Early warning method and system for single-phase disconnection of double-circuit line primary equipment under light load condition

By collecting dual-circuit current to calculate multi-dimensional deviation and load transfer characteristics, and combining light load judgment and bus active power calculation, the problem of CT disconnection criterion failure under light load conditions is solved. This enables accurate identification and differentiation of single-phase disconnection in primary equipment, reduces false alarm rate, shortens troubleshooting time, adapts to multiple extreme conditions, and reduces retrofit costs.

CN123136283APending Publication Date: 2026-11-20STATE GRID LIAONING ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611392486.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies cannot identify single-phase open circuit faults in primary equipment under light load conditions, rendering the CT open circuit criterion ineffective and leading to potential safety hazards in the power grid. Furthermore, existing systems cannot distinguish between primary and secondary open circuits, resulting in a high false alarm rate, significant modification difficulties, and an inability to cover extreme operating conditions.

Method used

By acquiring the current of the dual-circuit line in real time, calculating the multi-dimensional current deviation and load transfer characteristics, and combining the light load judgment and bus active power calculation, the system can accurately identify and distinguish single-phase line breaks in primary equipment. It adopts the CT current acquisition unit and bus active power acquisition device of the existing line protection device, without the need for additional hardware.

Benefits of technology

It achieves accurate identification of single-phase open circuit in primary equipment under light load conditions, reduces false alarm rate, shortens troubleshooting time, distinguishes between primary and secondary open circuits, reduces retrofit costs, adapts to multiple extreme conditions, and improves power grid fault monitoring capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136283A_ABST
    Figure CN123136283A_ABST
Patent Text Reader

Abstract

The application discloses a kind of light load conditions under double circuit primary equipment single-phase wire breakage early warning method and system, belong to power system fault monitoring technical field, solve the problem that CT wire breakage criterion fails under light load condition, wire breakage identification accuracy is low, primary / secondary wire breakage cannot be distinguished.This method is by real-time acquisition double circuit three-phase current, bus coupler current and bus active power, first determine light load condition, then calculate multi-dimensional current deviation degree, identify suspected wire breakage phase, double circuit same-phase current reverse change, time synchronism and bus coupler current cooperation four core features, combined with bus active power sum distinguishes primary equipment wire breakage and CT secondary circuit wire breakage, finally trigger accurate early warning;The system corresponds to the above method, contains data acquisition, light load determination and the like module, supports and existing protection device cooperative work, without adding hardware.The application supplements the deficiency of prior art, improves power grid operation efficiency, reduces fault loss.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power system fault monitoring technology, and in particular to a method and system for early warning of single-phase line failure in primary equipment of a double-circuit line under light load conditions. Background Technology

[0002] Double-circuit power grids are widely used in 110kV and above voltage level power grids due to their high power supply reliability and large transmission capacity, serving as a crucial support for the safe and stable operation of power systems. Single-phase line breaks in primary equipment (such as poor contact of disconnecting switches or conductor breaks caused by external damage to the line) are common faults in double-circuit power grids. If not identified in time, they may trigger a chain reaction of problems such as line overvoltage, protection malfunctions, and large-scale load shifts, seriously threatening the safety of the power grid.

[0003] Currently, power grids mainly rely on the CT disconnection criteria of line protection devices to monitor line disconnections. However, this criterion has obvious limitations: the action condition of the CT disconnection criterion depends on the load current threshold (usually 30% to 40% of the rated current). When a double-circuit line is under light load (the load current is less than 30% of the rated current), the load current cannot reach the criterion action threshold, causing the CT disconnection criterion to fail and making it impossible to identify single-phase disconnection faults in primary equipment, thus creating potential safety hazards in the power grid.

[0004] In existing technologies, most open circuit identification methods are designed for heavy load conditions, neglecting the unique characteristics of loads under light load conditions. This results in low accuracy and high false alarm / missed alarm rates. For example, one existing technology proposes an open circuit identification method based on the current difference between two circuits, but its core criterion relies on the comparison between the braking current and the zero-sequence current. This method is only applicable to bus differential protection under heavy load conditions and cannot effectively identify open circuits under light load conditions. Another existing technology uses a single current deviation for open circuit identification, without considering the load transfer characteristics of two circuits. This makes it susceptible to load fluctuations and electromagnetic interference, resulting in a high false alarm rate. Furthermore, it cannot distinguish between primary equipment open circuits and CT secondary circuit open circuits, which can easily lead to mishandling by maintenance personnel.

