A fault section location method for IIDG-containing power distribution network
By calculating the accumulated fault current and analyzing waveform data in distribution networks containing IIDGs, and combining symmetrical and asymmetrical short-circuit identification criteria, the signal area is dynamically adjusted to achieve accurate fault segment location, solve the problem of misjudgment caused by IIDG reverse current, and improve the location efficiency and accuracy.
Patent Information
- Application Number
- CN202611175833.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-04
- Publication Date
- 2026-11-20
AI Technical Summary
In distribution networks with inverter-type distributed generation (IIDG) access, traditional fault location methods suffer from misjudgment and inaccurate location due to the reverse fault current injection of IIDG, especially in multi-point fault scenarios, which are difficult to identify effectively. Existing technologies cannot solve this problem effectively.
By acquiring the protection trip signal and the rated power of the IIDG, calculating the cumulative value of the fault current, determining the impact of the IIDG on the alarm signal, and combining waveform data and current phasor analysis, designing symmetrical and asymmetrical short circuit identification criteria, dynamically adjusting the signal area, iteratively verifying the fault scenario, and achieving accurate positioning.
It significantly improves fault location efficiency, avoids resource waste, ensures location accuracy, solves the problem of false alarms and missed alarms caused by IIDG reverse current, and is suitable for rapid processing of complex fault scenarios.
Smart Images

Figure CN123136270A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power grid fault location technology, specifically relating to a fault section location method for a distribution network containing IIDG. Background Technology
[0002] With the rapid development of distributed generation technology, a large number of inverter-interfaced distributed generators (IIDGs) have been connected to the distribution network, gradually transforming traditional single-source radial networks into multi-source active networks. During fault periods, IIDGs are constrained by the grid-connected inverter control strategy, typically outputting only a limited short-circuit current (generally 1.2 to 2 times the rated current), exhibiting fault current characteristics significantly different from synchronous generators. This low-inertia, weak-support power source characteristic presents new challenges for fault location in distribution networks.
[0003] Traditional feeder automation (FA) systems primarily rely on overcurrent alarm signals for fault location determination. Their underlying logic is based on the fault current distribution patterns of a single-ended power supply radial network: all feeder terminals (FTUs) upstream of the fault point can detect overcurrent, while downstream FTUs do not. However, in distribution networks containing integrated fault-gate generators (IIDGs), when a fault occurs downstream of the IIDG connection point, the IIDG injects reverse fault current into the fault point. This can cause some downstream FTUs to also detect overcurrent signals, leading to misjudgments of the fault location by the FA system. Furthermore, when the IIDG capacity is large, its boosting current can cause overcurrent in non-faulty lines, further exacerbating location errors.
[0004] In existing technologies, some solutions attempt to circumvent the effects of IIDG by increasing protection settings, but this reduces the sensitivity of distribution network protection. Other solutions use impedance methods or traveling wave methods for precise location, but these methods require high accuracy of instrument transformers and synchronous sampling, and are difficult to adapt to complex distribution network topology changes. For multi-point fault scenarios (such as two-point faults on different feeders, two-point grounding faults on the same line, and different-phase faults on the same line), existing FA systems lack effective fault scenario identification mechanisms, often misjudging multi-point faults as single-point faults, leading to an expansion of the fault isolation range or failure to restore power supply. Summary of the Invention
[0005] To address the aforementioned shortcomings of existing technologies, this invention provides a method for locating fault sections in a distribution network containing IIDG, comprising: S1. Obtain the protection trip signal of the distribution network and determine the suspected faulty line based on the protection trip signal; S2. Obtain the sum of the rated power and maximum load of the IIDG downstream of each distribution network feeder terminal FTU. Calculate the accumulated value of the maximum output fault current of the IIDG based on the obtained sum of the rated power and maximum load of the IIDG. Compare the accumulated value of the maximum output fault current of the IIDG with the upstream protection setting to determine whether the IIDG affects the alarm signal of the distribution network feeder terminal. S3. If it is determined that IIDG has no effect on the alarm signal of the distribution network feeder terminal, the initial fault location result of the feeder automation FA is adopted and the fault isolation operation is performed. S4. If it is determined that IIDG has an impact on the alarm signal of the distribution network feeder terminal, then obtain the fault recording data, extract the positive sequence current and three-phase current of each section, and use the symmetrical short circuit identification criterion and the asymmetrical short circuit identification criterion to verify the correctness of the initial fault section location result. S5. If the verification result shows that the initial fault location result is accurate, then perform the fault isolation operation; if the verification result shows that the initial fault location result is inaccurate, then screen the faulty line or suspected faulty line according to the protection trip signal, line overcurrent condition and zero-sequence overcurrent condition. S6. Based on the screened faulty lines, detect whether there are two-point faults in different feeders, two-point grounding faults on the same line, or different-phase faults on the same line, and determine the fault scenario. S7. Based on the determined fault scenario, delineate the distribution network feeder terminal signal area to be analyzed: For single-point or multi-point faults on different lines, only analyze the feeder terminal signals in the area affected by IIDG on the faulty line or the tripped line; for multi-point faults on the same line, analyze all areas of the tripped line, and repeat steps S4 to S6 until the determined fault section location result is obtained.
[0006] Further improvements to this technical solution include step S1, which includes: S11. Monitor the status of auxiliary contacts of each circuit breaker and load switch in the distribution network in real time. When a change event occurs in the auxiliary contact of any feeder outlet circuit breaker or sectionalizing switch of the distribution network from closed to open, capture and record the switch number, feeder name and change time corresponding to the change event, and generate the original protection trip signal sequence. S12. Perform de-jittering and time window alignment on the original protection trip signal sequence. Based on the change time, backtrack the first preset time window and extend the second preset time window backward. Extract the information of all switchgear that have changed state within the time window, remove duplicate trip records caused by switch mechanical jitter or communication retransmission, and form an effective protection trip signal set. S13. Traverse the topological connection relationship of each trip switch in the effective protection trip signal set, trace upstream along the trip switch to the substation outgoing circuit breaker to which it belongs, mark the entire feeder under the jurisdiction of the substation outgoing circuit breaker as the first-level suspected fault line, and mark all branch lines directly connected downstream of the trip switch as the second-level suspected fault lines, and summarize to form a list of suspected fault lines.
[0007] Further improvements to this technical solution include step S2, which includes: S21. For each suspected faulty line that has triggered a protection trip signal, traverse the distribution network feeder topology segment by segment downstream to the installation location of each distribution network feeder terminal unit (FTU), and count the rated power values of all inverter-type distributed generation (IIDG) connected downstream of each distribution network feeder terminal FTU. Simultaneously, count the maximum load power value downstream of each distribution network feeder terminal FTU, and form a correspondence table between the rated power set of each distribution network feeder terminal FTU's downstream IIDG and the sum of the maximum loads. S22. Based on the set of IIDG rated power downstream of each distribution network feeder terminal FTU in the corresponding relationship table, the maximum output fault current coefficient of IIDG is introduced to convert and accumulate the rated power of each IIDG to obtain the accumulated value of the maximum output fault current of each distribution network feeder terminal FTU. At the same time, the sum of the maximum load downstream of each distribution network feeder terminal FTU is substituted into the protection setting calculation formula to obtain the upstream protection setting of the corresponding distribution network feeder terminal FTU. S23. Compare the accumulated maximum output fault current of the downstream IIDG of each distribution network feeder terminal FTU calculated in step S22 with its corresponding upstream protection setting. If the accumulated maximum output fault current of the IIDG is greater than the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is affected by the IIDG, and the IIDG causes distortion to the alarm signal of the distribution network feeder terminal, resulting in false alarms or missed alarms. If the accumulated maximum output fault current of the IIDG is less than or equal to the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is not affected by the IIDG, and the alarm signal of the distribution network feeder terminal is reliable.
[0008] Further improvements to this technical solution include calculating the cumulative value of the maximum output fault current of the IIDG downstream of the distribution network feeder terminal FTU. The calculation formula is: ; in, The maximum output fault current coefficient of the IIDG; Let i be the rated power of the i-th IIDG downstream of the distribution network feeder terminal FTU, i=1,2,...,m, where m is the total number of IIDGs connected downstream of the distribution network feeder terminal FTU. The rated voltage of the power distribution network system; Calculate the upstream protection setting The calculation formula is: ; in, The reliability coefficient for protecting the set value; This is the sum of the maximum load power downstream of the distribution network feeder terminal unit (FTU). The logical expression for determining the impact of IIDG is: ; in, This represents the cumulative value of the maximum output fault current of the IIDG downstream of the FTU in the distribution network feeder terminal. The upstream protection setting is corresponding to the distribution network feeder terminal unit (FTU). When the determination result is "affected", the alarm signal of the distribution network feeder terminal unit (FTU) will be marked as pending correction and enter the signal verification process in the subsequent step S4. When the determination result is "no effect", the alarm signal of the distribution network feeder terminal unit (FTU) will be directly accepted and enter the fault isolation process in step S3.
