Test fixture and method of operating the same

By designing a test fixture that includes a controller and a switch, the output power of the charger can be automatically detected and adjusted, solving the problems of high testing costs and manpower consumption in existing chargers, and realizing efficient and automated output power adjustment.

CN123136264APending Publication Date: 2026-11-20DELTA ELECTRONICS INC(CN)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510647271.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-20
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing charger testing methods are costly and labor-intensive, and it is difficult to effectively adjust the output power to avoid overheating, especially during the verification process, which can easily trigger over-temperature protection.

Method used

Design a test fixture that includes a first connection port, multiple second connection ports, a switch, and a controller. The controller detects changes in the output power of the charger and automatically shuts off the switch to reduce the load, thus avoiding the use of electronic loads and automatic test devices.

Benefits of technology

It reduces testing costs and manpower consumption, achieves automated control of dynamically adjusted output power, and improves testing efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136264A_ABST
    Figure CN123136264A_ABST
Patent Text Reader

Abstract

A test fixture and an operating method thereof. The test fixture includes a first connection port to couple a charger, a plurality of second connection ports to couple a plurality of loads, a plurality of switches, and a controller. The switches are respectively coupled the first connection port and the second connection ports, and the controller is coupled the first connection port and the switches. When the controller detects a change in output power of the charger through the first connection port, the controller turns off at least one switch according to the change in output power to reduce the number of loads coupled to the charger.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a test fixture and its operating method, and more particularly to a test fixture and its operating method for testing a charger with dynamically adjustable output power. Background Technology

[0002] In the field of electronic product technology, the demand for chargers is increasing as most electronic devices now have built-in batteries to maintain their battery life. However, in the field of charger technology, the trend towards miniaturization in charger products has led to a gradual increase in the difficulty of thermal management. Specifically, a common practice in existing charger products is to reduce the output power when the temperature rises to a preset upper limit during operation. This is mainly to reduce the charger's temperature and prevent overheating. Therefore, verifying the output power before and after temperature rise before the charger leaves the factory has become a challenge for suppliers. The main reason is that if the load cannot be adjusted in real time according to the charger's status during the verification process, the over-temperature protection is easily triggered. Furthermore, in addition to adjusting for temperature, there are other situations where the charger's output power needs to be dynamically adjusted.

[0003] However, the current testing methods for chargers are as follows: Figure 1A , Figure 1B As shown. In Figure 1A In this test fixture 100, one end is coupled to an electronic load EL, and the other end is coupled to a charger 200 under test. An automatic control device 300 monitors the status of the charger 200 and programmatically adjusts the electronic load EL accordingly. However, this testing method is costly, bulky, and requires a programming background. Figure 1B In this system, the automatic control device 300 is replaced by a computer 300B and a tester 300C. The tester 300C monitors the computer 300B to know the status of the charger 200 and also needs to manually adjust the electronic load EL as needed. However, this testing method is time-consuming, labor-intensive, and prone to human error.

[0004] Therefore, how to design a testing fixture and its operation method to reduce testing costs and manpower consumption is a major research topic that the inventors of this case intend to study. Summary of the Invention

[0005] To address the aforementioned problems, this disclosure provides a test fixture to overcome the limitations of the prior art. Therefore, the test fixture disclosed herein is used to couple a charger, and includes a first connection port, a plurality of second connection ports, a plurality of switches, and a controller. The first connection port is used to couple the charger, and the second connection ports are used to couple multiple loads. Switches are respectively coupled to the first and second connection ports, and the controller is coupled to the first connection port and the switches. When the controller detects a change in the charger's output power through the first connection port, the controller shuts off at least one switch according to the change in output power, thereby reducing the number of loads coupled to the charger.

[0006] To address the aforementioned problems, this disclosure provides a method for operating a test fixture to overcome the limitations of the prior art. Therefore, the test fixture disclosed herein includes multiple channels for coupling multiple loads corresponding to a charger. The method for operating the test fixture includes the following steps: short-circuiting a channel based on the output power provided by the charger, allowing the loads to draw output power from the charger; detecting the output power; and disconnecting at least one channel based on changes in the output power, thereby reducing the number of loads drawing output power.

[0007] The main purpose and effect of this disclosure is that the test fixture disclosed herein does not require an automatic test device or an electronic load. When the controller detects a change in the output power of the charger, it turns off at least one switch according to the change in output power, thereby reducing the load on the coupled charger and thus reducing test costs and manpower consumption.

