A power distribution network power failure diagnosis method, device, equipment, medium and product based on an improved Petri net

By improving the Petri net model and combining multi-source data and communication reliability estimation, the adaptability and accuracy problems in distribution network fault diagnosis are solved, achieving high-precision and high-reliability power outage diagnosis, which is applicable to distribution networks with complex topologies.

CN123136277APending Publication Date: 2026-11-20ELECTRIC POWER SCI & RES INST OF STATE GRID TIANJIN ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611331510.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2025-12-19
Filing Date
2026-08-31
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing power outage diagnosis methods for distribution networks suffer from poor adaptability, high misjudgment rate, lack of rational model logic, and strong data dependence under complex and ever-changing topologies and diverse fault scenarios, making it difficult to meet the diagnostic requirements of high accuracy and high reliability.

Method used

An improved Petri net model is constructed. By acquiring the static topology of the distribution network feeder and multi-source dynamic power outage data, the parent-child library relationship is established and the library limit capacity is set. The reliability of the power outage signal is estimated by combining the communication distance. The diagnostic results are corrected by using Lindeberg standardization and hypothesis testing. Multi-source data such as substation automation system, distribution automation system and AMI are integrated to generate node power outage signals and perform standardization processing.

Benefits of technology

It improves the accuracy and reliability of power outage fault diagnosis in distribution networks, reduces the proportion of outliers, adapts to various fault scenarios, supports dynamic updates of time sections and topology, is easy to integrate with existing distribution automation systems, and is suitable for newly built distribution networks with incomplete historical data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136277A_ABST
    Figure CN123136277A_ABST
Patent Text Reader

Abstract

The application discloses a power distribution network power failure diagnosis method and device based on an improved Petri network, equipment, a medium and a product, relates to the technical field of power distribution network fault diagnosis, and comprises the following steps: acquiring the static topology of a power distribution network feeder and multi-source dynamic power failure data; constructing power failure signals and Petri network basic elements according to the static topology and the multi-source dynamic power failure data; constructing the parent-child library relationship and setting the library all-limit capacity based on the Petri network basic elements; estimating the reliability of the power failure signals considering the communication distance according to the parent-child library relationship; generating an initial power failure identifier by using the power failure signals and the reliability of the power failure signals; and performing standardized and power failure hypothesis analysis based on the initial power failure identifier, the library all-limit capacity and the reliability of the power failure signals to obtain a power distribution network power failure diagnosis result. The method can improve the accuracy and reliability of power distribution network power failure fault diagnosis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of power distribution network fault diagnosis technology, and in particular to a power outage diagnosis method, device, equipment, medium and product based on an improved Petri network. Background Technology

[0002] As the hub connecting the transmission network and end users in the power system, the distribution network is crucial for quickly diagnosing the scope and fault nodes of power outages when they occur. This is a prerequisite for shortening outage duration and improving power restoration efficiency.

[0003] Currently, power outage diagnosis methods for distribution networks mainly include rule-based reasoning, traditional Petri nets, and machine learning. Among these, rule-based reasoning methods rely on manually pre-defined fault criteria, which suffer from weak adaptability and susceptibility to misjudgments when faced with the complex and ever-changing topology and diverse fault scenarios of distribution networks. While traditional Petri net methods can effectively describe the dynamic behavior of the system, they have significant shortcomings in large-scale distribution network outage diagnosis: first, the number of Petri net components increases explosively with the node size, making it difficult to adapt to the diagnostic needs of large-scale distribution networks; second, the model parameter settings cannot accurately reflect the influence weight of different nodes in the power supply topology, resulting in a lack of rationality in the model's operational logic; and third, the fault tolerance mechanisms of some improved methods rely on prior knowledge such as the inherent probability of node outages, while such historical data is often missing or incomplete in actual engineering projects, severely limiting the engineering application of these methods.

[0004] At the same time, with the continuous improvement of distribution automation, multi-source data platforms such as substation automation systems, distribution automation systems (including FTU, DTU, TTU), and advanced measurement systems (AMI) have been widely deployed, providing rich data of various types and dimensions, such as circuit breaker status, current and voltage measurements, and user power outage feedback.

[0005] However, existing diagnostic methods suffer from poor accuracy and reliability in diagnosing power outages in complex power distribution networks. Summary of the Invention

[0006] This application provides a method, device, equipment, medium, and product for power outage diagnosis of distribution networks based on an improved Petri net, which can improve the accuracy and reliability of power outage fault diagnosis in distribution networks.

[0007] To achieve the above objectives, this application adopts the following technical solution: In a first aspect, this application provides a method for power outage diagnosis in distribution networks based on an improved Petri network, the method comprising: S1: Obtain static topology and multi-source dynamic power outage data of the distribution network feeder; S2: Based on the static topology and multi-source dynamic power outage data, construct the power outage signal and basic Petri net elements; S3: Based on the basic elements of the Petri net, construct the parent-child library relationship and set the library limit capacity; S4: Based on the parent-child library relationship, estimate the reliability of the power outage signal considering the communication distance; S5: Utilize the reliability of the power outage signal to generate an initial power outage indicator; S6: Based on the initial power outage identifier, the limited capacity of the power supply, and the reliability of the power outage signal, perform standardized and quantified power outage assumption analysis to obtain the power outage diagnosis results of the distribution network.

[0008] Optionally, the method further includes: S7: If a topology update request is received, repeat S1 to S6; or, if a new time segment is entered, repeat S5 to S6.

[0009] Optionally, the static topology of the distribution network feeder includes the connection relationships of medium-voltage feeder circuit breakers, pole-mounted circuit breakers, ring main unit bays, ring main unit busbars, distribution transformers, medium and low voltage users, overhead lines, and cables; the multi-source dynamic power outage data of the distribution network feeder includes the power outage data of substation medium-voltage feeder circuit breakers, feeder terminal units (FTUs), distribution terminal units (DTUs), distribution transformer terminal units (TTUs), first-class voltage users, and second-class voltage users; the voltage corresponding to the first-class voltage users is greater than the voltage corresponding to the second-class voltage users.

[0010] Optionally, the basic elements of a Petri net include the vectors listed in the outage diagnosis library, the column vectors of outage diagnosis transitions, and the set of outage diagnosis arc adjacency matrices.

[0011] Optionally, based on the parent-child library relationship, the reliability of the power outage signal considering the communication distance is estimated, including: Obtain the maximum and minimum bit error rate of the feeder channel; Based on the communication distance between the parent and child storage facilities, calculate the power outage signal transmission failure rate or success rate for each child storage facility, and use the power outage signal transmission failure rate or success rate for each child storage facility as the reliability of the power outage signal.

[0012] Optionally, the process of obtaining the power outage diagnosis results of the distribution network includes: Based on the parent-child database relationship, obtain the vector of the child database corresponding to the current diagnostic node; Use the limited capacity of the reservoir and the initial power outage flag as input parameters for running the Petri net model; Run the Petri net model until a deadlock flag is reached, and calculate the residual flag in that deadlock state; Based on the reliability of the power outage signal and the residual identifier, the mean and variance of the power outage identifier are calculated. Using the limited capacity of the library, the mean of the power outage indicators, the variance of the power outage indicators, and the reliability of the power outage signal, calculate the improved Lindeberg normalized sum; Establish the null and alternative hypotheses for node power outage, and determine the first power outage state of the node based on the significance level, improved Lindeberg standardization, and performed hypothesis testing. If the first power outage state of the parent node indicates that the parent node is out of power and the first power outage state of the child node of the parent node indicates that the child node is not out of power, then the first power outage state of the child node of the parent node is corrected to power outage. The corrected first power outage status will be used as the power outage diagnosis result for the distribution network.

[0013] Secondly, this application provides a power outage diagnostic device for distribution networks based on an improved Petri network, the device comprising: The acquisition module is used to acquire static topology and multi-source dynamic power outage data of the distribution network feeders; The construction module is used to construct power outage signals and Petri net basic elements based on the static topology and multi-source dynamic power outage data; and to construct parent-child library relationships and set library limit capacity based on the Petri net basic elements. An estimation module is used to estimate the reliability of a power outage signal, taking into account communication distance, based on the parent-child library relationship. The diagnostic module is used to generate an initial power outage identifier by utilizing the power outage signal and its reliability; based on the initial power outage identifier, the limited capacity of the power supply, and the reliability of the power outage signal, it performs a standardized and quantified power outage hypothesis analysis to obtain the power outage diagnosis result of the distribution network.

[0014] Thirdly, this application provides a computing device, including a memory and a processor; The memory stores one or more computer programs, the one or more computer programs including instructions; when the instructions are executed by the processor, the computing device performs the method as described in any one of the first aspects.

[0015] Fourthly, this application provides a computer-readable storage medium for storing a computer program for performing the method as described in any one of the first aspects.

[0016] As can be seen from the above technical solution, this application has at least the following beneficial effects: This invention constructs parent-child library relationships and sets limited capacity, enabling the Petri net model to accurately match the radial topology characteristics and energy flow direction of the distribution network, and clearly defining the influence weights of different nodes. It combines communication distance to estimate the reliability of power outage signals, achieving differentiated signal processing and reducing the adverse effects of long-distance signal interference. Based on the hypothesis testing and result correction mechanism of Lindeberg normalization, it further improves the diagnostic accuracy in complex fault scenarios. Experimental verification shows that the diagnostic accuracy of the method of this invention reaches a mean of 0.8808 and a standard deviation of only 0.0898, which is superior to traditional Petri nets and weighted Petri nets in terms of central tendency and dispersion correlation indicators.

