Method for on-line measurement of transformer insulation parameters
By constructing mean and offset functions through online measurement methods, the problem of inaccurate conversion between dielectric loss factor and capacitance in online detection of transformer insulation parameters is solved, and more accurate insulation judgment is achieved.
Patent Information
- Application Number
- CN202611255274.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-11-20
AI Technical Summary
In existing technologies, online detection methods for transformer insulation parameters suffer from inaccurate values of dielectric loss factor and capacitance conversion at a 20°C reference, leading to inaccurate insulation assessments.
By acquiring the transformer parameters under reference conditions, a mean and offset function are constructed. Combined with real-time temperature and electrical parameters, online calibration of dielectric loss factor and capacitance is achieved, ensuring accuracy.
It improves the accuracy of dielectric loss factor and capacitance conversion at a 20℃ benchmark, thereby enhancing the accuracy of transformer insulation assessment.
Smart Images

Figure CN123136309A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of online insulation parameter detection technology, specifically to an online measurement method for transformer insulation parameters. Background Technology
[0002] Power transformers are the core hub equipment for energy conversion in the transmission and distribution of electricity. Their safe operation directly affects the safety, stability and economy of the entire power system. Once the internal insulation system of a transformer fails, it will not only cause serious damage to the equipment itself, but may also cause power grid outages.
[0003] Existing testing technologies mainly rely on periodic maintenance. However, this offline testing mode has obvious inherent limitations. First, preventive testing requires the equipment to be powered off and conducted offline, resulting in long testing cycles, large workloads, and significant power loss. Key electrical parameters reflecting the insulation status of capacitive equipment, such as dielectric loss factor and capacitance, can sensitively detect insulation defects. However, large temperature variations within the transformer affect the dielectric loss factor and capacitance. The conversion to a 20°C baseline using a fixed formula leads to inaccurate conversion. The dielectric loss factor and capacitance values obtained in existing technologies are inaccurate when converted to a 20°C baseline, resulting in inaccurate assessments of transformer insulation. Summary of the Invention
[0004] The present invention aims to at least partially solve one of the technical problems in the prior art, and can solve the problem that the values of dielectric loss factor and capacitance obtained in the prior art are inaccurate at a 20°C reference, which leads to inaccurate judgment of transformer insulation.
[0005] To achieve the above objectives, in a first aspect, this application provides an online measurement method for transformer insulation parameters, comprising the following steps: Step S100: Obtain the first reference temperature, first reference factor, and first reference capacitance of the transformer under reference conditions; Step S200: Set a first construction method, and obtain a first mean factor and a first mean capacity based on a first reference factor, a first reference capacitance and the first construction method; Step S300: Obtain the second reference factor and the second reference capacitance of the transformer at the historical operating temperature; and obtain the first offset factor and the first offset capacitance based on the first construction method, the second reference factor, and the second reference capacitance. Step S400: Obtain the first offset function and the second offset function through the first offset factor and the first offset capacitance; Step S500: Obtain the real-time transformer temperature, real-time dielectric loss factor, and real-time capacitance of the transformer to be tested; obtain the real-time calibration factor and real-time calibration capacitance value based on the real-time transformer temperature, real-time dielectric loss factor, real-time capacitance, first offset function, and second offset function; determine whether the dielectric loss factor and capacitance are normal based on the real-time calibration factor and real-time calibration capacitance value.
[0006] Furthermore, step S100 also includes the following sub-steps: Set a reference temperature for the transformer, and designate it as the first reference temperature; Obtain the dielectric loss factor and capacitance of a normal transformer, and label them as historical dielectric loss factor and historical capacitance, respectively. At the temperature of the first reference temperature, a first number of historical dielectric loss factors and historical capacitances are obtained, which are represented as the first reference factor and the first reference capacitance.
