Power transmission line insulation state early warning method and system based on conductivity sequence anomaly detection

By employing a conductivity sequence anomaly detection method based on run length probability inference and sequential dual-channel decision, the problem of early warning accuracy and timeliness of fog conductivity sequences in complex environments is solved, and efficient monitoring of insulation status is achieved.

CN123136306APending Publication Date: 2026-11-20ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611211280.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-11
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In existing technologies, it is difficult to effectively balance the complex sequence characteristics of fog water conductivity sequence under the coexistence of slow environmental drift and sudden pulses, resulting in insufficient accuracy and timeliness of early warning.

Method used

By receiving conductivity measurement data streams, performing distribution segmentation processing based on probability inference of running length, generating a domain-invariant benchmark distribution description set, and using sequential dual-channel decision units for online segmentation and cross-boundary monitoring, an insulation status early warning classification signal is generated.

Benefits of technology

It enables effective differentiation between slow environmental drift and precursory abrupt changes in insulator flashover, improving the accuracy of early warning and real-time response capabilities, and enhancing the anti-interference performance against measurement pulse noise.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136306A_ABST
    Figure CN123136306A_ABST
Patent Text Reader

Abstract

The application provides a power transmission line insulation state early warning method and system based on conductivity sequence anomaly detection, which receives continuous conductivity measurement data flow; performs distribution cutting based on running length probability inference on normal working condition data, divides the data into multiple normal measurement segments and extracts distribution form description information; divides the distribution form description information into domain groups according to environmental context labels, generates a domain invariant reference distribution description set through distribution difference elimination mapping; inputs real-time data, the reference distribution description set and a re-expression pipeline into a sequential double-channel judgment unit, the first channel generates a cumulative offset sequence, and the second channel generates a variable point posterior probability sequence; when both of them meet the cross-border duration condition and the trend condition, the abnormality is determined, and insulation state early warning classification signals are generated according to the offset amplitude and the probability slope. The application can detect slow degradation and sudden pollution sensitively and has a low false alarm rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of data processing, and in particular to a method and system for early warning of insulation status of transmission lines based on conductivity sequence anomaly detection. Background Technology

[0002] Flashover of insulator surfaces on transmission lines is a significant threat to the safe operation of the power grid. Water vapor conductivity, as a direct measurement indicator reflecting the surface contamination state of insulators, is frequently used for insulation condition assessment through continuous monitoring. Current technologies for anomaly detection in water vapor conductivity sequences typically rely on fixed threshold comparisons or sliding window statistics. When the conductivity sequence is affected by slow environmental drift, fixed thresholds struggle to adapt to the overall shift in distribution, easily misinterpreting normal gradual environmental changes as insulation degradation. Furthermore, sliding window statistics, when faced with the complex sequence characteristics of both gradual drift and sudden pulses, struggle to achieve an effective balance between suppressing pulse interference and capturing precursory abrupt changes, thus limiting the accuracy and timeliness of early warnings. Summary of the Invention

[0003] This invention provides a method and system for early warning of insulation status of transmission lines based on conductivity sequence anomaly detection.

[0004] In a first aspect, embodiments of the present invention provide a method for early warning of the insulation status of transmission lines based on conductivity sequence anomaly detection, including:

[0005] Receive a continuous conductivity measurement data stream collected by a mist conductivity sensor. The continuous conductivity measurement data stream contains multiple conductivity measurement points arranged in time sequence. Some conductivity measurement points carry a normal operating period identifier, while the remaining conductivity measurement points carry a period identifier to be monitored.

[0006] The conductivity measurement points carrying the normal operating period identifier are subjected to distribution segmentation processing based on the probability inference of the running length. Based on the recursive update of the running length belief state vector and the detection of abrupt change points, the conductivity measurement points carrying the normal operating period identifier are divided into multiple normal measurement segments with consistent statistical attributes. The distribution morphology description information is extracted from each normal measurement segment and the distribution morphology description information of the normal segments is collected.

[0007] Obtain environmental context markers synchronized with the acquisition time of each normal measurement segment. Based on the environmental context markers, divide the set of normal segment distribution morphology description information into multiple domain groups. Perform distribution difference elimination mapping processing on multiple domain groups to eliminate distribution differences between domains while maintaining the internal structure of the distribution and generate a domain-invariant benchmark distribution description set.

[0008] The real-time conductivity measurement point sequence carrying the identifier of the period to be monitored, together with the domain-invariant benchmark distribution description set and the re-expression pipeline obtained by the distribution difference elimination mapping process, are input into the sequential dual-channel decision unit. The real-time conductivity measurement point sequence is segmented online to obtain real-time measurement segments and their distribution morphology description information. The distribution morphology description information is converted into a real-time re-expression description vector through the re-expression pipeline. Based on the real-time re-expression description vector and the domain-invariant benchmark distribution description set, the first channel generates a real-time cumulative offset sequence, and the second channel generates a real-time change point posterior probability sequence.

[0009] Cross-boundary monitoring and trend tracking are applied in parallel to the real-time sequence of cumulative offset and the real-time sequence of posterior probability of change point. When the cumulative offset and the posterior probability of change point simultaneously meet their respective cross-boundary persistence conditions and trend conditions, the distribution anomaly is determined to be established. Based on the offset amplitude classification and probability slope classification, the corresponding joint early warning level is searched in the preset early warning classification mapping structure to generate an insulation state early warning classification signal.

[0010] Secondly, embodiments of the present invention provide a computer system, the computer device including a processor and a memory, the memory storing a computer program, the computer program being loaded and executed by the processor to implement the above-mentioned method for early warning of transmission line insulation status based on conductivity sequence anomaly detection.

[0011] The embodiments of the present invention have the following beneficial effects:

[0012] This invention receives conductivity measurement data streams and performs distribution segmentation processing based on probability inference of running length on conductivity measurement points carrying normal operating period identifiers. Based on the recursive update of the running length belief state vector, the data is adaptively segmented into normal measurement segments with consistent statistical attributes and the distribution morphology description information is extracted. Subsequently, the distribution morphology description information is combined with the synchronous environmental context label of each segment to perform domain grouping and distribution difference elimination mapping, generating a domain-invariant baseline distribution description set. This enables the baseline description of normal operating conditions to adapt to different environmental conditions and eliminate the distribution offset effect caused by environmental differences. After online segmentation of the real-time conductivity measurement point sequence, a sequential dual-channel decision unit generates a real-time sequence of cumulative offset and a real-time sequence of posterior probability of change point, respectively. Cross-boundary monitoring and trend tracking are applied to both in parallel. Distribution anomalies are determined only when the cumulative offset and the posterior probability of change point simultaneously satisfy their respective cross-boundary persistence conditions and trend conditions. This effectively distinguishes between slow environmental drift and abrupt changes in insulator flashover precursors, avoiding false alarms caused by a single statistic during gradual environmental changes. Furthermore, the entire early warning process can operate online without relying on historical fault tags, improving the accuracy and real-time response capability of early warning of transmission line insulation status. At the same time, the tail-controllable observation compatibility evaluation method used in distribution segmentation enhances the anti-interference performance against measurement impulse noise. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the application environment provided in the embodiments of the present invention;

[0014] Figure 2 This is a flowchart illustrating the method for early warning of transmission line insulation status based on conductivity sequence anomaly detection provided in this embodiment of the invention.

[0015] Figure 3 This is a structural block diagram of the computer system provided in an embodiment of the present invention. Detailed Implementation

[0016] To make the objectives, technical solutions, and advantages of the present invention clearer, the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.

[0017] In some embodiments, the transmission line insulation condition early warning method based on conductivity sequence anomaly detection provided in this invention is applied to, for example... Figure 1 The application environment shown. For example, as... Figure 1 As shown, the application environment includes a mist conductivity sensor 10 and a computer system 20.

[0018] The computer system 20 can be a single server, a server cluster consisting of multiple servers, or a cloud computing service center. Data transmission between the mist water conductivity sensor 10 and the computer system 20 occurs via a network. In some embodiments, the mist water conductivity sensor 10 collects conductivity measurement data and sends it to the computer system 20, which then processes the data to complete the method provided in this embodiment of the invention.

[0019] The above Figure 1 The description is merely exemplary and illustrative. In exemplary embodiments, the functions of the mist conductivity sensing device 10 and the computer system 20 can be flexibly set and adjusted, and the embodiments of the present invention do not limit this.

[0020] Please refer to Figure 2 This document illustrates a flowchart of a transmission line insulation condition early warning method based on conductivity sequence anomaly detection, according to an embodiment of the present invention. The steps in this method can be derived from the above-described... Figure 1 The method is executed by computer system 20. It may include the following steps:

[0021] Step S100: Receive the continuous conductivity measurement data stream collected by the mist conductivity sensor. The continuous conductivity measurement data stream contains multiple conductivity measurement points arranged in time sequence, some of which carry a normal operating period identifier, and the remaining conductivity measurement points carry a monitoring period identifier.

[0022] A mist conductivity sensor can be an online monitoring instrument deployed at the crossarm or insulator string suspension point of a transmission line tower for in-situ real-time measurement of the conductivity of the conductive liquid film formed on the insulator surface due to mist deposition. This device, for example, includes a mist condensation collection subunit, an immersion conductivity measurement cell, a temperature compensation probe, a digital signal processing motherboard, and a low-power remote communication module. Exemplarily, the core of the mist condensation collection subunit is a Peltier semiconductor refrigeration chip, whose cold end is tightly fitted to a metal collection tray with a hydrophilic coating. When mist droplets in the ambient airflow contact the cold end, they are condensed and collected into liquid water, which flows into the storage chamber along the guide channel. The immersion conductivity measurement cell contains a pair of concentric circular electrodes plated with platinum black. After the mist in the storage chamber completely submerges the electrodes, the excitation circuit applies a symmetrical square wave alternating voltage at a fixed frequency to both ends of the electrodes, and the conductivity is calculated by measuring the circuit current. The temperature compensation probe uses a platinum resistance thermometer installed close to the outer wall of the storage chamber to simultaneously acquire the mist temperature. The digital signal processing motherboard is responsible for performing analog-to-digital conversion, finite impulse response digital filtering, and temperature compensation reduction, converting the raw sampled voltage into a standard conductivity value at the corresponding reference temperature. The low-power remote communication module periodically uploads data frames to the aggregation gateway located in the substation via General Packet Radio Service or long-range spread spectrum modulation.

[0023] The continuous conductivity measurement data stream is a byte stream of ordered conductivity measurements continuously sent by the mist water conductivity sensor to the aggregation gateway at fixed sampling intervals. Each sampling moment corresponds to a conductivity measurement point. The data structure of a single conductivity measurement point includes a UTC timestamp, the calculated conductivity value, the real-time temperature value, the sensor's unique serial number, and a cyclic redundancy check (CRC) code. While receiving the data stream, the aggregation gateway maintains a time-series database based on a circular buffer, inserting the received conductivity measurement points into it in timestamp order.

[0024] The normal operating condition period identifier is a digital tag automatically generated by maintenance engineers after confirming through inspection data and historical discharge records that the insulation surface is clean, the atmospheric environment is relatively stable, and there are no abnormal discharge events. This time interval is selected in the backend management interface of the aggregation gateway, and the tag is attached to each conductivity measurement point falling within this interval as a single-bit logical value. A valid normal operating condition period identifier indicates that the measurement point was collected under reference operating conditions where the insulator can be assured of no surface contamination accumulation and abnormal leakage current. The statistical fluctuations it contains are entirely composed of normal fluctuations in meteorological factors and the background noise of the measurement system. The monitoring period identifier is another type of digital tag corresponding to the time interval that continues after the normal operating condition period in the management interface. Only measurement points with valid identifiers are the actual operating status objects that need to be determined later. The time sequence between normal operating periods and monitoring periods is continuous without any gaps. The dividing point can be manually set by operators based on factors such as seasonal changes, preventive test nodes, or changes in the level of contamination areas. Alternatively, it can be automatically determined by the aggregation gateway by retrospectively dividing historical archived data with a preset training window length and sliding step size.

[0025] Step S200: Perform distribution segmentation processing based on probability inference of running length on the conductivity measurement points carrying the normal operating period identifier. Based on the recursive update of the running length belief state vector and the detection of abrupt change points, divide the conductivity measurement points carrying the normal operating period identifier into multiple normal measurement segments with consistent statistical attributes, and extract the distribution morphology description information from each normal measurement segment to obtain a set of normal segment distribution morphology description information.

[0026] In an optional embodiment, step S200 may specifically include the following steps S210 to S260:

[0027] Step S210: Initialize the running length belief state vector, which contains multiple components corresponding to the preset maximum segment duration length. Each component represents the belief strength of the current segment having lasted for the corresponding length. At the beginning of the conductivity measurement point sequence, assign all belief strengths to the component corresponding to the duration length of zero, and preset the mutation confirmation belief limit and the observation compatibility noise limit.

[0028] The runtime belief state vector is a one-dimensional array whose length is equal to the preset maximum segment duration plus 1. The maximum segment duration determines the cutoff range for runtime inference; runtimes exceeding this length are no longer distinguished individually but are folded into the component corresponding to the maximum duration. Each index position in the array corresponds to a hypothetical runtime of the current segment: index 0 corresponds to a runtime of 0, meaning the current moment is the beginning of a brand new segment; index 1 corresponds to a runtime of 1, meaning the segment only contains the previous measurement point; index 2 corresponds to a runtime of 2, and so on until the index represents the maximum segment duration. The value stored at each index position represents the posterior belief strength that the current segment has actually lasted for that length based on evidence from all observed conductivity measurements, and the sum of all components is always 1.

