High-low temperature rapid temperature change anaerobic environment simulation box
By integrating a binary cascade refrigeration system and a nitrogen supply system into a high-low temperature rapid temperature change anaerobic environment simulation chamber, the oxygen concentration and gas pressure are adjusted in real time, solving the problem of unstable pressure in existing equipment under high-low temperature rapid temperature change conditions, and achieving stability in high-low temperature rapid temperature change and low-oxygen environment.
Patent Information
- Application Number
- CN202611607114.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-16
- Publication Date
- 2026-11-20
AI Technical Summary
Existing high-temperature anaerobic testing equipment is insufficient to meet the low-oxygen aging test requirements of semiconductor chips under rapid temperature changes at high and low temperatures, and cannot adapt to alternating positive and negative pressure fluctuations, resulting in an unstable testing environment.
A high-low temperature rapid temperature change anaerobic environment simulation chamber is designed. It adopts a binary cascade refrigeration system, a heating system, a nitrogen supply system, a pressure balance module, and a detection module. By adjusting the oxygen concentration and gas pressure in real time, it can achieve rapid alternation of high and low temperatures and stable pressure.
It can maintain a low-oxygen environment and stable pressure during rapid temperature changes at high and low temperatures, meeting the high-low temperature and low-oxygen aging test requirements of semiconductor chips and improving the reliability and consistency of the test environment.
Smart Images

Figure CN123136255A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of electronic product reliability testing and environmental testing equipment, specifically relating to a high and low temperature rapid temperature change anaerobic environment simulation chamber. Background Technology
[0002] With the widespread adoption of electronic devices and the continuous iteration of semiconductor technology, conducting reliability verification of chips and electronic components is of great significance for improving the level of advanced manufacturing. Anaerobic environment testing equipment, as the core equipment for material and device reliability testing, is widely used in electronics, materials, aerospace and other fields. Among them, high-temperature anaerobic test chambers are currently the most widely used testing equipment in the industry.
[0003] Common high-temperature anaerobic testing equipment in the prior art includes an anaerobic high-temperature test chamber disclosed in Chinese invention patent application CN122754628A. This chamber comprises a chamber body, a heating system, a nitrogen filling pipeline, and an oxygen concentration detection system. The control system implements a deoxygenation-before-heating operation logic, restarting the heating program only after the oxygen concentration inside the chamber drops below a preset threshold, thus preventing oxidation of the sample due to contact with residual oxygen during the heating phase. An air duct and circulating fan are installed inside the chamber to drive gas circulation. Heaters are arranged within the air ducts for temperature control, and a guide vane structure optimizes airflow distribution to ensure uniform temperature within the chamber.
[0004] Existing high-temperature anaerobic testing equipment generally adopts a similar architecture. This type of equipment is designed solely for high-temperature operating conditions, featuring only a single heating system and a simple air-cooling structure. However, with the rapid development of semiconductor technology, relying solely on high-temperature aging tests is no longer sufficient to fully expose design defects in chips under complex operating conditions. The industry's demand for low-oxygen aging tests under rapid high and low temperature changes is increasingly urgent. However, existing high-temperature anaerobic testing equipment cannot meet the reliability testing requirements of advanced process chips under low-oxygen aging conditions with rapid high and low temperature changes, for the following reasons: Existing high-temperature anaerobic chambers have relatively simple pressure regulation mechanisms. During the process of filling the chamber with nitrogen to replace the air inside, they can typically only maintain a positive pressure state higher than the external ambient pressure. If a rapid switching between high and low temperatures is directly introduced into such conventional equipment, the gas inside the chamber will inevitably experience frequent alternations between positive and negative pressures due to the thermal expansion and contraction caused by rapid heating and sudden cooling. Existing high-temperature anaerobic chambers are unable to adapt to such pressure changes and are prone to drawing back oxygen-rich air from the outside during low-temperature negative pressure conditions, thereby disrupting the anaerobic environment required for the test.
[0005] Currently, there is no testing equipment in the industry specifically designed for testing under conditions of rapid temperature changes at high and low temperatures. Therefore, there is an urgent need to develop a comprehensive simulation device that can quickly create a temperature environment with rapid temperature changes at high and low temperatures and stably create harsh ultra-low oxygen testing conditions. Summary of the Invention
[0006] The purpose of this invention is to propose a high and low temperature rapid temperature change anaerobic environment simulation chamber to solve the technical problems of existing high temperature anaerobic test equipment that can only achieve high temperature conditions, lack the ability to rapidly change high and low temperatures, and have a simple pressure regulation mechanism that cannot adapt to the alternating positive and negative pressure fluctuations during the temperature change process, making it difficult to meet the testing requirements of high and low temperature low oxygen aging of semiconductor chips.
[0007] To solve the above problems, the technical solution of the high and low temperature rapid temperature change anaerobic environment simulation chamber provided by the present invention is as follows: A high and low temperature rapid temperature change anaerobic environment simulation chamber includes a chamber body and a binary cascade refrigeration system, a heating system, a nitrogen supply system, a pressure balance module, a detection module and a control system integrated on the chamber body; The enclosure contains a sealed test chamber, which forms a test room and air duct that are physically separated but connected in a closed loop. The detection module is used to collect oxygen concentration data and pressure data in the test chamber in real time and transmit them to the control system. The evaporator end of the binary cascade refrigeration system and the heating system are both located inside the air duct, providing cooling capacity and heating capacity to the circulating airflow, respectively; the outlet end of the nitrogen supply system is connected to the test chamber, used to fill the test chamber with nitrogen to replace the internal oxygen; the pressure balance module connects the test chamber with the external environment to dynamically adjust the air pressure inside the test chamber. The control system adjusts the binary cascade refrigeration system and heating system according to the temperature setting requirements to provide a high and low temperature rapid alternation simulation environment and constant temperature control; it dynamically adjusts the gas supply flow of the nitrogen supply system according to the oxygen concentration data, and adjusts the pressure balance module in combination with the pressure data to maintain the oxygen concentration in the test chamber within the preset low oxygen threshold range and the pressure within the preset pressure range.