[0005] In addition, existing line breakage identification systems are mostly independent devices, requiring the addition of new hardware acquisition units, which is difficult and costly to upgrade. Furthermore, they lack coordination with existing line protection devices, which can easily lead to warning conflicts. At the same time, existing technologies do not cover extreme working conditions such as bus tie tripping and large impedance differences between double circuits, making it difficult to meet the actual needs of engineering projects.

[0006] To address the shortcomings of the existing technologies, there is an urgent need for a method and system for early warning of single-phase line failure in primary equipment of dual-circuit lines that requires no additional hardware, is adaptable to light load conditions, provides accurate identification, can distinguish between primary and secondary line failures, and covers multiple extreme conditions. This would solve the problem of CT criterion failure under light load conditions and improve the power grid fault monitoring capability. Summary of the Invention

[0007] The purpose of this invention is to provide a method and system for early warning of single-phase wire breakage in a dual-circuit primary equipment under light load conditions, so as to solve the problems of failure of CT wire breakage criteria, low accuracy of wire breakage identification, and inability to distinguish between primary and secondary wire breakage in the prior art under light load conditions.

[0008] To achieve the above objectives, the present invention provides a method and system for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions, the specific technical solution of which is as follows:

[0009] A method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions, the method comprising the following steps:

[0010] S1. Data Acquisition: Real-time acquisition of the three-phase current I of the double-circuit lines (line L1, line L2). a1 I b1 I c1 I a2 I b2 I c2 And the three-phase current I of the bus tie / sectionalizing switch mla I mlb I mlc The collected data all come from the CT current acquisition unit and busbar measurement and control acquisition device of the existing line, bus tie / section measurement and control device.

[0011] S2. Light Load Determination: Determine the light load threshold I based on the line voltage level and protection type. th If the load current I corresponding to the total active power of the line load <I th If the load current is below this threshold, it is determined to be a light load condition. Specifically, the light load threshold for 110kV lines is 25%~30% of the rated current, for 220kV lines it is 20%~25% of the rated current, and for 500kV lines it is 15%~20% of the rated current. The light load threshold for line longitudinal protection, distance protection, and zero-sequence protection is the upper limit of the corresponding voltage level. This threshold is determined based on field operating experience and analysis of line breakage characteristics. When the load current is below this threshold, traditional CT line breakage criteria fail, and this method can achieve accurate identification.

[0012] S31. Calculate the three-phase current deviation of a single line: ΔI1 = max(|I a1 -I avg1 |, |I b1 -I avg1 |, |I c1 -I avg1 |) / I avg1 , ΔI2 = max(|I a2 -I avg2 |, |I b2-I avg2 |, |I c2 -I avg2 |) / I avg2 , where I avg1 I avg2 These are the average three-phase currents of lines L1 and L2, respectively; this deviation is used to determine whether there is an abnormal current in a single line, providing a basis for identifying suspected open-circuit phases; supplementary constraint: I avg If the value is 0, exit this criterion.

[0013] S32. Calculate the single-phase current deviation of a single line: ΔI φ1 = |I φ1 -I avg1 | / I avg1 ΔI φ2 = |I φ2 -I avg2 | / I avg2 (φ=a, b, c); Focus on abnormal fluctuations in single-phase current to provide support for accurate location of the broken phase; Supplementary constraints: I avg If the value is 0, exit this criterion.

[0014] S33. Calculate the in-phase current deviation of a double-circuit line: ΔI a = |I a1 -I a2 | / max(I a1 , I a2 ), ΔI b = |I b1 -I b2 | / max(I b1 , I b2 ), ΔI c = |I c1 -I c2 | / max(I c1 , I c2 ); Combining the load transfer characteristics of the double-circuit line, the most likely broken phase is identified by the phase current deviation.

[0015] S4. Anomaly Feature Identification:

[0016] S41. If the current deviation of a certain phase is ΔI φ If the deviation is ≥80%, and the phase is the one with the largest deviation in the same phase current of a double-circuit line, it is marked as a suspected open circuit phase. The 80% deviation threshold is verified based on field data and can effectively distinguish between normal load fluctuations and open circuit faults, reducing false alarms.

[0017] S42. If the signs of the current changes in the suspected broken phase in a double-circuit line are opposite, and the absolute value ratio of the current changes is within the range of 1:0.9 to 1.4, it is determined to be a double-circuit line characteristic of reverse current changes in the same phase; where the current change is the difference between the current at the current moment and the current at the moment before the fault, and the absolute value of the current change is greater than 0.5% of the rated current of the line; the ratio range is derived based on the equivalent circuit theory of double-circuit lines, combined with the load transfer law, to ensure the accuracy of feature identification.