[0029] At the start of the conductivity measurement point sequence, the data sequence has just begun and there is no observational information available to infer the duration of a segment. At this point, based on the least informative initial assumption, all belief strengths are concentrated on the component corresponding to a duration of zero; that is, the belief strength of this component is initialized to 1, and the belief strengths of all other components are initialized to 0. This initialization setting indicates that the most likely scenario at the initial moment is that the current position is exactly at the beginning of a segment. The mutation confirmation belief threshold is a probability threshold used to determine whether a mutation point in the distribution is valid. When the posterior belief strength of the zero-duration component in the belief state vector exceeds this threshold, the current moment can be preliminarily considered a mutation candidate. The observation compatibility noise floor is a lower limit used to filter out extremely low probability values ​​to prevent numerical underflow and shield weak noise interference. For each element of the observation compatibility vector calculated in subsequent steps, if the value of that element is lower than this observation compatibility noise floor, it will be forcibly set to zero to avoid numerical interference from extremely low probability values ​​on the posterior distribution update and to improve the numerical stability of the calculation process.

[0030] Step S220: Traverse the conductivity measurement point sequence carrying the normal operating period identifier point by point. For each newly arrived conductivity measurement point, based on the running length belief state vector of the previous moment, generate the running length prior distribution at the current moment through the transition probability description structure containing the segment continuation probability and the distribution change probability. This prior distribution reflects the probability of each duration before the current measurement point is seen.

[0031] Point-by-point traversal refers to sequentially treating each conductivity measurement point as the current processing point according to its timestamp sequence. Starting from the second measurement point and continuing until the end of the sequence, the prior distribution of the running length is generated one by one. The initial measurement point is only used to initialize the belief state vector and does not require this step. For the current processing moment, the prior distribution of the running length is generated using the running length belief state vector retained after the recursive update at the previous processing moment. This prior distribution describes the subjective belief about the possible value of the running length of the current segment before the conductivity measurement point value at the current moment is observed. The generation process relies on a transition probability description structure, which is jointly defined by the segment continuation probability and the distribution mutation probability. The segment continuation probability represents the probability that the segment continues without mutation at the current moment if it has already run a given length at the previous moment; the distribution mutation probability is the complement of the segment continuation probability, representing the probability that a distribution mutation occurs at the current moment and the running length is reset to zero.

[0032] The transition probability description structure is organized using a discrete conditional probability form related to the run length: when the run length at the previous time step is a certain value, the probability that the run length at the current time step becomes that value plus 1 is equal to the segment continuation probability; the probability that the run length at the current time step abruptly becomes zero is equal to the distribution mutation probability; and the probability that the run length jumps to any other discontinuous value is zero. The prior distribution of the run length at the current time step is obtained by multiplying each component of the belief state vector at the previous time step by the segment continuation probability and shifting it forward by one index position, while simultaneously multiplying all components by the distribution mutation probability and summing the results to the zero-value run length component. The distribution mutation probability is set to a fixed constant that does not change with the run length. This constant is determined by prior estimation of the overall mutation frequency of data during normal operating periods, and its value is much smaller than the segment continuation probability, making the prior distribution of the complete run length biased towards segment continuation rather than frequent mutations under normal circumstances.

[0033] In an exemplary structure, the transition probability description structure can be:

[0034] ;

[0035] in, It represents the component with a duration of r in the prior distribution of the running length at the current time t, that is, the prior belief probability that the current segment has lasted for r measurement points before the current conductivity measurement point is observed;

[0036] The component with a duration of r' in the belief state vector of the running length at the previous time t-1 represents the posterior belief probability of the segment at the previous time after observing the previous measurement point, which has lasted for r' measurement points.

[0037] r represents the assumed duration of the current segment, which is the number of measurement points that have been reached consecutively since the most recent abrupt change in distribution.

[0038] r' represents the assumed duration of the segment at the previous time step;

[0039] r max This parameter represents the preset maximum segment duration, and it determines the dimension of the runtime belief state vector.

[0040] h represents the probability of a sudden change in the distribution, which is a preset fixed constant. It represents the probability that the data generation mechanism will fundamentally change at the current moment and the running length will be reset to zero. Its value is much smaller than the probability of fragment continuation.

[0041] 1-h represents the probability of segment continuation, that is, the probability that the data generation mechanism remains unchanged at the current moment and the running length naturally increases by 1.

[0042] Step S230: For each hypothetical duration in the prior distribution of running length, backtrack the corresponding historical conductivity measurement point subsequence based on the duration, extract its central level descriptor and scatter amplitude descriptor as the parameter representation of the data generation distribution, construct an observation compatibility description function with controllable tail decay, substitute the current conductivity measurement point into it to obtain the observation compatibility degree, traverse all hypothetical durations to form an observation compatibility degree vector, and perform zeroing on the components that are below the observation compatibility noise limit.

[0043] In an optional embodiment, step S230 may specifically include the following steps S231 to S236:

[0044] Step S231: For each hypothetical duration in the prior distribution of running length, determine the starting and ending measurement points of the corresponding historical conductivity measurement point subsequence. The starting measurement point is the position reached by tracing back from the current measurement point by the hypothetical duration plus an offset. If the tracing position exceeds the beginning of the sequence, it is truncated to the first measurement point, resulting in a set of multiple historical subsequences of unequal length.

[0045] For each non-zero hypothesis duration in the prior distribution, a historical data window needs to be defined to estimate the statistical parameters of the current segment. The right endpoint of the window is fixed at the time preceding the current measurement point. The starting point of the window is determined by backtracking the hypothesis duration plus a fixed offset from the current measurement point. If the backtracking distance exceeds the first point of the entire observation sequence, the left endpoint of the window is truncated to the starting point of the sequence. This operation ensures that for longer hypothesis durations, sufficient historical data can be backtracked to stably estimate the statistical parameters; while for shorter hypothesis lengths near the beginning of the sequence, even with insufficient data, a valid, albeit shorter, subsequence can be obtained. After this step, each hypothesis duration corresponds to a subsequence containing several consecutive historical conductivity measurement points.

[0046] Step S232: For each historical subsequence, determine whether the number of measurement points it contains reaches the minimum number of points required for reliable distribution estimation. If not, select the subsequence corresponding to the hypothesis that is adjacent to the current hypothesis in terms of duration and has a longer duration. Interpolate its distribution parameters according to the length ratio to generate a surrogate central level descriptor and a surrogate scatter amplitude descriptor for the current hypothesis.

[0047] A minimum point threshold is set to determine whether a subsequence contains enough information to robustly estimate its statistical parameters. For historical subsequences with fewer points than the threshold, instead of directly using their own data for parameter estimation, an auxiliary subsequence is found. This auxiliary subsequence corresponds to a hypothesis with a longer duration than the current hypothesis, and its length reaches the threshold. Using the concentration level descriptor and dispersion magnitude descriptor already successfully calculated for this auxiliary subsequence as anchors, and based on the proportional relationship between the length of the current hypothesis and the auxiliary hypothesis, surrogate concentration level descriptors and surrogate dispersion magnitude descriptors suitable for the current hypothesis are calculated through linear interpolation. This method ensures that each hypothesis has reasonable statistical parameter values ​​even in cases of sparse data.

[0048] Step S233: For a historical subsequence with a sufficient number of measurement points, perform an ordering of the measurement points within the subsequence, take the average level of the measurement point group in the middle region after the ordering as the central level descriptor, and take half of the span between the first and second quantiles after the ordering as the dispersion amplitude descriptor, thus obtaining the distribution parameter representation under the assumed duration.

[0049] When the length of the historical subsequence reaches a minimum point threshold, all conductivity measurements within that subsequence are sorted in ascending order. To robustly describe the central location of the data, a group of continuous measurements in the middle region, unaffected by extreme values, is extracted after sorting. The arithmetic mean of these points is calculated, and the resulting value is the lumped level descriptor, representing the typical level of conductivity data in that segment. To describe the dispersion of the data, a leading and a trailing quantile are selected in the ordered sequence, symmetrical about the median. The difference between the measurements corresponding to these two quantiles is calculated; this difference reflects the overall span of the data distribution. Dividing this difference by 2 yields the half-span value, which is the dispersion amplitude descriptor. This descriptor quantifies the breadth of data fluctuations in a robust manner to outliers.

[0050] Step S234: Construct an observation compatibility description function based on the lumped level descriptor and the scatter amplitude descriptor. The function takes the measurement point value as input and its output reaches the maximum compatibility level when the measurement point value is equal to the lumped level descriptor. As the measurement point value deviates from the lumped level descriptor, the output decays slowly at a rate negatively correlated with the scatter amplitude descriptor, and the decay curve maintains a non-zero tail at the far end.

[0051] The observation compatibility description function (OCM) serves as a bridge between statistical hypotheses and current actual observations. It takes a conductivity measurement as input and outputs a scalar fraction quantifying the probability that the measurement was generated by the data distribution described by the current hypothesis. The function curve is designed as a single-peaked, symmetric, non-negative function centered on the lumped level descriptor and controlled by the spread amplitude descriptor. The function output reaches its preset maximum value when the input value is exactly equal to the lumped level descriptor. As the input value deviates from the center, the function value begins to decay, and its decay rate is closely related to the spread amplitude descriptor: the larger the spread amplitude descriptor, the greater the fluctuation range of the data itself, and the smoother the function decays; conversely, the smaller the spread amplitude descriptor, the faster the decay. The function is designed not to return to zero in the tail region far from the center, but rather to maintain a very low but non-zero response level. This is to tolerate the extremely rare extreme observations and avoid overfitting problems where the probability value returns to zero in probabilistic inference, causing the entire hypothesis to be permanently rejected.

[0052] As an example, a compatibility description function can be:

[0053] ;

[0054] The parameters are explained below:

[0055] L(x t The ) indicates the degree of observation compatibility, i.e., the value x at the current conductivity measurement point. tThe degree to which the data distribution conforms to the assumed duration; a larger value indicates higher compatibility. t This indicates the specific value of the conductivity measurement point reached at the current time t;

[0056] μ represents the lumped level descriptor, which is calculated from the average level of the group of measurement points in the middle region of the historical conductivity measurement point subsequence traced back to the corresponding hypothesis duration. It represents the typical conductivity level of the data distribution under this hypothesis.

[0057] σ represents the dispersion magnitude, which is calculated from half the span between the first and second quantiles in the corresponding historical subsequence, and represents the degree of dispersion of the data distribution under this assumption.

[0058] k represents the preset tail attenuation control coefficient, which is used to adjust the sensitivity of the attenuation curve to the dispersion amplitude description, thereby controlling the rate at which the observation compatibility decreases as the deviation increases.

[0059] This represents a very small positive constant, used to ensure that the decay curve maintains a non-zero tail at the far end, thus preventing the entire hypothesis from being permanently excluded in probabilistic inference due to the probability value returning to zero.

[0060] Step S235: Input the current conductivity measurement point into the observation compatibility description function to obtain an observation compatibility value. This value quantifies the degree to which the current measurement point conforms to the data distribution pattern corresponding to the duration of the hypothesis. The value is between the upper and lower bounds.

[0061] At the current moment, the specific value of a conductivity measurement point to be processed is obtained, and this value is used as input into an observation compatibility description function constructed for a certain hypothesis duration. The output of the function is a real value within a preset upper and lower bound, which represents the observation compatibility of the current measurement point with the hypothesis. The magnitude of this value directly reflects the degree of conformity between the currently observed conductivity value and the data generation pattern expected by the hypothesis: the higher the value, the more the current point is generated from the statistical distribution corresponding to the hypothesis.

[0062] Step S236: Traverse all hypothesis durations, arrange the observation compatibility values ​​generated under each hypothesis in ascending order of hypothesis duration to form an observation compatibility vector, check each component in the vector, and forcibly set those components whose values ​​are below the preset observation compatibility noise limit to zero.

[0063] The duration of each hypothesis in the prior distribution of runtime is extracted one by one, and the observation compatibility of the current measurement point with respect to that hypothesis is calculated for each hypothesis. These calculated compatibility values ​​are then assembled into a floating-point vector with the same dimension as the prior distribution, arranged in ascending order of their corresponding hypothesis durations (i.e., ascending order of indices). This is the observation compatibility vector. Subsequently, each element in this vector is iterated, and its value is compared with the preset observation compatibility noise threshold from step S210. Any element value lower than this threshold is directly modified to 0. The purpose of this is to eliminate extremely low-probability hypotheses that are numerically almost impossible to generate the current observation from subsequent calculations, thereby improving the numerical stability and computational efficiency of probabilistic inference.

[0064] Step S240: The prior distribution of the run length is fused component by component with the observation compatibility vector that has been zeroed out. An updated posterior probability distribution of the run length is generated according to the Bayesian evidence synthesis rule. The updated distribution is used to replace the original belief state vector of the run length, so that the distribution probability of the belief state vector is concentrated towards the duration that is more consistent with the current observation.

