A high-temperature high-pressure high-wax-content condensate oil gas wax deposition dynamic simulation device and method

By designing a dynamic simulation device for wax deposition in high-temperature, high-pressure, high-wax condensate oil and gas, and adopting a direct fluid path and metering unit, the problem of the inability to simulate the wax deposition law in wellbore in existing technologies has been solved, and the accurate acquisition of wax precipitation and wax deposition amount under high-temperature and high-pressure conditions has been achieved.

CN123135656APending Publication Date: 2026-11-20PETROCHINA CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202510640969.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-19
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies cannot effectively simulate the wax deposition pattern in wellbore under high temperature and high pressure conditions, and cannot accurately obtain the amount of wax precipitation and wax deposition.

Method used

A dynamic simulation device for wax deposition in high-temperature, high-pressure, high-wax condensate oil and gas was designed, including a sample preparation unit, an injection unit, a deposition unit, and a metering unit. The device simulates wellbore condensate gas through a direct fluid path to avoid changes in fluid composition, and uses the metering unit to obtain the amount of wax precipitated and the amount of wax deposited.

Benefits of technology

It achieves accurate simulation of wellbore wax deposition patterns under high temperature and high pressure conditions, and can directly obtain the amount of wax precipitation and wax deposition, avoiding the influence of fluid composition changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123135656A_ABST
    Figure CN123135656A_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of petroleum instruments, and discloses a high-temperature high-pressure high-wax-content condensate oil and gas wax deposition dynamic simulation device and method. The device comprises a sample preparation unit, an injection unit, a deposition unit and a metering unit. The sample preparation unit is used for quantitatively injecting oil samples and gas samples into the injection unit according to experimental requirements. The injection unit is used for mixing, pressurizing and heating the oil samples and gas samples, and then injecting them into the deposition unit. The deposition unit is used for simulating a deposition pipeline. The metering unit is used for metering the amount of gas and oil collected at the outlet of the deposition unit. The device can well simulate the wellbore wax deposition law under high-temperature and high-pressure conditions. Meanwhile, the fluid directly flows through the oil flow pipeline, without using circulating fluid, directly simulating the wellbore condensate oil and gas, avoiding the influence of fluid component change on the wax precipitation of paraffin, and thus avoiding the influence of wax deposition thickness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of petroleum instrument technology, and in particular relates to a dynamic simulation device and method for high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition. Background Technology

[0002] Paraffin deposition is a serious problem in natural gas development and extraction. When high-temperature waxy condensate flows through a low-temperature pipeline, the wall temperature is lower than the wax precipitation point of the condensate, causing wax crystals to precipitate and deposit on the pipe wall surface, resulting in blockage and a significant decrease in gas well production, or even production shutdown. Currently, experimental methods for wax deposition are divided into static and dynamic methods. The static method, the cold finger cold plate method, involves immersing a cold finger cold plate in the fluid and continuously cooling it to simulate the pipe wall temperature, then weighing the amount of paraffin deposited on the cold finger cold plate over a specified time. Dynamic methods include the rotating disk method and the ring method. The rotating disk method involves immersing a metal disk containing a cooling medium into the crude oil, controlling the temperature of the crude oil and the cooling medium, as well as the rotation speed of the metal disk, to measure the amount of paraffin deposited on the metal disk over a specified time. The ring method involves immersing a ring in a cooling medium, controlling the flow rate of the circulating crude oil inside the pipeline and the temperature of the cooling medium outside the pipeline, and measuring the amount of wax deposited on the pipe wall over a specified time.

[0003] The methods mentioned above, whether the cold finger cold plate method, the rotating disk method, or even large-scale annular test apparatus, can typically only conduct wax deposition experiments under normal or low-pressure conditions, failing to meet the requirements of high-pressure testing. Furthermore, during the continuous circulation and deposition of waxy crude oil in the annular test apparatus, the constantly changing composition of the crude oil affects the wax precipitation, thus influencing the wax deposition thickness. Existing testing methods cannot effectively simulate the wax deposition patterns in wellbore under high-pressure conditions.

