A method and system for testing and evaluating the energy efficiency of fast charging of electric vehicles
By setting up multiple test points on the electric vehicle charging branch and introducing charging time and lifespan correction coefficients, the problems of inconsistent test conditions and lack of full-link evaluation in the existing electric vehicle fast charging energy efficiency test are solved, and a full-link, multi-dimensional energy efficiency quantitative evaluation is realized.
Patent Information
- Application Number
- CN202611517040.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-29
- Publication Date
- 2026-11-20
AI Technical Summary
Existing fast charging energy efficiency testing methods for electric vehicles suffer from problems such as inconsistent testing conditions, lack of end-to-end evaluation, inconsistent energy consumption handling of auxiliary systems, and failure to incorporate charging speed and battery aging into a unified evaluation framework, making it difficult to make horizontal comparisons and objective assessments of evaluation results.
By setting up multiple test points on the charging equipment, charging cables, vehicle high-voltage power distribution, thermal management system, and power battery pack charging branches, calculating the electrical energy at each point and obtaining the recyclable energy of the power battery pack, and introducing charging time and lifespan correction coefficients, a multi-dimensional evaluation system for the entire chain is established.
It achieves uniformity and comparability of test conditions, incorporates the measurement of energy consumption in the thermal management system, comprehensively evaluates charging speed and battery aging, and provides a quantitative evaluation of fast charging energy efficiency across the entire chain and in multiple dimensions.
Smart Images

Figure CN123136249A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of new energy vehicle charging testing and energy management technology, and more specifically, to a method and system for testing and evaluating the energy efficiency of fast charging of electric vehicles. Background Technology
[0002] As a crucial component of new energy vehicles, the charging efficiency of electric vehicles directly impacts the overall vehicle operating economy and grid load levels. With the rapid growth in electric vehicle ownership and the large-scale application of fast-charging technology, the importance of charging efficiency testing and evaluation methods is increasingly prominent. Currently, several testing standards related to charging efficiency have been published both domestically and internationally; however, existing testing methods still have the following shortcomings in terms of the completeness and consistency of energy efficiency evaluation: 1) Inconsistent testing conditions make cross-comparison difficult: Inconsistent testing conditions prevent effective cross-comparison of energy efficiency evaluation results between different vehicle models and charging piles. 2) Disconnect between charging pile-side and battery-side efficiency, lacking end-to-end evaluation: Existing tests typically only provide the AC-DC conversion efficiency of the charging pile, or calculate battery charging efficiency solely based on the battery-side energy recorded by the BMS. The former ignores cable losses between the charging pile output and the battery input, as well as vehicle-side losses; the latter fails to reflect the charging pile's own conversion efficiency. 3) Auxiliary system energy consumption is omitted or repeatedly deducted during charging: During fast charging of electric vehicles, auxiliary systems such as cooling pumps, compressors, fans, and battery heaters continuously operate to ensure the battery operates within a suitable temperature range, resulting in considerable energy consumption. Auxiliary system energy consumption significantly impacts the overall efficiency of the battery energy storage system. However, existing testing methods treat this energy consumption differently: some completely ignore it, only calculating the electrical energy entering the battery; others deduct it as a loss in battery charging efficiency. This inconsistent treatment leads to significant differences in energy efficiency evaluation results for the same charging process due to different attributions of auxiliary system energy consumption. 4) Charging speed and cycle aging are treated as independent indicators, and no unified evaluation conclusion has been reached: Although fast charging shortens charging time, a higher charging rate will accelerate battery capacity decay and increase internal resistance. However, the existing evaluation system fails to incorporate charging efficiency, charging speed, and battery aging into a unified evaluation framework, making it difficult for users and automakers to comprehensively and objectively assess the overall performance of fast charging solutions.
[0003] In summary, existing methods for testing and evaluating the energy efficiency of fast charging for electric vehicles suffer from problems such as inconsistent testing conditions, lack of end-to-end evaluation, inconsistent energy consumption handling of auxiliary systems, and independent evaluation indicators. Therefore, this application is proposed. Summary of the Invention
[0004] The purpose of this application is to provide a method and system for testing and evaluating the energy efficiency of fast charging for electric vehicles. Through multi-point synchronous energy measurement, standard discharge retesting, charging time correction, and battery life correction, the entire process of DC fast charging for electric vehicles can be evaluated and classified.
