Soc calibration method, controller and calibration system of energy storage power station

By generating a calibration queue and dynamically calculating the number of parallel calibrations in the field-level controller of the energy storage power station, the problem of lack of overall planning for SOC calibration in energy storage power stations is solved, achieving efficient automated calibration and ensuring system stability and responsiveness.

CN123136499APending Publication Date: 2026-11-20YUANJIAN WIND POWER JIANGYINENVISION ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611163125.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-31
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing SOC calibration of energy storage power stations lacks site-level coordination, and the timing of calibration conflicts with the operation requirements of the power station, making it difficult to balance system stability and calibration efficiency.

Method used

By receiving calibration requests from the site-level controller, generating a queue of systems to be calibrated, obtaining the operating status parameters of the power plant, dynamically calculating the number of parallel calibrations, and determining the target energy storage subsystem for calibration based on sorting rules.

Benefits of technology

It enables centralized management of calibration needs across the entire station, ensuring the overall stability and responsiveness of the energy storage power station, improving calibration efficiency, and resolving the conflict between calibration timing and power station operation requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136499A_ABST
    Figure CN123136499A_ABST
Patent Text Reader

Abstract

The embodiment of the application relates to the field of energy storage management, and discloses an SOC calibration method, a controller and a calibration system of an energy storage power station. The application is applied to the controller of the energy storage power station, and the method comprises the following steps: receiving a calibration request, and generating a to-be-calibrated queue; acquiring current operation state parameters of the energy storage power station, calculating the number of parallel calibrations that can be simultaneously executed according to the current operation state parameters; sorting the energy storage subsystems in the to-be-calibrated queue according to a preset sorting rule, and determining a target energy storage subsystem from the to-be-calibrated queue based on the number of parallel calibrations and the sorting result; and sending a calibration execution instruction to the target energy storage subsystem to control the target energy storage subsystem to execute calibration. Therefore, the problem of the conflict between the calibration opportunity and the operation demand of the power station is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to the field of energy storage management, and particularly to a SOC calibration method, controller and calibration system for energy storage power stations. Background Technology

[0002] In the operation and management of large-scale energy storage power stations, the Battery Management System (BMS) typically adopts a layered architecture, including a site-level controller and multiple energy storage subsystems. Each energy storage subsystem is responsible for cell-level data acquisition and status monitoring, and reports key parameters such as State of Charge (SOC) to the site-level controller. Since SOC estimation accumulates errors with battery cycling, it is necessary to periodically calibrate the SOC of each energy storage subsystem to ensure the accuracy of the estimated values, thereby providing a reliable data foundation for power dispatching and capacity management of the energy storage power station.

[0003] In related technologies, SOC calibration of energy storage power stations generally relies on manual triggering and confirmation. Operation and maintenance personnel must judge whether to perform calibration based on monitoring data and personal experience, lacking an integrated and standardized automatic calibration mechanism. This manual approach suffers from low execution efficiency and poor operational consistency. Furthermore, existing manual calibrations often target individual energy storage subsystems, failing to comprehensively assess the overall operational capability of the power station before execution and lacking a coordinated planning mechanism based on the entire station's operational status. This leads to situations where, under certain operating conditions, simultaneous calibration of too many energy storage subsystems may result in insufficient power station responsiveness, affecting system stability; while overly conservative calibration arrangements reduce calibration efficiency, making it difficult to achieve efficient SOC calibration while ensuring system safety. Summary of the Invention

[0004] The purpose of this invention is to provide a SOC calibration method, controller, and calibration system for energy storage power stations, in order to solve the problems in related technologies such as lack of site-level coordination in SOC calibration, conflict between calibration timing and power station operation requirements, and difficulty in balancing system stability and calibration efficiency.

[0005] To address the aforementioned technical problems, embodiments of the present invention provide a State of Charge (SOC) calibration method for an energy storage power station, applied to the controller of the energy storage power station. The method includes: receiving a calibration request and generating a calibration queue; obtaining the current operating status parameters of the energy storage power station, and calculating the number of parallel calibrations that can be performed simultaneously based on the current operating status parameters; sorting the energy storage subsystems in the calibration queue according to a preset sorting rule, and determining the target energy storage subsystem from the calibration queue based on the number of parallel calibrations and the sorting result; and sending a calibration execution command to the target energy storage subsystem to control the target energy storage subsystem to perform calibration.

[0006] Embodiments of the present invention also provide a controller for an energy storage power station, for performing the above-described SOC calibration method for the energy storage power station.

[0007] Embodiments of the present invention also provide a calibration system for an energy storage power station, comprising: a controller as described above; and at least one energy storage subsystem connected to the controller for reporting calibration requests to the controller and performing calibration based on calibration execution instructions sent by the controller.

[0008] In this embodiment of the invention, by receiving calibration requests reported by each energy storage subsystem and generating a calibration queue at the site-level controller, centralized management of the calibration requirements of the entire site is achieved, avoiding the problem of independent and uncoordinated operation of each energy storage subsystem. Simultaneously, by acquiring the current operating status parameters of the energy storage power station and dynamically calculating the number of parallel calibrations allowed to be performed simultaneously based on these parameters, the number of parallel calibrations is no longer a fixed value unrelated to the operating status, but rather varies with the actual operating status of the power station: within the allowable range of the operating status, the number of energy storage subsystems performing calibration simultaneously can be increased accordingly; when the operating status is limited, the number of energy storage subsystems performing calibration simultaneously decreases accordingly, ensuring that the power and capacity occupied by the calibration process are always within the range that the current operating status can bear. Furthermore, by sorting the energy storage subsystems in the calibration queue according to a preset sorting rule, and determining the target energy storage subsystem based on the number of parallel calibrations and the sorting results, orderly scheduling of calibration tasks is achieved. Thus, this invention achieves efficient automated SOC calibration while ensuring the overall stability and responsiveness of the energy storage power station, solving the problem of conflict between calibration timing and power station operating requirements in related technologies. Attached Figure Description

[0009] One or more embodiments are illustrated by way of example with reference numerals in the accompanying drawings. These illustrations do not constitute a limitation on the embodiments. Elements with the same reference numerals in the drawings are denoted as similar elements. Unless otherwise stated, the figures in the drawings are not to be limited by scale.