[0004] Patent CN207937383U discloses an experimental device for simulating the effect of different temperatures on wax deposition in condensate oil pipelines. By setting different temperatures to mix liquid wax and condensate oil, and conducting wax deposition experiments through a circulation loop test, it is still impossible to avoid the defect that the crude oil composition changes continuously during the circulation deposition process.

[0005] Patent CN209979413U discloses a dissolved gas crude oil wax deposition testing device, which reaches the experimental temperature through a high-temperature water bath. However, it does not involve the measurement of wax deposition and is inconvenient to obtain accurate wax precipitation and wax deposition amounts.

[0006] Patent CN115541458A discloses a high-pressure oil-gas-water mixture wax deposition simulation experimental device. By conducting two sets of cold finger experiments under high pressure, the two sets of experiments can be parallel experiments or control experiments, which reduces the number of experiments and the consumption of experimental oil and gas, and improves experimental efficiency. However, it does not involve high temperature conditions and a metering system, so it cannot well simulate the high temperature and high pressure wax precipitation conditions of waxy crude oil, and it is also inconvenient to obtain accurate wax precipitation and wax deposition amounts.

[0007] Patent CN216206615U discloses a high-pressure oil-gas mixed transportation experimental device for visualizing wax deposition, which is used to test the deposition of high-pressure multiphase wax. However, it does not consider high-temperature conditions, and the device does not involve a metering system. Therefore, it cannot effectively simulate the high-temperature and high-pressure wax precipitation conditions of waxy crude oil, and it is also inconvenient to obtain accurate wax precipitation and wax deposition amounts.

[0008] Therefore, it is necessary to provide an experimental apparatus and method that can effectively simulate the wax deposition pattern in wellbore under high temperature and high pressure conditions, and conveniently obtain accurate wax precipitation and wax deposition amounts. Summary of the Invention

[0009] In order to overcome the shortcomings of the existing technology, the purpose of this application is to provide an experimental device and method that can effectively simulate the wax deposition law in wellbore under high temperature and high pressure conditions and conveniently obtain accurate wax precipitation and wax deposition amounts.

[0010] To achieve the above objectives, this application provides the following technical solution:

[0011] A dynamic simulation device for high-temperature, high-pressure, high-wax condensate oil gas wax deposition includes: a sample preparation unit, an injection unit, a deposition unit, and a metering unit;

[0012] The sample preparation unit is used to quantitatively inject oil and gas samples into the injection unit according to experimental requirements;

[0013] The injection unit is used to mix, pressurize, and heat oil and gas samples before injecting them into the deposition unit;

[0014] Deposition units are used to simulate deposition channels;

[0015] The metering unit is used to measure the amount of gas and oil collected at the outlet of the sedimentation unit.

[0016] Optionally, the sample preparation unit includes a first intermediate container, a second intermediate container, a first high-pressure displacement pump, and a sample preparation valve;

[0017] The first intermediate container and the second intermediate container are respectively connected between the first high-pressure displacement pump and the sample mixing valve;

[0018] A first piston is installed in a first intermediate container, and a second piston is installed in a second intermediate container. A first high-pressure displacement pump drives the first piston and the second piston to reciprocate.

[0019] Optionally, an inlet shut-off valve is provided at the outlet end of the first intermediate container;

[0020] An air inlet valve is installed at the outlet end of the second intermediate container.

[0021] Optionally, the injection unit includes a sample preparation container, which is placed inside a constant temperature chamber;

[0022] One end of the sample preparation container is connected to the second high-pressure displacement pump, and the other end is connected to the sample preparation valve;

[0023] A third piston is installed inside the sample preparation container at one end near the second high-pressure displacement pump.