[0009] Further improvements to this technical solution include step S3, which includes: S31. Read the fault handling log of the feeder automation FA system and extract the initial fault section location result generated by the feeder automation FA based on the remote signaling alarm signals uploaded by each distribution network feeder terminal FTU. The initial fault section location result includes the fault section start and end node number, fault type label and fault occurrence time. S32. Perform topology consistency verification on the initial fault section location result. Based on the distribution network topology connection relationship, verify whether the upstream and downstream boundary switches marked as fault sections are in the change state or alarm trigger state. At the same time, verify whether the fault section has a topology belonging relationship with the list of suspected fault lines determined in step S1. If the verification is passed, the initial fault section location result is confirmed as a valid location result. S33. Based on the effective location results, generate a fault isolation control strategy, issue a trip control command to the adjacent distribution network feeder terminal FTU on the upstream power supply side of the fault section to cut off the fault current path, issue a trip control command to the adjacent distribution network feeder terminal FTU on the downstream load side of the fault section to isolate the fault section, and after confirming that the switches at both ends of the fault section have been opened, send a tie switch closing command to the non-fault power loss area to restore power supply to the healthy area of the distribution network feeder terminal.
[0010] Further improvements to this technical solution include step S4, which includes: S41. Based on the change time of the protection trip signal captured in step S1, the first recording time is intercepted forward and the second recording time is intercepted backward. The three-phase current sampling sequence within the corresponding time window is read from the built-in recording module of each distribution network feeder terminal FTU. The amplitude and phase of each phase current phasor are extracted by performing Fourier transform on the three-phase current sampling sequence. The positive sequence current phasor and three-phase current phasor of each section are calculated by the symmetrical component method. S42. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a three-phase short circuit, then extract the positive sequence current phasor at the branch line outlet, the positive sequence current phasor of the section to be verified and the positive sequence current phasor of its downstream adjacent section, and calculate the criterion parameters. Determine the correctness of the initial fault section location result under the symmetrical short circuit scenario based on the sign of the criterion parameters. S43. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a single-phase ground fault, a two-phase short circuit, or an asymmetrical short circuit, then extract the three-phase current phasors of the upstream adjacent section and the downstream adjacent section of the section to be verified. Eliminate the influence of the IIDG symmetrical component through the differential current calculation of the adjacent section currents, substitute it into the pre-stored differential current amplitude criterion formula to calculate the differential current amplitude, and determine the correctness of the initial fault section location result under the asymmetrical short circuit scenario based on the comparison result of the differential current amplitude and the load current threshold.
[0011] Further improvements to this technical solution include step S43, which includes: S431. Using the fault section marked by the initial fault section location result as a reference, trace upstream along the distribution network topology to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the upstream adjacent section during the fault period. Similarly, trace downstream to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the downstream adjacent section during the fault period. Perform Fourier transform on both sets of three-phase current sampling values to extract the three-phase current phasors of the upstream adjacent section. and the three-phase current phasors of the downstream adjacent section ; S432. For each phase, perform the adjacent segment current differential calculation sequentially, taking phase A and phase B as the calculation objects, and rotate the difference of phase A current phasor between the upstream adjacent segment and the downstream adjacent segment clockwise by 120 degrees. Subtract the difference between the phase A and phase B current phasors to obtain the phase A differential current phasor after eliminating the influence of the IIDG symmetrical components. Repeat this calculation process to obtain the corresponding differential current phasors of phase B and phase C in turn. The rotation calculation utilizes the characteristic of the three-phase symmetrical positive sequence of the IIDG output short-circuit current to make the IIDG components cancel each other out in the differential current calculation. S433. Calculate the amplitude of the differential current phasor of each phase and compare it with the preset load current threshold. If the differential current amplitude of any phase is greater than twice the load current amplitude, the section to be checked is determined to be an external fault, and the initial fault section location result is inaccurate. If the differential current amplitude of all phases does not exceed the load current threshold, the section to be checked is determined to be an internal fault, and the initial fault section location result is accurate.
[0012] Further improvements to this technical solution include step S5, which includes: S51. Read the verification output results of the symmetrical short circuit identification criteria and the asymmetrical short circuit identification criteria in step S4. If the positive sequence current amplitude ratio is less than 0 or the differential current amplitude criterion does not meet the threshold condition, the initial fault section location result is determined to be accurate. The preset fault isolation control strategy is called to perform the tripping operation of the upstream and downstream switches of the fault section. S52. If the verification result of step S4 is inaccurate, then take the change time of the protection trip signal as the benchmark, extract the three-phase current amplitude and zero-sequence current amplitude of each feeder substation outlet circuit breaker and each distribution network feeder terminal FTU during the steady-state period before the fault and the transient period after the fault, and calculate the overcurrent start flag and zero-sequence overcurrent start flag of each line. S53. Based on the spatial distribution of overcurrent start flags, zero-sequence overcurrent start flags, and protection trip signals for each line, the fault characteristic matching degree of each feeder is verified one by one using the elimination method. Feeders that simultaneously meet the overcurrent start condition and the protection trip condition are marked as fault lines, and feeders that only meet the overcurrent start condition but not the protection trip condition are marked as suspected fault lines, thus forming an updated list of fault lines and suspected fault lines.
[0013] Further improvements to this technical solution include step S6, which includes: S61. For each selected faulty line and suspected faulty line, extract the sudden change time of the A-phase, B-phase, and C-phase currents and the current amplitude of each phase at the circuit breaker at the outlet of each feeder substation. Simultaneously extract the measured values of the zero-sequence current transformers of each feeder. Using the change time of the protection trip signal as the time reference, calculate the time difference of the overcurrent sudden change time between different feeders and the time difference of the current sudden change time of each phase within the same feeder. S62. Combine the phase-to-phase overcurrent flag, zero-sequence overcurrent flag and the time difference of the overcurrent change moment of each feeder for judgment. If the difference of the overcurrent change moment between two or more different feeders is greater than the preset time interval for detecting faults in different feeders, or if the positive sequence current amplitude of the same feeder shows an opposite trend of increasing and decreasing at two consecutive time points, then it is determined that there is a two-point fault scenario in different feeders. S63. If no two-point fault characteristics of different feeders are detected, further verify whether the zero-sequence current amplitude of each feeder exceeds the zero-sequence current setting. If the zero-sequence current of any feeder meets the over-limit condition and there are at least two or more different trip signal sources for that feeder, then it is determined that there is a two-point grounding fault scenario on the same line. If the three-phase current of the feeder exceeds the phase current setting but the overcurrent change time of each phase is not equal, then it is determined that there is a different-phase fault scenario on the same line, and finally output the determined fault scenario type label.
[0014] Further improvements to this technical solution include step S7, which includes: S71. Read the fault scenario type label output in step S6. If it is determined to be a single-point fault or a two-point fault of different feeders, then based on the comparison result between the maximum output fault current accumulation value of the downstream IIDG of each distribution network feeder terminal FTU in step S2 and the upstream protection setting value, traverse the impact judgment flag of each distribution network feeder terminal FTU, and classify all distribution network feeder terminal FTUs and their downstream sections that are determined to be "affected" into the set of areas affected by IIDG. S72. If the fault scenario is a single-point fault or a two-point fault of a different feeder, then only the fault recording data and remote signaling alarm signal of the corresponding distribution network feeder terminal FTU are extracted from the set of areas affected by IIDG as the re-verification input for steps S4 to S6, and the distribution network feeder terminal FTU signals outside the areas affected by IIDG are ignored. S73. If the fault scenario is a two-point grounding fault on the same line or an out-of-phase fault on the same line, ignore the local judgment result of the IIDG influence in step S2, directly include all distribution network feeder terminals (FTUs) of the tripped line into the signal area to be analyzed, extract the fault recording data and remote signaling alarm signals of each distribution network feeder terminal (FTU) on the entire line, re-execute the symmetrical short circuit identification criterion and asymmetrical short circuit identification criterion verification in step S4, the fault line screening in step S5, and the fault scenario verification in step S6, iterate and loop until the location results of two consecutive iterations are consistent or the maximum number of iterations is reached, and output the final fault section location result.
