A multi-scale borehole strain monitoring method and system based on mining disturbance seismic source model

By configuring three-dimensional partitioning and multi-sensitivity borehole strain gauges, the problem of existing mine dynamic disaster monitoring methods being unable to capture pre-earthquake anomalies and make quantitative predictions has been solved, realizing full-chain monitoring and hierarchical early warning, and improving the accuracy and timeliness of early warning.

CN123136758APending Publication Date: 2026-11-20YANZHOU COAL ORDOS NENG HUA CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611458747.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-18
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing methods for monitoring dynamic disasters in mines are unable to effectively capture subtle abnormal changes in the stress field in the pre-earthquake region, lack means of extracting precursor information, and are therefore unable to achieve quantitative prediction and graded early warning of dynamic disasters in mines.

Method used

Based on three-dimensional geological modeling and geostress field inversion, the near-field rupture monitoring zone, the mid-field energy release monitoring zone, and the far-field background monitoring zone are divided. Ultra-high sensitivity, high resolution, and large range borehole strain gauges are configured to achieve multi-scale monitoring and collaborative early warning.

Benefits of technology

It has achieved closed-loop monitoring of the entire process of mine dynamic disasters, from weak precursors to rupture, improving the accuracy, timeliness and comprehensiveness of early warning, and enabling quantitative prediction of the time of occurrence, energy level and impact range of disasters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123136758A_ABST
    Figure CN123136758A_ABST
Patent Text Reader

Abstract

The application provides a multi-scale borehole strain monitoring method and system based on mining disturbance seismic source model, and belongs to the field of mine dynamic disaster monitoring and early warning. The method identifies stress conduction paths through three-dimensional geological modeling and geostress field inversion, divides the surrounding rock mass into three monitoring areas of near-field rupture, middle-field energy release and far-field background, and respectively constructs shallow, medium-deep and deep boreholes and installs four-component borehole strainmeters with different sensitivity levels. After time synchronization of the instruments in the three areas, the far-field area continuously monitors and identifies precursor anomalies, triggers the middle-field area to encrypt sampling and the near-field area to synchronously monitor, combines with the earthquake response mode to determine the energy supply range and stress release amount of mine earthquake, and then establishes a quantitative prediction model through multi-event statistical analysis, so as to realize the graded early warning of mine dynamic disasters. The application has the whole-chain monitoring capability from weak precursor capture of regional stress field to disaster early warning, and can be widely used in the field of mine dynamic disaster monitoring and early warning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mine dynamic disaster monitoring and early warning technology, specifically to a multi-scale borehole strain monitoring method and system based on a mining disturbance source model. Background Technology

[0002] With the increasing depth of mineral resource extraction, mine dynamic disasters, such as mine tremors and rock bursts, occur frequently, seriously threatening mine safety. Studies show that the strata involved in the gestation and induction of tectonic mine tremors during deep mining are far larger than the traditional stope and mining-induced impact range. In a single tectonic dynamic disaster event, the strata involved in stress and energy accumulation and adjustment can be 5 to 10 times larger, or even more, than the actual rock mass scale of the impact instability failure. This multi-scale mechanical behavior presents a significant challenge to monitoring and early warning systems. How to effectively capture the entire process from subtle changes in the regional tectonic stress field to rapid rock mass fracturing in the seismic source area has become a key technical problem urgently needing to be solved in this field.

[0003] Current monitoring of dynamic disasters in mines primarily relies on microseismic networks and microseismic monitoring systems. These systems work by deploying multiple seismic detectors within the mine area to receive vibration signals generated when rock masses fracture, thereby locating and analyzing the epicenter location, timing, and released energy. However, this method is essentially a passive, post-earthquake monitoring approach. It can only passively receive vibration signals for post-earthquake location and cannot directly measure the coordinated evolution of the stress field between the epicenter and the surrounding area, nor can it capture subtle anomalies in the stress field before an earthquake. More importantly, existing systems lack effective methods for extracting precursory information, making it impossible to quantitatively predict the timing, energy level, and impact range of dynamic disasters in mines, resulting in significant deficiencies in the timeliness and accuracy of early warnings.

[0004] The theory of stress transmission in geological structures provides a new solution to the above problems. Studies show that under tectonic stress, the contact relationship between rock masses determines the formation of the stress transmission path, which in turn determines the stress propagation route. Rock masses on the same stress transmission path exhibit significant correlations in their stress states, jointly participating in energy release and stress adjustment processes. Borehole strain observations confirm that when the measuring point and the seismic source are on the same stress transmission path, the borehole strain exhibits a permanent strain shift response mode, indicating that the rock mass in the measuring point area directly participated in the energy release and permanent stress adjustment of the seismic event. When the measuring point is outside this path, it only exhibits an elastic fluctuation response mode, indicating that the measuring point is only affected by seismic wave propagation. Further research reveals that through analysis methods such as waveform complexity index, group statistics, and strain asymmetry ratio, precursory information patterns of mine dynamic disasters can be extracted from borehole strain time history data: the waveform complexity index shows a "rise → fall" change, the group statistics composite characteristic parameters show a surge and other active changes, and the strain asymmetry ratio shows a "zero → positive → zero → negative → zero" change. The discovery of these precursor patterns provides actionable criteria for early warning of mine dynamic disasters. However, existing monitoring methods still face the following challenges: First, how to scientifically divide monitoring areas in three-dimensional space to differentiate rock masses with different mechanical behaviors and develop targeted monitoring plans; second, how to determine the depth, number, and arrangement of boreholes in different areas to effectively cover multi-scale mechanical processes; third, how to configure instruments with appropriate sensitivity levels for different areas so that the monitoring system can capture weak precursor signals in the far field while recording large dynamic range fracturing processes in the near field; and fourth, how to achieve coordinated early warning from multiple regional instruments and ultimately realize quantitative prediction and graded early warning of mine dynamic disasters. These problems prevent existing methods from achieving a closed-loop management of the entire chain of mine dynamic disasters, from capturing weak precursors to disaster early warning. Summary of the Invention

[0005] This application provides a multi-scale borehole strain monitoring method and system based on a mining disturbance source model. The purpose is to address the problems mentioned in the background section by using three-dimensional functional zoning, differentiated borehole parameter design, and multi-sensitivity instrument collaborative configuration to achieve multi-scale quantitative monitoring of mine dynamic disasters from weak precursor capture to source rupture, and ultimately achieve effective early warning of mine dynamic disasters such as mine tremors and rockbursts.