[0017] Furthermore, this invention integrates multi-source data from substation automation systems, distribution automation systems, and AMIs, and generates node outage signals by integrating multiple types of signals through OR gates, reducing interference caused by the loss or distortion of a single signal. In the diagnostic result correction stage, the logical relationship between parent and child nodes is used to correct contradictory diagnostic results, further improving fault tolerance. In experiments, the outlier rate of the method of this invention was only 0.76%, significantly lower than the 3.11% of the traditional BPetri network, and it has strong adaptability to various fault scenarios such as N-1, N-2, and N-3.

[0018] Furthermore, this invention does not rely on difficult-to-obtain prior knowledge such as the inherent probability of node power outages. It can complete signal reliability estimation simply by obtaining the maximum and minimum values ​​of the channel bit error rate through historical statistical data. It is suitable for newly built distribution networks with incomplete historical data or scenarios where data acquisition is limited. At the same time, the method achieves automated diagnosis with standardized steps and supports dynamic updates of time sections and topology. It is easy to integrate with existing distribution automation systems and has strong engineering practicality.

[0019] Furthermore, this invention merges the arc mapping and generalized weight mapping of traditional Petri nets, and sets the weights to 1 to simplify the complexity of model construction. By setting limited capacity, without adding additional places, transitions and arcs, the model's operating logic is improved, the model's adaptability to the distribution network topology is enhanced, and the problem of insufficient accuracy in the logical description of traditional Petri nets in power outage diagnosis of distribution networks is solved.

[0020] Furthermore, this invention fully leverages the complementary value of multi-source data, covering various types of information such as circuit breaker status, current and voltage measurements, and user power outage feedback. By implementing a unified time profile regularization mechanism to synchronize the data time axis, it solves the time deviation problem between data from different systems, allowing the supporting role of multi-source data in power outage diagnosis to be fully utilized.

[0021] It should be understood that the descriptions of technical features, technical solutions, beneficial effects, or similar language in this application do not imply that all features and advantages can be achieved in any single embodiment. Rather, it is understood that the description of a feature or beneficial effect means that a specific technical feature, technical solution, or beneficial effect is included in at least one embodiment. Therefore, the descriptions of technical features, technical solutions, or beneficial effects in this specification do not necessarily refer to the same embodiment. Furthermore, the technical features, technical solutions, and beneficial effects described in this embodiment can be combined in any suitable manner. Those skilled in the art will understand that embodiments can be implemented without one or more specific technical features, technical solutions, or beneficial effects of a particular embodiment. In other embodiments, additional technical features and beneficial effects may be identified in specific embodiments that do not embody all embodiments. Attached Figure Description

[0022] Figure 1 A flowchart illustrating a power outage diagnosis method for distribution networks based on an improved Petri net, provided as an embodiment of this application; Figure 2 Petri net model for medium-voltage feeder circuit breakers; Figure 3 Petri net model for pole-mounted circuit breakers and FTUs; Figure 4 A Petri net model for the ring main unit and DTU; Figure 5 A Petri net model of distribution transformers and TTUs; Figure 6 Petri net model for low-voltage users; Figure 7 Petri net model for medium-voltage users; Figure 8 This is a Petri net model for medium-voltage distribution network connection lines; Figure 9 This is a schematic diagram of a medium-voltage power distribution network. Figure 10 The estimated storage capacity for each node on the feeder line; Figure 11 The results are the communication reliability estimates for each node on the feeder line; Figure 12 To collect node communication failure rate and storage capacity estimation results; Figure 13 Monte Carlo sample generation and interference frequency distribution analysis; Figure 14 Box plots showing the accuracy of power outage diagnosis using different methods; Figure 15A schematic diagram of a power outage diagnostic device for a distribution network based on an improved Petri network, provided as an embodiment of this application; Figure 16 This is a schematic diagram of a computing device provided in an embodiment of this application. Detailed Implementation

[0023] The terms "first," "second," and "third," etc., used in this application specification and accompanying drawings are used to distinguish different objects, not to limit a specific order.

[0024] In the embodiments of this application, the terms "exemplary" or "for example" are used to indicate that something is an example, illustration, or description. Any embodiment or design that is described as "exemplary" or "for example" in the embodiments of this application should not be construed as being more preferred or advantageous than other embodiments or design. Specifically, the use of the terms "exemplary" or "for example" is intended to present the relevant concepts in a specific manner.

[0025] Existing diagnostic methods fail to fully leverage the complementary value of multi-source data, resulting in low data utilization and difficulty in meeting the high-precision and high-reliability requirements for fault diagnosis in complex distribution networks. Therefore, there is an urgent need to propose a distribution network fault outage diagnosis method that integrates multi-source data, adapts to the topology characteristics of the distribution network, and possesses both high fault tolerance and strong adaptability to address the shortcomings of existing technologies.

[0026] To make the technical solution of this application clearer and easier to understand, the technical solution of this application will be described below in conjunction with the accompanying drawings. This application provides a power outage diagnosis method for a distribution network based on an improved Petri net. This method can be executed by a processing device, such as a fault diagnosis system for the distribution network.

[0027] like Figure 1 As shown, this figure is a flowchart of a power outage diagnosis method for distribution networks based on an improved Petri net, provided in an embodiment of this application. The method includes: S1: Obtain the static topology and multi-source dynamic power outage data of the distribution network feeders.

[0028] The static topology of the distribution network feeders includes the connection relationships of medium-voltage feeder circuit breakers, pole-mounted circuit breakers, ring main unit bays, ring main unit busbars, distribution transformers, medium and low-voltage users, overhead lines, and cables. This data can be obtained after determining the static topology of the distribution network feeders.

[0029] The multi-source dynamic power outage data for the distribution network feeders includes: power outage data for substation medium-voltage feeder circuit breakers, feeder terminal units (FTUs), distribution terminal units (DTUs), distribution transformer terminal units (TTUs), first-class voltage users, and second-class voltage users; the voltage corresponding to the first-class voltage user is greater than the voltage corresponding to the second-class voltage user. For example, a first-class voltage user can be a medium-voltage user, and a second-class voltage user can be a low-voltage user.

[0030] In some examples, multi-source dynamic power outage data for distribution network feeders can be obtained in the following way. If there is missing information, the default value is 0. The acquisition process is as follows: Step S1.2.1: The substation automation system mainly provides medium-voltage feeder circuit breaker status and load current information. There is only one medium-voltage feeder circuit breaker on each feeder, so there is no need to distinguish them by number. The medium-voltage feeder circuit breaker has two states: open and closed, with 1 for closed and 0 for open. When the state of a medium-voltage feeder circuit breaker changes from 1 to 0 and meets the 1-second delay, a medium-voltage feeder circuit breaker status change information is generated. s MV_feeder_brk =1; The sampling frequency of medium-voltage feeder load current is generally 1 second, and when the medium-voltage feeder load current drops to 0.005... I n If the following conditions are met and a 1-second delay is satisfied, a medium-voltage feeder current loss message will be generated. s MV_feeder_CT =1. Where... I n This is the rated current of the data acquisition device.

[0031] Step S1.2.2: The distribution automation system mainly provides power outage information for FTUs, DTUs, and TTUs. Multiple FTUs, DTUs, and TTUs may exist on a single feeder; therefore, the pole-mounted circuit breaker number, ring main unit bay number, ring main unit busbar number, and distribution transformer number are set as follows: i FTU , i sect , i bus , i TTU This is how they are distinguished.

[0032] Step S1.2.2.1: The FTU provides three types of power outage information for the pole-mounted circuit breaker: switching status, current loss, and voltage loss. The pole-mounted circuit breaker status has two states: open and closed, with 1 indicating closed and 0 indicating open. When the number is... i FTU When the state of the pole-mounted circuit breaker changes from 1 to 0 with a 5-second delay, a state change message for that pole-mounted circuit breaker is generated. s FTU_brk ( i FTU=1; The time interval for collecting the load current and voltage of the pole-mounted circuit breaker is generally 60s. When the load current of the pole-mounted circuit breaker drops to 0.005... I n If the following conditions are met and a 60-second delay is satisfied, a current loss message for the circuit breaker on that pole will be generated. s FTU_CT ( i FTU )=1; when the voltage of the circuit breaker on this pole drops to 0.7 U n If the following conditions are met and a 60-second delay is satisfied, a report of undervoltage for the circuit breaker on that pole will be generated. s FTU_PT ( i FTU )=1. Where U n This is the rated voltage of the data acquisition device.

[0033] Step S1.2.2.2: The DTU provides three types of power outage information for the ring main unit: switch status, current loss, and voltage loss. The ring main unit's bay switch status has two states: open and closed, with 1 indicating closed and 0 indicating open. When the number is... i sect When the state of the interval switch changes from 1 to 0 with a 5-second delay, a state change message for that interval switch is generated. s DTU_brk ( i sect =1; The time interval for collecting load current and bus voltage in the ring main unit is generally 60s. When the load current in this interval drops to 0.005... I n If the following conditions are met and a 60-second delay is satisfied, a loss of power message for that interval will be generated. s DTU_CT ( i sect )=1; when the number is i bus The bus voltage of the ring main unit dropped to 0.7. U n If the following conditions are met and a 60-second delay is satisfied, a message indicating that the ring main unit has lost pressure will be generated. s DTU_PT ( i bus =1.