[0008] The beneficial effects of this invention are as follows: By constructing a physically separated test chamber and air duct with a closed-loop airflow inside the chamber, and arranging the evaporator end of the binary cascade refrigeration system and the heating system together inside the air duct, this invention breaks the limitation of existing test equipment that can only achieve a single high-temperature condition. It can provide sufficient cooling and heating capacity to the circulating airflow, thereby enabling the test chamber to have the ability to rapidly change high and low temperatures. This invention uses a detection module to collect real-time oxygen concentration data in the test chamber and dynamically adjusts the nitrogen supply system flow rate to replace and maintain a preset low-oxygen environment. Simultaneously, it combines pressure data to dynamically adjust the pressure balance module, achieving pressure stability during temperature changes. This overcomes the shortcomings of existing equipment's simple pressure regulation mechanism, which cannot adapt to the alternating positive and negative pressure fluctuations during temperature changes. It can promptly release expansion positive pressure and compensate for contraction negative pressure to reduce interference with the test environment. This invention can provide a rapidly changing high and low temperature environment and balance alternating positive and negative pressure fluctuations while maintaining a low-oxygen environment in a closed-loop airflow state, meeting the testing requirements for high and low temperature low-oxygen aging of specimens.
[0009] Furthermore, the binary cascade refrigeration system includes a high-temperature stage refrigeration cycle loop and a low-temperature stage refrigeration cycle loop. The high-temperature stage refrigeration cycle loop uses R404A as the refrigerant, and the low-temperature stage refrigeration cycle loop uses R23 as the refrigerant. The high-temperature stage refrigeration cycle loop and the low-temperature stage refrigeration cycle loop exchange heat through an intermediate heat exchanger and share the same water-cooled heat exchanger for condensation and heat dissipation, respectively.
[0010] Beneficial effects: It can provide a wider temperature regulation range and sufficient cooling output, supporting the environmental simulation chamber to achieve a wider range of high and low temperature test requirements; the two-stage refrigeration cycle loops share a water-cooled heat exchanger for condensation and heat dissipation respectively, which can reduce the heat load of the intermediate heat exchanger and improve the overall cooling efficiency and operating energy efficiency of the system.
[0011] Furthermore, the high-temperature refrigeration cycle includes a high-temperature compressor, a first oil separator, a liquid receiver, and a first electronic expansion valve arranged in series. The exhaust end of the high-temperature compressor is connected to the inlet of the first oil separator, and the exhaust end of the first oil separator is connected to the inlet of the first heat exchange channel of the water-cooled heat exchanger. The outlet of the first heat exchange channel of the water-cooled heat exchanger is connected to the inlet of the first electronic expansion valve via the liquid receiver. The throttling output end of the first electronic expansion valve is connected to the heat absorption side inlet of the intermediate heat exchanger, and the heat absorption side outlet of the intermediate heat exchanger is connected back to the suction end of the high-temperature compressor.
[0012] Furthermore, the low-temperature refrigeration cycle includes a low-temperature compressor, a second oil separator, a second electronic expansion valve, and an evaporator arranged in series. The evaporator is located inside the air duct. The exhaust end of the low-temperature compressor is connected to the inlet of the second oil separator. The exhaust end of the second oil separator is connected to the inlet of the second heat exchange channel of the water-cooled heat exchanger. The outlet of the second heat exchange channel of the water-cooled heat exchanger is connected to the heat release side inlet of the intermediate heat exchanger. The heat release side outlet of the intermediate heat exchanger is connected to the inlet of the second electronic expansion valve. The throttling output end of the second electronic expansion valve is connected to the inlet of the evaporator. The outlet of the evaporator is connected back to the suction end of the low-temperature compressor.
[0013] Furthermore, the nitrogen supply system includes a main intake pipe and multiple parallel nitrogen branches connected to the main intake pipe. A nitrogen pressure reducing valve and a flow metering device are sequentially connected in series along the gas flow direction on the main intake pipe. Each nitrogen branch is connected in series with an on / off control valve and a one-way regulating valve controlled by the control system. The output ends of the multiple nitrogen branches are all connected to the air duct.
[0014] Beneficial effects: The multi-branch parallel gas supply structure can realize multi-stage adjustment of nitrogen flow rate. The components on the main gas inlet pipe can stabilize the inlet pressure, monitor the flow rate in real time and prevent gas backflow, ensuring a stable and reliable gas supply process. After nitrogen enters the air duct, it can quickly diffuse with the circulating airflow, improving oxygen replacement efficiency.
[0015] Furthermore, the parallel nitrogen branch is provided with three paths, and each path independently controls the nitrogen flow state through its own on / off control valve. The control system opens or closes the corresponding number of on / off control valves in stages according to the oxygen concentration level in the test chamber fed back in real time by the detection module, so as to realize the step-by-step reduction control of the nitrogen flow rate into the air duct.
[0016] Beneficial effects: The three-stage gas supply method can match the flow requirements at different stages of oxygen concentration decline; a large flow rate is used when the oxygen concentration is high, which can accelerate the oxygen replacement speed and shorten the equipment preparation time; when the oxygen concentration is close to the target range, the gas supply path is gradually reduced to avoid oxygen concentration overshoot and ensure control stability; after the oxygen concentration reaches the target, a small flow rate is used to maintain it, which can reduce ineffective nitrogen consumption and reduce the long-term operating cost of the equipment.