[0005] To achieve the above objectives, this application adopts the following technical solution: Firstly, this application provides a method for testing and evaluating the energy efficiency of fast charging for electric vehicles, including: Multiple test points are set up on the charging branch under test of the electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack. According to the charging strategy, the power battery pack is fast charged from the initial SOC to the target SOC, and the electrical energy at each test point is calculated. After being left to stand at a specified temperature for a set period of time, the battery pack is discharged to its initial state of charge (SOC) at a specified rate and under specified cutoff conditions, and the recyclable energy of the power battery pack is calculated. The basic efficiency of fast charging is calculated based on the electrical energy and recyclable energy at each test point. The base efficiency is corrected based on the charging time correction factor and the lifespan correction factor to obtain the fast charging energy efficiency index. The fast charging energy efficiency of the electric vehicle is then classified according to the magnitude of the fast charging energy efficiency index.
[0006] Secondly, this application provides a fast-charging energy efficiency testing and evaluation system for electric vehicles, comprising: The setup module is used to set up multiple test points on the charging branch under test of an electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack. The fast charging module is used to fast charge the power battery pack from the initial SOC to the target SOC according to the charging strategy, and to calculate the electrical energy at each test point. The recycling module is used to calculate the recyclable energy of the power battery pack after it has been left to stand at a specified temperature for a set time and then discharged to the initial SOC at a specified rate and cutoff conditions. The calculation module is used to calculate the basic efficiency of fast charging based on the electrical energy and the recyclable energy at each test point. The correction and grading module is used to correct the basic efficiency based on the charging time correction coefficient and the life correction coefficient to obtain the fast charging energy efficiency index, and to grade the fast charging energy efficiency of the electric vehicle based on the magnitude of the fast charging energy efficiency index.
[0007] This application proposes a method for testing and evaluating the energy efficiency of fast charging for electric vehicles, which has the following technical advantages compared to existing technologies: This application sets up multiple test points on the tested charging branch, which consists of charging equipment, charging cables and connectors, the vehicle's high-voltage power distribution and thermal management system, and the power battery pack. The electrical energy at each point is calculated, and the recyclable energy of the power battery pack is obtained, thus yielding the basic fast charging efficiency. Based on this, a charging time correction coefficient is introduced to characterize the impact of charging speed on energy efficiency evaluation, and a lifespan correction coefficient is introduced to quantify the additional battery capacity decay caused by fast charging. After correcting the basic efficiency using these two coefficients, a fast charging energy efficiency index is obtained and graded accordingly. This method standardizes the test conditions to a specified SOC range, resting time, discharge rate, and cutoff conditions, making different test results comparable. The energy consumption of the thermal management system is included in the measurement as an inherent part of the charging branch, avoiding the omission or double deduction of auxiliary system energy consumption. Simultaneously, charging speed and battery aging are incorporated into the comprehensive evaluation system, achieving a full-link, multi-dimensional quantitative evaluation of fast charging energy efficiency. In summary, this application effectively solves the technical problems in the prior art, such as inconsistent testing conditions, lack of end-to-end evaluation, inconsistent energy consumption handling of auxiliary systems, and independent evaluation indicators. Attached Figure Description
[0008] To more clearly illustrate the technical solutions in the specific embodiments of this application or the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0009] Figure 1 This is a flowchart of a fast-charging energy efficiency testing and evaluation method for electric vehicles provided in an embodiment of this application; Figure 2 This is a schematic diagram of the test points provided in the embodiments of this application. Detailed Implementation
[0010] The following description, in conjunction with the accompanying drawings, illustrates exemplary embodiments of this application, including various details to aid understanding. These should be considered merely exemplary. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of this application. Similarly, for clarity and brevity, descriptions of well-known functions and structures are omitted in the following description.
[0011] Figure 1This is a flowchart illustrating a fast-charging energy efficiency testing and evaluation method for electric vehicles provided in this embodiment. The purpose of this embodiment is to provide unified test locations and test time windows, establishing a continuous evaluation chain for energy levels; to obtain basic efficiency without repeatedly calculating the energy consumption of the thermal management system; to obtain charging time and lifespan corrections through experiments; and finally, to output fast-charging energy efficiency index, loss ranking, anomaly diagnosis conclusions, and retest results. This embodiment is a testing and evaluation method primarily based on actual measurements supplemented by data processing techniques. Each core variable can be obtained using conventional instruments or prescribed retesting experiments, and the method can check data validity, locate the source of loss, and verify the improvement effect. See also... Figure 1 The method provided in this embodiment includes: S110. Multiple test points are set on the charging branch under test of the electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack.
[0012] See Figure 2 Multiple test points include: the AC input terminal B0 of the charging equipment (AC / DC), the DC output terminal B1 of the charging equipment, the vehicle interface side B2, the input terminal B3 of the power battery pack, and the input terminal BTM of the thermal management system. The charging equipment is a general term for equipment that provides electrical energy to electric vehicles or batteries, such as charging piles. If upstream metering conditions are available on-site, a low-voltage side point B of the distribution transformer can be added. 1. However, this test site is not a necessary condition for implementing this method.
[0013] The entire charging branch under test is taken as the object of test.