[0006] To solve the above-mentioned technical problems, the technical solution proposed in this application is as follows: This invention provides a multi-scale borehole strain monitoring method based on a mining disturbance source model, comprising: S1: Based on three-dimensional geological modeling and geostress field inversion, the stress transmission path of geological structures is identified, and the surrounding rock mass of the mining space is divided into near-field fracture monitoring zone, mid-field energy release monitoring zone and far-field background monitoring zone in three-dimensional space. S2: Construct stress-sensitive parts at the fold axis and fracture turning point in the far-field background monitoring area, drill deep holes with a depth of 500-1500m, and install ultra-high sensitivity four-component borehole strain gauges. S3: Drill a medium-deep borehole with a depth of 200-800m along the stress transmission path in the mid-field energy release monitoring area, and install a high-resolution four-component borehole strain gauge. S4: Install a large-range dynamic borehole strain gauge around the shallow borehole with a depth of 30-80m in the near-field fracture monitoring area. S5: The instruments in the near-field rupture monitoring zone, the mid-field energy release monitoring zone, and the far-field background monitoring zone are synchronized using GPS or NTP timing. After the far-field background monitoring zone captures precursor anomalies, it triggers the mid-field energy release monitoring zone to conduct encrypted sampling and the near-field rupture monitoring zone to conduct synchronous monitoring. By combining the coseismic response mode, the energy supply range and effective stress release of the mine seismic event are determined and inferred. Through multi-event statistical analysis, a quantitative prediction model for mine dynamic disasters is established to achieve early warning of mine dynamic disasters.

[0007] Furthermore, step S2 further includes: The deep borehole is installed in the intact rigid bedrock more than 30m above the coal seam floor. It is installed using a high-pressure grouting coupling method with expansive cement to ensure that the probe is fully coupled with the surrounding rock to achieve a 1:1 strain transfer. The far-field background monitoring area covers the entire mining area, with a spacing of 1000-3000m between the monitoring points, and 3-5 monitoring points are arranged in each mining area.

[0008] Furthermore, step S3 further includes: The installation strata of the medium-deep boreholes are selected from key thick sandstone layers with high strength and good elasticity. The measuring points are arranged radially or linearly along the structural strike with the mining area as the center. The spacing between the measuring points is 200-500m. At least 3-5 measuring points are arranged in each mining area or working face group to ensure that at least one monitoring line can cross the seismic stress transmission path.

[0009] Furthermore, step S4 further includes: The shallow boreholes are installed in intact rock strata outside the loosened zone; 3 to 5 monitoring holes are arranged along the strike and dip of the working face, and 4 to 8 measuring points are arranged on each working face to form a three-dimensional, enclosed near-field observation network.

[0010] Furthermore, both the ultra-high sensitivity four-component borehole strain gauge and the high resolution four-component borehole strain gauge are four independent measurement units arranged sequentially at a 45° angle. The observed values ​​S1, S2, S3, and S4 of the four independent measurement units satisfy the self-consistent equation S1 + S3 = S2 + S4.

[0011] Furthermore, in step S5, after the far-field background monitoring area captures the precursor anomaly, it triggers encrypted sampling in the mid-field energy release monitoring area and synchronous monitoring in the near-field rupture monitoring area, which further includes: The far-field background monitoring instrument continuously records the changes in the regional stress field at a sampling frequency of 0.1 to 1 Hz, and calculates the waveform complexity index, group statistical composite characteristic parameter, and strain asymmetry ratio η in real time. When the waveform complexity index shows an "increase → decrease" change, the group statistical composite feature parameter shows a surge, or the strain asymmetry ratio η shows one or more of the following precursor patterns of "zero → positive → zero → negative → zero", an early warning signal for mine dynamic disasters is issued. After receiving the warning signal, the instrument in the mid-field energy release monitoring area automatically encrypts the sampling frequency to 100Hz, tracks the direction and magnitude of stress adjustment along the stress transmission path, and identifies permanent strain offset type stress adjustment signals. The instrument in the near-field fracture monitoring zone monitors the strain release sequence of the rock mass fracture process in real time at a sampling frequency of not less than 200Hz, and determines the fracture scale D of the seismic source.

[0012] Furthermore, when two or more of the following three indicators simultaneously exhibit abnormalities: the waveform complexity index changes from "increase" to "decrease", the group statistical composite feature parameter surges, and the strain asymmetry ratio η changes from "zero" to "positive" to "zero" to "negative" to "zero", the reliability of the early warning signal is improved.

[0013] Furthermore, the strain asymmetry ratio η is calculated as follows: using a 24-hour time window, the ratio of the occurrence frequency p1 / p2 of the positive strain rate dataset and the ratio of the cumulative intensity Q1 / Q2 within this window are calculated, and the strain asymmetry ratio is defined as follows:

[0014] Where p1 and p2 are the number of times the positive and negative strain rates occur within the time window, respectively, and Q1 and Q2 are the cumulative values ​​of the positive and negative strain rate data, respectively.

[0015] Furthermore, the waveform complexity index is calculated as follows: taking a certain moment as a benchmark, 1440 borehole strain data with a sampling interval of 1 minute within the previous 24 hours are taken to form a calculation unit. With a sliding step of 1 minute, the waveform complexity index corresponding to each moment is calculated using the grid covering method to obtain the curve of the index changing with time. The occurrence of an "increase → decrease" change in the index with a change amplitude exceeding twice the normal fluctuation range is taken as one of the precursor judgment conditions.