[0017] Furthermore, the specific process of the stepwise reduction control of nitrogen flow rate within the air duct is as follows: The control system has preset target oxygen concentration thresholds and pressure safety ranges; During the oxygen replacement phase, when the detected oxygen concentration data is greater than the target oxygen concentration threshold, the control system gradually increases the number of on / off control valves to accelerate nitrogen replacement; when the detected oxygen concentration data is not greater than the target oxygen concentration threshold, the control system keeps only one on / off control valve open to maintain a low-oxygen environment. During the above control process, if the detected pressure data exceeds the pressure safety range, or if the oxygen concentration data continues to be greater than the target oxygen concentration threshold after all on / off control valves are turned on, the control system adjusts the opening of the pressure balance module until the acquired pressure data returns to the pressure safety range.
[0018] Beneficial effects: When the oxygen concentration exceeds the standard, the control logic gradually increases the gas supply flow to accelerate the oxygen reduction speed. After the oxygen concentration reaches the standard, it automatically switches to a low flow maintenance state. This can ensure the oxygen reduction efficiency while avoiding the pressure shock in the chamber caused by large flow fluctuations. At the same time, it reduces ineffective nitrogen consumption, lowers the long-term operating cost of the equipment, and ensures the continuous stability of the low-oxygen environment.
[0019] Furthermore, the detection module includes an oxygen concentration detection unit for detecting the oxygen concentration and a pressure detection unit for detecting the pressure parameter; the oxygen concentration detection unit includes an internal connecting pipe, a cooler, a vacuum pump, and a zirconia analyzer connected in series. The collecting end of the internal connecting pipe extends into the test chamber to obtain gas samples at high or low temperatures. The cooler is used to buffer and cool the extracted gas samples before sending them to the zirconia analyzer for component analysis.
[0020] Furthermore, the test chamber and the air duct are physically separated by a vertical partition, with connecting openings at the top and bottom of the vertical partition to allow airflow. A fan module is installed at the top of the air duct, and the gas in the test chamber and the air duct is driven by the fan module to form a circulating airflow loop that flows from bottom to top through the evaporator and the heating system, and is blown into the test chamber from the connecting opening at the top.
[0021] Beneficial effects: Separating the heat exchange area from the test area avoids direct contact between the heat exchange components and the test area, and also prevents impurities in the test area from contaminating the heat exchange components; the fan module drives a vertically circulating airflow loop, making the temperature and oxygen concentration distribution in the test chamber more uniform and improving the consistency of the test environment.
[0022] Furthermore, the pressure balancing module includes a balancing window connecting the internal space of the air duct with the external environment, and an inlet and outlet regulating valve disposed at the balancing window for controlling the interaction of internal and external gases. The control system is electrically connected to the inlet and outlet regulating valve to control its opening degree.
[0023] Beneficial effects: By cooperating with the balance window and the inlet and outlet regulating valves, the pressure inside the test chamber can be dynamically regulated in both directions. This means that the positive pressure caused by rapid heating or large flow of nitrogen can be released in time, and the gas supply can be activated when the gas volume shrinks due to rapid cooling and negative pressure occurs, thus ensuring the test environment. Attached Figure Description
[0024] Figure 1 This is a schematic diagram of the high and low temperature rapid temperature change anaerobic environment simulation chamber of the present invention; Figure 2 A schematic diagram of a nitrogen supply system; Figure 3 This is a schematic diagram of the detection module; Figure 4 This is a flowchart of the control logic for the high and low temperature rapid temperature change anaerobic environment simulation chamber of the present invention.
[0025] Explanation of reference numerals in the attached figures: 1. High-temperature stage compressor; 2. First high-pressure detection component; 3. First vibration damper; 4. First oil separator; 5. Water-cooled heat exchanger; 6. Liquid receiver; 7. First dryer; 8. First solenoid valve; 9. First electronic expansion valve; 10. Intermediate heat exchanger; 11. First low-pressure detection component; 12. Low-temperature stage compressor; 13. Fan module; 14. Nitrogen supply system; 15. Heater; 16. Evaporator; 17. Oxygen concentration detection unit; 18. Drain outlet; 19. Pressure balance module; 20. Second dryer; 21. Second electronic expansion valve. 21. Expansion valve; 22. Second high-pressure detection component; 23. Second low-pressure detection component; 24. Second shock absorber; 25. Second oil separator; 26. Housing; 27. Test chamber; 28. Air duct; 29. Nitrogen pressure reducing valve; 30. Manual regulating valve; 31. Main air inlet pipe; 32. Nitrogen branch line; 33. Glass rotor flow meter; 34. Electronic flow meter; 35. On / off control valve; 36. One-way regulating valve; 37. Internal connecting pipe; 38. Cooler; 39. Air pump; 40. Zirconia analyzer; 41. Test chamber; 42. Pressure gauge. Detailed Implementation
[0026] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0027] Specific embodiments of the high and low temperature rapid temperature change anaerobic environment simulation chamber provided by the present invention: like Figure 1 As shown, the high and low temperature rapid temperature change anaerobic environment simulation chamber includes a chamber body 26 and a binary cascade refrigeration system, a heating system, a nitrogen supply system 14, a pressure balance module 19, a detection module, and a control system integrated on the chamber body 26.
