Power supply system harmonic fault locating method and system based on multi-source data fusion
By integrating current waveform and track vibration data from the power supply and track systems, and utilizing timestamps and cross-correlation coefficient analysis, cross-system harmonic faults can be quickly located, solving the problem of time-consuming troubleshooting in traditional methods and achieving efficient fault location and early warning.
Patent Information
- Application Number
- CN202610972455.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-01
- Publication Date
- 2026-11-20
AI Technical Summary
Traditional power supply system fault diagnosis methods are difficult to quickly and accurately locate cross-system harmonic faults, especially when the root cause of the fault is not inside the power supply equipment, resulting in a long troubleshooting process.
By establishing data acquisition channels in the power supply system and the track system respectively, fusing current waveform data with track vibration characteristic data, and using timestamp alignment and cross-correlation coefficient analysis, we can identify vibration surge events and pinpoint fault propagation links. Combined with the track system's physical topology and operating condition records, we can locate the root cause of the fault.
It enables rapid and accurate location of electromechanical coupled latent harmonic faults, shortens the fault investigation cycle, reduces operation and maintenance costs, and provides an active early warning mechanism, thereby improving fault location efficiency.
Smart Images

Figure CN123136266A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of fault diagnosis technology for rail transit power supply systems, and in particular to a method and system for locating harmonic faults in power supply systems based on multi-source data fusion. Background Technology
[0002] In complex modern industrial systems, the coupling between subsystems is becoming increasingly tight, and a failure in one system may originate from another seemingly unrelated system. Urban rail transit systems, as a typical example of a strongly coupled system of vehicle-track-grid-electricity, rely heavily on the stable operation of their power supply system for safe and efficient operation. However, in practice, some troublesome latent faults are frequently encountered, such as the abnormal amplification of specific harmonics. These faults may not immediately trigger protective devices, but their long-term presence can exacerbate overheating of electrical equipment and insulation aging, threatening the system's lifespan and reliability.
[0003] For this type of fault, traditional fault diagnosis methods mainly rely on isolated analysis of electrical quantities within the power supply system, such as the amplitude, phase, and harmonic distortion rate of current and voltage. When the root cause of the fault is not from within the power supply equipment (such as abnormal transformer excitation characteristics or capacitor bank resonance), but is induced by external factors (such as electromechanical coupling effects caused by mechanical vibration), traditional methods suffer from difficulties in fault location and lengthy troubleshooting processes.
[0004] Taking a real-world problem encountered in actual operation and maintenance as an example, the power supply system of a certain subway line detected continuous and intermittent exceedances of the third harmonic current. However, after checking all potential sources within the system, such as rectifier units, harmonic filters, and cables, no abnormalities were found. This phenomenon is a typical example of a latent fault. Considering the temporal correlation between the occurrence of this harmonic and the train operation density, and the close physical proximity of the power supply line and the track, a scientific hypothesis can be proposed: the mechanical vibration of the track system caused by train operation, especially frequent starts and stops, affects the impedance characteristics or load characteristics of the power supply system through some physical mechanism, thereby exciting the characteristic harmonic.
[0005] Based on the above assumptions, in order to achieve rapid and accurate location of cross-system faults, there is an urgent need for a power supply system harmonic fault location method and system based on multi-source data fusion. Summary of the Invention
[0006] The purpose of this invention is to provide a method and system for locating harmonic faults in power supply systems based on multi-source data fusion. This method addresses the problems existing in the prior art by designing a targeted data alignment and correlation analysis process to reveal the propagation path of cross-system faults, thereby achieving rapid and accurate location of the root cause of cross-system faults.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solution: The first aspect of this invention provides a method for locating harmonic faults in a power supply system based on multi-source data fusion, comprising the following steps: Data acquisition channels are established for the power supply system and the track system respectively, to collect current waveform data of the power supply system and track vibration characteristic data of the track system respectively, and timestamps are added to the current waveform data and track vibration characteristic data based on a unified time service. A time series of harmonic amplitudes of a specified order is generated based on current waveform data; a time series of vibration intensity is generated based on track vibration characteristic data, and the vibration intensity time series is traversed to identify vibration surge events and record the corresponding timestamps; Using the timestamp of each vibration surge event as a reference point, a corresponding analysis time window is extracted. Within each analysis time window, the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series is calculated, and correlation analysis is performed based on the cross-correlation coefficient. Based on the results of correlation analysis, combined with the physical topology of the track system and the operating condition records, the fault propagation link is output and the fault root cause interval is identified.
[0008] Optionally, the current waveform data of the power supply system may be collected, including: Power quality analyzers or high-frequency fault recorders are deployed in the outgoing cabinets of traction substations or in the section substations along the line to continuously collect the instantaneous waveform data of the current at a fixed sampling frequency.
[0009] Optionally, the acquisition of track vibration characteristic data of the track system includes: Along the track in the power supply section where harmonic anomalies occur, triaxial vibration acceleration sensors and data acquisition units are deployed at intervals to collect vertical and horizontal vibration acceleration data of the track at a fixed sampling frequency.