[0024] Optionally, the deposition unit includes an oil flow pipe, which is placed in a cryogenic circulation device. The inlet of the oil flow pipe is connected to a sample mixing valve, and the outlet of the oil flow pipe is connected to a liquid discharge shut-off valve.

[0025] Optionally, the inlet of the oil flow pipeline and the sampler valve are connected through the two ends of the first tee, and the third end of the first tee is connected to the first pressure sensor.

[0026] Optionally, the outlet of the oil flow pipeline and the liquid outlet shut-off valve are connected through the two ends of the second tee, and the third end of the second tee is connected to the second pressure sensor.

[0027] Optionally, a high-pressure filter element is installed between the outlet of the oil flow pipeline and the liquid outlet shut-off valve.

[0028] Optionally, the metering unit includes an electronic balance, on which a condensation pool is placed, and a collection bottle is placed in the condensation pool. The collection bottle is connected to the outlet of the sedimentation unit through a first conduit, and the collection bottle is connected to a gas meter through a second conduit.

[0029] Optionally, a back pressure controller is provided on the first conduit, and the back pressure controller is also connected in sequence to a back pressure valve and a back pressure displacement pump.

[0030] This application also discloses a dynamic simulation method for high-temperature and high-pressure high-wax condensate oil gas wax deposition, which simulates the wax deposition process of wax condensate oil gas based on the above-mentioned device.

[0031] Optional simulation methods include:

[0032] According to experimental requirements, oil and gas samples are loaded into the first and second intermediate containers respectively. The liquid inlet shut-off valve, gas valve and sample mixing valve are opened, and the oil and gas samples are pumped into the sample mixing container by the first high-pressure displacement pump.

[0033] The electric heating constant temperature chamber is heated to the experimental temperature and the pressure is increased to the experimental pressure. The displacement flow rate, oil bath temperature and back pressure are set by the second high pressure displacement pump, low temperature oil bath circulation device and back pressure displacement pump.

[0034] Once the displacement flow rate, oil bath temperature, and back pressure reach the preset experimental values, open the sample mixing valve, liquid outlet shut-off valve, and back pressure valve in sequence to allow the gas-oil mixed sample to flow through the oil flow pipeline.

[0035] Record the experimental time, the pressure of the first and second pressure sensors, and the measurement results of the electronic balance and gas meter;

[0036] Based on the measurement results, the gas-oil ratio at the tail end of the oil flow pipeline was calculated. The oil flow pipeline was cleaned with petroleum ether, and nitrogen was used to clean all parts of the pipeline.

[0037] The technical effects and advantages of this application are as follows:

[0038] This application adopts a path where the fluid passes directly from the sample preparation unit through the injection unit, deposition unit, and metering unit in sequence, without using circulating fluid. This allows for the direct simulation of wellbore condensate gas, avoiding the influence of fluid composition changes. At the same time, the addition of the metering unit facilitates the direct acquisition of wax precipitation and wax deposition amounts.

[0039] Other features and advantages of this application will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the application. The objectives and other advantages of this application may be realized and obtained by means of the structures pointed out in the description, claims and drawings. Attached Figure Description

[0040] Figure 1 This is a schematic diagram of the structure of the dynamic simulation device for high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition according to an embodiment of this application;

[0041] Figure 2 The curves showing the pressure difference between the first pressure sensor and the second pressure sensor over time at different flow rates in well A according to an embodiment of this application are shown.

