A cooperative energy-saving control system, method and device for deep-buried underground station
By coordinating the control of elevator and escalator operation modes through real-time perception of passenger flow, the problem of energy waste and passenger backlog caused by independent operation of equipment in deeply buried underground stations has been solved, achieving energy-saving and efficient vertical transportation management.
Patent Information
- Application Number
- CN202611129532.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-28
- Publication Date
- 2026-11-20
AI Technical Summary
Existing energy-saving control technologies for underground stations fail to effectively coordinate the control of elevators and escalators, and do not fully consider the multi-level and long-distance vertical passage characteristics of deeply buried underground stations, resulting in energy waste and passenger backlog when the equipment operates independently.
By sensing the real-time passenger flow status of elevator waiting areas, escalator entrances and exits, and intermediate transfer areas, the system collaboratively determines the operating mode, response priority, standby position, and operating speed of elevators and escalators, forming a closed-loop control system to avoid equipment operating under no-load or low-load conditions and passenger congestion.
It achieves coordinated energy-saving control of elevators and escalators, reduces ineffective energy consumption of equipment, avoids passenger congestion, improves the real-time and targeted nature of control, and ensures that the service needs of special passengers are met.
Smart Images

Figure CN123137102A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of intelligent control of electromechanical equipment in urban rail transit stations, vertical traffic organization, and energy-saving operation technology, and in particular to a collaborative energy-saving control system, method, and equipment for deeply buried underground stations. Background Technology
[0002] Deeply buried underground stations are typically influenced by the depth of the railway line, topographical conditions, surrounding built environment, and transfer organization methods. They are characterized by large station depths, long vertical travel distances, multiple spatial levels, and a large number of vertical transportation facilities. Passengers in ordinary underground stations can usually complete the vertical transition between the ground level, the concourse, and the platform using a single escalator or a short elevator ride. Passengers in deeply buried underground stations may need to traverse multiple long escalators, elevators, intermediate transfer levels, and connecting passages to complete the entry, exit, or transfer process.
[0003] Escalators primarily handle continuous, directional passenger transport, and their energy consumption is mainly related to escalator length, operating speed, travel time, passenger load, and empty-load full-speed travel time. Elevators primarily serve passengers with disabilities, those with mobility impairments, those carrying large luggage, and other passengers requiring elevator access; they can also supplement transport during peak hours. Due to the significant lifting height of elevators in deeply underground stations, their single-trip travel time, round-trip service cycle, and energy consumption per trip are relatively high.
[0004] Currently, urban rail transit stations are typically equipped with video surveillance systems, integrated monitoring systems, elevator control systems, escalator control systems, and energy metering devices. These systems can monitor passenger flow, display equipment operating status, provide fault alarms, monitor equipment start / stop, and perform energy consumption statistics; however, these different systems usually operate independently.
[0005] Current elevator and escalator operation methods mostly rely on fixed time periods and preset rules. For example, all equipment is put into operation during peak hours, while a fixed number of equipment is maintained during off-peak and low-peak hours, with escalators running in preset directions and at rated speeds for extended periods. While this method facilitates operation and management, it is difficult to adapt to the dynamic changes in passenger flow in deeply buried underground stations across different service areas, directions, and time periods. During low-passenger-flow periods, some escalators may operate at full speed with no load for extended periods, and elevators may experience no-load response, low-load operation, or multiple devices simultaneously maintaining high power consumption in standby mode. During high-passenger-flow periods, if control is based solely on passenger flow in a single area or the status of a single device, there may be situations where upstream service areas have high transport capacity while downstream service areas have insufficient transport capacity, leading to passenger congestion at intermediate transfer levels, escalator exits, or elevator waiting areas.
[0006] Existing technologies include several energy-saving control schemes for escalators in rail transit stations. For example, some schemes control the escalator's start, stop, or speed adjustment by detecting the presence of passengers at the escalator entrance; others use train operation data to predict passenger arrival times and control escalator operation in advance. However, these schemes primarily control individual escalators or single types of vertical transportation equipment, failing to treat elevators and escalators as a unified vertical transportation system for coordinated control. Furthermore, existing schemes focus mainly on energy conservation at the equipment level, neglecting the multi-level, long-distance continuous vertical passage characteristics of deeply buried underground stations, and failing to establish passenger flow transfer and equipment capacity matching relationships between adjacent vertical service sections. This makes it difficult to avoid passenger congestion in intermediate transfer areas caused by localized energy-saving control.
[0007] Some existing technologies propose energy-saving scheduling methods for elevator groups, such as allowing elevators to enter standby mode by estimating passenger flow to achieve energy savings; or managing elevator groups by calculating passenger waiting time and standby floor proximity indicators during low passenger flow periods. However, these methods mainly optimize the elevator equipment itself and do not incorporate elevators and escalators into a unified control framework, nor do they consider the cooperative relationship between elevators and escalators in continuous vertical travel in deeply buried underground stations.
[0008] In summary, the existing energy-saving control technologies for underground railway stations have the following main shortcomings: 1. Video passenger flow monitoring, equipment control, and energy consumption metering are independent of each other, and the passenger flow perception results are not directly used for energy-saving control of elevators and escalators.
[0009] 2. Most control methods adjust the equipment status only based on fixed operating periods or single passenger flow thresholds, without comprehensively considering the number of people waiting for the elevator, passenger flow density, queue length, dwell time, passenger flow direction, and the number of passengers required for the elevator.
[0010] 3. Elevators and escalators are usually controlled separately, lacking unified coordination of the two types of equipment's operating modes.
[0011] 4. The characteristics of deeply buried underground stations, such as large vertical elevation differences, multiple service sections, and continuous arrangement of upstream and downstream equipment, were not fully considered.
[0012] 5. When adjacent vertical service sections implement speed reduction, standby, or suspension control independently, it may lead to the formation of new passenger flow bottlenecks in the intermediate transfer area.
[0013] 6. Existing energy-saving controls mainly focus on the power consumption of equipment, without fully considering passenger waiting time, long-distance equipment operation time, and passage delays caused by multi-level vertical transitions.
[0014] 7. Simply pursuing energy reduction may result in excessively long waiting times for passengers in elevator demand or insufficient service capacity in the main vertical travel direction.
[0015] 8. When complex prediction or optimization models are directly used for field control, there are problems such as large computational load, high requirements for implementation conditions, and untimely control response.
[0016] Therefore, an energy-saving control scheme is needed that can take real-time passenger flow perception as input, reflect the multi-level and long-distance vertical passage characteristics of deeply buried underground stations, and coordinate the operation modes of elevators and escalators. Summary of the Invention
[0017] The purpose of this invention is to overcome the technical problems existing in the prior art and provide a collaborative energy-saving control system, method and equipment for deeply buried underground stations. By sensing the real-time passenger flow status of elevator waiting areas, escalator entrances and exits, intermediate transfer areas and connecting passages, and taking into account the characteristics of deeply buried underground stations such as large vertical height differences, multiple spatial levels and continuous arrangement of vertical transportation equipment, the system collaboratively determines the elevator operation mode, response priority, standby position, escalator running direction, running speed and standby status. Without changing the original safety interlocking logic of elevators and escalators, it reduces the energy consumption of elevators running under no-load or low-load conditions, escalators running under no-load or full-speed conditions, and ineffective standby, while avoiding passenger congestion in the intermediate transfer areas of deeply buried underground stations caused by local energy-saving control.
[0018] The objective of this invention is achieved through the following technical solution: A first aspect of the present invention provides a collaborative energy-saving control system for deeply buried underground railway stations, comprising: The deeply embedded vertical transportation service relationship construction module is used to divide vertical transportation service sections according to station spatial hierarchy, equipment configuration and passenger passage path, and to establish upstream and downstream relationships between adjacent vertical transportation service sections according to the passenger entry, exit or transfer sequence. The passenger flow perception and operation scenario determination module is used to obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of people staying in the intermediate area, and number of passengers requiring elevators for each vertical transportation service section of the deeply buried underground station; calculate the basic service pressure; and determine the operation scenario by combining the vertical height difference of the vertical transportation service section, equipment running length, number of remaining service sections downstream, and dwell status in the intermediate transfer area. The equipment status and energy consumption acquisition module is used to collect data on the operating status, direction of travel, speed of travel, load, fault status and energy consumption of elevators and escalators. The service capacity and upstream / downstream matching module is used to calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and to determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section. The collaborative energy-saving strategy generation module is used to generate candidate strategies, including elevator operation mode, response priority, standby position, escalator operation mode, operation speed, standby state, and operation direction, based on the operation scenario, equipment status, and upstream and downstream capability matching status. The safety verification and control execution module is used to verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity and equipment safety conditions, and select the feasible strategy with low overall cost, and issue control instructions corresponding to the feasible strategy to the elevator control system and escalator control system. The operation effect feedback and parameter correction module is used to collect the actual energy consumption, passage time and equipment operation results after the implementation of feasible strategies, and to correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
[0019] The present invention sets up passenger flow monitoring areas in elevator waiting areas, escalator entrances and exits, intermediate transfer areas and connecting passages to obtain real-time data on the number of people in the area, passenger flow density, queue length, average dwell time, main passenger flow direction and the number of passengers required for elevators.