[0065] The run-length prior distribution vector generated in step S220 is multiplied element-wise with the observation compatibility vector generated in step S236 after being zeroed. Each element of this product vector is proportional to the posterior probability under the corresponding run-length hypothesis. Then, all elements of the product vector are summed, and each element in the product vector is normalized by dividing the sum by this sum as the denominator. The new vector obtained after normalization, with the sum of all elements being 1, is the Bayesian-updated run-length posterior probability distribution. Finally, this newly calculated posterior distribution is used to overwrite and replace the previously stored run-length belief state vector, completing one recursive step from prior to posterior for state beliefs. This update process automatically shifts the belief quality towards run-length hypotheses that can well explain the current observations, while the probability quality of hypotheses that cannot explain the current observations decreases.

[0066] In one exemplary implementation, the Bayesian evidence synthesis rule can be implemented using the following formula:

[0067] ;

[0068] B t (r) represents the component with a duration of r in the updated posterior belief state vector of the current time t, that is, the posterior belief probability of the current segment having lasted for r measurement points after the current conductivity measurement point is observed.

[0069] This represents the component of duration r in the prior distribution of the running length at the current time t;

[0070] This represents the r-th component of the observation compatibility vector after being zeroed out in step S236, which corresponds to the observation compatibility when the current hypothesis duration is r. Components that are lower than the observation compatibility noise threshold have been forcibly zeroed out.

[0071] r' is the traversal index in the summation operation, and the traversal range is from 0 to the maximum segment length r. max ;

[0072] The denominator is a normalization factor, which is equal to the sum of the products of the prior probabilities corresponding to the durations of all hypotheses and the observation compatibility after zeroing, ensuring that the sum of all components of the updated belief state vector is 1.

[0073] Step S250: Detect the posterior probability value of the updated running length posterior probability distribution on the continuous length zero component. When the value exceeds the mutation confirmation belief limit and shows a continuous upward trend compared with the zero component probability at previous times, mark the current conductivity measurement point as the distribution mutation point, record the time of mutation, and reset the running length belief state vector to the initial state.

[0074] After the state update is completed in step S240, the probability values ​​of the components with an index of zero in the updated run-length belief state vector are checked. This value represents the probability of a distributional abrupt change occurring at the current moment. This value is compared with the abrupt change confirmation belief threshold preset in step S210, while maintaining a historical record of the zero component probability for several recent moments to determine its trend. Only when the zero component probability at the current moment not only exceeds the threshold but also shows a monotonically increasing trend with at least several consecutive points when compared with the historical record, is the occurrence of a distributional abrupt change finally confirmed. This dual confirmation mechanism can effectively prevent misjudgments caused by single-point noise. After confirming the abrupt change, the timestamp of the conductivity measurement point is recorded as the moment the abrupt change occurred, and a state reset is immediately performed: the run-length belief state vector is restored to the initial state described in step S210, i.e., the zero component probability is 1 and the other components are 0, thus preparing for the sequential inference of the next new segment.

[0075] Step S260: Divide the conductivity measurement point sequence between two adjacent mutation times into a normal measurement segment. Arrange the conductivity measurement points within each normal measurement segment in order. Extract the position descriptor, scattering descriptor, morphological bias descriptor, and self-dependency descriptor from the ordered sequence. Combine them to form the distribution morphological description information of the normal measurement segment. The distribution morphological description information of all normal measurement segments constitutes the normal segment distribution morphological description information set.

[0076] In an optional embodiment, step S260 may specifically include the following steps S261 to S266:

[0077] Step S261: Arrange the conductivity measurement points within the normal measurement segment in ascending order of value to generate an ordered conductivity measurement point sequence, and record the measurement point values ​​in the sequence that are in the set low quantile, middle quantile, and high quantile order.

[0078] For a normal measurement segment defined by a pair of adjacent mutation points detected in step S250, all conductivity measurement points in the original acquisition sequence within the segment are extracted. Ignoring their original time order, they are arranged in ascending order only according to their numerical values ​​to form a sequenced conductivity measurement point sequence. In this ordered sequence, based on preset quantile ratio parameters, three representative positions are found: the low quantile order representing the lower boundary of the data, the middle quantile order representing the trend of the data center, and the high quantile order representing the upper boundary of the data. The specific conductivity values ​​at these three quantile positions are recorded.

[0079] Step S262: Take the measurement points located between the low quantile and high quantile in the ordered sequence to form the central trunk, and calculate the average level of the measurement points in the central trunk as the position descriptor. This position descriptor reflects the typical conductivity level of the segment.

[0080] A subsequence is extracted from the ordered sequence, between the low quantile and high quantile positions. This subsequence, after removing potential outliers at both ends, constitutes the central trunk data of this normal measurement segment. The arithmetic mean of all measurement points included in the central trunk is calculated, and the resulting average value is the location descriptor. This descriptor accurately characterizes the typical conductivity level of this segment in a manner resistant to outlier interference.

[0081] Step S263: The difference between the high quantile measurement point value and the low quantile measurement point value is used as the dispersion descriptor. This dispersion descriptor indicates the degree of concentration or openness of the distribution of measurement points within the segment. The smaller the difference, the more concentrated the distribution.

[0082] The numerical difference between the high quantile and low quantile measurement points obtained in step S261 is directly calculated, and the absolute value of this difference is directly used as the dispersion descriptor. The larger the dispersion descriptor, the wider the range of conductivity measurement points within the segment and the greater the dispersion; conversely, the smaller the dispersion descriptor, the more concentrated the distribution of measurement points.

[0083] Step S264: Compare the distance from the position descriptor to the lower quantile measurement point with the distance from the higher quantile measurement point to the position descriptor. Determine the morphological skew descriptor based on the sign and magnitude of the distance difference. A positive value indicates that the distribution extends to the right, and a negative value indicates that it extends to the left. The magnitude reflects the degree of skewness.

[0084] Calculate two distances separately: the upper quartile distance (interquartile range), which is the value of the higher quartile measurement point minus the positional descriptor; and the lower quartile distance, which is the positional descriptor minus the value of the lower quartile measurement point. Then, subtract the lower quartile distance from the upper quartile distance, and the resulting difference, after being scaled, is the morphological skew descriptor. If this descriptor is positive, it indicates that the data extends further at the higher values, showing a right-skewed distribution; if it is negative, it indicates that the data extends further at the lower values, showing a left-skewed distribution. Its absolute value reflects the degree to which the distribution shape deviates from perfect symmetry.

[0085] Step S265: Perform a time-step lag replication on the original measurement point sequence within the normal measurement segment to obtain the lag measurement point sequence. Compare the corresponding measurement points of the original sequence and the lag sequence pairwise to see if they deviate from their respective average levels in the same or opposite direction. Calculate the proportion of points in the same direction and convert it into a self-dependent descriptor. This descriptor represents the persistence of dependency between adjacent measurement points within the segment.

[0086] Extract the conductivity measurement point sequence arranged according to the original acquisition time within the normal measurement segment, and simultaneously generate a copy of this sequence. Shift the copy forward by one time step on the time axis to obtain the lag measurement point sequence. Align the first point of the original sequence with the second point of the lag sequence to form multiple pairs of adjacent measurement points. For each pair of measurement points, calculate the deviation direction of that point relative to the overall average of the segment. If the original point is above the average and subsequent lag points are also above the average, or both are below the average, they are marked as being in the same direction. Calculate the proportion of points in the same direction across all point pairs, and map this proportion to an unbounded real number range using a monotonic mapping function, such as the Fisher transform. The result is the autodependent descriptor. The larger this value, the more likely the measurements at adjacent times in the sequence are to maintain the same deviation direction, i.e., there is positive autocorrelation, and the stronger the inertia or persistence of the sequence.

[0087] Step S266: The location description, dispersion description, morphological tilt description, and self-dependent description are spliced ​​together in a preset order to form the distribution morphological description information of the normal measurement segment, and then merged into the normal segment distribution morphological description information set.

[0088] A fixed-length floating-point vector is created, and the position descriptors, scatter descriptors, morphological bias descriptors, and autodependent descriptors are sequentially filled into four consecutive positions of the vector. This vector represents the distribution morphology description information of a normal measurement segment, encoding the statistical characteristics of a segment into a structured numerical vector. Through the complete processing of steps S210 to S260, all normal measurement segments separated from the normal operating condition time period data are ultimately converted into such feature vectors, and the set of all vectors constitutes the set of normal segment distribution morphology description information.

[0089] Step S300: Obtain the environmental context marker synchronized with the acquisition time of each normal measurement segment. Divide the normal segment distribution morphology description information set into multiple domain groups based on the environmental context marker. Perform distribution difference elimination mapping processing on multiple domain groups. While eliminating the distribution differences between domains, maintain the internal structure of the distribution and generate a domain-invariant benchmark distribution description set. The domain-invariant benchmark distribution description set contains multiple distribution reference centers and corresponding distribution range boundaries.

[0090] In an optional embodiment, step S300 may specifically include the following steps S310 to S360:

[0091] Step S310: Obtain the fog conductive ion category marker, ambient temperature segment marker, and near-surface wind speed segment marker for each normal measurement segment from the environmental monitoring component deployed in conjunction with the conductivity sensing device. Concatenate these three discrete markers in sequence into an environmental context marker record and associate it with the distribution morphology description information of the corresponding normal measurement segment.

[0092] An environmental monitoring component integrating multiple environmental sensors is deployed near the insulator. This component can simultaneously collect fog samples and analyze them using ion chromatography to identify the dominant conductive ion type, such as chloride or sulfate ion dominance, and output a fog conductive ion category label. Simultaneously, the component integrates a thermometer, hygrometer, and an anemometer, which can map the average temperature within a corresponding time period to a preset ambient temperature range label, and the average wind speed to a preset near-surface wind speed range label, respectively. By reading the sensor records corresponding to each normal measurement segment, the three discrete values—fog conductive ion category label, ambient temperature range label, and near-surface wind speed range label—are concatenated into a single string using a fixed separator. This string serves as the environmental context label record for that segment, and is directly appended to the distribution morphology description information vector of that segment to establish a correlation.

[0093] Step S320: Traverse all normal measurement segments, using the environmental context marker record as the key, aggregate the distribution morphology description information with the same marker record into the same domain grouping container, and finally generate several domain groups, so that the distribution morphology description information in the same domain group is collected under the same external environment combination.

[0094] A hash map is created to organize all normal measurement segments. Each normal measurement segment is processed one by one, and the associated environmental context marker record string is extracted. This string is used as the key to look up the data in the hash map. If the key does not exist, a new domain grouping container is created in the table, and the distribution morphology description information vector of the current segment is stored in the container. If the key already exists, the vector is directly appended to the corresponding container. After all segments have been processed, each entry in the hash map represents a domain group. Each domain grouping container contains the distribution morphology description information of all normal measurement segments collected under the same combination of ion class, temperature range, and wind speed range.

[0095] Step S330: For the distribution pattern description information within each domain group, scale each component to a uniform numerical scale according to the statistical characteristics of each dimension to obtain standardized distribution pattern description information, and save the scaling reference parameters of each dimension; randomly select two domain groups from all domain groups to form a pair, treat the standardized distribution pattern description information within the pair of domain groups as two point sets respectively, calculate the distribution separation degree between the two point sets through the distribution distance metric that is sensitive to distribution offset but not sensitive to outliers, traverse all domain group pairs, and fill the calculated distribution separation degree values ​​into a two-dimensional array to obtain the inter-domain distribution separation degree array.

[0096] Standardization is performed independently within each domain group. For all distribution pattern description vectors within a given domain group container, each dimension of the vectors is traversed. In each dimension, the median and interquartile range (IMR) of all vector components are calculated. Then, using the median as the positional reference and the IMR as the scaling reference, subtraction centering and division scaling operations are performed on all components of that dimension to ensure the processed data has a uniform scale along that dimension. The median and IMR of each dimension are persistently stored as scaling reference parameters. After this step, all original distribution pattern descriptions are converted into standardized distribution pattern descriptions.

[0097] The inter-domain distribution separation array is a square matrix with domain group numbers as rows and columns. For any two different domain groups, their internal normalized vectors are treated as two multi-dimensional point sets. Energy distance is used as the distribution distance metric to calculate the degree of distribution separation between these two point sets. The energy distance is calculated by: calculating the average Euclidean distance between all point pairs between the two sets, then subtracting half of the average Euclidean distance between point pairs within each set. The final output is a non-negative scalar; the larger the value, the greater the difference in distribution patterns between the two domain groups. The calculated value is then filled into the corresponding row and column cells in the array. This process is repeated for all domain group pairs, ultimately forming a symmetric inter-domain distribution separation array.

[0098] Step S340: Construct a processing pipeline consisting of a multi-level transformation layer and an end-domain discrimination layer. Input the standardized distribution morphology description information into the transformation layer in sequence. Perform orientation rotation and shape reshaping operations on each layer and output a transition vector. The end-domain discrimination layer receives the transition vector and provides its domain origin inference. Using the inter-domain distribution separation array as a reference, the domain discrimination error of the transition vector output by the transformation layer on the domain discrimination layer is continuously increased by updating the parameters of the transformation layer and the domain discrimination layer in turn.

[0099] In an optional embodiment, step S340 may specifically include the following steps S341 to S345:

[0100] Step S341: Construct a stack of transformation layers, using the standardized distribution morphology description information as the initial input. Each transformation layer contains a linear mapping sublayer and a nonlinear activation sublayer. The linear mapping sublayer rotates and scales the input vector, and the nonlinear activation sublayer reshapes the mapping result. The output of the previous transformation layer is used as the input of the next transformation layer, and the final layer outputs a transition vector.

