A multi-mining area raw material coordinated mine plant linkage control system and control method
The mine linkage control system, which coordinates raw materials from multiple mining areas, has solved the problem of data disconnect between mines and sand and gravel processing plants. It has achieved homogenization and real-time control of raw materials at the source, improved the continuity of production and the stability of finished product quality, and achieved green and energy-saving production results.
Patent Information
- Application Number
- CN202611045840.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-14
- Publication Date
- 2026-11-20
AI Technical Summary
In existing technologies, the lack of unified scheduling and data collaboration between mines and sand and gravel processing plants leads to large fluctuations in raw material quality, poor production continuity, unstable finished product quality, and high energy consumption. Furthermore, existing solutions have failed to effectively achieve closed-loop control between mines and primary crushing workshops.
The mine linkage control system, which coordinates raw materials from multiple mining areas, includes a mine linkage control central module, a ore homogenization and regulation module, a mine three-dimensional geological model module, a mine coarse crushing workshop linkage control module, a positioning and identification module, an intelligent access control module, and a central control DCS module. It is connected via industrial Ethernet/4G wireless signal to realize ore source identification, vehicle verification, and unloading guidance. Combined with a quality weighted average algorithm and a dynamic regulation model, it controls the ore composition and particle size in real time to ensure homogenized feeding.
It achieves homogenization control of mineral sources, ensures stable feed, improves production continuity and finished product quality stability, controls the content of soil and weak particles, moisture content and particle size fluctuations, and realizes green and energy-saving production.
Smart Images

Figure CN123137221A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of sand and gravel aggregate preparation technology, specifically involving a control system and control method for homogenization of ore source in multiple mining areas and closed-loop control between the mine and the coarse crushing workshop. Background Technology
[0002] Currently, the sand and gravel aggregate preparation industry generally adopts an independent operation mode between raw material mining and sand and gravel processing plant production. Mines are only responsible for raw material mining and transportation, while sand and gravel plants are only responsible for crushing, screening and finished product processing. The lack of unified scheduling and data coordination between the two leads to large fluctuations in raw material quality, poor production continuity, unstable finished product quality and high energy consumption, which has become a common technical problem in the industry.
[0003] Existing technologies have solutions for aspects such as mine operation scheduling, raw material homogenization and batching, and automation of crushing plants, but all of them have obvious shortcomings: Mining and vehicle scheduling only focus on transportation efficiency and mining planning. For example, a mining intelligent scheduling system disclosed in Chinese Patent No. CN112037503A only realizes vehicle GPS positioning and transportation route optimization, without linking with the production needs of sand and gravel plants, and cannot dynamically adjust the mining and loading ratio according to the feeding status of the coarse crushing workshop.
[0004] Raw material homogenization and batching control are mostly concentrated in the in-plant silos or semi-finished product processing stages. For example, Chinese patent publication number CN216063697U discloses a quantification and homogenization feeding system for ore in regulating silos, and Chinese patent publication number CN114276010B discloses a glass raw material processing method for homogenization of multiple mineral sources. These methods only achieve static proportioning or in-plant homogenization, without quality classification and blending control from the source of multiple mining areas in the mine. It is difficult to stably control key indicators such as mud content, moisture content, and particle size.
[0005] Some technologies involve mining area matching and homogenization control. For example, Chinese Patent No. CN113359635A discloses an intelligent control method for quantitative homogenization matching of ore. Although it uses a three-dimensional geological model for mining planning, it does not establish a closed-loop control system from the mine to the coarse crushing workshop. It lacks key links such as intelligent access control, unloading guidance, and DCS system data linkage, and cannot achieve accurate blending and real-time correction.
[0006] In summary, existing technologies generally suffer from problems such as disconnection between mines and plants, inaccurate blending, unreal-time control, and lack of data closure, making it difficult to meet the continuous, stable, high-quality, efficient, green, and energy-saving production requirements of sand and gravel systems. Summary of the Invention
[0007] The purpose of this invention is to provide a mine linkage control system and control method for multi-mining area raw material coordination, addressing the technical problems described in the background art.