[0010] Figure 1 This is a device architecture diagram related to a SOC calibration method for an energy storage power station provided in an embodiment of this application; Figure 2 This is a flowchart of a SOC calibration method for an energy storage power station according to an embodiment of this application; Figure 3 This is a block diagram of the calibration status management of the energy storage subsystem in a SOC calibration method for an energy storage power station according to an embodiment of this application; Figure 4 This is a block diagram of queue management in a SOC calibration method for an energy storage power station according to an embodiment of this application; Figure 5 This is a block diagram illustrating the calibration execution in a SOC calibration method for an energy storage power station according to an embodiment of this application; Figure 6 This is an example diagram of a SOC calibration method for an energy storage power station provided in the embodiments of this application. Detailed Implementation

[0011] As mentioned in the background technology, the SOC calibration of energy storage power stations generally relies on manual triggering and confirmation, lacking an integrated and standardized automatic calibration mechanism, resulting in problems such as low execution efficiency and poor operational consistency. In addition, existing manual calibration is mostly performed on individual energy storage subsystems, failing to comprehensively assess the overall operating capability of the power station before execution, and lacking a coordinated arrangement mechanism based on the overall operating status of the station. This may lead to the simultaneous calibration of too many energy storage subsystems under certain operating conditions, which may affect system stability, while overly conservative calibration arrangements will reduce calibration efficiency.

[0012] The root cause of the above problems lies in the fact that existing technologies employ a calibration model where each energy storage subsystem makes independent decisions. This means that each subsystem independently determines whether it needs calibration and triggers the process, rather than coordinating across the entire system. This decision-making model fails to consider whether the power station's adjustable output still has a margin relative to the dispatch command power value during the calibration period, whether the grid support capacity of the energy storage subsystems that have not undergone calibration still has a margin relative to the preset grid capacity requirement, and also fails to consider the current operating mode and load level of the power station. This leads to a conflict between the calibration timing and the power station's operational needs. For example, when the energy storage power station is operating under high load or in grid-connected mode, the system needs to maintain sufficient online power support capacity to maintain grid voltage and frequency stability. If multiple energy storage subsystems simultaneously enter calibration mode, it will result in a sharp reduction in online capacity, making it impossible for the system to meet grid dispatch commands or maintain grid stability. Conversely, if a conservative one-by-one calibration strategy is still adopted in a grid-connected mode with ample adjustable output margin and low load, it will result in an excessively long calibration cycle and low efficiency. Therefore, the lack of a dynamic decision-making mechanism based on the overall station operating status is the fundamental reason why existing technologies cannot balance system stability and calibration efficiency.

[0013] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the various embodiments of the present invention will be described in detail below with reference to the accompanying drawings. However, those skilled in the art will understand that many technical details are presented in the various embodiments of the present invention to facilitate a better understanding of this application. However, the technical solutions claimed in this application can be implemented even without these technical details and various variations and modifications based on the following embodiments. The division of the various embodiments below is for ease of description and should not constitute any limitation on the specific implementation of the present invention. The various embodiments can be combined with and referenced by each other without contradiction.

[0014] An embodiment of the present invention relates to an SOC calibration method for an energy storage power station, and the method can be applied to a station-level controller of the energy storage power station. Specifically, the controller may be a station energy management system deployed in the central control room of the energy storage power station, a distributedly deployed edge computing node, or a remote cloud server or data center server. In practical applications, the controller may be a centralized management platform for a large-scale energy storage power station on the grid side, an energy storage management system supporting a new energy station (such as a wind farm or a photovoltaic power station), or a comprehensive energy management device for an industrial park microgrid. The controller is communicatively connected to a plurality of energy storage subsystems, each of which may be a battery cluster, a battery compartment, or an energy storage unit containing a plurality of battery packs, and each energy storage subsystem is equipped with a corresponding battery management system for cell-level data collection and state monitoring.

[0015] The embodiment of the present invention includes: receiving a calibration request and generating a to-be-calibrated queue; acquiring current operating state parameters of the energy storage power station; calculating the current number of parallel calibrations allowed to be executed simultaneously according to the current operating state parameters; sorting the energy storage subsystems in the to-be-calibrated queue according to a preset sorting rule, and determining target energy storage subsystems from the to-be-calibrated queue based on the number of parallel calibrations and the sorting result; sending a calibration execution instruction to the target energy storage subsystems, so as to control the target energy storage subsystems to perform calibration. In the embodiment of the present invention, by receiving the calibration request on the station-level controller and generating the to-be-calibrated queue, centralized management of the calibration requirements of the entire station is realized, and the problem that each energy storage subsystem is independent of each other and lacks coordination is avoided. At the same time, by acquiring the current operating state parameters of the energy storage power station and dynamically calculating the current number of parallel calibrations allowed to be executed simultaneously according to the current operating state parameters, the number of parallel calibrations is no longer a fixed value independent of the operating state, but changes with the actual operating state of the power station: within the allowable range of the operating state, the number of energy storage subsystems that perform calibration simultaneously can be increased accordingly; when the operating state is limited, the number of energy storage subsystems that perform calibration simultaneously is reduced accordingly, so that the power and capacity occupied by the calibration process are always within the range that the current operating state can bear. Further, by sorting the energy storage subsystems in the to-be-calibrated queue according to the preset sorting rule, and determining the target energy storage subsystems based on the number of parallel calibrations and the sorting result, orderly scheduling of calibration tasks is realized. Therefore, on the premise of ensuring the overall stability and response capability of the energy storage power station, the present invention realizes efficient automatic SOC calibration, and solves the problem that the calibration timing conflicts with the operation requirements of the power station in the related art.

