A method, test circuit, and system for eFuse trimming and relay status monitoring
By improving the physical connection topology between the relay and the test resources, and using voltage value changes to determine the relay status, the problem of high false positive rate in the existing technology is solved, thereby improving the accuracy and yield of chip testing.
Patent Information
- Application Number
- CN202611288630.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-20
AI Technical Summary
The lack of physical monitoring of the mechanical state of relays in existing technologies leads to a high misjudgment rate in chip testing, making it difficult to distinguish between chip-related problems and test hardware failures.
By improving the physical connection topology between relays and test resources and chip pins, the relay status is determined by voltage value changes, forming a multi-path closed-loop current path to identify mechanical faults.
This reduces the false positive rate during chip adjustment, improves yield and troubleshooting efficiency, and ensures the accuracy of testing.
Smart Images

Figure CN123136362A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of semiconductor testing, and more specifically to a method, test circuit, and system for monitoring eFuse adjustment and relay status. Background Technology
[0002] With the development of semiconductor technology, chip testing and eFuse (electronic fuse) tuning processes play a crucial role in semiconductor production testing (FT / CP). In existing chip testing systems, the proper closing and opening of relays directly affects the accuracy of tuning results and product yield.
[0003] Currently, the closest existing technology patents typically disclose a test board circuit structure that relies solely on the difference in parameters before and after adjustment (such as capacitor adjustment mode) to infer the result. In this type of prior art, the tester only forms a unidirectional signal application loop with the chip pins, and determines whether the adjustment is effective by comparing whether the difference in functional parameters before and after adjustment falls within a given range.
[0004] However, existing test hardware structures have significant limitations: due to the lack of a physical monitoring circuit for the mechanical operating state of the relay itself, when a relay experiences mechanical / electrical faults such as failure to reset after activation, contact sticking, or complete inoperability, the aforementioned judgment method relying solely on parameter differences is prone to misjudgment (e.g., influenced by parameter drift caused by the chip's own circuitry, or situations where some pins are not tested after modification). Because existing hardware topologies cannot perform state diagnosis on the relay itself, when defective products occur, testers find it difficult to determine whether the problem lies with the chip's yield or the mechanical failure of the test hardware. Summary of the Invention
[0005] In order to overcome the shortcomings and deficiencies of the existing technology, the purpose of this invention is to provide a method, test circuit and system for monitoring eFuse adjustment and relay status. By improving the physical connection topology between the relay and test resources and chip pins, accurate diagnosis of the mechanical status of the relay is achieved.
[0006] This invention is achieved through the following technical solution: In a first aspect, this invention discloses an eFuse-based relay status monitoring method based on test machine resources, applied to a test platform including a test machine resource interface and multiple relays, comprising the following steps: Initialize all relays to maintain their default state; A first safety detection current is applied through the test machine resource interface, and a first voltage value V1 is measured. The current value of the first safety detection current is set to a current value that will not cause the fuse of the chip under test to burn out. After the target relay executes the action closing command, the first safety detection current is applied again through the test machine resource interface, and the second voltage value V2 is measured. After adjusting the fuse of the chip under test by applying the adjustment voltage, the first safety detection current is applied for the third time through the test machine resource interface, and the third voltage value V3 is measured. Based on the values of V1, V2, and V3, or the numerical matrix they form, determine whether the target relay has a fault in its operating state.
[0007] In conjunction with the first aspect, further, determining whether the target relay's operating state is faulty based on the values of V1, V2, and V3 specifically includes: If V1 is a clamping value of 2V, V2 is a first small voltage value (approximately 5mV), and V3 is a clamping value of 2V, then the target relay is determined to be working normally. If V1 is a 2V clamping value, V2 is a 2V clamping value, and V3 is a 2V clamping value, then the target relay is determined to be stuck in the default state, or stuck in a state where it is both in the default state and in operation. If V1 is a first minute voltage value, V2 is a first minute voltage value, and V3 is a 2V clamping value, then the target relay is determined to be stuck in the post-operation state.