[0008] The technical solution of this invention: A multi-mining area raw material coordination mine linkage control system includes a mine linkage control central module, a ore homogenization control module, a mine three-dimensional geological model module, a mine coarse crushing workshop linkage control module, a positioning and identification module, an intelligent access control module, a central control DCS control module, and a semi-finished product stacking and storage module. The ore homogenization control module, the mine three-dimensional geological model module, the mine coarse crushing workshop joint control module, and the central control DCS module are all connected to the mine joint control central module via industrial Ethernet / 4G wireless. The positioning and identification module is connected to the intelligent access control module, and the intelligent access control module is connected to the joint control module of the mine's primary crushing workshop. The central control DCS control module is connected to the coarse crushing workshop execution equipment signal of the mine coarse crushing workshop joint control module, and the semi-finished product stacking and storage module is set at the coarse crushing workshop discharge end of the mine coarse crushing workshop joint control module.
[0009] The mine joint control central module has a built-in comprehensive ore database, a quality weighted average algorithm unit, and a dynamic control model unit.
[0010] The mineral homogenization control module is equipped with a particle size detection unit, a soil and weak particle detection unit, and a moisture content detection unit.
[0011] The positioning and identification module includes a GPS satellite positioning unit, a mine camera unit, and a drone aerial photography unit.
[0012] The intelligent access control module includes a vehicle identity verification unit, a quality verification unit, and an unloading guidance unit.
[0013] The joint control module of the primary crushing workshop in the mine is equipped with a periodic monitoring unit.
[0014] A mine linkage control method for multi-mining area raw material coordination, implemented based on a mine linkage control system for multi-mining area raw material coordination, includes the following steps: S1. Establish a database, collect data on particle size, soil and weak rock content and moisture content of ore from each mining area, and establish a comprehensive database of ore from multiple mining areas; S2. Determine the allocation ratio, analyze the differences in ore materials in each mining area based on the three-dimensional geological model of the mine and deduce the mining process to determine the allocation ratio of each mining area; S3. Control raw material quality fluctuations by using a quality-weighted average algorithm to calculate the blending ratio of ore in each mining area, and control raw material quality fluctuations by combining source selection with homogeneous blending. S4. Construct a dynamic control model. Based on the raw material quality fluctuation index, construct a dynamic control model to control the composition and particle size of the ore in real time, so that the ore enters the coarse crushing workshop in a homogeneous and balanced manner. S5. Ore source identification, vehicle verification and unloading guidance: Ore source identification, vehicle verification and unloading guidance are completed through location identification and intelligent access control; S6. Incoming material control and processing: Incoming material data is transmitted to the central control DCS module, linking the primary crushing workshop process, and the semi-finished material is homogenized through crushing, conveying and stacking.
[0015] The particle size distribution of the ore was obtained through blasting tests, and the blending parameters for each mining area and after breaking down oversized stones were determined by the mass-weighted average particle size.
[0016] The materials are loaded and matched according to the preset ratio of the multi-mining area, and the weight deviation is corrected at ±0.3%. When the matching result exceeds ±10% deviation, the coarse crushing gate is closed and unloading is prohibited.
[0017] The beneficial effects of this invention are: This application achieves homogenization control of ore sources by establishing a comprehensive database of ore from multiple mining areas and using a quality-weighted average algorithm to accurately calculate blending ratios. By constructing a joint control system between the mine and the primary crushing workshop, and combining location identification, intelligent access control, and unloading guidance, precise matching of incoming materials is achieved, ensuring stable feed. Through closed-loop data linkage between the mine and the central control DCS module, real-time reception of incoming material information and process adjustments are made, improving production continuity and the stability of finished product quality. By strictly controlling the content of clay and weak particles, moisture content, and particle size fluctuations, green, energy-saving, and efficient production is achieved. Attached Figure Description
[0018] Figure 1 This is a system module connection diagram of the present invention; Figure 2 This is a flow chart of the mineral homogenization production control process in this invention; Figure 3 This is the production control logic diagram for ore homogenization in this invention; Figure 4 This is a process flow diagram of the integrated control of mining and coarse crushing in this invention.