[0018] S43. If the reverse current change of the suspected disconnected phase in a double-circuit line is synchronous in time, with a time difference ≤100ms, it is determined to be a synchronous characteristic. This time threshold is determined based on the transient process characteristics of load transfer in a double-circuit line, which can exclude interference from switching operations, lightning transients, and random load fluctuations, and avoid misjudgment.

[0019] S44. If the double circuits are deployed on different busbars, and the different busbars are connected by bus couplers / sections, the change in phase current corresponding to the bus coupler / section is opposite to the trend of the change in phase current of the disconnected circuit.

[0020] When both circuits are connected to the same busbar and the bus tie / section switch is tripped and operated separately, the fault load is only transferred between the lines within this busbar section. There is no cross-busbar power exchange, and there is no significant reverse current change in the bus tie or section. At this time, it is not necessary to meet the S44 cooperative feature. As long as the three features S41, S42, and S43 are met simultaneously, it can be determined that the primary equipment is disconnected in a single phase.

[0021] S5. Early warning judgment: If all characteristics of S41 to S44 are met simultaneously under light load conditions, a single-phase disconnection early warning for primary equipment will be triggered; multi-characteristic combination judgment can effectively avoid misjudgment based on a single characteristic and improve the accuracy of early warning.

[0022] S6. Early Warning Output: Outputs corresponding alarm signals to the power monitoring system and displays the disconnected line, disconnected phase and fault type, providing maintenance personnel with accurate fault location information and shortening fault troubleshooting time.

[0023] Furthermore, it also includes a step for differentiating open circuits in the CT secondary circuit: real-time acquisition of the active power value P of each branch of the busbar. n Calculate the total active power ΔP of each branch of the busbar. sum = |Σ(all branches)P n (t) - Σ(all branches)P n (t-Δt)|, where Δt is 1~5 seconds;

[0024] If ΔPsum > 0.7 × the active power value of the disconnected phase, it is determined that the secondary circuit of the CT is disconnected and the corresponding alarm is triggered; otherwise, the single-phase disconnection warning judgment of the primary equipment is maintained. The active power value of the disconnected phase is the product of the current before the fault of the disconnected phase, the corresponding phase voltage and the power factor, that is: P = Ifault × Uphase × cosφ, where Ifault is the current before the fault of the disconnected phase, Uphase is the phase voltage (about 127kV for a 220kV system), and cosφ is the power factor (usually taken as 0.8~0.9).

[0025] When a primary equipment circuit fails, the power flow is redistributed through the intact return line, and the change in the sum of active power (ΔPsum) of each branch of the busbar, calculated based on actual measurements, is close to zero. However, when the secondary circuit of a current transformer (CT) fails, the current sampled by the monitoring and control device is not the actual primary current, resulting in a significant change in the sum of active power of the busbar calculated based on this change, comparable to the power transmitted through the failed line. Therefore, whether ΔPsum exceeds 0.7 times the phase-specific active power value of the failed line can be used as a criterion to distinguish between a primary equipment circuit failure and a CT secondary circuit failure.

[0026] Furthermore, in step S42, the absolute value ratio of the current change is: the ratio of the absolute value of the decrease in the current of the disconnected circuit to the absolute value of the increase in the current of the same phase of the other circuit.

[0027] Furthermore, when the positive sequence impedance difference between the two circuits is greater than 10%, the ratio range of the current change in step S42 is adjusted to 1:0.8~1.6, and the correction factor is the ratio of the positive sequence impedances of the two circuits; this adapts to working conditions with large differences in the parameters of the two circuits and expands the applicability of the method.

[0028] The present invention also provides a single-phase open circuit warning system for primary equipment of a double-circuit line under light load conditions. This system is used to execute the single-phase open circuit warning method for primary equipment of a double-circuit line under light load conditions described in any one of the above embodiments, and includes the following modules:

[0029] Data acquisition module: It adopts the CT current acquisition unit and bus active power acquisition device of the existing line protection device to acquire the three-phase current of the double-circuit line, the bus tie / section current and the active power value of the bus branch. It supports the IEEE 1588 precise time synchronization protocol to ensure that the time synchronization error between the double-circuit current and the bus tie current is ≤1ms. No new hardware is required, which reduces the difficulty and cost of transformation, while ensuring the synchronization of the acquired data and improving the calculation accuracy.

[0030] Light load determination module: It has a built-in database of light load thresholds corresponding to different voltage levels and protection types. It automatically matches the thresholds and determines the operating conditions based on the line parameters, and supports on-site parameter adjustment; it is compatible with lines of different voltage levels and protection types, improving system adaptability.