[0016] The implementation details of the SOC calibration method for an energy storage power station according to the embodiment of the present invention are specifically described below, and the following contents are only implementation details provided for the convenience of understanding, and are not essential for implementing the present solution.

[0017] like Figure 1 As shown, the SOC calibration system for an energy storage power station according to this embodiment of the invention includes a controller and at least one energy storage subsystem. The controller, as the core of energy management at the station level, communicates with multiple energy storage subsystems. In a typical deployment architecture, the controller is deployed in the central control room of the energy storage power station and establishes data interaction channels with each subordinate energy storage subsystem via a communication network (such as Ethernet, CAN bus, or fiber optic communication). Each energy storage subsystem reports calibration requests to the controller and performs SOC calibration operations based on the calibration execution instructions sent by the controller.

[0018] like Figure 1 As shown, at the functional module level, the controller involved in this embodiment of the invention can be divided into three core functional modules: an energy storage subsystem calibration status management module, a queue management module, and a calibration execution module. The energy storage subsystem calibration status management module is responsible for identifying energy storage subsystems with calibration requirements and transmitting the relevant information to the queue management module. The queue management module is responsible for receiving information on energy storage subsystems with calibration requirements from the energy storage subsystem calibration status management module, determining the calibration order and the number of parallel calibrations, generating a calibration subsystem queue, and transmitting it to the calibration execution module. The calibration execution module is responsible for receiving the calibration subsystem queue from the queue management module, performing the calibration operation, and feeding back the results to the energy storage subsystem calibration status management module.

[0019] like Figure 2 As shown, the SOC calibration method for an energy storage power station according to an embodiment of the present invention includes the following steps: Step S101: Receive calibration requests and generate a queue to be calibrated.

[0020] like Figure 3 As shown, in this embodiment of the invention, the energy storage subsystem calibration status management module in the controller is responsible for identifying energy storage subsystems with calibration requirements and transmitting relevant information to the queue management module. Specifically, this module completes the triggering and cancellation judgments for calibration requests of each energy storage subsystem, and can be deployed at the machine end (local controller of the energy storage subsystem) or the station end (site-level controller), or a hybrid deployment method can be adopted.

[0021] In a specific example, the calibration request triggering types include at least one of the following: manual intervention triggering type; triggering type when the time interval since the last calibration exceeds a preset period; triggering type when the cumulative charge / discharge ampere-hour value reaches a set threshold; and triggering type when the number of charge / discharge cycles reaches a set threshold. Among these, in the preset sorting rules, the manual intervention triggering type has higher priority than other types; and among the types triggered when the time interval since the last calibration exceeds a preset period, the energy storage subsystems are sorted according to the time interval since the last calibration.

[0022] Specifically, the methods for triggering calibration requests include one or more combinations of the following: The first is manual intervention triggering. Maintenance personnel or the upper-level scheduling system manually issue instructions to directly specify a particular energy storage subsystem to trigger a calibration request. This triggering method meets the need for manual intervention in emergency situations; for example, when an abnormal SOC display is found in an energy storage subsystem, maintenance personnel can proactively trigger the calibration operation for that subsystem. The second is calibration time interval triggering. The time when the energy storage subsystem last completed SOC calibration is recorded, and a calibration request is triggered when the interval exceeds a preset period. This triggering method ensures that even during low-load operation, each energy storage subsystem can be calibrated regularly, preventing a decrease in SOC estimation accuracy due to long-term lack of calibration. The third is ampere-hour integration triggering. The battery management system measures and integrates the charging and discharging current of the energy storage subsystem. When the accumulated ampere-hour value reaches a set threshold, a calibration request is triggered. This triggering method reflects the actual power throughput experienced by the energy storage subsystem and is suitable for application scenarios with frequent charging and discharging. The fourth is charge / discharge cycle count triggering. The number of charge / discharge cycles completed by the energy storage subsystem is counted, and a calibration request is triggered when the number of cycles reaches a set threshold. This triggering method is based on the cyclic characteristics of batteries and can be matched with the aging process of batteries. Therefore, by setting multiple trigger types, the generation of calibration requests can comprehensively consider the operating status and usage history of the energy storage subsystem, ensuring comprehensive coverage of calibration requirements.

[0023] After receiving a calibration request, the controller aggregates all energy storage subsystems requiring calibration and their related parameters, generating a calibration queue (i.e., the first queue). This calibration queue serves as input data for subsequent queue management.

[0024] Step S102: Obtain the current operating status parameters of the energy storage power station.

[0025] In this embodiment of the invention, before making a calibration decision, the controller needs to obtain the current operating status parameters of the energy storage power station so as to dynamically adjust the calibration strategy according to the actual operating conditions.

[0026] In a specific example, the current operating status parameters also include the operating mode of the energy storage power station, which includes at least two modes: grid-connected mode and grid-connected mode. Specifically, grid-connected mode means that the energy storage power station operates in tandem with the power grid, with the grid providing voltage and frequency references, and the energy storage power station mainly responds to dispatch commands to regulate power. Grid-connected mode means that the energy storage power station independently maintains the voltage and frequency stability of the local power grid. For example, in islanded operation or microgrid mode, the energy storage power station needs to assume the role of voltage and frequency source, requiring higher power support capabilities.

[0027] In addition, current operating status parameters may also include: system load level, expressed as a percentage of rated power; time interval between the last calibration and the current energy storage subsystem; and instruction information from the manual intervention interface. These parameters together constitute the data foundation for the queue management module to make decisions.