[0016] Furthermore, the identification criterion for the permanent strain offset type stress adjustment signal is as follows: within 24 hours after receiving the warning signal, adjacent measuring points in the field energy release monitoring area simultaneously experience a sudden change in strain value and stabilize at the new strain level, and the offset directions of at least two measuring points are coordinated and consistent.

[0017] Furthermore, step S5, which involves combining coseismic response modes to determine the energy supply range and effective stress release of a mine seismic event, further includes: After a mine earthquake event, the response modes are analyzed based on the distance S between each measuring point and the seismic source: if the ratio of S to D does not exceed 1, it is a composite mode of "permanent strain offset + elastic fluctuation"; if the ratio of S to D exceeds 1 and the ratio of S to L does not exceed 1, it is a mode of "permanent strain offset" or "permanent strain offset + elastic fluctuation"; if the ratio of S to L exceeds 1, it is a mode of "elastic fluctuation" or no response. The method for determining the energy supply range L is as follows: statistically analyze the response patterns of all measuring points, and take the distance corresponding to the measuring point that is farthest from the source among the measuring points that show the "permanent strain shift" response as the estimated lower limit of the energy supply range L.

[0018] Furthermore, the establishment of a quantitative prediction model for mine dynamic disasters through multi-event statistical analysis to achieve early warning of mine dynamic disasters includes: By statistically analyzing the source rupture scale D, energy supply range L, and effective stress release of multiple mine earthquake events, an empirical model of the "DL-stress release" relationship for different types and energy levels of mine dynamic disasters in mining areas is established. Based on this empirical model, the occurrence time, energy level, and impact range of subsequent mine dynamic disasters are quantitatively predicted according to real-time monitoring data, and graded early warnings are issued based on the predicted energy level and impact range.

[0019] Furthermore, the step S1 of identifying the geological stress transmission path includes: based on the geostress field inversion results, extracting the maximum principal stress trace map and the maximum shear strain increment distribution map, and identifying the convergence area of ​​the maximum principal stress trace and the gradient change zone of the maximum shear strain increment as the stress transmission path.

[0020] Furthermore, the three-dimensional spatial division of the near-field fracture monitoring zone, the mid-field energy release monitoring zone, and the far-field background monitoring zone in step S1 is calculated based on the mining disturbance potential model, and the expression for the mining disturbance potential W is:

[0021] Where H is the mining depth, V is the mining volume, d is the vertical distance from the mining location to the controlling structure, λ is the regional tectonic stress non-uniformity coefficient, and α and β are empirical constants.

[0022] On the other hand, this application also claims protection for a multi-scale borehole strain monitoring system based on a mining disturbance source model, for performing the method as described in any of the foregoing statements, including: The near-field fracture monitoring zone borehole array consists of three-dimensional enclosed shallow boreholes surrounding the mining space, equipped with large-range dynamic borehole strain gauges to capture the rapid rock fracture and strong stress release process caused by mining in real time. The borehole array in the mid-field energy release monitoring area consists of medium-deep boreholes arranged radially or linearly along the stress transmission path of geological structures. High-resolution four-component borehole strain gauges are installed to identify and track permanent stress adjustment signals on the stress transmission path. The far-field background monitoring area borehole array consists of deep boreholes arranged at fixed points in the stress-sensitive parts of the fold axis and fracture turning point, and is equipped with ultra-high sensitivity four-component borehole strain gauges to capture weak precursor anomalies of the regional tectonic stress field. The system also includes a monitoring and control host, which receives monitoring data from borehole strain gauges in various areas, executes precursor pattern recognition algorithms, issues early warning signals for mine dynamic disasters, and combines coseismic response patterns to infer the energy supply range and effective stress release of mine seismic events. Through multi-event statistical analysis, a quantitative prediction model for mine dynamic disasters is established to achieve graded early warning of mine dynamic disasters.

[0023] Furthermore, the drilling depth of the shallow boreholes in the near-field fracture monitoring area is 30-80m, and the installation layer enters the intact rock layer outside the loosening zone; 3-5 monitoring holes are arranged along the strike and dip of the working face, and 4-8 measuring points are arranged on each working face to form a three-dimensional enclosed near-field observation network. The drilling depth of the deep boreholes in the mid-field energy release monitoring area is 200-800m. The installation layer is selected from the key bearing layer of thick sandstone with high strength and good elasticity. The measuring points are arranged radially or linearly along the structural strike with the mining area as the center. The spacing between the measuring points is 200-500m. At least 3-5 measuring points are arranged in each mining area or working face group. The drilling depth of the deep boreholes in the far-field background monitoring area is 500-1500m, and the installation layer enters the complete rigid bedrock more than 30m into the coal seam floor. The installation is carried out by high-pressure grouting coupling with expansive cement. The measuring points in the far-field background monitoring area cover the entire mining area, with a spacing of 1000-3000m between the measuring points, and 3-5 measuring points are arranged in each mining area.

[0024] Compared with the prior art, the present invention achieves the following beneficial technical effects: This application achieves closed-loop monitoring of the entire chain of mine dynamic disasters, from capturing weak precursors in the far field to the near-field rupture process, through three-dimensional zone monitoring, coordinated deployment of multi-sensitivity instruments, and a linkage early warning mechanism. It can also combine coseismic response analysis to infer the energy supply range and stress release, and finally establish a quantitative prediction model for graded early warning, which significantly improves the accuracy, timeliness, and comprehensiveness of disaster early warning. Attached Figure Description

[0025] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0026] Figure 1 A flowchart of a multi-scale borehole strain monitoring method based on a mining disturbance source model is provided in this embodiment of the invention. Figure 2 This is a schematic diagram of the structure of a multi-scale borehole strain monitoring system provided in an embodiment of the present invention; Figure 3 A schematic diagram of a computer device structure provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of the overall process of the monitoring system provided in an embodiment of the present invention; Figure 5 The schematic diagram of the multi-component borehole strain gauge provided in the embodiment of the present invention.