[0028] like Figure 1 As shown, the enclosure 26 houses a sealed test chamber 41, within which a test chamber 27 and an air duct 28 are formed, physically separated but connected in a closed-loop gas path. The evaporator and heating systems of the binary cascade refrigeration system are both located inside the air duct 28; the outlet of the nitrogen supply system 14 is connected to the air duct 28; the pressure balancing module 19 connects the interior of the air duct 28 to the external environment; and the acquisition end of the detection module extends into the test chamber 41. The control system is electrically connected to the binary cascade refrigeration system, heating system, nitrogen supply system 14, pressure balancing module 19, and detection module, enabling coordinated control of the operating status of each system and module.
[0029] Specifically, the enclosure 26 adopts a cabinet-type structure. The test chamber 27 is used to place the chip and electronic component samples to be tested. The air duct 28 is located behind the test chamber 27, and the test chamber 27 and the air duct 28 are physically separated by a vertical partition. Both the top and bottom of the vertical partition have connecting openings for airflow. A fan module 13 is installed at the top of the air duct 28. The fan module 13 can be a multi-blade centrifugal fan structure, capable of driving the gas in the test chamber 41 to form a circulating flow. After the fan module 13 is started, the gas in the air duct 28 flows from bottom to top, passing sequentially through the evaporator end of the binary cascade refrigeration system and the heating system. After heat exchange, the gas is blown into the test chamber 41 through the connecting opening at the top of the vertical partition. The airflow flows from top to bottom within the test chamber 41, exchanging heat with the samples, and then flows back into the air duct 28 through the connecting opening at the bottom of the vertical partition, forming a complete closed-loop airflow circuit. A drain outlet 18 is also provided at the bottom of the air duct 28 inside the test chamber 41.
[0030] The binary cascade refrigeration system provides deep cooling capacity support for the equipment. It includes a high-temperature stage refrigeration cycle and a low-temperature stage refrigeration cycle. The high-temperature stage refrigeration cycle uses R404A as the refrigerant, and the low-temperature stage refrigeration cycle uses R23 as the refrigerant. The two circulation pipelines exchange heat through an intermediate heat exchanger 10 and share the same water-cooled heat exchanger 5 for condensation and heat dissipation, respectively. In practical applications, the refrigerants used in the high-temperature stage refrigeration cycle and the low-temperature stage refrigeration cycle can be flexibly adjusted according to experimental requirements, and are not limited to R404A and R23 as described in this embodiment.
[0031] In this embodiment, as Figure 1As shown, the high-temperature refrigeration cycle includes a high-temperature compressor 1, a first oil separator 4, a first vibration damper 3, a liquid receiver 6, a first dryer 7, a first solenoid valve 8, a first electronic expansion valve 9, and the heat absorption side channel of an intermediate heat exchanger 10, all connected in series. The high-temperature compressor 1 is located in the refrigeration chamber at the rear of the test chamber 41. Its exhaust end is connected in series with a first high-pressure detection component 2 via an exhaust pipe. The discharged high-pressure gas enters the inlet of the first oil separator 4 via the first vibration damper 3. The first oil separator 4 is used to separate the lubricating oil carried in the high-temperature gaseous refrigerant. The separated lubricating oil returns to the crankcase of the high-temperature compressor 1 via a return oil pipe. The exhaust end of the first oil separator 4 is connected to the inlet of the first heat exchange channel of a water-cooled heat exchanger 5 via a pipe. The water-cooled heat exchanger 5 has two independent heat exchange channels, a first heat exchange channel and a second heat exchange channel, both of which exchange heat with the external cooling water channel. The outlet of the first heat exchange channel of the water-cooled heat exchanger 5 is connected to the inlet of the liquid storage tank 6 via a pipeline. The liquid storage tank 6 is used to buffer liquid refrigerant and mitigate flow fluctuations caused by changes in system load. The outlet of the liquid storage tank 6 is connected to the inlet of the first dryer 7 via a pipeline. The first dryer 7 is used to adsorb moisture and impurities in the refrigerant to prevent blockages under low-temperature conditions. The outlet of the first dryer 7 is connected to the inlet of the first solenoid valve 8 via a pipeline. The first solenoid valve 8 is used to control the on / off state of the high-temperature stage refrigeration cycle loop. The outlet of the first solenoid valve 8 is connected to the inlet of the first electronic expansion valve 9 via a pipeline. The throttling output end of the first electronic expansion valve 9 is connected to the heat absorption side inlet of the intermediate heat exchanger 10 via a pipeline. The heat absorption side outlet of the intermediate heat exchanger 10 is connected to the first low-pressure detection component 11 via a pipeline, and finally connected back to the suction end of the high-temperature stage compressor 1.
[0032] The first high-pressure detection component 2 is used to detect the discharge pressure of the high-pressure gaseous refrigerant discharged from the high-temperature stage compressor 1, monitor the high-pressure side operating pressure of the high-temperature stage refrigeration cycle in real time, and determine whether the condensation condition is normal. When the discharge pressure exceeds the safety threshold, the system overload protection is triggered to prevent the high-temperature stage compressor 1 from being damaged due to excessive pressure. The first low-pressure detection component 11 is used to detect the suction pressure of the high-temperature stage compressor 1, which corresponds to the evaporation pressure on the heat absorption side of the intermediate heat exchanger 10. It can indirectly reflect the evaporation temperature in the intermediate heat exchanger 10, thereby monitoring the stability of the high-temperature stage refrigeration cycle loop in providing a cold source to the low-temperature stage refrigeration cycle loop.