[0028] In another specific example, the current operating status parameters include at least one of the following: the current operating point of the energy storage power station, the dispatch command power value, the rated grid support capacity of each energy storage subsystem, and the preset grid capacity requirement. The operating point refers to the total active power actually output by the energy storage power station to the grid, which can be collected in real time by the controller through the gate meter on the power station's output side; the dispatch command power value refers to the target active power value issued to the energy storage power station by the superior dispatch system; the rated grid support capacity of each energy storage subsystem refers to the maximum active power support capacity that each energy storage subsystem can provide in grid mode, determined by the design parameters of each subsystem; and the preset grid capacity requirement refers to the minimum grid support capacity required to maintain grid voltage and frequency stability.

[0029] In an optional embodiment, the preset grid capacity requirement is at least one of the following values: a pre-configured fixed capacity requirement value, for example, configured by maintenance personnel in the controller storage area according to the power design documents during controller initialization; a capacity requirement value received in real time through an external interface, for example, issued by the superior scheduling system or safety verification system through a communication protocol and refreshed in the controller; a capacity requirement value determined in real time according to the current operating conditions of the energy storage power station, for example, dynamically calculated based on parameters such as real-time frequency deviation, voltage fluctuation amplitude, and predicted value of new energy output fluctuation.

[0030] In a preferred embodiment, in addition to grid-connected mode and grid-connected mode, the operating modes can be further subdivided into the following types: grid-connected standby mode, grid-connected peak shaving mode, grid-connected frequency regulation mode, islanded operation mode, and black start mode. Different subdivided operating modes correspond to different power support requirements and calibration constraints. For example, in grid-connected frequency regulation mode, the energy storage power station needs to maintain a high power response speed, at which point the number of parallel calibrations should be further limited; while in grid-connected standby mode, the power response requirement is lower, and the limit on the number of parallel calibrations can be appropriately relaxed. This subdivided design enables the calibration strategy to more accurately match the needs of different operating scenarios, achieving an optimal balance between calibration efficiency and system stability.

[0031] Step S103: Calculate the number of parallel calibrations that can be performed simultaneously based on the current operating status parameters.

[0032] like Figure 4As shown, in this embodiment of the invention, the queue management module calculates the number of parallel calibrations that can be performed simultaneously based on the acquired current operating status parameters. By introducing a dynamic decision-making mechanism based on the station-wide operating status parameters, the number of parallel calibrations can be dynamically adjusted.

[0033] In a specific example, based on the current operating status parameters, the number of parallel calibrations allowed to be performed simultaneously is calculated. This includes: calculating the number of calibrations allowed under each of the multiple constraints based on the current operating status parameters, and taking the minimum value among them as the number of parallel calibrations. These multiple constraints include output constraints, grid construction constraints, and ratio constraints. Specifically, the output constraint means that the adjustable output of the energy storage power station during calibration is not lower than the dispatch command power value; the grid construction constraint means that the grid support capacity of the energy storage subsystems that have not undergone calibration is not lower than the preset grid construction capacity requirement; and the ratio constraint means that the ratio of the grid support capacity of the energy storage subsystems that have not undergone calibration to the calibration capacity of the energy storage subsystems that can undergo calibration is not lower than a preset safety factor.

[0034] The number of calibrations corresponding to the output constraint is determined based on the power margin of the energy storage power station. Specifically, the power margin is the difference between the total available power of the energy storage power station and the dispatch command power value. This difference represents the remaining power space available for calibration charging and discharging while maintaining the dispatch command response capability. The total available power refers to the maximum active power that the energy storage power station can currently output. The number of calibrations corresponding to the output constraint can be obtained by dividing the power margin by the charging and discharging power required for calibration of a single energy storage subsystem. For example, when the total available power of the energy storage power station is 50MW and the dispatch command power value is 40MW, the power margin is 10MW; if the charging and discharging power required for calibration of a single energy storage subsystem is 2MW, then the number of calibrations corresponding to the output constraint is 10 / 2 = 5 units.

[0035] The number of calibrations corresponding to the grid constraint conditions is determined based on the difference between the sum of the grid support capacities of all energy storage subsystems in the energy storage power station and the preset grid capacity requirement. Specifically, the difference between the sum of the rated grid support capacities of all energy storage subsystems in the power station and the preset grid capacity requirement represents the maximum grid support capacity that can be "released" under the premise of ensuring that the grid support capacity meets the requirements. The number of calibrations corresponding to the grid constraint conditions can be obtained by dividing this difference by the rated grid support capacity of a single energy storage subsystem. For example, if the power station contains 10 energy storage subsystems, each with a rated grid support capacity of 5MW, the total rated grid support capacity is 50MW; the preset grid capacity requirement is 30MW; then the release capacity is 20MW, and the number of calibrations corresponding to the grid constraint conditions is 20 / 5 = 4 systems.

[0036] The calibration quantity corresponding to the ratio constraint is determined based on the ratio of the grid support capacity of the uncalibrated energy storage subsystem to the calibration capacity of the calibrable energy storage subsystem. The preset safety factor represents the safety margin multiple of the grid support capacity of the uncalibrated energy storage subsystem relative to the calibration capacity of the calibrable energy storage subsystem, and can be set according to the power plant type and safety requirements. The calibration quantity is calculated by reverse calculation based on the constraint that the ratio of the grid support capacity of the uncalibrated energy storage subsystem to the calibration capacity of the calibrable energy storage subsystem is not less than the preset safety factor. For example, if a power plant contains 10 energy storage subsystems of equal capacity, with a grid support capacity to calibration capacity ratio of 1:1 for each subsystem, and the preset safety factor is 3, the calibration quantity N must satisfy "(10-N) / N ≥ 3", resulting in N ≤ 2.5. Therefore, the calibration quantity corresponding to the ratio constraint is 2 subsystems.

[0037] The minimum value among the above output constraint (5 units), network constraint (4 units), and ratio constraint (2 units) is taken to obtain a parallel calibration quantity of 2 units.

