A transformer-to-charging pile line loss uninterrupted real-time calculation system and method

By implementing uninterrupted real-time calculation of line loss through acquisition units and edge computing gateways on the transformer and charging station sides, the problems of coarse calculation granularity and poor real-time performance in existing technologies are solved, achieving accurate loss decomposition and dynamic alarm, and improving the real-time performance and adaptability of line loss monitoring.

CN123136218APending Publication Date: 2026-11-20BEIFANG WEIJIAMAO COAL POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611132198.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-29
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing line loss monitoring technologies have coarse calculation granularity, poor real-time performance, and cannot accurately locate line losses. Furthermore, they lack closed-loop loss reduction mechanisms, leading to false alarms, missed alarms, and wasted energy.

Method used

Electrical data is collected by acquisition units located on the transformer side and the charging station side, and time-stamp synchronization and data matching are performed through the edge computing gateway. The total active power loss is calculated, decomposed into fundamental wave, contact and harmonic losses, and a dynamic theoretical line loss benchmark value is generated. The system outputs graded alarms and issues loss reduction instructions.

Benefits of technology

It achieves uninterrupted and accurate calculation of low-voltage link line loss and dynamic adaptive alarm, improving the real-time performance and precision of line loss monitoring, and enhancing the system's adaptability under load fluctuation conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136218A_ABST
    Figure CN123136218A_ABST
Patent Text Reader

Abstract

The application discloses a transformer-to-charging-pile line loss uninterrupted real-time calculation system and method, and belongs to the field of electric power metering. Collection units are arranged at the transformer side and the charging station side to collect time stamp data after clock synchronization; an edge gateway matches the data on the two sides, and if the time difference is qualified, the groups are validly matched, otherwise, out-of-step alarm is given. Total loss is obtained from the validly matched power difference, and harmonic loss is obtained by deducting the fundamental wave and contact loss; dynamic reference is obtained by correcting resistance according to current and temperature, total loss and reference value are compared, hierarchical alarm and proportion are output according to the exceeding degree, and loss reduction instructions are generated according to the level and transmitted and uploaded for issuing. The problems that the traditional method cannot distinguish loss in real time and lacks synchronous checking are solved, and online line loss monitoring and fine decomposition are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power metering, and in particular to a system and method for uninterrupted real-time calculation of line loss from transformer to charging pile. Background Technology

[0002] In recent years, the new energy vehicle industry has experienced explosive growth, and the scale of charging station construction has expanded rapidly. By 2025, my country's charging pile inventory had exceeded ten million units. As a typical high-power nonlinear load, the large-scale connection of charging stations has made the problem of power distribution network line loss increasingly prominent. According to industry statistics, the low-voltage line loss rate between transformers and charging stations is generally between 3% and 8%, and can reach more than 10% in some scenarios. Taking a charging station equipped with 10 120kW DC fast charging piles as an example, if the line loss rate is reduced from 5% to 3%, a single station can save about 120,000 to 150,000 yuan in electricity costs per year. Nationwide, the energy wastage caused by line loss exceeds 10 billion kilowatt-hours annually. In addition, abnormal line loss often indicates electrical faults such as poor contact and aging cables. If not detected in time, there is a potential risk of causing safety accidents such as fires. Therefore, accurate and uninterrupted line loss monitoring and closed-loop loss reduction of this low-voltage link has significant economic benefits and safety value.

[0003] However, existing line loss monitoring technologies have the following shortcomings: (1) The calculation granularity is coarse, and the statistics are mostly performed on the entire transformer area or high-voltage line, making it difficult to accurately locate the independent link between a single transformer and a single charging station; (2) The real-time performance is poor, relying on the daily or monthly meter reading cycle, and it is impossible to achieve uninterrupted calculation at the second level, making it difficult to capture the instantaneous loss fluctuations caused by the intermittent large current of the charging pile; (3) The strong nonlinearity and high harmonic content characteristics of the charging pile are not fully considered, the model adaptability is insufficient, the calculation error often exceeds 20%, and it is impossible to effectively separate the fundamental loss, harmonic loss and contact loss and other components of different natures; (4) The alarm mechanism is inaccurate, and fixed thresholds are generally used, without taking into account the influence of load changes and ambient temperature on line resistance, which easily leads to false alarms or missed alarms; (5) Data and control are disconnected, and line loss data is mostly used for post-event statistics, lacking a real-time closed-loop linkage channel with the dispatch center, making it impossible to achieve dynamic loss reduction during online operation.