[0015] The beneficial effects of this invention are as follows: In the initial stage of the fault location process, this invention calculates the cumulative value of the maximum output fault current of the downstream IIDG of each distribution network feeder terminal FTU through step S2. and compare it with the upstream protection setting. Quantitative comparisons are performed to clearly determine whether the IIDG has a substantial impact on the alarm signal before fault localization. For sections determined to have "no impact," the initial FA localization result is directly adopted to perform isolation operations, significantly shortening the fault handling time in scenarios without IIDG impact. For sections determined to have "impact," subsequent waveform analysis and signal correction processes are initiated. This capacity boundary-based predictive mechanism avoids the resource waste caused by indiscriminate complex calculations on all sections of the entire network in existing technologies, significantly improving localization efficiency.
[0016] This invention designs symmetrical short-circuit identification criteria (positive sequence current amplitude ratio criterion) and asymmetrical short-circuit identification criteria (adjacent section current difference criterion) for different types of fault characteristics. For symmetrical faults such as three-phase short circuits, the sign of the positive sequence current amplitude ratio λ is used to determine the location of the fault section, and the significant difference in the positive sequence current distribution characteristics upstream and downstream of the fault section is used to achieve accurate location; for asymmetrical faults such as single-phase grounding and two .... The rotating subtraction operation eliminates the influence of the three-phase symmetrical positive-sequence component of the IIDG, ensuring that the differential current calculation only reflects the contribution of the fault branch and load current. These two criteria work together to cover all fault types in the distribution network, fundamentally solving the problem of false alarms and missed alarms in the FTU caused by the reverse injection current of the IIDG.
[0017] This invention systematically detects three complex fault scenarios through step S6: two-point faults on different feeders, two-point grounding faults on the same line, and phase-different faults on the same line. It identifies two-point faults on different feeders by utilizing the time difference between the sudden changes in overcurrent between different feeders; it identifies two-point grounding faults on the same line by utilizing zero-sequence current exceeding limits in conjunction with multiple tripping sources; and it identifies phase-different faults on the same line by utilizing three-phase overcurrent with discrete timing of each phase's sudden change. This mechanism effectively solves the problem of existing FA systems misjudging multiple faults as single-point faults, leading to expanded isolation ranges or power restoration failures. It is particularly suitable for handling scenarios involving successive multi-point faults in distribution networks during severe weather conditions such as typhoons and snowstorms.
[0018] This invention dynamically adjusts the feeder terminal signal area to be analyzed based on the fault scenario type: for single-point or multi-point faults on different lines, only the terminal signals within the area affected by the IIDG are analyzed to avoid interference from signals in sections without joints; for multi-point faults on the same line, all terminal signals of the entire tripped line are analyzed to ensure that no multi-point faults across sections are missed. This site-specific area delineation strategy minimizes computational scale while ensuring positioning accuracy, and the iterative verification mechanism in step S7 ensures that the algorithm converges within a finite number of iterations, meeting the timeliness requirements of distribution network fault handling. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is a schematic flowchart illustrating a method according to an embodiment of the present invention.
[0021] Figure 2 This is a schematic diagram illustrating the scope of influence of IIDG.
[0022] Figure 3 This is a schematic diagram of the distribution network after IIDG is connected. Detailed Implementation
[0023] To make the objectives, features, and advantages of this invention more apparent and understandable, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings of the specific embodiments. Obviously, the embodiments described below are only some embodiments of this invention, and not all embodiments. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
[0025] Figure 1 This is a schematic flowchart illustrating a method for locating fault sections in a distribution network containing IIDG, provided by the present invention. The order of steps in this flowchart can be changed, and some steps can be omitted, depending on different requirements.
[0026] like Figure 1 As shown, the method includes: S1. Obtain the protection trip signal of the distribution network and determine the suspected faulty line based on the protection trip signal; S2. Obtain the sum of the rated power and maximum load of the IIDG downstream of each distribution network feeder terminal FTU. Calculate the accumulated value of the maximum output fault current of the IIDG based on the obtained sum of the rated power and maximum load of the IIDG. Compare the accumulated value of the maximum output fault current of the IIDG with the upstream protection setting to determine whether the IIDG affects the alarm signal of the distribution network feeder terminal. S3. If it is determined that IIDG has no effect on the alarm signal of the distribution network feeder terminal, the initial fault location result of the feeder automation FA is adopted and the fault isolation operation is performed. S4. If it is determined that IIDG has an impact on the alarm signal of the distribution network feeder terminal, then obtain the fault recording data, extract the positive sequence current and three-phase current of each section, and use the symmetrical short circuit identification criterion and the asymmetrical short circuit identification criterion to verify the correctness of the initial fault section location result. S5. If the verification result shows that the initial fault location result is accurate, then perform the fault isolation operation; if the verification result shows that the initial fault location result is inaccurate, then screen the faulty line or suspected faulty line according to the protection trip signal, line overcurrent condition and zero-sequence overcurrent condition. S6. Based on the screened faulty lines, detect whether there are two-point faults in different feeders, two-point grounding faults on the same line, or different-phase faults on the same line, and determine the fault scenario. S7. Based on the determined fault scenario, delineate the distribution network feeder terminal signal area to be analyzed: For single-point or multi-point faults on different lines, only analyze the feeder terminal signals in the area affected by IIDG on the faulty line or the tripped line; for multi-point faults on the same line, analyze all areas of the tripped line, and repeat steps S4 to S6 until the determined fault section location result is obtained.
[0027] To facilitate understanding of the present invention, the following description further illustrates the fault section location method for IIDG-containing distribution networks provided by the present invention, based on the principle of the fault section location method for IIDG-containing distribution networks and the process of locating fault sections in feeder terminals of IIDG-containing distribution networks in the embodiments.
[0028] like Figure 2As shown, this invention provides a typical 10kV radial distribution network feeder topology containing inverter-type distributed generation (IIDG) to intuitively illustrate the implementation scenario of the fault section location method of this invention. In the figure: the horizontal main line is the distribution network feeder, with multiple sections set sequentially from left to right (section boundaries are represented by solid black dots); the feeder connects to the substation outgoing circuit breaker on the left (the leftmost black dot in the figure), and extends to the end load on the right; three inverter-type distributed generation (IIDG) sources are connected to the feeder, labeled DG1, DG2, and DG3 respectively, with their connection positions corresponding to the upstream sides of sections 2, 4, and 6; each IIDG is monitored and controlled through a distribution network feeder terminal unit (FTU). In the diagram, the black square above the IIDG represents the FTU, and the red arrow below indicates the monitoring range of the FTU over the downstream lines; the blue dashed box in the diagram marks the key section affected by the IIDG (section 3 between DG1 and DG2 in the example), which is used to illustrate the analysis area of "comparing the accumulated value of the maximum output fault current of the IIDG with the upstream protection setting" in step S2; the red dashed line represents the remote signaling alarm coverage of the FTU (in the example, the alarm monitoring boundary of the downstream sections of DG1, DG2, and DG3).
[0029] The accompanying diagram corresponds to the physical scenario of the "Fault Section Location Method in Distribution Network with IIDG" in the technical solution of this invention. It intuitively presents core elements such as IIDG access location, FTU deployment, feeder topology, and section division, providing a visual reference for understanding steps S1 (protection trip signal triggering), S2 (IIDG impact prediction), S4 (waveform data extraction), and S7 (signal area delineation). For example: When switch K3 (located between section 3 and section 4) trips, the system can trace the "first-level suspected fault line (the entire feeder)" and the "second-level suspected fault line (sections 4, 5, and 6)" through the topology relationship shown in this attached diagram. The area within the blue dashed box (section 3) is the section in step S2 where the accumulated value of the IIDG fault current needs to be calculated, in order to determine whether the IIDG affects the alarm signal. The section covered by the red dashed line (downstream of DG1, DG2, and DG3) is the source area for the waveform data of "extracting three-phase current and positive sequence current" in step S4.