[0014] Optionally, when performing fast-charging energy efficiency tests on electric vehicles, first determine and record the vehicle, battery model, SOH, cumulative mileage / cycle count, target SOC range, rated power of charging equipment, ambient temperature, and whether the passenger compartment air conditioning is on. Subsequent reference group tests use the same SOC range and the same thermal management system state. Then, allow the vehicle or battery to stand at a specified ambient temperature until the maximum temperature difference of the battery does not exceed a preset value; preferably, control the initial SOC at 10%±1% and the target SOC at 80%±1%. Perform a pre-charge and discharge cycle to eliminate historical state differences.
[0015] Measuring devices (at least ammeters and voltmeters) are arranged at B0, B1, B2, and B3 respectively. The thermal management system in this embodiment includes a compressor, coolant pump, cooling fan, battery heater, and controller for regulating the power battery temperature. Measurement points BTM,j (where j is the measurement point number) are set up on each independent power supply branch to measure its voltage, current, and active power, obtaining the corresponding energy consumption ETM,j; the ETM of the thermal management system is the sum of the energy / energy consumption of the non-overlapping power supply branches. Optionally, a three-phase active power analyzer is used at B0, and a bidirectional DC power analyzer or a calibrated isolated voltage and current measurement channel is used at B1 to B3 and the power supply branches of the thermal management system. Shared compressors should report the sharing range and accessory mode; if there is independent external power supply or low-voltage battery net discharge, separate measurements and processing should be performed. All deployed sensors are triggered and collected using the same timing source, and zero-point, polarity, and range checks are performed; the sampling frequency of all sensors is not less than 10 Hz, and the time deviation is not greater than one sampling period.
[0016] S120. According to the charging strategy, the power battery pack is fast charged from the initial SOC to the target SOC, and the electrical energy at each test point is calculated.
[0017] This embodiment provides a unified test time window [t0, t1]: t0 is the time when the charging device starts outputting DC current and the current value continuously exceeds the start-up threshold I. start The battery pack reaches its initial SOC (State of Charge) at the time the preset time (e.g., 2 seconds) is reached; t1 is the time when the target SOC is reached and the DC current continuously falls below the termination threshold I. end The time when the preset duration (e.g., 2 seconds) is reached. This embodiment does not limit the specific values of the start and end thresholds; they can be determined based on the performance of the charging device or testing requirements.
[0018] Energy flowing in the direction of charging (i.e., from AC power and charging equipment to the battery pack) is defined as positive. State of Charge (SOC) is expressed as a percentage or a decimal (0-1) within the same batch of data; capacity loss rate is used in calculations as a decimal (0-1). Power is uniformly expressed in kW, and the integrated energy / energy consumption is uniformly expressed in kWh.
[0019] Charging strategies include charging power and charging intervals, and are designed based on the performance of the charging equipment.
[0020] Optionally, the power battery pack is fast-charged from the initial SOC to the target SOC according to the charging strategy, and a test time window [t0, t1] is determined. Within the test time window, the current and voltage at each test point are collected, and the active power is calculated. The active power is integrated over time to obtain the electrical energy at each test point. In addition, the power of the thermal management system is calculated based on the current and voltage of the thermal management system, and the power is integrated over time to obtain the thermal management system energy consumption / electricity consumption (ETM).
[0021] Optionally, during the test, it is also necessary to record the battery SOC, battery temperature, cooling system status, ambient temperature, and timestamp.
[0022] S130. After standing at a specified temperature for a set time, discharge the battery pack at a specified rate to the initial SOC and calculate the recyclable energy of the power battery pack.
[0023] Optionally, constant current discharge at 0.5C or 1C can be used to reduce the impact of discharge rate differences on the results, where 1C represents the current value for a full charge or discharge within 1 hour.
[0024] In one implementation, when both the vehicle and the charging equipment support compatible bidirectional DC transmission, the battery pack can discharge to the charging equipment via the original connection path; the recoverable energy is measured as the net output energy at the battery pack end. For vehicles without reverse discharge capability, a battery pack bench retesting method can be used, for example, by removing the battery pack from the vehicle and connecting it to a battery pack test bench. The bench can precisely control the charging and discharging conditions and allow the battery pack to discharge to its initial state of charge (SOC). Voltage and current are measured at the DC output port of the power battery pack, power (negative value) is calculated, and the power is integrated over time to obtain the recyclable energy.
[0025] S140. Calculate the basic efficiency of fast charging based on the electrical energy and recyclable energy at each test point.