[0031] Current deviation calculation module: Real-time calculation of three-phase current deviation of a single line, single-phase current deviation, and in-phase current deviation of a double-circuit line; quickly completes data calculation and provides data support for anomaly feature identification.

[0032] Anomaly Feature Identification Module: Identifies suspected open-circuit phases, reverse current changes in the same phase of double-circuit lines, time synchronization characteristics, and bus tie current coordination characteristics; accurately identifies fault features and avoids misjudgment and missed judgment.

[0033] Early warning and judgment module: Based on the combination of abnormal characteristics, it judges and outputs a single-phase open circuit warning for primary equipment or an open circuit alarm for CT secondary circuit; it realizes accurate differentiation of fault types and provides a basis for operation and maintenance.

[0034] Protection device interface module: Communicates with existing line protection devices to obtain CT disconnection alarm signals from the protection devices. When the protection device issues a CT disconnection alarm, it blocks the warning output of this system; realizes collaborative work with existing protection devices, avoids warning conflicts, and improves system reliability.

[0035] Early warning output module: Transmits early warning signals to the power monitoring system, supports audible and visual alarms, SMS push notifications, and pop-up prompts on the monitoring screen; multi-channel early warning ensures that maintenance personnel receive alarm information in a timely manner and can quickly handle faults.

[0036] The present invention also provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the single-phase circuit failure early warning method for a dual-circuit primary equipment under light load conditions as described in any one of the above claims.

[0037] Compared with the prior art, the present invention has the following significant advantages:

[0038] Addressing the gap in wire breakage monitoring under light load conditions: Targeting the core pain point that traditional CT wire breakage criteria fail under light load conditions, this technology combines multi-dimensional current deviation and load transfer characteristics to achieve accurate identification of single-phase wire breaks in primary equipment under light load conditions, significantly reducing false alarm rates, shortening troubleshooting time, and supplementing the deficiencies of existing technologies.

[0039] It can distinguish between primary and secondary circuit breaks, avoiding mishandling: By calculating the total active power of the bus, it can accurately distinguish between primary equipment circuit breaks and CT secondary circuit breaks, solving the defect of existing technology that cannot distinguish between the two types of faults, reducing mishandling by maintenance personnel, and shortening the fault diagnosis time (from hours to minutes).

[0040] No new hardware required, low deployment cost: Reuse the acquisition unit and monitoring system of existing line protection devices, no new hardware equipment is required, and deployment can be carried out by software upgrade only. The deployment cycle of a single site is short, which can achieve rapid deployment, low transformation cost, and easy large-scale promotion.

[0041] Covering multiple extreme operating conditions and highly adaptable: It supports extreme operating conditions such as bus tie tripping and large impedance differences between double circuits, and is compatible with double circuits of multiple voltage levels such as 110kV, 220kV, and 500kV. It is suitable for various bus operation modes such as single bus, double bus, and double bus double section, thus expanding the scope of application.

[0042] High reliability with existing protection devices: Through the protection device interface module, it can work in coordination with existing line protection devices to avoid warning conflicts. At the same time, it supports IEEE 1588 precise time synchronization to ensure data synchronization and improve system operation reliability. Attached Figure Description

[0043] To more clearly illustrate the technical solution of the present invention, the drawings used in the embodiments will be briefly introduced below. Obviously, those skilled in the art can obtain other drawings based on these drawings without creative effort.

[0044] Figure 1 This is a flowchart illustrating the single-phase circuit failure early warning method for primary equipment in a double-circuit line under light load conditions according to the present invention.

[0045] Figure 2 This is a schematic diagram of the module structure of the single-phase circuit failure early warning system for a double-circuit primary equipment under light load conditions according to the present invention.

[0046] Diagram description: 1 Data acquisition module, 2 Light load judgment module, 3 Deviation calculation module, 4 Feature recognition module, 5 Early warning judgment module, 6 Protection interface module, 7 Early warning output module. Detailed Implementation

[0047] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below in conjunction with specific embodiments and corresponding drawings. Obviously, the described embodiments are only a part of the embodiments of this invention, and not all of them. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this invention. The following description, in conjunction with... Figure 1 and Figure 2 The technical solutions provided in the various embodiments of the present invention will be described in detail.

[0048] Example 1: Early warning of single-phase wire breakage in primary equipment under normal operating conditions

[0049] Taking a 220kV double-circuit line (line L1 and line L2) as an example, the rated current of the line is 1000A, and longitudinal protection is adopted. The positive sequence impedance difference of the double-circuit line is 3% (≤10%), and the light load threshold is set to 25% of the rated current (i.e., 250A). One second before the fault, the three-phase current of the double-circuit line is 200A, the three-phase current of the bus tie is 30A, and the total active power of the bus is 2MW (obtained by summing the active power of each branch on the bus at the same time).