[0020] The system combines the vertical elevation difference of each vertical service section, the equipment running length, the upstream and downstream connection relationship, and the capacity of the intermediate transfer area. It uses the above-mentioned deep-buried characteristic parameters, along with the basic service pressure, the main passenger flow direction, and the proportion of passengers in elevator demand, to determine the operating scenario. This allows for the identification of operating scenarios such as low load, normal operation, high passenger flow concentrated in a particular direction, increased elevator demand, or mismatch between upstream and downstream transport capacity.
[0021] The system generates a limited number of candidate operating strategies for elevators and escalators based on the operating scenario, and selects the operating strategy with better overall energy consumption and service effect under the premise of meeting the minimum continuous transport capacity, elevator demand for passenger service, intermediate area capacity and equipment safety constraints.
[0022] By adopting the above methods, without changing the original safety interlocking logic of elevators and escalators, the energy consumption of elevators running at low or no load, escalators running at full speed while no load, and ineffective standby energy consumption can be reduced. At the same time, local energy-saving control can avoid passenger congestion in the intermediate transfer areas of deeply buried underground stations.
[0023] In some embodiments, the calculation of basic service pressure in the passenger flow perception and operation scenario determination module includes: After normalizing the number of people waiting for elevators, passenger flow density, queue length, average dwell time and the number of passengers requiring elevators, a weighted calculation is performed to obtain the basic service pressure of each vertical transportation service section. The operating scenarios include low-load energy-saving scenarios, normal balanced scenarios, one-way concentrated passenger flow scenarios, two-way high passenger flow scenarios, elevator demand priority scenarios, and upstream and downstream transportation capacity mismatch scenarios.
[0024] In some embodiments, the elevator operation modes include a normal service mode, a direction priority service mode, an energy-saving standby mode, and a backup service mode; the escalator operation modes include a normal speed operation mode, a speed reduction operation mode, a sensor standby mode, and a shutdown standby mode.
[0025] In some embodiments, the collaborative energy-saving strategy generation module evaluates candidate strategies based on equipment energy consumption, passenger travel time, number of people staying in intermediate transfer areas, degree of inefficient equipment operation, and cost of equipment mode switching.
[0026] In some embodiments, when there are passengers with elevator needs, at least one elevator associated with the passenger's travel path is in either a regular service mode or a guaranteed service mode.
[0027] In some embodiments, the system sets a scene confirmation time and a minimum mode hold time for the device to limit the frequent switching of operating modes of elevators and escalators.
[0028] In some embodiments, in the event of equipment failure, communication interruption, insufficient data quality, fire alarm, or manual takeover, the collaborative energy-saving control is stopped and the original safety control system of the elevator and escalator is taken over.
[0029] In some embodiments, the upstream and downstream capability matching status is calculated using the following formula: in Indicates direction The ability matching coefficient, The number of passengers expected to be transported from the upstream vertical traffic service section within the control period; The number of passengers that the downstream vertical traffic service section can receive within the same control period; It is a positive number not less than 0; when the capacity matching coefficient is lower than the set threshold, it is determined that the downstream vertical traffic service section has insufficient receiving capacity.
[0030] A second aspect of the present invention provides a collaborative energy-saving control method for deeply buried underground railway stations, comprising the following steps: S1. Used to divide vertical transportation service sections according to station spatial hierarchy, equipment configuration and passenger passage path, and to establish upstream and downstream relationships between adjacent vertical transportation service sections according to the passenger entry, exit or transfer sequence; S2. Obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of passengers staying in the middle area, and number of passengers requiring elevators for each vertical transportation service section of the deep underground station. S3. Calculate the basic service pressure and determine the operation scenario by combining the vertical elevation difference of the vertical traffic service section, the equipment running length, the number of downstream remaining service sections, and the stagnation status of the intermediate transfer area; S4. Collect data on the operating status, direction of travel, speed of travel, load, fault status, and energy consumption of elevators and escalators; S5. Calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section. S6. Based on the operating scenario, equipment status, and upstream and downstream capability matching status, generate candidate strategies including elevator operating mode, response priority, standby position, and escalator operating mode, operating speed, standby status, and operating direction; S7. Verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity and equipment safety conditions, and select the feasible strategy with low overall cost, and issue control commands corresponding to the feasible strategy to the elevator control system and escalator control system.
[0031] S8. Collect the actual energy consumption, passage time and equipment operation results after the feasible strategy is implemented, and correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
[0032] A third aspect of the present invention provides an electronic device, including a memory and a processor, wherein the memory stores computer instructions that can be executed on the processor, and the processor executes a collaborative energy-saving control method for deeply buried underground stations as described in the second aspect when executing the computer instructions.
[0033] It should be further noted that the technical features corresponding to the above-mentioned options and embodiments can be combined or substituted with each other to form new technical solutions without conflict.
[0034] Compared with the prior art, the beneficial effects of the present invention are: 1. This invention directly applies passenger flow perception results to the operation control of elevators and escalators. A passenger flow perception and operation scenario determination module acquires real-time passenger flow data for each service section. A collaborative energy-saving strategy generation module generates control strategies based on the operation scenario, which are then executed after safety verification. Finally, an operation effect feedback and parameter correction module adjusts the control parameters based on actual operation results, forming a complete closed-loop control. Compared to existing technologies where video passenger flow monitoring, equipment control, and energy consumption metering operate independently, this invention achieves direct conversion of passenger flow perception results into energy-saving equipment control, improving the real-time nature and targeted nature of the control.
[0035] 2. This invention performs normalized weighted calculations on the number of people waiting for elevators, passenger flow density, queue length, average dwell time, and the number of passengers required for elevator access, to obtain the basic service pressure of the service segment. Compared with the existing technology that adjusts equipment status only based on fixed operating hours or a single passenger flow threshold, this invention comprehensively utilizes multi-dimensional passenger flow indicators, which can more accurately reflect the actual service demand of each service segment and avoid control errors caused by the bias of a single indicator.
[0036] 3. This invention incorporates the vertical elevation difference of service sections, equipment operating length, number of remaining downstream service sections, and the lingering status of intermediate transition areas as additional conditions for determining operating scenarios, setting minimum service capacity, and selecting equipment operating strategies. Existing technologies do not fully consider the characteristics of deeply buried underground stations, such as large vertical elevation differences, numerous service sections, and continuous upstream and downstream equipment arrangement. This invention, by introducing the aforementioned deep-buried characteristic parameters, incorporates the unique spatial structural features of deeply buried stations into the actual control process, improving the adaptability of control strategies to deeply buried stations.
[0037] 4. This invention calculates the effective service capacity of each service segment in different directions through a service capacity and upstream / downstream matching module, and determines the upstream / downstream capacity matching status based on the ratio of the passenger flow output of the upstream service segment to the receiving capacity of the downstream service segment. When the downstream receiving capacity is insufficient, the equipment service capacity of the downstream service segment is prioritized to be increased; when the downstream service capacity cannot be increased, the output capacity of the upstream service segment is restricted. This mechanism effectively avoids the problem in existing technologies where adjacent vertical service segments are controlled independently, leading to passenger flow bottlenecks in intermediate transfer areas.
[0038] 5. This invention sets minimum continuous service requirements under deep burial conditions, stipulating that under normal operating conditions, no two adjacent vertical transportation service sections may simultaneously set all major transportation equipment to standby or shutdown status. This minimum continuous service requirement fully considers the characteristic that passengers in deeply buried underground stations need to pass through multiple service sections to complete their journey, avoiding the risk of interrupting the complete vertical travel path due to the simultaneous reduction of service levels in adjacent sections.
[0039] 6. This invention integrates the elevator's regular service mode, direction-priority service mode, energy-saving standby mode, and backup service mode with the escalator's normal speed operation mode, deceleration operation mode, sensor standby mode, and shutdown backup mode into a unified operation mode library. The system treats elevators and escalators as a unified vertical transportation system for coordinated control, avoiding duplicate or insufficient service capacity caused by separate control of the two types of equipment.