[0007] Furthermore, step S200 also includes the following sub-steps: The first construction method includes: obtaining the mean of the target filtered data and identifying it as the first filtered mean; Target data that is less than or equal to the first screening mean is identified as the first category of data; Target data that are greater than or equal to the mean of the first screening are identified as second-category data; Obtain the mean of the data in the first category and label it as the first category mean; Replace the first type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data, and label it as the first standard deviation. Obtain the mean of the data in the second category and label it as the second category mean; Replace the second type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data, and label it as the second standard deviation. The difference between the first screening mean and three times the first standard deviation is identified as the first position value; The sum of the first screening mean and three times the second standard deviation is used as the second position value; Obtain the range from the first position value to the second position value, and mark it as the target filtering range; Obtain the mean of the target filtering data within the target filtering range and mark it as the target construction mean.
[0008] Furthermore, step S200 also includes the following sub-steps: The first benchmark factor is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the first mean factor. The first benchmark capacity is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the first mean capacity.
[0009] Furthermore, step S300 also includes the following sub-steps: Obtain the operating temperature inside the transformer and label it as the historical operating temperature; At a historical operating temperature, a first number of historical dielectric loss factors and historical capacitances are obtained and identified as the second reference factor and the second reference capacitance. The second benchmark factor is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the second mean factor. The second benchmark capacity is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the second mean capacity. The difference between the second mean factor and the first mean factor is obtained and identified as the first offset factor; The difference between the second average capacitance and the first average capacitance is obtained and identified as the first offset capacitance; Obtain the first offset factor and the first offset capacitance at different historical operating temperatures.
[0010] Furthermore, step S400 also includes the following sub-steps: A Cartesian coordinate system is established with historical operating temperature as the horizontal axis value and the first offset factor as the vertical axis value, and it is labeled as the first offset coordinate system. Obtain the coordinates of the historical operating temperature and the corresponding first offset factor as the x and y coordinates, and mark them as the first offset coordinate points; Plot all the first offset coordinate points in the first offset coordinate system to obtain a scatter plot, and label it as the first offset scatter plot; The function is obtained by fitting a function to all the first offset coordinate points in the first offset scatter plot, and is identified as the first offset function.
[0011] Furthermore, step S400 also includes the following sub-steps: A Cartesian coordinate system is established with historical operating temperature as the horizontal axis and first offset capacitance as the vertical axis, and this system is labeled as the second offset coordinate system. Obtain the coordinates of the historical operating temperature and the corresponding first offset capacitance as the x and y coordinates, respectively, and mark them as the second offset coordinate points; Plot all the second offset coordinate points in the second offset coordinate system to obtain a scatter plot, and label it as the second offset scatter plot; The function is obtained by fitting a function to all the second offset coordinate points in the second offset scatter plot, and is identified as the second offset function.
[0012] Furthermore, step S500 also includes the following sub-steps: The temperature inside the transformer to be tested is obtained and marked as the real-time transformer temperature; Obtain the dielectric loss factor and capacitance of the transformer to be tested, and label them as real-time dielectric loss factor and real-time capacitance, respectively. Substitute the real-time transformer temperature as the horizontal axis value into the first offset function to obtain the vertical axis value, which is then identified as the real-time offset factor. Substitute the real-time transformer temperature as the horizontal axis value into the second offset function to obtain the vertical axis value, which is then identified as the real-time offset capacitance. The difference between the real-time dielectric loss factor and the real-time offset factor is obtained and identified as the real-time calibration factor. The difference between the real-time capacitance and the real-time offset capacitance is obtained and identified as the real-time calibration capacitance value. The real-time calibration factor is used as the dielectric loss factor detection value calibrated at the first reference temperature; the real-time calibration capacitance value is used as the capacitance detection value calibrated at the first reference temperature. Obtain the normal fluctuation range of the dielectric loss factor at the first reference temperature and identify it as the normal dielectric loss factor range; Obtain the normal fluctuation range of capacitance at the first reference temperature and label it as the normal capacitance range; Determine whether the real-time calibration factor is within the normal dielectric loss factor range. If it is, it indicates that the dielectric loss factor is normal. Determine whether the real-time calibration capacitor value is within the normal dielectric loss factor range. If it is, the capacitance is normal.