[0008] To gain a deeper understanding of the techniques, means, and effects employed by this invention to achieve its intended purpose, please refer to the following detailed description and accompanying drawings. It is believed that the purpose, features, and characteristics of this invention can be understood in a thorough and specific manner from these drawings. However, the accompanying drawings are provided for reference and illustration only and are not intended to limit this invention. Attached Figure Description

[0009] Figure 1A This is a circuit block diagram of one of the existing test fixtures;

[0010] Figure 1B Here is a circuit block diagram of another existing test fixture;

[0011] Figure 2A This is a circuit block diagram of the first embodiment of the test fixture disclosed herein;

[0012] Figure 2B This invention discloses a circuit block diagram of the test fixture in operation according to the first embodiment;

[0013] Figure 3 This is a circuit block diagram of a second embodiment of the test fixture disclosed herein;

[0014] Figure 4 This document presents a flowchart illustrating the operation method of the test fixture;

[0015] Figure 5A The test flowchart for the first test method of the power drop of the test fixture disclosed herein; and

[0016] Figure 5B This is a test flowchart for the second test method of power drop of the test fixture disclosed herein.

[0017] Explanation of icon numbers

[0018] 100: Test fixture

[0019] 100A: First connection port

[0020] 100B: Second connection port

[0021] S1~Sn: Switches

[0022] 1: Controller

[0023] 1A: Communication pin

[0024] 2: Detection circuit

[0025] 3: Current adjustment circuit

[0026] 200: Charger

[0027] EL: Electronic Load

[0028] CL: Passive Load

[0029] 300A: Automatic control device

[0030] 300B: Computer

[0031] 300C: Tester

[0032] R1~Rn: Load

[0033] Po: Output power

[0034] Io: Output current

[0035] Vo: Output voltage

[0036] Sc1~Scn: Control signals

[0037] Si: Current signal

[0038] Sv: Voltage signal

[0039] HS: Interlocking Communications

[0040] NS: Drop Notification Detailed Implementation

[0041] The technical content and detailed description of the present invention are explained below with reference to the accompanying drawings:

[0042] Please see Figure 2A This is a circuit block diagram of the first embodiment of the test fixture disclosed herein. Figure 2B This is a circuit block diagram of the test fixture in the first embodiment of this invention during operation, and can be further referenced. Figures 1A-1B The test fixture 100 is used to couple the charger 200 and multiple loads R1 to Rn, and is used to test the dynamic output power Po of the charger 200. Specifically, the test fixture 100 includes a first connection port 100A, multiple second connection ports 100B, multiple switches S1 to Sn, and a controller 1. The first connection port 100A is used to couple the charger 200, and each second connection port 100B can be used to couple one load R1 to Rn respectively. Preferably, the first connection port 100A is a Type-C connection port, but it is not limited thereto. Each switch S1 to Sn is coupled to the first connection port 100A, and each switch S1 to Sn is correspondingly coupled to one second connection port 100B. The controller 1 is coupled to the first connection port 100A and each switch S1 to Sn, and the controller 1 can provide control signals Sc1 to Scn to control the corresponding switches S1 to Sn to be turned on or off. The types of loads R1 to Rn are not limited; they can be electronic loads EL or passive loads CL (e.g., but not limited to, cement resistors, wire-wound resistors, etc.).

[0043] When controller 1 detects a change in the output power Po of charger 200 through the first connection port 100A, controller 1 provides control signals Sc1 to Scn to turn off at least one of switches S1 to Sn (e.g., ...). Figure 2B As shown in the dashed box, for example, but not limited to, providing control signals Scn to turn off switches Sn or providing control signals S2~Scn to turn off switches S2~Sn) to reduce the number of loads coupled to the charger 200, thereby reducing the load on the charger 200. Specifically, when the charger 200 is operating and its own temperature is too high, the charger 200 has a thermal protection mechanism. Therefore, when the charger 200's own temperature is too high, the charger 200 generally has a power reduction design, that is, when the charger 200's own temperature is too high, the charger 200 will automatically reduce the output power Po (i.e., the change in output power Po is negatively correlated with the charger 200's own temperature), thereby reducing its own heat generation to ensure safe operation. However, unlike Figure 1A , Figure 1BAs shown in the prior art, the existing testing methods require the use of an automatic testing device 300A to adjust the electronic load EL based on the changes in output power Po, or require the tester 300C to participate in controlling the electronic load EL for a long time, resulting in increased testing costs or a long period of time and a large amount of manpower.