[0040] 7. This invention comprehensively evaluates candidate strategies by considering five dimensions: equipment energy consumption, passenger transit time, number of passengers stranded in intermediate transition areas, degree of equipment inefficiency, and equipment mode switching costs, thus avoiding energy conservation at the expense of service levels. Compared to existing technologies that primarily focus on a single objective of optimizing equipment power consumption, this invention balances passenger transit efficiency and intermediate zone congestion levels while saving energy, avoiding a severe decline in service quality caused by simply pursuing energy reduction.
[0041] 8. This invention employs a limited number of candidate strategies for comparison, without relying on complex large-scale model training or real-time global optimization. The system generates a limited number of candidate strategies based on the operating scenario, and selects the optimal strategy from them through comprehensive evaluation. This approach has low computational requirements, low implementation conditions, and timely control response, making it easy to deploy and implement on local control equipment or edge computing devices at the station.
[0042] 9. This invention stipulates that when there are passengers requiring elevator access, at least one elevator related to the passenger's travel path is in either regular service mode or guaranteed service mode. This mechanism ensures that even under low-passenger-flow, energy-saving operation, passengers with elevator needs, such as those with mobility impairments, elderly passengers, and passengers carrying large luggage, can still receive necessary elevator services, avoiding excessively long waiting times for these passengers due to energy-saving standby.
[0043] 10. This invention does not alter the original safety interlocking and emergency control logic of the equipment, facilitating retrofitting and deployment using existing video surveillance, equipment control, and energy metering systems. Simultaneously, it sets a scene confirmation time and a minimum mode hold time for the equipment; the equipment's operating mode can only be adjusted after the new scene has been continuously held for the scene confirmation time. This mechanism reduces frequent elevator starts and stops, as well as frequent speed changes and direction switching on escalators, thus reducing mechanical wear, extending equipment lifespan, and avoiding additional energy consumption caused by frequent switching. Attached Figure Description
[0044] Figure 1 This is a flowchart illustrating a collaborative energy-saving control method for deeply buried underground railway stations, as shown in an embodiment of the present invention. Detailed Implementation
[0045] The technical solution of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0046] It should be noted that the defects in the solutions in the prior art are all the results of the inventors' practice and careful research. Therefore, the discovery process of the above problems and the solutions proposed by the embodiments of this application in the following text should be the inventors' contributions to this application in the process of invention and creation, and should not be understood as technical content known to those skilled in the art.
[0047] In view of the technical problems pointed out in the background art, the present invention provides the following embodiments: In one exemplary embodiment, a collaborative energy-saving control system for deeply buried underground railway stations is provided, comprising: The deeply embedded vertical transportation service relationship construction module is used to divide vertical transportation service sections according to station spatial hierarchy, equipment configuration and passenger passage path, and to establish upstream and downstream relationships between adjacent vertical transportation service sections according to the passenger entry, exit or transfer sequence. The passenger flow perception and operation scenario determination module is used to obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of people staying in the intermediate area, and number of passengers requiring elevators for each vertical transportation service section of the deeply buried underground station; calculate the basic service pressure; and determine the operation scenario by combining the vertical height difference of the vertical transportation service section, equipment running length, number of remaining service sections downstream, and dwell status in the intermediate transfer area. The equipment status and energy consumption acquisition module is used to collect data on the operating status, direction of travel, speed of travel, load, fault status and energy consumption of elevators and escalators. The service capacity and upstream / downstream matching module is used to calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and to determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section. The collaborative energy-saving strategy generation module is used to generate candidate strategies, including elevator operation mode, response priority, standby position, escalator operation mode, operation speed, standby state, and operation direction, based on the operation scenario, equipment status, and upstream and downstream capability matching status. The safety verification and control execution module is used to verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity and equipment safety conditions, and select the feasible strategy with low overall cost, and issue control instructions corresponding to the feasible strategy to the elevator control system and escalator control system. The operation effect feedback and parameter correction module is used to collect the actual energy consumption, passage time and equipment operation results after the implementation of feasible strategies, and to correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
[0048] The passenger flow perception and operation scenario determination module is connected to the station video surveillance system, passenger flow detection equipment, accessible elevator call interface, or manual service terminal. The equipment status and energy consumption acquisition module is connected to the elevator control system, escalator control system, and energy metering device. The safety verification and control execution module is connected to the elevator group control interface, escalator control interface, and station integrated monitoring system, respectively. The system can be deployed on a local station server, edge computing device, or station integrated monitoring platform.
[0049] Specifically, the following functions are implemented in the deep-buried vertical transportation service relationship construction module: 1. Vertical traffic service area division Based on the spatial hierarchy, equipment configuration, and passenger travel routes of the deeply buried underground station, the station is divided into several vertical transportation service sections.
[0050] The set of vertical traffic service segments is represented as follows: in, For vertical traffic service section numbering, This represents the total number of vertical traffic service sections.
[0051] Vertical transportation service sections include one or more of the following: 1. Ground-level entrance / exit to station hall service section; 2. Ground-level entrance / exit to intermediate level service section; 3. Station hall to intermediate transfer level service section; 4. Intermediate transfer level to platform service section; 5. Station hall to platform service section; 6. Platform to transfer level service section; 7. Transfer level to station hall service section; 8. Barrier-free vertical access service section. Each service section consists of specific vertical spatial connections, elevators and escalators serving those spatial connections, and corresponding passenger flow monitoring areas.
[0052] No. The basic attributes of a vertical traffic service segment are represented as follows: in: The vertical elevation difference of the vertical traffic service section; The operating length of elevators or escalators within the vertical transportation service area; The effective area of the passenger flow monitoring area; For the collection of elevators within the vertical transportation service area; A collection of escalators for vertical transportation service areas; For the collection of passenger flow directions in the vertical transportation service area; This represents the maximum number of people allowed to remain in the intermediate transit area.
[0053] 2. Continuous vertical service relationship Based on passenger entry, exit, or transfer routes, upstream and downstream service relationships are established for two or more consecutive vertical transportation service sections according to the traffic flow sequence. A continuous vertical passageway is represented as follows: in: Indicates the first The first of the travel routes One vertical traffic service section; This indicates the number of vertical traffic service sections included in the travel route.
[0054] The cumulative vertical elevation difference of the passageway is expressed as: In a continuous vertical traffic path, passengers exiting from the upstream vertical traffic service section will enter the downstream vertical traffic service section. Based on this, the system establishes the passenger flow transfer and equipment capacity matching relationship between each vertical traffic service section. Through this method, the characteristics of deeply buried underground stations—large vertical elevation differences, multiple spatial levels, and continuous connection of multiple equipment sections—are incorporated into the control scheme.
[0055] Furthermore, the following functions are implemented in the passenger flow perception and operation scenario determination module: The passenger flow perception and operation scenario determination module acquires the real-time passenger flow status of each service section according to a set control cycle. The control cycle can be set from 30 seconds to 5 minutes, preferably 1 minute.
[0056] 1. Population and passenger density in the area By using existing video surveillance equipment or newly added passenger flow detection equipment at the station, passenger information can be obtained at various times. The position coordinates. Passengers at the time The position is represented as , No. The passenger flow monitoring area for each vertical traffic service section is represented as follows: . No. The number of passengers in each area is calculated using the following formula: in: For a moment Total number of passengers detected; This is an indicator function; it takes the value 1 when the passenger is within the region (\Omega_z), and 0 otherwise.
[0057] The regional passenger flow density is calculated using the following formula: in, The effective area is the area after deducting walls, columns, equipment, and other inaccessible spaces.
[0058] 2. Passenger flow direction The system calculates the direction of passenger movement based on passenger trajectories in consecutive video frames. Each vertical traffic service section is in the direction The proportion of passengers on the platform is calculated according to the following formula: in: For along direction The number of passengers moving; A positive number set to prevent the denominator from being zero.
[0059] When the proportion of passenger flow in a certain direction exceeds a set threshold, that direction is identified as the main passenger flow direction.
[0060] 3. Queue length and average dwell time The system pre-defines the queuing directions for elevator waiting areas and escalator entrances. The queue length is calculated based on the difference between the maximum and minimum projected coordinates of queuing passengers along the queuing direction; that is, the difference between the farthest projected position and the nearest projected position of each passenger along the queuing direction. in: For the first The set of passengers identified as being in a queue within a given area; when empty, the queue length is 0, and the same applies below. For the first The projected coordinates of each passenger in the queuing direction.