[0026] η station =EC / EG; η cable =EV / EC; η vehicle =EB / EV; η recover =ER / EB; η base =η station ·η cable ·η vehicle ·η recover =ER / EG; In the above formula, / represents division, |·| represents absolute value, EG is the electrical energy at the AC input terminal B0 of the charging equipment, in kWh, including the necessary auxiliary power for the charging branch served in this test, which can be obtained by measurement and integration using a three-phase power analyzer. EC is the electrical energy at the DC output terminal B1 of the charging equipment, in kWh. EV is the electrical energy at the vehicle interface side B2, in kWh. EB is the electrical energy at the input terminal B3 of the power battery pack. ER is the recyclable energy, which is a negative value, and is calculated using absolute value in kWh when calculating the recycling efficiency.
[0027] Calculate the first efficiency η of the charging device based on the electrical energy EG at the AC input terminal and the electrical energy EC at the DC output terminal. station Based on the electrical energy EC at the DC output terminal of the charging equipment and the electrical energy EV at the vehicle interface side, the second efficiency η of the charging cable and connector is calculated. cable Based on the electric energy EV at the vehicle interface side and the electric energy EB at the input end of the power battery pack, the third efficiency η at the vehicle side is calculated. vehicle Based on the electrical energy EB and recyclable energy ER at the input of the power battery pack, the recovery efficiency η is calculated. recover .
[0028] According to the first efficiency η station Second efficiency η cable Third efficiency η vehicle and recycling efficiency η recover (Multiplication) Calculate the base efficiency η of fast charging. base .
[0029] To verify the collected data, an independently calibrated reference energy meter is set up at point B0. The input energy measured within the range [t0, t1] is denoted as EG,ref, where EG,ref > 0. The data consistency deviation is defined as follows: rchk=|EG EG,ref| / EG,ref; Here, rchk represents the consistency between the energy measured by the reference energy meter at point B0 and the aforementioned EG; a smaller value indicates a smaller difference. If rchk is less than a set threshold (e.g., 3%), the current baseline efficiency and all collected raw data are retained. If rchk is greater than or equal to the set threshold, the time synchronization, sensor polarity, whether any branches are missing, and SOC hysteresis (a stable range set to avoid fluctuations in the displayed SOC value) are checked. After confirming no issues, the electric vehicle fast charging efficiency test is re-executed and data is collected.
[0030] S150. The basic efficiency is corrected according to the charging time correction coefficient and the life correction coefficient to obtain the fast charging energy efficiency index, and the fast charging energy efficiency of the electric vehicle is classified according to the magnitude of the fast charging energy efficiency index.
[0031] Before correcting the base efficiency, it is necessary to calculate the charging time correction factor and the lifetime correction factor. The calculation of the charging time correction factor includes: Based on the actual fast charging time, the reference fast charging time, and the time sensitivity factor, the original charging time correction coefficient is calculated; the original charging time correction coefficient is truncated at the upper and lower limits to obtain the final charging time correction coefficient.
[0032] Ct=clip[(t ref / t c )^λ,C t,min C t,max ]; In the above formula, Ct is the charging time correction coefficient, which is dimensionless. clip[x,a,b] means restricting x to [a,b], and C... t,min C t,max These are the lower and upper limits of the charging time correction factor, respectively. C is optional. t,min 0.80, C t,max It is 1.20. t ref To determine the baseline fast charging time, a batch of reference battery packs were fast charged from their initial SOC to a target SOC, maintaining the same ambient temperature and battery state as in the previous tests. The fast charging time series for each reference battery pack was statistically analyzed, and the median of the fast charging time series was taken as the baseline fast charging time. c This represents the actual fast charging time in this test, i.e., the test time window [t0, t1]. λ is a time-sensitive factor, indicating the sensitivity of the fast charging efficiency index (FCEI) to changes in charging time. The smaller λ is, the more the evaluation focuses on pure energy efficiency, and the impact of charging speed on the FCEI is relatively small; the larger λ is, the more the evaluation emphasizes charging speed, and even slight changes in charging time can significantly affect the FCEI; when λ=0, Ct=1, charging time is completely disregarded; when λ=1, the charging time correction coefficient is inversely proportional to the charging time, and the impact of charging time on the FCEI is relatively strong.
[0033] For example, λ=0.3 means that, without triggering the upper and lower limits, the charging time is longer than (t). ref / t c The improvement is approximately 10% (including a 10% increase or decrease in charging time), and the charging time correction factor is approximately 3% improved.
[0034] In practical applications, researchers can select different time-sensitive factors based on the evaluation scenario, as shown in the table below:
[0035] It is generally not recommended that λ be greater than 1, otherwise slight changes in charging time may overshadow the impact of basic efficiency on the fast charging energy efficiency index.