[0008] In conjunction with the first aspect, the value of the first safety detection current is further set based on empirical values of factors such as the circuit characteristics and material selection of the chip under test during its design and fluctuates within a certain range. Preferably, the first safety detection current is configured to be 500uA.
[0009] Secondly, this invention discloses an eFuse-based relay status monitoring method based on an external power supply, applicable to a test platform including an external power supply, test machine resources, and multiple relays, comprising the following steps: Initialize all relays to their default state; Control all relays to simultaneously close the action, apply a 0mA current through the test machine and measure the first voltage value V1; The recovery capability of the target relay is judged in sequence, and all other relays except the target relay are controlled to close. A 0mA current is applied through the test machine and the second voltage value V2 is measured. Based on the numerical characteristics of V1 and V2, determine whether a specific relay is stuck or unable to operate.
[0010] In conjunction with the second aspect, further, based on the numerical characteristics of V1 and V2, it is determined whether a specific relay is stuck or unable to operate, specifically including: If V1 is 0V and V2 is the voltage value corresponding to the external power supply, then the target relay is determined to be working normally. If V1 is the voltage value corresponding to the external power supply and V2 is the voltage value corresponding to the external power supply, then it is determined that the target relay is stuck in the default state, or the left side is stuck in the default state and the right side is activated. If both V1 and V2 are 0V, then the target relay is determined to be stuck in the post-action state, or the right side is stuck in the default state after the left side has been activated.
[0011] Thirdly, the present invention discloses a test circuit for eFuse adjustment and status monitoring, which includes: a first test interface, a second test interface, a power supply terminal, a ground terminal, a chip under test adjustment pin, and at least one double-pole double-throw relay, wherein the double-pole double-throw relay includes a control coil, a first switching unit and a second switching unit. The moving contact of the first switching unit is electrically connected to the first test interface, its normally closed contact is electrically connected to the power supply terminal or the second test interface, and its normally open contact is electrically connected to the first adjustment pin of the chip under test. The normally open contact of the second switching unit is electrically connected to the second adjustment pin of the chip under test, and its moving contact is electrically connected to the ground terminal; The test circuit is configured to form a detection circuit or adjustment circuit by switching the contacts of the double-pole double-throw relay under different power supply and control sequences, so as to identify the sticking or jamming state of the relay.
[0012] In conjunction with the third aspect, further, when applied to a platform that only uses test machine resources for tuning, the characteristic is: The first test interface is connected to the test machine resources, and the normally closed contact of the first switch unit is fixedly connected to the 5V power supply terminal; When the normal current flows downward and the relay is in the closed state, the test machine resources are connected to the first adjustment pin, flow through the fuse inside the chip under test, the second adjustment pin, and the second switching unit in sequence, and finally flow back to the ground terminal.
[0013] In conjunction with the third aspect, further, when applied to a platform that uses an external power supply for adjustment, it is characterized by: The first test interface is connected to an external power supply, and the second test interface is connected to the test machine resources; The normally closed contact of the first switching unit is electrically connected to the test machine resource; When the relay is stuck in the default state, the electrical signal emitted by the external power supply is directly detected and read by the test machine resources via the first switching unit.
[0014] Fourthly, the present invention discloses a semiconductor automated test equipment system, including the STS8200 platform; The test circuit described above; The controller, which is communicatively connected to the test circuit, stores a computer program internally. When the computer program is executed, it implements the monitoring method based on test machine resources as described above, or the monitoring method based on external power supply as described above.