[0101] The transform layer stack is a feedforward deep network structure consisting of several structurally identical but parameter-independent transform layers connected in series. The input data for each transform layer first enters a linear mapping sublayer, which is essentially a fully connected network layer maintaining a learnable weight matrix and a bias vector. The input vector is multiplied by the weight matrix, and the result is added to the bias vector. This operation is geometrically equivalent to performing a linear transformation with translation on the space containing the original input vector, specifically a rotation of direction and scaling. The output of the linear mapping sublayer is then fed into a nonlinear activation sublayer. This sublayer uses a leaky rectified linear unit as its core, independently and nonlinearly reshaping the shape of each component of the input vector, enabling the network to learn and express complex mapping relationships beyond linear transformations. The output vector after the activation sublayer is the output of that transform layer and also serves as the input to the next transform layer. The normalized distribution shape description information enters from the first transform layer, undergoes multiple successive transformations, and finally outputs a transition vector with the same dimension as the input from the last transform layer.

[0102] Step S342: After stacking the transform layers, add a domain discrimination layer. The domain discrimination layer receives the transition vector and outputs the possible scores for each domain group through multiple fully connected layers and the final branch to obtain the domain affiliation tendency vector.

[0103] The domain discrimination layer is structurally similar to a multilayer perceptron classifier, immediately following the stack of transformation layers. It receives the transition vector output from the stack of transformation layers as its input. This layer contains several fully connected layers, each performing linear mapping and non-linear activation operations to progressively extract high-level semantic features relevant to domain classification. The last fully connected layer is followed by an output branch, the dimension of which is strictly equal to the total number of domain groups. Each component of the output vector represents a raw score indicating that the input transition vector is classified into its corresponding domain group. A flexible maximum transfer function is applied after the output branch to transform the score vector into a domain affiliation propensity vector, where each element represents the probability that the current input belongs to the corresponding domain group.

[0104] Step S343: Extract the guidance signal from the inter-domain distribution separation array, construct the adversarial learning target, which includes the loss term for the domain discrimination layer to correctly distinguish the transition vector and the alignment term between the inter-domain distribution separation array and the current transition vector distribution separation, and jointly drive the parameter update.

[0105] For example, a composite loss function for guiding parameter updates is constructed, consisting of two parts. The first part is the domain-discrimination loss term, which penalizes the domain-discrimination layer for misclassifying the domain origin of the transition vector. This is quantified by calculating the cross-entropy loss between the domain-attribution tendency vector output by the domain-discrimination layer and the true domain grouping label. The second part is the distribution alignment loss term, which guides the distribution structure of the transition vector output by the transform layer to align with the target distribution relationship described by the inter-domain distribution separation array pre-calculated in step S330. In each training mini-batch, the inter-domain distribution distance between each pair of transition vectors corresponding to these samples is calculated, forming a real-time distribution separation matrix. Then, the sum of squares of the element-wise differences between this real-time matrix and the corresponding sub-blocks in the pre-calculated target inter-domain distribution separation array is calculated as the distribution alignment loss term. The overall adversarial learning objective is the weighted sum of the domain-discrimination loss term and the distribution alignment loss term.

[0106] Step S344: Execute the parameter alternation update process. In the first stage, freeze the transformation layer parameters and update the domain discrimination layer parameters using the current transition vector and domain label to improve domain resolution. In the second stage, freeze the domain discrimination layer parameters and update the transformation layer parameters to increase the error rate of the transition vector being resolved by the domain discrimination layer. At the same time, apply the distribution structure preservation constraint. The distribution structure preservation constraint is achieved by selecting a batch of standardized distribution shape description information, calculating the relative distance array between each pair of them, and similarly calculating the relative distance array of the corresponding transition vector. The deviation of the corresponding elements of the two arrays is constrained to be within a preset tolerance range. If it exceeds the range, a correction is applied.

[0107] The model training employs a phased, alternating optimization strategy. Each training epoch consists of two phases. The first phase aims to train the domain discrimination layer to become a stronger domain classifier. In this phase, all learnable parameters of the transform layer stack are frozen. A batch of standardized distribution morphological description information is randomly sampled from a domain group, input into the transform layer to obtain a transition vector, and then fed into the domain discrimination layer. The domain discrimination loss term is calculated, and the weights and biases of the fully connected layers in the domain discrimination layer are updated using an adaptive moment estimation optimizer. The second phase aims to train the transform layer to generate transition vectors that can confuse the domain discrimination layer. In this phase, all parameters of the domain discrimination layer are frozen. A batch of data is sampled again, the transition vector is obtained through the transform layer, and then fed into the frozen domain discrimination layer. The domain discrimination loss term is calculated here, but the optimization objective is to maximize this loss. This is achieved by reversing the gradient direction to update the parameters of the transform layer, thereby increasing the classification error rate of the domain discrimination layer.

[0108] Simultaneously, a distribution structure preservation constraint is applied in the second stage. For the standardized distribution morphology description information within the same batch, the Euclidean distance between all pairs of vectors is calculated, forming a relative distance array; for the transition vectors corresponding to this batch of data, the Euclidean distance between each pair is also calculated, forming another relative distance array. A penalty term is constructed, which activates a secondary penalty when the deviation of element values ​​at corresponding positions in the two arrays exceeds a preset tolerance range. This forces the parameters of the transform layer to be updated in the confusion domain discrimination layer without excessively distorting the relative geometric structure between the original data points.

[0109] Step S345: Alternately repeat the above two stages. After each round, evaluate the accuracy of the domain discrimination layer in grouping the validation domain. When the accuracy falls within the range that is not significantly different from random guessing, stop alternating and stack the transformation layers at this time to fix them as a re-expression pipeline to eliminate environmental domain differences.

[0110] During training, the two phases described in step S344 are continuously iterated. After each complete alternating update, the current model pipeline is evaluated using a set of validation domain group data that was not used in training. During evaluation, all parameters are frozen, validation data is input into the pipeline, and the classification accuracy of the domain discrimination layer on the validation samples is calculated. This accuracy is compared with a theoretical random guess probability, which is equal to 1 divided by the total number of domain groups. When the classification accuracy of the domain discrimination layer consistently hovers around the random guess probability across multiple evaluation epochs, and statistical tests show no significant difference between the two, it indicates that the transformation layer stack has successfully mapped the distributions of different domains to a common space, making it impossible for the domain discrimination layer to infer its source domain from the transition vector. At this point, the training process stops, and the current network structure of the transformation layer stack and the parameters of all layers are completely fixed and preserved. This parameter-fixed network model is the re-expression pipeline for eliminating environmental domain differences.

[0111] Step S350: During the alternating update process, a structure preservation constraint is also applied to the transition vector. This constraint measures the difference between the relative distance between the transition vectors and the relative distance between the original standardized distribution pattern description information. By limiting the difference within a preset tolerance range, it is ensured that the transformation does not destroy the distribution structure inside the data. When the domain discrimination layer’s domain discrimination accuracy for the transition vector drops to the random guessing range, the update is stopped, and the transition vector at this time is used as the re-expression description vector.

[0112] In the second stage of alternating optimization, in addition to the adversarial loss, the structure preservation constraint acts directly on the output of the transform layer as a regularization term. This constraint quantifies the bias by calculating the ratio of the median Euclidean distance between each pair of normalized distribution morphological descriptions within a mini-batch to the median Euclidean distance between each pair of corresponding transition vectors, and constrains this ratio to fall within a preset tolerance range. This eliminates domain-specific information while maximally maintaining the relative distribution structure within the data determined by the changes in the insulation state itself. When training reaches the stopping condition of step S345, all subsequent new input normalized distribution morphological descriptions are processed through this fixed re-representation pipeline network for a forward computation, and the output transition vector is defined as the re-representation description vector.

[0113] Step S360: Use all re-expressed description vectors as sample points, perform multi-level density partitioning, extract multiple distribution reference centers and their corresponding distribution range boundaries, and construct a domain-invariant baseline distribution description set containing several distribution reference centers and range boundaries representing normal distribution patterns.

[0114] In an optional embodiment, step S360 may specifically include the following steps S361 to S366:

[0115] Step S361: Place all re-expression description vectors in the same space, calculate the proximity distance between each pair of vectors, and assign a local density value to each vector based on the proximity distance. The local density value is defined as the number of neighbor vectors within a preset proximity radius centered on the vector.

[0116] All re-expression description vectors obtained by mapping all normal measurement segments through the re-expression pipeline after training are considered as a set of points in a high-dimensional space. The Euclidean distances between all pairs of points in the set are calculated, forming a distance matrix. Then, the local density value is calculated for each point: a pre-defined neighborhood radius is determined as a distance threshold. For a target point, all other points in the set are traversed, and the number of points whose Euclidean distance to the target point is less than this neighborhood radius is counted. This count is the local density value of the target point. Points with high local density values ​​are usually located near the center of densely distributed regions.

[0117] Step S362: Sort the vectors hierarchically according to the magnitude of the local density values. Starting from the point with the highest density, mark it as the first candidate for distribution reference center. Then, along the direction of decreasing density, include vectors with achievable density and a density not lower than a preset ratio into the coverage of the candidate to obtain a coverage cluster. Define the coverage cluster as a distribution pattern.

[0118] All re-expression descriptive vectors are sorted in descending order of their local density values, and the point with the highest density is automatically marked as the first candidate distribution reference center. Starting from this candidate point, a density-based region expansion strategy is executed: all neighboring points reachable from this candidate point along the direction of decreasing density are found. Here, density reachability is a recursive concept—if point A is within the nearest radius of point B, and the local density of point A is not lower than a certain preset threshold of the density of point B, then point A is considered density reachable from point B. All points starting from the initial candidate point that meet the density reachability condition are continuously included, eventually forming a coverage cluster. This coverage cluster and all the points it contains are defined as a distribution pattern.

[0119] Step S363: When the boundary of the distribution pattern expands to a point where the local density is lower than the preset density valley threshold, stop the expansion of the distribution pattern, take the boundary of the distribution pattern at this time as the initial range boundary of the pattern, and remove the vectors in the distribution pattern from the set to be processed.

[0120] During the expansion process, the local density values ​​of newly attempted points are continuously checked. When the local density value of a neighboring point encountered at the expansion front falls below a preset density valley threshold, it indicates that the expansion has reached the density boundary of the distribution pattern—the sparse zone between two high-density regions. At this point, further expansion of neighbors in that direction is immediately stopped. All points with lower density that were not included in this expansion are temporarily retained in the pending set. Once the expansion of the distribution pattern reaches the valley in all directions and stops, the outer contour of the pattern is determined, forming the initial range boundary of the pattern. Subsequently, all points covered by the distribution pattern are removed from the pending point set and no longer participate in subsequent pattern extraction.

[0121] Step S364: Repeatedly search for the highest density point in the remaining vector and expand it into a new distribution pattern until the highest local density in the remaining vector is lower than the preset minimum pattern density requirement, then stop the extraction.

[0122] After removing the first distribution pattern, the same method is used to find the point with the highest local density in the remaining point set. This point is then used as a candidate new distribution reference center, and the expansion and boundary delimitation processes in steps S362 and S363 are repeated to generate a second distribution pattern. This iterative process continues, searching for density peaks and forming new patterns in the ever-decreasing remaining point set each time. When, in a certain iteration, the local density value of the point with the highest density in the remaining point set is lower than a preset minimum pattern density requirement, it indicates that the remaining points are discrete noise points or do not constitute any meaningful clustering pattern. At this point, the entire iterative extraction process terminates.

[0123] Step S365: Check whether there are overlapping areas between the preliminary range boundaries of each distribution pattern. For adjacent boundaries that overlap, divide the overlapping area into distribution patterns that are closer to the distribution reference center and have stronger density continuity by cutting along the density valley line, and generate flat and mutually exclusive final range boundaries.

[0124] After all distribution patterns have been extracted, the preliminary extent boundaries of any two patterns are examined. If geometric overlap is found in space, boundary arbitration is required. For each vector point within the overlap region, its affiliation is evaluated: the Euclidean distance from the point to the distribution reference centers of the two competing patterns is calculated, and the density continuity between the point and the main bodies of the two patterns is compared. The density continuity is evaluated by determining which pattern's reference center in the point and its neighboring regions can be reached via a continuous path with a density greater than the valley threshold. The overlapping point is assigned to the distribution pattern that is closer and has stronger density continuity. By performing this cropping on all overlapping points, the originally blurred and overlapping boundaries are refined into clear, mutually exclusive final extent boundaries.

[0125] Step S366: Assign a distinguishing label to the distribution reference center inside each final range boundary, and store the distinguishing label, the distribution reference center vector, and the final range boundary data together in the structure of the domain-invariant benchmark distribution description set to complete the construction.

[0126] Each valid distribution pattern identified through the preceding steps is assigned a unique integer code as a distinguishing marker. For each pattern, its three core pieces of information—the distinguishing marker, the distribution reference center vector (i.e., the vector coordinates of the initial seed point), and the final range boundary data describing the geometric boundaries of the pattern (defined by a set of parametric equations or boundary support vectors of the hyperplane)—are packaged into a data record. These records for all distribution patterns are aggregated and stored in a list-structured container, which constitutes a complete set of domain-invariant baseline distribution descriptions, characterizing all typical microstates and their boundaries presented by the normal operating condition data in the re-representation space after eliminating environmental influences.

