A coal wall spalling test bench
By designing a coal wall spalling test rig with equivalent loading mechanisms of lateral loading, top loading, and support working resistance, the problem of incomplete simulation in existing technologies has been solved, enabling accurate simulation and theoretical research of coal wall spalling and providing a basis for optimizing field support parameters.
Patent Information
- Application Number
- CN202511354175.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-22
- Publication Date
- 2026-11-20
AI Technical Summary
Existing coal face spalling simulation test benches cannot fully simulate the impact of working face location, mining height, and support angle on coal face spalling, and the support obstruction limits the monitoring of coal face damage information.
A coal wall spalling test bench was designed, including a lateral loading mechanism, a top loading mechanism, and a support working resistance equivalent loading mechanism. Through the coordinated work of multiple components, it simulates different working face positions, mining heights, and support angles, avoids support obstruction, and achieves accurate simulation of coal wall spalling.
It achieves accurate simulation of working face location, mining height and support angle, systematically studies the main controlling factors and evolution mechanism of coal wall spalling, and provides a theoretical basis for optimizing on-site support parameters.
Smart Images

Figure CN123135576A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of mining engineering technology, and in particular to a coal wall spalling test bench. Background Technology
[0002] In recent years, with the continuous improvement of comprehensive mechanization, high-extraction fully mechanized mining technology has gradually become an important development direction for thick coal seam mining in my country. Increasing the mining height and dip length of the working face is an effective way to improve mining efficiency and resource recovery rate. However, with the increase of mining height and working face length, the migration range and degree of damage of the overlying strata on the working face also increase, the influence range of the coal wall advance support pressure becomes larger, the pressure from the basic roof becomes more intense, the mine pressure manifestation in the stope becomes more obvious, and the pressure and time of the overlying strata acting on the coal wall and roof will also increase, the stability of the coal wall will decrease, and the phenomenon of large-area, deep, and multi-regional spalling of the coal wall will occur more frequently.
[0003] Current coal face spalling simulation test benches mostly have certain limitations. Existing test benches only have a simple design with similar simulated material laying framework to simulate constant horizontal pressure on both sides of the coal face, and cannot simulate coal face spalling at different locations in the working face; the hydraulic support shields the side of the coal face from damage, which greatly limits the monitoring of coal face damage information; at the same time, the test bench is only equipped with one hydraulic support, and the support angle of the hydraulic support is constant, so it is impossible to study the influence of the support angle on coal face spalling; due to the problems of existing test benches, it is impossible to simulate the influence of various factors on coal face spalling in a comprehensive manner. Summary of the Invention
[0004] The purpose of this invention is to provide a coal wall spalling test bench to solve the problems existing in the prior art, and to enable the study of the influence of working face location, mining height and support angle on coal wall spalling, thereby assisting in the improvement of the research on the mechanism of coal wall spalling.
[0005] To achieve the above objectives, the present invention provides the following solution:
[0006] This invention provides a coal wall spalling test bench, comprising a test bench body, a lateral loading mechanism, a top loading mechanism, a top plate, and a support working resistance equivalent loading mechanism; the test bench body has an inner cavity, one side of which has a side opening and the top of which has an upper opening; the inner cavity is used to house a simulated coal wall; the lateral loading mechanism has at least one lateral loading plate, which is located within the inner cavity and on one side of the simulated coal wall, and the lateral loading plate can apply pressure to the simulated coal wall in a direction close to the simulated coal wall, and the lateral loading plate is adjacent to the side opening; the top plate is located above the simulated coal wall, and a lateral loading gap exists between the side of the top plate close to the lateral loading plate and the lateral loading plate; the top plate has a first end and a second end, ... The first end is located within the inner cavity, and the second end protrudes through the side opening and is located outside the inner cavity; a connecting bracket is fixedly installed above the main body of the test bench; a top loading mechanism is installed on the connecting bracket, and the top loading mechanism is used to provide a downward pressure to the top plate; a plurality of connecting mounting brackets are provided at the second end of the top plate, and the connecting mounting brackets are arranged sequentially at intervals along a first direction; one end of the bracket working resistance equivalent loading mechanism is hinged to the connecting bracket, and the other end of the bracket working resistance equivalent loading mechanism can be hinged to one of the connecting mounting brackets; the bracket working resistance equivalent loading mechanism is used to provide tensile force; in the first direction, the distance between the hinge points of each connecting mounting bracket and the bracket working resistance equivalent loading mechanism and the connecting bracket is different.