[0044] Therefore, the test fixture 100 disclosed herein is characterized in that it does not require an automatic test device 300A, nor does it require an electronic load EL. When the controller 1 detects a change in the output power Po of the charger 200, it shuts off at least one of switches S1 to Sn (e.g., but not limited to, switch Sn) according to the change in output power Po, thereby reducing the load on the coupled charger 200 and achieving the effect of reducing testing costs and manpower consumption. Therefore, this disclosure is similar to... Figure 1A , Figure 1B The difference is that the loads R1 to Rn disclosed herein are preferably all passive loads CL. That is, the controller 1 disclosed herein does not have any communication lines coupled to the loads R1 to Rn, and even if the loads R1 to Rn include electronic loads EL, there is no need to use signal lines to couple with the electronic loads EL for communication.

[0045] On the other hand Figure 2A The switches S1 to Sn shown are mainly for short-circuiting or disconnecting the channel from the first connection port 100A to the second connection port 100B, so that the loads R1 to Rn correspondingly coupled to the second connection port 100B can draw output power Po from the charger 200. Therefore, the establishment of the channel requires the configuration of switches S1 to Sn. Therefore, any component that can be controlled by the controller 1 to short-circuit / disconnect the channel (e.g., but not limited to, thyristors, transistors, relays, etc.) should be included in the scope of this embodiment and is not limited here. Furthermore, to avoid obscuring the features of this disclosure, switches S1 to Sn are used for illustration in this disclosure. In addition, in one embodiment, the controller 1 can be, for example, but not limited to, a digital signal processor (DSP), a field-programmable gate array (FPGA), or a single-chip microcontroller (MCU) or other device with detection and control capabilities, and is not limited here.

[0046] Please see Figure 3 This is a circuit block diagram of the second embodiment of the test fixture disclosed herein, which can be further referenced. Figures 2A-2B . Figure 3 Test fixture 100 and Figure 2A , Figure 2B The difference between the 100 test fixtures is that... Figure 3 The test fixture 100 provides a configurable output power Po detection element and its detection method. Specifically, in Figure 3In the test fixture 100, a detection circuit 2 is included, and a controller 1 includes a communication pin 1A. The detection circuit 2 is coupled to the controller 1 and a first connection port 100A, and the detection circuit 2 may include a current detection circuit and / or a voltage detection circuit. The current detection circuit is used to detect the output current Io of the charger 200 and provide a current signal Si, and the voltage detection circuit is used to detect the output voltage Vo of the charger 200 and provide a voltage signal Sv.

[0047] Generally, chargers 200 with power derating designs typically include a power delivery communication protocol (PD function). Therefore, controller 1 may include a communication pin 1A, which also includes the PD function, for handshake communication with charger 200. Specifically, controller 1 may include a communication pin 1A, which is used to couple to the communication port (not shown) of charger 200 via a first connection port 100A. Controller 1 and charger 200 can handshake communication via communication pin 1A to communicate and confirm their respective set parameters and requirements. Furthermore, controller 1 can also request charger 200 to provide a specific voltage level output voltage Vo (e.g., but not limited to, 20V, 10V, etc.) via handshake communication via PD function.

[0048] by Figure 3 Taking the architecture as an example, the controller 1 can have at least three means of detecting changes in the output power Po of the charger 200. One detection means is that the controller 1 can establish communication with the charger 200 via communication pin 1A (HS), and when the controller 1 receives a load reduction notification from the charger 200 via communication pin 1A, it indicates that the charger 200 is experiencing, for example but not limited to, excessively high temperature, and determines that a power reduction operation is required. Therefore, when the controller 1 receives a load reduction notification NS from the charger 200 via communication pin 1A, the controller shuts off at least one of switches S1 to Sn according to the load reduction notification NS. This detection means can detect changes in output power Po solely through communication pin 1A, therefore it does not require the detection circuit 2 and is suitable for chargers 200 equipped with a power delivery communication protocol.

[0049] Another detection method involves the controller 1 establishing a communication HS with the charger 200 via communication pin 1A to notify the charger 200 to provide an output voltage Vo. Therefore, the controller 1 is aware of the voltage level of the output voltage Vo provided by the charger 200 through the communication HS. Furthermore, the test fixture 100 detects the output current Io at the first connection port 100A via a detection circuit 2 that includes a current detection circuit, and correspondingly provides a current signal Si to the controller 1, allowing the controller 1 to determine the magnitude of the output current Io based on the current signal Si. Finally, the controller 1 can calculate the output power Po based on the output voltage Vo obtained from the communication HS and the output current Io obtained from the current signal Si, and determine when the output power Po changes based on the output voltage Vo and output current Io, and then turn off at least one of switches S1 to Sn. This detection method may not include a voltage detection circuit; the output power Po can be calculated using only a current detection circuit.