[0015] The beneficial effects of this invention are: This invention provides a method, test circuit, and system for monitoring eFuse adjustment and relay status. It features a novel physical topology for double-pole double-throw relays, integrating a test machine resource interface, an external power supply interface, and chip adjustment pins. This structure creates multiple measurable closed-loop current paths before, during, and after adjustment. When a relay experiences mechanical faults such as default state jamming or jamming after activation, the voltage characteristic value in the circuit changes significantly and is directly read by the test interface. This minimizes blind spots in troubleshooting without damaging the fuse of the chip under test, solving the problem of high false positive rates caused by parameter derivation in existing technologies, and improving the yield and efficiency of chip adjustment. Attached Figure Description
[0016] The present invention will be further described with reference to the accompanying drawings, but the embodiments in the drawings do not constitute any limitation on the present invention. For those skilled in the art, other drawings can be obtained based on the following drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of the current flow and circuit topology when the relay is working normally in an embodiment of the present invention.
[0018] Figure 2 This is a schematic diagram of the test circuit in the test machine resource adjustment mode in an embodiment of the present invention, showing different fault states.
[0019] Figure 3 This is a schematic diagram of the test circuit in the external power supply adjustment mode in an embodiment of the present invention, showing different fault states. Detailed Implementation
[0020] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Many specific details are set forth in the following description to provide a thorough understanding of the present invention. However, the present invention can be practiced in many other ways different from those described herein, and those skilled in the art can make similar modifications without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0021] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0022] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.
[0023] This embodiment discloses a test circuit for eFuse tuning and status monitoring, the core of which lies in a multi-path hardware test layout structure. (Reference) Figure 1 The test circuit includes: a first test interface J2, an optional second test interface J3, a power supply terminal +5V, a ground terminal GND, adjustment pins of the chip under test (such as T1-1, VS1), and at least one double-pole double-throw relay K1; in a typical chip test socket array, multiple relays (such as K1 to K6) can be included in parallel. The double-pole double-throw relay K1 includes a control coil, a first switching unit and a second switching unit.
[0024] Specifically, the moving contact (pin 3) of the first switching unit is electrically connected to the first test interface J2, its normally closed contact (pin 2) is electrically connected to the power supply terminal +5V or the second test interface J3, and its normally open contact (pin 4) is electrically connected to the first trimming pin T1-1 of the chip under test; simultaneously, the normally open contact (pin 5) of the second switching unit is electrically connected to the second trimming pin VS1 of the chip under test, and its moving contact (pin 6) is electrically connected to the ground terminal GND. This physical topology allows the test circuit to form a detection circuit or trimming circuit by switching the internal contacts of the double-pole double-throw relay K1 under different power supply and control sequences, which is used to identify the sticking or jamming state of the relay.
[0025] refer to Figure 2In the first application scenario (applied to a platform using test machine resources for calibration), the first test interface J2 is connected to the precision measurement resources inside the test machine, and the normally closed contact (pin 2) of the first switching unit is fixedly connected to the 5V power supply. When testing is required, the test machine resources provide a first safe detection current (approximately 500uA, affected by factors such as circuit characteristics and material selection during chip design) through J2 without causing the chip fuse to blow. Under normal operation and with relay K1 in the activated closed state, the current flows from J2, through pin 3 to pin 4, into the first calibration pin T1-1, through the fuse inside the chip IC, out through the second calibration pin VS1, through pin 5 to pin 6, and finally into GND. This complete circuit allows a small voltage of approximately 5mV to be measured at J2. If relay K1 is stuck in the default state (not activated), pin 3 and pin 2 remain connected, and the measured voltage will be clamped at 2V, thus exposing mechanical faults through the drastically different voltage performance of the hardware circuit.
[0026] At this time, the first test interface J2 is connected to the internal measurement resources of the test machine, and the normally closed contact (pin 2) is fixed to 5V. The system performs the following monitoring steps: Initialize all relays to their default state, apply a first safety detection current using J2, and measure the first voltage value V1. This first safety detection current is configured to be a small current that will not cause the fuse of the chip under test to blow (preferably about 500uA, depending on the characteristics of the chip circuit and the selected materials; voltage level is 2V).
[0027] The target relay is activated, the first safety detection current is applied, and the second voltage value V2 is measured. Since a complete conduction circuit is formed at this time (the test machine resources flow sequentially through pins 3, 4, the internal fuse of the chip, pins 5 and 6 to GND), the resistance should be around 10Ω.