[0050] Step 1: Data collection.

[0051] Real-time data collection at the moment of failure:

[0052] Three-phase current of line L1: I a1 =190A, I b1 =205A, I c1 =10A (C phase open circuit, current drops sharply).

[0053] Three-phase current of line L2: I a2 =200A, I b2 =195A, I c2 =365A (C phase receives the transferred load, and the current increases).

[0054] Bus tie C-phase current: I mlc =190A (load transferred to L2 via bus tie).

[0055] Total active power of each branch of the busbar: ΣP n (t)=5MW, ΣP n (t-Δt)=2MW (Δt=1s).

[0056] Step 2: Light load determination.

[0057] Load current I corresponding to the total active power of the line load =200A < 250A, which is considered a light load condition.

[0058] Step 3: Calculate the current deviation.

[0059] Average three-phase current of line L1: I avg1 =(190+205+10) / 3≈135A.

[0060] Single-phase current deviation: ΔI c1 =|10-135| / 135≈92.6%≥80%, phase C is marked as a suspected broken phase.

[0061] Double-circuit in-phase current deviation: ΔI c =|10-365| / 365≈97.3%, which is the phase with the largest deviation among the three phases.

[0062] Average three-phase current of line L2: I avg2 =(200+195+365) / 3≈253.3A.

[0063] Single-phase current deviation: ΔI c2 =|365-253.3| / 253.3≈44.1%.

[0064] Step 4: Anomaly feature identification.

[0065] 1. S41 characteristic verification: The current deviation of phase C is 92.6%≥80%, and it is the phase with the largest current deviation in the same phase of the double circuit, which meets the condition of suspected open circuit phase.

[0066] 2. S42 Feature Verification:

[0067] Calculation of current change (fault time - original time): L1 phase C current change = 10 - 200 = -190A (negative sign), L2 phase C current change = 365 - 200 = 165A (positive sign). The signs are opposite, and the absolute value of the current change is greater than 0.5% of the line rated current (i.e. >5A).

[0068] The ratio of current change is approximately 1:1.152, which falls within the reasonable range of 1:0.9 to 1.4, satisfying the characteristic of reverse change of in-phase current in a double-circuit line.

[0069] 3. S43 characteristic verification: The time difference of the reverse change of the C-phase current of the double-circuit line is ≤100ms, which meets the synchronization characteristic (this threshold is determined based on the characteristics of the load transfer process of the double-circuit line, and can exclude the interference of switching operation, lightning transient and random load fluctuation).

[0070] 4. S44 Feature Verification: The double circuits are located on different busbars, which are connected by the operating bus tie phase. The current of the bus tie phase C increases from 30A to 190A, which is opposite to the decreasing trend of the current of phase C of L1, thus satisfying the bus tie current coordination feature.

[0071] 5. CT secondary circuit differentiation verification:

[0072] The total active power of the busbar ΔPsum = |5-2| = 3MW, which is much smaller than the phase active power of the disconnected line (200A×127kV×0.9≈22.9MW). ΔPsum does not exceed 0.7×22.9MW=16.0MW, so it is determined that the primary equipment is disconnected and the condition for the CT secondary circuit to be disconnected is not met.

[0073] Step 5: Early warning judgment.

[0074] Simultaneously satisfying all characteristics of S41~S44, and not meeting the CT secondary circuit disconnection condition, triggers a single-phase disconnection warning for the primary equipment of phase C of line L1.

[0075] Step 6: Early warning output.

[0076] The warning signal is output to the power monitoring system, displaying "Single-phase open circuit in the primary equipment of line L1 C phase. It is recommended to check the contact status of the disconnecting switch and the external damage to the line." At the same time, a yellow audible and visual alarm is triggered. Maintenance personnel can quickly check the fault based on the warning information to ensure timely handling of the fault.

[0077] Example 2: This case illustrates the actual operating conditions of the Dangong Line 1 at the 220kV Dandongbei Substation in the Northeast Power Grid. The line is one of a double-circuit line in a 220kV high-current grounding system. The Dangong Line 2 was under maintenance and the switches were in the open position, with the average three-phase current being 0. At 10:45:00 on April 21, 2026, the three-phase switch on the opposite side tripped, while the switch on this side remained closed. No remote tripping, remote transmission, or protection action signals were received from the opposite side, fully conforming to the coverage scenario of a three-phase open circuit fault in a single-circuit double-circuit line operation according to this invention.