[0038] Furthermore, as an example, the charging and discharging power of the target energy storage subsystem during SOC calibration is determined based on a power margin. Specifically, the power margin is allocated to all target energy storage subsystems undergoing calibration, for example, by an average allocation method, where the charging and discharging power of each target energy storage subsystem is the power margin divided by the number of parallel calibrations. This allocation method ensures that the total charging and discharging power of all target energy storage subsystems during calibration is exactly equal to the power margin, ensuring that the total output of the energy storage power station remains consistent with the dispatch command power value.

[0039] In a specific example, the preset safety factor can be set differently according to the type of power plant and safety requirements: For independent off-grid power plants, since there is no backing from the external power grid, the disturbances are directly borne by the on-site subsystems, and the preset safety factor can be set to a higher value (e.g., between 3 and 5), which means that the grid support capacity of the energy storage subsystem that has not been calibrated needs to be 3 to 5 times the calibration capacity of the energy storage subsystem that can be calibrated; For grid-connected power plants, since the external power grid has a certain backing, the preset safety factor can be appropriately reduced (e.g., between 2 and 3).

[0040] In a specific example, the current operating status parameters also include the operating mode of the energy storage power station, which includes at least two modes: grid-connected mode and grid-connected mode. When the load level, adjustable output margin, and grid support capacity margin of the energy storage power station are the same, the number of parallel calibrations in grid-connected mode is no greater than the number of parallel calibrations in grid-connected mode. Specifically, for the multi-constraint minimum approach, higher values ​​can be used for the preset grid capacity requirement and preset safety factor in grid-connected mode, reducing the number of calibrations corresponding to grid-connected constraints and ratio constraints. Conversely, lower values ​​can be used for the preset grid capacity requirement and preset safety factor in grid-connected mode, increasing the number of calibrations corresponding to grid-connected constraints and ratio constraints. Therefore, in grid-connected mode, since the energy storage power station bears a greater responsibility for grid support, including maintaining voltage and frequency stability, reducing the number of parallel calibrations allows for the retention of more online energy storage subsystems to provide power support. The technical principle behind this design is as follows: In grid-connected mode, each energy storage subsystem needs to actively support the system voltage and frequency. If too many energy storage subsystems are allowed to enter calibration mode simultaneously, the number of online units available to provide virtual inertia will decrease, thus affecting the stability of the grid frequency. In grid-connected mode, however, the grid itself provides frequency and voltage support, and the support pressure on energy storage power stations is relatively small. Therefore, more energy storage subsystems can be calibrated simultaneously to improve efficiency.

[0041] In a preferred embodiment, when the energy storage power station is in grid-connected mode, the calculation of the number of parallel calibrations must also meet the virtual inertia constraint. Specifically, the controller evaluates the total virtual inertia provided by each currently online energy storage subsystem and compares it with the minimum inertia threshold required by the grid. The calibration batch is only allowed to start if the total virtual inertia provided by the remaining online energy storage subsystems (i.e., the remaining subsystems excluding those intended for calibration) is still greater than or equal to the minimum inertia threshold required by the grid. This inertia constraint mechanism ensures that the system always has sufficient frequency support capability in grid-connected mode, preventing grid frequency instability caused by a reduction in online units due to calibration.

[0042] Step S104: Sort the energy storage subsystems in the queue to be calibrated according to the preset sorting rules, and determine the target energy storage subsystem from the queue to be calibrated based on the number of parallel calibrations and the sorting results.

[0043] In this embodiment of the invention, the queue management module prioritizes the energy storage subsystems in the queue to be calibrated according to a preset sorting rule, and selects the target energy storage subsystem from the queue to be calibrated based on the calculated number of parallel calibrations, forming a calibration execution queue (i.e., the second queue).

[0044] In a specific example, in the preset sorting rules, the first type (manual intervention triggered) has a higher priority than the second type (time interval triggered); within the second type, sorting is based on the time interval since the last calibration.

[0045] Specifically, the sorting rules include the following levels: The first level is the highest priority for manual intervention. All energy storage subsystems whose calibration is triggered by manual commands are marked as having the highest priority and directly enter the first position in the queue. This design meets the need for manual intervention in emergency situations, enabling maintenance personnel or the scheduling system to prioritize specific energy storage subsystems. The second level is priority based on calibration interval time. Subsystems are sorted according to the time interval since the last calibration, with those exceeding a set threshold (e.g., 60 days) marked as high priority, and the longer the interval, the higher the priority. This design prevents a decrease in SOC estimation accuracy due to long periods without calibration and ensures the balance of calibration work. The third level is the chronological order. The remaining normal energy storage subsystems are sorted according to the time they entered the calibration queue, with priority given to the energy storage subsystem that submitted the request earliest, reflecting the first-in, first-out fairness principle. After sorting, energy storage subsystems are selected sequentially according to the sorting results until the upper limit for the number of parallel calibrations is reached, which then becomes the target energy storage subsystem for the same calibration batch.

[0046] In a specific example, after identifying the target energy storage subsystem from the queue to be calibrated, the process includes: obtaining the electrical topology location information of each target energy storage subsystem; if two target energy storage subsystems are located under the same electrical topology node, only the one ranked higher is retained as the target energy storage subsystem, and the other is postponed to the next batch. Thus, by considering the electrical topology location of the energy storage subsystems, the system avoids simultaneous calibration of multiple energy storage subsystems under the same electrical topology node (such as under the same step-up transformer or on the same feeder), preventing excessive power fluctuations or transformer overload in that branch, and further ensuring electrical safety. For example, if two energy storage subsystems are connected to the same step-up transformer, even if both are selected as target energy storage subsystems in this batch in the priority ranking, the system will automatically postpone the one ranked lower to the next batch to avoid a large power gap in that transformer branch due to the simultaneous shutdown of two energy storage subsystems.