[0013] A second aspect of the present invention provides an electronic device comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the method described in the first aspect above.
[0014] A third aspect of the present invention provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the method described in the first aspect above.
[0015] The beneficial effects of this invention are as follows: 1. This invention obtains a first reference temperature, a first reference factor, and a first reference capacitance of a transformer under reference conditions; sets a first construction method to obtain a first average factor and a first average capacitance based on the first reference factor, the first reference capacitance, and the first construction method; obtains a second reference factor and a second reference capacitance of the transformer under historical operating temperatures; obtains a first offset factor and a first offset capacitance based on the first construction method, the second reference factor, and the second reference capacitance; obtains a first offset function and a second offset function through the first offset factor and the first offset capacitance; obtains the real-time transformer temperature, real-time dielectric loss factor, and real-time capacitance of the transformer to be tested; obtains a real-time calibration factor and a real-time calibration capacitance value based on the real-time transformer temperature, real-time dielectric loss factor, real-time capacitance, the first offset function, and the second offset function; and determines whether the dielectric loss factor and capacitance are normal based on the real-time calibration factor and the real-time calibration capacitance value. The advantage is that it makes the obtained dielectric loss factor and capacitance values more accurate when converted to values under a 20℃ reference, thus improving the accuracy of transformer insulation judgment. 2. The present invention obtains the first offset factor and the first offset capacitance based on the first construction method, the second reference factor, and the second reference capacitance. The advantage is that it improves the accuracy of obtaining the dielectric loss factor and capacitance offset at different temperatures converted to a 20°C reference, making the obtained dielectric loss factor and capacitance values at a 20°C reference more accurate, and improving the accuracy of transformer insulation judgment. Attached Figure Description
[0016] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.
[0017] Figure 1 This is a flowchart of the steps of the method of the present invention; Figure 2 This is a schematic diagram of the first offset function of the present invention; Figure 3 This is a schematic diagram of the second offset function of the present invention. Detailed Implementation
[0018] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.
[0019] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be used interchangeably where appropriate so that the embodiments of the invention described herein can cover implementations in sequences other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0020] Existing testing technologies mainly rely on periodic maintenance, but this offline testing mode has obvious inherent limitations. Therefore, online measurement of transformer insulation parameters has been proposed. However, key electrical parameters reflecting the insulation condition of capacitive equipment, such as the dielectric loss factor and capacitance conversion, are inaccurate at a 20°C reference. To solve the above problems, Embodiment 1 of this application provides an online measurement method for transformer insulation parameters. Please refer to... Figure 1 As shown, step S100 involves obtaining the first reference temperature, first reference factor, and first reference capacitance of the transformer under reference conditions; step S100 also includes the following sub-steps: Step S101: Set an internal reference temperature for the transformer, and designate it as the first reference temperature; Step S102: Obtain the dielectric loss factor and capacitance of a normal transformer, and label them as historical dielectric loss factor and historical capacitance, respectively; historical dielectric loss factor and historical capacitance can more sensitively detect insulation defects in equipment. Step S103: At the temperature of the first reference temperature, obtain a first number of historical dielectric loss factors and historical capacitances, which are represented as the first reference factor and the first reference capacitance; for example, the reference temperature is 20°C, which makes it convenient to obtain the reference values of dielectric loss factor and capacitance at the reference temperature as qualified reference values.