[0036] The calculation method for the lifespan correction factor is as follows: Multiple power battery packs were randomly selected as samples from batteries of the same batch and with consistent manufacturing processes (representing consistent charge and discharge performance). These samples were divided into a fast-charging group and a reference group. The fast-charging group underwent a cycle aging test under fast charging conditions, while the reference group underwent a cycle aging test under non-fast charging conditions. For example, the fast-charging group was charged at a constant current using the maximum charging current allowed by the battery manufacturer (or a preset fast-charging rate, such as 2C, 3C, or 4C). When the voltage reached the upper limit of the charging voltage, the system switched to constant voltage charging until the State of Charge (SOC) reached 80%, at which point charging was terminated. The difference between the reference group and the fast-charging group was that the charging current for the reference group was set to 0.5C or 1C. The SOC range, ambient temperature, and discharge conditions of the reference group and the fast-charging group were identical. Both the reference group and the fast-charging group underwent charge-discharge cycles. After each cycle block (e.g., containing 25 complete charge-discharge cycles), a capacity test was performed according to standard capacity testing to obtain the actual usable capacity of the battery. The first capacity loss rate is obtained by subtracting the actual usable capacity from the initial usable capacity of the calibrated fast-charging battery and then dividing by the initial usable capacity. Similarly, the second capacity loss rate of the reference group is calculated. Since the first and second capacity loss rates are calculated after each cycle block, after all cycles are completed, the average of all calculated first capacity loss rates and the average of all calculated second capacity loss rates are used in the subsequent calculation of the lifetime correction factor.
[0037] Calculate the lifetime correction factor based on the first capacity loss rate, the second capacity loss rate, and the penalty intensity factor: CL=exp{ k·max[0,L] FC L REF ]}; In the above formula, CL is the lifetime correction factor, which is dimensionless, and L... FC This is the first capacity loss rate, ranging from 0 to 1, L. REF This is the second capacity loss rate, ranging from 0 to 1. `max` is the maximum value operation, L... FC L REFThis refers to the lifespan degradation measured using the same batch of reference group tests, avoiding attributing all natural aging, reference cycle aging, and test errors to fast charging. k is the penalty strength factor, representing the strength of the fast charging energy efficiency index's penalty for "additional battery capacity loss." A smaller k indicates less sensitivity to battery lifespan loss; a larger k results in a greater FCEI reduction for the same additional capacity loss. When k=0, CL=1, lifespan is not considered at all. When the fast charging group does not incur more loss than the reference group (i.e., L_FC≤ L_REF), CL=1, and no penalty is imposed.
[0038] In practical applications, researchers can select different penalty intensity factors based on the evaluation scenario, as shown in the table below:
[0039] It should be noted that, because the formula uses an exponential form, the penalty intensity factor should generally not be too large. Otherwise, even a small amount of lifetime decay can cause the FCEI to fluctuate drastically.
[0040] The calculation method for fast charging energy efficiency index is as follows: FCEI=100×η base ×Ct×CL; Where FCEI is the fast charging energy efficiency index, η base Based on the base efficiency, Ct is the charging time correction factor, and CL is the lifespan correction factor.
[0041] FCEI is a dimensionless evaluation index. The grading thresholds should be obtained from statistical analysis of samples of similar vehicles, within the same SOC range, and under the same environmental conditions. A preferred embodiment is: Grade A: FCEI ≥ 90, Grade B: 80 ≤ FCEI < 90, Grade C: 70 ≤ FCEI < 80, Grade D: FCEI < 70.
[0042] Optionally, after classifying the fast charging energy efficiency of electric vehicles, the system also includes sorting of process losses, anomaly diagnosis, and retesting, and provides the anomaly diagnosis results and retesting results.
[0043] Specifically, calculate ΔE separately. station ΔE cable ΔE vehicle ΔE battery And the proportion of ETM in EG: ΔE station =EG EC; ΔE cable =EC EV; ΔE vehicle =EV EB; ΔE battery =EB ER; In the above formula, ΔE station ΔE is the electrical energy consumed by the charging device itself. cable ΔE represents the electrical energy consumed by the charging cable and connector itself. vehicle ΔE represents the electrical energy consumed by the vehicle's high-voltage power distribution system. battery Electrical energy consumed by the power battery pack and thermal management system (non-recoverable energy).
[0044] Sort these proportions by size. Adjust the corresponding hardware or control strategies for the energy-consuming items / loss links corresponding to the largest proportions, and generate anomaly diagnostic results, such as ΔE. cable If the proportion of a battery is the highest, then the hardware structure of the charging cable should be replaced; if the proportion of an ETM battery is the highest, then the control strategy of the thermal management system should be improved, and the test should be repeated under the same conditions (same ambient temperature, SOC range, and battery state). The improvement is considered effective only if the improved FCEI is higher and the repeatability and energy balance residual both meet the requirements.