[0004] Therefore, there is an urgent need for an integrated solution that can achieve uninterrupted and accurate calculation of link loss, fine decomposition of loss components, dynamic adaptive alarm, and closed-loop issuance of loss reduction instructions. Summary of the Invention

[0005] The present invention aims to at least partially solve one of the technical problems in the related art.

[0006] To address this issue, this invention proposes a real-time, uninterrupted calculation system for line losses between transformers and charging stations. Acquisition units located on both the transformer and charging station sides collect timestamped electrical data after clock synchronization. An edge computing gateway matches the charging station data with the transformer-side timestamp as a reference to form valid data pairs. Based on this, the total active power loss is calculated, and harmonic losses are obtained by subtracting fundamental and contact losses. Simultaneously, a dynamic theoretical line loss benchmark is generated by correcting resistance based on real-time current and cable temperature. The total active power loss is compared to this benchmark, and graded alarms and the proportions of the three types of losses are output according to the degree of exceedance. Based on the alarm level, voltage regulation, compensation, or power limiting commands are generated and transmitted. This invention achieves continuous and accurate calculation of link losses and multi-level alarms, solving the problems of poor real-time performance, indiscriminate loss component differentiation, and lack of closed-loop loss reduction in existing technologies.

[0007] Another objective of this invention is to propose a method for uninterrupted real-time calculation of line loss from transformer to charging pile.

[0008] To achieve the above objectives, the present invention provides a real-time uninterrupted calculation system for line loss from transformer to charging pile, comprising: The first acquisition unit, located on the transformer side, is used to acquire electrical data from the transformer side and mark the first timestamp; The second acquisition unit is located on the charging station side and is used to synchronously acquire electrical data on the charging station side and mark the second timestamp. The clock synchronization unit is used to provide a unified time reference for the two acquisition units, so that the timestamp deviation between the two sides is less than a preset threshold. The edge computing gateway is used to receive two timestamped data streams and match the corresponding data from the charging station side with the transformer side timestamp as a reference. If the time difference is less than a preset threshold, the data is combined into a valid data pair; otherwise, a synchronization alarm is triggered. The edge computing gateway is also used to perform the following processing based on valid data pairs: The total active power loss is calculated from the difference in active power on both sides; The fundamental loss is calculated based on the fundamental current and the preset line resistance. The contact loss is calculated based on the fundamental voltage difference and the fundamental current on both sides. The harmonic loss is obtained by deducting the fundamental loss and the contact loss from the total active power loss. The preset reference resistor is corrected based on real-time current and cable temperature to generate a dynamic theoretical line loss reference value. The total active power loss is compared with the dynamic theoretical line loss reference value, and graded alarms and the proportion of the three types of losses are output according to the degree of exceedance. Based on the alarm level, generate voltage regulation, compensation, or power limiting commands to reduce losses. The data transmission unit is used to upload alarm and percentage information to the scheduling platform and to send the loss reduction instruction to the corresponding execution mechanism.

[0009] The transformer-to-charging-pile uninterrupted real-time calculation system for line loss according to an embodiment of the present invention may also have the following additional technical features: In one embodiment of the present invention, the clock synchronization unit generates a second pulse by receiving BeiDou or GPS satellite signals, or provides a unified time reference to the two acquisition units through the IEEE 1588 precision time protocol.

[0010] In one embodiment of the present invention, the preset threshold is 1 millisecond; when the time difference is greater than or equal to the preset threshold, the edge computing gateway, in addition to triggering a loss-of-synchronization alarm, also discards the currently received transformer-side data packet and waits for the data packet of the next cycle to be re-matched.

[0011] In one embodiment of the present invention, the first acquisition unit and the second acquisition unit synchronously acquire electrical data at a frequency of not less than 1Hz. The electrical data includes three-phase voltage, three-phase current, total active power and 3rd to 13th harmonic current.