[0010] Optionally, generating a time series of harmonic amplitudes of a specified order based on current waveform data includes: A sliding window fast Fourier transform is used to perform window-by-window spectral analysis on the current waveform data; the amplitude or content of a specified harmonic is extracted from the spectrum of each sliding window, and the harmonic amplitude time series of the specified harmonic is generated in chronological order and synchronized with the original current waveform data.
[0011] Optionally, generating a vibration intensity time series based on track vibration characteristic data includes: Based on track vibration characteristic data, the effective value of vibration is calculated to generate a vibration intensity time series.
[0012] Optionally, identifying and marking sudden vibration increases includes: Based on the track vibration characteristic data of the historical running segment before the occurrence of the vibration surge event, the dynamic event trigger threshold is determined; Traverse the vibration intensity time series. When the vibration intensity at a certain time point exceeds the dynamic event trigger threshold, mark that time point as a vibration surge event and record the start timestamp and peak vibration intensity of the vibration surge event.
[0013] Optionally, determining the dynamic event trigger threshold based on vibration data from historical operating periods prior to the occurrence of the vibration surge event includes: Track vibration characteristic data from the historical operating period 24 hours before the vibration surge event was selected as a benchmark. The mean and standard deviation of the historical vibration effective values were calculated, and the dynamic event trigger threshold was set as the sum of the mean and twice the standard deviation.
[0014] Optionally, during the process of collecting track vibration characteristic data, an early warning signal is issued when the vibration intensity exceeds the dynamic event trigger threshold.
[0015] Optionally, the analysis time window is centered on the timestamp of the sudden increase in vibration; or The analysis time window is an asymmetric time window that is based on the timestamp of the vibration surge event and is biased towards the back of the timestamp.
[0016] Optionally, association analysis based on cross-correlation coefficients includes: Within the analysis time window corresponding to each vibration surge event, the time lag of the current harmonic response relative to the track machinery vibration is determined by searching for the time offset corresponding to the maximum cross-correlation coefficient. The analysis results of all vibration surge events were statistically summarized, the correlation success rate and the average time lag were calculated, and statistical hypothesis testing was performed to exclude random correlations. The correlation success rate is the proportion of vibration surge events in which the current harmonic response rises synchronously with the track machinery vibration to the total number of vibration surge events.
[0017] Optionally, a historical operating period before the occurrence of the vibration surge event is used as the reference period, and the average value of the harmonic amplitude within the reference period is used as the reference value. After a sudden increase in vibration occurs, if multiple consecutive data points in the harmonic amplitude time series exceed the product of the reference value and a preset multiple, and the increase exceeds three times the standard deviation of the harmonic amplitude within the reference time period, it is determined that the current harmonic response corresponding to the current sudden increase in vibration increases is synchronously increasing with respect to the vibration of the track machinery.
[0018] Optionally, outputting the fault propagation path and pinpointing the fault root cause region includes: When the association success rate exceeds the preset threshold, the average time lag is within the preset range, and the standard deviation of the time lag of each vibration surge event is less than the preset standard deviation, it is determined that there is an electromechanical coupling fault propagation link caused by the vibration of track machinery to induce electrical harmonic abnormalities. By combining the physical topology of the track system with the operating condition records, the mechanical vibration of the track is located and the cause of the vibration is analyzed.
[0019] A second aspect of the present invention provides a power supply system harmonic fault location system based on multi-source data fusion, comprising: The data acquisition module is connected to the power supply system and the track system, and is used to collect current waveform data of the power supply system and track vibration characteristic data of the track system, respectively. The storage module, connected to the data acquisition module, is used to store current waveform data and track vibration characteristic data, and to timestamp the current waveform data and track vibration characteristic data based on a unified time service. The preprocessing module, connected to the storage module, is used to generate a time series of harmonic amplitudes of a specified order based on current waveform data; and to generate a time series of vibration intensity based on track vibration characteristic data, and to traverse the vibration intensity time series to identify and mark vibration surge events and record the corresponding timestamps. The analysis module, connected to the preprocessing module, is used to extract the corresponding analysis time window based on the timestamp of each vibration surge event, calculate the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series within each analysis time window, and perform correlation analysis based on the cross-correlation coefficient. The fault location output module is connected to the analysis module. Based on the results of correlation analysis, combined with the physical topology of the track system and the operating condition records, it outputs the fault propagation link and locks the fault root cause range.
[0020] Optionally, the data acquisition module includes a power supply monitoring unit, which includes a power quality analyzer or a high-frequency fault recorder deployed in the outgoing cabinet of the traction substation or in the section along the line, for continuously acquiring the instantaneous waveform data of the current at a fixed sampling frequency.
[0021] Optionally, the data acquisition module includes a track vibration monitoring unit, which includes triaxial vibration acceleration sensors and data acquisition units deployed at intervals along the track in the power supply section where harmonic anomalies occur, for acquiring vertical and horizontal vibration acceleration data of the track at a fixed sampling frequency.