[0033] The low-temperature refrigeration cycle includes a low-temperature compressor 12, a second oil separator 25, a second vibration damper 24, a second dryer 20, a second electronic expansion valve 21, and an evaporator 16 connected in series. The low-temperature compressor 12 is also located in the refrigeration compartment at the rear of the housing 26, adjacent to the high-temperature compressor 1. The discharge end of the low-temperature compressor 12 is connected to the inlet of the second oil separator 25 via the second high-pressure detection component 22 and the second vibration damper 24. The second oil separator 25 is used to separate the refrigeration lubricating oil carried in the low-temperature gaseous refrigerant. The discharge end of the second oil separator 25 is connected to the inlet of the second heat exchange channel of the water-cooled heat exchanger 5 through a pipeline. The high-temperature gaseous refrigerant discharged by the low-temperature compressor 12 can be pre-cooled by external cooling water in the second heat exchange channel, removing some of the sensible heat and condensation heat. The outlet of the second heat exchange channel of the water-cooled heat exchanger 5 is connected to the heat release side inlet of the intermediate heat exchanger 10. The heat release side outlet of the intermediate heat exchanger 10 is connected to the inlet of the second dryer 20 via a pipeline. The second dryer 20 is used to purify the refrigerant in the low-temperature refrigeration cycle. The outlet of the second dryer 20 is connected to the inlet of the second electronic expansion valve 21 via a pipeline. The throttling output end of the second electronic expansion valve 21 is connected to the inlet of the evaporator 16 via a pipeline. The evaporator 16 is located in the lower section inside the air duct 28, arranged along the airflow direction. The outlet of the evaporator 16 is connected to the second low-pressure detection component 23, and finally connected back to the suction end of the low-temperature compressor 12 via a pipeline. The intermediate heat exchanger 10 is located in the middle of the refrigeration chamber. Its heat absorption side flow channel and heat release side flow channel are independent of each other, and heat is transferred only through the metal wall, realizing the thermodynamic coupling of the two-stage refrigeration cycle.
[0034] The second high-pressure detection component 22 is used to detect the discharge pressure of the high-pressure gaseous refrigerant discharged from the cryogenic compressor 12, monitor the high-pressure side operation status of the cryogenic refrigeration cycle in real time, ensure that the condensing pressure is within a reasonable range, and trigger protection action when the pressure exceeds the limit, thereby improving the reliability of the cryogenic compressor 12. The second low-pressure detection component 23 is used to detect the suction pressure of the cryogenic compressor 12, which corresponds to the evaporation pressure of the evaporator 16 in the air duct 28. It can indirectly reflect the refrigeration temperature in the test chamber 41 and is an important reference for the system to adjust the refrigeration output and achieve temperature control. At the same time, it can monitor the suction condition to prevent liquid slugging damage to the cryogenic compressor 12 caused by excessively low pressure.
[0035] The heating system includes a heater 15, which is located inside the air duct 28, above the evaporator 16, and downstream of the evaporator 16 along the airflow direction. A gap is left between the evaporator 16 and the heater 15. The heater 15 can be an electric heating tube structure, and its output power can be adjusted according to the instructions of the control system to heat the circulating airflow in the air duct 28, thereby achieving rapid alternation of high and low temperatures and constant temperature control in conjunction with the binary cascade refrigeration system.
[0036] likeFigure 2 As shown, the nitrogen supply system 14 is used to fill the test chamber 41 with nitrogen to replace the internal oxygen. It includes a main intake pipe 31 and three parallel nitrogen branch pipes 32 connected to the main intake pipe 31. The intake end of the main intake pipe 31 extends to the outside of the test chamber 41 to connect to an external nitrogen source. Along the gas flow direction, the main intake pipe 31 is equipped with a nitrogen pressure reducing valve 29, a manual regulating valve 30, a pressure gauge 42, a glass rotor flow meter 33, and an electronic flow meter 34, connected in series. The nitrogen pressure reducing valve 29 reduces the pressure of the high-pressure gas source to a preset working pressure, stabilizing the intake pressure. The manual regulating valve 30 is used to manually adjust the total intake flow rate to complete the initial equipment commissioning. The pressure gauge 42 is used to detect the pipeline pressure. The glass rotor flow meter 33 is used to visually display the nitrogen flow rate on-site, facilitating on-site verification by operators. The electronic flow meter 34 is used to accurately detect the nitrogen flow rate and transmit the flow data to the control system. The main intake duct 31 branches into three parallel nitrogen branches 32. Each nitrogen branch 32 is equipped with a control valve 35 and a one-way regulating valve 36 connected in series. The control valve 35 is a two-way solenoid valve, controlled by an electrical signal from the control system. The one-way regulating valve 36 is located downstream of the control valve 35 and is used to block reverse airflow, preventing gas from flowing back into the gas supply system. The outputs of the three nitrogen branches 32 are all connected to the interior of the air duct 28. After entering the air duct 28, the nitrogen can quickly diffuse throughout the entire space of the test chamber 41 with the circulating airflow.
[0037] The pressure balancing module 19 is used to dynamically adjust the air pressure in the test chamber 41. It includes a balancing window and inlet / outlet regulating valves. The balancing window is located on the side wall of the ventilation duct 28, connecting the internal space of the ventilation duct 28 with the external environment. The inlet / outlet regulating valves are located at the balancing window and their opening is adjusted by the control system to achieve air intake and exhaust actions respectively. When the inlet / outlet regulating valves are open in the exhaust state, excess gas in the test chamber 41 can be discharged to the external environment; when they are open in the intake state, external nitrogen can be supplied to the test chamber 41, thereby dynamically adjusting the air pressure inside the chamber.