[0045] Optionally, after classifying the fast-charging energy efficiency of the electric vehicle, it further includes at least one of the following: 1) Conduct fast-charging energy efficiency tests on electric vehicles under different ambient temperatures to obtain the change curves of the fast-charging energy efficiency index at different ambient temperatures (in order of increasing temperature); identify the energy efficiency inflection point caused by heating or cooling load based on these curves. For example, preset at least 5 ambient temperature points θ within the safe temperature range. i The electric vehicle fast charging energy efficiency test is repeated in order of increasing ambient temperature, and the electrical energy EG at the AC input terminal B0 of the charging device in the i-th test is obtained. i And the thermal management system energy consumption ETM in the i-th test i : H i =ETM i / EG i ; In the above formula, H i The thermal management system energy consumption (ETM) during the i-th test. i For EG i The proportion; Calculate the slope s of the relative temperature difference between the proportion of temperature points at adjacent time points. i : s i =(H i+1 H i ) / (θ i+1 θ i ); In the above formula, H i+1 and Hi These are the proportions at time i+1 and time i, respectively, and θ i+1 θ i These are the temperatures at time i+1 and i, respectively. The slope difference |s| between adjacent temperature points is... i s i 1| When the preset threshold determined by the repeated test error is exceeded, [θ] i+1 θ i [θ] is marked as a candidate transition interval, and multiple sampled temperature points are added within the candidate transition interval. Further testing is then conducted to obtain [θ]. i+1 θ i The system calculates the change curves of the fast-charging energy efficiency index at multiple temperature points (in ascending order of temperature) within a given range, and then calculates the slope difference between adjacent temperature points based on these curves, thereby gradually narrowing down the candidate inflection interval. If the smallest candidate inflection interval obtained after multiple rounds of calculation is less than a set interval threshold, then this smallest candidate inflection interval is the energy efficiency inflection point.
[0046] 2) Perform fast-charging energy efficiency tests on electric vehicles under different charging power limits (within the allowable charging power range of the charging equipment), maintaining a consistent SOC range during the test, and obtain the charging time, basic efficiency, and maximum temperature (the maximum value T of the pre-selected temperature measurement point of the power battery within the charging time window) under different charging power limits. b,max The measurement points can be the cell surface, the tabs, or the individual cell temperature reported by the BMS, and the energy consumption of the thermal management system.
[0047] For example, multiple allowable charging power limits can be set within the same SOC range, initial temperature, SOH, and accessory modes. The actual charging power curves over time can be recorded, along with the t value corresponding to each charging power limit. c η base T b,max And ETM (hereinafter referred to as the four indicators). First, data from fast charging energy efficiency tests of electric vehicles that violate voltage, current, and temperature constraints or fail to reach the target SOC are excluded. Then, for each of the four indicators, the optimal indicator under different charging power limits is obtained. For example, under different charging power limits, the charging time is 1 hour, 1 hour and 10 minutes, and 1 hour and 20 minutes respectively; then the optimal indicator is 1 hour.
[0048] 3) Perform fast-charging energy efficiency tests on electric vehicles under different thermal management control parameter groups (each control parameter group corresponds to a thermal management control strategy) to obtain data sets under different thermal management control parameter groups, including: thermal management system energy consumption, maximum temperature (the maximum value of the pre-selected temperature measurement point of the power battery within the charging time window) and fast-charging energy efficiency index; by comparing the same data under different thermal management control parameter groups, determine the impact of different thermal management control strategies.
[0049] For example, select thermal management parameter groups A and B, and perform fast-charging energy efficiency tests on electric vehicles under the same initial conditions, ambient temperature, SOC range, and charging power limit. Record (or calculate) the thermal management system energy consumption, maximum temperature, and fast-charging energy efficiency index during the test. If the thermal management system energy consumption of parameter group A is greater than that of parameter group B, it indicates that the thermal management system consumes more energy under the thermal management control strategy corresponding to parameter group A. If the maximum temperature of parameter group A is lower than that of parameter group B, it indicates that the thermal management system has a better temperature reduction effect under the thermal management control strategy corresponding to parameter group A. If the fast-charging energy efficiency index of parameter group A is greater than that of parameter group B, it indicates that the charging performance is stronger under the thermal management control strategy corresponding to parameter group A.
[0050] In one specific implementation, under a 25°C environment, the same vehicle is pre-charged to 10% SOC and then charged to 80% SOC using a DC charging device with a rated power not lower than the vehicle's requirements. B0 to B3 utilize synchronous power analysis channels, with independent metering for the thermal management branch. After fast charging and resting, the vehicle is discharged back to 10% SOC under a 0.5C equivalent operating condition to obtain the ER (Energy Return). Three consecutive tests are performed, and invalid data with consistency deviations greater than or equal to a set threshold are discarded. 500 cycles are performed on both the fast charging group and the 1C reference group, with capacity measured every 100 cycles, and CL (Capacity Limit) is calculated accordingly. The final output includes the energy consumption, first efficiency, second efficiency, third efficiency, recovery efficiency, Ct, CL, FCEI (Fairness-to-Effectiveness Index), loss ranking, and retest conclusions for each point.