[0127] Step S400: The real-time conductivity measurement point sequence carrying the identifier of the time period to be monitored, together with the domain-invariant benchmark distribution description set and the re-expression pipeline obtained by the distribution difference elimination mapping process, are input into the sequential dual-channel decision unit. The sequential dual-channel decision unit performs online segmentation of the real-time conductivity measurement point sequence to obtain real-time measurement segments and their distribution morphology description information. The distribution morphology description information is converted into a real-time re-expression description vector through the re-expression pipeline. Based on the real-time re-expression description vector and the domain-invariant benchmark distribution description set, a real-time cumulative offset sequence is generated through the first channel, and a real-time sequence of change point posterior probability is generated through the second channel.

[0128] In an optional embodiment, step S400, generating a real-time sequence of accumulated offset via the first channel, may specifically include the following steps S410 to S470:

[0129] Step S410: Standardize the distribution morphology description information of the real-time measurement segment using scaling reference parameters of each dimension to obtain standardized real-time distribution morphology description information. Input the standardized real-time distribution morphology description information into the re-expression pipeline obtained by the distribution difference elimination mapping process to obtain the real-time re-expression description vector.

[0130] After entering the online monitoring phase, for a real-time measurement segment segmented online, its distribution morphology description information is extracted. Using the scaling reference parameters (position reference and scale reference) saved for each dimension in step S330, the same standardization operation as during training (subtracting the median and dividing by the interquartile range) is performed on each component of the current segment's distribution morphology description information to generate standardized real-time distribution morphology description information. This vector is then fed into the re-representation pipeline network trained and saved in step S345 for forward propagation computation. The vector output from the final layer of the network is the real-time re-representation description vector, which resides in the re-representation space that eliminates environmental domain differences.

[0131] Step S420: For each real-time re-expression description vector, calculate its distribution deviation from each distribution reference center in the domain-invariant baseline distribution description set, select the distribution reference center with the smallest deviation as the current comparison reference point, and record the smallest deviation.

[0132] The domain-invariant baseline distribution description set stores multiple distribution reference centers representing normal operating condition distribution patterns. When a real-time re-expression description vector is generated, the Euclidean distance between this vector and each distribution reference center vector in the description set is calculated, and this Euclidean distance is used as a measure of the distribution deviation. After traversing all distribution reference centers, the distribution reference center with the smallest Euclidean distance is found and designated as the current comparison reference point, while this smallest Euclidean distance value is recorded.

[0133] Step S430: Compare the real-time re-expression description vector with the current alignment reference point one by one in each dimension to generate a single offset description vector. Each dimension of this vector corresponds to the offset direction and offset magnitude in a dimension.

[0134] The real-time re-expression description vector is subtracted dimension-wise from the current alignment reference point vector determined in step S420. The result of the subtraction forms a difference vector with the same dimensions as the re-expression vector, which is the single-shift description vector. Each component of this vector contains the direction of the shift (indicated by the sign) and the magnitude of the shift (indicated by the absolute value) in the corresponding dimension, fully depicting the shift of the current real-time segment's distribution pattern relative to its closest normal pattern in each statistical feature dimension.

[0135] Step S440: For each dimension of the single offset description vector, determine whether its offset magnitude exceeds a pre-defined offset tolerance range for that dimension. If it exceeds, record the magnitude of the excess. If it does not exceed, set the excess value of that dimension to zero. Collect all non-zero excess values ​​to form the comprehensive offset for this round.

[0136] For each dimension of the single offset description vector, an independent offset tolerance range is pre-defined. This range is typically a symmetrical numerical range centered at zero, and its half-width is statistically determined by the historical fluctuation range of that dimension in normal segments. For each dimension component of the single offset description vector obtained in step S430, check whether its absolute value is greater than the corresponding offset tolerance range half-width. If it is greater, it indicates that the offset amplitude in that dimension has exceeded the normal fluctuation range, and the specific value of the excess part is recorded; if it is less than or equal to, the over-amplitude contribution of that dimension is considered zero. All non-zero over-amplitude contribution values ​​are summarized, and their weighted sum or the maximum over-amplitude value is taken to obtain the comprehensive offset of this round. This scalar comprehensively reflects the degree of structural deviation of the current real-time segment from the closest normal pattern in terms of overall distribution.

[0137] Step S450: Introduce the historical cumulative offset memory. If the current round's comprehensive offset is not zero, add it to the current value in the historical cumulative offset memory. If the current round's comprehensive offset is zero, apply a decay process to the historical cumulative offset. The decay rate increases with each consecutive round that is zero.

[0138] A persistent historical cumulative offset memory is maintained, initially set to zero. Each time a new round's composite offset is calculated, two different update operations are performed depending on whether it is zero. If the composite offset is not zero, it indicates a detectable offset in the current segment, and the non-zero value is directly added to the current cumulative value in the historical cumulative offset memory. If the composite offset is zero, it indicates no out-of-bounds offset was detected in the current segment. In this case, instead of immediately clearing the cumulative value to zero, an exponential decay is applied to the current cumulative value in the memory. The decay coefficient is a positive number less than 1, and the decay strength increases progressively with the number of consecutive rounds with zero offsets, ensuring that the cumulative offset smoothly decreases under continuous normal conditions, preventing accidental clearing to zero due to occasional normal segments.

[0139] Step S460: Check whether the historical cumulative offset has remained below the preset quiescent level in multiple consecutive real-time measurement segments. If so, perform controlled migration on the current alignment reference point, move it by a limited step in the direction pointing to the real-time re-expression description vector, and reset the historical cumulative offset.

[0140] In an optional embodiment, step S460 may specifically include the following steps S461 to S466:

[0141] Step S461: Continuously track the value of the historical cumulative offset and maintain a dormant counter. Whenever the updated value of the historical cumulative offset is less than the preset dormant threshold, the dormant counter increments. Once the historical cumulative offset exceeds the threshold, the dormant counter is reset to zero.

[0142] For example, a near-zero dormancy threshold can be set. After each update of the historical cumulative offset memory, the updated cumulative value is compared with the dormancy threshold. If the cumulative value is less than the threshold, it indicates that the current real-time state is highly consistent with the normal mode it is comparing with, and it has entered a stable dormancy period. At this time, the dormancy counter is incremented by 1. If the cumulative value is greater than or equal to the threshold, it indicates that there are still perceptible offset fluctuations, and it has not yet entered a stable dormancy state. The dormancy counter is immediately reset to zero.

[0143] Step S462: When the count value of the silencing counter reaches the adjustable minimum silencing dwell requirement, the current alignment reference point is set as a transferable marker, and the real-time re-expression description vector obtained by mapping the current real-time measurement fragment through the re-expression pipeline is recorded as the transfer target.

[0144] Specifically, a minimum dormancy requirement can be preset, i.e., a threshold for the number of consecutive dormant cycles. When the accumulated count of the dormancy counter reaches this threshold, it means that for a sufficiently long period of time, the real-time data distribution shows a continuous and stable match with the normal pattern represented by the current alignment reference point. At this point, the currently used alignment reference point is marked as a transferable state, and the most recently calculated real-time re-expression description vector in a dormant state is recorded as the transfer target. The purpose of this operation is to allow the alignment reference point to slowly follow and adapt to the evolution of the normal pattern when the gradual changes in the real-time operating environment cause a slight drift in the normal baseline.

[0145] Step S463: Generate a direction vector from the current comparison reference point to the migration target, calculate the spatial distance between the two, and normalize the direction vector to obtain the unit direction.

[0146] Subtract the corresponding dimension component of the current transferable reference point vector from each dimension component of the recorded target vector to obtain a direction vector pointing towards the target. Calculate the Euclidean length of this direction vector to obtain the spatial distance between the current reference point and the target. Then, divide each component of the direction vector by this spatial distance to perform normalization, resulting in a unit direction vector of length 1. This vector retains only the pure directional information from the reference point to the target.

[0147] Step S464: Based on the preset upper limit of single migration stride, truncate the spatial distance. If the spatial distance exceeds the upper limit of stride, then set the current movement distance as the upper limit of stride; otherwise, set it as the spatial distance to obtain the restricted movement vector.

[0148] For example, a preset upper limit for a single migration step is used to limit the maximum magnitude of each update of the reference point, preventing drastic jumps in the comparison reference due to excessively large single migration amounts. The spatial distance calculated in step S463 is compared with this upper limit: if the spatial distance is less than or equal to the upper limit, the reference point is allowed to move directly to the migration target location, and the limited movement distance is the spatial distance; if the spatial distance is greater than the upper limit, the reference point is only allowed to move along the direction by the upper limit, and the limited movement distance is the value of the upper limit. The unit direction vector is multiplied by the limited movement distance to obtain the limited movement vector.

[0149] Step S465: Move the current comparison reference point a distance specified by the restricted movement vector along the unit direction to obtain the updated comparison reference point. At the same time, reset the historical cumulative offset to the initial value, reset the dormant counter to zero, and remove the migrateable mark.

[0150] Each component of the current comparison reference point vector is added one by one to the corresponding component of the restricted movement vector to obtain the updated comparison reference point vector. This new vector is stored in the domain-invariant reference distribution description set, replacing the original comparison reference point. Next, the historical cumulative offset memory is cleared and reset, the dormant counter is set to zero, and the migrated flag set in step S462 is canceled. The entire migration process is complete, and the first channel enters the next round of cumulative offset monitoring with the new reference point as the reference.

[0151] Step S466: During the multiple migrations of the benchmark point, monitor the changes in the migration direction. If the migration direction is detected to alternate between adjacent migrations, automatically reduce the upper limit of the single migration step size to reduce the oscillation amplitude of the benchmark point near the boundary of the two distribution patterns.

[0152] Record the direction vector of each migration of the benchmark point. Before each migration, retrieve the direction vectors from the most recent migration records and calculate the cosine of the angle between adjacent migration directions. If an alternating positive and negative oscillation pattern is found, i.e., a significant reversal in migration direction between two migrations, it indicates that the benchmark point may be located at the boundary between two adjacent distribution patterns. The conventional step size upper limit may cause it to jump back and forth on both sides of the boundary. In this case, the upper limit of the single migration step size for subsequent migrations is automatically multiplied by a decay factor less than 1 to reduce the single movement amount, allowing the benchmark point to gradually converge to a stable equilibrium position with finer step sizes, avoiding continuous oscillation.

[0153] Step S470: After each update of the historical cumulative offset memory, retrieve the current value from the memory, record it in chronological order to obtain a continuously updated real-time sequence of cumulative offsets, and push the sequence to the dual-condition coupling evaluation stage.

[0154] Each time step S450 completes an update to the historical cumulative offset memory (whether by accumulation or decay), the updated current value of the memory is immediately read and recorded along with the timestamp of the corresponding real-time measurement segment into a time-series record that grows sequentially. This sequence, which continues to extend as real-time segments arrive, is the real-time cumulative offset sequence. This sequence is continuously pushed to the dual-condition coupling evaluation stage in the subsequent step S500 as the decision input for the first channel.

[0155] In an optional embodiment, step S400, generating a real-time sequence of the posterior probability of the change point via the second channel, may specifically include the following steps S410 to S470:

[0156] Step S480: Maintain a sequence probability inference process that runs synchronously with the first channel in the second channel. This process has its own current running length belief set. Each element in the set corresponds to a hypothesis of the current segment duration and its belief strength.

[0157] The second channel operates independently of the first channel, but its input data stream is completely synchronized with the first channel, both originating from the real-time measurement segment segmentation results of the same sequential dual-channel decision unit. Within the second channel, a running length belief state vector with the same structure as step S210 is initialized and maintained; that is, a one-dimensional array with a length equal to the preset maximum segment duration plus 1. Each element at each index position corresponds to a hypothetical current segment duration, and the stored value represents the posterior belief strength of that duration hypothesis based on the currently observed real-time measurement segment evidence. At the start of monitoring, this belief set is initialized to an initial state where the probability of the zero-index component is 1, and the probability of the remaining components is 0.

[0158] Step S490: Whenever a distribution pattern description of a real-time measurement segment is generated, it is first standardized by using the saved scaling reference parameters of each dimension to obtain standardized real-time distribution pattern description information. Then, the standardized real-time distribution pattern description information is input into the re-expression pipeline to obtain a real-time re-expression description vector. Then, it is compared with the comparison reference point after controlled migration update to generate a distribution anomaly salience quantity. This distribution anomaly salience quantity quantifies the degree to which the current distribution deviates from the normal pattern represented by the current reference point.

[0159] Whenever the sequential dual-channel decision unit cuts out a new real-time measurement segment online and extracts its distribution morphology description information, the second channel synchronously receives this information. First, using the scaling reference parameters of each dimension saved in step S330, the distribution morphology description information is standardized to generate standardized real-time distribution morphology description information. Then, this standardized vector is input into the re-expression pipeline constructed in step S345 to obtain the real-time re-expression description vector. Subsequently, the current alignment reference point vector updated by controlled migration in step S460 in the first channel is retrieved, and the Euclidean distance between the real-time re-expression description vector and the alignment reference point vector is calculated. This distance value is defined as the distribution anomaly salience. The larger the value of the distribution anomaly salience, the more significant the deviation between the distribution morphology of the current segment and the normal pattern of the current reference; the closer the value is to zero, the higher the consistency between the two.