[0050] The third detection method involves the test fixture 100 detecting the output current Io at the first connection port 100A via the current detection circuit of the detection circuit 2, and correspondingly providing a current signal Si to the controller 1, allowing the controller 1 to determine the magnitude of the output current Io based on the current signal Si. Furthermore, the test fixture 100 also detects the output voltage Vo at the first connection port 100A via the voltage detection circuit of the detection circuit 2, and correspondingly provides a voltage signal Sv to the controller 1, allowing the controller 1 to determine the magnitude of the output voltage Vo based on the voltage signal Sv. Finally, the controller 1 can calculate the output power Po based on the output voltage Vo obtained from the voltage signal Sv and the output current Io obtained from the current signal Si, and determine when the output power Po changes based on the output voltage Vo and output current Io, and then turn off at least one of the switches S1 to Sn. This detection method can determine the change in output power Po solely through the detection circuit 2, thus eliminating the need for a power delivery communication protocol. This allows the test fixture 100 to be coupled to a charger 200 with or without a power delivery communication protocol, resulting in better versatility. It is worth mentioning that, in one embodiment, those skilled in the art can select appropriate detection elements based on the three technical means of detecting output power Po exemplified above, and there is no limitation that the test fixture 100 must include [specific elements]. Figure 3 All components shown. In addition to the three techniques for detecting output power Po exemplified above, the test fixture 100 may also include various other techniques for detecting output power Po, which are not limited here.

[0051] On the other hand, controller 1 can also determine whether the output power Po is abnormal through at least the three detection methods mentioned above, so as to execute the protection mechanism. Specifically, since charger 200 is generally mass-produced, during the testing of multiple chargers 200, defective products are inevitable, or control errors may occur during the testing process. Therefore, when controller 1 determines that the output power Po is abnormal, controller 1 can turn off all switches S1 to Sn to disconnect all channels, so as to execute the protection mechanism and prevent damage to test fixture 100 or charger 200.

[0052] Furthermore, the test fixture 100 may optionally include multiple current adjustment circuits 3. Each current adjustment circuit 3 is coupled to a first connection port 100A, and each current adjustment circuit 3 is correspondingly coupled to a second connection port 100B. The controller 1 is coupled to each current adjustment circuit 3 and is used to adjust the current flowing through each channel by controlling the current adjustment circuit 3. Specifically, since each load R1 to Rn can be the same or different, and even if the loads R1 to Rn are the same, there are still tolerances between them. Therefore, the output current Io drawn by the loads R1 to Rn may not be accurate enough, and it is not easy to achieve the effect of equalization, especially when at least one of the switches S1 to Sn is turned off, the error may be greater, resulting in inaccurate power drop test of the charger 200. Therefore, when the controller 1 knows that there is a difference between the expected output current Io or the current that should flow through the channel and the actual current, the controller 1 controls the current adjustment circuit 3 to adjust the current flowing through each channel so that the actual current flowing through it matches the preset current, thereby improving the test accuracy of the test fixture 100.

[0053] Please see Figure 4 This document discloses a flowchart of the operation method for the test fixture; please refer to it for further information. Figures 2A to 3 The operation method of the test fixture 100 disclosed herein is mainly applicable to testing a charger 200 with dynamic output power Po. The operation method of the test fixture 100 includes short-circuiting all channels according to the output power provided by the charger, so that the load of the coupled channel draws output power from the charger (S100). When the charger 200 starts to provide output power Po, it means that the charger 200 has been started and entered the normal operating state. Therefore, the controller 1 can control, for example, but not limited to, the switches S1 to Sn to conduct to short-circuit the channels between the charger 200 and the loads R1 to Rn, so that the loads R1 to Rn draw output power Po from the charger 200.