[0012] In one embodiment of the present invention, the total active power loss is calculated by the following formula:

[0013] in, This represents the total active power loss of the line. This refers to the active power on the transformer side. This refers to the active power on the charging station side.

[0014] In one embodiment of the present invention, the fundamental loss is calculated by the following formula:

[0015] in, For fundamental frequency resistance, power loss , , These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively. , , The resistances of the three phases A, B, and C are respectively. This represents the effective value of the fundamental current of the neutral line. This is the neutral line resistance.

[0016] In one embodiment of the present invention, the contact loss is calculated by the following formula:

[0017] in, Power loss is due to contact resistance. , , These represent the fundamental voltage differences between phases A, B, and C on the transformer side and the charging station side, respectively. , , These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively.

[0018] In one embodiment of the present invention, harmonic loss is calculated by the following formula:

[0019] in, Adding power loss to harmonics, This represents the total active power loss of the line. For fundamental frequency resistance, power loss The power loss is calculated based on contact resistance. The edge computing gateway also calculates the percentage of fundamental loss, contact loss, and harmonic loss in the total active power loss, as percentage information.

[0020] In one embodiment of the present invention, the dynamic theoretical line loss benchmark value is calculated by the following formula:

[0021] in, This is the benchmark value for dynamic theoretical line loss. This represents the effective value of the total line current. The DC resistance of the cable at 20°C. For conductor temperature coefficient, The temperature of the cable conductor; Tiered alarms are executed according to the following criteria: Normal state: ; Anomaly Alert: ; Fault alarm: .

[0022] To achieve the above objectives, another aspect of the present invention proposes a method for uninterrupted real-time calculation of line loss from transformer to charging pile, comprising: S1 provides a unified time reference to the two acquisition units through the clock synchronization unit, controls the two acquisition units to synchronously acquire electrical data from the transformer side and the charging station side at a preset frequency, and marks the data packets of each acquisition cycle with a timestamp. S2, the edge computing gateway receives two timestamped electrical data, and matches the corresponding data packet on the charging station side with the timestamp of the data packet on the transformer side as a reference; if the difference between the two timestamps is less than a preset threshold, they are combined into a valid data pair; otherwise, the current data packet is discarded and a synchronization failure alarm is triggered, and the process returns to step S1. S3, the edge computing gateway calculates the total active power loss of the line based on the difference in total active power on both sides of the effective data pair; S4, the edge computing gateway calculates the fundamental resistance loss based on the fundamental current and preset line resistance in the effective data pair; calculates the contact resistance loss based on the fundamental voltage difference of the corresponding phases on both sides and the fundamental current of the corresponding phases; deducts the fundamental loss and contact loss from the total active power loss in sequence to obtain the harmonic additional loss; and calculates the percentage of each of the three types of losses in the total loss as the loss attribution data output. S5, the edge computing gateway performs temperature correction on the preset reference resistor based on the real-time total current and the real-time cable temperature to generate a dynamic theoretical line loss reference value; compares the total active power loss with the dynamic reference value, outputs graded alarms according to the degree of exceedance, and attaches the loss attribution data. S6 automatically generates and outputs loss reduction instructions according to the level of the graded alarm and the preset priority. The loss reduction instructions include voltage adjustment instructions, reactive power compensation instructions or power limiting instructions, which are sent to the corresponding actuators respectively. S7. After completing step S6, the system automatically returns to step S1 and continuously executes the above steps at a preset frequency to achieve uninterrupted real-time calculation and closed-loop control of line loss.

[0023] This invention discloses a real-time uninterrupted calculation system and method for line loss from a transformer to a charging pile. A clock synchronization unit ensures that the time stamp deviation of the data collected from both sides is less than a preset threshold. An edge computing gateway matches the charging station data with the transformer-side time stamp as a reference, balancing synchronization accuracy and data validity. Based on this, the total active power loss is finely decomposed into three components: fundamental loss, contact loss, and harmonic loss. A dynamic theoretical line loss benchmark value is generated based on real-time current and cable temperature for graded alarms, effectively solving the false alarm and missed alarm problems caused by fixed thresholds and coarse models in existing technologies. Simultaneously, voltage regulation, compensation, or power limiting commands are automatically generated according to the alarm level and issued to the actuator in a closed loop. This achieves uninterrupted operation of the entire process from data acquisition, loss decomposition, dynamic alarms to loss reduction command execution, significantly improving the real-time performance and precision of low-voltage power supply link line loss monitoring, and enhancing the system's adaptability and engineering practical value under conditions of drastic fluctuations in charging load.