[0042] Reference numerals: 1. First high-pressure displacement pump; 2. First intermediate container; 3. First piston; 4. Second intermediate container; 5. Second piston; 6. Liquid inlet shut-off valve; 7. Gas inlet valve; 8. Second high-pressure displacement pump; 9. Constant temperature chamber; 10. Sample preparation container; 11. Third piston; 12. Sample preparation valve; 13. First tee; 14. First pressure sensor; 15. Low-temperature circulation device; 16. Oil flow pipeline; 17. Second pressure sensor; 18. Second tee; 19. High-pressure filter element; 20. Liquid outlet shut-off valve; 21. Back pressure displacement pump; 22. Back pressure valve; 23. Back pressure controller; 24. Condensate tank; 25. Collection bottle; 26. Electronic balance; 27. Gas meter. Detailed Implementation

[0043] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0044] This application provides a high-temperature, high-pressure, high-wax-content condensate oil and gas wax deposition dynamic simulation device, comprising: a sample preparation unit, an injection unit, a deposition unit, and a metering unit; the sample preparation unit is used to quantitatively inject oil and gas samples into the injection unit according to experimental requirements; the injection unit is used to mix, pressurize, and heat the oil and gas samples, and then inject them into the deposition unit; the deposition unit is used to simulate a deposition pipeline; and the metering unit is used to measure the amount of gas and oil collected at the outlet of the deposition unit.

[0045] By adopting a path where the fluid flows directly from the sample preparation unit through the injection unit, deposition unit, and metering unit in sequence, without using circulating fluid, wellbore condensate gas can be directly simulated, avoiding the influence of fluid composition changes. At the same time, the addition of the metering unit also facilitates the direct acquisition of wax precipitation and wax deposition amounts.

[0046] like Figure 1 As shown, in some embodiments of this application, the sample preparation unit includes a first intermediate container 2, a second intermediate container 4, a first high-pressure displacement pump 1, and a sample preparation valve 12. The first intermediate container 2 and the second intermediate container 4 are respectively connected between the first high-pressure displacement pump 1 and the sample preparation valve 12. The first intermediate container 2 is provided with a first piston 3, and the second intermediate container is provided with a second piston 5. The first intermediate container 2 and the second intermediate container 4 are respectively used to hold the oil sample and the gas sample required for the experiment. The first high-pressure displacement pump 1 drives the first piston 3 and the second piston 5 to move back and forth. The outlet end of the first intermediate container 2 is provided with a liquid inlet shut-off valve 6, and the outlet end of the second intermediate container 4 is provided with an air inlet valve 7.

[0047] By dividing the oil and gas sample addition paths into two branches, and using the first high-pressure displacement pump 1 as the drive, the amount of oil and gas samples added is adjusted by using a piston in conjunction with the liquid inlet shut-off valve 6 and the gas inlet valve 7. The initial gas-oil ratio of the simulated condensate oil can be accurately adjusted according to experimental needs.

[0048] In some embodiments of this application, the injection unit includes a sample preparation container 10, which is disposed in a constant temperature chamber 9, such as an electric heating constant temperature chamber. One end of the sample preparation container 10 is connected to a second high-pressure displacement pump 8, and the other end is connected to a sample preparation valve 12. A third piston 11 is disposed in the sample preparation container 10 near the end of the second high-pressure displacement pump 8.

[0049] By setting up a constant temperature chamber 9 and a second high-pressure displacement pump 8, the displacement flow rate and high-pressure and high-temperature conditions of the simulated condensate oil can be adjusted according to experimental needs, making the simulation results more accurate.

[0050] In some embodiments of this application, the deposition unit includes an oil flow pipe 16, which is placed in a cryogenic circulation device 15. The cryogenic circulation device 15 may be an oil bath circulation device. The inlet of the oil flow pipe 16 is connected to a sample mixing valve 12, and the outlet of the oil flow pipe 16 is connected to a liquid outlet shut-off valve 20. The inlet of the oil flow pipe 16 and the sample mixing valve 12 are connected through both ends of a first tee 13, and the third end of the first tee 13 is connected to a first pressure sensor 14. The outlet of the oil flow pipe 16 and the liquid outlet shut-off valve 20 are connected through both ends of a second tee 18, and the third end of the second tee 18 is connected to a second pressure sensor 17.

[0051] The low-temperature circulation device 15 can simulate the pipeline temperature under actual production conditions;

[0052] By installing a first pressure sensor 14 and a second pressure sensor 17 at the inlet and outlet of the oil flow pipeline 16, differential pressure testing of the oil flow pipeline 16 can be conveniently performed.