[0027] Explanation of reference numerals in the attached drawings: 1-surrounding rock, 2-expansive cement coupling layer, 3-strain gauge, 4-communication compartment, 5-cable protection pipe, 6-sensor. Detailed Implementation

[0028] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0029] For ease of description, the near-field rupture monitoring area will be referred to as Area A, the mid-field energy release monitoring area as Area B, and the far-field background monitoring area as Area C.

[0030] like Figure 1 As shown in the embodiments of this application, a multi-scale borehole strain monitoring method based on a mining disturbance source model is provided. The ultimate goal of this method is to achieve quantitative prediction and graded early warning of mining dynamic disasters such as mine tremors and rockbursts. The method includes the following steps: Step S1: Based on three-dimensional geological modeling and geostress field inversion, identify the stress transmission path of geological structures, and divide the surrounding rock mass of the mining space into a near-field fracture monitoring zone (Area A), a mid-field energy release monitoring zone (Area B), and a far-field background monitoring zone (Area C) in three-dimensional space.

[0031] Step S2: Construct stress-sensitive areas at the fold shaft and fracture turning point in area C, drill deep holes with a depth of 500-1500m, and install ultra-high sensitivity four-component borehole strain gauges.

[0032] Step S3: Drill medium-deep boreholes with a depth of 200-800m along the stress transmission path in area B, and install high-resolution four-component borehole strain gauges.

[0033] Step S4: In area A, construct shallow boreholes with a depth of 30-80m around the mining space and install large-range dynamic borehole strain gauges.

[0034] Step S5: The instruments in the three zones use GPS or NTP time synchronization to achieve time synchronization. After capturing the precursor anomaly in zone C, it triggers encrypted sampling in zone B and synchronous monitoring in zone A. Combined with the coseismic response mode, the energy supply range and effective stress release of the mine seismic event are determined and inferred. Through multi-event statistical analysis, a quantitative prediction model for mine dynamic disasters is established to achieve early warning of mine dynamic disasters.

[0035] In one embodiment of this application, step S1 first requires collecting geological information such as topographic elevation, stratigraphic distribution, fold and fault geometry, borehole columnar sections, and exploration line profiles. Based on this information, a three-dimensional geological entity model is established. Then, the stress relief method is used to perform original geostress measurements at no fewer than six measuring points to obtain the magnitude, direction, and dip angle of the principal stresses. These are used as constraints for regional geostress field inversion. Based on the geostress field inversion results, the maximum principal stress trace map and the maximum shear strain increment distribution map are extracted. The convergence area of ​​the maximum principal stress trace and the gradient change zone of the maximum shear strain increment are identified as stress transmission paths. This stress transmission path reflects the main channels for stress transmission in the strata, and rock masses on the same path have a significant correlation in their stress state. Subsequently, based on the mining disturbance potential model... The impact range of mining disturbance is calculated, where H is the mining depth, V is the mining volume, d is the vertical distance from the mining location to the controlling structure, λ is the regional tectonic stress non-uniformity coefficient, and α and β are empirical constants. This model allows for the quantitative calculation of the disturbance degree of mining activities on the surrounding rock mass, thus scientifically determining the spatial boundaries of each monitoring area. Based on the stress transmission path distribution characteristics, the surrounding rock mass around the mining space is divided into three-dimensional zones: Zone A (approximately 0–50 m), Zone B (approximately 50–500 m, which can be appropriately extended along the transmission direction), and Zone C (exceeding 500 m, focusing on fold axes and fracture inflection points).

[0036] In one embodiment of this application, step S2 specifically involves drilling deep boreholes of 500–1500 m at selected points in structurally stress-sensitive areas such as the fold axis and fracture inflection points of Zone C. These deep boreholes need to penetrate more than 30 m into intact rigid bedrock at the coal seam floor. The purpose is to install the instrument in deep, intact rigid bedrock to eliminate interference from shallow mining disturbances and surface noise, thereby obtaining stable information on regional stress field changes. During installation, a high-pressure grouting coupling method using expansive cement is employed to ensure complete coupling between the probe and the surrounding rock, achieving a 1:1 strain transfer. The measuring points in Zone C need to cover the entire mining area, with a spacing of 1000–3000 m between measuring points, and 3–5 measuring points are arranged in each mining area.

[0037] In one embodiment of this application, step S3 specifically involves drilling medium-deep boreholes of 200–800 m along the stress transmission path in area B. These medium-deep boreholes are installed in key bearing layers of thick sandstone with high strength and good elasticity, and high-resolution four-component borehole strain gauges are installed in these key bearing layers. The measuring points are arranged radially from the mining area or linearly along the structural strike, with a spacing of 200–500 m. At least 3–5 measuring points are arranged in each mining area or working face group to ensure that at least one monitoring line can traverse the seismic stress transmission path.

[0038] In one embodiment of this application, step S4 specifically involves drilling shallow boreholes of 30–80 m into the roof, floor, and both sides of the mining space around area A. These shallow boreholes need to be installed in intact rock strata outside the loosened zone. Three to five monitoring holes are arranged along the strike and dip of the working face, with four to eight measuring points arranged on each working face, forming a three-dimensional, enclosed near-field observation network.

[0039] The configuration parameters of the borehole strain gauges in each area are as follows: The sensitivity of the ultra-high sensitivity four-component borehole strain gauge in area C is better than 10. - ¹ 0 The range is on the order of magnitude, with a sampling frequency of 0.1–1 Hz and a measurement range of ±100 microstrains; the sensitivity of the high-resolution four-component borehole strain gauge in area B is 10. -8 ~10 -9 The range is ±1000 microstrain; the sampling frequency is adjustable from 1 to 100 Hz; the sensitivity of the large-range dynamic borehole strain gauge in area A is 10. -6 ~10 -7 The sampling frequency is no less than 200Hz, and the measurement range is ±5000 microstrains. Through the above-mentioned sensitivity gradient configuration spanning four orders of magnitude, full-scale coverage from weak far-field signals to strong near-field signals is achieved.