[0038] like Figure 3As shown, the detection module is used to collect operating parameters within the test chamber 41 in real time. It includes an oxygen concentration detection unit 17 and a pressure detection unit. The oxygen concentration detection unit 17 includes an internal connecting pipe 37, a cooler 38, a vacuum pump 39, and a zirconia analyzer 40 connected in series. The collecting end of the internal connecting pipe 37 extends into the test chamber 41 to obtain gas samples from within the chamber. The cooler 38 uses a coil structure to buffer and cool the extracted high-temperature or low-temperature gas samples, stabilizing the gas temperature to the applicable temperature range for the detection element. The vacuum pump 39 provides the suction power to continuously extract gas samples from the test chamber 41 into the zirconia analyzer 40. The zirconia analyzer 40 uses the oxygen ion conductivity of zirconia ceramics to detect the oxygen concentration in the gas, and the detection data is transmitted to the control system in real time. The pressure detection unit uses a pressure sensor, installed in the gas path inside the air duct 28, to collect pressure data within the test chamber 41 in real time and transmit the pressure data to the control system.
[0039] The control system is located in the electrical compartment of chamber 26. It has built-in temperature control logic, oxygen concentration classification control logic, and pressure dynamic compensation logic. It can coordinate and control the operation status of each system according to the preset test program and real-time detection data, so as to continuously maintain the low oxygen environment and stable pressure in the chamber while achieving rapid temperature changes at high and low temperatures.
[0040] The overall working principle of the high and low temperature rapid temperature change anaerobic environment simulation chamber is as follows: first, the air in the test chamber 41 is replaced by the nitrogen supply system 14 to create a low oxygen environment, and then the high and low temperature change program is started according to the test requirements. Throughout the test cycle, the detection module provides real-time feedback data and dynamically adjusts the nitrogen supply and pressure balance to ensure the stability of the test environment.
[0041] The control process for rapid temperature changes at high and low temperatures is divided into three operating conditions: rapid cooling, rapid heating, and constant temperature. Under the rapid cooling condition, the control system stops the heater 15 and the binary cascade refrigeration system operates at full load. In the high-temperature stage refrigeration cycle, the high-temperature and high-pressure gaseous R404A discharged from the high-temperature stage compressor 1 is separated from the lubricating oil by the first oil separator 4 and enters the first heat exchange channel of the water-cooled heat exchanger 5. It is condensed into high-pressure liquid R404A by external cooling water. After being buffered by the liquid storage tank 6 and purified by the first dryer 7, the high-pressure liquid R404A is throttled and depressurized by the first solenoid valve 8 and the first electronic expansion valve 9, becoming a low-temperature and low-pressure gas-liquid two-phase mixture. It then enters the heat absorption side channel of the intermediate heat exchanger 10 to evaporate and absorb heat, absorbing the heat released by the low-temperature side refrigerant. The evaporated low-pressure gaseous refrigerant flows back to the suction port of the high-temperature stage compressor 1 to complete the cycle. In the low-temperature stage refrigeration cycle, the high-temperature, high-pressure gaseous R23 discharged from the low-temperature stage compressor 12, after being separated from lubricating oil by the second oil separator 25, first enters the second heat exchange channel of the water-cooled heat exchanger 5 for pre-cooling. The pre-cooled refrigerant then enters the heat release side channel of the intermediate heat exchanger 10, where it is deeply condensed into high-pressure liquid R23 by the high-temperature side refrigerant. The high-pressure liquid R23 is then throttled and depressurized by the second electronic expansion valve 21 before entering the evaporator 16 to evaporate and absorb heat, cooling the circulating air in the air duct 28. The evaporated low-pressure gaseous R23 then flows back to the suction port of the low-temperature stage compressor 12 to complete the cycle. The circulating air in the air duct 28 is continuously cooled by the evaporator 16 and then sent to the test chamber 41, causing the temperature inside the test chamber 41 to rapidly drop to the set low-temperature value.
[0042] Under rapid heating conditions, the control system reduces the binary cascade refrigeration system to its minimum load, while the heater 15 operates at full power. Air flowing through the duct 28 is rapidly heated as it passes through the heater 15, and then sent into the test chamber 27 to rapidly raise the indoor temperature. Maintaining low-load operation of the binary cascade refrigeration system avoids pressure imbalances caused by prolonged system shutdown, and simultaneously works with the heater 15 to achieve a smooth temperature transition and prevent temperature overshoot.
[0043] Under constant temperature conditions, the control system controls the binary cascade refrigeration system to output a stable base cooling capacity, while simultaneously controlling the operation of heater 15. Temperature control is achieved through matching cooling and heating capacity, reducing temperature fluctuations within the test chamber 41. As the temperature approaches the set value, the control system gradually adjusts the output power of cooling and heating, smoothly transitioning to a constant temperature state.
[0044] Oxygen replacement and hypoxic environment maintenance employ a hierarchical control logic. The specific control process is as follows: The control system has preset target oxygen concentration thresholds and pressure safety ranges; The control system acquires oxygen concentration data in the test chamber 41. If the oxygen concentration data detected by the detection module is not greater than the target oxygen concentration threshold, it controls to open one on / off control valve 35 and close the other on / off control valves 35, and then proceeds to the pressure judgment process. If the oxygen concentration data detected by the detection module is greater than the target oxygen concentration threshold, the control system opens two on / off control valves 35 and closes the remaining on / off control valves 35. After waiting for a preset detection period, the oxygen concentration data is judged again. If it is still greater than the target oxygen concentration threshold, the control system opens all three on / off control valves 35 and judges the oxygen concentration data again. During the above process, if the oxygen concentration data detected by the detection module drops to no greater than the target oxygen concentration threshold, the pressure judgment process is initiated. If the oxygen concentration data is still greater than the target oxygen concentration threshold after all three on / off control valves 35 are opened, the pressure regulation process is initiated.
[0045] The pressure judgment process is as follows: obtain the pressure data in the test chamber 41, determine whether it is within the pressure safety range, if so, wait for the preset detection cycle and then obtain the oxygen concentration data again for cyclic control; if not, proceed to the pressure regulation process.