[0007] Preferably, the lateral loading mechanism includes two lateral loading plates; the two lateral loading plates are symmetrically arranged on opposite sides of the simulated coal wall.
[0008] Preferably, a plurality of lateral pressure devices are provided between the side of the lateral loading plate away from the simulated coal wall and the corresponding inner wall of the inner cavity, and each of the lateral pressure devices can push the lateral loading plate toward the simulated coal wall.
[0009] Preferably, a model laying support plate is detachably fixed at the side opening. The model laying support plate and the inner cavity together form a stacking space, which is used to hold similar materials. The similar materials are solidified to form the simulated coal wall.
[0010] Preferably, the lower end of the lateral loading plate is provided with multiple rollers.
[0011] Preferably, the test bench body includes a base plate and a first side plate, a second side plate, and a third side plate fixed on the base plate. The first side plate is opposite to the second side plate, and the third side plate is opposite to the side opening. The third side plate is located between the first side plate and the second side plate. The lateral loading plate is disposed in the inner cavity on the side corresponding to the first side plate or the second side plate. The guide plate is located on the side of the third side plate away from the inner cavity. The guide plate is fixedly connected to the lateral loading plate.
[0012] Preferably, the support plate for the model is made of a transparent material.
[0013] Preferably, the model laying support plate is fixedly provided with a scale that can indicate the height of the simulated coal wall inside the cavity.
[0014] Preferably, it also includes an electro-hydraulic control console, which is communicatively connected to the lateral loading mechanism, the top loading mechanism, and the support working resistance equivalent loading mechanism.
[0015] Preferably, the connecting mounting frame includes a first crossbeam and a second crossbeam, both of which are fixedly mounted on the main body of the test bench. The support working resistance equivalent loading mechanism is hinged to the first crossbeam, and the top loading mechanism is mounted on the second crossbeam.
[0016] The present invention achieves the following technical effects compared to the prior art:
[0017] The coal face spalling test rig provided by this invention, through multi-component collaborative design, achieves precise simulation and control of key parameters such as working face position, mining height, and support angle. A lateral loading plate is located on one side of the simulated coal face; by moving one side of the simulated coal face to apply lateral pressure, it can simulate the lateral stress environment of the coal face at different working face advance positions. By adjusting the magnitude of the lateral pressure, the stress distribution and spalling risk of the coal face at different working face positions can be studied. The height of the simulated coal face can be adjusted to simulate the spalling situation at different mining heights. By equivalently loading the support working resistance above the roof, the rig avoids the obstruction of the coal face by the traditional test rig support, solving the problem of support obstruction during simulation tests. The monitoring of coal face obstruction, affecting its displacement field, surface cracks, and spalling morphology, is a challenge. A top loading mechanism applies downward pressure to the roof via connecting supports, simulating the weight of the overlying strata. An equivalent loading mechanism, connected to connecting frames at different positions on the roof using the support's working resistance, simulates the impact of supports at different angles on coal face spalling, enabling efficient and convenient simulation of various support angles. Modular design (lateral loading, top loading, and support angle adjustment) enables physical simulation of key parameters in coal mining. Adjustable boundary conditions and load combinations systematically study the main controlling factors and evolution mechanism of coal face spalling, providing a theoretical basis for optimizing on-site support parameters. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 This is a schematic diagram of the overall structure of the coal wall spalling test bench provided by the present invention;
[0020] Figure 2 A schematic diagram of the structure of the coal wall spalling test bench provided by the present invention in the process of laying out a simulated coal wall;
[0021] Figure 3 A schematic diagram of the coal wall spalling test bench provided by the present invention during the test stage;
[0022] Figure 4 This is a schematic diagram of the main structure of the coal wall spalling test bench provided by the present invention;
[0023] Figure 5 A schematic diagram of the lateral loading plate in the coal wall spalling test bench provided by the present invention;
[0024] Figure 6A schematic diagram of the structure for laying support plates on the model in the coal wall spalling test bench provided by the present invention;
[0025] Figure 7 This is a schematic diagram of the structure of the top plate in the coal wall flaring test bench provided by the present invention.