[0051] This application proposes a method for testing and evaluating the energy efficiency of fast charging for electric vehicles, which has the following technical advantages compared to existing technologies: This application sets up multiple test points on the tested charging branch, which consists of charging equipment, charging cables and connectors, the vehicle's high-voltage power distribution and thermal management system, and the power battery pack. The electrical energy at each point is calculated, and the recyclable energy of the power battery pack is obtained, thus yielding the basic fast charging efficiency. Based on this, a charging time correction coefficient is introduced to characterize the impact of charging speed on energy efficiency evaluation, and a lifespan correction coefficient is introduced to quantify the additional battery capacity decay caused by fast charging. After correcting the basic efficiency using these two coefficients, a fast charging energy efficiency index is obtained and graded accordingly. This method standardizes the test conditions to a specified SOC range, resting time, discharge rate, and cutoff conditions, making different test results comparable. The energy consumption of the thermal management system is included in the measurement as an inherent part of the charging branch, avoiding the omission or double deduction of auxiliary system energy consumption. Simultaneously, charging speed and battery aging are incorporated into the comprehensive evaluation system, achieving a full-link, multi-dimensional quantitative evaluation of fast charging energy efficiency. In summary, this application effectively solves the technical problems in the prior art, such as inconsistent testing conditions, lack of end-to-end evaluation, inconsistent energy consumption handling of auxiliary systems, and independent evaluation indicators.
[0052] This application also provides a fast-charging energy efficiency testing and evaluation system for electric vehicles, including: The setup module is used to set up multiple test points on the charging branch under test of an electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack. The fast charging module is used to fast charge the power battery pack from the initial SOC to the target SOC according to the charging strategy, and to calculate the electrical energy at each test point. The recycling module is used to calculate the recyclable energy of the power battery pack after it has been left to stand at a specified temperature for a set time and then discharged to the initial SOC at a specified rate and cutoff conditions. The calculation module is used to calculate the basic efficiency of fast charging based on the electrical energy and the recyclable energy at each test point. The correction and grading module is used to correct the basic efficiency based on the charging time correction coefficient and the life correction coefficient to obtain the fast charging energy efficiency index, and to grade the fast charging energy efficiency of the electric vehicle based on the magnitude of the fast charging energy efficiency index.
[0053] The electric vehicle fast charging energy efficiency testing and evaluation system can execute the electric vehicle fast charging energy efficiency testing and evaluation method provided in any of the above embodiments, and has the corresponding technical effects.
[0054] This embodiment provides a medium storing computer instructions for instructing a computer to perform the methods described above. The computer instructions on this medium, used to instruct the computer to perform the methods described above, thus possess at least the same advantages as the methods described above.
[0055] The medium in this application may be any combination of one or more computer-readable media. The medium may be a computer-readable signal medium or a computer-readable storage medium. The medium may be, for example,, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of the medium (a non-exhaustive list) include: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In this document, the medium may be any tangible medium containing or storing a program that may be used by or in connection with an instruction execution system, apparatus, or device.
[0056] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, carrying computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, capable of sending, propagating, or transmitting programs for use by or in connection with an instruction execution system, apparatus, or device.
[0057] Program code contained on a computer-readable medium may be transmitted using any suitable medium, including but not limited to wireless, wire, optical fiber, RF (Radio Frequency), or any suitable combination thereof.
[0058] Computer program code for performing the operations of this application can be written in one or more programming languages or a combination thereof. Programming languages include object-oriented programming languages such as Java, Smalltalk, and C++, as well as conventional procedural programming languages such as C or similar languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or it can be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0059] It should be understood that the various forms of processes shown above can be used to rearrange, add, or delete steps. For example, the steps described in this application can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution disclosed in this application can be achieved, and this is not limited herein.
[0060] The specific embodiments described above do not constitute a limitation on the scope of protection of this application. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the scope of protection of this application.
Claims
1. A method for testing and evaluating the energy efficiency of fast charging for electric vehicles, characterized in that, include: Multiple test points are set up on the charging branch under test of the electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack. According to the charging strategy, the power battery pack is fast charged from the initial SOC to the target SOC, and the electrical energy at each test point is calculated. After being left to stand at a specified temperature for a set period of time, the battery pack is discharged to its initial state of charge (SOC) at a specified rate and under specified cutoff conditions, and the recyclable energy of the power battery pack is calculated. The basic efficiency of fast charging is calculated based on the electrical energy and recyclable energy at each test point. The base efficiency is corrected based on the charging time correction factor and the lifespan correction factor to obtain the fast charging energy efficiency index. The fast charging energy efficiency of the electric vehicle is then classified according to the magnitude of the fast charging energy efficiency index.