[0022] This invention has at least the following technical effects: It breaks through the limitations of traditional harmonic diagnosis that relies solely on single-dimensional analysis of electrical quantities. By integrating electrical data from the power supply system and mechanical vibration data from the track system, it constructs a vibration event-driven time window alignment and cross-domain correlation analysis model. This model quantitatively determines the correlation between current harmonic anomalies and track mechanical vibration, enabling rapid and accurate location of the root cause of electromechanical coupled latent harmonic faults. This helps to shorten the fault investigation cycle and reduce maintenance manpower and time costs. Attached Figure Description
[0023] Figure 1 This is a flowchart illustrating a method for locating harmonic faults in a power supply system based on multi-source data fusion, according to an embodiment of the present invention. Figure 2 This is a schematic diagram of the control logic for a power supply system harmonic fault location method based on multi-source data fusion, provided in an embodiment of the present invention. Detailed Implementation
[0024] The following detailed description, in conjunction with the accompanying drawings and specific embodiments, provides a further detailed explanation of the harmonic fault location method and system for power supply systems based on multi-source data fusion proposed in this invention. The advantages and features of this invention will become clearer from the following description. It should be noted that the accompanying drawings are in a very simplified form and use non-precise proportions, used only to facilitate and clearly illustrate the embodiments of this invention. Please refer to the accompanying drawings to make the objectives, features, and advantages of this invention more apparent and understandable. It should be understood that the structures, proportions, sizes, etc., depicted in the accompanying drawings are only for illustrative purposes to aid those skilled in the art and are not intended to limit the implementation conditions of this invention. Therefore, they have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to the size, without affecting the effects and objectives achieved by this invention, should still fall within the scope of the technical content disclosed in this invention.
[0025] like Figure 1 and Figure 2 As shown, this embodiment provides a method for locating harmonic faults in a power supply system based on multi-source data fusion, including the following steps: Step S1: Establish data acquisition channels for the power supply system and the track system respectively, so as to collect the current waveform data of the power supply system and the track vibration characteristic data of the track system respectively, and timestamp the current waveform data and the track vibration characteristic data based on the unified time service. Step S2: Generate a time series of harmonic amplitudes of a specified order based on current waveform data; generate a time series of vibration intensity based on track vibration characteristic data; traverse the vibration intensity time series to identify vibration surge events and record the corresponding timestamps; Step S3: Using the timestamp of each vibration surge event as the reference point, extract the corresponding analysis time window, calculate the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series within each analysis time window, and perform correlation analysis based on the cross-correlation coefficient. Step S4: Based on the results of the correlation analysis, combined with the physical topology of the track system and the operating condition records, output the fault propagation link and lock the fault root cause interval.
[0026] In some embodiments, in step S1, to collect current waveform data of the power supply system, a power quality analyzer or a high-frequency fault recorder can be deployed in the outgoing cabinet of the traction substation or along the line section to continuously collect instantaneous current waveform data at a fixed sampling frequency. For example, the instantaneous waveform data of the three-phase currents A, B, and C can be continuously collected at a sampling frequency of 6.4 kHz (i.e., 128 points per power frequency cycle). The collected current waveform data can be stored in the format of a continuous time series file and timed via Network Time Protocol (NTP) to add an absolute timestamp with millisecond precision to each data point.
[0027] In some embodiments, in step S1, to collect track vibration characteristic data of the track system, triaxial vibration acceleration sensors and data acquisition units can be deployed at intervals along the track corresponding to the power supply section where harmonic anomalies occur. Vertical and horizontal vibration acceleration data of the track are collected at a fixed sampling frequency, for example, at a sampling frequency of 1 Hz. For the collected track vibration characteristic data, the original acceleration time series is retained, and minute-level effective vibration values (Root Mean Square, RMS) are simultaneously calculated and recorded. Each record is then stamped with an absolute timestamp that is from the same time source as the current waveform data.
[0028] Further, in step S2, in order to generate a time series of harmonic amplitudes of a specified order based on the current waveform data, a sliding window fast Fourier transform can be used to perform window-by-window spectral analysis on the current waveform data, and the amplitude or content of the specified harmonic can be extracted from the spectrum of each sliding window. These are then arranged in chronological order to generate a time series of harmonic amplitudes of the specified order synchronized with the original current waveform data. In some embodiments, the length of the sliding window is set to, for example, 1 second, containing 50 complete power frequency cycles, and the sliding step size of the sliding window is set to, for example, 0.1 seconds. Taking the third harmonic as an example, the amplitude or content of the third harmonic (150Hz) can be accurately extracted from the spectrum calculated from each sliding window, and the results of each extraction are arranged in chronological order to generate a time series of third harmonic amplitudes with high time resolution that is synchronized with the original current data.
[0029] Similarly, in order to generate a vibration intensity time series based on track vibration characteristic data, the effective value of vibration can be calculated based on the track vibration characteristic data to generate the vibration intensity time series.