[0034] Step S1.2.2.3: Provide the status of circuit breakers on the medium-voltage and low-voltage sides of the distribution transformer, and four types of power outage information: low-voltage side current loss, low-voltage loss, and power failure. Both the medium-voltage and low-voltage side switches of the distribution transformer have two states: open and closed, 1 for closed and 0 for open. When the number is... i TTU When the switch state changes from 1 to 0 with a 5-second delay, the status change information of the medium-voltage side circuit breaker of the distribution transformer is generated.s TTU_MV_brk ( i TTU )=1, Low-voltage side circuit breaker status change information s TTU_LV_brk ( i TTU =1; The time interval for collecting the load current and low-voltage bus voltage on the low-voltage side of the distribution transformer is generally 60s. When the load current of the low-voltage side circuit breaker drops to 0.005... I n If the following conditions are met and a 60-second delay is satisfied, a current loss message for the low-voltage feeder of the distribution transformer will be generated. s TTU_CT ( i TTU )=1; when the low-voltage bus voltage of the distribution transformer drops to 0.7 U n If the following conditions are met and a 60-second delay is satisfied, a low-voltage feeder undervoltage message for this distribution transformer will be generated. s TTU_PT ( i TTU =1.

[0035] Step S1.2.3: The AMI system mainly provides power outage information for medium-voltage and low-voltage users. Multiple users may exist on a single feeder. Let the numbers for medium-voltage and low-voltage users be , respectively. i MV_user , i LV_user When the AC voltage of the smart meter on the user's side is less than 0.7... U n It also satisfies a 60-second delay to generate pressure loss information for medium-voltage users. s MV_user_PT ( i MV_user )=1, low-voltage user's pressure loss information s LV_user_PT ( i LV_user =1. When the load current of the smart meter on the user side is less than 0.005 I n It also satisfies a 60-second delay to generate power loss information for medium-voltage users. s MV_user_CT ( i MV_user )=1, Low-voltage user power loss information s LV_user_CT ( i LV_user =1. When a user reports a power outage, a user trouble calling message is generated. This includes power outage feedback messages for medium-voltage users. sMV_user_TC ( i MV_user )=1 and power outage feedback information for low-voltage users s LV_user_TC ( i LV_user =1.

[0036] Noting the differences in configuration, deployment environment, and communication latency of different automation systems in different regions, when a feeder experiences a power outage, incomplete signals may occur, and the timing of power outage information generated by different systems may deviate. To improve the universality of the method of this invention and to achieve a unified data timeline, the following provisions are made: (1) Power outage information generated by the same device with a timestamp error within 1 minute is considered as the same power outage information, and the power outage information with the latest timestamp shall prevail. That is, each minute is considered a diagnostic time segment.

[0037] (2) When the automated data acquisition system does not configure certain signals or data in the table, or when the data acquisition device is offline, the default value of the signal or data item is 0.

[0038] (3) The measurement data is A-phase measurement data by default. Three-phase measurement data can be used when the automation level is high and there are special requirements.

[0039] S2: Based on the static topology and multi-source dynamic power outage data, construct the power outage signal and basic Petri net elements.

[0040] The basic elements of a Petri net include the vectors listed in the outage diagnosis library, the column vectors of outage diagnosis transitions, and the set of outage diagnosis arc adjacency matrices.

[0041] In step S2, the construction of the power outage signal and Petri net basic elements includes the following steps: Step S2.1: Vectors listed in the power outage diagnostic library P OA The construction process specifically includes the following steps: Step S.2.1.1: Construct a collection of medium-voltage feeder facilities. P MV_feeder and the corresponding set of power outage signals S MV_feeder .

[0042] A schematic diagram of a medium-voltage feeder circuit breaker model for a power distribution network is shown below. Figure 2As shown. In a high-voltage / medium-voltage substation, under normal operating conditions, the electrical energy from the medium-voltage busbar is transmitted to the distribution network via medium-voltage cables. A medium-voltage feeder circuit breaker is installed between the busbar and the feeder. A current transformer is installed on the line side of the medium-voltage feeder. Generally, only one set of circuit breakers and one set of current transformers are equipped on a single medium-voltage feeder in the substation. Assuming the combination of an important feeder circuit breaker and a current transformer constitutes a data acquisition node, the opening and closing signals of the feeder circuit breaker and the current loss signal monitored by the current transformer are ANDed to obtain a feeder power outage signal. s MV_feeder , s MV_feeder The signal is transmitted to the main station model via the channel and converted into a power outage token through the identifier setting process. A medium-voltage feeder depot needs to be established. To store The generated power outage token. Let the set consisting of the medium-voltage feeder library be... : (1) The set of medium-voltage feeder power outage signals is as follows :

[0043] Since a medium-voltage power distribution feeder has only one power source under normal operating conditions, and The number of elements in each is 1.

[0044] Step S.2.1.2: Construct the collection of pole-mounted circuit breaker libraries P FTU and the corresponding set of power outage signals s FTU .

[0045] A schematic diagram of a single pole-mounted circuit breaker and FTU model in a distribution network is shown below. Figure 3 As shown. The pole-mounted circuit breaker is connected to other equipment on both sides via medium-voltage overhead lines. The FTU is installed near the pole-mounted circuit breaker and collects the voltage and current on the medium-voltage overhead lines through PT and CT, controlling the opening and closing of the pole-mounted circuit breaker through a control circuit. Let the FTU be a data acquisition node. For the numbered... i FTU The FTU (Fault-Telemetry Unit) can obtain information about the pole-mounted circuit breaker via telemetry. s FTU_brk ( i FTU ), s FTU_CT ( i FTU ), s FTU_PT ( i FTUThese three signals represent the FTU's circuit breaker signal, current loss signal, and voltage loss signal, respectively. In the signal processing module, these three signals are integrated through an OR gate to obtain a power outage signal for the circuit breaker on that pole. s FTU ( i FTU The signal is transmitted to the master station model via the channel; in the Petri net modeling module, s FTU ( i FTU A power outage token is generated through the identifier setting process, requiring the construction of a library of circuit breakers for that pole. p FTU ( i FTU To store s FTU ( i FTU Generate a power outage token. Let the set of all pole-mounted circuit breaker libraries be: (3) The set of all pole-mounted circuit breaker power outage signals is as follows: (4) Step S.2.1.3: Construct the set of ring main unit bays. P sect and the corresponding set of power outage signals s sect Ring main unit busbar warehouse collection P bus and the corresponding set of power outage signals s bus .

[0046] A schematic diagram of a single ring main unit and DTU model in a distribution network is shown below. Figure 4 As shown, the model is divided into a busbar model and a bay model. Since the data collected for the busbar and bay of the ring main unit differs, this invention models them separately. Some ring main units may have single-busbar segments. Under normal operating conditions, the voltage of different buses is taken from different medium-voltage feeders. In this case, the ring main unit can be decomposed into multiple independent single-power-source, single-busbar ring main units for analysis based on the number of power sources and busbar segments. The following discussion focuses on single-power-source, single-busbar ring main units. Figure 4 (a) is a Petri net model of the ring main unit busbar. The ring main unit busbar is connected to the interval circuit breaker through multiple internal connection lines of the equipment. The DTU realizes voltage acquisition by installing voltage transformers on the ring main unit busbar. Let the ring main unit busbar PT be a data acquisition node. For the numbered i bus The ring main unit busbar acquisition node can provide a ring main unit undervoltage signal.s DTU_PT ( i bus Since there are no other data acquisition devices on the ring main unit busbar, the power outage signal of the ring main unit busbar is processed in the signal processing module. s bus ( i bus )= s DTU_PT ( i bus ),in s DTU_PT ( i bus The signal represents the DTU's undervoltage signal; the signal is transmitted to the master station model via the channel; in the Petri net modeling module, s bus ( i bus The power outage token is generated through the identifier setting process, which requires setting up a DTU bus depot. p bus ( i bus To store s bus ( i bus The generated power outage token. Figure 4 (b) is a Petri net model of a ring main unit (RNB) bay. A RNB may have multiple bays. Taking a single bay as an example, the bay circuit breaker is connected to the RNB busbar via internal wiring and to equipment on other medium-voltage feeders via medium-voltage cables. The DTU collects current by installing a current transformer on the medium-voltage cable side and controls the opening and closing of the bay switch via a control circuit. The bay circuit breaker and its current transformer are considered a data acquisition node. For the numbered... i sect Interval acquisition nodes, providing a set s DTU_brk ( i sect ), s DTU_CT ( i sect ), representing the circuit breaker status and current loss signal of the DTU, respectively; in the signal processing module, s DTU_brk ( i sect ), s DTU_CT ( i sect Output a power outage signal with one interval through an OR gate. s sect (i sect The signal is transmitted to the master station model via the channel; in the Petri net modeling module, s sect ( i sect A power outage token is generated through the identifier setting process, requiring the setup of a ring main unit bay. p sect ( i sect To store s sect ( i sect The generated power outage token. Let the set consisting of all ring main unit busbars and the set consisting of all bays on a feeder be: (5) (6) The sets of all ring main unit bus power outage signals and the sets of all interval power outage signals are as follows: (7) (8) Step S.2.1.4: Construct the distribution transformer collection set P TTU and the corresponding set of power outage signals s TTU .