[0078] The system automatically identifies the line as operating as a single-circuit double-circuit line and initiates the single-circuit three-phase open circuit criterion. The specific matching conditions are as follows:

[0079] 1. Light load condition judgment: Before the circuit breaker on the opposite side is tripped, the three-phase current of the line is about 260A, which is 20% lower than the rated current, thus meeting the light load judgment condition;

[0080] 2. Switch status and opposite signal determination: The switch on this side remains in the closed position and no action signal is received from the opposite side, meeting the matching criterion requirements;

[0081] 3. Current characteristic judgment: After the opposite side is tripped, the three-phase current is the unloaded line capacitive current with stable amplitude and basically balanced three phases. The unbalance of the three-phase current is far less than 30%, which meets the judgment criteria.

[0082] 4. Power characteristic determination: After the circuit breaker on the opposite side is tripped, the total active power of the line drops sharply and then remains stable at approximately 0, and the total reactive power is capacitive reactive power with a fixed amplitude, which meets the matching criterion requirements.

[0083] 5. Impedance characteristic judgment: After the circuit breaker on the opposite side is tripped, the measured impedance of the line reaches 0.98 times the rated impedance of the entire line, which meets the criterion requirement of ≥0.9 times, effectively eliminating the normal operating condition of an unloaded transformer at the end.

[0084] 6. Duration determination: The above-mentioned fault characteristics have been present continuously and stably since 10:45:00, far exceeding the criterion requirement of ≥1s.

[0085] At 10:45:01, the system accurately determined a three-phase open circuit fault in a single circuit (three-phase tripping / unauthorized tripping of the switch on the opposite side), triggering an early warning. At the same time, based on the measured average capacitive current amplitude of the three phases, the system calculated the approximate distance between the open circuit point and the Dandongbei substation on this side, and pushed the data to the monitoring system simultaneously. This achieved accurate early warning and assisted location of the fault, verifying the field effectiveness of the proposed solution.

[0086] Example 3: Early warning of single-phase circuit failure in primary equipment under the condition of large impedance difference between two circuits

[0087] Using the line parameters of Example 1, if the positive sequence impedance difference of the two circuits is 15% (>10%), the current change ratio range in step S42 will be automatically adjusted to 1:0.8~1.6, and the correction factor will be the ratio of the positive sequence impedances of the two circuits (1.15).

[0088] If a fault occurs, the L1 C-phase current decreases by 190A, and the L2 C-phase current increases by 120A. The ratio of current change is approximately 190:120:1:1.58, which falls within the adjusted range of 1:0.8~1.6. It also meets the characteristics of S41, S43, and S44, and can correctly identify single-phase open circuits in the L1 C-phase primary equipment of the line, adapting to working conditions with large differences in parameters between double-circuit lines.

[0089] like Figure 2 As shown, the present invention provides a single-phase circuit failure early warning system for a double-circuit primary equipment under light load conditions, comprising:

[0090] Data acquisition module 1: It adopts the CT current acquisition unit and bus active power acquisition device of the existing line protection device to acquire the three-phase current of the double-circuit line, the bus tie / section current and the active power value of the bus branch. It supports the IEEE 1588 precise time synchronization protocol to ensure that the time synchronization error between the double-circuit current and the bus tie current is ≤1ms.

[0091] Light load determination module 2: It has a built-in database of light load thresholds corresponding to different voltage levels and protection types. It automatically matches the thresholds and determines the operating conditions based on the line parameters, and supports on-site parameter adjustment.

[0092] Current deviation calculation module 3: Real-time calculation of three-phase current deviation of a single line, single-phase current deviation, and in-phase current deviation of a double-circuit line;

[0093] Anomaly Feature Identification Module 4: Identifies suspected open-circuit phases, reverse current change characteristics of double-circuit in-phase lines, synchronization characteristics, and bus tie current coordination characteristics;

[0094] Early warning judgment module 5: Based on the combination of abnormal features, judge and output a single-phase open circuit warning for primary equipment or an open circuit alarm for CT secondary circuit;

[0095] Protection device interface module 6: Communicates with existing line protection devices to obtain CT disconnection alarm signals from the protection devices. When the protection device issues a CT disconnection alarm, it blocks the early warning output of this system.

[0096] Early warning output module 7: Transmits early warning signals to the power monitoring system, supporting audible and visual alarms, SMS push notifications, and pop-up prompts on the monitoring screen.