[0028] After adjusting the fuse, the first safety detection current is applied again, and the third voltage value V3 is measured.
[0029] The system controller determines faults based on the measurement matrix: If V1 is 2V, V2 is 5mV, and V3 is 2V, then the relay is working properly.
[0030] If V1 is 2V, V2 is 2V, and V3 is 2V, it means that the relay is stuck in the default state (no action, pin 3 and pin 2 are continuously connected), or stuck in a state where one side is in default and the other side is in action.
[0031] If V1 is 5mV, V2 is 5mV, and V3 is 2V, it means that the relay is stuck in the post-operation state.
[0032] refer to Figure 3In the second application scenario (used in platforms that use external power supplies for adjustment), the first test interface J2 is connected to the external power supply, while the second test interface J3 is connected to the test machine resource to act as a monitoring probe. In this case, the normally closed contact (pin 2) of the first switching unit is no longer connected to a fixed 5V power supply, but is electrically connected to the test machine resource J3. Under this physical structure, when relay K1 is stuck in the default state, the voltage signal emitted by the external power supply J2 is directly shorted to the normally closed contact (pin 2) via the moving contact (pin 3) of the first switching unit, allowing J3 to directly read the corresponding external power supply voltage (e.g., 5V). If the voltage measured at J3 becomes 0V after the relay executes its closing command, it verifies that pin 3 has successfully disconnected its physical connection with pin 2 and connected to pin 4, thus determining that the relay is functioning normally.
[0033] At this time, the first test interface J2 is connected to an external power supply, the second test interface J3 is connected to the test machine resources, and the normally closed contact (pin 2) of the first switching unit is electrically connected to J3. The system performs the following monitoring steps: Initialize all relays to their default state. Activate all relays at once, apply a 0mA current through J3, and measure the first voltage value V1.
[0034] To check the relay's reset capability: except for the target relay under test, activate all other relays, apply a 0mA current through J3 and measure the second voltage value V2.
[0035] The system controller determines faults based on the measurement matrix: If V1 is 0V and V2 is the voltage corresponding to the external power supply (e.g., 5V), it indicates that the target relay is working normally (it has been restored normally and disconnected from J3).
[0036] If V1 is 5V and V2 is 5V, it means that the target relay is stuck in the default state (pin 3 and pin 2 are shorted), or the left side is stuck and the right side is activated by default.
[0037] If V1 is 0V and V2 is 0V, it means that the target relay is stuck in the post-action state.
[0038] Based on the above test circuit, this embodiment also discloses a semiconductor automatic test equipment (ATE) system, which includes STS8200 test platform hardware; in addition to the above test circuit, the system also includes a controller that is communicatively connected to the test circuit. The controller stores a computer program for sending relay control commands (to switch the state of K1-K6) and extracting the voltage parameter feature matrix of J2 / J3 to realize automated fault state judgment.
[0039] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit the scope of protection of the present invention. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the essence and scope of the technical solutions of the present invention.
Claims
1. A method for monitoring the state of an eFuse-adjusted relay based on test machine resources, applied to a test platform including a test machine resource interface and multiple relays, characterized in that, Includes the following steps: Initialize all relays to maintain their default state; A first safety detection current is applied through the test machine resource interface, and a first voltage value V1 is measured. The current value of the first safety detection current is set to a current value that will not cause the fuse of the chip under test to burn out. After the target relay executes the action closing command, the first safety detection current is applied again through the test machine resource interface, and the second voltage value V2 is measured. After adjusting the fuse of the chip under test by applying the adjustment voltage, the first safety detection current is applied for the third time through the test machine resource interface, and the third voltage value V3 is measured. Based on the values of V1, V2, and V3, or the numerical matrix formed by them, determine whether the target relay has a fault in its operating state.