[0024] Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. Attached Figure Description

[0025] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein: Figure 1 This is an architecture diagram of a real-time uninterrupted calculation system for line loss from a transformer to a charging pile according to an embodiment of the present invention. Figure 2This is a schematic diagram of the method flow steps according to an embodiment of the present invention; Figure 3 This is a block diagram of the multidimensional line loss calculation model according to an embodiment of the present invention. Detailed Implementation

[0026] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0027] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0028] The following describes, with reference to the accompanying drawings, an embodiment of the present invention, a system and method for uninterrupted real-time calculation of line loss from transformer to charging pile.

[0029] Example 1 like Figure 1 As shown, the present invention provides a real-time uninterrupted calculation system for line loss from a transformer to a charging pile, comprising: The first acquisition unit, located on the transformer side, is used to acquire electrical data from the transformer side and mark the first timestamp; The second acquisition unit, located on the charging station side, is used to synchronously acquire electrical data from the charging station side and mark it with a second timestamp.

[0030] It should be further explained that the hardware selection for the first and second acquisition units is as follows: 0.2S-class multi-functional harmonic energy meter, supporting RS485 communication interface; Time synchronization: Time synchronization is performed through a high-precision clock synchronization unit (BeiDou / GPS second pulse or PTP network clock) to ensure that the time deviation between the two acquisition ends is less than 1 millisecond; Acquisition frequency: Synchronously acquire all electrical parameters such as three-phase voltage, three-phase current, total active power, total reactive power, power factor, 3rd-13th harmonic voltage, and 3rd-13th harmonic current at a frequency of 1Hz; Data marking: Mark the data packet of each acquisition cycle with the precise timestamp of the acquisition time.

[0031] The clock synchronization unit is used to provide a unified time reference to the two acquisition units, so that the timestamp deviation between the two sides is less than a preset threshold.

[0032] It should be further noted that the hardware selection for the clock synchronization unit is: an industrial-grade BeiDou / GPS dual-mode synchronous clock with a time accuracy of ±100 nanoseconds, which provides time synchronization to the acquisition unit via PPS second pulses and serial port messages. An alternative solution is to use the IEEE 1588 PTP precise time synchronization protocol, achieving network-level microsecond-level clock synchronization via Ethernet, suitable for scenarios such as underground charging stations where it is inconvenient to install satellite antennas.

[0033] The edge computing gateway is used to receive two timestamped data streams and match the corresponding data from the charging station side with the transformer-side timestamp as a reference. If the time difference is less than a preset threshold, the data is combined into a valid data pair; otherwise, a synchronization alarm is triggered.

[0034] The edge computing gateway is also used to perform the following processing based on valid data pairs: The total active power loss is calculated from the difference in active power on both sides; The fundamental loss is calculated based on the fundamental current and the preset line resistance. The contact loss is calculated based on the fundamental voltage difference and the fundamental current on both sides. The harmonic loss is obtained by deducting the fundamental loss and the contact loss from the total active power loss. The preset reference resistor is corrected based on real-time current and cable temperature to generate a dynamic theoretical line loss reference value. The total active power loss is compared with the dynamic theoretical line loss reference value, and graded alarms and the proportion of the three types of losses are output according to the degree of exceedance. Based on the alarm level, generate voltage regulation, compensation, or power limiting commands to reduce losses.

[0035] It should be further explained that the edge computing gateway's hardware selection is: an industrial-grade ARM architecture processor, equipped with no less than 2GB of RAM and 32GB of local storage. Its core functions include: timing alignment and matching: real-time comparison of the timestamps of two data packets; only when the deviation is less than a preset threshold (e.g., 1 millisecond) is a valid data pair formed; otherwise, it is discarded and a clock anomaly alarm is triggered; multi-dimensional line loss calculation: online decomposition calculation of fundamental resistance loss, harmonic additional loss, and contact resistance loss; dynamic benchmark diagnosis: dynamic calculation of theoretical line loss benchmark values ​​based on real-time current and cable temperature, performing multi-level anomaly judgment; alarms and closed-loop commands: generating and uploading hierarchical alarms, and automatically generating loss reduction control commands to send to the dispatch center or directly to the execution device.

