitting support. The vertical bars on both sides of the U-shaped bracket have notches and grooves that mate with the guide rod. An L-shaped bracket is mounted on the crossbar of the U-shaped bracket. The horizontal frame of the L-shaped bracket extends to one side of the connecting block. A bottom pad is mounted on the second clamping plate on the side of the connecting block. A first internal threaded sleeve is installed inside the bottom pad. The threaded connecting rod moves through the horizontal frame of the L-shaped bracket and is threadedly connected to the first internal threaded sleeve. An elastic element for lifting the U-shaped bracket is connected between the bottom pad and the horizontal frame of the L-shaped bracket.

8. The solenoid valve sealing performance testing device according to claim 7, characterized in that, The lifting and limiting assembly also includes a second internal threaded sleeve. The connecting support block is equipped with a second internal threaded sleeve that is threadedly connected to the adjusting screw. An annular groove is provided at the connection between the adjusting screw and the second internal threaded sleeve. A notch limiting groove that mates with the annular groove is provided on the crossbar of the U-shaped bracket. The width of the annular groove is the same as the thickness of the U-shaped bracket.

9. The solenoid valve sealing performance testing device according to claim 1, characterized in that, The water circulation mechanism includes a collection tank, a guide pipe, a water pump, a delivery pipe, a filter tank, and a connecting pipe; Below the test bench is a collection tank for collecting fluid discharged from the downstream pipeline. The bottom of the collection tank is connected to a water pump installed inside the test cabinet through a guide pipe. The outlet of the water pump is connected to the inlet of the filter tank through a delivery pipe. The outlet of the filter tank is connected to the outlet of the upstream pipeline through a connecting pipe.

10. The solenoid valve sealing performance testing device according to claim 1, characterized in that, A sensor is installed on the upstream pipeline via a tee, and both the upstream and downstream pipelines are equipped with on / off valves.