[0053] In some embodiments of this application, a high-pressure filter element 19 is provided between the outlet of the oil flow pipe 16 and the liquid outlet shut-off valve 20.

[0054] By introducing a high-pressure filter element 19, the wax deposited on the pipe wall and the undeposited wax can be separated, thus obtaining accurate wax precipitation and wax deposition amounts.

[0055] In some embodiments of this application, the metering unit includes an electronic balance 26, on which a condensation pool 24 is placed. A collection bottle 25 is placed in the condensation pool 24. The collection bottle 25 is connected to the outlet of the deposition unit through a first conduit and to a gas meter 27 through a second conduit.

[0056] In some embodiments of this application, a back pressure controller 23 is provided on the first conduit, and the back pressure controller 23 is also connected in sequence to a back pressure valve 22 and a back pressure displacement pump 21, thereby simulating the condensate back pressure during actual production.

[0057] This application also discloses a dynamic simulation method for wax deposition in high-temperature, high-pressure, high-wax-content condensate oil gas. The method uses the aforementioned apparatus to simulate the wax deposition process in wax-content condensate oil gas, and includes the following steps:

[0058] S1: Prepare the oil and gas samples required for the experiment and put them into the first intermediate container 2 and the second intermediate container 4 respectively. Connect the sample preparation unit and the injection unit through the sample preparation valve 12. Open the liquid inlet stop valve 6, the gas valve 7 and the sample preparation valve 12, and use the first high-pressure displacement pump 1 to pump the oil and gas samples into the sample preparation container 10 for mixing.

[0059] S2: Close sample preparation valve 12, separate the sample preparation unit from sample preparation valve 12, and then connect sample preparation valve 12 to the deposition unit, so that the injection unit, deposition unit, and metering unit are connected in sequence. Heat the electric heating constant temperature chamber 9 to the experimental temperature and the pressure to the experimental pressure. After it stabilizes, set the displacement flow rate, oil bath temperature, and back pressure through the second high-pressure displacement pump 8, the low-temperature oil bath circulation device 15, and the back pressure displacement pump 21.

[0060] S3: Once the temperature and pressure reach the preset experimental values, open the sample mixing valve 12, the liquid outlet shut-off valve 20, and the back pressure valve 22 in sequence to allow the gas-oil mixture sample to flow through the oil flow pipe 16.

[0061] S4: Record the experimental time, the pressure of the first pressure sensor 14 and the second pressure sensor 17, and the measurement results of the electronic balance 26 and the gas meter 27.

[0062] S5: After the experiment, calculate the gas-oil ratio at the tail end of the oil flow pipeline 16 obtained from the above dynamic simulation process of high temperature, high pressure and high wax content condensate oil gas wax deposition, and use petroleum ether to clean the oil flow pipeline 16 and use nitrogen to clean all parts of the pipeline.

[0063] S6: Change the experimental conditions and repeat steps S1-S5.

[0064] Taking the dynamic simulation process of condensate gas wax deposition in Well A as an example, the oil pressure during the on-site production of Well A is 40 MPa. To simulate the wax deposition near the wellhead in the wellbore, the experimental pressure is the same as the oil pressure of Well A, i.e., the experimental pressure is 40 MPa. To ensure the accuracy of the experimental results, wax should not precipitate before the gas-bearing oil enters the oil flow pipeline 16. The temperature of the gas-bearing oil in the experiment should be greater than the wax precipitation point under the condition of 40 MPa. Under the condition of 40 MPa, the wax precipitation point of condensate gas wells is less than 45℃. Therefore, an electric heating constant temperature chamber 9 is used to control the temperature of the gas-bearing oil at 65℃. This temperature is greater than the wax precipitation point but not too high, which helps the gas-bearing oil to cool down quickly to below the wax precipitation point when it enters the oil flow pipeline 16. The temperature of the oil flow pipeline 16 is controlled at 15℃ using a low-temperature oil bath circulation device 15, and the temperature of the oil flow pipeline 16 is the same as the wellhead temperature. Since the production system of the gas well in the field is constantly adjusted during production, its output will also change constantly. The fluid flow rate in the wellbore will directly affect the wax deposition rate. Therefore, a gas-oil ratio of 108.6m was adopted. 3 / m 3The prepared gas-containing oil was used as the experimental sample, and dynamic flow wax deposition experiments were conducted at displacement flow rates of 0.1 ml / min, 0.2 ml / min, and 0.3 ml / min under a pressure of 40 MPa.