[0046] The pressure regulation process is as follows: adjust the opening degree of the inlet and outlet regulating valves in the pressure balance module 19, and then return to the pressure judgment process. When the on / off control valves 35 of all nitrogen branches 32 are in the maximum conduction state and the oxygen concentration has not yet dropped to the target threshold, it indicates that the system has changed from insufficient air intake to obstructed exhaust. The continuous influx of a large amount of nitrogen causes a high positive back pressure to form inside the test chamber 41, weakening the effective air intake pressure difference between the gas supply end and the test chamber 41. At the same time, the lack of an effective exhaust channel causes high concentrations of oxygen to be trapped inside the test chamber 41. At this time, the control system adjusts the opening degree of the inlet and outlet regulating valves in the pressure balance module 19 to actively release pressure and exhaust gas, restore the effective air intake pressure difference, and under the action of the circulating airflow, discharge the trapped oxygen-containing gas to the external environment through the balance window, so as to achieve a rapid drop in oxygen concentration to the target low oxygen threshold range.
[0047] During the alternating high and low temperatures, the gas inside test chamber 41 expands and contracts with temperature changes. When the temperature rises and the gas expands, causing the pressure inside test chamber 41 to exceed the preset upper limit, the control system opens the inlet and outlet regulating valves to release excess gas and lower the pressure back to the preset range. When the temperature drops and the gas contracts, causing the pressure inside test chamber 41 to fall below the preset lower limit, the control system opens the inlet and outlet regulating valves to supply nitrogen, causing the pressure to rise back to the preset range. Nitrogen is used as the supplementary gas source during the pressure regulation process, ensuring the stability of the low-oxygen environment by preventing the introduction of external oxygen while replenishing pressure.
[0048] The following explanation uses a target oxygen concentration threshold of 500 ppm as an example. Figure 4As shown, during equipment operation, the control system establishes data communication with the oxygen concentration detection unit via the MODBUS-RTU communication protocol. The specific control algorithm steps are as follows: Step (1): Read the oxygen concentration value Value1 in the test chamber.
[0049] Step (2): Determine whether Value1≤500ppm is true. If yes, proceed to step (3); otherwise, proceed to step (6).
[0050] Step (3): Open the on / off control valve of one of the nitrogen branches and close the on / off control valves of the remaining branches.
[0051] Step (4): Read the pressure value Value2 inside the test chamber.
[0052] Step (5): Determine whether the pressure value Value2 is within the target pressure range (e.g., within ±5% of atmospheric pressure, depending on the area where the equipment is used). If it is, determine whether the equipment is conducting an anaerobic test. If so, wait 30 seconds (this detection cycle can be adjusted according to actual needs) and execute step (1) again. If the pressure value Value2 is not within the target pressure range, execute step (9).
[0053] Step (6): Open the on / off control valves of two nitrogen branches and close the on / off control valves of the remaining nitrogen branches.
[0054] Step (7): After waiting for 30 seconds, read the oxygen concentration value Value1 in the test chamber again. Determine whether Value1≤500ppm is true. If yes, proceed to step (4); otherwise, proceed to step (8).
[0055] Step (8): Open all on / off control valves of nitrogen branch lines 1, 2, and 3. Read the oxygen concentration value Value1 in the test chamber and determine if Value1 ≤ 500ppm. If it is, proceed to step (4); otherwise, proceed to step (9).
[0056] Step (9): Adjust the opening of the pressure balancing module (balance window inlet / outlet solenoid valve) to release excess air pressure or adjust the intake and exhaust balance, and then perform step (4) to re-determine the pressure.
[0057] In the above embodiment, the refrigerant discharged from the low-temperature stage compressor 12 is first pre-cooled through the second heat exchange channel of the water-cooled heat exchanger 5 before entering the intermediate heat exchanger 10. In other embodiments, the pre-cooling structure of the second heat exchange channel of the water-cooled heat exchanger 5 can be omitted, and the exhaust gas of the low-temperature stage compressor 12 can be directly connected to the heat release side inlet of the intermediate heat exchanger 10. All condensation heat load is transferred and discharged from the high-temperature stage refrigeration circuit through the intermediate heat exchanger 10, and the basic function of two-stage cascade refrigeration can still be achieved.
[0058] In the above embodiment, the parallel nitrogen branch 32 is provided with three branches. In other embodiments, the parallel nitrogen branch 32 can also be provided with two or more branches, corresponding to different gas supply flow rates, and more precise step flow regulation can be achieved by gradually increasing or decreasing the number of connected branches.
[0059] In the above embodiments, the nitrogen flow rate is controlled in a stepped manner using an on / off control valve 35. In other embodiments, a proportional regulating valve can be used instead of the on / off control valve 35. The valve opening is continuously adjusted according to the deviation between the oxygen concentration detection value and the target threshold, thereby achieving stepless continuous adjustment of the nitrogen flow rate and stabilizing the oxygen concentration within a preset range.
[0060] While various embodiments of the invention have been shown and described in this specification, it will be apparent to those skilled in the art that such embodiments are provided by way of example only. Many modifications, alterations, and alternatives will occur to those skilled in the art without departing from the spirit and essence of the invention.