[0036] The data transmission unit is used to upload alarm and percentage information to the scheduling platform and to send the loss reduction instruction to the corresponding execution mechanism.

[0037] It should be further explained that the hardware selection for the data transmission unit is: an industrial-grade 4G / 5G wireless communication module; the communication protocol is MQTT, encrypted with AES-128. Line loss data is uploaded once per minute; abnormal alarms are uploaded in real time; the dispatch center functions include: displaying real-time line loss data and historical trends; and automatically or manually performing loss reduction operations such as voltage regulation, reactive power compensation, or load adjustment according to preset strategies.

[0038] It is worth mentioning that the system architecture will now be further explained, such as... Figure 1 The system includes: a distribution transformer (10kV / 0.4kV); a first high-precision synchronous acquisition unit; a high-precision clock synchronization unit (BeiDou / GPS or PTP); a second high-precision synchronous acquisition unit; a charging station; a 0.4kV AC power supply cable; an edge computing gateway; and a dispatch center platform. Electrical energy flows from the transformer through the first acquisition unit, the cable, and the second acquisition unit to the charging station. The clock synchronization unit sends synchronization signals to both acquisition units. The edge computing gateway receives the two acquisition data streams, processes them, and uploads them to the dispatch center platform. The dispatch center issues control commands to the transformer, reactive power compensation device, and charging station based on alarms, forming a closed loop.

[0039] The system of this invention effectively solves the problems of poor real-time performance, false alarms and missed alarms, and inability to close the loop to reduce losses caused by fixed thresholds, coarse models, and disconnect between data and scheduling in the prior art. It realizes the integrated and uninterrupted operation of the entire process from synchronous acquisition of multi-source data, fine decomposition of losses, dynamic adaptive alarm to closed-loop issuance of loss reduction instructions. It significantly improves the real-time performance, precision and intelligence of low-voltage charging link line loss monitoring, and enhances the system's adaptability and engineering practical value under conditions of severe fluctuations in charging load and harmonic pollution.

[0040] Example 2 like Figure 2 As shown, the method for uninterrupted real-time calculation of line loss from transformer to charging pile according to the present invention includes the following steps: S1 provides a unified time reference to the two acquisition units through the clock synchronization unit, controls the two acquisition units to synchronously acquire electrical data from the transformer side and the charging station side at a preset frequency, and marks the data packets of each acquisition cycle with a timestamp.

[0041] In one embodiment of the present invention, after the system is powered on, the clock synchronization unit synchronizes the two acquisition units to ensure that the time synchronization error is less than 1 millisecond. The two acquisition units synchronously acquire electrical parameters at their respective installation locations at a frequency of 1Hz and timestamp each data packet for each cycle.

[0042] S2, the edge computing gateway receives two timestamped electrical data streams and matches the corresponding data stream from the charging station side with the timestamp of the data stream from the transformer side as a reference. If the difference between the two timestamps is less than a preset threshold, they are combined into a valid data pair. Otherwise, the current data stream is discarded and a synchronization failure alarm is triggered, and the process returns to step S1.

[0043] In one embodiment of the present invention, the edge computing gateway receives two data streams in real time. For a newly received data packet from the transformer side, the gateway searches for the data packet with the closest timestamp in the charging station side buffer queue: if the time deviation is less than 1 millisecond, it is grouped into a "valid data pair" for calculation; if the time deviation is greater than 1 millisecond, it is determined to be a clock out of sync, the group of data is discarded, and a "clock synchronization anomaly" alarm event is generated.

[0044] S3, the edge computing gateway calculates the total active power loss of the line based on the difference in total active power on both sides of the valid data pair.

[0045] In one embodiment of the present invention, such as Figure 3 As shown, the edge computing gateway performs the following calculations for each valid data pair: Total active power loss of the line:

[0046] in: —Total active power loss of the line, in kW; —Active power on the transformer side, measured by the first acquisition unit, in kW; —Active power at the charging station, measured by the second acquisition unit, in kW.