[0019] Attached label: 1-Mine joint control central module, 2-Ore homogenization control module, 3-Mine 3D geological model module, 4-Mine coarse crushing workshop joint control module, 5-Positioning identification module, 6-Intelligent access control module, 7-Central control DCS module, 8-Semi-finished product stacking module, 9-Ore comprehensive database, 10-Quality weighted average algorithm unit, 11-Dynamic control model unit, 12-Particle size detection unit, 13-Soil and weak particle detection unit, 14-Moisture content detection unit, 15-GPS satellite positioning unit, 16-Mine camera unit, 17-UAV aerial photography unit, 18-Vehicle identification verification unit, 19-Quality review unit, 20-Unloading guidance unit, 21-Periodic monitoring unit. Detailed Implementation
[0020] Example 1 refer to Figures 1-4 A multi-mining area raw material coordination mine linkage control system includes a mine linkage control central module 1, a ore homogenization control module 2, a mine three-dimensional geological model module 3, a mine coarse crushing workshop linkage control module 4, a positioning and identification module 5, an intelligent access control module 6, a central control DCS control module 7, and a semi-finished product stacking and storage module 8. The ore homogenization control module 2, the mine three-dimensional geological model module 3, the mine coarse crushing workshop joint control module 4, and the central control DCS module 7 are all connected to the mine joint control central module 1 via industrial Ethernet / 4G wireless. The positioning and identification module 5 is connected to the intelligent access control module 6 by signal, and the intelligent access control module 6 is connected to the mine primary crushing workshop joint control module 4 by signal; The central control DCS control module 7 is connected to the coarse crushing workshop execution equipment signal of the mine coarse crushing workshop joint control module 4; the execution equipment includes a jaw crusher, a vibrating feeder and a belt conveyor.
[0021] The semi-finished product stacking module 8 is installed at the discharge end of the coarse crushing workshop of the mine coarse crushing workshop control module 4; The mine control central module 1 incorporates a comprehensive ore database 9, a quality-weighted average algorithm unit 10, and a dynamic control model unit 11. It is used to collect data on particle size, soil and weak rock content, and moisture content of ore from each mining area, calculate the blending ratio, and perform dynamic control. The specific algorithm is as follows: Weighted average particle size D = Σ(mi×Di) / Σmi; Control the weighted average particle size fluctuation within ±5%; Post-blending parameters: Soil and weak particles <3%, moisture content of particles with a diameter of less than 5mm <3%; The mineral homogenization control module 2 is equipped with a particle size detection unit 12, a soil and weak particle detection unit 13 and a moisture content detection unit 14, so that the content of soil and weak particles in the blended mineral is <3%, the moisture content of particles with a diameter of less than 5mm is <3%, and the weighted average diameter fluctuation of the raw stone is controlled within ±5%.
[0022] The positioning and identification module 5 includes a GPS satellite positioning unit 15, a mine camera unit 16, and a drone aerial photography unit 17, which are used to track the travel trajectory of transport vehicles in real time and identify the regional category of the ore.
[0023] The intelligent access control module 6 includes a vehicle identity verification unit 18, a quality review unit 19, and an unloading guidance unit 20, which are used for vehicle identity verification, quality review, and unloading guidance.
[0024] The joint control module 4 of the mine's primary crushing workshop is equipped with a periodic monitoring unit 21, which performs inspections every 30 minutes and runs in a cycle every 120 minutes. The allowable deviation range is ±10%. If the deviation is exceeded, the primary crushing access control system will be shut down, and vehicles will be prohibited from unloading materials.
[0025] Specifically, in this application, the mine joint control central module 1, as a green production control technology for ore homogenization, mainly dispatches and transports different ores with differences to the coarse crushing workshop of the sand and gravel system in proportion, which is the mine coarse crushing workshop joint control module 4. In the coarse crushing workshop, the feed is matched, and after crushing, conveying, and stacking, it is made uniformly mixed in the semi-finished material, providing a mixed material with stable composition and particle size for the medium and fine crushing production workshop, so as to achieve a balanced and stable feed of subsequent material sources for sand and gravel preparation.
[0026] The control parameters and control methods for the ore homogenization control module 2 are as follows: The main control parameters of the ore homogenization control module 2 are as follows: Homogenization control of mineral composition: After the raw materials are mixed in the mine (stock yard), the content of soil and weak particles is <3%; the moisture content of particles with a diameter of less than 5mm is <3%.