[0040] In one embodiment of this application, both the ultra-high sensitivity four-component borehole strain gauge and the high-resolution four-component borehole strain gauge are four independent measurement units arranged sequentially at a 45° angle. Figure 5 As shown, the structural principle of the multi-component borehole strain gauge is as follows: In a deep borehole, the probe outer cylinder is coupled to the surrounding rock 1 through an expansive cement coupling layer 2. Four independent measuring units are installed inside the probe outer cylinder, arranged at 45° angles along the circumference, denoted as S1, S2, S3, and S4. When the surrounding rock undergoes slight deformation, this is transmitted to the probe outer cylinder through the expansive cement coupling layer 2. The four measuring units then sense the strain changes in different directions, transmitting the data to the ground data acquisition equipment via communication cables in the communication compartment 4 and cable protection pipe 5. The observed values ​​S1, S2, S3, and S4 of the four independent measuring units satisfy the self-consistent equation S1 + S3 = S2 + S4. This self-consistent equation can be used for data quality verification. When the observed values ​​of the four components satisfy this equation, the data is reliable; when they deviate from the equation, it indicates a possible instrument malfunction or installation problem, requiring timely investigation.

[0041] All measuring points are synchronized using GPS time synchronization, with a time accuracy better than 1ms. Monitoring data from each measuring point is transmitted in real time to the remote monitoring and control host via a wireless signal transmitter. GPS or NTP time synchronization ensures the time consistency of data from measuring points in different areas, providing an accurate time reference for subsequent coseismic response mode analysis and stress transmission path tracing.

[0042] In one embodiment of this application, the process of triggering encrypted sampling in area B and synchronous monitoring in area A after capturing the precursor anomaly in area C in step S5 is as follows: the instrument in area C continuously records the changes in the regional stress field at a sampling frequency of 0.1 to 1 Hz, and automatically calculates the waveform complexity index, group statistical composite characteristic parameter and strain asymmetry ratio η value within a 24-hour sliding window every day.

[0043] The waveform complexity index is calculated as follows: taking a certain moment as a baseline, 1440 borehole strain data points with a sampling interval of 1 minute within the preceding 24 hours are used to form a calculation unit. Using a 1-minute sliding step, the waveform complexity index corresponding to each moment is calculated using a grid covering method, resulting in a curve of the index changing over time. A "rising → falling" change in the index with a magnitude exceeding twice the normal fluctuation range is considered one of the precursor criteria.

[0044] The strain asymmetry ratio η is calculated as follows: using a 24-hour time window, calculate the ratio of the occurrence frequencies of the positive strain rate dataset and the negative strain rate dataset within this window, p1 / p2, and the ratio of the cumulative intensity, Q1 / Q2. The specific calculation formula is as follows:

[0045] Where p1 and p2 are the number of times the positive and negative strain rates occur within the time window, respectively, and Q1 and Q2 are the cumulative values ​​of the positive and negative strain rate data, respectively. The strain asymmetry ratio η reflects the degree of asymmetry in the positive and negative directions of the borehole strain time history data. When η shows a regular change of "zero → positive → zero → negative → zero", it indicates that the stress state of the surrounding rock is undergoing a systematic adjustment, which can be used as a precursor criterion for mine dynamic disasters.

[0046] The calculation method for the composite characteristic parameter of the group statistical method is as follows: using group statistical theory, the borehole strain time history data is divided into several "groups" according to the amplitude, and the occurrence frequency and intensity distribution of each group are statistically analyzed to construct the composite characteristic parameter. When the composite characteristic parameter shows a surge, it indicates that the statistical distribution characteristics of the strain data have changed significantly, which can also be used as one of the precursor criteria.

[0047] In one embodiment of this application, an early warning signal for mine dynamic disasters is issued when one or more precursor patterns are detected, such as a waveform complexity index changing from "increase" to "decrease", a surge in the group statistical composite feature parameter, or a strain asymmetry ratio η changing from "zero" to "positive" to "zero" to "negative" to "zero". When two or more of the three indicators show abnormalities simultaneously, the reliability of the warning is significantly improved, and the early warning signal issued at this time has higher reliability.

[0048] In one embodiment of this application, after an early warning is issued in area C, the instrument in area B automatically increases the sampling frequency to 100Hz to track the direction and magnitude of stress adjustment along the stress transmission path. The focus is on determining whether a permanent strain shift signal appears. The identification criterion for a permanent strain shift-type stress adjustment signal is: within 24 hours of receiving the warning signal, adjacent measuring points in area B simultaneously experience a sudden change in strain value and stabilize at the new strain level, and the shift directions of at least two measuring points are consistent. "Consistency" means that the strain shift direction of each measuring point matches the direction of the stress transmission path. For example, multiple measuring points arranged along the same stress transmission path all exhibit compression or tension, and the magnitude of the shift is positively or negatively correlated with the distance of the measuring point from the seismic source. When this criterion is met, it is confirmed that the stress transmission path activity is enhanced, marking it as a high-risk period, and the probability of mine dynamic disasters increases significantly.

[0049] In one embodiment of this application, the instrument in area A captures the rapid strain release process of the surrounding rock in real time during mining activities at a sampling frequency of not less than 200Hz, directly recording the spatiotemporal evolution sequence of rock mass fracturing to determine the source fracturing scale D. The source fracturing scale D can be determined by joint inversion of the arrival time difference and amplitude attenuation characteristics of the fracturing waveform recorded by multiple measuring points in area A. Specifically, based on the arrival time difference of P-waves and S-waves at multiple measuring points in the three-dimensional enclosed observation network of area A, the spatial locations of the fracturing initiation point and termination point are determined, and the distance between the two is used as an estimate of the source fracturing scale D.