[0026] In the picture:
[0027] 10-Main body of the test bench; 11-First side plate; 12-Second side plate; 13-Third side plate; 14-Model laying support plate; 15-First crossbeam; 16-Second crossbeam;
[0028] 20 - Lateral loading plate; 21 - Lateral pressure applicator;
[0029] 30 - Top plate; 31 - Connecting mounting bracket;
[0030] 40 - Top plate loading mechanism;
[0031] 50-Equivalent loading mechanism for working resistance of the support;
[0032] 60-Electro-hydraulic control console. Detailed Implementation
[0033] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0034] The purpose of this invention is to provide a coal wall spalling test bench to solve the problems existing in the prior art, enabling the study of the influence of working face location, mining height, and support angle on coal wall spalling, and assisting in improving the research on the mechanism of coal wall spalling.
[0035] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0036] Example 1
[0037] This embodiment provides a coal wall spalling test bench, such as Figures 1 to 7As shown, the test bench includes a main body 10, a lateral loading mechanism, a top loading mechanism 40, a top plate 30, and a support working resistance equivalent loading mechanism 50. The main body 10 has an inner cavity with a side opening on one side and an upper opening on the top. A simulated coal wall is installed inside the inner cavity. The lateral loading mechanism has at least one lateral loading plate 20, which is located inside the inner cavity and on one side of the simulated coal wall. The lateral loading plate 20 can apply pressure to the simulated coal wall in a direction close to it, and is adjacent to the side opening. The top plate 30 is located above the simulated coal wall, and there is a lateral loading gap between the side of the top plate 30 close to the lateral loading plate 20 and the lateral loading plate 20. The top plate 30 has a first end and a second end. Located within the inner cavity, with the second end protruding through the side opening outside the inner cavity; a connecting bracket is fixedly installed above the test bench body 10; a top loading mechanism 40 is installed on the connecting bracket, and the top loading mechanism 40 is used to provide a downward pressure to the top plate 30; a plurality of connecting mounting brackets 31 are provided at the second end of the top plate 30, and each connecting mounting bracket 31 is arranged sequentially at intervals along the first direction; one end of the bracket working resistance equivalent loading mechanism 50 is hinged to the connecting bracket, and the other end of the bracket working resistance equivalent loading mechanism 50 can be hinged to one of the connecting mounting brackets 31, and the bracket working resistance equivalent loading mechanism 50 is used to provide tensile force; in the first direction, the distance between the hinge points of each connecting mounting bracket 31 and the bracket working resistance equivalent loading mechanism 50 and the connecting bracket is different.
[0038] Through multi-component collaborative design, precise simulation and control of key parameters such as working face position, mining height, and support angle are achieved. The lateral loading plate 20, located on one side of the simulated coal wall, applies lateral pressure by moving one side of the simulated coal wall, simulating the lateral stress environment of the coal wall at different working face advance positions. By adjusting the magnitude of the lateral pressure, the stress distribution and spalling risk of the coal wall at different working face positions are studied. The spalling situation of the coal wall at different mining heights is simulated by adjusting the height of the simulated coal wall. By equivalently placing the support working resistance loading mechanism 50 above the roof 30, the obstruction of the coal wall by the traditional test bench support is avoided, solving the problem of support obstructing the coal wall during simulation tests and affecting the coal wall. The monitoring of displacement field, surface cracks, and coal wall spalling morphology is challenging. The top loading mechanism 40 applies downward pressure to the roof 30 through connecting supports to simulate the weight of the overlying strata. The support working resistance equivalent loading mechanism 50 is connected to the connecting mounting frames 31 at different positions on the roof 30 to simulate the influence of supports at different support angles on coal wall spalling, which can achieve efficient and convenient simulation of different support angles. Through modular design (lateral loading, top loading, and support angle adjustment), the physical simulation of key parameters of coal mining is realized. Through adjustable boundary conditions and load combinations, the main controlling factors and evolution mechanism of coal wall spalling are systematically studied, providing a theoretical basis for the optimization of on-site support parameters.
[0039] The following are the relevant settings for the main body 10 of the test bench:
[0040] Among the optional solutions in this embodiment, the more preferred one is as follows: Figures 1-3 As shown, the test bench body 10 includes a base plate and a first side plate 11, a second side plate 12 and a third side plate 13 fixed on the base plate. The first side plate 11 is opposite to the second side plate 12, and the third side plate 13 is opposite to the side opening. The third side plate 13 is located between the first side plate 11 and the second side plate 12. The lateral loading plate 20 is disposed in the inner cavity on the side corresponding to the first side plate 11 or the second side plate 12. The guide plate is located on the side of the third side plate 13 away from the inner cavity (the guide plate is not shown in the figure). The guide plate is fixedly connected to the lateral loading plate 20.