[0097] System operation verification: The system of this invention was used to conduct on-site verification of the 220kV double-circuit line and two other 110kV and one 500kV double-circuit lines for 12 consecutive months. All nine faults were correctly identified, and there were no false alarms recorded during the 12-month on-site operation. The average response time was 280ms. The test results compared with existing technologies are shown in Table 1.

[0098] Table 1. Comparison Test Results of the Invention and Existing Technologies

[0099] Technical solution Recognition accuracy under light load False alarm rate Average response time Do you differentiate between primary and secondary wire breaks? This invention >95% <0.1% 280ms yes Traditional CT line breakage criteria 0% — No response no Single current deviation method 78.5% 12.7% 1.2s no

[0100] Test results show that the recognition accuracy and response speed of the present invention are superior to those of the prior art, and it can distinguish between primary and secondary wire breaks. It can effectively solve the technical pain points of wire break monitoring under light load conditions and has engineering applicability.

[0101] The scope of protection of this invention is not limited to the above embodiments. For those skilled in the art, without departing from the principle of this invention, the parameters and module functions of each step can be appropriately adjusted according to actual engineering needs, such as adjusting the light load threshold, the current change ratio range, etc., and these adjustments all fall within the scope of protection of this invention.

[0102] Furthermore, the method of the present invention can be implemented by a software program that can be stored in a computer-readable storage medium and executed by a processor to realize the single-phase disconnection early warning function of the primary equipment of the double-circuit line under light load conditions; the system can be embedded into the existing substation monitoring system without independent deployment, further reducing the implementation cost.

Claims

1. A method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions, characterized in that, Includes the following steps: S1. Data Acquisition: Real-time acquisition of the three-phase current I of line L1 and line L2. a1 I b1 I c1 I a2 I b2 I c2 And the three-phase current I of the bus tie / sectionalizing switch mla I mlb I mlc ; S2. Light Load Determination: Determine the light load threshold I based on the line voltage level and protection type. th If the load current I corresponding to the total active power of the line load <I th If the current is too high, it is considered a light load condition. The light load threshold for 110kV lines is 25% to 30% of the rated current, for 220kV lines it is 20% to 25% of the rated current, and for 500kV lines it is 15% to 20% of the rated current. The light load threshold for line longitudinal protection, distance protection, and zero-sequence protection is the upper limit of the corresponding voltage level. S3. Current deviation calculation: S31. When the average value of the three-phase current of the line is I avg1、 I avg2 When all values ​​are not zero, calculate the three-phase current deviation of a single line respectively: ΔI1 = max(|I a1 -I avg1 |, |I b1 -I avg1 |, |I c1 -I avg1 |) / I avg1 , ΔI2 = max(|I a2- I avg2 |, |I b2 -I avg2 |, |I c2 -I avg2 |) / I avg2 , Where I avg1 I avg2 These are the average three-phase currents of the double-circuit lines L1 and L2, respectively. S32. Calculate the single-phase current deviation of a single line: ΔI φ1 = |I φ1 -I avg1 | / I avg1 , ΔI φ2 = |I φ2 -I avg2 | / I avg2 (φ=a、b、c); S33. Calculate the in-phase current deviation of a double-circuit line: ΔI a = |I a1 -I a2 | / max(I a1 , I a2 ) ΔI b = |I b1 -I b2 | / max(I b1 , I b2 ) ΔIc = |I c1 -I c2 | / max(I c1 , I c2 ); S4. Anomaly Feature Identification: S41. Calculate the single-phase deviation ΔI of a single line. φ Filter out ΔI φ Phases with ≥80% of the abnormality rate are designated as suspected abnormal phases; from among the suspected abnormal phases, the phase with the largest double-circuit phase deviation is selected and marked as a suspected broken phase. S42. Determining the reverse change characteristic of in-phase current in a double-circuit line: If the signs of the current changes in the suspected broken phase in the double-circuit line are opposite, and the absolute value ratio of the current changes is within the range of 1:0.9 to 1.4, then it is determined to be a reverse change characteristic of in-phase current in a double-circuit line; where the current change is the difference between the current at the current moment and the current at the moment before the fault, and the absolute value of the current change is greater than 0.5% of the line's rated current; S43. If the time difference between the reverse changes of the phase current in the suspected open circuit of a double-circuit line is ≤100ms, it is determined to be a synchronous characteristic. S44. When the bus tie / section switch is closed and the two circuits belong to different busbars, the current of the corresponding phase of the bus tie or section switch changes in the opposite trend to the current of the suspected disconnected phase. S5. Early warning judgment: If all characteristics of S41~S44 are met simultaneously under light load conditions, a single-phase disconnection early warning for primary equipment will be triggered. S6. Early warning output: Output the corresponding alarm signal to the power monitoring system and display the disconnected line, disconnected phase and fault type.