2. The monitoring method according to claim 1, characterized in that, The step of determining whether the target relay has a fault based on the values of V1, V2, and V3 specifically includes: If V1 is a clamping value of 2V, V2 is a first small voltage value (approximately 5mV), and V3 is a clamping value of 2V, then the target relay is determined to be working normally. If V1 is a 2V clamping value, V2 is a 2V clamping value, and V3 is a 2V clamping value, then the target relay is determined to be stuck in the default state, or stuck in a state where it is both in the default state and activated at the same time. If V1 is a first minute voltage value, V2 is a first minute voltage value, and V3 is a 2V clamping value, then the target relay is determined to be stuck in the post-operation state.
3. The monitoring method according to claim 1, characterized in that: The value of the first safety detection current is set based on empirical values of factors such as the circuit characteristics and material selection of the chip under test during its design and fluctuates within a certain range. Preferably, the first safety detection current is configured to be 500uA.
4. A method for monitoring the status of an eFuse-adjustable relay based on an external power supply, applied to a test platform including an external power supply, test equipment resources, and multiple relays, characterized in that... Includes the following steps: Initialize all relays to their default state; Control all relays to simultaneously close the action, apply a 0mA current through the test machine resources and measure the first voltage value V1; The recovery capability of the target relay is judged in sequence, and all other relays except the target relay are controlled to close. A 0mA current is applied through the test machine and the second voltage value V2 is measured. Based on the numerical characteristics of V1 and V2, determine whether a specific relay is stuck or unable to operate.
5. The monitoring method according to claim 4, characterized in that, Based on the numerical characteristics of V1 and V2, determine whether a specific relay is stuck or unable to operate, specifically including: If V1 is 0V and V2 is the voltage value corresponding to the external power supply, then the target relay is determined to be working normally. If V1 is the voltage value corresponding to the external power supply and V2 is the voltage value corresponding to the external power supply, then it is determined that the target relay is stuck in the default state, or the left side is stuck in the default state and the right side is activated. If both V1 and V2 are 0V, then the target relay is determined to be stuck in the post-action state, or the right side is stuck in the default state after the left side has been activated.
6. A test circuit for eFuse tuning and status monitoring, characterized in that, include: The system includes a first test interface, a second test interface, a power supply terminal, a ground terminal, a chip under test adjustment pin, and at least one double-pole double-throw relay, wherein the double-pole double-throw relay comprises a control coil, a first switching unit, and a second switching unit. The moving contact of the first switching unit is electrically connected to the first test interface, its normally closed contact is electrically connected to the power supply terminal or the second test interface, and its normally open contact is electrically connected to the first adjustment pin of the chip under test. The normally open contact of the second switching unit is electrically connected to the second adjustment pin of the chip under test, and its moving contact is electrically connected to the ground terminal; The test circuit is configured to form a detection circuit or adjustment circuit by switching the contacts of the double-pole double-throw relay under different power supply and control sequences, so as to identify the sticking or jamming state of the relay.
7. The test circuit according to claim 6, when applied to a platform that only uses test machine resources for adjustment, is characterized in that: The first test interface is connected to the test machine resources, and the normally closed contact of the first switch unit is fixedly connected to the 5V power supply terminal; When the normal current flows downward and the relay is in the closed state, the test machine resources are connected to the first adjustment pin, flow through the fuse inside the chip under test, the second adjustment pin, and the second switching unit in sequence, and finally flow back to the ground terminal.
8. The test circuit according to claim 6, when applied to a platform that uses an external power supply for adjustment, is characterized in that: The first test interface is connected to an external power supply, and the second test interface is connected to the test machine resources; The normally closed contact of the first switching unit is electrically connected to the test machine resource; When the relay is stuck in the default state, the electrical signal emitted by the external power supply is directly detected and read by the test machine resources via the first switching unit.
9. A semiconductor automated test equipment system, comprising an STS8200 platform, characterized in that, include: The test circuit as described in any one of claims 6 to 8; The controller, which is communicatively connected to the test circuit, stores a computer program internally. When the computer program is executed, it implements the monitoring method based on test machine resources as described in any one of claims 1-3, or the monitoring method based on external power supply as described in any one of claims 4-5.