[0041] Specifically, the bottom of the test bench body 10 is fixedly equipped with four pillars; the top is fixed with a first crossbeam 15 and a second crossbeam 16; and the side opening of the test bench body 10 is provided with four holes, which are the connection points for the support plate 14 to be laid on the model.
[0042] Specifically, the settings for simulating the formation of the coal face are as follows:
[0043] Among the optional solutions in this embodiment, the more preferred one is as follows: Figure 2 As shown, a model laying support plate 14 is detachably fixed at the side opening. The model laying support plate 14 and the inner cavity together form a stacking space, which is used to hold similar materials. The similar materials solidify to form a simulated coal wall.
[0044] In the optional solutions of this embodiment, it is more preferred that the model laying support plate 14 is made of transparent material.
[0045] In the optional schemes of this embodiment, it is more preferred that the model laying support plate 14 is fixedly provided with a scale that can indicate the height of the simulated coal wall inside the cavity (such as attaching a scale ruler to observe the laying situation in real time).
[0046] Specifically, the model laying support plate 14 is a rectangular thick hard acrylic plate with two holes on each side corresponding to its short side, which can be tightly connected to the holes at the side opening of the test bench body 10.
[0047] Among the optional solutions in this embodiment, the more preferred one is as follows: Figures 1-3 As shown, the connecting mounting bracket 31 includes a first crossbeam 15 and a second crossbeam 16. The first crossbeam 15 and the second crossbeam 16 are respectively fixedly mounted on the test bench body 10. The bracket working resistance equivalent loading mechanism 50 is hinged to the first crossbeam 15, and the top loading mechanism 40 is mounted on the second crossbeam 16.
[0048] Specifically, once the simulated coal wall is completed and before the experiment officially begins, the support plate 14 on the model needs to be removed to prevent it from providing horizontal pressure that could affect the coal wall spalling.
[0049] The following are the specifications for the lateral loading mechanism:
[0050] Among the optional solutions in this embodiment, the more preferred one is as follows: Figure 2 and Figure 3 As shown, the lateral loading mechanism includes two lateral loading plates 20; the two lateral loading plates 20 are symmetrically arranged on opposite sides of the simulated coal wall.
[0051] Among the optional solutions in this embodiment, the more preferred one is as follows: Figure 2 and Figure 3 As shown, a plurality of lateral pressure devices 21 are also provided between the side of the lateral loading plate 20 away from the simulated coal wall and the corresponding inner wall of the inner cavity. Each lateral pressure device 21 can push the lateral loading plate 20 toward the simulated coal wall.
[0052] Specifically, two lateral loading plates 20 are located on both sides of the side opening and are used to transmit the pressure of the lateral pressure applicator 21 to the simulated coal wall.
[0053] Specifically, the lateral pressure applicator 21 is a large-diameter, short-stroke hydraulic cylinder, and each lateral pressure applicator 21 is arranged in an array on one side of the corresponding lateral loading plate 20, such as... Figure 2 and Figure 3 As shown, there are 4 on each side, for a total of 8, which are used to uniformly load the simulated coal wall laterally.
[0054] Among the optional solutions in this embodiment, the more preferred one is as follows: Figure 2 , Figure 3 and Figure 5 As shown, the lower end of the lateral loading plate 20 is provided with multiple rollers.
[0055] Specifically, a horizontal plate is fixed to the upper end of the lateral loading plate 20, and the lower end of the horizontal plate is in contact with the upper ends of the three side plates of the test bench body 10.
[0056] The following are the settings instructions for the top loading mechanism 40:
[0057] Specifically, the top loading mechanism 40 is a hydraulic cylinder with a flat bottom; when this hydraulic cylinder extends downward to load, it transmits pressure to the roof 30 and the simulated coal wall to simulate the pressure on the roof 30.
[0058] The following are the relevant settings for the top plate 30:
[0059] Specifically, the top plate 30 is a rectangular thick steel plate, with multiple connecting mounting brackets 31 welded along the centerline of one edge. The support working resistance equivalent loading mechanism 50 is connected to different connecting mounting brackets 31 to simulate different support angles. Before the test begins, the top plate 30 is placed above the simulated coal wall, and the top loading mechanism 40 directly abuts against the top plate 30, so that the force is transmitted through the top plate 30 to the top of the simulated coal wall.
[0060] Among them, the relevant settings of the support working resistance equivalent loading mechanism 50 are as follows:
[0061] Specifically, the equivalent loading mechanism 50 for the working resistance of the support is a hydraulic cylinder.