2. The method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions according to claim 1, characterized in that, It also includes steps for identifying open circuits in the CT secondary circuit: Real-time acquisition of the active power value Pn of each branch of the bus, and calculation of the change in the total active power value of each branch of the bus ΔPsum = |ΣPn(t) - ΣPn(t-Δt)|, where Δt is 1~5 seconds; If ΔPsum > 0.7 × the active power value of the disconnected line phase, it is determined that the CT secondary circuit is disconnected and the corresponding alarm is triggered. Otherwise, maintain the single-phase disconnection warning judgment for the primary equipment; The active power value of each phase of the broken line is the product of the current before the fault in the broken phase, the voltage of the corresponding phase, and the power factor.

3. The method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions according to claim 1, characterized in that, In step S42, the ratio of the absolute value of the current change is the ratio of the absolute value of the decrease in the phase current of the disconnected return line to the absolute value of the increase in the phase current of the intact return line, and the value range is 1:0.9 to 1.

4.

4. The method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions according to claim 1, characterized in that, In step S43, the time difference of the reverse change of the phase current of the suspected open circuit in the double circuit is ≤100ms. This 100ms time threshold is determined based on the transient process characteristics of the load transfer of the double circuit and is used to eliminate interference from switching operations, lightning transients and random load fluctuations.

5. The method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions according to claim 1, characterized in that, The warning judgment in step S5 is further limited: when one circuit breaker in a double-circuit line is tripped and the system is in single-circuit operation, step S5 also includes the following branch for determining the line break fault warning: (1) When one circuit breaker of a double-circuit line is tripped and the other side of the running circuit trips three-phase, if the following conditions are met: the circuit breaker on this side is closed, there is no remote trip / protection action signal on the other side, the three phases are balanced no-load capacitor current, the unbalance degree is <30%, the total active power is ≈0, the reactive power is fixed capacitive reactive power, and the measured impedance is ≥0.9 times the total impedance, then it is determined to be a single-circuit three-phase open circuit fault and an early warning is triggered. (2) When a single-phase line is disconnected under single-circuit operation, if the following conditions are met: the disconnected phase has a very small stable capacitive current, the non-disconnected phase fluctuates normally, the total active power drops by ≥20%, the steady-state active power before the fault is superimposed with fixed capacitive reactive power, and there is no short circuit / ground fault component, then it is determined to be a single-phase line disconnection fault and an early warning is triggered.

6. The method for early warning of single-phase circuit failure in primary equipment of a double-circuit line under light load conditions according to claim 1, characterized in that, When the positive sequence impedance difference of the double-circuit line is greater than 10%, the ratio of the absolute values ​​of the changes in the in-phase current of the double-circuit line is in the range of 1:0.8 to 1.

6.

7. A single-phase circuit failure early warning system for primary equipment in a double-circuit line under light load conditions, characterized in that, For performing the method as described in any one of claims 1 to 6, comprising: Data acquisition module: It adopts the CT current acquisition unit and bus active power acquisition device of existing line protection device to acquire the three-phase current of double circuit, bus tie / section current and bus branch active power values. It supports the IEEE 1588 precise time synchronization protocol to ensure that the time synchronization error between the double circuit current and the bus tie current is ≤1ms. Light load determination module: It has a built-in database of light load thresholds corresponding to different voltage levels and protection types. It automatically matches the thresholds and determines the operating conditions based on the line parameters, and supports on-site parameter adjustment. Current deviation calculation module: Real-time calculation of three-phase current deviation of a single line, single-phase current deviation, and in-phase current deviation of a double-circuit line; Anomaly feature identification module: Identifies suspected open-circuit phases, reverse current change characteristics of double-circuit in-phase lines, time synchronization characteristics, and bus tie current coordination characteristics; Early warning judgment module: Based on the combination of abnormal features, judge and output a single-phase open circuit warning for primary equipment or an open circuit alarm for CT secondary circuit; Protection device interface module: Communicates with existing line protection devices to obtain CT disconnection alarm signals from the protection devices. When the protection device issues a CT disconnection alarm, it blocks the early warning output of this system. Early warning output module: Transmits early warning signals to the power monitoring system, supporting audible and visual alarms, SMS push notifications, and pop-up prompts on the monitoring screen.

8. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the single-phase circuit failure early warning method for a dual-circuit primary equipment under light load conditions as described in any one of claims 1 to 6.