[0030] In step S2, in order to identify and mark vibration surge events, it is necessary to determine the dynamic event triggering threshold based on the track vibration characteristic data of the historical operating period before the vibration surge event occurred. In some embodiments, the track vibration characteristic data of the historical operating period 24 hours before the vibration surge event can be selected as a benchmark, the mean and standard deviation of the historical vibration effective values can be calculated, and the dynamic event triggering threshold can be set as the sum of the mean and twice the standard deviation.
[0031] Furthermore, after determining the dynamic event trigger threshold and generating the vibration intensity time series, the vibration intensity time series can be traversed. When the vibration intensity at a certain time point exceeds the dynamic event trigger threshold, that time point is marked as a vibration surge event, and the start timestamp and peak vibration intensity of the vibration surge event are recorded.
[0032] In some embodiments, the analysis time window is centered on the timestamp of the vibration surge event, and the timestamp of the vibration surge event is denoted as T_vib. The range of the analysis time window can be defined as [T_vib - 30 seconds, T_vib + 30 seconds].
[0033] In other embodiments, reference is made to Figure 2 The analysis time window is an asymmetric time window that is based on the timestamp of the vibration surge event and is biased towards the back of the timestamp. The timestamp of the vibration surge event is denoted as T_vib, and the range of the analysis time window can be defined as [T_vib - 30 seconds, T_vib + 60 seconds] to cover the complete dynamic response process of electrical harmonics before and after the vibration surge event.
[0034] Furthermore, in step S3, within the analysis time window corresponding to each vibration surge event, the vibration intensity curve and the harmonic amplitude curve can be superimposed and compared on the same time axis. This allows observation and determination of whether the harmonic amplitude shows a statistically significant synchronous increase after the start time of the vibration surge event. Within each analysis time window, the cross-correlation coefficient between the vibration intensity time series and the harmonic amplitude time series is calculated.
[0035] As those skilled in the art will understand, the cross-correlation coefficient is an indicator that measures the degree of correlation between two time series over time. In this embodiment, the cross-correlation coefficient is used to determine the time lag relationship between the vibration intensity time series and the harmonic amplitude time series.
[0036] Specifically, the cross-correlation coefficient is calculated as follows: within each analysis time window, the vibration intensity time series is fixed, and the harmonic amplitude time series is gradually shifted relative to the vibration intensity time series along the time axis, shifting by one sampling step each time, and the Pearson correlation coefficient under the current shift is calculated; after traversing all preset shift ranges, the shift corresponding to the maximum value of the correlation coefficient is determined as the time lag of the current harmonic response relative to the track mechanical vibration.
[0037] More specifically, for the vibration intensity time series X(t) and the harmonic amplitude time series Y(t), the cross-correlation coefficient R(τ) within the analysis time window is calculated using the following formula: Where t is the index of the time point within the analysis time window; τ is the time offset (lag), with a value range of [-T]. max ,T max ], T max This is the preset maximum search lag time; and These represent the mean values of the vibration intensity time series and harmonic amplitude time series within the analysis time window, respectively.
[0038] In the calculation, the vibration intensity time series X(t) is fixed, while the harmonic amplitude time series Y(t) slides relative to it along the time axis, with each slide being one time step. The cross-correlation coefficient R(τ) at the current offset τ is then calculated. After traversing all τ values, the τ corresponding to the maximum value of R(τ) is the optimal time lag, indicating that the correlation between the two is strongest when the harmonic amplitude time series lags the vibration intensity time series by τ.
[0039] Specifically, for correlation analysis, within the analysis time window corresponding to each vibration surge event, the time lag of the current harmonic response relative to the track machinery vibration can be determined by searching for the time offset corresponding to the maximum cross-correlation coefficient. The analysis results for all vibration surge events are then statistically summarized to calculate the correlation success rate and the average time lag. The correlation success rate is the proportion of vibration surge events in which the current harmonic response increases synchronously with the track machinery vibration to the total number of vibration surge events.
[0040] Specifically, a stable historical operating period prior to the vibration surge event is used as the reference period, and the average harmonic amplitude within the reference period is used as the reference value. After the vibration surge event, if multiple consecutive data points in the harmonic amplitude time series exceed the product of the reference value and a preset multiple, and the increase exceeds three times the standard deviation of the harmonic amplitude within the reference period, then the current harmonic response corresponding to the vibration surge event is determined to have achieved a synchronous increase relative to the track machinery vibration. The preset multiple ranges, for example, from 1.5 to 2.5.
[0041] This embodiment overcomes the significant differences in sampling frequency and response time characteristics between the two types of data by designing an asymmetric analysis time window alignment strategy anchored by a vibration surge event. Based on this, by calculating the cross-correlation coefficient within the analysis window, a stable and minute time lag exists between the vibration intensity surge and the harmonic amplitude increase, providing direct data evidence for the fault propagation link between mechanical vibration and harmonic amplification.