[0030] First, step S1 includes: S11. Monitor the status of auxiliary contacts of each circuit breaker and load switch in the distribution network in real time. When a change event occurs in the auxiliary contact of any feeder outlet circuit breaker or sectionalizing switch of the distribution network from closed to open, capture and record the switch number, feeder name and change time corresponding to the change event, and generate the original protection trip signal sequence. S12. Perform de-jittering and time window alignment on the original protection trip signal sequence. Based on the change time, backtrack the first preset time window and extend the second preset time window backward. Extract the information of all switchgear that have changed state within the time window, remove duplicate trip records caused by switch mechanical jitter or communication retransmission, and form an effective protection trip signal set. S13. Traverse the topological connection relationship of each trip switch in the effective protection trip signal set, trace upstream along the trip switch to the substation outgoing circuit breaker to which it belongs, mark the entire feeder under the jurisdiction of the substation outgoing circuit breaker as the first-level suspected fault line, and mark all branch lines directly connected downstream of the trip switch as the second-level suspected fault lines, and summarize to form a list of suspected fault lines.
[0031] Considering the coordination between the relay protection device's operating time and the circuit breaker's tripping time, the time window width is defined. The calculation formula is: ; in, This is the longest operating time of the relay protection device, with a value ranging from 0.1s to 0.5s. This is the inherent opening time of the circuit breaker, with a value ranging from 0.04s to 0.08s. This is the time margin factor, with a value ranging from 0.02s to 0.05s.
[0032] First preset time window The second preset time window is taken This ensures complete coverage of the time interval during which the main protection operation and the backup protection of adjacent lines may be activated.
[0033] The topology tracing criterion for marking suspected faulty lines is: Let the node number of the trip switch be... Its directly connected upstream parent node is numbered as If the parent node If the node is a substation outgoing circuit breaker node, then the entire feeder connected to that outgoing circuit breaker... Included in the first-level suspected fault line set ,Right now: ; in, This refers to the set of outgoing circuit breaker nodes in a substation.
[0034] At the same time, the trip switch The set of directly connected child nodes downstream All corresponding branch lines (i=1,2,...,k, where k is the number of downstream branches) are included in the second-level suspected fault line set. ,Right now: ; Final list of suspected faulty lines The union of the two sets mentioned above: ; In the formula, This is the complete list of suspected faulty lines output in step S13, which is used for calculating the IIDG capacity boundary and screening faulty lines in the subsequent step S2.
[0035] Secondly, step S2 includes: S21. For each suspected faulty line that has triggered a protection trip signal, traverse the distribution network feeder topology segment by segment downstream to the installation location of each distribution network feeder terminal unit (FTU), and count the rated power values of all inverter-type distributed generation (IIDG) connected downstream of each distribution network feeder terminal FTU. Simultaneously, count the maximum load power value downstream of each distribution network feeder terminal FTU, and form a correspondence table between the rated power set of each distribution network feeder terminal FTU's downstream IIDG and the sum of the maximum loads. S22. Based on the set of IIDG rated power downstream of each distribution network feeder terminal FTU in the corresponding relationship table, the maximum output fault current coefficient of IIDG is introduced to convert and accumulate the rated power of each IIDG to obtain the accumulated value of the maximum output fault current of each distribution network feeder terminal FTU. At the same time, the sum of the maximum load downstream of each distribution network feeder terminal FTU is substituted into the protection setting calculation formula to obtain the upstream protection setting of the corresponding distribution network feeder terminal FTU. S23. Compare the accumulated maximum output fault current of the downstream IIDG of each distribution network feeder terminal FTU calculated in step S22 with its corresponding upstream protection setting. If the accumulated maximum output fault current of the IIDG is greater than the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is affected by the IIDG, and the IIDG causes distortion to the alarm signal of the distribution network feeder terminal, resulting in false alarms or missed alarms. If the accumulated maximum output fault current of the IIDG is less than or equal to the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is not affected by the IIDG, and the alarm signal of the distribution network feeder terminal is reliable.
[0036] Calculate the cumulative maximum output fault current of the IIDG downstream of the feeder terminal unit (FTU) in the distribution network. The calculation formula is: ; in, The maximum output fault current coefficient of the IIDG is 1.2~2, which is used to characterize the reactive current amplification factor that the IIDG may output during a fault. The rated power of the i-th IIDG downstream of the distribution network feeder terminal FTU is expressed in watts (W), where i = 1, 2, ..., m, and m is the total number of IIDGs connected downstream of the distribution network feeder terminal FTU. This is the rated voltage of the power distribution network system, in volts. The unit is ampere, which represents the maximum reverse fault current that all IIDGs downstream of the distribution network feeder terminal unit (FTU) may output during a fault.
[0037] Calculate the upstream protection setting The calculation formula is: ; in, The reliability coefficient for protecting the set value is set to a value ranging from 1.1 to 1.3, which is used to account for the safety margin of load fluctuations and measurement errors. This is the sum of the maximum load power downstream of the distribution network feeder terminal FTU, in watts, obtained from the statistics in step S21; The unit is amperes, which represents the overcurrent protection setting value of the section where the feeder terminal unit (FTU) of the distribution network is located.
[0038] The logical expression for determining the impact of IIDG is: ; in, The cumulative value of the maximum output fault current of the downstream IIDG of the distribution network feeder terminal FTU obtained in step S22; The upstream protection setting of the corresponding distribution network feeder terminal FTU calculated in step S22 is used. When the determination result is "affected", the alarm signal of the distribution network feeder terminal FTU will be marked as pending correction and enter the signal verification process in the subsequent step S4. When the determination result is "no effect", the alarm signal of the distribution network feeder terminal FTU will be directly accepted and enter the fault isolation process in step S3.
[0039] like Figure 3As shown, this invention utilizes PSCAD to construct a simulation model of an IEEE 33-node distribution network with IIDGs under a constant power control strategy. In this model, considering the combined effect of multiple IIDGs, 3-4 IIDGs are set up, with each individual capacity adjustable up to 4-5MW. Fault types include two-phase short circuits with single or multiple grounding points, three-phase short circuits, single-phase grounding faults with effective neutral grounding, and two-point single-phase grounding faults with ineffective neutral grounding. Based on the rated capacity of the IIDGs, the maximum output fault current is analyzed online to determine whether it will affect the FTU. If there is no impact, the terminal alarm signal is considered reliable, and fault location is then performed. If there is a potential impact, fault line selection is required. The asymmetric short-circuit identification criterion based on the similarity of currents in adjacent distribution terminals and the symmetric short-circuit identification criterion based on the positive sequence current amplitude ratio are used to identify suspected false alarm terminals, ultimately achieving accurate and rapid fault location.
[0040] In addition, step S3 includes: S31. Read the fault handling log of the feeder automation FA system and extract the initial fault section location result generated by the feeder automation FA based on the remote signaling alarm signals uploaded by each distribution network feeder terminal FTU. The initial fault section location result includes the fault section start and end node number, fault type label and fault occurrence time. S32. Perform topology consistency verification on the initial fault section location result. Based on the distribution network topology connection relationship, verify whether the upstream and downstream boundary switches marked as fault sections are in the change state or alarm trigger state. At the same time, verify whether the fault section has a topology belonging relationship with the list of suspected fault lines determined in step S1. If the verification is passed, the initial fault section location result is confirmed as a valid location result. S33. Based on the effective location results, generate a fault isolation control strategy, issue a trip control command to the adjacent distribution network feeder terminal FTU on the upstream power supply side of the fault section to cut off the fault current path, issue a trip control command to the adjacent distribution network feeder terminal FTU on the downstream load side of the fault section to isolate the fault section, and after confirming that the switches at both ends of the fault section have been opened, send a tie switch closing command to the non-fault power loss area to restore power supply to the healthy area of the distribution network feeder terminal.
[0041] The criteria for generating the initial fault location result in the feeder automation (FA) system are based on the remote signaling signal matrix uploaded by each distribution network feeder terminal unit (FTU), and a remote signaling alarm vector is defined. for: ; in, This refers to the remote signaling alarm status value uploaded by the j-th distribution network feeder terminal unit (FTU), where j = 1, 2, ..., N, and N is the total number of FTUs installed along the entire distribution network. When the FTU detects an overcurrent or zero-sequence overcurrent... ,otherwise The superscript T indicates the transpose operation.
[0042] The criteria for determining topology consistency are: Let the start and end nodes of the fault section marked in the initial fault section location results be respectively and The corresponding distribution network feeder terminal unit (FTU) numbers are as follows: and Then the verification function Defined as: ; in, and These are the remote signaling alarm status values of the distribution network feeder terminals (FTUs) corresponding to the start and end nodes of the fault section, respectively. The faulty line section pointed to by the initial fault section location result; This is the list of suspected faulty lines output in step S1; ∩ represents a logical AND operation; when When the result is true, the topology consistency check is considered to have passed, and the initial fault segment location result is considered a valid location result.