[0047] The distribution transformer model of a medium-voltage distribution network is as follows: Figure 5 The distribution transformer connects to the medium-voltage feeder via medium-voltage cables or overhead lines, and then to other low-voltage equipment via the low-voltage busbar and internal connection lines. It's important to note that some low-voltage busbars may have segmented sections. Under normal operating conditions, the voltage of different busbars is taken from different medium-voltage feeders. In this case, the low-voltage busbar and distribution transformer can be decomposed into multiple independent single-power-source, single-busbar distribution transformers for analysis based on the number of power sources and busbar segments. The following description focuses on single-power-source, single-busbar distribution transformers. The distribution transformer TTU collects the current and voltage of the low-voltage feeder by installing current transformers between the low-voltage side circuit breaker and the low-voltage busbar, and voltage transformers on the low-voltage busbar. A control loop controls the opening and closing of the high-voltage and low-voltage side circuit breakers of the distribution transformer. Each TTU has one data acquisition node. For example, the one numbered [number missing]... i TTU For distribution transformer data acquisition nodes, a TTU can provide a set of... s TTU_MV_brk ( i TTU ), sTTU_LV_brk ( i TTU ), s TTU_CT ( i TTU ), s TTU_PT ( i TTU These represent the status of the high-voltage side circuit breaker, the status of the low-voltage side circuit breaker, the current loss signal, and the voltage loss signal of the TTU, respectively; in the signal processing module, s TTU_MV_brk ( i TTU ), s TTU_LV_brk ( i TTU ), s TTU_CT ( i TTU ), s TTU_PT ( i TTU The power outage signal of the distribution transformer is obtained through the output of an OR gate. s TTU ( i TTU The signal is transmitted to the master station model via the channel; in the Petri net modeling module, s TTU ( i TTU A power outage token is generated through the identifier setting process, which requires the establishment of a distribution transformer depot. p TTU ( i TTU To store s TTU ( i TTU The generated power outage token. Let the set of all distribution transformer banks and the corresponding set of power outage signals on a feeder be: (9) (10) Step S.2.1.5: Construct the set of low-voltage user databases P LV_user and the corresponding set of power outage signals s LV_user .

[0048] A schematic diagram of a low-voltage user model is shown below. Figure 6As shown. Low-voltage users are connected to the low-voltage busbar via internal wiring. A low-voltage user circuit breaker and a smart meter are installed between the low-voltage busbar and the low-voltage user. The low-voltage user circuit breaker is used to cut off the power supply to the low-voltage user or to disconnect faults in the low-voltage user. The low-voltage user's smart meter is used to collect the low-voltage user's voltage and current loss signals and upload them to the AMI. In addition, low-voltage users can also directly report power outage information through the power supply service hotline; the reported power outage information is also collected and stored by the AMI. Therefore, let the low-voltage user's smart meter and the user's trouble calling hotline be considered a data collection node. For the numbered... i LV_user The low-voltage user acquisition node can generate a set s LV_user_PT ( i LV_user ), s LV_user_CT ( i LV_user ), s LV_user_TC ( i LV_user These represent the low-voltage user's undervoltage signal, current loss signal, and power outage feedback telephone call, respectively. In the signal processing module, s LV_user_PT ( i LV_user ), s LV_user_CT ( i LV_user ), s LV_user_TC ( i LV_user The low-voltage user power outage signal is generated via an OR gate. s LV_user ( i LV_user The signal is transmitted to the master station model via the channel; in the Petri net modeling module, s LV_user ( i LV_user Generating a power outage token through the identifier setting process requires setting up a low-voltage user database. p LV_user ( i LV_user To store s LV_user ( i LV_user The generated power outage token. Assume that on a feeder, the set of all low-voltage user databases and the corresponding set of power outage signals are as follows: (11) (12) Step S.2.1.6: Construct the set of medium-voltage user databases P MV_user and the corresponding set of power outage signals s MV_user .

[0049] Medium-voltage user model of distribution network, such as Figure 7 As shown. Medium-voltage users are connected to medium-voltage feeders via medium-voltage overhead lines or cables. Medium-voltage user circuit breakers and smart meters are installed between the medium-voltage overhead lines or cables and the medium-voltage users. The medium-voltage user circuit breakers are used to cut off the power supply to the medium-voltage users or to disconnect faults in the medium-voltage users. The medium-voltage user's smart meter is used to collect the medium-voltage user's undervoltage and undercurrent signals and upload them to the AMI (Automatic Management System). In addition, medium-voltage users can also directly report power outage information through the power supply service hotline; the reported power outage information is also collected and stored by the AMI. Therefore, let the medium-voltage user's smart meter and the user's trouble calling be considered a data collection node. For the numbered... i MV_user The medium-voltage user acquisition node can generate a set s MV_user_PT ( i MV_user ), s MV_user_CT ( i MV_user ), s MV_user_TC ( i MV_user These represent the undervoltage signal, current loss signal, and power outage feedback telephone call for medium-voltage users, respectively. In the signal processing module, s MV_user_PT ( i MV_user ), s MV_user_CT ( i MV_user ), s MV_user_TC ( i MV_user The power outage signal for the medium-voltage user is generated via an OR gate. s MV_user ( i MV_user The signal is transmitted to the master station model via the channel; in the Petri net modeling module, s MV_user ( i MV_user The generation of a power outage token through the identifier setting process requires the establishment of a medium-voltage user database. p MV_user ( iMV_user To store s MV_user ( i MV_user The generated power outage token. Assume that on a feeder, the set of all medium-voltage user databases and the corresponding set of power outage signals are respectively: (13) (14) Step S.2.1.7: Construct the vectors listed in the power outage diagnosis library. P OA .

[0050] set up P MV_feeder , P FTU , P sect , P bus , P TTU , P LV_user , P MV_user The total number of elements after merging the seven collections is m OA : (15) Will P MV_feeder , P FTU , P sect , P bus , P TTU , P LV_user , P MV_user After merging, sorting the elements according to energy flow direction yields the library vector of the Petri net model for outage diagnosis in medium-voltage distribution networks. P OA : (16) in, p OA ( i OA )for P OA The i OA The row element represents the node used to receive the data. The repository for uploading power outage signals and storing power outage tokens; and Indicates two different library numbers; and Indicates two different warehouses; m OA for P OA The total number of elements; P MV_feeder This is a collection of medium-voltage feeder circuit breakers. P FTU Collected by the FTU library, P sect It is a collection of ring network cabinets. P bus It is a collection of ring main unit busbars. P TTU Collected by the TTU library, P LV_user This is a collection of low-voltage user databases. P MV_user This refers to the collection of medium-voltage user depots; upstream indicates the upstream location; downstream indicates the downstream location. In an open-loop radial medium-voltage distribution network, the depot number at the power source end needs to be smaller than the number at the load end, meaning electrical energy is transmitted from the smaller number side to the larger number side. Since the medium-voltage feeder depots are the source, therefore... p OA (1) It must be a medium-voltage feeder depot. The numbers of other depots may vary depending on the traversal method.

[0051] Step S.2.1.8: Construct the power outage diagnostic signal column vector s OA .

[0052] Due to power outage, diagnostic warehouse P OA It is used to store power outage signals. s OA The two have a one-to-one correspondence, therefore the column vector of the power outage signal uploaded by the corresponding acquisition node can be obtained. s OA : (17) in, s OA ( i OA )for s OA The i OA The row element represents the collection node. Uploaded power outage signal, and Indicates two different library numbers; and This indicates a power outage signal from two different data acquisition devices; m OA for s OA The total number of elements; S MV_feeder This is a collection of power outage signals from medium-voltage feeder circuit breakers. s FTU This is a collection of FTU power outage signals. s sect For collecting power outage signals of the ring main unit, s bus This is a collection of power outage signals for the ring main unit busbar. s TTU This is a collection of TTU power outage signals. s LV_user This is a collection of power outage signals for low-voltage users. s MV_user This is a set of power outage signals for medium-voltage users; upstream represents the upstream location; downstream represents the downstream location. This invention assumes... s OA ( i OA This reflects the nodes. i OA A real power outage will s OA ( i OA Data is collected locally and then transmitted to the main station for modeling. p OA ( i OA The process of generating power outage tokens is called the channel. If a missing or distorted token occurs during this process, preventing the correct generation of power outage tokens in the warehouse, it is called channel interference.

[0053] Step S.2.2: Construct the power outage diagnostic transition column vector T OA .

[0054] The engineering significance of the power outage diagnosis and transformation proposed in this invention lies in modeling the distribution network connection lines, such as... Figure 8 As shown. Medium-voltage distribution network connection lines include medium-voltage overhead lines, cables, and internal equipment connection lines, used to connect other components in the distribution network and transmit electrical energy, and are segmented by circuit breakers or busbars. Currently, there are few dedicated measurement devices for overhead lines, cables, and internal equipment connection lines; therefore, this invention does not consider the acquisition of power outage signals for connection lines. Let the total number of connection elements on a certain medium-voltage feeder be... n OAUnder normal operating conditions, the medium-voltage feeder is a unidirectional open-loop tree diagram, therefore: (18) set up j OA Indicates the number of the connecting line. i OA and i OA Given the numbers of two storage locations, in the Petri net modeling module, each connecting line segment uses a power outage diagnostic transition. t OA ( j OA This indicates that the arc is input using two segments of arc-type medium-voltage feeders. F OA_p_t ( i OA ', j OA ), medium voltage feeder output arc F OA_t_p ( j OA , i OA ") A library for connecting other components p OA ( i OA '), p OA ( i OA “), indicating that electrical energy comes from the storage facility. i OA 'Transfer to i OA This also means that power outage tokens in warehouses can only be transferred from upstream warehouses to downstream warehouses.

[0055] A feeder line may have multiple overhead lines and cables, therefore it may have multiple medium-voltage transitions, input arcs, and output arcs. Let the column vectors of all medium-voltage transitions on a single feeder line be... T OA for: (19) Step S.2.3: Construct the set of arc adjacency matrices for power outage diagnosis. F OA The specific steps are as follows: Step S.2.3.1: Construct the input and output arc adjacency matrix for power outage diagnosis. F OA_p_t , F OA_p_t The adjacency matrix of all power outage diagnostic input arcs and output arcs is as follows:F OA_p_t , F OA_t_p : (20) (twenty one) in, F OA_p_t The dimension is m OA × n OA The row number represents the warehouse location number, and the column number represents the change number; F OA_t_p Dimensions n OA × m OA The row number represents the transition number, and the column number represents the storage location number. F OA_p_t ( i OA , j OA )for F OA_t_p The first in i OA Line number j OA Column elements. F OA_p_t , F OA_t_p The value can be obtained from the feeder wiring diagram exported from the power distribution automation system: if the component corresponds to the warehouse i OA The transitions corresponding to the connecting lines j OA If an input arc connection exists, then F OA_p_t ( i OA , j OA If )=1, then if there is no input arc connection, then F OA_p_t ( i OA , j OA )=0; if the transition corresponding to the connecting line is 0 j OA The corresponding library of components i OA If there is an output arc connection, then F OA_t_p ( j OA , i OAIf )=1, then there is no output arc connection. F OA_t_p ( j OA , i OA )=0.