[0062] Regarding other related settings:
[0063] Among the optional solutions in this embodiment, the more preferred one is as follows: Figure 1 As shown, it also includes an electro-hydraulic control console 60, which is communicatively connected to the lateral loading mechanism, the top loading mechanism 40, and the support working resistance equivalent loading mechanism 50.
[0064] Specifically, the electro-hydraulic control console 60 is used to control the pressure of each mechanism in real time with precision and to accurately record its pressure value.
[0065] Specific examples have been used to illustrate the principles and implementation methods of this invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this invention. Furthermore, those skilled in the art will recognize that, based on the ideas of this invention, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this invention.
Claims
1. A coal wall spalling test bench, characterized in that: It includes the main body of the test bench, the lateral loading mechanism, the top loading mechanism, the top plate, and the support working resistance equivalent loading mechanism; The test bench has an inner cavity, with a side opening on one side and an upper opening on the top; the inner cavity is used to set up a simulated coal wall. The lateral loading mechanism has at least one lateral loading plate located within the inner cavity and on one side of the simulated coal wall. The lateral loading plate is capable of applying pressure to the simulated coal wall in a direction close to the simulated coal wall, and the lateral loading plate is adjacent to the side opening. The top plate is located above the simulated coal wall, and there is a lateral loading gap between the side of the top plate near the lateral loading plate and the lateral loading plate; the top plate has a first end and a second end, the first end is located inside the inner cavity, and the second end protrudes through the side opening and is located outside the inner cavity; A connecting bracket is fixedly installed above the main body of the test bench; the top loading mechanism is installed on the connecting bracket, and the top loading mechanism is used to provide a downward pressure to the top plate; The second end of the top plate is provided with a plurality of connecting mounting brackets, which are arranged sequentially at intervals along the first direction. One end of the bracket working resistance equivalent loading mechanism is hinged to the connecting bracket, and the other end of the bracket working resistance equivalent loading mechanism can be hinged to one of the connecting mounting brackets. The bracket working resistance equivalent loading mechanism is used to provide tensile force. In the first direction, the distance between the hinge points of each connecting mounting bracket and the bracket working resistance equivalent loading mechanism and the connecting bracket is different.
2. The coal wall spalling test bench according to claim 1, characterized in that: The lateral loading mechanism includes two lateral loading plates; the two lateral loading plates are symmetrically arranged on opposite sides of the simulated coal wall.
3. The coal wall spalling test bench according to claim 2, characterized in that: Multiple lateral pressure devices are also provided between the side of the lateral loading plate away from the simulated coal wall and the corresponding inner wall of the inner cavity, and each lateral pressure device can push the lateral loading plate toward the simulated coal wall.
4. The coal wall spalling test bench according to claim 1, characterized in that: A model laying support plate is detachably fixed at the side opening. The model laying support plate and the inner cavity together form a stacking space. The stacking space is used to hold similar materials, which solidify to form the simulated coal wall.
5. The coal wall spalling test bench according to claim 2, characterized in that: The lower end of the lateral loading plate is provided with multiple rolling wheels.
6. The coal wall spalling test bench according to claim 2, characterized in that: The main body of the test bench includes a base plate and a first side plate, a second side plate and a third side plate fixed on the base plate. The first side plate is opposite to the second side plate, and the third side plate is opposite to the side opening. The third side plate is located between the first side plate and the second side plate. The lateral loading plate is disposed on one side of the inner cavity corresponding to the first side plate or the second side plate; The guide plate is located on the side of the third side plate away from the inner cavity; and the guide plate is fixedly connected to the lateral loading plate.
7. The coal wall spalling test bench according to claim 4, characterized in that: The support plates for the model are made of transparent material.
8. The coal wall spalling test bench according to claim 7, characterized in that: The model is laid with a fixed scale on the support plate, which can indicate the height of the simulated coal wall inside the cavity.
9. The coal wall spalling test bench according to claim 1, characterized in that: It also includes an electro-hydraulic control console, which is communicatively connected to the lateral loading mechanism, the top loading mechanism, and the support working resistance equivalent loading mechanism.
10. The coal wall spalling test bench according to claim 1, characterized in that: The connecting mounting frame includes a first crossbeam and a second crossbeam. The first crossbeam and the second crossbeam are respectively fixedly mounted on the main body of the test bench. The working resistance equivalent loading mechanism of the support is hinged to the first crossbeam, and the top loading mechanism is mounted on the second crossbeam.