[0043] The generation of fault isolation control strategies follows the principle of minimum power outage range, defining the set of non-fault-related power loss areas after fault isolation. The calculation formula is: ; in, This refers to the i-th line segment in the feeder; Indicates the node at the end of the faulty section to downstream load nodes The set of all line segments along the power supply path; This is the confirmed faulty section; For non-fault-affected power loss areas that need to have power restored from the tie switch; after fault isolation is completed, the connection is closed. By connecting the power supply side with a reliable power supply switch, power can be restored to non-faulty areas, thereby reducing the number of households affected by power outages.
[0044] Then, step S4 includes: S41. Based on the change time of the protection trip signal captured in step S1, the first recording time is intercepted forward and the second recording time is intercepted backward. The three-phase current sampling sequence within the corresponding time window is read from the built-in recording module of each distribution network feeder terminal FTU. The amplitude and phase of each phase current phasor are extracted by performing Fourier transform on the three-phase current sampling sequence. The positive sequence current phasor and three-phase current phasor of each section are calculated by the symmetrical component method. S42. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a three-phase short circuit, then extract the positive sequence current phasor at the branch line outlet, the positive sequence current phasor of the section to be verified and the positive sequence current phasor of its downstream adjacent section, and calculate the criterion parameters. Determine the correctness of the initial fault section location result under the symmetrical short circuit scenario based on the sign of the criterion parameters. S43. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a single-phase ground fault, a two-phase short circuit, or an asymmetrical short circuit, then extract the three-phase current phasors of the upstream adjacent section and the downstream adjacent section of the section to be verified. Eliminate the influence of the IIDG symmetrical component by calculating the differential current of the adjacent sections, substitute it into the differential current amplitude criterion formula to calculate the differential current amplitude, and determine the correctness of the initial fault section location result under the asymmetrical short circuit scenario based on the comparison result of the differential current amplitude and the load current threshold.
[0045] Among them, the positive sequence current phasor of each section is calculated by the symmetrical component method. The formula is: ; in, These are the three-phase current phasors measured by the feeder terminal unit (FTU) of a certain section of the distribution network; For rotation operators, satisfying , ; for The conjugate of complex numbers; This is the positive sequence current phasor for this section, used to represent the three-phase symmetrical fault component.
[0046] The formula for calculating the positive sequence current amplitude ratio criterion parameter λ is: ; in, This is the positive sequence current phasor at the branch line outlet. The positive sequence current phasor of the section to be verified; The positive sequence current phasor is the downstream adjacent segment of the segment to be verified; This represents the calculation of the phasor amplitude; the criterion boundary value 2 comprehensively considers measurement error, calculation error and safety margin; when λ<0, it is determined that there is a symmetrical short-circuit fault in the section to be verified, and the initial fault section location result is accurate; when λ≥0, it is determined that the initial fault section location result is inaccurate.
[0047] Specifically, if the IIDG has no impact on the terminal, the FA fault location result can be directly considered accurate; if the IIDG has an impact on the terminal, the waveform data needs to be used to determine the correctness of the initial fault section.
[0048] If the fault is a symmetrical short-circuit fault, an identification criterion using the positive sequence current amplitude ratio is proposed. Considering measurement and calculation errors and a certain margin, the boundary of the amplitude ratio is taken as 2. Based on this, the three-phase short-circuit verification criterion for single-point faults and faults with different feeders is shown in Equation (1).
[0049] (1) In the formula, This represents the positive sequence current at the branch line outlet. , These are the positive sequence currents of the section to be checked and its downstream adjacent section, respectively.
[0050] When the initial positioning result satisfies equation (1), it is determined that there is a three-phase short circuit in the section.
[0051] If the fault is an asymmetrical short-circuit fault, an identification criterion based on the similarity of currents in adjacent distribution terminals is proposed. When no fault occurs... , These are the three-phase currents of upstream section 1 and downstream section 2 under normal system operation conditions, respectively; x represents phases A, B, and C; Z is the load resistance. The sum of the unmeasurable IIDG and load current between section 1 and section 2 is shown in equation (2).
[0052] (2) In the formula, , These are the three-phase currents of IIDG and branch loads, which are not measurable during normal operation.
[0053] Further, step S43 includes: S431. Using the fault section marked by the initial fault section location result as a reference, trace upstream along the distribution network topology to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the upstream adjacent section during the fault period. Similarly, trace downstream to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the downstream adjacent section during the fault period. Perform Fourier transform on both sets of three-phase current sampling values to extract the three-phase current phasors of the upstream adjacent section. and the three-phase current phasors of the downstream adjacent section ; S432. For each phase, perform the adjacent segment current differential calculation sequentially, taking phase A and phase B as the calculation objects, and rotate the difference of phase A current phasor between the upstream adjacent segment and the downstream adjacent segment clockwise by 120 degrees. Subtract the difference between the phase A and phase B current phasors to obtain the phase A differential current phasor after eliminating the influence of the IIDG symmetrical components. Repeat this calculation process to obtain the corresponding differential current phasors of phase B and phase C in turn. The rotation calculation utilizes the characteristic of the three-phase symmetrical positive sequence of the IIDG output short-circuit current to make the IIDG components cancel each other out in the differential current calculation. S433. Calculate the amplitude of the differential current phasor of each phase and compare it with the preset load current threshold. If the differential current amplitude of any phase is greater than twice the load current amplitude, the section to be checked is determined to be an external fault, and the initial fault section location result is inaccurate. If the differential current amplitude of all phases does not exceed the load current threshold, the section to be checked is determined to be an internal fault, and the initial fault section location result is accurate.
[0054] A-phase differential flow phase quantity to eliminate the influence of IIDG The calculation formula is: ; in, , These are the A-phase current phasors when faults occur in the upstream adjacent section and the downstream adjacent section, respectively; , These are the B-phase current phasors when there is a fault in the upstream adjacent section and the downstream adjacent section, respectively; Rotate clockwise twitch factor; , The fault currents are phase A and phase B of the faulty branch; , For the A-phase and B-phase currents of the branch loads that cannot be measured during the fault period; , The short-circuit currents of phases A and B of the IIDG output that are unmeasurable during the fault period; The differential current is the current in the faulty branch. This is the load current differential current; because the short-circuit current output by the IIDG during a fault is a three-phase symmetrical positive-sequence component, the phases of its A-phase, B-phase, and C-phase short-circuit currents are strictly out of phase. ,go through The rotation operation completely cancels out during the subtraction process, that is... This will allow for the complete elimination of the impact of IIDG.
[0055] Differential phasors of phases B and C The calculation formulas are as follows: ; ; The physical meaning of each parameter in the formula is consistent with the corresponding parameter in the A-phase differential current calculation formula. The three-phase differential current is calculated sequentially by cyclic shifting.
[0056] When an external fault occurs, there is no faulty branch within the section. Considering that the difference in current between phases is related to the load characteristics, generally, when the A-phase current rotates 120° and is exactly opposite to the B-phase current, the differential current amplitude can reach twice the load current amplitude. The formula for calculating the differential current amplitude is: ; In the formula, For any two phases of the upstream and downstream adjacent segments of the section to be checked during the fault period, the current phasor corresponds to the formula mentioned above. and The difference form; This is the load margin factor, with a value ranging from 1.0 to 1.2, used to account for safety margins related to load fluctuations and measurement errors; The normal load current amplitude of phase X is obtained from historical operating data during the steady-state period before the fault. When an external fault occurs, there is no fault branch in the section to be verified, and the differential current consists only of unmeasurable branch loads and unmeasurable IIDG components. The IIDG component has been eliminated by the rotating subtraction operation, and the remaining load current is in phase A during the rotating subtraction operation. In a special operating condition that is exactly opposite to B, the differential current amplitude can reach up to twice the load current amplitude. When the above criteria are met, the section to be checked is determined to be an external fault, and the initial fault section location result is inaccurate. When the criteria are not met, the section to be checked is determined to be an internal fault, and the initial fault section location result is accurate.
[0057] The protection trip signals, FTU remote signaling alarms, and fault recording data relied upon in this invention are all standard configurations of existing distribution network automation systems, requiring no additional dedicated hardware. The rated power and maximum load data of the IIDG can be directly obtained from the ledger information of the Distribution Management System (DMS), and calculations such as positive sequence current extraction and differential current calculation can be performed on the existing server of the distribution master station. The entire technical solution, by fully utilizing existing infrastructure and upgrading software algorithms, achieves a qualitative leap in fault location performance, with low modification costs, easy implementation, and convenient application in large-scale distribution networks.