[0056] Step S.2.3.2: Construct the set of arc adjacency matrices for power outage diagnosis outputs. F OA .

[0057] F OA_p_t and F OA_t_p Collectively referred to as the set of arc adjacency matrices for power outage diagnosis. F OA : (twenty two) The above F OA_p_t and F OA_t_p The construction of the system combines the construction of arc mapping and generalized weight mapping in traditional finite capacity Petri nets, and sets all weights to 1 to adapt to distribution network topologies and engineering applications.

[0058] Step S2.4: Construct other basic elements of the Petri net for power outage diagnosis.

[0059] Step S.2.4.1: Construct the power outage diagnostic identifier column vector .

[0060] Set up a column vector for power outage diagnostic identifiers. , dimension m OA ×1, for The first in Row element, representing the library The power outage diagnostic identifier, in this invention, treats the power outage signal as a token, then... It also means warehouse. Number of power outage tokens in the system: (twenty three) Step S.2.4.2: Preset power outage diagnostic capacity column vector This step only allocates memory for variables and does not set specific values.

[0061] Let the power outage diagnostic capacity column vector be... , dimension m OA ×1, No. row element is ,and One-to-one correspondence means Maximum number of power outage tokens that can be stored: (twenty four) Therefore, power outage sign .

[0062] Step S.2.4.3: Construct the power outage diagnosis correlation matrix A OA .

[0063] Let the power outage diagnosis correlation matrix be: A OA ,yes m OA × n OA Matrix of order: (25) in a OA ( i OA , j OA )for A OA The Middle i OA Line number j OA The elements of the column represent the changes that have occurred. j OA Time Library i OA In the traditional finite-capacity Petri net model, the increase and decrease of the number of tokens are discussed. The weights are calculated, and since the arc construction method proposed in this invention already incorporates the weights, the elements of the arc adjacency matrix are directly used for calculation here. Furthermore, because all weights are set to 1 during the construction of the arc adjacency matrix, and radial distribution networks generally operate in an open-loop manner, The value can only be -1, 0, or 1. Time indicates a change. j OA At that time, the warehouse i OA The number of tokens in the system decreases by 1. Time indicates a change. j OA At that time, the warehouse i OA The token in the data remains unchanged; Time indicates a change. j OA At that time, the warehouse iOA The token in the data is increased by 1.

[0064] Yes A OA Then, the power outage diagnosis state equation can be constructed as follows: (26) in, and These represent the column vectors of power outage diagnostic identifiers before and after the transition sequence occurs. τ OA For power outage diagnosis, a column vector is generated. yes The number of times it occurs, therefore Non-negative integers: (27) Fire must occur to meet both of the following conditions: (28) That is, when the warehouse is identified The element is not less than the input arc matrix element. And output arc matrix elements With warehouse identification The total does not exceed the storage capacity At that time, changes occurred.

[0065] Step S.2.4.4: Construct a deadlock indicator for power outage diagnosis M dead .

[0066] Since the distribution network targeted by this invention has a radial feeder structure and a loop-free topology, outage tokens will eventually reach a storage location where further transfers are impossible. When all outage tokens cease transferring and the outage tokens in all storage locations no longer change, this state is called a deadlock flag. M dead : (29) That is, an identifier For locked flag M dead The necessary and sufficient condition is that the transition column vectors any one of the transitions None of them satisfy the conditions for the occurrence of equation (28).

[0067] S3: Based on the basic elements of the Petri net, construct the parent-child library relationship and set the library limit capacity.

[0068] In step S3, the construction of the parent-child library relationship and the setting of limited capacity mainly include the following steps: Step S3.1: Construct the parent-child relationship of the Petri net library for power outage diagnosis. The specific steps are as follows: Step S3.1.1: Parent-child library relationship matrix .

[0069] Based on the radial open-loop operation characteristics and power flow direction of the distribution network, a parent-child node relationship exists between devices. The model construction of this invention converts devices into storage locations, thus yielding the parent-subsidiary place relationship: Let the parent-subsidiary place relationship matrix be... , dimension The first of them Line number Column elements are , The specific values ​​are as follows: (30) in, for A set of positive integer column vectors of dimension 1 A column vector for identifying parent and child elements. for The row element, only when hour, The tokens of the remaining repositories are 0. (31) For the two warehouses and ,like ,but This indicates that all diagonal elements are 1. If and yes The father of the library, yes The sub-repository, then ,otherwise The parent-child relationship is constructed as follows: If one token comes from... Starting from this point, after at least one and at most a finite number of changes, one can reach... Then it is called for The father of the library, for Sub-warehouse, yes The parent node, yes The child nodes.

[0070] From equation (30), we can construct parent-child column vectors: if one token comes from... Starting from, after a limited number of changes, one can reach... Then what is needed The parent-child transition generates a column vector, denoted as , for The first in j OA row element, indicating from Change to hour, Number of occurrences: (32) Based on the parent-child database structure described above, it can be observed that the power outage token in the database can only migrate from the parent database to the child database.

[0071] Step S3.1.2: Locator Distance Column Vector .

[0072] The distance from the parent location to the child location can be constructed according to equation (28): If Then the father's storehouse p OA ( i OA ) to the sub-warehouse The distance is : (33) Ruofukusuo p OA ( i OA If a sub-library is not unique, then there exist multiple sub-libraries. ,all The vector formed is ,say The column vector of child place distances from the parent place: (34) in, It is the set of positive integers. First, according to Sort in descending order, when When they are equal, then follow Sort in descending order. η for row number, for The η row element, For the father's storehouse p OA (i OA Total number of sub-repositories:

[0073] Since the distance from different child databases to the parent database may be the same, There are duplicate elements in the database. Let the parent database contain duplicate elements. p OA ( i OA The unique distance column vector is The unique(.) function is unique. (36) in, The element number is δ , This is called representation The Middle δ The value of the row element, Indicates the farthest distance from the child repository to the parent repository: (37) It can be seen that, It is a vector arranged in descending order, with elements following... δ The increase is uniformly reduced from the maximum value to 1 at intervals of 1. It may correspond to multiple That is, different sub-libraries may have the same parent-child distance. Let's assume... corresponding The number is to express The repeating feature, also known as multiplicity: (38) Furthermore, according to equation (36), it can also be deduced that δ and They are complementary: (39) when i OA =1, and When the maximum value is taken, the corresponding sub-depot number is called the farthest depot number of the feeder. i OA_p_far ,say The distance to the farthest warehouse of the feeder : (40) Step S3.1.3: Vectors listed in the sub-library .

[0074] like p OA ( i OA If ) is the parent storehouse, then p OA ( i OA There may be multiple child repositories, therefore a parent repository is defined. p OA ( i OA The column vector consisting of all sub-libraries of ) is ,say For the father's storehouse p OA ( i OA Vectors listed in the sub-library of ) (41) in, First, according to Sort in descending order, when When they are equal, then follow If sorted in descending order, then and The row numbers are the same. for The first in η row element, Called The η Individual warehouses yes The η Each child node.

[0075] Since the storage places are used to store tokens generated by power outage signals, and there should be a one-to-one correspondence between storage places and power outage signals, the power outage signal column vector can be rewritten in parent-child form: if and Used for storage and The generated power outage token, and yes The η Individual warehouses Then it is called yes The η Power outage signal of each child node , The resulting column vector is the child node power outage signal column vector: (42) Step S3.1.4: Vectors listed by Yeku .

[0076] According to equation (41), borrowing from the construction of leaf nodes in topology, we can further construct the leaf library: Let satisfy... of The column vector formed is the vector listed by Yeku. : (43) in, according to i OA Ascending order, The row element is , The corresponding acquisition node is called a leaf node. Step S3.2: Calculate the storage capacity of the Petri network for power outage diagnosis. The specific steps are as follows: Step S3.2.1: Initial parent library settings: Settings .

[0077] Step S3.2.2: Construct the capacity of the sub-library : like For the father's storehouse, for The η If there are several sub-stores, then the capacity of each sub-store is... : (44) Step S3.2.3: Construction p OA ( i OA The parent-child relationship matrix between sub-libraries. A s_p_s ( i OA ).

[0078] Set up the father's storehouse p OA ( i OA The parent-child relationship matrix between the sub-stores is as follows: This is The matrix represents the constraints of equation (57); The parent library is represented p OA ( i OA The parent-child relationship between child libraries in ) ; the first Line number The elements of the column are ;when ,and When not Yekusuo, ;when yes When the sub-warehouse was located, ;otherwise : (45) Step S3.2.4: Construction p OA ( i OA Sub-locus isometry matrix A s_d ( i OA ) Set up the father's storehouse p OA ( i OA Sub-locus isometry matrix This is Upper triangular matrix; The rows and columns represent the distance relationships between the child nodes; the first row represents the distance relationships between the child nodes. Line number The elements of the column are ;when hour, ;when and And for any , ,but ;otherwise : (46) Step S3.2.5: Construction p OA ( i OA The total capacity of the sub-library's row vector A s_Σ ( i OA ) set up The row vector representing the total capacity of the sub-libraries, with dimension . The element consisting entirely of 1s represents the constraint that the sum of all child places equals the sum of the parent place. (47) Step S3.2.6: Construction p OA ( i OA Capacity design matrix AK_des ( i OA ) Synthetic formulas (45)(46)(47), with parent repository as the unit. p OA ( i OA The capacity design matrix is ​​as follows: Its dimensions are : (48) Step S3.2.7: Iteration Initialization: Set the number of iterations Capacity step size Initial parent library Observation capacity .