[0054] Then, the output power is measured (S200). The test fixture 100 can be constructed as described above. Figure 3The different detection methods used to detect the output power Po of the charger 200 will not be elaborated further here. Finally, at least one of these channels is disconnected based on the change in output power to reduce the number of loads drawing output power (S300). When the charger 200 experiences a decrease in output power Po due to, for example but not limited to, excessively high internal temperature, the test fixture 100 can be activated by the above-described... Figure 3 The different detection methods are used to detect changes in output power Po. Therefore, controller 1 can control, for example, but not limited to, at least one of switches S1 to Sn to turn off, thereby disconnecting the corresponding channel. In this way, the number of loads drawing output power Po can be reduced, and the power reduction function of charger 200 can be confirmed as normal. It is worth mentioning that, in one embodiment, Figure 4 For any steps or procedures not described, please refer to the following: Figures 2A to 3 This will not be elaborated upon further here.

[0055] Please see Figure 5A This is a test flowchart for the first test method of the power drop of the test fixture disclosed herein, please refer to the attached diagram. Figures 2A to 4 .exist Figure 5A The power drop test is mainly to simulate the power reduction behavior of the charger after it actually heats up (200V), and it can be shown as... Figure 4 The steps in the test fixture can be further processed using optional procedures. Therefore, the power drop test procedure for the test fixture includes starting the charger (S400). The first connection port 100A of the test fixture 100 is connected to the charger 200, and the second connection port 100B is coupled to the loads R1 to Rn. The test fixture 100 can detect the charger 200's coupling to the test fixture 100 through the controller 1's detection or handshake communication HS, etc., to perform subsequent tests. Furthermore, when the charger 200 can provide output power Po, the controller 1 controls all switches S1 to Sn to be turned on, short-circuiting all channels so that the charger 200 initially draws its output power Po to full power. This operation requires knowing the full power value of the charger 200 and accordingly placing appropriate loads R1 to Rn so that when all channels are short-circuited, full power can be drawn.

[0056] Then, the system is allowed to stabilize until the temperature reaches a threshold value (S420). The test fixture 100 allows the charger 200 to continuously output full power, for example, but not limited to, continuously outputting 100kW (or rated power), and maintains this position for a period of time (for example, but not limited to, 10–30 minutes). The test fixture 100, or an external device, then monitors the internal temperature of the charger 200 to ensure that the temperature rise during the test is normal. Furthermore, when the internal temperature of the charger 200 reaches a certain threshold value, the charger 200 automatically reduces its power. At this time, the test fixture 100 can, through the above... Figure 3 The detection method reveals the change in output power Po. Then, one can proceed to... Figure 4 The step (S300) enables the controller 1 to actively disconnect at least one of the channels.

[0057] Finally, the cooling and recovery test (S440) was conducted. Figure 4 After the process of step (S300) is completed, the controller 1 can slowly cool down the charger 200 by disconnecting at least one of these channels. During this process, it can be observed whether the charger 200 can automatically recover to its original output power Po. In this way, the power derating test of the charger 200 can be completed to determine whether the power derating function of the charger 200 meets the specifications.

[0058] Please see Figure 5B This is a test flowchart for the second test method of the power drop of the test fixture disclosed herein, please refer to the attached diagram. Figures 2A to 5A .exist Figure 5B The power descent test is primarily to perform another power descent test method for the charger 200. Specifically, Figure 5B The main purpose of the test is to determine the maximum safe output power Po at a specific temperature. In other words, the test aims to identify the Safe Operating Area (SOA) of the charger 200. Therefore, the power descent test procedure for the test fixture includes setting the temperature conditions (S500). This test can use an ambient chamber (temperature control chamber) or a hot air blower to simulate different ambient temperatures for the charger 200, typically starting from 25°C and increasing to 40°C, 50°C, 60°C, or even 70°C. Then, the input conditions are fixed (S520). The input voltage of the charger 200 is maintained at its rated value or within the minimum / maximum permissible range (e.g., but not limited to, AC 220V or DC 800V for electric vehicle chargers).

[0059] Then, the output power is gradually increased (S540). Starting from 0%, the test fixture 100 gradually turns on switches S1 to Sn to gradually short-circuit the channel, thereby gradually increasing the output power Po provided by the charger 200 (e.g., increasing by 10% each time). Before this operation, it is necessary to know the correspondence between the output power Po of the charger 200 and the loads R1 to Rn, and accordingly place appropriate loads R1 to Rn so that the output power Po provided by the charger 200 can be gradually increased percentage by percentage as the channel is gradually short-circuited. Then, the test fixture 100 or an external device is used to monitor the internal temperature of the charger 200 to ensure that the temperature rise during the test is normal.