[0050] like Figure 4 As shown, the overall process of the monitoring system of this invention is as follows: First, three-dimensional geological modeling and inversion of the geostress field are performed to identify the stress transmission path; then, three zones (A / B / C) are divided and boreholes are drilled to install instruments; after the instruments in the three zones are synchronized, long-term background monitoring is carried out in zone C and precursor indicators are calculated in real time; when a precursor pattern is detected, an early warning is issued, triggering intensive tracking in zone B and synchronous monitoring in zone A; after a mine seismic event occurs, the coseismic response is analyzed to infer the energy supply range L and the effective stress release; after accumulating multi-event data, an empirical model of "DL-stress release" is established; in daily monitoring, this model is used to quantitatively predict the occurrence time, energy level and impact range of future disasters, and to issue yellow, orange or red warnings in different grades.

[0051] In one embodiment of this application, the process of determining the energy supply range and effective stress release of a mine seismic event in step S5 by combining the coseismic response mode is as follows: After a mine seismic event occurs, the distance S between each measuring point and the seismic source is calculated based on the source location parameters provided by the microseismic system. The distance-scale ratio S / D is calculated based on the rock mass fracture scale D measured by the instrument in area A. The coseismic response mode of the borehole strain at each measuring point is analyzed: a ratio of S to D not exceeding 1 indicates a composite mode of "permanent strain shift + elastic fluctuation"; a ratio of S to D exceeding 1 and a ratio of S to L not exceeding 1 indicates a mode of "permanent strain shift" or "permanent strain shift + elastic fluctuation"; and a ratio of S to L exceeding 1 indicates a mode of "elastic fluctuation" or no response. The method for determining the energy supply range L is as follows: statistically analyze the response modes of all measuring points, and take the distance corresponding to the measuring point with the "permanent strain shift" response that is farthest from the seismic source as the estimated lower limit of the energy supply range L. Based on this, the energy supply range L and effective stress release of the mine dynamic disaster event are deduced.

[0052] In the above analysis, "permanent strain shift" refers to an irreversible change in the strain value at a measuring point after a seismic event, transitioning from one stable level to another. This indicates that the rock mass where the measuring point is located directly participated in the energy release and permanent stress adjustment of the seismic event. "Elastic fluctuation," on the other hand, refers to a momentary fluctuation in the strain value at the measuring point as the seismic wave passes through, but which subsequently returns to the pre-event level. This indicates that the measuring point was only affected by the elasticity of the seismic wave propagation and did not participate in energy release or stress adjustment. By distinguishing between these two response modes, the actual impact range and energy supply range of a seismic event can be accurately defined.

[0053] The effective stress release is calculated as follows: based on the strain changes of the measuring points in areas B and C before and after the seismic event, combined with the physical and mechanical parameters such as the elastic modulus and Poisson's ratio of the rock, the strain energy release per unit volume of rock mass is calculated, and then the total effective stress release of the event is obtained by volume integration along the energy supply range L.

[0054] In one embodiment of this application, the process of establishing a quantitative prediction model for mine dynamic disasters through multi-event statistical analysis in step S5, thereby achieving early warning of mine dynamic disasters, is as follows: After accumulating sufficient monitoring data on mine dynamic disaster events, an empirical model of the "DL-stress release" relationship for different types and energy levels of mine dynamic disasters is established through statistical analysis of the source rupture scale D, energy supply range L, and effective stress release of multiple mine seismic events. This empirical model reflects the statistical regularity between the source rupture scale, energy supply range, and stress release of mine dynamic disasters under specific geological conditions in the mining area.

[0055] Based on this empirical model, during routine monitoring, when a precursor anomaly is detected in area C and an early warning is issued, the model is used to quantitatively predict the timing, energy level, and impact range of potential mine dynamic disasters, based on the range and magnitude of stress adjustment along the stress transmission path in area B, combined with the development trend of rock mass fracturing in area A. Specifically: based on the duration and rate of change of the precursor anomaly in area C, the remaining time before the disaster is predicted; based on the magnitude and range of stress adjustment in area B, combined with the "DL-stress release" relationship in the empirical model, the energy level and impact range of the impending event are predicted. A graded warning system is then implemented based on the predicted energy level and impact range: a yellow warning is issued when the predicted energy level is low and the impact range is small; an orange warning is issued when the predicted energy level is medium and may affect the main production area; and a red warning is issued when the predicted energy level is high and may cause serious damage, with immediate personnel evacuation and production shutdown recommended.

[0056] like Figure 2 As shown, this embodiment also provides a multi-scale borehole strain monitoring system based on a mining disturbance source model, including: a borehole array in area A, consisting of three-dimensional enclosed shallow boreholes with a depth of 30-80m, equipped with large-range dynamic borehole strain gauges to capture the rapid rock fracturing and strong stress release process caused by mining in real time; a borehole array in area B, consisting of medium-deep boreholes arranged along the stress transmission path with a depth of 200-800m, equipped with high-resolution four-component borehole strain gauges to identify and track permanent stress adjustment signals on the stress transmission path; a borehole array in area C, consisting of deep boreholes arranged at fixed points in tectonic stress-sensitive areas with a depth of 500-1500m, equipped with ultra-high sensitivity four-component borehole strain gauges to capture weak precursor anomalies in the regional tectonic stress field; and a measurement and control host, used to receive monitoring data from each area, execute precursor identification algorithms, issue early warnings, combine coseismic response to determine the energy supply range and effective stress release, establish a prediction model, and issue graded warnings.

[0057] In Area A, the borehole array is installed in intact rock strata outside the loosened zone. Three to five monitoring boreholes are arranged along the strike and dip of the working face, with four to eight measuring points on each working face, forming a three-dimensional, enclosed near-field observation network. The sensitivity of the large-range dynamic borehole strain gauge in Area A is 10. -6 ~10 -7 The range is ±5000 microstrain, with a sampling frequency of not less than 200Hz.