[0160] Step S4100: Construct an observation activation function using the distribution anomaly salience as input. When the distribution anomaly salience is significant, the activation function lowers the observation probability and pushes belief updates toward shorter running lengths. When the distribution anomaly salience is weak, the activation function outputs a higher observation probability, allowing beliefs to grow toward longer running lengths.

[0161] The distribution anomaly salience quantifies the deviation between the current real-time re-expression description vector and the current alignment reference point, specifically the Euclidean distance between them. A larger distance value indicates a more significant difference between the distribution pattern of the current real-time measurement segment and the aligned normal distribution pattern. The observation activation function maps this distance value to an observation likelihood between 0 and 1, used for subsequent Bayesian recursive updates.

[0162] To define the significance and weakness of distribution anomalies, a scale parameter can be preset. This scale parameter is statistically derived from the set of Euclidean distances between the re-expressed descriptive vectors of all normal operating condition segments and their respective distribution reference centers, and the 95th percentile of this distance set is taken as the value of the scale parameter. When the significance of a distribution anomaly generated by a single real-time input is greater than this scale parameter, it is determined that the significance of the distribution anomaly is significant; when the significance of the distribution anomaly is less than or equal to this scale parameter, it is determined that the significance of the distribution anomaly is weak.

[0163] During the Bayesian recursive update process in the second channel, the observation likelihood directly affects each non-zero component of the prior distribution of run length. When the salience of the distribution anomaly is significant enough to cause the observation likelihood to approach zero, the prior probabilities of all non-zero run length hypotheses are greatly compressed after multiplying by this minimum value, while the posterior probabilities corresponding to the components with zero run length after normalization increase relatively sharply. This drives the belief state to concentrate on shorter run lengths, indicating that the current moment is likely the starting point of a new segment. When the salience of the distribution anomaly is slight enough to cause the observation likelihood to approach 1, the prior probability structure is basically preserved, the long run length hypothesis is not forcibly weakened by this observation, and the belief state continues and naturally grows towards a longer run length.

[0164] For example, as a schematic observation activation function, it can be:

[0165] ;

[0166] in, This represents the observation likelihood, which is the probability of observation used to update the belief set of run length in the second channel. It takes a value between 0 and 1. When the distribution anomaly is significant, this value is lowered, pushing belief updates to concentrate on shorter run lengths.

[0167] d t The distribution anomaly salience is represented by the Euclidean distance between the current real-time re-expression description vector and the current alignment reference point after controlled migration update. It quantifies the degree to which the current distribution deviates from the normal pattern represented by the current reference point. t The larger the value, the more significant the deviation.

[0168] The scale parameter is determined by the statistical upper quantile of the distance between the re-expression description vector of the normal operating condition segment and its respective comparison reference point. It is used to control the rate at which the observation likelihood decays as the salience of the distribution anomaly increases.

[0169] Step S4110: Update the current running length belief set by observing the output of the activation function. The update method follows Bayesian recursion to obtain the updated belief set. Extract the belief strength corresponding to the running length of zero as the original change point posterior probability.

[0170] For the runtime belief set maintained by the second channel, a Bayesian recursive update process similar to steps S220 to S240 of the first channel is executed. However, its observation likelihood is no longer given by the multi-hypothesis observation compatibility description function in step S234, but instead uniformly uses the output of the observation activation function constructed in step S4100. Specifically, the prior distribution of the runtime at the current moment is first generated based on the segment continuation probability and the distribution change probability. The prior distribution is then multiplied component by component by component of the observation activation function output value and normalized to obtain the updated runtime belief set. Then, the probability value stored on the component with index zero is directly read from the updated belief set. This value is the posterior probability of the distribution change point occurring at the current moment, defined as the original change point posterior probability.

[0171] Step S4120: Perform continuity regularization on the original change point posterior probability sequence generated at continuous time points, identify and remove isolated probability spikes caused by single-point perturbations, and fill in temporary missing information to generate a smooth change point posterior probability real-time sequence.

[0172] A median filter is applied to the raw posterior probability sequence of the change point output in step S4110. The median filter uses a sliding window of preset width, sorts the raw posterior probability values ​​within the window, and takes the median as the smoothed output value. This process effectively removes isolated spikes in the posterior probability sequence caused by occasional abnormal fluctuations in a single real-time measurement segment. Furthermore, for individual time-stamp probability value missing due to transient data loss or quality regression, the median filter can also smoothly fill in the missing values ​​using nearby valid values. The sequence after median filtering is the smoothed real-time posterior probability sequence of the change point, which is then transmitted to the dual-conditional coupling evaluation stage.

[0173] Step S4130: Output the smoothed real-time sequence of posterior probabilities of the change points and send it to the dual-conditional coupling evaluation stage for synchronous processing with the real-time sequence of cumulative offset.

[0174] The second channel, using the exact same timeline as the first channel, pushes the smoothed real-time sequence of the posterior probability of the change point generated in step S4120 one by one to the dual-conditional coupling evaluation stage in step S500. At this time, the dual-conditional coupling evaluation stage simultaneously receives the real-time sequence of the cumulative offset from the first channel and the real-time sequence of the posterior probability of the change point from the second channel. The two sequences are aligned one-to-one on the timestamps, providing complete two-dimensional information for joint decision-making.

[0175] Step S500: Apply cross-boundary monitoring and trend tracking in parallel to the real-time sequence of cumulative offset and the real-time sequence of posterior probability of change point. When the cumulative offset and the posterior probability of change point simultaneously meet their respective cross-boundary persistence conditions and trend conditions, it is determined that the distribution anomaly is established. Based on the offset amplitude classification and probability slope classification, the corresponding joint early warning level is searched in the preset early warning classification mapping structure to generate an insulation state early warning classification signal.

[0176] In an optional embodiment, step S500 may specifically include the following steps S510 to S560:

[0177] Step S510: Set the cumulative offset attention trigger limit for the real-time cumulative offset sequence, set the change point probability attention trigger limit for the real-time change point posterior probability sequence, and perform independent point-by-point scanning on the two sequences.

[0178] A positive cumulative offset attention trigger threshold is pre-set for the real-time cumulative offset sequence. This threshold value is determined by the high quantile of the historical fluctuation range of the cumulative offset corresponding to the normal operating condition segment. A change-point probability attention trigger threshold between 0 and 1 is pre-set for the real-time change-point posterior probability sequence. This threshold value is also determined by the high quantile of the historical fluctuation range of the change-point posterior probability corresponding to the normal operating condition segment. During online monitoring, whenever each of the two sequences updates a newest data point, the latest value is independently compared with the corresponding attention trigger threshold, performing a point-by-point scan.

[0179] Step S520: When the real-time cumulative offset sequence crosses the cumulative offset attention trigger limit upwards, if it does not fall back below the limit in several consecutive subsequent points, a cumulative offset cross-limit activation signal is generated, and its duration and the magnitude of exceeding the limit are recorded.

[0180] In an optional embodiment, step S520 may specifically include the following steps S521 to S526:

[0181] Step S521: Apply asymmetric sliding smoothing to the real-time cumulative offset sequence, using a narrower smoothing window for the rising segment to maintain response speed, and a wider smoothing window for the falling segment to delay the fallback, thereby generating a smoothed cumulative offset sequence.

[0182] Specifically, an asymmetric sliding window smoother is maintained to process the real-time cumulative offset sequence online. The smoother maintains two sliding windows of different widths: a narrower window with a shorter width and a wider window with a longer width. When processing each newly arrived cumulative offset data point, the local first-order difference sign of the current sequence is determined. If the current phase is rising, the arithmetic mean of the data within the narrow window is used as the smoothing output to maintain a rapid response to offset increases; if the current phase is falling, the arithmetic mean of the data within the wide window is used as the smoothing output to artificially slow down the rate of cumulative offset decline and avoid repeated reversals of the cross-boundary signal caused by short-term fluctuations. The processed sequence is the smoothed cumulative offset sequence.

[0183] Step S522: Compare the cumulative offset sequence with the cumulative offset trigger limit point by point. When the first point that exceeds the limit appears, record the moment as the start time of the cross-limit and start a cross-limit continuous timer.

[0184] Each point in the cumulative offset sequence generated in step S521 is compared with the cumulative offset attention trigger limit in chronological order. Once the cumulative offset value of a point exceeds the limit, that moment is immediately marked as the start of the cross-limit, and a cross-limit duration timer is started and set to 1.

[0185] Step S523: When each new point is reached, check whether the accumulated offset of the smoothing has fallen back below the limit. If it has, reset the cross-limit duration timer to zero and return to the monitoring state. If it has not fallen back, the cross-limit duration timer continues to accumulate.

[0186] After the boundary crossing begins, whenever a new data point is updated in the accumulated offset sequence, it is checked whether the smoothing value of the new point is still greater than the accumulated offset trigger limit. If the smoothing value falls below the limit, it indicates that the boundary crossing has failed to continue. The boundary crossing duration timer is immediately reset to zero, and the boundary crossing pending confirmation state is exited, returning to the normal monitoring state in step S521. If the smoothing value remains above the limit, the count value of the boundary crossing duration timer is incremented by 1.

[0187] Step S524: When the cumulative time of the cross-boundary duration timer reaches the preset minimum cross-boundary confirmation time, the cumulative offset cross-boundary signal is flipped from the pending state to the confirmation activation state, and the signal is locked.

[0188] A minimum cross-boundary confirmation duration is preset, which is the minimum count value that the cross-boundary duration timer needs to reach. When the count value of the cross-boundary duration timer accumulates to equal this minimum cross-boundary confirmation duration, the cross-boundary status of the accumulated offset switches from pending to confirmed activation. At this time, the accumulated offset cross-boundary activation signal is set to valid and locked, and even if the accumulated offset is subsequently smoothed and temporarily falls below the limit, this activation signal will not be immediately deactivated.

[0189] Step S525: In the confirmed active state, continuously calculate the time integral or average excess amplitude of the portion of the smoothed cumulative offset that exceeds the cumulative offset attention trigger limit, and use this as the basis for classifying the excess amplitude level.

[0190] After the cumulative offset cross-boundary activation signal is locked as valid, the positive difference between the subsequent smoothing cumulative offset sequence and the cumulative offset attention trigger limit is continuously tracked. The integral of this positive difference over time, or the average of this positive difference during the activation period, is defined as the excess amplitude. This excess amplitude is used for subsequent amplitude level classification.

[0191] Step S526: Confirm the activation status of the cumulative offset cross-boundary activation signal and the level of exceeding the amplitude limit to the subsequent AND gate logic and hierarchical lookup table.

[0192] After each update of the excess amplitude value, the current confirmed activation status of the accumulated offset cross-boundary activation signal and the excess amplitude level determined based on the preset segment into which the excess amplitude falls are sent to the AND gate logic link in step S540 and the hierarchical lookup table link in step S550.

[0193] Step S530: When the real-time sequence of the posterior probability of the change point crosses the attention trigger limit of the change point probability upward, if the subsequent sequence shows a continuous upward trend or remains at a high level without falling back quickly, a change point probability cross-limit activation signal is generated, and its upward slope is evaluated.

[0194] For the real-time sequence of the posterior probability of the change point after point-by-point scanning in step S510, the moment when it crosses the change point probability attention trigger boundary upwards is detected. After the crossing occurs, the signal is not activated immediately, but the observation continues for several subsequent consecutive points. Short sequence segments composed of these subsequent points are extracted, and their least squares linear regression slope is calculated. If the slope is positive and its absolute value exceeds a preset minimum slope threshold, or if the sequence value continues to remain in the high region above the trigger boundary without falling below it, then the upward trend of the posterior probability of the change point is determined to be valid, and the change point probability cross-boundary activation signal is set to effective. At the same time, the value of the linear regression slope is recorded as the upward slope.

[0195] Step S540: Input the cumulative offset cross-boundary activation signal and the change point probability cross-boundary activation signal into an AND gate logic circuit. When both are active at the same time and their respective durations exceed the corresponding minimum duration limits, output the distribution anomaly confirmation signal.

[0196] For example, an AND gate logic decision unit is constructed, whose two inputs are connected to the cumulative offset cross-boundary activation signal generated in step S520 and the change point probability cross-boundary activation signal generated in step S530, respectively. The AND gate logic unit continuously checks the current state of the two input signals. If and only if the cumulative offset cross-boundary activation signal is in a confirmed activation state and the change point probability cross-boundary activation signal is also in a valid activation state, it further checks whether the duration of both signals in the active state has exceeded their respective preset minimum duration limits. If these two conditions are met simultaneously, the AND gate logic unit outputs a distribution anomaly confirmation signal, indicating that a credible anomalous distribution change has occurred in the current insulation state through dual cross-verification from the cumulative offset dimension and the change point probability dimension.

[0197] Step S550: When the distribution anomaly confirmation signal is output, determine the offset amplitude level label according to the interval where the cumulative offset exceeds the limit amplitude, and determine the probability slope level label according to the interval where the posterior probability rise slope of the change point is located.

[0198] Simultaneously with outputting the distribution anomaly confirmation signal in step S540, the cumulative offset exceeding amplitude value calculated in step S525 is read. This exceeding amplitude value is compared with multiple preset segment boundaries, dividing the data into several continuous intervals from low to high. Each interval is assigned a unique integer offset amplitude level label; the interval in which the exceeding amplitude value falls corresponds to that label. Simultaneously, the rising slope value recorded in step S530 is read, and the slope value is compared with multiple preset slope segment boundaries, similarly dividing the data into several continuous intervals from gentle to steep. Each interval is assigned a unique integer probability slope level label.