[0060] When the simulated temperature is constant, and the charger 200 gradually increases its output power Po, if the charger 200 automatically reduces its power at a certain output power Po, the test fixture 100 can, through the above... Figure 3The detection method reveals the change in output power Po. Then, one can proceed to... Figure 4 Step (S300) enables controller 1 to actively disconnect at least one of the channels and continue into... Figure 5A Step (S440) is used to observe whether the charger 200 can automatically restore to its original output power Po. Finally, the ambient temperature of the charger 200 can be adjusted one by one, and the above steps (S520) to (S540) are repeated to record the maximum stable output power Po at each ambient temperature. In this way, an output power / ambient temperature curve can be obtained to confirm whether the power reduction function of the charger 200 meets the specifications.

[0061] However, the above description is only a detailed description and accompanying drawings of preferred embodiments of the present invention. The features of the present invention are not limited thereto and are not intended to limit the present invention. The scope of the present invention should be determined by the following claims. All embodiments that are in line with the spirit of the claims of the present invention and similar variations thereof should be included in the scope of the present invention. Any variations or modifications that can be easily conceived by those skilled in the art within the field of the present invention can be covered by the following claims.

Claims

1. A test fixture for coupling a charger, said test fixture comprising: The first connection port is used to couple the charger; Multiple secondary connection ports are used to couple multiple loads; Multiple switches are respectively coupled to the first connection port and the multiple second connection ports; and A controller is coupled to the first connection port and the plurality of switches, and when the controller detects a change in the output power of the charger through the first connection port, the controller turns off at least one of the plurality of switches according to the change in output power, so as to reduce the number of loads coupled to the charger.

2. The test fixture according to claim 1, wherein the controller comprises: A communication pin is used to couple to the communication port of the charger via the first connection port; The controller has a power delivery communication protocol, and when the controller receives a load reduction notification from the charger through the communication pin, the controller shuts off at least one of the plurality of switches according to the load reduction notification.

3. The test fixture according to claim 1 further includes: A detection circuit is coupled to the controller and the first connection port, and is used to detect the output current of the charger and provide a current signal; The controller has a power delivery communication protocol and includes a communication pin that is coupled to the communication port of the charger through the first connection port; the controller communicates with the charger through the communication pin to notify the charger to provide an output voltage, and when the controller determines the change in output power based on the current signal, the controller turns off at least one of the plurality of switches.

4. The test fixture according to claim 1 further includes: A detection circuit is coupled to the controller and the first connection port, and is used to detect the output current and output voltage of the charger, so as to provide voltage signals and current signals accordingly. When the controller determines the change in output power based on the voltage signal and the current signal, the controller turns off at least one of the plurality of switches.

5. The test fixture according to claim 1, wherein the controller controls the plurality of switches to be turned on so that the output power is full power.

6. The test fixture according to claim 1, wherein the plurality of loads are passive loads, and the controller has no communication lines coupled to the plurality of loads.

7. The test fixture according to claim 1, wherein the change in output power is negatively correlated with the temperature of the charger.

8. A method for operating a test fixture, the test fixture comprising multiple channels, wherein the multiple channels are used to couple multiple loads corresponding to a charger, the method for operating the test fixture comprising the following steps: The plurality of channels are short-circuited according to the output power provided by the charger, so that the plurality of loads can draw the output power from the charger; Detect the output power; and At least one of the plurality of channels is disconnected based on the change in output power, in order to reduce the number of loads drawing the output power.

9. The method of operating the test fixture according to claim 8, wherein the test fixture has a power supply communication protocol, and the method of operating the test fixture further includes the following steps: Engage in handshake communication with the charger; Receives a load reduction notification from the charger via the handshake communication; and At least one of the plurality of channels is disconnected in accordance with the load reduction notification.

10. The method of operating the test fixture according to claim 8, wherein the test fixture has a power supply communication protocol, and the method of operating the test fixture further includes the following steps: Engage in handshake communication with the charger; The charger is notified to provide output voltage via the handshake communication; and Detect the output current of the charger; When the output power changes based on the output voltage and the output current, at least one of the multiple channels is disconnected.

11. The method of operating the test fixture according to claim 8 further includes the following steps: Detect the output current and output voltage of the charger; and When the output power changes based on the output current and the output voltage signal, at least one of the multiple channels is disconnected.

12. The method of operating the test fixture according to claim 8 further includes the following steps: When the charger provides the output power, the multiple channels are short-circuited to make the output power full power.

13. The method of operating the test fixture according to claim 8 further includes the following steps: Determine that the output power is abnormal; and Disconnect the aforementioned multiple channels.