[0021] Step S200: A first construction method is defined, and a first mean factor and a first mean capacity are obtained based on a first reference factor, a first reference capacitance, and the first construction method. Step S200 also includes the following sub-steps: Step S201, the first construction method includes: obtaining the mean of the target screening data and identifying it as the first screening mean; the target screening data is one of the first reference factor, the first reference capacitance, the second reference factor, and the second reference capacitance, so as to facilitate obtaining the corresponding values of the normal dielectric loss factor and capacitance at different temperatures; Step S202: Identify target filtered data that are less than or equal to the first filtering mean as first-class data; identify target filtered data that are greater than or equal to the first filtering mean as second-class data. Step S203: Obtain the mean of the first category of data and label it as the first category mean; Step S204: Replace the first type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data and mark it as the first standard deviation; Step S205: Obtain the mean of the second category of data and label it as the second category mean; Step S206: Replace the second type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data, and mark it as the second standard deviation; divide the data into two parts to improve the accuracy of the subsequent first position value and second position value; Step S207: Obtain the difference between the first screening mean and three times the first standard deviation, and mark it as the first position value; obtain the sum of the first screening mean and three times the second standard deviation, and mark it as the second position value; at the same temperature, normal capacitance and dielectric loss factors are concentrated in a range, and the data distribution is approximately normal. The target screening data is considered to be normally distributed. If it is normally distributed, P(μ-3×σ)<P(μ+3×σ)≈99.73%; where μ is the population mean, the data center location; σ is the population standard deviation, which measures the degree of data dispersion; therefore, only data within the range of the first position value to the second position value are obtained to exclude target screening data that is abnormally small or large, thereby improving the accuracy of target screening data acquisition; Step S208: Obtain the range from the first position value to the second position value, and mark it as the target filtering range; Step S209: Obtain the mean of the target filtering data within the target filtering range and mark it as the target construction mean; Step S210: Treat the first benchmark factor as the target screening data, obtain the target construction mean through the first construction method, and identify it as the first mean factor; Step S211: The first reference capacity is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the first mean capacity; target screening data that is too small or too large is obtained to eliminate abnormalities; the accuracy of the mean is improved. Step S300: Obtain the second reference factor and the second reference capacitance of the transformer at historical operating temperatures; obtain the first offset factor and the first offset capacitance based on the first construction method, the second reference factor, and the second reference capacitance; Step S300 also includes the following sub-steps: Step S301: Obtain the operating temperature inside the transformer and mark it as the historical operating temperature; Step S302: Obtain a first number of historical dielectric loss factors and historical capacitances at a historical operating temperature, and identify them as the second reference factor and the second reference capacitance; the first number is 1000. Step S303: The second benchmark factor is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the second mean factor; thus improving the accuracy of the medium loss factor corresponding to different historical operating temperatures. Step S304: The second reference capacitance is regarded as the target screening data, and the target construction average is obtained through the first construction method and identified as the second average capacitance; thus improving the accuracy of the capacitance corresponding to different historical operating temperatures. Step S305: Obtain the difference between the second mean factor and the first mean factor, and mark it as the first offset factor; obtain the offset of the dielectric loss factor under different historical operating temperatures; Step S306: Obtain the difference between the second average capacitance and the first average capacitance, and mark it as the first offset capacitance; obtain the offset of capacitance under different historical operating temperatures; Step S307: Obtain the first offset factor and the first offset capacitance at different historical operating temperatures; this facilitates the construction of the offset of the dielectric loss factor and capacitance at different temperatures compared to the standard state.
[0022] Step S400 involves obtaining a first offset function and a second offset function using a first offset factor and a first offset capacitance; step S400 also includes the following sub-steps: Step S401: Establish a Cartesian coordinate system with historical operating temperature as the horizontal axis value and the first offset factor as the vertical axis value, and label it as the first offset coordinate system; Step S402: Obtain the coordinate points of the historical operating temperature and the corresponding first offset factor as the x-coordinate and y-coordinate, respectively, and mark them as the first offset coordinate points; Step S403: Plot all the first offset coordinate points in the first offset coordinate system to obtain a scatter plot, and label it as the first offset scatter plot; Step S404: Perform function fitting on all the first offset coordinate points in the first offset scatter plot to obtain a function, which is then identified as the first offset function; For practical applications, please refer to Figure 2 The diagram shows the acquisition of the first offset function; the first offset function represents the offset of the dielectric loss factor at different temperatures from that under standard conditions.