[0199] Step S560: Use the offset amplitude level label and the probability slope level label as a joint query key to search a pre-configured two-dimensional early warning level lookup table, retrieve the corresponding joint early warning level code, and bind the code with the current timestamp to form an insulation state early warning level signal.

[0200] In an optional embodiment, step S560 may specifically include the following steps S561 to S566:

[0201] Step S561: Divide the cumulative offset excess amplitude into several segments from low to high, assign a unique offset amplitude level label to each segment, and divide the slope of the change point posterior probability increase from gentle to steep into several segments, assigning a unique probability slope level label.

[0202] Based on the experience of operations and maintenance experts and statistical analysis of historical anomalies, the possible values ​​of cumulative offset exceeding the allowable range are divided into several discrete segments, such as slight offset segments, significant offset segments, and severe offset segments, each assigned an offset magnitude level label arranged from smallest to largest. Similarly, the possible values ​​of the slope of the posterior probability of the change point are divided into a slow-rise segment, a medium-speed rise segment, and a steep rise segment, each assigned a probability slope level label arranged from smallest to largest. The boundaries of these segments are fixed as configuration parameters.

[0203] Step S562: Create a two-dimensional lookup table with the horizontal axis representing the offset magnitude level label and the vertical axis representing the probability slope level label. Each cell in the table is filled with a preset joint warning level code, with the level code gradually transitioning from a level indicating minor concern to a level indicating emergency response.

[0204] Construct a two-dimensional matrix lookup table. The rows of the matrix correspond to the probability slope level labels defined in step S561, and the columns correspond to the offset amplitude level labels. Each cell in the matrix is ​​filled with a joint warning level code representing the severity of the insulation status warning. The level codes are arranged according to the following principles: the higher the offset amplitude level and the higher the probability slope level, the closer the warning level code in the cell is to the emergency response level; the lower the offset amplitude level and the lower the probability slope level, the closer the warning level code is to the minor concern level. The diagonal and surrounding areas reflect the combined effect of the two dimensions.

[0205] Step S563: After receiving the distribution anomaly confirmation signal, extract the currently valid offset amplitude level label and probability slope level label, use them as horizontal and vertical coordinates to locate the corresponding cell in the two-dimensional lookup table, and read the joint early warning level code in that cell.

[0206] Once the distribution anomaly confirmation signal is generated, the offset amplitude level label and probability slope level label at the current moment are immediately retrieved from step S550. Using the offset amplitude level label as the column index and the probability slope level label as the row index, the unique cell is located in the two-dimensional lookup table established in step S562, and the joint warning level code stored in that cell is read.

[0207] Step S564: If the read joint warning level code is inconsistent with the previous output, start the level transition smoothing process. In the subsequent dual-condition evaluation of multiple real-time measurement segments, only when the proportion of the new level code appears exceeds the preset stability ratio will it be confirmed as the formal output level. Otherwise, the level of the previous output will continue to be maintained.

[0208] Specifically, a recent warning level cache queue is maintained to record the joint warning level codes read from the most recent real-time measurement segments. When the code read in step S563 is different from the currently officially output level code, the output is not switched immediately, but a smoothing process is initiated. The frequency of the new level code in the cache queue is checked, and its proportion to the total length of the queue is calculated. Only when this proportion exceeds a preset stability threshold is it determined that the new level has been stably established, and the officially output level is switched to the new level; if the proportion is insufficient, the previously output official level remains unchanged to avoid frequent changes in warning levels due to instantaneous disturbances.

[0209] Step S565: After confirming the formal output level, encapsulate the level code together with the current timestamp information into an insulation status early warning classification signal.

[0210] Once the official output level is confirmed or maintained, a structured warning signal data frame is created. This frame contains the joint warning level code for the official output, the timestamp of the confirmation time, the associated anomaly measurement segment number, and the original values ​​for the corresponding offset amplitude level and probability slope level. This data frame is the insulation condition warning classification signal.

[0211] Step S566: The insulation condition early warning classification signal is sent to the insulation condition monitoring terminal along the communication path to complete the delivery of early warning information. After that, the subsequent real-time measurement segments are continuously evaluated.

[0212] The insulation condition early warning classification signal, encapsulated in step S565, is pushed to the human-machine interface of the insulation condition monitoring terminal in front of the operation personnel via the station's local area network or dedicated power communication network. After parsing the signal frame, the terminal presents the joint early warning level and key parameters in the form of visual audible and visual alarms and text prompts. After the signal delivery is completed, the sequential dual-channel decision unit continues to perform online segmentation, re-representation mapping, and dual-channel decision-making on subsequent newly generated real-time measurement segments without interruption, continuously updating the insulation condition assessment results.

[0213] Please refer to Figure 3 This diagram illustrates the structural block diagram of a computer system 20 provided in one embodiment of the present invention. This computer system can be used to implement the functions of the aforementioned method for early warning of transmission line insulation status based on conductivity sequence anomaly detection. Specifically:

[0214] The computer system 20 includes a central processing unit (CPU) 21, a system memory 24 including random access memory (RAM) 22 and read-only memory (ROM) 23, and a system bus 25 connecting the system memory 24 and the CPU 21. The computer device 20 also includes a basic input / output system (I / O system) 26 that facilitates information transfer between various devices within the computer, and a mass storage device 27 for storing the operating system 271.

[0215] The input / output system 26 may include a display for showing information and input devices such as a mouse and keyboard for user input. Both the display and the input devices are connected to the central processing unit 21 via an input / output controller connected to the system bus 25.

[0216] Mass storage device 27 is connected to central processing unit 21 via a mass storage controller (not shown) connected to system bus 25. Mass storage device 27 and its associated computer-readable media provide non-volatile storage for computer device 20. That is, mass storage device 27 may include computer-readable media (not shown) such as hard disk or CD-ROM (Compact Disc Read-Only Memory) drive.

[0217] Without loss of generality, computer-readable media can include computer storage media and communication media. Computer storage media includes volatile and non-volatile, removable and non-removable media implemented using any method or technology for storing information such as computer-readable instructions, data structures, program modules, or other data. Computer storage media includes RAM, ROM, EPROM (Erasable Programmable Read Only Memory), EEPROM (Electrically Erasable Programmable Read Only Memory), flash memory or other solid-state storage devices, CD-ROM, DVD (Digital Video Disc) or other optical storage, magnetic tape cassettes, magnetic tape, disk storage, or other magnetic storage devices. Of course, those skilled in the art will recognize that computer storage media are not limited to the above-mentioned types. The system memory 24 and mass storage device 27 described above can be collectively referred to as memory.

[0218] According to various embodiments of the present invention, the computer device 20 can also be connected to a remote computer on a network such as the Internet. That is, the computer device 20 can be connected to the network 29 via the network interface unit 28 connected to the system bus 25, or the network interface unit 28 can be used to connect to other types of networks or remote computer systems (not shown).

[0219] The memory also includes a computer program stored in the memory and configured to be executed by one or more processors to implement the above-described method for early warning of transmission line insulation status based on conductivity sequence anomaly detection.

[0220] In an exemplary embodiment, a computer-readable storage medium is also provided, wherein a computer program is stored therein, which, when executed by a processor, implements the above-described method for early warning of transmission line insulation status based on conductivity sequence anomaly detection, or implements the above-described method for training the lesion area determination model.

[0221] Optionally, the computer-readable storage medium may include: ROM (Read Only Memory), RAM (Random Access Memory), SSD (Solid State Drives), or optical disc, etc. The random access memory may include ReRAM (Resistance Random Access Memory) and DRAM (Dynamic Random Access Memory).

[0222] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for early warning of transmission line insulation status based on conductivity sequence anomaly detection, characterized in that, include: Receive a continuous conductivity measurement data stream collected by a mist conductivity sensor. The continuous conductivity measurement data stream contains multiple conductivity measurement points arranged in time sequence, wherein some conductivity measurement points carry a normal operating period identifier, and the remaining conductivity measurement points carry a period identifier to be monitored. The conductivity measurement points carrying the normal operating period identifier are subjected to distribution segmentation processing based on the probability inference of the running length. Based on the recursive update of the running length belief state vector and the detection of abrupt change points, the conductivity measurement points carrying the normal operating period identifier are divided into multiple normal measurement segments with consistent statistical attributes. Distribution morphology description information is extracted from each normal measurement segment, and the distribution morphology description information set of normal segments is obtained. Obtain environmental context markers synchronized with the acquisition time of each normal measurement segment. Divide the normal segment distribution morphology description information set into multiple domain groups based on the environmental context markers. Perform distribution difference elimination mapping processing on the multiple domain groups to eliminate inter-domain distribution differences while maintaining the internal structure of the distribution and generate a domain-invariant benchmark distribution description set. The real-time conductivity measurement point sequence carrying the identifier of the time period to be monitored, together with the domain-invariant benchmark distribution description set and the re-expression pipeline obtained by the distribution difference elimination mapping process, are input into the sequential dual-channel decision unit. The real-time conductivity measurement point sequence is segmented online to obtain real-time measurement segments and their distribution morphology description information. The distribution morphology description information is converted into a real-time re-expression description vector through the re-expression pipeline. Based on the real-time re-expression description vector and the domain-invariant benchmark distribution description set, a real-time cumulative offset sequence is generated through the first channel, and a real-time sequence of change point posterior probability is generated through the second channel. Cross-boundary monitoring and trend tracking are applied in parallel to the real-time sequence of cumulative offset and the real-time sequence of posterior probability of change point. When the cumulative offset and the posterior probability of change point simultaneously meet their respective cross-boundary persistence conditions and trend conditions, the distribution anomaly is determined to be established. Based on the offset amplitude classification and probability slope classification, the corresponding joint early warning level is searched in the preset early warning classification mapping structure to generate an insulation state early warning classification signal.

2. The method according to claim 1, characterized in that, The conductivity measurement points carrying the normal operating period identifier are subjected to distribution segmentation processing based on the probability inference of running length. According to the recursive update of the running length belief state vector and the detection of abrupt change points, the conductivity measurement points carrying the normal operating period identifier are divided into multiple normal measurement segments with consistent statistical attributes. Distribution morphology description information is extracted from each normal measurement segment, and a set of normal segment distribution morphology description information is obtained, including: Initialize the running length belief state vector, which contains multiple components corresponding to the preset maximum segment duration. Each component represents the belief strength of the current segment having lasted for the corresponding length. At the beginning of the conductivity measurement point sequence, assign all belief strengths to the component corresponding to the duration of zero, and preset the mutation confirmation belief limit and the observation compatibility noise limit. The conductivity measurement point sequence carrying the normal operating period identifier is traversed point by point. For each newly arrived conductivity measurement point, based on the running length belief state vector of the previous moment, the running length prior distribution at the current moment is generated through a transition probability description structure that includes the segment continuation probability and the distribution change probability. For each hypothetical duration in the prior distribution of running length, the corresponding historical conductivity measurement point subsequence is traced back according to the duration, and its central level descriptor and scatter amplitude descriptor are extracted as the parameter representation of the data generation distribution. Based on this, an observation compatibility description function is constructed, and the current conductivity measurement point is substituted into it to obtain the observation compatibility degree. After traversing all hypothetical durations, an observation compatibility degree vector is formed, and the components that are lower than the observation compatibility noise limit are set to zero. The prior distribution of the running length is fused component by component with the observation compatibility vector that has been zeroed out. An updated posterior probability distribution of the running length is generated according to the Bayesian evidence synthesis rule, and the original running length belief state vector is replaced with the updated distribution. The updated posterior probability distribution of the running length is detected. When the value exceeds the mutation confirmation belief limit and shows a continuous upward trend compared with the zero component probability of the previous several times, the current conductivity measurement point is marked as the distribution mutation point, the time of mutation is recorded, and the running length belief state vector is reset to the initial state. The conductivity measurement point sequence between two adjacent abrupt change times is divided into a normal measurement segment. The conductivity measurement points within each normal measurement segment are arranged in order. The position descriptor, scattering descriptor, morphological bias descriptor, and self-dependency descriptor are extracted from the ordered sequence and combined to form the distribution morphological description information of the normal measurement segment. The distribution morphological description information of all normal measurement segments constitutes the normal segment distribution morphological description information set.