[0058] The borehole array in Area B is installed in key bearing layers of thick sandstone with high strength and good elasticity. Measuring points are arranged radially from the mining area or linearly along the structural strike, with a spacing of 200–500 m. At least 3–5 measuring points are arranged in each mining area or working face group. The sensitivity of the high-resolution four-component borehole strain gauge in Area B is 10. -8 ~10 -9 The range is ±1000 microstrain, with an adjustable sampling frequency of 1 to 100 Hz.

[0059] The borehole array in Zone C is installed in intact rigid bedrock more than 30m deep into the coal seam floor. It is installed using a high-pressure grouting coupling method with expansive cement. The measuring points in Zone C cover the entire mining area, with a spacing of 1000–3000m between points, and 3–5 points are deployed in each mining area. The ultra-high sensitivity four-component borehole strain gauge in Zone C has a sensitivity better than 10-1. - ¹ 0 The range is ±100 microstrain. The sampling frequency is 0.1 to 1 Hz.

[0060] like Figure 3 As shown in the illustration, this disclosure also provides a computer device, including a processor, a memory, an input device, an output device, and a communication device, all connected via a bus. The memory stores instructions executable by the processor, which, when executing the instructions, performs all or part of the steps of the aforementioned method.

[0061] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A multi-scale borehole strain monitoring method based on a mining disturbance source model, characterized in that, include: S1: Based on three-dimensional geological modeling and geostress field inversion, the stress transmission path of geological structures is identified, and the surrounding rock mass of the mining space is divided into near-field fracture monitoring zone, mid-field energy release monitoring zone and far-field background monitoring zone in three-dimensional space. S2: Construct stress-sensitive parts at the fold axis and fracture turning point in the far-field background monitoring area, drill deep holes with a depth of 500-1500m, and install ultra-high sensitivity four-component borehole strain gauges. S3: Drill a medium-deep borehole with a depth of 200-800m along the stress transmission path in the mid-field energy release monitoring area, and install a high-resolution four-component borehole strain gauge. S4: Install a large-range dynamic borehole strain gauge around the shallow borehole with a depth of 30-80m in the near-field fracture monitoring area. S5: The instruments in the near-field rupture monitoring zone, the mid-field energy release monitoring zone, and the far-field background monitoring zone are synchronized using GPS or NTP timing. After the far-field background monitoring zone captures precursor anomalies, it triggers the mid-field energy release monitoring zone to conduct encrypted sampling and the near-field rupture monitoring zone to conduct synchronous monitoring. By combining the coseismic response mode, the energy supply range and effective stress release of the mine seismic event are determined and inferred. Through multi-event statistical analysis, a quantitative prediction model for mine dynamic disasters is established to achieve early warning of mine dynamic disasters.

2. The method according to claim 1, characterized in that, Step S2 further includes: The deep borehole is installed in the intact rigid bedrock more than 30m above the coal seam floor. It is installed using a high-pressure grouting coupling method with expansive cement to ensure that the probe is fully coupled with the surrounding rock to achieve a 1:1 strain transfer. The far-field background monitoring area covers the entire mining area, with a spacing of 1000-3000m between the monitoring points, and 3-5 monitoring points are arranged in each mining area.

3. The method according to claim 1, characterized in that, Step S3 further includes: The installation strata of the medium-deep boreholes are selected from key thick sandstone layers with high strength and good elasticity. The measuring points are arranged radially or linearly along the structural strike with the mining area as the center. The spacing between the measuring points is 200-500m. At least 3-5 measuring points are arranged in each mining area or working face group to ensure that at least one monitoring line can cross the seismic stress transmission path.

4. The method according to claim 1, characterized in that, Step S4 further includes: The shallow boreholes are installed in intact rock strata outside the loosened zone; 3 to 5 monitoring holes are arranged along the strike and dip of the working face, and 4 to 8 measuring points are arranged on each working face to form a three-dimensional, enclosed near-field observation network.

5. The method according to claim 1, characterized in that, Both the ultra-high sensitivity four-component borehole strain gauge and the high resolution four-component borehole strain gauge consist of four independent measurement units arranged at a 45° angle. The observed values ​​S1, S2, S3, and S4 of the four independent measurement units satisfy the self-consistent equation S1 + S3 = S2 + S4.

6. The method according to claim 1, characterized in that, Step S5, which involves the far-field background monitoring area capturing precursor anomalies and triggering encrypted sampling in the mid-field energy release monitoring area and synchronous monitoring in the near-field rupture monitoring area, further includes: The far-field background monitoring instrument continuously records the changes in the regional stress field at a sampling frequency of 0.1 to 1 Hz, and calculates the waveform complexity index, group statistical composite characteristic parameter, and strain asymmetry ratio η in real time. When the waveform complexity index shows an "increase → decrease" change, the group statistical composite feature parameter shows a surge, or the strain asymmetry ratio η shows one or more of the following precursor patterns: "zero → positive → zero → negative → zero", an early warning signal for mine dynamic disasters is issued. After receiving the warning signal, the instrument in the mid-field energy release monitoring area automatically encrypts the sampling frequency to 100Hz, tracks the direction and magnitude of stress adjustment along the stress transmission path, and identifies permanent strain offset type stress adjustment signals. The instrument in the near-field fracture monitoring zone monitors the strain release sequence of the rock mass fracture process in real time at a sampling frequency of not less than 200Hz, and determines the fracture scale D of the seismic source.

7. The method according to claim 6, characterized in that, When two or more of the following three indicators simultaneously show abnormalities: the waveform complexity index changes from "increasing" to "decreasing", the group statistical composite feature parameter shows a surge, and the strain asymmetry ratio η changes from "zero" to "positive" to "zero" to "negative" to "zero", the reliability of the early warning signal is improved.