[0079] set up To estimate the number of iterations for capacity estimation, For capacity step size, For the first The parent library after the next iteration For observation capacity, the following values ​​are recommended during iterative initialization:

[0080] Step S3.2.8: Construct the first t K After the next iteration, the parent library p OA ( i OA The observation capacity column vector .

[0081] set up For the first t K After the next iteration, the parent library p OA ( i OA The observation capacity column vector, with dimension ) , for row number, for The Middle Row elements, Only the last row contains non-zero elements; all other elements are 0. (50) Step S3.2.9: Calculate the first... t K After the next iteration, the parent library p OA (i OA The column vector of the sub-library capacity. .

[0082] Since the system of equations (50) and (48) is an overdetermined system of equations, it may not have an exact solution. The final calculated capacity may be an estimate. Therefore, the least squares method is needed to estimate the storage capacity. (51) in For the first t K After the next iteration, the parent library p OA ( i OA The sub-library capacity column vector, for The first in Line element: (52) Step S3.2.10: Determine Does the array contain an element less than 1? If so, proceed to step S3.2.10; otherwise, proceed to step S3.2.12. Step S3.2.11: Update the iteration count. t K = t K +1; Step S3.2.12: Update The specific calculation method is as follows, and then proceed to step S3.2.6.

[0083] when t K When >1, The value can be: (53) Step S3.2.13: For Rounding down the elements in the parent library yields the result. Sub-library capacity column vector .

[0084] The solution obtained by equation (51) middle, The integers may be less than 1 or non-integer, while the parameters of a finite-capacity Petri net model are positive integers. Therefore, a rounding function needs to be defined. Processing, ultimately obtaining the parent repository Sub-library capacity column vector :

[0085] in This represents the floor function. It calculates... Then, equation (57) can be used to solve for the parent library. capacity .

[0086] Step S3.2.14: Calculate the parent database capacity .

[0087] Calculate Then, equation (57) can be used to solve for the parent library. capacity :

[0088] Step S3.2.15: Calculate the capacity of the Petri network for power outage diagnosis. K OA .

[0089] like ,but Then the power outage diagnostic capacity column vector can be directly solved. K OA : (56) One of the fundamental differences between the improved Petri net method used in this invention and the traditional Petri net method is the method for constructing parent-child storage relationships and setting capacity. By setting limited capacity, this invention improves the operational logic of the Petri net model for outage diagnosis in medium-voltage distribution networks without adding additional storage locations, transitions, or arcs, thus enhancing the adaptability of the Petri net model.

[0090] S4: Based on the parent-child library relationship, estimate the reliability of the power outage signal considering the communication distance.

[0091] In some embodiments, estimating the reliability of a power outage signal considering communication distance based on the parent-child library relationship includes: obtaining the maximum and minimum bit error rate of the feeder channel; calculating the power outage signal transmission failure rate or success rate corresponding to each child library based on the communication distance between the parent and child libraries, and using the power outage signal transmission failure rate or success rate corresponding to each child library as the reliability of the power outage signal.

[0092] Specifically, in step S4, the reliability parameter estimation of power outage information in the distribution network, considering communication distance, mainly includes the following steps: Step S4.1: Obtain the maximum channel bit error rate of the feeder based on historical statistical data. P ro_CBER_maxand minimum value P ro_CBER_min .

[0093] Step S4.2: Parent library traversal initialization: Let... .

[0094] Step S4.3: According to step S3.1.2, with For the parent location, calculate the distance column vector to the child location. .

[0095] Step S4.4: Based on step S3.1.2, calculate the unique distance column vector of the sub-database. .

[0096] Step S4.5: Based on step S3.1.2, calculate the distance to the farthest sub-bank. .

[0097] Step S4.6: Sub-library traversal initialization: Let... .

[0098] Step S4.7: Calculate the first... Individual warehouses Power outage signal transmission failure rate and success rate .

[0099] like Yes No. Individual warehouses Then the node and parent node The Communication failure rate of each child node They are the same: (57) Further, we can deduce the father's position. No. Individual warehouses To success rate : (58) Step S4.8: Calculate the next sub-location: .

[0100] Step S4.9: Determine if the condition is met. If the condition is met, proceed to step S4.10; otherwise, proceed to step S4.7.

[0101] Step S4.10: The success rate and failure rate of power outage signal transmission from all nodes on the feeder to the corresponding depot have been calculated, i.e., communication reliability.

[0102] The method proposed in this invention only requires constructing the maximum and minimum values ​​of the channel bit error rate to estimate the communication reliability of each acquisition node based on the topology. The maximum and minimum values ​​of the channel bit error rate are easily obtained. Therefore, it solves the problem of difficulty in differentiating the reliability parameters of various power outage signals, improves the accuracy and versatility of the communication reliability estimation method, and provides important analytical parameters for the power outage assumption analysis of the distribution network based on standardized sums in step S6.

[0103] S5: Utilize the reliability of the power outage signal to generate an initial power outage identifier.

[0104] Furthermore, in step S5, generating the initial power outage indicator specifically includes the following steps: Step S5.1: Read the new time section.

[0105] Step S5.2: According to step S1, upload the power outage diagnostic signal column vector within this section. To the main site model.

[0106] Step S5.3: Initialize the identifier generation library: Set .

[0107] Step S5.4: In the main station model Has a power outage signal been received? If yes, proceed to step S5.5. Otherwise, proceed to step S5.6.

[0108] Step S5.5: Fill in the power outage tokens for the corresponding warehouses in the main site: Then proceed to step S5.7.

[0109] Step S5.6: Clear the power outage token for the corresponding warehouse in the main station: Then proceed to step S5.7.

[0110] Step S5.7: Perform initial node setup for the next storage location: .

[0111] Step S5.8: Determine if the condition is met. If the condition is met, proceed to step S5.9; otherwise, proceed to step S5.4.

[0112] Step S5.9: Construct the initial identifier column vector for power outage diagnosis .

[0113] Assemble the initial identifiers for power outage diagnosis of all depots into a column vector to obtain the initial identifier column vector for power outage diagnosis. : (59) Extend the above initial identifier setting rules to parent-child relationships: If For the father's storehouse, for The η If there are multiple sub-stores, then the initial identifier of the sub-store is: : (60) The Petri network initial identifier generation method for power outage diagnosis proposed in this invention is based on the parent-child library relationship construction and limited capacity setting described in step S3. It is a continuation of step S3 and also provides important analysis parameters for the distribution network power outage hypothesis analysis based on standardization in step S6.

[0114] S6: Based on the initial power outage identifier, the limited capacity of the power supply, and the reliability of the power outage signal, perform standardized and quantified power outage assumption analysis to obtain the power outage diagnosis results of the distribution network.

[0115] In some embodiments, the process of obtaining the power outage diagnosis results of the power distribution network includes: Based on the parent-child database relationship, obtain the vector of the child database corresponding to the current diagnostic node; use the database's limited capacity and initial power outage flag as input parameters for the Petri net model; run the Petri net model until a deadlock flag is reached, and calculate the residual flag in the deadlock state; combine the reliability of the power outage signal, and calculate the mean and variance of the power outage flag based on the residual flag; use the database's limited capacity, the mean and variance of the power outage flag, and the reliability of the power outage signal to calculate the improved Lindeberg normalized sum; establish the null and alternative hypotheses for node power outage, perform hypothesis testing based on the significance level and the improved Lindeberg normalized sum, and determine the first power outage state of the node; if the first power outage state of the parent node indicates that the parent node is out of power and the first power outage state of the child node of the parent node indicates that the child node is not out of power, then correct the first power outage state of the child node of the parent node to power outage; use the corrected first power outage state as the power outage diagnosis result of the distribution network.

[0116] Specifically: Further, in step S6, the distribution network outage assumption analysis based on standardized sums includes the following steps: Step S6.1: Initialize the storage facilities corresponding to the power outage diagnostic node: Set .

[0117] Step S6.2: Based on step S3.1.3, construct the vectors listed in the sub-library. .

[0118] Step S6.3: Initialize the sub-library corresponding to the child node: Let... .

[0119] Step S6.4: Based on steps S3.2.2 and S5.9, obtain the contents of this sub-library. Power outage diagnostic capacity and initial identification , .

[0120] Step S6.8: Calculate the sub-database corresponding to the next child node. .

[0121] Step S6.6: Determine if the condition is met. If the condition is met, proceed to step S6.7; otherwise, proceed to step S6.4.

[0122] Step S6.7: All sub-stores have been calculated. , .

[0123] Step S6.8: Based on all sub-repositories , The Petri net model is run until the power outage diagnostic flag reaches a certain deadlock flag. According to the Petri net operating rules, after generating the initial power outage flag for the sub-depot based on the sub-depot's power outage signal, if the parent depot's power outage token is set to... Then the state equation of the Petri net model from the initial mark to the deadlock mark can be expressed as: (61) In equation (61), It is an indicator function: (62) (63) The first item indicates that the identifier of the parent repository is set to... The second item represents the sub-depot power outage identifier generated based on the sub-depot power outage signal; This represents the transition sequence from the parent warehouse to the child warehouse whose capacity is not yet full. If the child warehouse is out of power and the token is 0, then according to the construction of the parent-child relationship in equation (30), there must exist a parent-child transition sequence. This causes tokens in the parent vault to be transferred to the child vault. As long as the number of tokens in the child vault is less than its capacity, this parent-child transition sequence will continue to be triggered until the number of tokens in the child vault equals its capacity. Since this invention uses a weight of 1 for each transition (meaning only one token can be transferred per transition), if the initial power outage flag of the child vault is 0 (initial power outage token count is 0), then... Only the triggering of the parent-child transition sequence can increase the number of power outage tokens in the child vault from 0 to [a higher value]. .