3. The method according to claim 2, characterized in that, For each hypothetical duration in the prior distribution of the running length, the corresponding historical conductivity measurement point subsequence is traced back based on the duration, and its central level descriptor and scattering amplitude descriptor are extracted as parameter representations of the data generation distribution. Based on this, an observation compatibility description function is constructed, and the observation compatibility degree is obtained by substituting the current conductivity measurement point into it. After traversing all hypothetical durations, an observation compatibility degree vector is formed, and components below the observation compatibility noise threshold are zeroed out, including: For each hypothetical duration in the prior distribution of running length, determine the starting and ending measurement points of the corresponding historical conductivity measurement point subsequence. The starting measurement point is the position reached by tracing back from the current measurement point by the hypothetical duration plus an offset. If the tracing position exceeds the beginning of the sequence, it is truncated to the first measurement point, resulting in a set of multiple historical subsequences of unequal length. For each historical subsequence, determine whether the number of measurement points it contains reaches the minimum number of points required for reliable distribution estimation. If it does not reach the minimum number of points required for reliable distribution estimation, select the subsequence corresponding to the hypothesis that is adjacent to the current hypothesis in terms of duration and longer. Interpolate the distribution parameters of the subsequence according to the length ratio to generate the surrogate central level descriptor and the surrogate spread magnitude descriptor for the current hypothesis. For a historical subsequence with a sufficient number of measurement points, the measurement points within the subsequence are ordered. The average level of the measurement point group in the middle region after the ordering is taken as the central level descriptor. Half of the span between the first and second quantiles after the ordering is taken as the dispersion amplitude descriptor, thus obtaining the distribution parameter representation under the assumed duration. An observation compatibility description function is constructed based on the lumped level descriptor and the scatter amplitude descriptor. The function takes the measurement point value as input and its output reaches the maximum compatibility level when the measurement point value is equal to the lumped level descriptor. As the measurement point value deviates from the lumped level descriptor, the output decays slowly at a rate negatively correlated with the scatter amplitude descriptor, and the decay curve maintains a non-zero tail at the far end. Input the current conductivity measurement point into the observation compatibility description function to obtain an observation compatibility value. Iterate through all the hypothesis durations and arrange the observation compatibility values ​​generated under each hypothesis into an observation compatibility vector in order of hypothesis duration from shortest to longest. Check each component in the vector and force the components whose values ​​are below the preset observation compatibility noise limit to zero.

4. The method according to claim 2, characterized in that, The process involves dividing the conductivity measurement point sequence between two adjacent abrupt changes into a normal measurement segment, sequentially arranging the conductivity measurement points within each normal measurement segment, and extracting location descriptors, scattering descriptors, morphological bias descriptors, and autodependent descriptors from the ordered sequence. These are then combined to form the distribution morphological description information of the normal measurement segment, including: Arrange the conductivity measurement points within the normal measurement segment in ascending order of value to generate an ordered conductivity measurement point sequence, and record the values ​​of the measurement points in the sequence that are in the set low quantile, middle quantile, and high quantile order. The central torso is formed by taking the measurement points located between the low quantile and high quantile in the ordered sequence, and the average level of the measurement points in the central torso is calculated as the position descriptor, which reflects the typical conductivity level of the segment. The difference between the high quantile measurement point value and the low quantile measurement point value is used as the dispersion descriptor. This dispersion descriptor indicates the degree of concentration or openness of the distribution of measurement points within the segment. The smaller the difference, the more concentrated the distribution. The distance from the position descriptor to the lower quantile measurement point is compared with the distance from the higher quantile measurement point to the position descriptor. The morphological skewness descriptor is determined based on the sign and magnitude of the distance difference. A positive value indicates that the distribution extends to the right, a negative value indicates that it extends to the left, and the magnitude reflects the degree of skewness. The original measurement point sequence within the normal measurement segment is copied with a time step lag to obtain the lag measurement point sequence. The corresponding measurement points of the original sequence and the lag sequence are compared one by one to see whether they deviate from their respective average levels in the same or opposite direction. The proportion of the same direction is statistically analyzed and converted into a self-dependent descriptor. The location description, dispersion description, morphological tilt description, and self-dependent description are spliced ​​together in a preset order to form the distribution morphological description information of the normal measurement segment, and then incorporated into the normal segment distribution morphological description information set.

5. The method according to claim 1, characterized in that, The process involves acquiring environmental context markers synchronized with the acquisition time periods of each normal measurement segment, dividing the normal segment distribution morphology description information set into multiple domain groups based on the environmental context markers, performing distribution difference elimination mapping processing on the multiple domain groups, maintaining the internal structure of the distribution while eliminating inter-domain distribution differences, and generating a domain-invariant baseline distribution description set, including: The environmental monitoring components deployed in conjunction with the conductivity sensing device acquire the fog conductive ion category marker, ambient temperature zone marker, and near-surface wind speed zone marker for each normal measurement segment. These three discrete markers are then sequentially concatenated into an environmental context marker record and associated with the distribution morphology description information of the corresponding normal measurement segment. Traverse all normal measurement segments, using the environmental context marker record as the key, aggregate the distribution pattern description information of records with the same marker record into the same domain grouping container, and finally generate several domain groups; For the distribution pattern description information within each domain group, each component is scaled to a uniform numerical scale based on the statistical characteristics of each dimension to obtain standardized distribution pattern description information, and the scaling reference parameters of each dimension are saved. Two domain groups are randomly selected from all domain groups to form a pair, and the standardized distribution pattern description information within the pair of domain groups is regarded as two point sets respectively. The distribution separation degree between the two point sets is calculated by using a distribution distance metric that is sensitive to distribution offset but not sensitive to outliers. All domain group pairs are traversed, and the calculated distribution separation degree values ​​are filled into a two-dimensional array to obtain the inter-domain distribution separation degree array. A processing pipeline consisting of a multi-level transformation layer and an end-domain discrimination layer is constructed. The standardized distribution morphology description information is sequentially input into the transformation layer. Each layer performs orientation rotation and shape reshaping operations and outputs a transition vector. The end-domain discrimination layer receives the transition vector and provides its domain origin inference. Using the inter-domain distribution separation array as a reference, the domain discrimination error of the transition vector output by the transformation layer on the domain discrimination layer is continuously increased by updating the parameters of the transformation layer and the domain discrimination layer in turn. During the successive updates, a structure preservation constraint is also applied to the transition vectors. This constraint measures the difference between the relative distance between the transition vectors and the relative distance between the original standardized distribution pattern description information. By limiting the difference within a preset tolerance range, it is ensured that the transformation does not destroy the distribution structure inside the data. When the domain discrimination layer’s domain discrimination accuracy for the transition vectors drops to the random guessing range, the update is stopped, and the transition vector at this time is used as the re-expression description vector. All re-expression description vectors are used as sample points, and multi-level density partitioning is performed to extract multiple distribution reference centers and their corresponding distribution range boundaries, forming a domain-invariant baseline distribution description set containing several distribution reference centers and range boundaries representing normal distribution patterns.

6. The method according to claim 5, characterized in that, The process constructs a processing pipeline consisting of multi-level transformation layers and an end-domain discrimination layer. The standardized distribution morphology description information is sequentially input into the transformation layers. Each layer performs orientation rotation and shape reshaping operations, outputting a transition vector. The end-domain discrimination layer receives the transition vector and provides its domain origin inference. Using the inter-domain distribution separation array as a reference, the domain resolution error of the transition vector output by the transformation layer on the domain discrimination layer is continuously increased by iteratively updating the parameters of the transformation layer and the domain discrimination layer. This includes: A stack of transformation layers is constructed, with the standardized distribution morphology description information as the initial input. Each transformation layer contains a linear mapping sublayer and a nonlinear activation sublayer. The linear mapping sublayer rotates and scales the input vector, and the nonlinear activation sublayer reshapes the mapping result. The output of the previous transformation layer is used as the input of the next transformation layer, and the final layer outputs the transition vector. After the transformation layers are stacked, a domain discrimination layer is added. The domain discrimination layer receives the transition vector and outputs the possible scores of each domain group through multiple fully connected layers and the final branch, thus obtaining the domain affiliation tendency vector. The guidance signal is extracted from the inter-domain distribution separation array to construct the adversarial learning target, which includes the loss term for the domain discrimination layer to correctly distinguish the transition vector and the alignment term between the inter-domain distribution separation array and the current transition vector distribution separation, and together drive the parameter update; The parameter alternation update process is executed. In the first stage, the transformation layer parameters are frozen, and the domain discrimination layer parameters are updated with the current transition vector and domain label to improve the domain discrimination capability. In the second stage, the domain discrimination layer parameters are frozen, and the transformation layer parameters are updated to increase the error rate of the transition vector being distinguished by the domain discrimination layer, while the distribution structure preservation constraint is applied. The two phases are repeated alternately. After each round, the accuracy of the domain discrimination layer in grouping the validation domain is evaluated. When the accuracy falls within the range that is not significantly different from random guessing, the alternation is stopped, and the transformation layers at this time are stacked and fixed as a re-expression pipeline to eliminate environmental domain differences.

7. The method according to claim 5, characterized in that, The process of using all re-expressed descriptive vectors as sample points, performing multi-level density partitioning, and extracting multiple distribution reference centers and their corresponding distribution range boundaries includes: Place all re-expressed descriptive vectors in the same space, calculate the proximity distance between each pair of vectors, and assign a local density value to each vector based on the proximity distance; The vectors are hierarchically sorted according to the magnitude of the local density values. Starting with the vector with the highest density, it is marked as the first candidate for distribution reference center. Vectors with achievable density and a density not lower than a preset ratio are included in the coverage of this candidate along the density decreasing direction to obtain a coverage cluster. This coverage cluster is defined as a distribution pattern. When the boundary of the distribution pattern expands to a vector whose local density is lower than the preset density valley threshold, the expansion of the distribution pattern is stopped, the boundary of the distribution pattern at this time is taken as the initial range boundary of the distribution pattern, and the vectors within the distribution pattern are removed from the set to be processed. Repeatedly search for the highest density point in the remaining vector and expand it into a new distribution pattern until the highest local density in the remaining vector is lower than the preset minimum pattern density requirement, then stop the extraction; Check whether there are overlapping areas between the preliminary range boundaries of each distribution pattern. For adjacent boundaries that overlap, divide the overlapping area into distribution patterns that are closer to the distribution reference center and have stronger density continuity by cutting along the density valley line, and generate flat and mutually exclusive final range boundaries. A distinguishing label is assigned to the distribution reference center inside each final range boundary. This distinguishing label, along with the distribution reference center vector and the final range boundary data, is stored in the structure of the domain-invariant benchmark distribution description set to complete the construction.

8. The method according to claim 5, characterized in that, The step of generating a real-time sequence of cumulative offsets based on the real-time re-expression description vector and the domain-invariant baseline distribution description set via the first channel includes: The distribution morphology description information of the real-time measurement segment is standardized by scaling reference parameters of each dimension to obtain standardized real-time distribution morphology description information. The standardized real-time distribution morphology description information is then input into the re-expression pipeline obtained by the distribution difference elimination mapping process to obtain the real-time re-expression description vector. For each of the real-time re-expression description vectors, calculate its distribution deviation from each distribution reference center in the domain-invariant benchmark distribution description set, select the distribution reference center with the smallest deviation as the current comparison benchmark point, and record the smallest deviation. The real-time re-expression description vector is compared with the current comparison benchmark point one by one in each dimension to generate a single offset description vector; For each dimension of the single offset description vector, determine whether its offset magnitude exceeds a pre-defined offset tolerance range for that dimension. If it exceeds, record the excess magnitude value. If it does not exceed, set the excess magnitude mark of that dimension to zero. Collect all non-zero excess magnitude values ​​to form the comprehensive offset of this round. A historical cumulative offset memory is introduced. If the current round's overall offset is not zero, it is added to the current value in the historical cumulative offset memory. If the current round's overall offset is zero, a decay process is applied to the historical cumulative offset, and the decay rate increases with each consecutive round that is zero. Check whether the historical cumulative offset has remained below a preset quiescent level for multiple consecutive real-time measurement segments. If so, perform controlled migration on the current alignment reference point, move it by a limited step in the direction pointing to the real-time re-expression description vector, and reset the historical cumulative offset. After each update of the historical cumulative offset memory, the current value in the memory is retrieved and recorded in chronological order to obtain a continuously updated real-time sequence of cumulative offsets, which is then pushed to the dual-condition coupling evaluation stage.

9. The method according to claim 8, characterized in that, The step of checking whether the historical cumulative offset has remained below a preset quiescent level for multiple consecutive real-time measurement segments, and if so, performing controlled migration on the current alignment reference point, moving it by a limited step in the direction pointing to the real-time re-expression description vector, and resetting the historical cumulative offset, includes: The value of the historical cumulative offset is continuously tracked, and a dormant counter is maintained. Whenever the updated value of the historical cumulative offset is less than the preset dormant threshold, the dormant counter is incremented. Once the historical cumulative offset exceeds the threshold, the dormant counter is reset to zero. When the count value of the silencing counter reaches the adjustable minimum silencing dwell requirement, the current alignment reference point is set as a transferable marker, and the real-time re-expression description vector obtained by mapping the current real-time measurement segment through the re-expression pipeline is recorded as the transfer target. Generate a direction vector from the current comparison reference point to the migration target, calculate the spatial distance between the two, and normalize the direction vector to obtain the unit direction; Based on the preset upper limit of a single migration step, the spatial distance is truncated. If the spatial distance exceeds the upper limit of the step, the current movement distance is set as the upper limit of the step; otherwise, it is set as the spatial distance, thus obtaining a restricted movement vector. The current comparison reference point is moved along the unit direction by the distance specified by the restricted movement vector to obtain the updated comparison reference point. At the same time, the historical cumulative offset is reset to the initial value, the dormant counter is set to zero, and the migrateable mark is removed. During the multiple migrations of the benchmark point, the changes in the migration direction are monitored. If the migration direction is detected to alternate between adjacent migrations, the upper limit of the single migration step is automatically reduced to reduce the oscillation amplitude of the benchmark point near the boundary of the two distribution patterns.

10. A computer system, characterized in that, The computer device includes a processor and a memory, the memory storing a computer program, which is loaded and executed by the processor to implement the transmission line insulation status early warning method based on conductivity sequence anomaly detection as described in any one of claims 1 to 9.