[0061] The time when passengers enter the area is indicated as follows The time of leaving the region is represented as .
[0062] The average time spent in the area is calculated using the following formula: 4. Elevator demand from passengers Passengers requiring elevator access include: passengers with mobility impairments; elderly passengers; passengers carrying large luggage; passengers using wheelchairs or strollers; and other passengers with a high demand for elevator use. The number of passengers requiring elevator access can be obtained through one or more of the following methods: accessible call buttons; manual service terminals; reservation service information; authorized video behavioral feature recognition; and dedicated passenger flow detection equipment at elevator entrances. This invention does not require facial recognition or passenger identification as essential conditions.
[0063] The ratio of passengers requiring elevator access is expressed as follows: in, The number of passengers required for the elevator.
[0064] 5. Service pressure calculation The system normalizes the number of people waiting for elevators, passenger density, queue length, average dwell time, and the number of passengers required for elevator access from 0 to 1. Any one of these indicators... Normalize according to the following formula: The value is 0 when the normalization result is less than 0, and 1 when the normalization result is greater than 1.
[0065] No. The basic service pressure for each service segment is calculated using the following formula: in: to The weights of each indicator are: Each weight satisfies: 6. Deep Burial Feature Parameters and Scene Determination To reflect the characteristics of deep-buried underground stations, such as long vertical travel distances, multiple spatial levels, and continuous connection of multiple vertical traffic service sections, the system further sets deep-buried characteristic parameters in addition to basic service pressure, including vertical elevation difference of service sections, equipment operating length, number of remaining downstream service sections, and stagnation status of intermediate transfer areas.
[0066] No. The deep-buried characteristic parameters of each vertical traffic service section are expressed as follows: in: The vertical elevation difference of the vertical traffic service section. This refers to the actual operating length of elevators or escalators within the vertical transportation service area. This represents the number of downstream vertical traffic service sections that passengers still need to traverse after passing through the current vertical traffic service section. This represents the current number of people stranded in the intermediate transit area. This represents the maximum number of people allowed to remain in the intermediate transit area.
[0067] The buried characteristic parameters do not directly change the basic service pressure calculated from the number of people waiting for elevators, passenger flow density, queue length, average dwell time, and the number of passengers required for elevator access. Instead, it serves as an additional condition for determining the operating scenario, setting the minimum service capacity, and selecting the equipment operating strategy.
[0068] Under the same pressure on basic services: 1. When the vertical height difference or the operating length of equipment in a vertical transportation service section is large, increase the minimum service capacity of the vertical transportation service section and reduce the priority of related elevators and escalators to enter standby, speed reduction or stop operation. 2. When passengers need to pass through multiple downstream vertical traffic service sections after passing through the current vertical traffic service section, maintain the continuous transportation capacity in the main passenger flow direction and avoid the simultaneous reduction of service level in adjacent vertical traffic service sections; 3. When the number of people stranded in the intermediate transfer area approaches the maximum allowable number of people stranded, priority should be given to improving the equipment service capacity of the downstream vertical transportation service section; if the downstream service capacity cannot be improved in time, the upstream vertical transportation service section should be restricted from continuing to increase passenger flow. 4. When there is a large vertical height difference and a high proportion of passengers needing elevators, at least one relevant elevator should be kept in regular service mode or emergency service mode.
[0069] The system uses basic service pressure, main passenger flow direction, elevator demand ratio, and the aforementioned deep-buried characteristic parameters as the basis for determining the operating scenario, in order to identify operating scenarios such as low-load energy saving, normal balance, one-way concentrated passenger flow, elevator demand priority, and mismatch between upstream and downstream transportation capacity.
[0070] 7. Determining the Scenario The system determines the operating scenario based on basic service pressure, main passenger flow directions, elevator demand ratio, passenger flow trends, vertical elevation differences in service sections, equipment operating length, number of remaining downstream service sections, and congestion levels in intermediate transfer areas. Operating scenarios include: (1) Low load energy saving scenario - Low load energy saving scenario refers to a state where the service pressure is low, the number of people queuing in the area is small and the passenger flow changes steadily.
[0071] (2) Normal equilibrium scenario - The normal equilibrium scenario refers to the state in which the passenger flow scale and equipment supply are basically matched, and the upstream and downstream demand is relatively balanced.
[0072] (3) One-way concentrated passenger flow scenario - One-way concentrated passenger flow scenario refers to the state where the service pressure reaches the set level and the proportion of passenger flow in a certain direction exceeds the direction concentration threshold.
[0073] (4) Two-way high passenger flow scenario - Two-way high passenger flow scenario refers to a state in which there is a high passenger flow demand in both the up and down directions.
[0074] (5) Elevator demand priority scenario - Elevator demand priority scenario refers to the state in which the proportion of passengers demanding elevators, the request for accessible elevators, or the request for special services exceeds the set threshold.
[0075] (6) Upstream and downstream transport capacity mismatch scenario - Upstream and downstream transport capacity mismatch scenario refers to the situation where the passenger flow output from the upstream section exceeds the receiving capacity of the downstream section, or the number of people stranded in the intermediate transfer area continues to increase.
[0076] (7) Emergency or manual takeover scenarios.
[0077] Furthermore, the following functions are implemented in the device status and energy consumption acquisition module: 1. Elevator Status The elevator status data collected includes: current floor; direction of travel; speed; running, standby, or fault status; car load or occupancy rate; call requests; door opening / closing status; number of start / stop cycles; single travel distance; idle standby time; real-time power; and power consumption per control cycle.
[0078] 2. Escalator Status The collected escalator status data includes: direction of travel; speed of travel; normal, deceleration, standby, or stopped status; passenger detection status at entrances and exits; load status; mode hold time; number of mode switching times; fault or maintenance status; real-time power; and power consumption during control cycles.
[0079] All data is timestamped, with device number and service segment number included, and time-aligned according to a unified control cycle.
[0080] This system has a library of elevator and escalator operation modes, including the following elevator operation modes: 1. Regular Service Mode - In regular service mode, the elevator responds to ordinary call requests according to the original group control rules.
[0081] 2. Direction Priority Service Mode - In direction priority service mode, the elevator increases the response priority of the main passenger flow direction or designated service section, and can adjust the standby floor.
[0082] 3. Energy-saving standby mode - In energy-saving standby mode, the elevator maintains safety detection, communication and wake-up functions, and does not actively undertake routine elevator dispatching tasks. Service will resume when there is an elevator call or the service pressure reaches the wake-up condition.
[0083] 4. Guaranteed Service Mode - Under the guaranteed service mode, the elevator remains available, prioritizes responding to passengers' elevator needs, and undertakes necessary accessibility and emergency support services.
[0084] The escalator's operating status and direction configuration are as follows: The coordinated control of escalators includes two dimensions: operation status control and direction configuration control. Operation status is used to determine the operating speed and start / stop status of a single escalator, while direction configuration is used to determine the upward and downward combination relationship of multiple escalators within the same vertical traffic service section.
[0085] (1) Escalator operating status: 1. Normal Speed Operation Mode - Normal speed operation mode is used for scenarios with high passenger flow or continuous traffic demand; 2. Reduced Speed Operation Mode - Reduced speed operation mode is used in scenarios where passenger flow is low but continuous traffic capacity still needs to be maintained; 3. Sensor Standby Mode - Sensor standby mode is used in intermittent passenger flow scenarios. The escalator maintains detection and safety monitoring functions, and resumes operation when a passenger is detected approaching. 4. Shutdown Standby Mode - Shutdown standby mode is used for extremely low passenger flow, non-operational periods, or as backup equipment, but should meet minimum service and safety requirements.
[0086] (2) Directional configuration of escalators: 1. Two-way balanced configuration - Two-way balanced configuration refers to setting up escalators for both upward and downward travel to meet the basic passenger flow needs in both directions. It is suitable for scenarios with normal balanced passenger flow and high passenger flow in both directions.
[0087] 2. Enhanced Main Direction Configuration - Enhanced main direction configuration refers to adjusting one or more reversible escalators to the main passenger flow direction while retaining the minimum transport capacity in the opposite direction, in order to improve the transport capacity in the main direction. It is suitable for scenarios such as morning and evening peak hours, concentrated train arrivals, or obvious passenger flow directions.