[0058] In addition, step S5 includes: S51. Read the verification output results of the symmetrical short circuit identification criteria and the asymmetrical short circuit identification criteria in step S4. If the positive sequence current amplitude ratio is less than 0 or the differential current amplitude criterion does not meet the threshold condition, the initial fault section location result is determined to be accurate. The preset fault isolation control strategy is called to perform the tripping operation of the upstream and downstream switches of the fault section. S52. If the verification result of step S4 is inaccurate, then take the change time of the protection trip signal as the benchmark, extract the three-phase current amplitude and zero-sequence current amplitude of each feeder substation outlet circuit breaker and each distribution network feeder terminal FTU during the steady-state period before the fault and the transient period after the fault, and calculate the overcurrent start flag and zero-sequence overcurrent start flag of each line. S53. Based on the spatial distribution of overcurrent start flags, zero-sequence overcurrent start flags, and protection trip signals for each line, the fault characteristic matching degree of each feeder is verified one by one using the elimination method. Feeders that simultaneously meet the overcurrent start condition and the protection trip condition are marked as fault lines, and feeders that only meet the overcurrent start condition but not the protection trip condition are marked as suspected fault lines, thus forming an updated list of fault lines and suspected fault lines.
[0059] The matching criteria for fault line screening are as follows: Let the overcurrent start flag of the k-th feeder be... The zero-sequence overcurrent start flag is The protection trip flag is (When any distribution network feeder terminal FTU or outgoing circuit breaker trips downstream of this feeder) Then the fault confidence of the feeder. Defined as: ; in, These are the weighting coefficients for overcurrent start-up, zero-sequence overcurrent start-up, and protection tripping, respectively, all ranging from 0 to 1. According to the recommended value in the power distribution network operation regulations, ; The fault determination logic for the kth feeder is as follows: ; in, For the fault attribute label of the k-th feeder; The fault confidence threshold is set between 0.5 and 0.7. When the fault confidence of a feeder reaches the threshold and a protection trip signal is present, it is determined to be a confirmed faulty line. When the fault confidence reaches the threshold but there is no protection trip signal, it is determined to be a suspected faulty line (usually caused by IIDG amplification leading to overcurrent but not reaching the trip setting). When the fault confidence is below the threshold, it is determined to be a non-faulty line. All feeders identified as faulty lines will be included in the faulty line set. All feeders identified as potentially faulty lines will be included in the suspected faulty line set. The two are combined to form an updated list of faulty lines and suspected faulty lines. : ; in, ; ; As input to step S6, it is used to further detect specific scenarios such as two-point faults on different feeders, two-point grounding faults on the same line, or different-phase faults on the same line.
[0060] Then, step S6 includes: S61. For each selected faulty line and suspected faulty line, extract the sudden change time of the A-phase, B-phase, and C-phase currents and the current amplitude of each phase at the circuit breaker at the outlet of each feeder substation. Simultaneously extract the measured values of the zero-sequence current transformers of each feeder. Using the change time of the protection trip signal as the time reference, calculate the time difference of the overcurrent sudden change time between different feeders and the time difference of the current sudden change time of each phase within the same feeder. S62. Combine the phase-to-phase overcurrent flag, zero-sequence overcurrent flag and the time difference of the overcurrent change moment of each feeder for judgment. If the difference of the overcurrent change moment between two or more different feeders is greater than the preset time interval for detecting faults in different feeders, or if the positive sequence current amplitude of the same feeder shows an opposite trend of increasing and decreasing at two consecutive time points, then it is determined that there is a two-point fault scenario in different feeders. S63. If no two-point fault characteristics of different feeders are detected, further verify whether the zero-sequence current amplitude of each feeder exceeds the zero-sequence current setting. If the zero-sequence current of any feeder meets the over-limit condition and there are at least two or more different trip signal sources for that feeder, then it is determined that there is a two-point grounding fault scenario on the same line. If the three-phase current of the feeder exceeds the phase current setting but the overcurrent change time of each phase is not equal, then it is determined that there is a different-phase fault scenario on the same line, and finally output the determined fault scenario type label.
[0061] Calculate the time difference of overcurrent change between different feeders and the time difference of overcurrent sudden change in each phase within the same feeder The formulas are as follows: ; ; in, These represent the overcurrent mutation times of the x-feeder and y-feeder, respectively, which are determined by the operating time of the phase current mutation starting element of the substation outgoing circuit breaker. These represent the times of sudden overcurrent changes in phase x and phase y at the outlet of the same feeder substation, respectively. This represents the absolute value operation; Temporal dispersion characteristics used to identify two-point faults in different feeders Phase-by-phase development characteristics used to identify faults of different phases on the same line.
[0062] The detection criteria for a two-point fault in a feeder are: ; in, The time interval for detecting sudden current changes in feeder faults is set to a value ranging from 20ms to 40ms. These represent the positive sequence current amplitudes of feeder m and feeder n at time t+Δt, respectively. These represent the m-feeder and n-feeder at time t, respectively. The positive sequence current amplitude of Δt, where t is the time of the first overcurrent mutation and Δt is the time interval between the two faults; H is the current change proportional coefficient, with a value range of 0.5~0.8; when any of the above conditions are met, it indicates that after the first fault occurs, the non-faulty line experiences overcurrent due to the amplification effect of IIDG, and then the second fault occurs on the line, causing the current of the original faulty line to decrease due to current shunting, thus determining it as a two-point fault scenario of a different feeder.
[0063] The detection criteria for a two-point grounding fault on the same line are: ; in, These are the current phasors of phases A, B, and C at the outlet of the faulty line substation; Set the zero-sequence current value; This refers to the total number of distribution network feeder terminals (FTUs) and circuit breakers that trip on the same faulty line; when the zero-sequence current exceeds the limit and there are two or more trip signal sources on the same feeder, it is determined to be a two-point grounding fault scenario on the same line.
[0064] The detection criteria for non-phase faults on the same line are: ; in, These represent the current amplitudes of phases A, B, and C at the substation outlet, respectively. The overcurrent setting is set for the phase current. The time interval for detecting out-of-phase faults is set to a value ranging from 20ms to 40ms. When all three phase currents exceed the overcurrent set value but the abrupt changes in overcurrent of each phase are not equal, it is determined to be an out-of-phase fault scenario on the same line, indicating that the fault develops phase by phase rather than occurring simultaneously.
[0065] Specifically, if accurate, fault isolation is performed directly. If inaccurate, it is necessary to screen faulty or suspected faulty lines based on protection trip signals, line overcurrent, or zero-sequence overcurrent. When a short-circuit fault occurs between different lines, one possible scenario is that the overcurrent timing of each line is inconsistent; another possible scenario is that after the first fault occurs, due to the influence of IIDG, the non-faulty line may experience overcurrent. When the second fault occurs on that line, the fault current increases, and the original faulty line is diverted and the fault current decreases. The detection method for two-point faults between different lines is shown in Equation (3), which combines the current amplitude and its change characteristics on both sides of the substation and pole.
[0066] (3) In the formula, These represent the overcurrent moments of the x and y lines, respectively. Indicates the time of lines m and n The positive sequence current amplitude; Indicates the time of lines m and n The positive sequence current amplitude; The time interval for detecting sudden current changes in feeder faults is set to 20ms~40ms.
[0067] It should be noted that, The value of is subjective, but a smaller value only increases the possibility that a single point fault is misjudged as a feeder fault. For the fault location method described later, it only increases the amount of calculation without affecting the location result.
[0068] Finally, step S7 includes: S71. Read the fault scenario type label output in step S6. If it is determined to be a single-point fault or a two-point fault of different feeders, then based on the comparison result between the maximum output fault current accumulation value of the downstream IIDG of each distribution network feeder terminal FTU in step S2 and the upstream protection setting value, traverse the impact judgment flag of each distribution network feeder terminal FTU, and classify all distribution network feeder terminal FTUs and their downstream sections that are determined to be "affected" into the set of areas affected by IIDG. S72. If the fault scenario is a single-point fault or a two-point fault of different feeders, then only the fault recording data and remote signaling alarm signal of the corresponding distribution network feeder terminal FTU are extracted from the set of areas affected by IIDG as the re-verification input for steps S4 to S6. The distribution network feeder terminal FTU signals outside the areas affected by IIDG are ignored, thus reducing the calculation scale and avoiding interference from irrelevant node signals with the positioning accuracy. S73. If the fault scenario is a two-point grounding fault on the same line or an out-of-phase fault on the same line, ignore the local judgment result of the IIDG influence in step S2, directly include all distribution network feeder terminals (FTUs) of the tripped line into the signal area to be analyzed, extract the fault recording data and remote signaling alarm signals of each distribution network feeder terminal (FTU) on the entire line, re-execute the symmetrical short circuit identification criterion and asymmetrical short circuit identification criterion verification in step S4, the fault line screening in step S5, and the fault scenario verification in step S6, iterate and loop until the location results of two consecutive iterations are consistent or the maximum number of iterations is reached, and output the final fault section location result.