[0023] Step S405: Establish a Cartesian coordinate system with historical operating temperature as the horizontal axis and first offset capacitance as the vertical axis, and label it as the second offset coordinate system; Step S406: Obtain the coordinate points of the historical operating temperature and the corresponding first offset capacitance as the x-axis and y-axis, respectively, and mark them as the second offset coordinate points; Step S407: Plot all the second offset coordinate points in the second offset coordinate system to obtain a scatter plot, and label it as the second offset scatter plot; Step S408: Perform function fitting on all the second offset coordinate points in the second offset scatter plot to obtain the function, and label it as the second offset function; For practical applications, please refer to Figure 3 The diagram shows the acquisition of the second offset function; the second offset function represents the offset of the capacitance at different temperatures from that under standard conditions.
[0024] Step S500: Obtain the real-time transformer temperature, real-time dielectric loss factor, and real-time capacitance of the transformer to be tested; obtain the real-time calibration factor and real-time calibration capacitance value based on the real-time transformer temperature, real-time dielectric loss factor, real-time capacitance, first offset function, and second offset function; determine whether the dielectric loss factor and capacitance are normal based on the real-time calibration factor and real-time calibration capacitance value; Step S500 also includes the following sub-steps: Step S501: Obtain the temperature inside the transformer to be tested and mark it as the real-time transformer temperature; Step S502: Obtain the dielectric loss factor and capacitance of the transformer to be tested, and label them as real-time dielectric loss factor and real-time capacitance, respectively. Step S503: Substitute the real-time transformer temperature as the horizontal axis value into the first offset function to obtain the vertical axis value, and mark it as the real-time offset factor. Step S504: Substitute the real-time transformer temperature as the horizontal axis value into the second offset function to obtain the vertical axis value, which is then identified as the real-time offset capacitance. Step S505: Obtain the difference between the real-time dielectric loss factor and the real-time offset factor, and mark it as the real-time calibration factor; Step S506: Obtain the difference between the real-time capacitance and the real-time offset capacitance, and mark it as the real-time calibration capacitance value; Step S507: Use the real-time calibration factor as the dielectric loss factor detection value calibrated at the first reference temperature; use the real-time calibration capacitance value as the capacitance detection value calibrated at the first reference temperature; Step S508: Obtain the normal fluctuation range of the dielectric loss factor at the first reference temperature and mark it as the normal dielectric loss factor range; obtain the normal fluctuation range of the capacitance at the first reference temperature and mark it as the normal capacitance range; for example, the first average factor is 0.3% and the first average capacitance is 285pF; combining the first average factor and the first average capacitance, the normal dielectric loss factor range is obtained as 0.27% to 0.33%; the normal capacitance range is 284pF to 294pF. Step S509: Determine whether the real-time calibration factor is within the normal dielectric loss factor range. If yes, it indicates that the dielectric loss factor is normal. Determine whether the real-time calibration capacitance value is within the normal dielectric loss factor range. If yes, it indicates that the capacitance is normal. For practical applications, please refer to Figure 2 and Figure 3 As shown, the real-time transformer temperature is 60℃. Substituting the real-time transformer temperature of 60℃ as the horizontal axis value into the first offset function yields a vertical axis value of 1.2%, so the real-time offset factor is 1.2%. Substituting the real-time transformer temperature of 60℃ as the horizontal axis value into the second offset function yields a vertical axis value of 12pF, so the real-time offset capacitance is 12pF. The real-time dielectric loss factor and real-time capacitance are 1.5% and 297pF, respectively. The difference between the real-time dielectric loss factor of 1.5% and the real-time offset factor of 1.2% is 0.3%, so the real-time calibration factor is 0.3%. The difference between the real-time capacitance of 297pF and the real-time offset capacitance of 12pF is 285pF, so the real-time calibration capacitance is 285pF. The real-time calibration factor of 0.3% is within the range of 0.27% to 0.33%, indicating that the dielectric loss factor is normal. The real-time calibration capacitance value of 285pF is within the range of 284pF to 294pF, indicating that the capacitance is normal.
[0025] This application provides an electronic device. The electronic device may include a processor and a memory communicatively connected to the processor. The memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method embodiment as described in Embodiment 1 above. The specific implementation and technical effects are similar and will not be repeated here.