[0042] In some embodiments, to rule out random correlations, statistical hypothesis testing can be further performed to avoid misjudgment. Statistical hypothesis testing, for example, employs a permutation test. Using the null hypothesis that "there is no correlation between track machinery vibration and power supply system harmonic anomalies," the timestamps of the vibration surge event are randomly permuted multiple times on the timeline, and the correlation success rate is recalculated after each permutation. If the actual observed correlation success rate falls outside the top 5% confidence interval in the random permutation results, the null hypothesis is rejected, and the correlation is determined to be statistically significant.
[0043] Finally, in step S4, when the association success rate exceeds a preset threshold, the average time lag is within a preset range, and the standard deviation of the time lag for each vibration surge event is less than a preset standard deviation, it is determined that there is an electromechanical coupling fault propagation link caused by electrical harmonic anomalies induced by track machinery vibration. The preset threshold is, for example, 90%, the preset range is, for example, 100 milliseconds to 5 seconds, and the preset standard deviation is, for example, 50% of the average time lag for each vibration surge event. These threshold settings ensure the reliability of the determination results while also taking into account the tolerance for data fluctuations in practical engineering applications.
[0044] Furthermore, by combining the physical topology of the track system with operational records, the mechanical vibration of the track can be located and its cause analyzed. For example, by combining auxiliary information such as train timetables and driver operation logs, the root cause of the fault can be identified as severe rail vibration caused by frequent train start-stop operations.
[0045] In some embodiments, based on physical evidence such as time lag obtained from correlation analysis, the specific electromechanical coupling fault propagation mechanism can be further analyzed and output. The electromechanical coupling fault propagation mechanism includes, but is not limited to: rail vibration caused by train start-stop, which is transmitted through the wheel-rail-pantograph-catenary relationship, resulting in fluctuations in contact pressure and nonlinear changes in contact resistance between the pantograph and the catenary (such as the generation of intermittent arcs). This nonlinear load characteristic ultimately excites a significant third harmonic current in the power supply network, which is then captured by the power supply monitoring device.
[0046] In some embodiments, the method further includes an active monitoring and early warning mechanism that works in conjunction with current waveform data acquisition. Specifically, during the acquisition of track vibration characteristic data, if the vibration intensity exceeds the dynamic event trigger threshold, the system can issue an early warning signal even if the harmonic indicators of the power supply system have not yet shown abnormalities, prompting maintenance personnel to pay attention to the power quality change trend in that section. By providing a vibration-harmonic active monitoring and early warning mechanism based on real-time data streams, the operation and maintenance model can be driven to shift from passive troubleshooting after a fault to proactive early warning during an event. This not only solves the problem of post-fault location but also extends the technical solution to the preventative maintenance stage.
[0047] The following section provides a further explanation of the harmonic fault location method for power supply systems based on multi-source data fusion provided in this embodiment, using real-world application scenarios as examples.
[0048] To address the intermittent excessive third harmonic current issue on Metro Line 2 in a certain city, the harmonic fault location method for power supply systems based on multi-source data fusion, provided in this embodiment, was applied for fault diagnosis and location. This line uses a 1500V DC overhead contact line for power supply, and the trains are 6-car A-type trains with a peak-hour interval of approximately 2 minutes.
[0049] First, in step S1, to collect data from the power supply system, a power quality analyzer is installed at the 214 outgoing switchgear of the traction substation. The sampling frequency is set to 6.4kHz, and the instantaneous waveforms of the three-phase currents A, B, and C are continuously recorded. Time synchronization is performed through a network time server to ensure that the timestamp accuracy reaches the millisecond level.
[0050] To collect data from the track system, in the upstream section between Zhongshan Park Station and Jiangsu Road Station, where harmonic alarms frequently occur, six triaxial vibration accelerometers, approximately 2.3 kilometers long, were deployed at equal intervals of about 500 meters along the track waist to collect track vibration characteristic data. The triaxial vibration accelerometers continuously record the Z-axis vibration acceleration in the vertical direction of the track at a sampling rate of 1Hz and calculate the effective vibration value per minute in real time. All vibration data is also synchronized with a network time server.
[0051] Further, in step S2, a sliding window Fast Fourier Transform is performed on the acquired current waveform data. Specific parameters are set as follows: a rectangular window with a window length of 1 second (covering 50 power frequency cycles), and a sliding step size of 0.1 seconds. The amplitude of the 3rd harmonic at a frequency of 150Hz is extracted from each spectrum result. After processing, a time series of the 3rd harmonic amplitude with a time granularity of 0.1 seconds is generated.
[0052] For the collected track vibration characteristic data, the effective vibration value per minute was calculated for the vibration acceleration data at 6 measuring points to form a vibration intensity time series. Data from the normal operation period of 24 hours prior to the fault was selected as a baseline, and the historical mean and standard deviation of the effective values were calculated. The dynamic event trigger threshold was set as the sum of the mean and twice the standard deviation. Traversing the vibration intensity time series, when the effective vibration value at any measuring point exceeded the dynamic event trigger threshold, the system automatically recorded the timestamp and peak intensity of the vibration surge event. In the above application scenario, a total of 27 valid vibration surge events were detected during the peak hour from 18:00 to 19:00.