[0124] Step S6.9: Calculate the deadlock flag under this deadlock indicator Residual markings .

[0125] set up From the initial identifier The residual flags after reaching the deadlock flag are : (64) Step S6.10: According to The following formula is used to calculate... Mean and variance: mean With variance for: (65) Step S6.11: According to , , and the results obtained in step S5 The result obtained in step S3 The following formula is used to calculate... Lindberg standardization and : (66) Step S6.12: Determine the node based on the power outage hypothesis test using Lindberg normalized sums. To determine if there is a power outage, please follow these steps: Step S6.12.1: Input node number .

[0126] Step S6.12.2: Establishing Hypotheses Node actual i OA Power outage, i.e. .

[0127] Step S6.12.3: Establish alternative hypotheses Nodes are not actually i OA Power outage, i.e. .

[0128] Step S6.12.4: Determine Whether it is a leaf node, i.e., whether it satisfies the condition. If the condition is met, proceed to step S6.12.5; otherwise, proceed to step S6.12.6.

[0129] Step S6.12.5: Set the salience level And find the corresponding critical value. ; Step S6.12.6: Determine if the condition is met. If the condition is met, proceed to step S6.12.7; otherwise, proceed to step S6.12.8. Step S6.12.7: Reject ,accept There is no sufficient reason to believe that the node i OA power failure; Step S6.12.8: Accept ,reject There are good reasons to believe that nodes i OA power failure.

[0130] Step S6.13: Diagnose the location corresponding to the next node: .

[0131] Step S6.14: Determine if the condition is met. If the condition is met, proceed to step S6.2; otherwise, proceed to step S6.15.

[0132] Step S6.15: The standardized data of all nodes corresponding to the storage locations at this time section of the feeder has been obtained. Determine the power outage status of all nodes.

[0133] Step S6.16: Standardize and normalize all nodes of the feeder at this time section. and Sort them. smaller and The larger the node, the more reliable the assessment of node power outages.

[0134] Step S6.17: If the parent node diagnoses a power outage but the child node diagnoses no power outage, and the parent node's... Less than child node If so, the power outage diagnosis result of the child node will be corrected to power outage.

[0135] The standardized sum and outage hypothesis analysis method proposed in this invention overcomes the problem of obtaining the inherent probability of an outage in existing outage diagnosis methods, enabling the correction and fault tolerance of Petri net output results for outage diagnosis, thus improving the method's fault tolerance and universality. The standardized sum, also known as the Lindeberg standardized sum in the context of the Lindeberg condition, is a unique analytical parameter for the improved Petri net operation results proposed in this paper.

[0136] In some embodiments, the method further includes: S7: If a topology update request is received, repeat S1 to S6; or, if a new time segment is entered, repeat S5 to S6.

[0137] Furthermore, in step S7, the power outage diagnosis and update step specifically includes the following steps: Step S7.1: Determine whether to update the time profile. If yes, proceed to step S5; otherwise, proceed to step S7.2. Step S7.2: Determine whether to update the feeder topology. If yes, proceed to step S1; otherwise, end the power outage diagnosis process.

[0138] Furthermore, to verify the effectiveness, superiority, and applicability of the method proposed in this invention, a power outage diagnosis was performed on an actual feeder. This feeder is a medium-voltage power distribution network consisting of three ring main units, two pole-mounted circuit breakers, and several cables and overhead lines, supplying power to five medium-voltage users and twelve low-voltage users, such as... Figure 9 As shown.

[0139] The improved Petri network outage diagnosis model obtained by modeling using the method proposed in this invention is as follows: Figure 10 , Figure 11 As shown: Settings P ro_FT_max =0.5, P ro_FT_min =1, P ro_CBER_max =10 -3 , P ro_CBER_min =10 -5 The calculated communication failure rate of each node and the corresponding storage capacity of the node are as follows: Figure 12 As shown. Figure 10 , Figure 11 The aim is to visualize the communication reliability of nodes and their corresponding storage capacity. The height along the z-axis in the figure represents the specific parameters of the node, the red stem represents the capacity of the storage corresponding to the node, and the blue stem represents the communication reliability of the node. Figure 12 The aim is to analyze the correlation between the two. The horizontal axis in the figure represents the node number. The number of upstream nodes is smaller than that of downstream nodes. As the node number increases, the communication failure rate gradually increases. This is due to the increasing distance from the substation to which the node belongs. Meanwhile, the storage capacity corresponding to the node decreases. This is because the deeper the node is downstream, the smaller its impact on the upstream node. It can be seen that there is a certain negative correlation between the storage capacity estimation method and the node communication reliability estimation method proposed in this invention. It achieves the effect of reducing the impact of nodes with lower communication reliability and increasing the impact of nodes with higher communication reliability.

[0140] The Monte Carlo test designed in this invention is as follows: For all combinations of three fault conditions (N-1, N-2, and N-3), 99 power outage signals with random Gaussian white noise interference are generated for each fault combination. Each generated random signal covers all nodes on the feeder. Then, for each group of generated power outage signals with random interference, the method proposed in this invention is used to diagnose the faults using three other methods (BPetri network, FPetri network, and WFPetri network). The diagnostic accuracy considering all nodes in the confusion matrix is ​​used as the evaluation index to analyze the general applicability and superiority of the method proposed in this invention. Here, N-1 fault in the power grid refers to the situation where one device in the power grid fails under normal conditions; N-2 refers to the situation where two devices fail simultaneously under normal conditions; and N-3 refers to the situation where three devices fail simultaneously.

[0141] The frequency distributions of the generated Monte Carlo samples and the interference are as follows: Figure 13 As shown. From Figure 13 As can be seen, there are 367 combinations of the three types of faults. The first matrix in the upper left corner of Figure (a) is the original power outage signal, with a dimension of 41 rows and 367 columns. Each subsequent matrix is ​​a signal matrix with an applied interference signal. A total of 99 signal matrices were generated, resulting in 36,333 fault conditions. As can be seen from Figure (b), the mean number of nodes affected by interference is 4.96, with a standard deviation of 1.88, ranging from 0 to 13, indicating a clear normal distribution characteristic of the noise interference.

[0142] The accuracy statistics for the four methods are shown in Table 1. Figure 14 As shown.

[0143] Table 1. Accuracy Indicators of Power Outage Diagnosis for Different Methods (in terms of...) Figure 13 (For example)

[0144] Table 1 Figure 14The method proposed in this invention was comprehensively evaluated for accuracy against three existing methods. Table 1 shows the mean and median, reflecting the overall accuracy rate; the standard deviation and interquartile range, reflecting the stability of the accuracy rate; and the maximum and minimum accuracy rates, the number of outliers, and the proportion of outliers, reflecting the adaptability and robustness of the method. Statistical results show that the method proposed in this invention exhibits significant advantages in accuracy, stability, and robustness.

[0145] Among the statistical indicators characterizing central tendency, the mean (0.8808) and median (0.9091) of the method proposed in this invention are the best values ​​among all methods, which indicates that it can maintain high diagnostic accuracy in most test scenarios.

[0146] Regarding the metrics for measuring dispersion, the standard deviation (0.0898) and interquartile range (0.1364) of the proposed method are both lower than those of the BPetri net method, reflecting better consistency in its output results. Of particular note are the outlier analysis results; the outlier rate of the proposed method (0.76%) is significantly lower than that of the BPetri net method (3.11%). This difference indicates that the proposed method has stronger adaptability and robustness to various fault scenarios.

[0147] From an engineering application perspective, the core advantage of the proposed method compared to the BPetri net method lies in its complete elimination of reliance on the prior knowledge of the inherent probability of node power outages. This characteristic makes the proposed method of significant practical value in newly built systems lacking complete historical data or in real-world industrial scenarios where data acquisition is limited. Although the average accuracy is only improved by 1.43%, the standard deviation, interquartile range, and outlier ratio are all superior to those of the BPetri net. Therefore, overall, the proposed method is more meaningful for engineering practice than the BPetri net method.

[0148] The above text combined Figures 1 to 14 The power outage diagnosis method based on the improved Petri net provided in the embodiments of this application has been described in detail. The apparatus and equipment provided in the embodiments of this application will be described below with reference to the accompanying drawings.

[0149] like Figure 15 As shown in the figure, this is a schematic diagram of a power outage diagnostic device for a distribution network based on an improved Petri network provided in an embodiment of this application. The device includes: The acquisition module 601 is used to acquire the static topology and multi-source dynamic power outage data of the distribution network feeders; Construction module 602 is used to construct power outage signals and Petri net basic elements based on the static topology and multi-source dynamic power outage data; and to construct parent-child library relationships and set library limit capacity based on the Petri net basic elements. The estimation module 603 is used to estimate the reliability of the power outage signal considering the communication distance based on the parent-child library relationship. The diagnostic module 604 is used to generate an initial power outage identifier by utilizing the power outage signal and its reliability; based on the initial power outage identifier, the limited capacity of the power supply and the reliability of the power outage signal, it performs a standardized and quantified power outage hypothesis analysis to obtain the power outage diagnosis result of the distribution network.

[0150] Optionally, the apparatus further includes an iteration module, which is used to repeatedly execute S1 to S6 upon receiving a topology update request; or to repeatedly execute S5 to S6 upon entering a new time segment.