[0026] In this embodiment, the memory and processor are connected via a bus. The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus can be categorized into address bus, data bus, control bus, etc.
[0027] In the above embodiments, it should be understood that the processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), etc. The general-purpose processor can be a microprocessor or any conventional processor. The steps of the method disclosed in this invention can be directly implemented by a hardware processor, or implemented by a combination of hardware and software modules within the processor.
[0028] The memory may include random access memory (RAM) and may also include non-volatile memory (NVM), such as at least one disk storage device.
[0029] The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of illustration, the buses shown in the accompanying drawings are not limited to a single bus or a single type of bus.
[0030] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the above-described method.
[0031] This application also provides a computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the above-described method.
[0032] The aforementioned readable storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. The readable storage medium can be any available medium accessible to a general-purpose or special-purpose computer.
[0033] An exemplary readable storage medium is coupled to a processor, enabling the processor to read information from and write information to the readable storage medium. Of course, the readable storage medium can also be a component of the processor. The processor and the readable storage medium can reside in an Application Specific Integrated Circuit (ASIC). Alternatively, the processor and the readable storage medium can exist as discrete components in the device.
[0034] Those skilled in the art will understand that all or part of the steps of the above-described method embodiments can be implemented by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When executed, the program performs the steps of the above-described method embodiments; and the aforementioned storage medium includes various media capable of storing program code, such as ROM, RAM, magnetic disks, or optical disks.
[0035] Finally, it should be noted that other embodiments of the invention will readily occur to those skilled in the art upon consideration of the specification and practice of the invention disclosed herein. This invention is intended to cover any variations, uses, or adaptations of the invention that follow the general principles of the invention and include common knowledge or customary techniques in the art not disclosed herein, and is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of the invention is limited only by the appended claims.
Claims
1. An online measurement method for transformer insulation parameters, characterized in that, include: Step S100: Obtain the first reference temperature, first reference factor, and first reference capacitance of the transformer under reference conditions; Step S200: Set a first construction method, and obtain a first mean factor and a first mean capacity based on a first reference factor, a first reference capacitance and the first construction method; Step S300: Obtain the second reference factor and the second reference capacitance of the transformer at the historical operating temperature; and obtain the first offset factor and the first offset capacitance based on the first construction method, the second reference factor, and the second reference capacitance. Step S400: Obtain the first offset function and the second offset function through the first offset factor and the first offset capacitance; Step S500: Obtain the real-time transformer temperature, real-time dielectric loss factor, and real-time capacitance of the transformer to be tested. The real-time calibration factor and real-time calibration capacitance value are obtained based on the real-time transformer temperature, real-time dielectric loss factor, real-time capacitance, first offset function, and second offset function. The dielectric loss factor and capacitance are judged to be normal based on the real-time calibration factor and the real-time calibration capacitance value.
2. The method according to claim 1, characterized in that, Step S100 further includes the following sub-steps: Set a reference temperature for the transformer, and designate it as the first reference temperature; Obtain the dielectric loss factor and capacitance of a normal transformer, and label them as historical dielectric loss factor and historical capacitance, respectively. At the temperature of the first reference temperature, a first number of historical dielectric loss factors and historical capacitances are obtained, which are represented as the first reference factor and the first reference capacitance.
3. The method according to claim 2, characterized in that, Step S200 further includes the following sub-steps: The first construction method includes: Obtain the mean of the target filtered data and mark it as the first filtered mean; Target data that is less than or equal to the first screening mean is identified as the first category of data; Target data that are greater than or equal to the mean of the first screening are identified as second-category data; Obtain the mean of the data in the first category and label it as the first category mean; Replace the first type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data, and label it as the first standard deviation. Obtain the mean of the data in the second category and label it as the second category mean; Replace the second type mean in the standard deviation calculation formula with the first screening mean to obtain the standard deviation of the first type of data, and label it as the second standard deviation. The difference between the first screening mean and three times the first standard deviation is identified as the first position value; The sum of the first screening mean and three times the second standard deviation is used as the second position value; Obtain the range from the first position value to the second position value, and mark it as the target filtering range; Obtain the mean of the target filtering data within the target filtering range and mark it as the target construction mean.