[0053] Further, in step S3, for each detected vibration surge event, an analysis time window is extracted from the three harmonic amplitude time series, with the corresponding timestamp T_vib as the reference, and the interval is [T_vib-30 seconds, T_vib+60 seconds]. For example, if the timestamp T_vib of a vibration surge event is 18:23:45, then the time range of the corresponding analysis time window is 18:23:15 to 18:24:45. For each analysis time window, the vibration intensity curve and the harmonic amplitude curve are plotted on the same coordinate system, and the cross-correlation coefficient between the two within that analysis time window is calculated.
[0054] In the aforementioned application scenario, 27 vibration surge events during peak periods were analyzed one by one. The results are as follows: 25 correlations were successful, meaning that a significant synchronous increase in harmonic amplitude was observed after each vibration surge within all 25 analysis time windows; the correlation success rate was 25 / 27 = 92.6%. Based on the calculated average time lag, the starting point of the harmonic rise lagged behind the starting point of the vibration surge by an average of 320 milliseconds, with a standard deviation of ±150 milliseconds.
[0055] Finally, in step S4, the high correlation success rate of 92.6% and the steady-state time lag of approximately 320 milliseconds leading the harmonics constitute a strong chain of quantitative evidence, ruling out accidental factors and conclusively proving that track mechanical vibration is the direct cause of the third harmonic amplification. Further examination of the train timetable and driver operation records revealed that train operations were frequent during this period. Due to high passenger flow at the stations ahead, trains frequently performed electric braking operations before entering the station and then rapidly started high-power traction upon leaving. This frequent longitudinal force impact is the energy source of the track vibration. The repeated starting and stopping of the trains excited severe vertical vibrations in specific sections of the track through the wheel-rail contact surface, i.e., a vibration surge event.
[0056] Based on the on-site investigation, slight loosening of the contact wire hangers was found near sensor measuring point #3 in the section with the most severe vibration. The fault mechanism is inferred to be: severe track vibration is transmitted to the contact wire through the track bed and supports, causing the pantograph to experience periodic high-frequency fluctuations in the pantograph-contact contact pressure at 320 milliseconds when passing through this section. This fluctuation causes nonlinear changes in contact resistance, accompanied by minor arcing, forming a dynamic nonlinear load, which ultimately induces a characteristic third harmonic current in the power supply circuit.
[0057] Based on the analysis, it can be clearly determined that the root cause of the fault lies in the section between K12+300 and K12+800 of the "Zhongshan Park Station - Jiangsu Road Station" upstream line. The frequent starts and stops of trains caused track vibrations, leading to a deterioration of the pantograph-catenary relationship. To repair the fault, the overhead contact system in this section can be tightened and repaired, and the track in this section can be ground to improve the wheel-rail contact condition.
[0058] The power supply system harmonic fault location method based on multi-source data fusion provided in this embodiment significantly reduces the average location time for latent harmonic faults induced by external mechanical vibration in power supply systems from approximately 4 hours to less than 1 hour, improving fault location efficiency by 75% and effectively reducing maintenance manpower and time costs. Furthermore, the power supply system harmonic fault location method based on multi-source data fusion provided in this embodiment has high versatility and portability, providing a reusable technical paradigm for complex industrial scenarios with electromechanical coupling effects, such as large wind farms, high-voltage transmission lines, and ship propulsion systems, and has broad prospects for widespread application.
[0059] In other aspects, this embodiment also provides a power supply system harmonic fault location system based on multi-source data fusion, including a data acquisition module, a storage module, a preprocessing module, an analysis module, and a fault location output module.
[0060] The system comprises several modules: a data acquisition module connected to the power supply system and the track system, used to acquire current waveform data from the power supply system and track vibration characteristic data from the track system, respectively; a storage module connected to the data acquisition module, used to store the current waveform data and track vibration characteristic data, and to timestamp the data based on a unified time service; a preprocessing module connected to the storage module, used to generate a time series of harmonic amplitudes of a specified order based on the current waveform data, and a time series of vibration intensity based on the track vibration characteristic data, traversing the vibration intensity time series to identify and mark vibration surge events and record the corresponding timestamps; an analysis module connected to the preprocessing module, used to extract corresponding analysis time windows based on the timestamp of each vibration surge event, calculate the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series within each analysis time window, and perform correlation analysis based on the cross-correlation coefficient; and a fault location output module connected to the analysis module, used to output the fault propagation link and pinpoint the fault root cause region based on the results of the correlation analysis, combined with the track system physical topology and operating condition records.
[0061] In some embodiments, the data acquisition module includes a power supply monitoring unit, which includes a power quality analyzer or a high-frequency fault recorder deployed in the outgoing cabinet of the traction substation or along the line section, for continuously acquiring instantaneous waveform data of the current at a fixed sampling frequency.
[0062] In some embodiments, the data acquisition module includes a track vibration monitoring unit, which includes triaxial vibration acceleration sensors and a data acquisition unit deployed at intervals along the track in the power supply section where harmonic anomalies occur, for acquiring vertical and horizontal vibration acceleration data of the track at a fixed sampling frequency.