[0069] Construct a set of regions affected by IIDG The defining formula is: ; in, Indicates the tripped line The j-th distribution network feeder terminal unit (FTU); The maximum output fault current accumulation value of the downstream IIDG of the j-th distribution network feeder terminal FTU is calculated by step S2. The upstream protection setting corresponding to the j-th distribution network feeder terminal FTU; This is a collection of all distribution network feeder terminals (FTUs) within the area affected by the IIDG, used to limit the signal analysis range in scenarios of single-point faults or two-point faults in different feeders.
[0070] Delineate the effective analysis area for single-point and non-feeder fault scenarios. The calculation formula is: ; in, This refers to the set of regions affected by IIDG as determined in step S71. To protect the set of distribution network feeder terminals (FTUs) corresponding to the trip signal; ∪ represents the union operation of the set; this formula ensures that when analyzing single-point faults or two-point faults in different feeders, it covers both the area where the IIDG may cause signal distortion and the actual switch position where the trip action occurs, avoiding the omission of real fault points due to the narrow definition of the area.
[0071] Define the full-line analysis area under the scenario of multiple faults on the same line. The calculation formula is: ; in, The tripped lines selected in step S5; The total number of distribution network feeder terminals (FTUs) installed along the entire line of the tripped line; It includes all distribution network feeder terminals (FTUs) on the tripped line, and is not limited by the IIDG local influence determination in step S2, in order to deal with the complex cross-section fault characteristics that may exist in multiple faults on the same line.
[0072] Iteration termination condition The formula for determining this is: ; in, This represents the fault location result output in the k-th iteration; This represents the fault location result output in the (k-1)th iteration; This is the maximum number of iterations, ranging from 3 to 5. When the fault location results of two consecutive iterations are completely consistent or the number of iterations reaches the maximum, the iteration stops and the final fault location result is output, ensuring that the algorithm converges within a finite time.
[0073] Although the present invention has been described in detail with reference to the accompanying drawings and preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made to the embodiments of the present invention by those skilled in the art without departing from the spirit and essence of the invention, and such modifications or substitutions should all be within the scope of the present invention. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should also be covered within the protection scope of the present invention.
Claims
1. A method for locating fault sections in a distribution network containing IIDG, characterized in that, include: S1. Obtain the protection trip signal of the distribution network and determine the suspected faulty line based on the protection trip signal; S2. Obtain the sum of the rated power and maximum load of the IIDG downstream of each distribution network feeder terminal FTU. Calculate the accumulated value of the maximum output fault current of the IIDG based on the obtained sum of the rated power and maximum load of the IIDG. Compare the accumulated value of the maximum output fault current of the IIDG with the upstream protection setting to determine whether the IIDG affects the alarm signal of the distribution network feeder terminal. S3. If it is determined that IIDG has no effect on the alarm signal of the distribution network feeder terminal, the initial fault location result of the feeder automation FA is adopted and the fault isolation operation is performed. S4. If it is determined that IIDG has an impact on the alarm signal of the distribution network feeder terminal, then obtain the fault recording data, extract the positive sequence current and three-phase current of each section, and use the symmetrical short circuit identification criterion and the asymmetrical short circuit identification criterion to verify the correctness of the initial fault section location result. S5. If the verification result shows that the initial fault location result is accurate, then perform the fault isolation operation. If the verification result indicates that the initial fault location result is inaccurate, then the faulty line or suspected faulty line is screened based on the protection trip signal, line overcurrent condition and zero-sequence overcurrent condition. S6. Based on the screened faulty lines, detect whether there are two-point faults in different feeders, two-point grounding faults on the same line, or different-phase faults on the same line, and determine the fault scenario. S7. Based on the determined fault scenario, delineate the distribution network feeder terminal signal area to be analyzed: For single-point or multi-point faults on different lines, only analyze the feeder terminal signals in the area affected by IIDG on the faulty line or the tripped line; for multi-point faults on the same line, analyze all areas of the tripped line, and repeat steps S4 to S6 until the determined fault section location result is obtained.
2. The fault section location method for a distribution network containing IIDG according to claim 1, characterized in that, Step S1 includes: S11. Monitor the status of auxiliary contacts of each circuit breaker and load switch in the distribution network in real time. When a change event occurs in the auxiliary contact of any feeder outlet circuit breaker or sectionalizing switch of the distribution network from closed to open, capture and record the switch number, feeder name and change time corresponding to the change event, and generate the original protection trip signal sequence. S12. Perform de-jittering and time window alignment on the original protection trip signal sequence. Based on the change time, backtrack the first preset time window and extend the second preset time window backward. Extract the information of all switchgear that have changed state within the time window, remove duplicate trip records caused by switch mechanical jitter or communication retransmission, and form an effective protection trip signal set. S13. Traverse the topological connection relationship of each trip switch in the effective protection trip signal set, trace upstream along the trip switch to the substation outgoing circuit breaker to which it belongs, mark the entire feeder under the jurisdiction of the substation outgoing circuit breaker as the first-level suspected fault line, and mark all branch lines directly connected downstream of the trip switch as the second-level suspected fault lines, and summarize to form a list of suspected fault lines.
3. The fault section location method for a distribution network containing IIDG according to claim 2, characterized in that, Step S2 includes: S21. For each suspected faulty line that has triggered a protection trip signal, traverse the distribution network feeder topology segment by segment downstream to the installation location of each distribution network feeder terminal unit (FTU), and count the rated power values of all inverter-type distributed generation (IIDG) connected downstream of each distribution network feeder terminal FTU. Simultaneously, count the maximum load power value downstream of each distribution network feeder terminal FTU, and form a correspondence table between the rated power set of each distribution network feeder terminal FTU's downstream IIDG and the sum of the maximum loads. S22. Based on the set of IIDG rated power downstream of each distribution network feeder terminal FTU in the corresponding relationship table, the maximum output fault current coefficient of IIDG is introduced to convert and accumulate the rated power of each IIDG to obtain the accumulated value of the maximum output fault current of each distribution network feeder terminal FTU. At the same time, the sum of the maximum load downstream of each distribution network feeder terminal FTU is substituted into the protection setting calculation formula to obtain the upstream protection setting of the corresponding distribution network feeder terminal FTU. S23. Compare the accumulated maximum output fault current of the downstream IIDG of each distribution network feeder terminal FTU calculated in step S22 with its corresponding upstream protection setting. If the accumulated maximum output fault current of the IIDG is greater than the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is affected by the IIDG, and the IIDG causes distortion to the alarm signal of the distribution network feeder terminal, resulting in false alarms or missed alarms. If the accumulated maximum output fault current of the IIDG is less than or equal to the upstream protection setting, it is determined that the section where the distribution network feeder terminal FTU is located is not affected by the IIDG, and the alarm signal of the distribution network feeder terminal is reliable.
4. The fault section location method for a distribution network containing IIDG according to claim 3, characterized in that, Calculate the maximum cumulative output fault current of the IIDG downstream of the feeder terminal unit (FTU) in the distribution network. The calculation formula is: ; in, The maximum output fault current coefficient of the IIDG; Let i be the rated power of the i-th IIDG downstream of the distribution network feeder terminal FTU, i=1,2,...,m, where m is the total number of IIDGs connected downstream of the distribution network feeder terminal FTU. The rated voltage of the power distribution network system; Calculate the upstream protection setting The calculation formula is: ; in, The reliability coefficient for protecting the set value; This is the sum of the maximum load power downstream of the distribution network feeder terminal unit (FTU). The logical expression for determining the impact of IIDG is: ; in, This represents the cumulative value of the maximum output fault current of the IIDG downstream of the FTU in the distribution network feeder terminal. The upstream protection setting is corresponding to the distribution network feeder terminal unit (FTU). When the determination result is "affected", the alarm signal of the distribution network feeder terminal unit (FTU) will be marked as pending correction and enter the signal verification process in the subsequent step S4. When the determination result is "no effect", the alarm signal of the distribution network feeder terminal unit (FTU) will be directly accepted and enter the fault isolation process in step S3.