2. The method according to claim 1, characterized in that, Multiple test points include: the AC input terminal of the charging equipment, the DC output terminal of the charging equipment, the vehicle interface side, and the input terminal of the power battery pack.
3. The method according to claim 2, characterized in that, According to the charging strategy, the power battery pack is fast-charged from the initial SOC to the target SOC, and the electrical energy at each test point is calculated, including: According to the charging strategy, the power battery pack is fast charged from the initial SOC to the target SOC, and the test time window is determined. Within the test time window, the current and voltage at each test point are collected, and the active power is calculated. The active power is integrated over time to obtain the electrical energy at each test point.
4. The method according to claim 3, characterized in that, Based on the electrical energy and recyclable energy at each test point, the basic efficiency of fast charging is calculated, including: Calculate the first efficiency of the charging device based on the electrical energy at the AC input terminal and the electrical energy at the DC output terminal of the charging device. The second efficiency of the charging cable and connector is calculated based on the electrical energy at the DC output terminal of the charging equipment and the electrical energy at the vehicle interface side. The third efficiency at the vehicle end is calculated based on the electrical energy at the vehicle interface side and the electrical energy at the input end of the power battery pack. The recovery efficiency is calculated based on the electrical energy and recyclable energy at the input of the power battery pack. The basic efficiency of fast charging is calculated based on the first efficiency, the second efficiency, the third efficiency, and the recycling efficiency.
5. The method according to claim 4, characterized in that, Before correcting the base efficiency based on the charging time correction factor and lifespan correction factor to obtain the fast charging energy efficiency index, the following steps are also included: The original charging time correction coefficient is calculated based on the actual fast charging time, the reference fast charging time, and the time-sensitive factor. The original charging time correction factor is truncated by upper and lower limits to obtain the final charging time correction factor.
6. The method according to claim 5, characterized in that, Before correcting the base efficiency based on the charging time correction factor and lifespan correction factor to obtain the fast charging energy efficiency index, the following steps are also included: Multiple power battery packs were randomly selected as samples from batteries of the same batch and with the same manufacturing process. The samples were divided into a fast-charging group and a reference group; Cyclic aging tests were conducted on the fast-charging group under fast charging conditions, and cyclic aging tests were conducted on the reference group under non-fast charging conditions. Calculate the first capacity loss rate of the fast charging group and the second capacity loss rate of the reference group; The lifetime correction factor is calculated based on the first capacity loss rate, the second capacity loss rate, and the penalty intensity factor.
7. The method according to claim 6, characterized in that, The base efficiency is corrected based on the charging time correction factor and the lifespan correction factor to obtain the fast charging energy efficiency index, including: FCEI=100×η base ×Ct×CL; Where FCEI is the fast charging energy efficiency index, η base Based on the base efficiency, Ct is the charging time correction factor, and CL is the lifespan correction factor.
8. The method according to claim 7, characterized in that, After classifying the fast-charging energy efficiency of the electric vehicle, it also includes at least one of the following: Electric vehicle fast charging energy efficiency tests were performed under different ambient temperatures to obtain the change curves of fast charging energy efficiency index under different ambient temperatures; the energy efficiency inflection point caused by heating or cooling load was identified based on the change curves. Electric vehicle fast charging energy efficiency tests were conducted under different charging power limits to obtain charging time, basic efficiency, maximum temperature and thermal management system energy consumption under different charging power limits. Electric vehicle fast-charging energy efficiency tests were performed under different thermal management control parameter sets to obtain data sets under different thermal management control parameter sets, including: thermal management system energy consumption, maximum temperature, vehicle-side third efficiency, and fast-charging energy efficiency index; by comparing the same data under different thermal management control parameter sets, the impact of different thermal management control strategies was determined.
9. A fast-charging energy efficiency testing and evaluation system for electric vehicles, characterized in that, include: The setup module is used to set up multiple test points on the charging branch under test of an electric vehicle; the charging branch under test includes charging equipment, charging cables and connectors, vehicle high-voltage power distribution, thermal management system, and power battery pack. The fast charging module is used to fast charge the power battery pack from the initial SOC to the target SOC according to the charging strategy, and to calculate the electrical energy at each test point. The recycling module is used to calculate the recyclable energy of the power battery pack after it has been left to stand at a specified temperature for a set time and then discharged to the initial SOC at a specified rate and cutoff conditions. The calculation module is used to calculate the basic efficiency of fast charging based on the electrical energy and the recyclable energy at each test point. The correction and grading module is used to correct the basic efficiency based on the charging time correction coefficient and the life correction coefficient to obtain the fast charging energy efficiency index, and to grade the fast charging energy efficiency of the electric vehicle based on the magnitude of the fast charging energy efficiency index.