[0065] The pressure difference between the first pressure sensor 14 and the second pressure sensor 17 at different flow rates varies with time as shown in the curves below. Figure 2 As shown, by Figure 2 It can be seen that the greater the displacement velocity, the greater the pressure difference across the oil flow pipe 16. The change in the pressure difference across the oil flow pipe 16 can reflect whether wax has formed in the oil flow pipe 16. Under the same displacement velocity, the greater the pressure difference across the oil flow pipe 16 at different times, the more wax has formed in the oil flow pipe 16. The pressure difference across the oil flow pipe 16 fluctuates frequently and reaches a peak after a period of time. This indicates that the wax formation process of condensate gas in the oil flow pipe 16 is a dynamic process. Wax crystals are continuously deposited in the pipe wall and continuously washed away by the increasing pressure difference, eventually resulting in a larger blockage pressure difference. The time corresponding to the maximum change in the blockage pressure difference is recorded as the wax formation time point.

[0066] Table 1 shows the wax deposition data of gas-bearing oil in Well A at different flow rates. As can be seen from Table 1, with the increase of flow rate, the wax deposition time increases, the wax deposition thickness increases, and the wax deposition rate decreases. This is because the increase of flow rate makes the gas-bearing oil more scouring of the wax deposit layer, stripping off the deposited wax. That is, the higher the flow rate of the gas-bearing oil, the greater the shearing and stripping effect on the wax deposit layer. Therefore, the higher the flow rate, the lower the wax deposition rate. This is consistent with the actual production situation in the field, where the production increases and the degree of wax deposition decreases. With the increase of flow rate, the outlet gas-oil ratio decreases and approaches the original value of the sample, indicating that once the well is shut in, it may be more likely to cause wax blockage. This finding has an important impact on guiding the development of condensate gas reservoirs and the treatment of wellbore wax blockage problems.

[0067] Table 1. Waxing data of gas-bearing oil in Well A at different flow rates.

[0068]

[0069] In summary, this application provides an experimental apparatus and method that can effectively simulate the wax deposition pattern in wellbore under high temperature and high pressure conditions, and conveniently obtain accurate wax precipitation and wax deposition amounts.

[0070] Finally, it should be noted that the above description is only a preferred embodiment of this application and is not intended to limit this application. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A dynamic simulation device for high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition, characterized in that, include: Sample preparation unit, injection unit, deposition unit, and metering unit; The sample preparation unit is used to quantitatively inject oil and gas samples into the injection unit according to experimental requirements; The injection unit is used to mix, pressurize, and heat the oil and gas samples, and then inject them into the deposition unit; The deposition unit is used to simulate a deposition channel; The metering unit is used to measure the amount of gas and oil collected at the outlet of the deposition unit.

2. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 1, characterized in that, The sample preparation unit includes a first intermediate container (2), a second intermediate container (4), a first high-pressure displacement pump (1), and a sample preparation valve (12); The first intermediate container (2) and the second intermediate container (4) are respectively connected between the first high-pressure displacement pump (1) and the sample mixing valve (12); The first intermediate container (2) is provided with a first piston (3), and the second intermediate container (4) is provided with a second piston (5). The first high-pressure displacement pump (1) drives the first piston (3) and the second piston (5) to reciprocate.

3. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 2, characterized in that, The outlet end of the first intermediate container (2) is provided with a liquid inlet shut-off valve (6); An air inlet valve (7) is provided at the outlet end of the second intermediate container (4).

4. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 1, characterized in that, The injection unit includes a sample preparation container (10), which is disposed inside a constant temperature chamber (9); One end of the sample container (10) is connected to the second high-pressure displacement pump (8), and the other end is connected to the sample dispenser valve (12); A third piston (11) is provided inside the sample container (10) near the end of the second high-pressure displacement pump (8).

5. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 1, characterized in that, The deposition unit includes an oil flow pipe (16), which is placed in a low-temperature circulation device (15). The inlet of the oil flow pipe (16) is connected to a sampler valve (12), and the outlet of the oil flow pipe (16) is connected to a liquid discharge shut-off valve (20).

6. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 5, characterized in that, The inlet of the oil flow pipe (16) and the sampler valve (12) are connected through the two ends of the first tee (13), and the third end of the first tee (13) is connected to the first pressure sensor (14).

7. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 5, characterized in that, The outlet of the oil flow pipe (16) and the liquid outlet shut-off valve (20) are connected through the two ends of the second tee (18), and the third end of the second tee (18) is connected to the second pressure sensor (17).

8. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 5, characterized in that, A high-pressure filter element (19) is provided between the outlet of the oil flow pipe (16) and the liquid outlet shut-off valve (20).

9. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 1, characterized in that, The metering unit includes an electronic balance (26), on which a condensation pool (24) is placed. A collection bottle (25) is placed in the condensation pool (24). The collection bottle (25) is connected to the outlet of the deposition unit through a first conduit. The collection bottle (25) is connected to a gas meter (27) through a second conduit.

10. The high-temperature, high-pressure, high-wax-content condensate oil gas wax deposition dynamic simulation device according to claim 9, characterized in that, The first conduit is equipped with a back pressure controller (23), which is also connected in sequence to a back pressure valve (22) and a back pressure displacement pump (21).

11. A method for simulating the dynamic deposition of wax in high-temperature, high-pressure, high-wax-content condensate oil and gas, characterized in that, The method simulates the wax deposition process of waxy condensate oil gas based on the apparatus described in any one of claims 1-10.

12. The method for simulating the dynamic deposition of wax in high-temperature, high-pressure, high-wax condensate oil gas according to claim 11, characterized in that, include: According to the experimental requirements, oil and gas samples are loaded into the first intermediate container (2) and the second intermediate container (4) respectively. The liquid inlet stop valve (6), gas valve (7) and sample mixing valve (12) are opened. The oil and gas samples are pumped into the sample mixing container (10) by the first high-pressure displacement pump (1) and mixed. The electric heating constant temperature chamber (9) is heated to the experimental temperature and the pressure is increased to the experimental pressure. The displacement flow rate, oil bath temperature and back pressure are set by the second high pressure displacement pump (8), the low temperature oil bath circulation device (15) and the back pressure displacement pump (21). Once the displacement flow rate, oil bath temperature and back pressure reach the preset experimental values, open the sample mixing valve (12), liquid outlet shut-off valve (20) and back pressure valve (22) in sequence to allow the gas-oil mixed sample to flow through the oil flow pipe (16); Record the experimental time, the pressure of the first pressure sensor (14) and the second pressure sensor (17), and the measurement results of the electronic balance (26) and the gas meter (27); Based on the measurement results, the gas-oil ratio at the tail end of the oil flow pipeline (16) was calculated, the oil flow pipeline (16) was cleaned with petroleum ether, and the pipelines were cleaned with nitrogen.

Citation Information

Patent Citations

  • Experimental device for simulation different temperatures says to condensation oil pipe that wax deposit influences

    CN207937383U

  • Gas-dissolved crude oil wax deposition testing device

    CN209979413U