8. The method according to claim 6, characterized in that, The strain asymmetry ratio η is calculated as follows: using a 24-hour time window, the ratio of the occurrence frequency p1 / p2 of the positive strain rate dataset and the ratio of the cumulative intensity Q1 / Q2 within this window are calculated, and the strain asymmetry ratio is defined as follows: Where p1 and p2 are the number of times the positive and negative strain rates occur within the time window, respectively, and Q1 and Q2 are the cumulative values ​​of the positive and negative strain rate data, respectively.

9. The method according to claim 6, characterized in that, The waveform complexity index is calculated as follows: taking a certain moment as a benchmark, 1440 borehole strain data with a sampling interval of 1 minute within the previous 24 hours are used to form a calculation unit. With a sliding step of 1 minute, the waveform complexity index corresponding to each moment is calculated using the grid covering method to obtain the curve of the index changing with time. The index showing an "increase → decrease" change and the change amplitude exceeding twice the normal fluctuation range is used as one of the precursor judgment conditions.

10. The method according to claim 6, characterized in that, The identification criteria for the permanent strain offset stress adjustment signal are as follows: within 24 hours after receiving the warning signal, adjacent measuring points in the field energy release monitoring area simultaneously experience a sudden change in strain value and stabilize at the new strain level, and the offset directions of at least two measuring points are coordinated and consistent.

11. The method according to claim 6, characterized in that, Step S5, which involves combining coseismic response modes to determine the energy supply range and effective stress release of a mine seismic event, further includes: After a seismic event, the response modes are analyzed based on the distance S between each measuring point and the seismic source: if the ratio of S to D is less than 1, it is a composite mode of "permanent strain offset + elastic fluctuation"; if the ratio of S to D is greater than 1 and the ratio of S to L is less than 1, it is a mode of "permanent strain offset" or "permanent strain offset + elastic fluctuation"; if the ratio of S to L is greater than 1, it is a mode of "elastic fluctuation" or no response. The method for determining the energy supply range L is as follows: statistically analyze the response patterns of all measuring points, and take the distance corresponding to the measuring point that is farthest from the source among the measuring points that show the "permanent strain shift" response as the estimated lower limit of the energy supply range L.

12. The method according to claim 11, characterized in that, The aforementioned quantitative prediction model for mine dynamic disasters, established through multi-event statistical analysis, enables early warning of mine dynamic disasters, including: By statistically analyzing the source rupture scale D, energy supply range L, and effective stress release of multiple mine earthquake events, an empirical model of the "DL-stress release" relationship for different types and energy levels of mine dynamic disasters in mining areas is established. Based on this empirical model, the occurrence time, energy level, and impact range of subsequent mine dynamic disasters are quantitatively predicted according to real-time monitoring data, and graded early warnings are issued based on the predicted energy level and impact range.

13. The method according to claim 1, characterized in that, The step S1 of identifying the stress transmission path of geological structures includes: based on the inversion results of the geostress field, extracting the maximum principal stress trace map and the maximum shear strain increment distribution map, and identifying the convergence area of ​​the maximum principal stress trace and the gradient change zone of the maximum shear strain increment as the stress transmission path.

14. The method according to claim 1, characterized in that, The three-dimensional spatial division of the near-field fracture monitoring zone, the mid-field energy release monitoring zone, and the far-field background monitoring zone in step S1 is calculated based on the mining disturbance potential model. The expression for the mining disturbance potential W is: Where H is the mining depth, V is the mining volume, d is the vertical distance from the mining location to the controlling structure, λ is the regional tectonic stress non-uniformity coefficient, and α and β are empirical constants.

15. A multi-scale borehole strain monitoring system based on a mining disturbance source model, characterized in that, For performing the method as described in any one of claims 1 to 14, comprising: The near-field fracture monitoring zone borehole array consists of three-dimensional enclosed shallow boreholes surrounding the mining space, equipped with large-range dynamic borehole strain gauges to capture the rapid rock fracture and strong stress release process caused by mining in real time. The borehole array in the mid-field energy release monitoring area consists of medium-deep boreholes arranged radially or linearly along the stress transmission path of geological structures. High-resolution four-component borehole strain gauges are installed to identify and track permanent stress adjustment signals on the stress transmission path. The far-field background monitoring area borehole array consists of deep boreholes arranged at fixed points in the stress-sensitive parts of the fold axis and fracture turning point, and is equipped with ultra-high sensitivity four-component borehole strain gauges to capture weak precursor anomalies of the regional tectonic stress field. The system also includes a monitoring and control host, which receives monitoring data from borehole strain gauges in various areas, executes precursor pattern recognition algorithms, issues early warning signals for mine dynamic disasters, and combines coseismic response patterns to infer the energy supply range and effective stress release of mine seismic events. Through multi-event statistical analysis, a quantitative prediction model for mine dynamic disasters is established to achieve graded early warning of mine dynamic disasters.

16. The system according to claim 15, characterized in that, The shallow boreholes in the near-field fracture monitoring area are drilled to a depth of 30–80 m, and the installation layer enters the intact rock layer outside the loosened zone. 3–5 monitoring holes are arranged along the strike and dip of the working face, and 4–8 measuring points are arranged on each working face to form a three-dimensional enclosed near-field observation network. The drilling depth of the deep boreholes in the mid-field energy release monitoring area is 200-800m. The installation layer is selected from the key bearing layer of thick sandstone with high strength and good elasticity. The measuring points are arranged radially or linearly along the structural strike with the mining area as the center. The spacing between the measuring points is 200-500m. At least 3-5 measuring points are arranged in each mining area or working face group. The drilling depth of the deep boreholes in the far-field background monitoring area is 500-1500m, and the installation layer enters the complete rigid bedrock more than 30m into the coal seam floor. The installation is carried out by high-pressure grouting coupling with expansive cement. The measuring points in the far-field background monitoring area cover the entire mining area, with a spacing of 1000-3000m between the measuring points, and 3-5 measuring points are arranged in each mining area.