[0063] To ensure that the technical solution of this application complies with the provisions of Article 5, Paragraph 1 of the Patent Law and does not constitute a violation of the law, social morality, or harm to the public interest, the applicant hereby makes the following compliance statement.
[0064] The data collection, storage, and processing involved in this application strictly comply with current laws and regulations. Specifically, all user-related data to be processed in this solution originates from legal channels, and explicit authorization and consent from the data subjects have been obtained through user agreements or privacy policies during the data collection phase. For cases involving sensitive personal information, separate consent from the users has been further obtained, strictly adhering to the principle of informed consent. In the actual data processing process, if identity-identifying information is involved, this solution employs anonymization or de-identification techniques to ensure that the processed data cannot identify any specific natural person and cannot be restored. The data processing activities do not infringe upon personal privacy rights and comply with the provisions of the "Personal Information Protection Law of the People's Republic of China," the "Cybersecurity Law of the People's Republic of China," and other relevant laws. If this solution involves collecting information in public places, the purpose of collection is limited to maintaining public safety or specific scenarios with explicit user authorization, and does not exceed the necessary limits.
[0065] Regarding the algorithmic decision-making mechanism, the technical solution of this application fully considers technological ethics and social morality. The training data, label settings, and decision-making logic used in the model construction process do not introduce discriminatory or unfair parameters based on factors such as race, gender, age, ethnicity, or religious belief. The algorithm output is optimized based on objective technical parameters, rather than making value judgments based on the inherent attributes of individuals. For scenarios involving decision-making models or recommendation algorithms, the decision-making basis of this solution is strictly limited to objective physical parameters, technical indicators, or a pre-defined priority order of legal obligations, and does not contain any content that violates the right to equality of life or social morality. The business logic and algorithmic recommendation content of this solution conform to the core socialist values and do not contain content that harms public interests, disrupts social order, or induces undesirable behavior.
[0066] In summary, the technical solution claimed in this application ensures its legality, compliance, and ethics through technical means throughout the entire chain of data acquisition, data processing, and result output, and there is no situation that violates the law, social morality, or harms the public interest.
[0067] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0068] It should be noted that the apparatus and methods disclosed in the embodiments herein can also be implemented in other ways. The apparatus embodiments described above are merely illustrative; for example, the flowcharts and block diagrams in the accompanying drawings show the architecture, functionality, and operation of possible implementations of apparatus, methods, and computer program products according to various embodiments herein. In this regard, each block in a flowchart or block diagram may represent a module, program, or part of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions marked in the blocks may occur in a different order than those marked in the drawings. For example, two consecutive blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in a block diagram and / or flowchart, and combinations of blocks in block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system to perform the specified function or action, or can be implemented using a combination of dedicated hardware and computer instructions.
[0069] In addition, the functional modules in the various embodiments of this article can be integrated together to form an independent part, or each module can exist independently, or two or more modules can be integrated to form an independent part.
[0070] Although the present invention has been described in detail through the preferred embodiments above, it should be understood that the above description should not be considered as a limitation of the present invention. Various modifications and substitutions to the present invention will be apparent to those skilled in the art after reading the above description. Therefore, the scope of protection of the present invention should be defined by the appended claims.
Claims
1. A method for locating harmonic faults in a power supply system based on multi-source data fusion, characterized in that, Includes the following steps: Data acquisition channels are established for the power supply system and the track system respectively, to collect current waveform data of the power supply system and track vibration characteristic data of the track system respectively, and timestamps are added to the current waveform data and the track vibration characteristic data based on a unified time service. A time series of harmonic amplitudes of a specified order is generated based on the current waveform data; a time series of vibration intensity is generated based on the track vibration characteristic data; the vibration intensity time series is traversed to identify vibration surge events and record the corresponding timestamps. Using the timestamp of each vibration surge event as a reference point, a corresponding analysis time window is extracted. Within each analysis time window, the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series is calculated, and correlation analysis is performed based on the cross-correlation coefficient. Based on the results of correlation analysis, combined with the physical topology of the track system and the operating condition records, the fault propagation link is output and the fault root cause interval is identified.
2. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, The current waveform data collected from the power supply system includes: Power quality analyzers or high-frequency fault recorders are deployed in the outgoing cabinets of traction substations or in the section substations along the line to continuously collect the instantaneous waveform data of the current at a fixed sampling frequency.
3. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, The track vibration characteristic data collected for the track system include: Along the track in the power supply section where harmonic anomalies occur, triaxial vibration acceleration sensors and data acquisition units are deployed at intervals to collect vertical and horizontal vibration acceleration data of the track at a fixed sampling frequency.
4. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, Generating a time series of harmonic amplitudes of a specified order based on the current waveform data includes: The current waveform data is subjected to window-by-window spectral analysis using a sliding window fast Fourier transform. The amplitude or content of a specified harmonic is extracted from the spectrum of each sliding window and arranged in chronological order to generate a time series of the specified harmonic amplitude synchronized with the original current waveform data.
5. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, Generating a vibration intensity time series based on the aforementioned track vibration characteristic data includes: Based on the track vibration characteristic data, the effective value of vibration is calculated to generate a vibration intensity time series.
6. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 5, characterized in that, Identifying and marking sudden increases in vibration events includes: Based on the track vibration characteristic data of the historical running period before the occurrence of the vibration surge event, the dynamic event trigger threshold is determined; Traverse the vibration intensity time series. When the vibration intensity at a certain time point exceeds the dynamic event trigger threshold, mark the time point as a vibration surge event and record the start timestamp and peak vibration intensity of the vibration surge event.
7. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 6, characterized in that, Based on vibration data from historical operating periods prior to the occurrence of a vibration surge event, the dynamic event trigger threshold is determined by including: Track vibration characteristic data from the historical operating period 24 hours before the vibration surge event is selected as a benchmark. The mean and standard deviation of the historical vibration effective values are calculated, and the dynamic event trigger threshold is set as the sum of the mean and twice the standard deviation.
8. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 6, characterized in that, Also includes: During the process of collecting track vibration characteristic data, when the vibration intensity exceeds the dynamic event trigger threshold, an early warning signal is issued.
9. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, The analysis time window is centered on the timestamp of the sudden vibration increase event; or The analysis time window is an asymmetric time window that uses the timestamp of the vibration surge event as a reference point and is biased towards the back of the reference point.
10. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 1, characterized in that, Association analysis based on cross-correlation coefficients includes: Within the analysis time window corresponding to each vibration surge event, the time lag of the current harmonic response relative to the track machinery vibration is determined by searching for the time offset corresponding to the maximum cross-correlation coefficient. The analysis results of all vibration surge events are statistically summarized, the correlation success rate and the average time lag are calculated, and statistical hypothesis testing is performed to exclude random correlations. The correlation success rate is the proportion of vibration surge events in which the current harmonic response rises synchronously with the track machinery vibration to the total number of vibration surge events.
11. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 10, characterized in that, The historical operating period before the occurrence of the vibration surge event is used as the reference period, and the average value of the harmonic amplitude within the reference period is used as the reference value. After a sudden increase in vibration occurs, if multiple consecutive data points in the harmonic amplitude time series exceed the product of the reference value and a preset multiple, and the increase exceeds three times the standard deviation of the harmonic amplitude within the reference time period, it is determined that the current harmonic response corresponding to the current sudden increase in vibration increases is synchronously increasing with respect to the vibration of the track machinery.
12. The method for locating harmonic faults in a power supply system based on multi-source data fusion according to claim 10, characterized in that, Outputting the fault propagation path and pinpointing the fault root cause region includes: When the association success rate exceeds the preset threshold, the average time lag is within the preset range, and the standard deviation of the time lag of each vibration surge event is less than the preset standard deviation, it is determined that there is an electromechanical coupling fault propagation link caused by the vibration of track machinery to induce electrical harmonic abnormalities. By combining the physical topology of the track system with the operating condition records, the mechanical vibration of the track is located and the cause of the vibration is analyzed.
13. A power supply system harmonic fault location system based on multi-source data fusion, characterized in that, include: The data acquisition module is connected to the power supply system and the track system, and is used to collect current waveform data of the power supply system and track vibration characteristic data of the track system, respectively. A storage module, connected to the data acquisition module, is used to store the current waveform data and the track vibration characteristic data, and to timestamp the current waveform data and the track vibration characteristic data based on a unified time service; A preprocessing module, connected to the storage module, is used to generate a time series of harmonic amplitudes of a specified order based on the current waveform data; and to generate a time series of vibration intensity based on the track vibration characteristic data, and to traverse the vibration intensity time series to identify and mark vibration surge events and record the corresponding timestamps. The analysis module, connected to the preprocessing module, is used to extract the corresponding analysis time window based on the timestamp of each vibration surge event, calculate the cross-correlation coefficient between the harmonic amplitude time series and the vibration intensity time series within each analysis time window, and perform correlation analysis based on the cross-correlation coefficient. The fault location output module is connected to the analysis module and is used to output the fault propagation link and lock the fault root cause interval based on the results of correlation analysis and in combination with the physical topology of the track system and the operating condition records.
14. The power supply system harmonic fault location system based on multi-source data fusion according to claim 13, characterized in that, The data acquisition module includes a power supply monitoring unit, which includes a power quality analyzer or a high-frequency fault recorder deployed in the outgoing cabinet of the traction substation or along the line section, for continuously acquiring the instantaneous waveform data of the current at a fixed sampling frequency.
15. The power supply system harmonic fault location system based on multi-source data fusion according to claim 13, characterized in that, The data acquisition module includes a track vibration monitoring unit, which includes triaxial vibration acceleration sensors and data acquisition units deployed at intervals along the track in the power supply section where harmonic anomalies occur. These sensors are used to collect vertical and horizontal vibration acceleration data of the track at a fixed sampling frequency.