[0088] 3. One-Way Centralized Configuration – One-way centralized configuration refers to adjusting all or most of the reversible escalators within the same service section that meet the switching conditions to the main passenger flow direction in scenarios such as sudden large passenger flows in one direction, concentrated entry and exit, or other significant increases in one-way transportation demand, to form centralized transportation capacity. When adopting one-way centralized configuration, necessary reverse passage paths should be reserved, which can be provided by other escalators, stairs, or adjacent passage facilities.
[0089] (3) Direction configuration determination The system determines the escalator direction configuration based on the proportion of main passenger flow, service pressure, reverse passenger flow demand, upstream and downstream service capacity, and the stagnation status in intermediate transfer areas.
[0090] Let the first Each service section is on the main direction The passenger flow ratio is: When the proportion of passenger flow, service pressure, and passenger flow growth rate in the main direction reach the set conditions, and the demand in the reverse direction is lower than the set threshold, the system can be adjusted from a bidirectional balanced configuration to a main direction enhanced configuration. When the proportion of passenger flow and service pressure in the main direction further increases, forming a sudden large passenger flow in one direction, and the conditions for alternative passage in the reverse direction, downstream receiving capacity, and safe equipment switching are met, the system can be adjusted to a unidirectional centralized configuration.
[0091] (4) Unidirectional centralized configuration constraints One-way centralized configuration should meet at least the following conditions: the proportion of passenger flow in the main direction reaches the preset one-way centralized threshold; the service pressure in the main direction reaches the preset level; the passenger flow in the opposite direction is lower than the preset threshold, or the passengers in the opposite direction can be handled by other safe passage facilities; the adjusted downstream service section has sufficient receiving capacity; the expected number of people staying in the intermediate transfer area does not exceed the allowable limit; the escalator to be adjusted has reversible operation function and is not in a fault or maintenance state; there are no passengers on the escalator, and temporary control and direction prompts have been completed at the entrance and exit; the escalator has stopped running and reached the prescribed direction switching waiting time; the direction switching complies with the station operation management regulations and the equipment control system's permission conditions.
[0092] If any of the above conditions are not met, the system shall not execute unidirectional centralized configuration, and alternative strategies such as main direction enhanced configuration, increasing elevator service capacity or passenger flow guidance may be adopted.
[0093] (5) Configuration recovery When the proportion of passenger flow in the main direction, service pressure, and number of people stranded in the intermediate area decrease to the recovery threshold for several consecutive control cycles, the system restores from unidirectional centralized configuration to main direction enhanced configuration, and then to bidirectional balanced configuration in a preset order.
[0094] During the restoration process, it is necessary to re-verify whether there are people on the escalator, the demand for passengers in the opposite direction, the service capacity of upstream and downstream, and the safety conditions for switching the direction of the equipment, so as to avoid frequent changes in the operating direction of the escalator due to short-term fluctuations in passenger flow.
[0095] Furthermore, the following functions are implemented in the service capability and upstream / downstream matching modules: 1. Effective service capacity of elevators No. The service cycle of each elevator includes running time, acceleration and deceleration time, door opening and closing time, and necessary stopping time: in: The actual running time is determined based on the lifting height, operating speed, and acceleration / deceleration process; This refers to the time it takes for the door to open and close; This refers to the time for stopping and passengers to board and alight. The effective service capacity of the elevator within the control cycle is determined based on the rated capacity of the car, the expected load rate, and the single service cycle.
[0096] 2. Effective service capacity of escalators Escalator travel time is calculated using the following formula: in: This refers to the length of the escalator's journey. This represents the running speed corresponding to the current running mode.
[0097] The effective service capacity of an escalator is determined based on the step width, operating speed, direction of travel, and passenger utilization factor.
[0098] 3. Comprehensive capabilities of the service area No. Each service segment is in the direction The effective conveying capacity is expressed as: in: To ensure the effective service capacity of elevators; To ensure the effective service capacity of escalators; Indicates whether the elevator can serve the area. direction Provide services; Indicates whether the escalator's direction of travel is consistent with the direction of travel. Consistent.
[0099] 4. Matching of upstream and downstream capabilities For adjacent upstream service sections in a continuous travel path and downstream service areas Define direction Capability matching coefficient: in: This represents the number of passengers expected to be transported from the upstream section within the control period. This represents the number of passengers that the downstream section can receive within the same control period.
[0100] When the capability matching coefficient is lower than the set threshold, it is determined that the downstream segment has insufficient reception capability.
[0101] The number of people stranded in the intermediate transfer area is updated on a rolling basis based on the actual number of people entering from upstream and the actual transport capacity downstream. This applies to adjacent upstream service sections within a continuous vertical transport path. and downstream service areas The number of people remaining in the next control cycle shall be calculated according to the following formula: in, For a moment The number of people already stranded at the entrance of the downstream service section or intermediate transfer area; During the current control period, the upstream service section along the direction The actual number of people output; During the current control period, the downstream service section along the direction The actual number of people that can be transported; The number of people remaining at the start of the next control cycle; We will ensure that the number of stranded people does not become negative.
[0102] When downstream receiving capacity is insufficient, the system will prioritize one or more of the following measures: increase the operating speed of downstream escalators; wake up downstream standby elevators or escalators; increase the response priority of downstream elevators in the main direction; adjust the operating direction of downstream escalators when safety conditions are met; limit upstream equipment from further increasing its output capacity; and issue passenger diversion or waiting prompts.
[0103] 5. Minimum continuous service requirements for deep burial To prevent multiple continuous service sections of deeply buried underground stations from simultaneously entering a low service state, the system sets minimum continuous service requirements.
[0104] The minimum service capacity of each service section is determined based on the following factors: vertical elevation difference of the service section; equipment operating length; number of remaining downstream service sections; proportion of passengers requiring elevators; capacity of intermediate transfer areas; and station operation and management requirements.
[0105] No. The minimum service capacity of each service segment is expressed as follows: in: Basic minimum service capacity; Maximum service capacity when all available equipment is deployed; This is the minimum service capacity adjustment factor, with a value not less than 1, and is calibrated based on the vertical elevation difference, equipment operating length, number of remaining downstream service sections, and capacity of intermediate conversion areas.
[0106] The equipment operation strategy should meet the following requirements: Under normal operating conditions, adjacent service sections within the same continuous vertical travel path must not simultaneously set all major transport equipment to standby or shutdown status. When there are passengers requiring elevator access, at least one elevator associated with that passenger's travel path should be in either regular or emergency service mode.
[0107] Furthermore, the following functions are implemented in the collaborative energy-saving strategy generation module: The collaborative energy-saving strategy generation module generates a limited number of candidate strategies based on the operating scenario, equipment status, service capacity, and upstream and downstream matching. The candidate strategies include the following control elements: 1. Number of elevators in operation; 2. Elevator normal, direction-priority, energy-saving standby, or guaranteed service modes; 3. Response priority for elevators in the main passenger flow direction; 4. Elevator standby floors; 5. Escalator normal speed, deceleration, sensor-activated standby, or shutdown backup modes; 6. Escalator running direction; 7. Order of equipment capacity adjustment in upstream and downstream service sections; 8. Necessary passenger flow guidance and diversion prompts.
[0108] The strategy generation rules for different scenarios are as follows.
[0109] 1. Low-load energy-saving scenarios Under the premise of meeting the minimum continuous service capacity: reduce the number of elevators for regular service; set some elevators to energy-saving standby mode; retain at least one elevator for backup service; set some escalators to speed reduction or sensor standby mode; avoid the main equipment in adjacent service sections from being on standby at the same time; and place standby elevators on floors with high passenger flow or at key nodes in the service chain.
[0110] 2. Standard Balanced Scenario: Maintain basic equipment configuration; adjust elevator standby positions according to main passenger flow directions; maintain basic capacity for both up and down escalators; implement standby control for low-load backup equipment.
[0111] 3. In scenarios with concentrated passenger flow in one direction: increase the response priority of elevators in the main direction; dispatch idle elevators to standby floors with concentrated passenger flow; maintain the normal speed of escalators in the main direction; adjust the direction of standby escalators when the minimum service capacity and safety conditions in the opposite direction are met; and verify the receiving capacity of downstream service sections.
[0112] 4. High passenger flow scenarios in both directions: Maintain basic two-way transport capacity; increase the number of regular service equipment; reduce energy-saving standby equipment; prioritize avoiding imbalances in the directional configuration of elevators and escalators; suspend unnecessary energy-saving mode switching.
[0113] 5. Prioritizing elevator demand scenarios: Keep at least one elevator in guaranteed service mode; increase the priority of accessible elevator calls and special service requests; shorten the waiting time for dispatching guaranteed elevators; and do not cancel necessary elevator services due to low general passenger flow.