4. The method according to claim 3, characterized in that, Step S200 further includes the following sub-steps: The first benchmark factor is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the first mean factor. The first benchmark capacity is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the first mean capacity.
5. The method according to claim 4, characterized in that, Step S300 further includes the following sub-steps: Obtain the operating temperature inside the transformer and label it as the historical operating temperature; At a historical operating temperature, a first number of historical dielectric loss factors and historical capacitances are obtained and identified as the second reference factor and the second reference capacitance. The second benchmark factor is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the second mean factor. The second benchmark capacity is regarded as the target screening data, and the target construction mean is obtained through the first construction method and identified as the second mean capacity. The difference between the second mean factor and the first mean factor is obtained and identified as the first offset factor; The difference between the second average capacitance and the first average capacitance is obtained and identified as the first offset capacitance; Obtain the first offset factor and the first offset capacitance at different historical operating temperatures.
6. The method according to claim 5, characterized in that, Step S400 further includes the following sub-steps: A Cartesian coordinate system is established with historical operating temperature as the horizontal axis value and the first offset factor as the vertical axis value, and it is labeled as the first offset coordinate system. Obtain the coordinates of the historical operating temperature and the corresponding first offset factor as the x and y coordinates, and mark them as the first offset coordinate points; Plot all the first offset coordinate points in the first offset coordinate system to obtain a scatter plot, and label it as the first offset scatter plot; The function is obtained by fitting a function to all the first offset coordinate points in the first offset scatter plot, and is identified as the first offset function.
7. The method according to claim 6, characterized in that, Step S400 further includes the following sub-steps: A Cartesian coordinate system is established with historical operating temperature as the horizontal axis and first offset capacitance as the vertical axis, and this system is labeled as the second offset coordinate system. Obtain the coordinates of the historical operating temperature and the corresponding first offset capacitance as the x and y coordinates, respectively, and mark them as the second offset coordinate points; Plot all the second offset coordinate points in the second offset coordinate system to obtain a scatter plot, and label it as the second offset scatter plot; The function is obtained by fitting a function to all the second offset coordinate points in the second offset scatter plot, and is identified as the second offset function.
8. The method according to claim 7, characterized in that, Step S500 further includes the following sub-steps: The temperature inside the transformer to be tested is obtained and marked as the real-time transformer temperature; Obtain the dielectric loss factor and capacitance of the transformer to be tested, and label them as real-time dielectric loss factor and real-time capacitance, respectively. Substitute the real-time transformer temperature as the horizontal axis value into the first offset function to obtain the vertical axis value, which is then identified as the real-time offset factor. Substitute the real-time transformer temperature as the horizontal axis value into the second offset function to obtain the vertical axis value, which is then identified as the real-time offset capacitance. The difference between the real-time dielectric loss factor and the real-time offset factor is obtained and identified as the real-time calibration factor. The difference between the real-time capacitance and the real-time offset capacitance is obtained and identified as the real-time calibration capacitance value. The real-time calibration factor is used as the measured value of the dielectric loss factor calibrated at the first reference temperature; The real-time calibration capacitance value is used as the capacitance detection value calibrated at the first reference temperature; Obtain the normal fluctuation range of the dielectric loss factor at the first reference temperature and identify it as the normal dielectric loss factor range; Obtain the normal fluctuation range of capacitance at the first reference temperature and label it as the normal capacitance range; Determine whether the real-time calibration factor is within the normal dielectric loss factor range. If it is, it indicates that the dielectric loss factor is normal. Determine whether the real-time calibration capacitor value is within the normal dielectric loss factor range. If it is, the capacitance is normal.
9. An electronic device, characterized in that, The electronic device includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the method as described in any one of claims 1-8.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, implements the method as described in any one of claims 1-8.