[0151] Optionally, the static topology of the distribution network feeder includes the connection relationships of medium-voltage feeder circuit breakers, pole-mounted circuit breakers, ring main unit bays, ring main unit busbars, distribution transformers, medium and low voltage users, overhead lines, and cables; the multi-source dynamic power outage data of the distribution network feeder includes the power outage data of substation medium-voltage feeder circuit breakers, feeder terminal units (FTUs), distribution terminal units (DTUs), distribution transformer terminal units (TTUs), first-class voltage users, and second-class voltage users; the voltage corresponding to the first-class voltage users is greater than the voltage corresponding to the second-class voltage users.

[0152] Optionally, the basic elements of a Petri net include the vectors listed in the outage diagnosis library, the column vectors of outage diagnosis transitions, and the set of outage diagnosis arc adjacency matrices.

[0153] Optionally, the estimation module 603 is used to obtain the maximum and minimum values ​​of the bit error rate of the feeder channel; and to calculate the power outage signal transmission failure rate or success rate corresponding to each sub-library based on the communication distance between the parent and child libraries, and to use the power outage signal transmission failure rate or success rate corresponding to each sub-library as the reliability of the power outage signal.

[0154] Optionally, the diagnostic module 604 is used to obtain the sub-library list vector corresponding to the current diagnostic node based on the parent-child library relationship; use the library's limited capacity and initial power outage flag as input parameters for running the Petri net model; run the Petri net model until a deadlock flag is reached, and calculate the residual flag in the deadlock state; combine the reliability of the power outage signal, and calculate the mean and variance of the power outage flag based on the residual flag; use the library's limited capacity, the mean of the power outage flag, the variance of the power outage flag, and the reliability of the power outage signal to calculate the improved Lindeberg normalized sum; establish the null hypothesis and alternative hypothesis for node power outage, perform hypothesis testing based on the significance level and the improved Lindeberg normalized sum, and determine the first power outage state of the node; if the first power outage state of the parent node indicates that the parent node is out of power and the first power outage state of the child node of the parent node indicates that the child node is not out of power, then correct the first power outage state of the child node of the parent node to power outage; and use the corrected first power outage state as the power outage diagnosis result of the distribution network.

[0155] The power outage diagnostic device for distribution networks based on an improved Petri net, according to the embodiments of this application, can correspondingly execute the method described in the embodiments of this application, and the other operations and / or functions of each module / unit of the power outage diagnostic device for distribution networks based on an improved Petri net are respectively for implementing Figure 1-14 For the sake of brevity, the corresponding processes of each method in the illustrated embodiments will not be described in detail here.

[0156] This application also provides a computing device. For example... Figure 16 As shown in the figure, this is a schematic diagram of a computing device provided in an embodiment of this application. The computing device 700 includes a bus 701, a processor 702, a communication interface 703, and a memory 704. The processor 702, the memory 704, and the communication interface 703 communicate with each other via the bus 701.

[0157] The 701 bus can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of representation, Figure 16 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.

[0158] The processor 702 can be any one or more of the following processors: central processing unit (CPU), graphics processing unit (GPU), microprocessor (MP), or digital signal processor (DSP).

[0159] The communication interface 703 is used for communication with external devices.

[0160] Memory 704 may include volatile memory, such as random access memory (RAM). Memory 704 may also include non-volatile memory, such as read-only memory (ROM), flash memory, hard disk drive (HDD), or solid state drive (SSD).

[0161] The memory 704 stores executable code, and the processor 702 executes the executable code to perform the aforementioned power outage diagnosis method for distribution networks based on the improved Petri net.

[0162] Specifically, in achieving Figure 15 In the case of the illustrated embodiment, and Figure 15 When the modules or units of the power outage diagnostic device based on the improved Petri net described in the embodiments are implemented in software, the following steps are performed: Figure 15 The software or program code required for the functions of each module / unit can be partially or entirely stored in memory 704. Processor 702 executes the program code corresponding to each unit stored in memory 704, and executes the aforementioned power outage diagnosis method for distribution networks based on improved Petri nets.

[0163] This application also provides a computer-readable storage medium. The computer-readable storage medium can be any available medium that a computing device can store, or a data storage device such as a data center containing one or more available media. The available medium can be a magnetic medium (e.g., floppy disk, hard disk, magnetic tape), an optical medium (e.g., DVD), or a semiconductor medium (e.g., solid-state drive). The computer-readable storage medium includes instructions that instruct the computing device to execute the above-described improved Petri net-based power outage diagnosis method for distribution networks.

[0164] This application also provides a computer program product comprising one or more computer instructions. When the computer instructions are loaded and executed on a computing device, all or part of the processes or functions described in this application are generated.

[0165] The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions may be transmitted from one website, computer, or data center to another website, computer, or data center via wired (e.g., coaxial cable, fiber optic, digital subscriber line) or wireless (e.g., infrared, wireless, microwave, etc.) means.

[0166] When the computer program product is executed by a computer, the computer performs any of the aforementioned methods of the distribution network outage diagnosis method based on the improved Petri net. The computer program product can be a software installation package; when any of the aforementioned methods of the distribution network outage diagnosis method based on the improved Petri net needs to be used, the computer program product can be downloaded and executed on the computer.

[0167] The descriptions of the processes or structures corresponding to the above figures each have their own emphasis. For parts of a process or structure that are not described in detail, please refer to the relevant descriptions of other processes or structures.

[0168] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions within the technical scope disclosed in this application should be covered within the scope of protection of this application.

Claims

1. A power outage diagnosis method for distribution networks based on an improved Petri net, characterized in that, The method includes: S1: Obtain static topology and multi-source dynamic power outage data of the distribution network feeder; S2: Based on the static topology and multi-source dynamic power outage data, construct the power outage signal and basic Petri net elements; S3: Based on the basic elements of the Petri net, construct the parent-child library relationship and set the library limit capacity; S4: Based on the parent-child library relationship, estimate the reliability of the power outage signal considering the communication distance; S5: Utilize the reliability of the power outage signal to generate an initial power outage indicator; S6: Based on the initial power outage identifier, the limited capacity of the power supply, and the reliability of the power outage signal, perform standardized and quantified power outage assumption analysis to obtain the power outage diagnosis results of the distribution network.

2. The method according to claim 1, characterized in that, The method further includes: S7: If a topology update request is received, repeat S1 to S6; or, if a new time segment is entered, repeat S5 to S6.

3. The method according to claim 1, characterized in that, The static topology of the distribution network feeder includes the connection relationships of medium-voltage feeder circuit breakers, pole-mounted circuit breakers, ring main unit bays, ring main unit busbars, distribution transformers, medium and low voltage users, overhead lines, and cables; the multi-source dynamic power outage data of the distribution network feeder includes the power outage data of substation medium-voltage feeder circuit breakers, feeder terminal units (FTUs), distribution terminal units (DTUs), distribution transformer terminal units (TTUs), first-class voltage users, and second-class voltage users; the voltage corresponding to the first-class voltage users is greater than the voltage corresponding to the second-class voltage users.

4. The method according to claim 1, characterized in that, The basic elements of a Petri net include the vectors listed in the outage diagnosis library, the column vectors of outage diagnosis transitions, and the set of outage diagnosis arc adjacency matrices.

5. The method according to claim 1, characterized in that, Based on the parent-child library relationship, the reliability of the power outage signal considering communication distance is estimated, including: Obtain the maximum and minimum bit error rate of the feeder channel; Based on the communication distance between the parent and child storage facilities, calculate the power outage signal transmission failure rate or success rate for each child storage facility, and use the power outage signal transmission failure rate or success rate for each child storage facility as the reliability of the power outage signal.

6. The method according to claim 1, characterized in that, The process of obtaining the power outage diagnosis results of the distribution network includes: Based on the parent-child database relationship, obtain the vector of the child database corresponding to the current diagnostic node; Use the limited capacity of the reservoir and the initial power outage flag as input parameters for running the Petri net model; Run the Petri net model until a deadlock flag is reached, and calculate the residual flag in that deadlock state; Based on the reliability of the power outage signal and the residual identifier, the mean and variance of the power outage identifier are calculated. Using the limited capacity of the library, the mean of the power outage indicators, the variance of the power outage indicators, and the reliability of the power outage signal, calculate the improved Lindeberg normalized sum; Establish null and alternative hypotheses for node power outage, and determine the first power outage state of the node based on the significance level, improved Lindeberg standardization, and performed hypothesis testing. If the first power outage state of the parent node indicates that the parent node is out of power and the first power outage state of the child node of the parent node indicates that the child node is not out of power, then the first power outage state of the child node of the parent node is corrected to power outage. The corrected first power outage status is taken as the power outage diagnosis result of the distribution network.

7. A power outage diagnostic device for distribution networks based on an improved Petri network, characterized in that, The device includes: The acquisition module is used to acquire static topology and multi-source dynamic power outage data of the distribution network feeders; The construction module is used to construct power outage signals and Petri net basic elements based on the static topology and multi-source dynamic power outage data; and to construct parent-child library relationships and set library limit capacity based on the Petri net basic elements. An estimation module is used to estimate the reliability of a power outage signal, taking into account communication distance, based on the parent-child library relationship. The diagnostic module is used to generate an initial power outage identifier by utilizing the power outage signal and its reliability; based on the initial power outage identifier, the limited capacity of the power supply, and the reliability of the power outage signal, it performs a standardized and quantified power outage hypothesis analysis to obtain the power outage diagnosis result of the distribution network.

8. A computing device, characterized in that, Including memory and processor; The memory stores one or more computer programs, the one or more computer programs including instructions; when the instructions are executed by the processor, the computing device performs the method as described in any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium is used to store a computer program for performing the method as described in any one of claims 1 to 6.

10. A computer program product, characterized in that, The computer program product includes one or more computer instructions, which, when loaded and executed on a computing device, enable the computing device to perform the method as described in any one of claims 1 to 6.