[0114] 6. Upstream and downstream capacity mismatch scenarios: Prioritize improving the capacity of downstream service area equipment; wake up downstream standby equipment; adjust the operating direction or speed of downstream equipment; when downstream capacity cannot be improved, restrict upstream output capacity; implement passenger flow guidance and diversion in intermediate transfer areas.
[0115] Furthermore, the following functions are implemented in the security verification and control execution module: 1. Evaluation of candidate strategies The system first eliminates candidate strategies that do not meet security and minimum service requirements, and then performs a comprehensive evaluation of the remaining candidate strategies. Candidate Strategies The overall cost is expressed as: in: This represents the normalized projected energy consumption. This represents the normalized estimated passenger travel time. This represents the maximum number of people remaining in the intermediate region after normalization. The normalized level of equipment inefficiency; The normalized cost of switching device modes; , , , and To evaluate the weights, the sum of all weights is 1.
[0116] The estimated passenger travel time includes: waiting time for elevators or queuing; elevator or escalator travel time; and walking and connection time between adjacent service sections. Inefficient equipment operation includes: elevators running empty; elevators running at low load; escalators running at full speed while empty; equipment supply significantly exceeding actual passenger demand; and unreasonable up / down direction configuration. The system selects the strategy with the lowest overall cost from candidate strategies that satisfy the constraints.
[0117] This invention employs a limited candidate strategy comparison, which does not require complex large-scale model training or real-time global optimization to be performed on-site.
[0118] 2. Security Verification and Control Execution Before the strategy is issued, the safety verification and control execution module performs the following verifications: whether the equipment is in a normal and available state; whether the minimum continuous service capacity of each service section is met; whether there is insufficient downstream receiving capacity; whether the number of people staying in the intermediate conversion area exceeds the threshold; whether the elevator service capacity for passengers is reserved; whether the current mode of the equipment has reached the minimum holding time; whether the conditions for escalator speed change or direction adjustment are met; and whether there is any conflict with fire, emergency, or manual control commands.
[0119] Before changing the direction of travel of an escalator, the following should be confirmed: there are no passengers on the escalator; the entrance and exit have been marked or controlled; the escalator has stopped running; the prescribed waiting time has been reached; and the equipment control system allows the direction to be changed.
[0120] After successful verification, the system sends control commands to the equipment control system. These commands include: operating mode; standby floor; primary direction response priority; group control dispatch priority; and standby device wake-up command.
[0121] Escalator control commands include: operating speed; standby or stopped status; direction of travel when safety conditions are met; and commands to resume operation from standby.
[0122] This invention does not alter the existing safety circuits, braking protection, door protection, fire control, and fault interlocking logic of elevators and escalators. In the event of communication interruption, insufficient data quality, equipment failure, fire alarm, or manual intervention, the system ceases automatic energy-saving control, and the existing equipment control system takes over.
[0123] 3. Prevention of frequent switching control The system sets the scene confirmation time and the minimum mode hold time for the device. The device's operating mode can only be adjusted after the new scene has been continuously held for the scene confirmation time. Once the device enters a certain operating mode, it should remain in that mode for at least the set time, unless the following occurs: service pressure reaches the highest level; the number of people remaining in the intermediate transition area exceeds the safety threshold; downstream receiving capacity is significantly insufficient; an emergency elevator service request occurs; the device malfunctions; or the device enters fire, emergency, or manual takeover mode.
[0124] By implementing scene confirmation and minimum mode maintenance mechanisms, the frequency of elevator starts and stops, as well as the frequent speed changes and direction switching of escalators, can be reduced.
[0125] Furthermore, after the strategy is executed, the operation effect feedback and parameter correction module collects the following operation results: actual power consumption of elevators and escalators; energy consumption per unit passenger flow; average waiting time; maximum waiting time; maximum number of people remaining in the intermediate transfer area; complete vertical passage time; number of times elevators run empty and low load; escalator empty full speed operation time; number of times equipment mode is switched; and completion status of elevator passenger service requests.
[0126] The system compares actual operating results with the predicted results of candidate strategies. When the actual energy consumption deviates significantly from the predicted energy consumption, the system adjusts the energy consumption parameters of the equipment under different operating modes. When the actual waiting time or the number of people remaining in intermediate areas deviates significantly, the system adjusts the effective service capacity parameters of the equipment and the scenario judgment threshold. When the equipment switches frequently, the system increases the mode switching cost or extends the minimum mode holding time. Fire control parameters, equipment safety interlock parameters, and manually set safety thresholds must not be automatically modified by the system.
[0127] like Figure 1 As shown, in another exemplary embodiment, based on the inventive concept of the above system embodiment, a collaborative energy-saving control method for deeply buried underground stations is provided, including the following steps: S1. Used to divide vertical traffic service sections according to station spatial hierarchy, equipment configuration and passenger passage path (set deep buried space parameters: set vertical height difference of each service section, equipment running length, intermediate transfer area capacity and number of downstream remaining service sections), and establish the upstream and downstream relationship between adjacent vertical traffic service sections according to the passenger entry, exit or transfer order; S2. Obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of passengers staying in the middle area, and number of passengers requiring elevators for each vertical transportation service section of the deep underground station. S3. Calculate the basic service pressure and determine the operation scenario by combining the vertical elevation difference of the vertical traffic service section, the equipment running length, the number of downstream remaining service sections, and the stagnation status of the intermediate transfer area; S4. Collect data on the operating status, direction of travel, speed of travel, load, fault status, and energy consumption of elevators and escalators; S5. Calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section, and determine whether there is a mismatch between upstream and downstream transportation capacity. S6. Based on the operating scenario, equipment status, and upstream and downstream capability matching status, generate candidate strategies including elevator operating mode, response priority, standby position, and escalator operating mode, operating speed, standby status, and operating direction; S7. Verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity, and equipment safety conditions, and select the feasible strategy with the lower overall cost. Issue control commands corresponding to the feasible strategy to the elevator control system and escalator control system. Among these, candidate strategies that do not meet the requirements of minimum continuous service, elevator demand passenger service, intermediate area capacity, and equipment safety are eliminated, and the energy consumption, travel time, area delay, inefficient operation, and mode switching cost of the remaining strategies are evaluated.
[0128] S8. Collect the actual energy consumption, passage time and equipment operation results after the feasible strategy is implemented, and correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
[0129] Based on the above methods and systems, the working process of the present invention will be described below in conjunction with specific operating scenarios. The number of devices, passenger flow values, thresholds, and control parameters used in the embodiments are exemplary settings and can be adjusted according to the actual station spatial structure, equipment configuration, and operation management requirements.
[0130] The total vertical height difference between the platform and the ground level of a certain underground station is approximately 45 meters. When exiting the station, passengers pass through three vertical transportation service sections in sequence: from the platform to the intermediate transfer level, from the intermediate transfer level to the station hall, and from the station hall to the ground level. The station is equipped with a total of 4 elevators and 8 escalators, and the system control cycle is set to 60 seconds.
[0131] Example 1: Low-load energy-saving operation During off-peak hours on a weekday, the system detected low passenger flow in all three service areas using the video passenger flow perception module. Specifically, in the waiting area for elevators and passengers between the platform and the intermediate transfer level, there were only 4 passengers, with a passenger density of 0.18 people / m². 2 The queue length was 1.2m, the average waiting time was 18s, and one of the passengers was a passenger who needed the elevator.
[0132] The system performs normalization based on pre-defined indicator ranges for the station. Assuming the normalized values for the number of passengers waiting for elevators, passenger density, queue length, average dwell time, and the number of passengers required for elevator access are 0.20, 0.12, 0.15, 0.20, and 0.20 respectively, with corresponding weights of 0.25, 0.20, 0.20, 0.15, and 0.20, the basic service pressure for this service segment is approximately: Based on this, the system determines that the current scenario is one of low load and energy saving. Although the passenger flow pressure is low, the system still needs to maintain a minimum continuous service capacity for the complete passage path because passengers still need to pass through three vertical service sections to complete their exit.
[0133] The system generates three candidate strategies based on the current device status: Strategy A maintains the existing operating status of all elevators and escalators; Strategy B retains necessary up and down escalators in each major service area, with some escalators adjusted from normal speed to reduced speed or sensor standby mode; one elevator is kept in guaranteed service mode, one elevator is in regular or flexible standby mode, and the rest of the elevators enter energy-saving standby mode. Strategy C involves keeping only one main piece of equipment running in each service area, while the rest of the elevators and escalators are put into standby or stopped.