5. The fault section location method for a distribution network containing IIDG according to claim 3, characterized in that, Step S3 includes: S31. Read the fault handling log of the feeder automation FA system and extract the initial fault section location result generated by the feeder automation FA based on the remote signaling alarm signals uploaded by each distribution network feeder terminal FTU. The initial fault section location result includes the fault section start and end node number, fault type label and fault occurrence time. S32. Perform topology consistency verification on the initial fault section location result. Based on the distribution network topology connection relationship, verify whether the upstream and downstream boundary switches marked as fault sections are in the change state or alarm trigger state. At the same time, verify whether the fault section has a topology belonging relationship with the list of suspected fault lines determined in step S1. If the verification is passed, the initial fault section location result is confirmed as a valid location result. S33. Based on the effective location results, generate a fault isolation control strategy, issue a trip control command to the adjacent distribution network feeder terminal FTU on the upstream power supply side of the fault section to cut off the fault current path, issue a trip control command to the adjacent distribution network feeder terminal FTU on the downstream load side of the fault section to isolate the fault section, and after confirming that the switches at both ends of the fault section have been opened, send a tie switch closing command to the non-fault power loss area to restore power supply to the healthy area of the distribution network feeder terminal.
6. The fault section location method for a distribution network containing IIDG according to claim 3, characterized in that, Step S4 includes: S41. Based on the change time of the protection trip signal captured in step S1, the first recording time is intercepted forward and the second recording time is intercepted backward. The three-phase current sampling sequence within the corresponding time window is read from the built-in recording module of each distribution network feeder terminal FTU. The amplitude and phase of each phase current phasor are extracted by performing Fourier transform on the three-phase current sampling sequence. The positive sequence current phasor and three-phase current phasor of each section are calculated by the symmetrical component method. S42. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a three-phase short circuit, then extract the positive sequence current phasor at the branch line outlet, the positive sequence current phasor of the section to be verified and the positive sequence current phasor of its downstream adjacent section, and calculate the criterion parameters. Determine the correctness of the initial fault section location result under the symmetrical short circuit scenario based on the sign of the criterion parameters. S43. For the fault section marked by the initial fault section location result, if the fault type determined by the feeder automation FA is a single-phase ground fault, a two-phase short circuit, or an asymmetrical short circuit, then extract the three-phase current phasors of the upstream adjacent section and the downstream adjacent section of the section to be verified. Eliminate the influence of the IIDG symmetrical component through the differential current calculation of the adjacent section currents, substitute it into the pre-stored differential current amplitude criterion formula to calculate the differential current amplitude, and determine the correctness of the initial fault section location result under the asymmetrical short circuit scenario based on the comparison result of the differential current amplitude and the load current threshold.
7. The fault section location method for a distribution network containing IIDG according to claim 6, characterized in that, Step S43 includes: S431. Using the fault section marked by the initial fault section location result as a reference, trace upstream along the distribution network topology to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the upstream adjacent section during the fault period. Then, trace downstream to obtain the three-phase current sampling values of the distribution network feeder terminal unit (FTU) of the downstream adjacent section during the fault period. Perform Fourier transform on both sets of three-phase current sampling values to extract the three-phase current phasors of the upstream adjacent section. and the three-phase current phasors of the downstream adjacent section ; S432. For each phase, perform the adjacent segment current differential calculation sequentially, taking phase A and phase B as the calculation objects, and rotate the difference of phase A current phasor between the upstream adjacent segment and the downstream adjacent segment clockwise by 120 degrees. Subtract the difference between the phase A and phase B current phasors to obtain the phase A differential current phasor after eliminating the influence of the IIDG symmetrical components. Repeat this calculation process to obtain the corresponding differential current phasors of phase B and phase C in turn. The rotation calculation utilizes the characteristic of the three-phase symmetrical positive sequence of the IIDG output short-circuit current to make the IIDG components cancel each other out in the differential current calculation. S433. Calculate the amplitude of the differential current phasor of each phase and compare it with the preset load current threshold. If the differential current amplitude of any phase is greater than twice the load current amplitude, the section to be checked is determined to be an external fault, and the initial fault section location result is inaccurate. If the differential current amplitude of all phases does not exceed the load current threshold, the section to be checked is determined to be an internal fault, and the initial fault section location result is accurate.
8. The fault section location method for a distribution network containing IIDG according to claim 6, characterized in that, Step S5 includes: S51. Read the verification output results of the symmetrical short circuit identification criteria and the asymmetrical short circuit identification criteria in step S4. If the positive sequence current amplitude ratio is less than 0 or the differential current amplitude criterion does not meet the threshold condition, the initial fault section location result is determined to be accurate. The preset fault isolation control strategy is called to perform the tripping operation of the upstream and downstream switches of the fault section. S52. If the verification result of step S4 is inaccurate, then take the change time of the protection trip signal as the benchmark, extract the three-phase current amplitude and zero-sequence current amplitude of each feeder substation outlet circuit breaker and each distribution network feeder terminal FTU during the steady-state period before the fault and the transient period after the fault, and calculate the overcurrent start flag and zero-sequence overcurrent start flag of each line. S53. Based on the spatial distribution of overcurrent start flags, zero-sequence overcurrent start flags, and protection trip signals for each line, the fault characteristic matching degree of each feeder is verified one by one using the elimination method. Feeders that simultaneously meet the overcurrent start condition and the protection trip condition are marked as fault lines, and feeders that only meet the overcurrent start condition but not the protection trip condition are marked as suspected fault lines, thus forming an updated list of fault lines and suspected fault lines.
9. The fault section location method for a distribution network containing IIDG according to claim 8, characterized in that, Step S6 includes: S61. For each selected faulty line and suspected faulty line, extract the sudden change time of the A-phase, B-phase, and C-phase currents and the current amplitude of each phase at the circuit breaker at the outlet of each feeder substation. Simultaneously extract the measured values of the zero-sequence current transformers of each feeder. Using the change time of the protection trip signal as the time reference, calculate the time difference of the overcurrent sudden change time between different feeders and the time difference of the current sudden change time of each phase within the same feeder. S62. Combine the phase-to-phase overcurrent flag, zero-sequence overcurrent flag and the time difference of the overcurrent change moment of each feeder for judgment. If the difference of the overcurrent change moment between two or more different feeders is greater than the preset time interval for detecting faults in different feeders, or if the positive sequence current amplitude of the same feeder shows an opposite trend of increasing and decreasing at two consecutive time points, then it is determined that there is a two-point fault scenario in different feeders. S63. If no two-point fault characteristics of different feeders are detected, further verify whether the zero-sequence current amplitude of each feeder exceeds the zero-sequence current setting. If the zero-sequence current of any feeder meets the over-limit condition and there are at least two or more different trip signal sources for that feeder, then it is determined that there is a two-point grounding fault scenario on the same line. If the three-phase current of the feeder exceeds the phase current setting but the overcurrent change time of each phase is not equal, then it is determined that there is a different-phase fault scenario on the same line, and finally output the determined fault scenario type label.
10. The fault section location method for a distribution network containing IIDG according to claim 9, characterized in that, Step S7 includes: S71. Read the fault scenario type label output in step S6. If it is determined to be a single-point fault or a two-point fault of different feeders, then based on the comparison result between the maximum output fault current accumulation value of the downstream IIDG of each distribution network feeder terminal FTU in step S2 and the upstream protection setting value, traverse the impact judgment flag of each distribution network feeder terminal FTU, and classify all distribution network feeder terminal FTUs and their downstream sections that are determined to be "affected" into the set of areas affected by IIDG. S72. If the fault scenario is a single-point fault or a two-point fault of a different feeder, then only the fault recording data and remote signaling alarm signal of the corresponding distribution network feeder terminal FTU are extracted from the set of areas affected by IIDG as the re-verification input for steps S4 to S6, and the distribution network feeder terminal FTU signals outside the areas affected by IIDG are ignored. S73. If the fault scenario is a two-point grounding fault on the same line or an out-of-phase fault on the same line, ignore the local judgment result of the IIDG influence in step S2, directly include all distribution network feeder terminals (FTUs) of the tripped line into the signal area to be analyzed, extract the fault recording data and remote signaling alarm signals of each distribution network feeder terminal (FTU) on the entire line, re-execute the symmetrical short circuit identification criterion and asymmetrical short circuit identification criterion verification in step S4, the fault line screening in step S5, and the fault scenario verification in step S6, iterate and loop until the location results of two consecutive iterations are consistent or the maximum number of iterations is reached, and output the final fault section location result.