[0047] Step S105: Send a calibration execution command to the target energy storage subsystem to control the target energy storage subsystem to perform calibration.

[0048] like Figure 5As shown, in this embodiment of the invention, the calibration execution module is responsible for receiving the calibration subsystem queue (i.e., the target energy storage subsystem list) from the queue management module and sending calibration execution instructions to each target energy storage subsystem to control it to perform SOC calibration operations. After calibration is completed, the calibration execution module feeds back the calibration results to the energy storage subsystem calibration status management module so that the corresponding calibration request can be revoked.

[0049] Specific SOC calibration methods may include one or more of the following: The first is the open-circuit voltage method. Specifically, after controlling the target energy storage subsystem to charge or discharge to a preset SOC range, charging or discharging is stopped and the system is left to stand for a preset time. The open-circuit voltage of the target energy storage subsystem is collected, and the SOC of the target energy storage subsystem is corrected according to the preset correspondence between open-circuit voltage and SOC. The calibration completion judgment condition is: when the SOC of the target energy storage subsystem stabilizes within the allowable error range of the preset calibration value after standing, the calibration is judged to be complete, and the target energy storage subsystem is removed from the calibration queue. Specifically, the stability of SOC can be characterized by continuously collecting the terminal voltage values ​​at multiple times, and the difference in voltage values ​​at each time is within a set range. The second is the full charge / discharge method. Specifically, the calibration direction is determined according to the current SOC of the target energy storage subsystem: if the current SOC of the target energy storage subsystem is greater than a preset high threshold (e.g., 60%), the target energy storage subsystem is controlled to charge to a full charge state; if the current SOC is less than a preset low threshold (e.g., 40%), the target energy storage subsystem is controlled to discharge to a full discharge state. The calibration completion criteria are as follows: when the SOC of the target energy storage subsystem reaches the value corresponding to the fully discharged state or the fully charged state, the calibration is considered complete, and the target energy storage subsystem is removed from the calibration queue. Optionally, the terminal voltage is continuously collected, and the voltage value remains near the upper or lower limit with the difference within a set range. This method of adaptively selecting the calibration direction based on the current SOC can reduce the time and energy loss required for calibration compared to indiscriminately forcing charging and discharging to the endpoint. The third method is partial cycle calibration. The energy storage subsystem is controlled to perform partial charge and discharge cycles within a known SOC range, and the estimated SOC value is corrected based on the comparison with a pre-calibrated voltage-SOC curve. The calibration completion criteria are as follows: the terminal voltage is continuously collected, and the voltage value reaches a preset characteristic point (such as the start or end point of a voltage plateau segment).

[0050] In an optional embodiment, the power recovery of the energy storage subsystem after calibration employs a linear ramping method. Specifically, the controller sends a command containing the power ramping slope to the calibrated energy storage subsystem, causing it to gradually recover to normal power output according to a preset slope, rather than immediately resuming full power response. This design prevents the impact on the power grid caused by a sudden surge in power output after calibration, ensuring the stability of system operation.

[0051] In a specific example, after sending the calibration execution command to the target energy storage subsystem, the process also includes: real-time monitoring of the energy storage power station's operating mode; when an operating mode switch is detected, sending an interrupt command to all energy storage subsystems currently performing calibration; and after the operating mode switch is completed, recalculating the number of parallel calibrations and re-determining the target energy storage subsystem. Thus, when the energy storage power station's operating mode switches (e.g., from grid-connected mode to grid-connected mode, or entering islanded operation due to a grid fault), the currently executing calibration task can be interrupted promptly, and the current adjustable output margin and grid support capacity requirements can be reassessed under the new operating mode, the allowed number of parallel calibrations can be recalculated, and the target energy storage subsystem can be re-determined. This mechanism ensures that system stability is not affected by the calibration task during operating mode switching, and each energy storage subsystem can quickly respond to the power support requirements under the new mode.

[0052] In a specific example, during the calibration of a target energy storage subsystem, if the grid support capacity of an uncalibrated energy storage subsystem falls below the preset grid capacity requirement, the calibration operation of the subsystem currently undergoing calibration is interrupted. Specifically, during calibration, the controller continuously monitors the actual grid support capacity of the remaining online energy storage subsystems that have not yet undergone calibration. When one of the following situations causes the remaining grid support capacity to fall below the preset grid capacity requirement, the controller immediately sends an interruption command to the target energy storage subsystem currently undergoing calibration: for example, a change in operating conditions causing a real-time increase in the preset grid capacity requirement; or, a failure of some energy storage subsystems leading to a decrease in the remaining grid support capacity. The interrupted target energy storage subsystem returns to the calibration queue to await the next batch of calibrations. This real-time protection mechanism can address the safety risks associated with dynamic changes in operating parameters and prevent grid instability caused by the violation of constraints.

[0053] like Figure 6 As shown, taking the energy storage subsystem with ID 001 as an example, the complete execution flow of the SOC calibration method involved in this embodiment of the invention is described. This flow involves the interaction between four parties: the energy storage subsystem, the energy storage subsystem calibration status management module (module 1), the queue management module (module 2), and the calibration execution module (module 3).

[0054] First, during normal operation, the battery management system of energy storage subsystem ID:001 continuously monitors its operating status. When calibration trigger conditions are met (such as the calibration time interval exceeding a preset period), energy storage subsystem ID:001 reports a calibration request to the energy storage subsystem calibration status management module. After receiving the calibration request, the energy storage subsystem calibration status management module verifies the validity of the request and adds energy storage subsystem ID:001 to the calibration queue, while simultaneously transmitting the calibration queue information to the queue management module.