[0047] S4, the edge computing gateway calculates the fundamental resistance loss based on the fundamental current and preset line resistance in the valid data pair; calculates the contact resistance loss based on the fundamental voltage difference and corresponding phase fundamental current on both sides; deducts the fundamental loss and contact loss from the total active power loss in sequence to obtain the harmonic additional loss; and calculates the percentage of each of the three types of losses in the total loss as the loss attribution data output.

[0048] In one embodiment of the present invention, such as Figure 3 As shown, it should be noted that the calculation method for fundamental wave resistance loss power is as follows (including three phases and neutral line):

[0049] in: —Fundamental frequency resistance loss power, in kW; , , —These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively, in amperes (A). , , —These are the resistances of the three phases A, B, and C, pre-set according to cable specifications and length, in Ω; —The effective value of the fundamental current of the neutral line, in amperes (A); — Neutral line resistance, preset according to cable specifications and length, in Ω.

[0050] The calculation method for contact resistance loss power is as follows:

[0051] in: —Contact resistance power loss, unit kW; , , —These are the fundamental voltage differences between the transformer side and the charging station side for each of phases A, B, and C, respectively, in V; , , —These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively, in amperes (A).

[0052] The calculation method for harmonic-induced power loss is as follows:

[0053] in: —Harmonic-induced power loss, in kW; —Total active power loss of the line, in kW; —Fundamental frequency resistance loss power, in kW; —— Contact resistance loss power, unit kW.

[0054] S5, the edge computing gateway performs temperature correction on the preset reference resistor based on the real-time total current and the real-time cable temperature, and generates a dynamic theoretical line loss reference value; it compares the total active power loss with the dynamic reference value, outputs graded alarms according to the degree of exceedance, and attaches the loss attribution data.

[0055] In one embodiment of the present invention, it should be noted that the calculation method of the dynamic theoretical line loss benchmark value is as follows:

[0056] in: —Dynamic theoretical line loss benchmark value, unit kW; —The effective value of the total line current, in amperes (A); —The DC resistance of the cable at 20℃, in Ω; —Temperature coefficient of conductor, taken as 0.00393 / ℃ for copper conductor; —Measured or calculated cable conductor temperature using a thermal model, in °C.

[0057] S6 automatically generates and outputs loss reduction instructions according to the level of the graded alarm and the preset priority. The loss reduction instructions include voltage adjustment instructions, reactive power compensation instructions or power limiting instructions, which are sent to the corresponding actuators respectively.

[0058] In one embodiment of the present invention, it should be understood that the criteria for determining various states include: Normal state: Data is uploaded at a regular interval (e.g., every 15 minutes); anomaly alerts: Immediately upload an alarm, along with... and Percentage of total losses; Fault alarm: It can immediately upload an emergency alarm and trigger a local audible and visual alarm.

[0059] It should be further explained that the dispatch center or edge gateway will automatically perform loss reduction operations according to the following priorities based on the alarm level: First priority - voltage regulation: send a voltage increase command to the on-load tap changer controller of the transformer to appropriately increase the output voltage within the voltage qualification range in order to reduce the line current; Second priority - compensation: if the line loss still exceeds the limit or the reactive power factor is too low, switch the reactive power compensation device to achieve local reactive power balance; Third priority - load control: if the above measures are ineffective, send a flexible power reduction command to the charging station energy management system to temporarily reduce the upper limit of the total charging power.

[0060] The entire process, from detecting the anomaly to initiating a loss reduction response, can be completed within seconds.

[0061] S7. After completing step S6, the system automatically returns to step S1 and continuously executes the above steps at a preset frequency to achieve uninterrupted real-time calculation and closed-loop control of line loss.

[0062] In one embodiment of the present invention, return to S1 to achieve uninterrupted closed-loop monitoring.

[0063] It is worth mentioning that the multidimensional line loss decomposition calculation will now be further explained and supplemented. Figure 3 The internal structure of the line loss calculation model is shown, such as Figure 3 As shown: The top section contains input data, divided into two groups: one group consists of synchronous electrical data from the transformer side and the charging station side, which are combined and then enter the bus loss calculation module below; the other group consists of inherent cable parameters and cable conductor temperature, which are both entered into the dynamic reference value calculation module.