[0134] Security verification results indicate that Strategy C may cause two adjacent service segments to simultaneously reduce the service capacity in the main direction, posing a risk of temporary interruption of the complete vertical passage path before the standby equipment resumes operation. Therefore, it has been eliminated.
[0135] The system further compares the projected energy consumption, passenger travel time, number of passengers stranded in intermediate areas, degree of equipment inefficiency, and mode switching costs of Strategy A and Strategy B. Although Strategy A does not have a switching impact, it results in more escalator empty-load full-speed operation time and more elevator low-load operation times; Strategy B, while maintaining minimum continuous service and elevator demand passenger guarantee capacity, has a lower projected overall cost, therefore Strategy B is selected.
[0136] After control is executed, each service section maintains at least one continuous passageway in the main direction. Service elevators are ensured to stop at floors with high passenger flow and maintain accessible call response. When the basic service pressure of any service section reaches the wake-up threshold for two consecutive control cycles, or when a new passenger request for elevator service occurs, the system immediately resumes operation of the corresponding standby equipment.
[0137] Example 2: Control of one-way centralized exit passenger flow and upstream / downstream capacity mismatch During a certain evening rush hour, passenger flow increased rapidly from the platform to the station hall after the train arrived at the station. The system detected that the passenger density in the service area from the platform to the intermediate transfer level reached 1.8 people / m². 2 There were 34 people waiting for the elevator, with a queue length of about 8 meters. The proportion of passengers going up was 0.86, indicating a high level of pressure on basic services. The system determined that the current situation was a one-way concentrated exit passenger flow scenario.
[0138] During the current control period, the upstream service area is expected to transport 220 people to the intermediate transfer level, while the downstream intermediate transfer level to the station hall service area can only transport 150 people. The upstream and downstream capacity matching coefficient is approximately: This value is below the station's capacity matching threshold, indicating insufficient downstream receiving capacity. If there are currently 25 people stranded in the intermediate transfer area, then, assuming the current operational status is maintained, the estimated number of stranded people in the next control cycle is: The system thus identified a combined scenario of "one-way concentrated passenger flow and mismatch between upstream and downstream capabilities" and generated the following candidate strategies: Strategy A is to maintain the existing equipment configuration; Strategy B is to restore a downstream escalator that is slowing down to its normal speed, wake up a standby elevator, and increase the upward response priority of the downstream elevator. Strategy C is based on Strategy B, which adjusts a reversible downward escalator to upward, forming a main direction enhanced configuration or a one-way centralized configuration.
[0139] Calculations show that Strategy B can increase the downstream transport capacity during the control cycle to approximately 195 people, but this is still lower than the expected output from the upstream; Strategy C can increase the downstream transport capacity to approximately 235 people, improve the capacity matching coefficient to approximately 1.07, and reduce the expected number of people remaining in the middle area during the next control cycle. The system then performs a safety check on Strategy C, confirming that the passenger flow in the opposite direction is low, there are still other escalators or stairs providing passage in the opposite direction, and Strategy C is implemented only after the escalator is adjusted to have reversible operation function, there are no passengers on the escalator, the entrance and exit provide directional prompts, and the next service section has sufficient receiving capacity.
[0140] The system also dispatches idle elevators to the platform level, increases the response priority for the exit direction, and guides ordinary passengers to use escalators through displays and announcements. Elevators give priority to passengers with mobility difficulties and those carrying large luggage.
[0141] When the proportion of passenger flow in the main direction, the pressure on basic services, and the number of people stranded in the intermediate area decrease to the recovery threshold for three consecutive control cycles, the system first switches from unidirectional centralized configuration to main direction enhanced configuration, and then back to bidirectional balanced configuration to avoid frequent changes in the operating direction of escalators.
[0142] Example 3: Elevator demand under low passenger flow conditions - passenger priority service During a low passenger flow period, the number of ordinary passengers at the station is relatively small, and the basic service pressure of the service section is about 0.24. According to the ordinary passenger flow status, the elevator energy-saving standby and escalator speed reduction operation strategies can be adopted.
[0143] At this time, the system continuously received accessibility elevator requests and identified four passengers with elevator needs through elevator waiting area passenger flow detection, including one wheelchair passenger and three passengers carrying large luggage. The proportion of passengers requiring elevator access exceeded the station's set threshold, and the system switched the current scenario from a low-load energy-saving scenario to an elevator demand-priority scenario.
[0144] The system checks the status of the relevant elevators. Elevator 1 is in backup service mode, located on the lobby floor; Elevator 2 is in energy-saving standby mode; Elevators 3 and 4 are in other service areas. Based on Elevator 1's current location, lifting height, recent average running time, and car capacity, the system determines that a backup elevator can complete the service within the allowed waiting time, therefore the second elevator is not immediately activated.
[0145] The system issues a priority response command to elevator number 1, dispatching it to the floor where the passenger is located, and increases the group control priority of accessible elevator calls. The escalator maintains a low-load energy-saving operation state to avoid resuming high-power operation of all vertical transportation equipment due to a small number of passengers requiring elevator access.
[0146] If the number of passengers demanding the elevator continues to increase, or if the maximum expected waiting time exceeds the set threshold, the system will activate elevator number 2 and set it to auxiliary support service mode.
[0147] After passengers have completed their passage, the system continues to maintain elevator No. 1 in guaranteed service status. If no new passengers request accessibility or elevator services within three consecutive control cycles, and the general passenger flow pressure remains at a low level, elevator No. 2 will re-enter energy-saving standby mode, and elevator No. 1 will revert to the minimum guaranteed service mode.
[0148] Through the above controls, the system retains the necessary elevator service capacity even when passenger flow is low, avoiding excessive waiting time for accessible passengers due to energy-saving standby.
[0149] Example 4: Service capability reconfiguration under equipment failure conditions During a certain operating period, an upward escalator on the section from the intermediate transfer level to the station hall service area malfunctioned. After receiving the fault signal, the equipment status acquisition module set the service effectiveness coefficient of the escalator to 0 and prohibited it from participating in candidate strategy generation.
[0150] Before the malfunction, the upstream service area was expected to transport 180 people during the current control cycle, and the downstream service area could transport approximately 200 people, which was sufficient to meet normal passenger flow demand. After the malfunction, the effective downstream transport capacity decreased to 135 people, and the upstream-downstream capacity matching coefficient decreased to: If there are currently 10 people stranded in the intermediate area, the number of stranded people in the next control cycle is expected to increase to: (The original text appears to be incomplete and contains several grammatical errors. A more accurate translation would require the full context.) The system generates the following candidate strategies based on the available device status: Strategy A involves maintaining the operation of remaining equipment and strengthening manual passenger flow guidance; Strategy B is to activate a standby escalator in the same section, restoring the downstream transport capacity to approximately 180 people. Strategy C, based on Strategy B, increases the main direction response priority of nearby elevators, thereby increasing the downstream comprehensive transport capacity to approximately 195 people. Strategy D limits the output capacity of the upstream service segment when no backup equipment is available, and controls the number of people entering the intermediate area through upstream area diversion and waiting prompts.
[0151] The system first selects the strategy that satisfies safety constraints and has the lowest overall cost. If the standby escalator can be put into normal operation and there are no passengers with concentrated elevator demand, then strategy B is sufficient to achieve basic matching of upstream and downstream capacity, and the system will not increase the elevator operation intensity further. If the number of people staying in the intermediate area continues to increase, then strategy C will be further implemented.
[0152] If the backup escalator cannot be put into operation, the system will execute strategy D, keeping all available downstream equipment running while reducing the output intensity of the upstream escalator, and guiding passengers to postpone their entry into the intermediate transfer area through displays, broadcasts and on-site personnel.
[0153] The system simultaneously sends equipment failure and capacity degradation alarms to the integrated monitoring platform. After the faulty equipment is restored, it is not automatically put back into operation. Instead, it is re-added to the set of available equipment only after maintenance confirmation, equipment safety status verification, and authorization by operations personnel.
[0154] The above process ensures that when equipment fails, the system can rebuild the collaborative operation strategy based on the remaining equipment capacity, thus preventing local equipment failures from quickly escalating into passenger backlogs in intermediate transfer areas.
[0155] In another exemplary embodiment, based on the same inventive concept as the method embodiment, an electronic device is provided, including a memory and a processor. The memory stores computer instructions that can be executed on the processor. When the processor executes the computer instructions, it performs a collaborative energy-saving control method for deeply buried underground stations provided in the embodiment of the present invention.