[0055] Subsequently, the queue management module obtains the current operating status parameters of the energy storage power station, including the total available power, dispatch command power value, grid support capacity of each energy storage subsystem, preset grid capacity requirements, and operating mode. The queue management module calculates the allowable number of calibrations for each constraint and takes the minimum value to obtain the number of parallel calibrations. It then prioritizes each energy storage subsystem in the calibration queue according to preset sorting rules. If energy storage subsystem ID:001 is within the range of parallel calibrations after sorting, it is selected into the target energy storage subsystem list for this batch. The queue management module then transmits this target energy storage subsystem list to the calibration execution module.

[0056] Next, the calibration execution module sends a calibration execution command to the energy storage subsystem ID:001. Upon receiving the command, the energy storage subsystem ID:001 enters calibration mode and executes the specific SOC calibration operation. During the calibration process, the energy storage subsystem ID:001 periodically reports calibration progress and status information to the calibration execution module.

[0057] Once energy storage subsystem ID:001 completes the calibration operation and meets the calibration completion criteria, it sends a calibration completion signal to the calibration execution module. Upon receiving this signal, the calibration execution module sends a calibration completion notification to the energy storage subsystem calibration status management module. The energy storage subsystem calibration status management module then cancels the calibration request for energy storage subsystem ID:001 and removes it from the calibration queue. At this point, the SOC calibration process for energy storage subsystem ID:001 is complete, and the subsystem returns to normal operation, ready to participate in the power dispatch of the energy storage power station.

[0058] Through the above process, energy storage subsystem ID:001 completed the entire lifecycle management from triggering a calibration request, entering the calibration queue, being selected as the target subsystem, performing calibration operations, to finally being removed from the queue. This process demonstrates the invention's ability to coordinate calibration tasks for various energy storage subsystems at the site-level.

[0059] To further illustrate the technical solution of the present invention, the following description is based on specific operating conditions. Assume that a certain energy storage power station contains 7 energy storage subsystems, all of which have calibration requirements, and are numbered sequentially according to the time sequence of the calibration requests issued as #01, #02, #03, #04, #05, #06, and #07.

[0060] Operating Conditions: The energy storage power station is in grid-connected mode, and the number of units to be calibrated in parallel is determined by taking the minimum value of multiple constraints, which is 2 units. It was detected that energy storage subsystem #03 has been 75 days since its last calibration, and energy storage subsystem #07 has been 60 days since its last calibration. After initial prioritization based on calibration time intervals, #03 and #07 have been identified as the target energy storage subsystems for this batch. At this point, the maintenance personnel issue an instruction requiring energy storage subsystem #06 to immediately perform calibration. Manual intervention is now marked as the highest priority, unconditionally allowing this energy storage subsystem to jump the queue. The calibration order is based on the highest priority of manual intervention, with #06 at the top of the queue, followed by the calibration time interval priority, and the remaining energy storage subsystems are sorted by time; the number of units to be calibrated in parallel remains at 2 units; the target energy storage subsystems for calibration are determined to be #06 and #03, and energy storage subsystem #07 enters the next batch calibration queue.

[0061] In this embodiment of the invention, by receiving calibration requests reported by each energy storage subsystem and generating a calibration queue at the site-level controller, centralized management of the calibration requirements of the entire site is achieved, avoiding the problem of independent and uncoordinated operation of each energy storage subsystem. Simultaneously, by acquiring the current operating status parameters of the energy storage power station and dynamically calculating the number of parallel calibrations allowed to be performed simultaneously based on these parameters, the number of parallel calibrations can be dynamically adjusted according to the actual operating status of the power station: when the power station's adjustable output and grid support capabilities are sufficient, the number of calibrations corresponding to multiple constraints is larger, allowing more energy storage subsystems to perform calibrations simultaneously to improve efficiency; when the margin in any dimension is tight, the number of calibrations corresponding to the constraints decreases, and the number of parallel calibrations is limited after multiple constraints are minimized, ensuring that the power station has sufficient responsiveness and support capabilities. Furthermore, by sorting the energy storage subsystems in the calibration queue according to a preset sorting rule and determining the target energy storage subsystem based on the number of parallel calibrations and the sorting results, orderly scheduling of calibration tasks is achieved. Thus, this invention achieves efficient automated SOC calibration while ensuring the overall stability and responsiveness of the energy storage power station, solving the problem of conflict between calibration timing and power station operation requirements in related technologies.

[0062] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.

[0063] The steps described above are for clarity only. In practice, they can be combined into one step or some steps can be split into multiple steps. As long as they include the same logical relationship, they are all within the protection scope of this invention. Adding insignificant modifications or introducing insignificant designs to the algorithm or process, without changing the core design of the algorithm and process, are also within the protection scope of this invention.

[0064] Furthermore, the examples mentioned in the above embodiments can be freely combined, and any combination can be understood as an embodiment. The terms "embodiment" or "example" appearing in various locations in the specification do not necessarily refer to the same embodiment, nor are they independent or alternative embodiments mutually exclusive with other embodiments. Those skilled in the art will understand that the embodiments described herein can be combined with other embodiments.

[0065] Another embodiment of the present invention relates to a controller for an energy storage power station, used to perform the above-described SOC calibration method for the energy storage power station.

[0066] Another embodiment of the present invention relates to a calibration system for an energy storage power station, comprising: a controller as described above; at least one energy storage subsystem connected to the controller for reporting calibration requests to the controller and performing SOC calibration operations based on calibration execution instructions sent by the controller.

[0067] It is not difficult to see that this embodiment is a device embodiment corresponding to the above method embodiments, and this embodiment can be implemented in conjunction with the above method embodiments. The relevant technical details mentioned in the above method embodiments are still valid in this embodiment, and will not be repeated here to reduce repetition. Accordingly, the relevant technical details mentioned in this embodiment can also be applied to the above method embodiments.