[0064] The total active power loss output from the bus loss calculation module is split into three paths: one path goes to the fundamental frequency resistance loss calculation module, one path goes to the contact resistance loss calculation module, and the other path goes directly through to the harmonic additional loss calculation module. The fundamental frequency resistance loss calculation module and the contact resistance loss calculation module are completely parallel and independent modules. Each module obtains the required parameters from the original electrical data, performs its own calculations, and then sends the results to the harmonic additional loss calculation module. The harmonic additional loss calculation module combines the three inputs—bus loss, fundamental frequency loss, and contact loss—to complete the decomposition calculation of harmonic losses.

[0065] The bus loss calculation module has an additional output that directly sends the total active power loss to the multi-level alarm diagnosis module below. The dynamic reference value calculation module calculates the theoretical line loss reference value based on cable parameters and temperature, and also sends it to the multi-level alarm diagnosis module. The multi-level alarm diagnosis module compares the actual bus loss with the dynamic reference value and generates alarm levels of normal, abnormal, or fault.

[0066] The bottom shows the output results: instantaneous line loss power and dynamic reference value output, with total active power loss data provided by the bus line loss calculation module and reference value data provided by the dynamic reference value calculation module.

[0067] The line loss rate output is obtained by dividing the total active power loss data provided by the bus loss calculation module and the active power on the transformer side provided by the transformer-side synchronous electrical data.

[0068] The loss component percentage output is provided by the fundamental resistance loss calculation module, the contact resistance loss calculation module, and the harmonic additional loss calculation module, which together provide three types of loss values, and calculate the percentage of each component in the total loss.

[0069] Alarm information output is determined by the multi-level alarm diagnosis module, which provides the alarm level assessment results.

[0070] The method of this invention effectively solves the problems of poor real-time performance, false alarms and missed alarms, and inability to close the loop to reduce losses caused by fixed thresholds, coarse models, and disconnected data scheduling in the prior art. It realizes the integrated solution of the entire process from synchronous data acquisition, fine loss decomposition, dynamic adaptive alarm to closed-loop issuance of loss reduction instructions, which significantly improves the real-time performance and precision of charging link line loss monitoring, and enhances the system's adaptability and engineering practical value under conditions of severe fluctuations in charging load and harmonic pollution.

[0071] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0072] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

Claims

1. A real-time uninterrupted calculation system for line loss from transformer to charging pile, characterized in that, include: The first acquisition unit, located on the transformer side, is used to acquire electrical data from the transformer side and mark the first timestamp; The second acquisition unit is located on the charging station side and is used to synchronously acquire electrical data on the charging station side and mark the second timestamp. The clock synchronization unit is used to provide a unified time reference for the two acquisition units, so that the timestamp deviation between the two sides is less than a preset threshold. The edge computing gateway is used to receive two timestamped data streams and match the corresponding data from the charging station side with the transformer side timestamp as a reference. If the time difference is less than a preset threshold, the data is combined into a valid data pair; otherwise, a synchronization alarm is triggered. The edge computing gateway is also used to perform the following processing based on valid data pairs: The total active power loss is calculated from the difference in active power on both sides; The fundamental loss is calculated based on the fundamental current and the preset line resistance. The contact loss is calculated based on the fundamental voltage difference and the fundamental current on both sides. The harmonic loss is obtained by deducting the fundamental loss and the contact loss from the total active power loss. The preset reference resistor is corrected based on real-time current and cable temperature to generate a dynamic theoretical line loss reference value. The total active power loss is compared with the dynamic theoretical line loss reference value, and graded alarms and the proportion of the three types of losses are output according to the degree of exceedance. Based on the alarm level, generate voltage regulation, compensation, or power limiting commands to reduce losses. The data transmission unit is used to upload alarm and percentage information to the scheduling platform and to send the loss reduction instruction to the corresponding execution mechanism.

2. The system as described in claim 1, characterized in that, The clock synchronization unit generates a second pulse by receiving BeiDou or GPS satellite signals, or provides a unified time reference to the two acquisition units through the IEEE 1588 precision time protocol.