[0156] The processor may be a single-core or multi-core central processing unit or a specific integrated circuit, or one or more integrated circuits configured to implement the present invention.
[0157] The embodiments of the subject matter and functional operation described in this specification can be implemented in: tangibly embodied computer software or firmware, computer hardware including the structures disclosed in this specification and their structural equivalents, or combinations thereof. Embodiments of the subject matter described in this specification can be implemented as one or more computer programs, i.e., one or more modules of computer program instructions encoded on a tangible, non-transitory program carrier for execution by a data processing device or for controlling the operation of a data processing device. Alternatively or additionally, the program instructions may be encoded on artificially generated propagation signals, such as machine-generated electrical, optical, or electromagnetic signals, which are generated to encode information and transmit it to a suitable receiving device for execution by the data processing device.
[0158] The processing and logic flow described in this specification can be executed by one or more programmable computers that execute one or more computer programs to perform corresponding functions by operating on input data and generating output. The processing and logic flow can also be executed by dedicated logic circuitry—such as FPGAs (Field-Programmable Gate Arrays) or ASICs (Application-Specific Integrated Circuits), and the device can also be implemented as dedicated logic circuitry.
[0159] Suitable processors for executing computer programs include, for example, general-purpose and / or special-purpose microprocessors, or any other type of central processing unit. Typically, the central processing unit receives instructions and data from read-only memory and / or random access memory. The basic components of a computer include a central processing unit for implementing or executing instructions and one or more memory devices for storing instructions and data. Typically, a computer will also include one or more mass storage devices for storing data, such as disks, magneto-optical disks, or optical disks, or the computer will be operatively coupled to such mass storage devices to receive data from or transfer data to them, or both. However, a computer is not required to have such devices. Furthermore, a computer can be embedded in another device, such as a mobile phone, a personal digital assistant (PDA), a mobile audio or video player, a game console, a global positioning system (GPS) receiver, or a portable storage device such as a universal serial bus (USB) flash drive, to name a few.
[0160] It should be understood that each block in a flowchart or block diagram can represent a module, segment, or portion of code, which contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the blocks may occur in a different order than those shown in the figures. For example, two consecutive blocks may actually be executed substantially in parallel, or they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in a block diagram and / or flowchart, and combinations of blocks in block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system that performs the specified function or action, or using a combination of dedicated hardware and computer instructions.
[0161] The above detailed embodiments are a description of the present invention. It should not be considered that the specific embodiments of the present invention are limited to these descriptions. For those skilled in the art, several simple deductions and substitutions can be made without departing from the concept of the present invention, and all of these should be considered to fall within the protection scope of the present invention.
Claims
1. A collaborative energy-saving control system for deeply buried underground railway stations, characterized in that, include: The deeply embedded vertical transportation service relationship construction module is used to divide vertical transportation service sections according to station spatial hierarchy, equipment configuration and passenger passage path, and to establish upstream and downstream relationships between adjacent vertical transportation service sections according to the passenger entry, exit or transfer sequence. The passenger flow perception and operation scenario determination module is used to obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of people staying in the intermediate area, and number of passengers requiring elevators for each vertical transportation service section of the deeply buried underground station; calculate the basic service pressure; and determine the operation scenario by combining the vertical height difference of the vertical transportation service section, equipment running length, number of remaining service sections downstream, and dwell status in the intermediate transfer area. The equipment status and energy consumption acquisition module is used to collect data on the operating status, direction of travel, speed of travel, load, fault status and energy consumption of elevators and escalators. The service capacity and upstream / downstream matching module is used to calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and to determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section. The collaborative energy-saving strategy generation module is used to generate candidate strategies, including elevator operation mode, response priority, standby position, escalator operation mode, operation speed, standby state, and operation direction, based on the operation scenario, equipment status, and upstream and downstream capability matching status. The safety verification and control execution module is used to verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity and equipment safety conditions, and select the feasible strategy with low overall cost, and issue control instructions corresponding to the feasible strategy to the elevator control system and escalator control system. The operation effect feedback and parameter correction module is used to collect the actual energy consumption, passage time and equipment operation results after the implementation of feasible strategies, and to correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
2. The collaborative energy-saving control system for deeply buried underground stations according to claim 1, characterized in that, The calculation of basic service pressure in the passenger flow perception and operation scenario determination module includes: After normalizing the number of people waiting for elevators, passenger flow density, queue length, average dwell time and the number of passengers requiring elevators, a weighted calculation is performed to obtain the basic service pressure of each vertical transportation service section. The operating scenarios include low-load energy-saving scenarios, normal balanced scenarios, one-way concentrated passenger flow scenarios, two-way high passenger flow scenarios, elevator demand priority scenarios, and upstream and downstream transportation capacity mismatch scenarios.
3. The collaborative energy-saving control system for deeply buried underground stations according to claim 1, characterized in that, The elevator operation modes include normal service mode, direction priority service mode, energy-saving standby mode, and backup service mode; the escalator operation modes include normal speed operation mode, deceleration operation mode, sensor standby mode, and shutdown standby mode.
4. The collaborative energy-saving control system for deeply buried underground stations according to claim 1, characterized in that, The collaborative energy-saving strategy generation module evaluates candidate strategies based on equipment energy consumption, passenger travel time, number of people stranded in intermediate transfer areas, degree of equipment inefficient operation, and cost of equipment mode switching.
5. A collaborative energy-saving control system for deeply buried underground stations according to claim 3, characterized in that, When there are passengers requiring elevator access, at least one elevator associated with the passenger's travel path is in either regular service mode or guaranteed service mode.
6. A collaborative energy-saving control system for deeply buried underground stations according to claim 3, characterized in that, The system sets a scene confirmation time and a minimum mode hold time for the equipment to limit the frequent switching of operating modes of elevators and escalators.
7. A collaborative energy-saving control system for deeply buried underground stations according to claim 1, characterized in that, In the event of equipment failure, communication interruption, insufficient data quality, fire alarm, or manual takeover, the collaborative energy-saving control will be stopped, and the original safety control system of the elevator and escalator will take over.
8. A collaborative energy-saving control system for deeply buried underground stations according to claim 1, characterized in that, The upstream and downstream capability matching status is calculated using the following formula: ; in Indicates direction The ability matching coefficient, The number of passengers expected to be transported out of the upstream vertical traffic service section within the control period; The number of passengers that the downstream vertical traffic service section can receive within the same control period; It is a positive number not less than 0; when the capacity matching coefficient is lower than the set threshold, it is determined that the downstream vertical traffic service section has insufficient receiving capacity.
9. A collaborative energy-saving control method for deeply buried underground railway stations, characterized in that, Includes the following steps: S1. Used to divide vertical transportation service sections according to station spatial hierarchy, equipment configuration and passenger passage path, and to establish upstream and downstream relationships between adjacent vertical transportation service sections according to the passenger entry, exit or transfer sequence; S2. Obtain the number of passengers, passenger flow density, passenger flow direction, queue length, average dwell time, number of passengers staying in the middle area, and number of passengers requiring elevators for each vertical transportation service section of the deep underground station. S3. Calculate the basic service pressure and determine the operation scenario by combining the vertical elevation difference of the vertical traffic service section, the equipment running length, the number of downstream remaining service sections, and the stagnation status of the intermediate transfer area; S4. Collect data on the operating status, direction of travel, speed of travel, load, fault status, and energy consumption of elevators and escalators; S5. Calculate the effective service capacity of elevators and escalators in different directions for each vertical transportation service section, and determine the upstream and downstream capacity matching status based on the passenger flow output from the upstream vertical transportation service section and the receiving capacity of the downstream vertical transportation service section. S6. Based on the operating scenario, equipment status, and upstream and downstream capability matching status, generate candidate strategies including elevator operating mode, response priority, standby position, and escalator operating mode, operating speed, standby status, and operating direction; S7. Verify the candidate strategies based on the minimum continuous service capacity, elevator demand passenger service, intermediate transfer area capacity and equipment safety conditions, and select the feasible strategy with low overall cost, and issue control instructions corresponding to the feasible strategy to the elevator control system and escalator control system. S8. Collect the actual energy consumption, passage time and equipment operation results after the feasible strategy is implemented, and correct the operation scenario judgment, equipment effective service capability and energy consumption parameters.
10. An electronic device comprising a memory and a processor, wherein the memory stores computer instructions executable by the processor, characterized in that, When the processor executes computer instructions, it performs a collaborative energy-saving control method for deeply buried underground stations as described in claim 9.