Claims
1. A high and low temperature rapid temperature change anaerobic environment simulation chamber, characterized in that, It includes the enclosure and the binary cascade refrigeration system, heating system, nitrogen supply system, pressure balance module, detection module and control system integrated on the enclosure; The enclosure contains a sealed test chamber, which forms a test room and air duct that are physically separated but connected in a closed loop. The detection module is used to collect oxygen concentration data and pressure data in the test chamber in real time and transmit them to the control system. The evaporator end of the binary cascade refrigeration system and the heating system are both located inside the air duct, providing cooling capacity and heating capacity to the circulating airflow, respectively; the outlet end of the nitrogen supply system is connected to the test chamber, used to fill the test chamber with nitrogen to replace the internal oxygen; the pressure balance module connects the test chamber with the external environment to dynamically adjust the air pressure inside the test chamber. The control system adjusts the binary cascade refrigeration system and heating system according to the temperature setting requirements to provide a high and low temperature rapid alternation simulation environment and constant temperature control; it dynamically adjusts the gas supply flow of the nitrogen supply system according to the oxygen concentration data, and adjusts the pressure balance module in combination with the pressure data to maintain the oxygen concentration in the test chamber within the preset low oxygen threshold range and the pressure within the preset pressure range.
2. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 1, characterized in that, The binary cascade refrigeration system includes a high-temperature stage refrigeration cycle loop and a low-temperature stage refrigeration cycle loop. The high-temperature stage refrigeration cycle loop uses R404A as the refrigerant, and the low-temperature stage refrigeration cycle loop uses R23 as the refrigerant. The high-temperature refrigeration cycle and the low-temperature refrigeration cycle exchange heat through an intermediate heat exchanger, and share the same water-cooled heat exchanger for condensation and heat dissipation respectively.
3. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 2, characterized in that, The high-temperature stage refrigeration cycle includes a high-temperature stage compressor, a first oil separator, a liquid storage tank, and a first electronic expansion valve arranged in series. The exhaust end of the high-temperature stage compressor is connected to the inlet of the first oil separator, and the exhaust end of the first oil separator is connected to the inlet of the first heat exchange channel of the water-cooled heat exchanger. The outlet of the first heat exchange channel of the water-cooled heat exchanger is connected to the inlet of the first electronic expansion valve via the liquid storage tank. The throttling output end of the first electronic expansion valve is connected to the heat absorption side inlet of the intermediate heat exchanger, and the heat absorption side outlet of the intermediate heat exchanger is connected back to the suction end of the high-temperature stage compressor.
4. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 2, characterized in that, The cryogenic refrigeration cycle includes a cryogenic compressor, a second oil separator, a second electronic expansion valve, and an evaporator arranged in series. The evaporator is located inside the air duct. The exhaust end of the cryogenic compressor is connected to the inlet of the second oil separator. The exhaust end of the second oil separator is connected to the inlet of the second heat exchange channel of the water-cooled heat exchanger. The outlet of the second heat exchange channel of the water-cooled heat exchanger is connected to the heat release side inlet of the intermediate heat exchanger. The heat release side outlet of the intermediate heat exchanger is connected to the inlet of the second electronic expansion valve. The throttling output end of the second electronic expansion valve is connected to the inlet of the evaporator. The outlet of the evaporator is connected back to the suction end of the cryogenic compressor.
5. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 1, characterized in that, The nitrogen supply system includes a main intake pipe and multiple parallel nitrogen branches connected to the main intake pipe. A nitrogen pressure reducing valve and a flow metering device are connected in series along the gas flow direction on the main intake pipe. Each nitrogen branch is connected in series with an on / off control valve and a one-way regulating valve controlled by the control system. The output ends of the multiple nitrogen branches are all connected to the air duct.
6. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 5, characterized in that, The parallel nitrogen branch is configured with three paths, and each path independently controls the nitrogen flow state through its own on / off control valve. The control system opens or closes a corresponding number of on / off control valves in stages according to the oxygen concentration level in the test chamber fed back in real time by the detection module, so as to achieve step-by-step reduction control of the nitrogen flow rate into the air duct.
7. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 6, characterized in that, The specific process of the stepwise reduction control of nitrogen flow rate in the air duct is as follows: The control system has preset target oxygen concentration thresholds and pressure safety ranges; During the oxygen replacement phase, when the detected oxygen concentration data is greater than the target oxygen concentration threshold, the control system gradually increases the number of on / off control valves to accelerate nitrogen replacement; when the detected oxygen concentration data is not greater than the target oxygen concentration threshold, the control system keeps only one on / off control valve open to maintain a low-oxygen environment. During the above control process, if the detected pressure data exceeds the pressure safety range, or if the oxygen concentration data continues to be greater than the target oxygen concentration threshold after all on / off control valves are turned on, the control system adjusts the opening of the pressure balance module until the acquired pressure data returns to the pressure safety range.
8. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 1, characterized in that, The detection module includes an oxygen concentration detection unit for detecting the oxygen concentration and a pressure detection unit for detecting the pressure parameter; the oxygen concentration detection unit includes an internal connecting pipe, a cooler, a vacuum pump, and a zirconia analyzer connected in series. The collecting end of the internal connecting pipe extends into the test chamber to obtain gas samples at high or low temperatures. The cooler is used to buffer and cool the extracted gas samples before sending them to the zirconia analyzer for component analysis.
9. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 1, characterized in that, The test chamber and the air duct are physically separated by a vertical partition, with connecting openings at the top and bottom of the vertical partition to allow airflow. A fan module is installed at the top of the air duct, and the gas in the test chamber and the air duct is driven by the fan module to form a circulating airflow loop that flows from bottom to top through the evaporator and the heating system, and is blown into the test chamber from the connecting opening at the top.
10. The high and low temperature rapid temperature change anaerobic environment simulation chamber according to claim 1, characterized in that, The pressure balancing module includes a balancing window that connects the internal space of the air duct with the external environment, and an inlet and outlet regulating valve installed at the balancing window to control the interaction of internal and external gases. The control system is electrically connected to the inlet and outlet regulating valve to control its opening degree.
Citation Information
Patent Citations
Anaerobic high temperature test chamber
CN122754628A