3. The system as described in claim 1, characterized in that, The preset threshold is 1 millisecond; when the time difference is greater than or equal to the preset threshold, the edge computing gateway, in addition to triggering a loss-of-synchronization alarm, also discards the currently received transformer-side data packets and waits for the data packets of the next cycle to be matched again.

4. The system as described in claim 1, characterized in that, Both the first acquisition unit and the second acquisition unit synchronously acquire electrical data at a frequency of not less than 1Hz. The electrical data includes three-phase voltage, three-phase current, total active power, and 3rd to 13th harmonic current.

5. The system as described in claim 1, characterized in that, Total active power loss is calculated using the following formula: in, This represents the total active power loss of the line. This refers to the active power on the transformer side. This refers to the active power on the charging station side.

6. The system as described in claim 1, characterized in that, The fundamental loss is calculated using the following formula: in, For fundamental frequency resistance, power loss , , These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively. , , The resistances of the three phases A, B, and C are respectively. This represents the effective value of the fundamental current of the neutral line. This is the neutral line resistance.

7. The system according to claim 1, characterized in that, Contact loss is calculated using the following formula: in, Power loss is due to contact resistance. , , These represent the fundamental voltage differences between phases A, B, and C on the transformer side and the charging station side, respectively. , , These are the effective values ​​of the fundamental currents of phases A, B, and C, respectively.

8. The system according to claim 1, characterized in that, Harmonic loss is calculated using the following formula: in, Adding power loss to harmonics, This represents the total active power loss of the line. For fundamental frequency resistance, power loss The power loss is calculated based on contact resistance. The edge computing gateway also calculates the percentage of fundamental loss, contact loss, and harmonic loss in the total active power loss, as percentage information.

9. The system according to claim 1, characterized in that, The dynamic theoretical line loss benchmark value is calculated using the following formula: in, This is the benchmark value for dynamic theoretical line loss. This represents the effective value of the total line current. The DC resistance of the cable at 20°C. For conductor temperature coefficient, The temperature of the cable conductor; Tiered alarms are executed according to the following criteria: Normal state: ; Anomaly Alert: ; Fault alarm: .

10. A method for uninterrupted real-time calculation of line loss from transformer to charging pile, characterized in that, Includes the following steps: S1 provides a unified time reference to the two acquisition units through the clock synchronization unit, controls the two acquisition units to synchronously acquire electrical data from the transformer side and the charging station side at a preset frequency, and marks the data packets of each acquisition cycle with a timestamp. S2, the edge computing gateway receives two timestamped electrical data streams and matches the corresponding data packets on the charging station side with the timestamp of the data packets on the transformer side as a reference; If the difference between the two timestamps is less than the preset threshold, they are combined into a valid data pair; otherwise, the current data packet is discarded and a synchronization alarm is triggered, and the process returns to step S1. S3, the edge computing gateway calculates the total active power loss of the line based on the difference in total active power on both sides of the effective data pair; S4, the edge computing gateway calculates the fundamental resistance loss based on the fundamental current and preset line resistance in the valid data pair; and calculates the contact resistance loss based on the fundamental voltage difference of the corresponding phases on both sides and the fundamental current of the corresponding phases. The harmonic additional loss is obtained by successively subtracting the fundamental loss and contact loss from the total active power loss; It also calculates the percentage of each of the three types of losses in the total loss, and outputs this as loss attribution data. S5, the edge computing gateway performs temperature correction on the preset reference resistor based on the real-time total current and the real-time cable temperature, and generates a dynamic theoretical line loss reference value. The total active power loss is compared with the dynamic benchmark value, and graded alarms are output according to the degree of exceedance, along with the loss attribution data. S6 automatically generates and outputs loss reduction instructions according to the level of the graded alarm and the preset priority. The loss reduction instructions include voltage adjustment instructions, reactive power compensation instructions or power limiting instructions, which are sent to the corresponding actuators respectively. S7. After completing step S6, the system automatically returns to step S1 and continuously executes the above steps at a preset frequency to achieve uninterrupted real-time calculation and closed-loop control of line loss.