[0068] It is worth mentioning that all modules involved in this embodiment are logical modules. In practical applications, a logical unit can be a physical unit, a part of a physical unit, or a combination of multiple physical units. Furthermore, to highlight the innovative aspects of this invention, this embodiment does not introduce units that are not closely related to solving the technical problem proposed by this invention; however, this does not mean that other units are absent from this embodiment.

[0069] Those skilled in the art will understand that the above embodiments are specific embodiments for implementing the present invention, and in practical applications, various changes in form and detail may be made without departing from the spirit and scope of the present invention.

Claims

1. A method for calibrating the State of Charge (SOC) of an energy storage power station, characterized in that, The method, applied to the controller of the energy storage power station, includes: Receive calibration requests and generate a queue of devices to be calibrated; Obtain the current operating status parameters of the energy storage power station; Based on the current operating status parameters, calculate the number of parallel calibrations that can be performed simultaneously. The energy storage subsystems in the queue to be calibrated are sorted according to a preset sorting rule, and the target energy storage subsystem is determined from the queue based on the number of parallel calibrations and the sorting results. A calibration execution command is sent to the target energy storage subsystem to control the target energy storage subsystem to perform calibration.

2. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, The step of calculating the number of parallel calibrations that can be performed simultaneously based on the current operating status parameters includes: Calculate the number of calibrations allowed for each of the multiple constraints based on the current operating status parameters, and take the minimum value among them as the number of parallel calibrations; Among them, the multiple constraints include: the adjustable output of the energy storage power station during the calibration period is not lower than the power value of the dispatch command; The grid support capacity of the energy storage subsystem that has not undergone calibration shall not be lower than the preset grid capacity requirement under the grid constraint condition. The ratio of the grid support capacity of the uncalibrated energy storage subsystem to the calibration capacity of the calibrated energy storage subsystem shall not be lower than the constraint condition of a preset safety factor.

3. The SOC calibration method for an energy storage power station according to claim 2, characterized in that, The number of calibrations corresponding to the output constraint is determined based on the power margin of the energy storage power station, where the power margin is the difference between the total available power of the energy storage power station and the power value of the dispatch command. The number of calibrations corresponding to the network constraint conditions is determined based on the difference between the sum of the network support capacity of each energy storage subsystem in the energy storage power station and the preset network capacity requirement.

4. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, If, during the calibration process of the target energy storage subsystem, the grid support capacity of the energy storage subsystem that has not been calibrated is lower than the preset grid capacity requirement, the calibration operation of the energy storage subsystem that is being calibrated will be interrupted.

5. The SOC calibration method for an energy storage power station according to claim 2, characterized in that, The preset network capacity requirement is at least one of the following values: Pre-configured fixed capacity requirements; The capacity requirement value is received in real time through an external interface; The capacity demand value is determined in real time based on the current operating conditions of the energy storage power station.

6. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, Sending a calibration execution command to the target energy storage subsystem to control the target energy storage subsystem to perform calibration includes: If the current SOC of the target energy storage subsystem is greater than a preset high threshold, then the target energy storage subsystem is controlled to be charged to a full charge state. If the current SOC is less than a preset low threshold, the target energy storage subsystem is controlled to discharge to full capacity.

7. The SOC calibration method for an energy storage power station according to claim 6, characterized in that, When the SOC of the target energy storage subsystem reaches the value corresponding to the fully discharged state or the fully charged state, the calibration of the target energy storage subsystem is determined to be complete, and the target energy storage subsystem is removed from the calibration queue.

8. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, Sending a calibration execution command to the target energy storage subsystem to control the target energy storage subsystem to perform calibration includes: After controlling the target energy storage subsystem to charge or discharge to a preset SOC range, stop charging and discharging and let it stand still for a preset time; The open-circuit voltage of the target energy storage subsystem is collected, and the SOC of the target energy storage subsystem is corrected according to the preset correspondence between open-circuit voltage and SOC.

9. The SOC calibration method for an energy storage power station according to claim 8, characterized in that, When the SOC of the target energy storage subsystem stabilizes within the allowable error range of the preset calibration value after resting, the calibration of the target energy storage subsystem is determined to be complete, and the target energy storage subsystem is removed from the calibration queue.

10. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, The current operating status parameters include the operating mode of the energy storage power station, which includes at least a grid-connected mode and a grid-connected mode; after sending the calibration execution command to the target energy storage subsystem, the process further includes: Real-time monitoring of the operation mode of the energy storage power station; When the switch to the operating mode is detected, an interrupt command is sent to all energy storage subsystems currently performing calibration. After the operation mode switch is completed, the number of parallel calibrations is recalculated and the target energy storage subsystem is redefined.

11. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, After determining the target energy storage subsystem from the queue to be calibrated, the following steps are included: Obtain the electrical topology location information of each of the target energy storage subsystems; If two target energy storage subsystems are located under the same electrical topology node, only the one that appears earlier in the sorting results will be retained as the target energy storage subsystem, and the other will be postponed to the next batch.

12. The SOC calibration method for an energy storage power station according to claim 1, characterized in that, The calibration request triggering type includes at least one of the following: Types of triggers for human intervention; The type of event triggered when the time interval since the last calibration exceeds a preset period; The type of event triggered when the cumulative charge / discharge ampere-hour value reaches a set threshold; The type that is triggered when the number of charge / discharge cycles reaches a set threshold.

13. The SOC calibration method for an energy storage power station according to claim 12, characterized in that, In the preset sorting rules, the type triggered by manual intervention has a higher priority than other types; among the types triggered when the time interval since the last calibration exceeds a preset period, they are sorted according to the time interval since the last calibration.

14. A controller for an energy storage power station, characterized in that, The SOC calibration method for performing the energy storage power station as described in any one of claims 1 to 13.

15. A calibration system for an energy storage power station, characterized in that, include: The controller as described in claim 14; At least one energy storage subsystem is connected to the controller to report a calibration request to the controller and perform calibration based on the calibration execution command sent by the controller.