[0027] Average particle size control of ore: After the raw materials are blended in the mine (stock yard), the fluctuation of the weighted average diameter of the raw stone is controlled within ±5% by the weighted average algorithm unit 10.
[0028] The green production control method for ore homogenization in the mine's central control module 1: Mineral composition control parameters: Based on the geological survey data of the mine (or solid waste storage data), and following the principles of "balanced matching, reasonable spatial arrangement, and appropriate timing", a three-dimensional geological model of the mine is constructed (i.e., the three-dimensional geological model module 3 of the mine). The differences in lithology, water content, mud content, and blasting parameters of each mining area are analyzed. The mining process is deduced through the three-dimensional geological model of the three-dimensional geological model module 3 of the mine. The locations and quantities of differences are preliminarily determined, and the proportion of each mining area is calculated. During the mining process, relevant parameters of soil and soft particles and particles with a diameter of less than 5mm are collected through experiments in each mining area to correct the mineral composition homogenization mining matching parameters of each mining area.
[0029] In the process of adjusting the particle size of the ore, blasting tests in the mining area are conducted to obtain the particle size distribution of large-scale mining areas, slope shaping control blasting, blasting tests in special geological sections, and small-diameter stone particles (the particle size distribution of ore in each area is obtained by collecting excavated materials from the solid waste dump). The particle size of different mining areas and small-diameter stone particles is calculated by the mass-weighted average algorithm unit 10 to determine the blending parameters.
[0030] This application, based on detailed geological exploration data and mining design plans, analyzes the differences in lithology, water and mud content, blasting parameters, etc., of the ore. Combined with a three-dimensional geological model of the mine, it simulates the mining process, preliminarily determines the locations and quantities of differences, and calculates the allocation ratios for different mining areas at each stage. Its core lies in achieving overall classification and coordination of the mine, planning mining areas according to homogeneity, and constructing an intelligent, quantitative, and dynamic mining control system for homogeneous ore mining that is "balanced in allocation, spatially rational, and temporally appropriate." This system provides decision-making basis and control parameters for the mine's central control module 1. The technical principles of this technology refer to... Figure 2 : Ore homogenization control includes ore particle size homogenization control and ore grade homogenization control. Ore particle size homogenization control involves the rational mixing and matching of ore particle size in the main mining area, the stripping area, the controlled blasting area, and oversized small calcined ore particles, combined with blasting tests and detection to determine the ore particle size of each mining area. Ore grade homogenization control involves controlling the ore grade in the main mining area and other mining areas, combined with geological exploration data and on-site testing to determine the mud, weak rock, and moisture content of each mining area, and then combining blasting tests and detection to determine the ore grade of each mining area. An ore quality database is then constructed to calculate the ore mix ratio of each mining area.
[0031] In this application, after fully understanding the moisture content of soil and weak particles, particles smaller than 5mm, and ore particle size in each mining area, a ore matching production scheduling model (i.e., ore homogenization control module 2) is constructed using the main mining area as the benchmark raw material and a quality-weighted average method. The ore homogenization production control logic is referenced. Figure 3 : Raw materials from areas B1 (excessive soft rock), B2 (excessive mud content), B3 (excessive moisture content), C1 (excessively large ore particles), and C1 (excessively small ore particles) are mixed with basic ore from large-scale mining area A. In principle, no more than two types of raw materials should be mixed. The particle size of the mixed ore should be controlled within ±5% of the preset value, mud content <5%, soft particle content <5%, moisture content <3%, and particle size fluctuation within ±5%. After mixing, an average raw material is obtained.
[0032] Mineral homogenization control technologies include: Example 2: A mine linkage control method for multi-mining area raw material coordination, implemented based on a mine linkage control system for multi-mining area raw material coordination, includes the following steps: S1. Establish a database, collect data on particle size, soil and weak rock content and moisture content of ore from each mining area, and establish a comprehensive database of ore from multiple mining areas. S2. Determine the allocation ratio, analyze the differences in ore materials in each mining area based on the three-dimensional geological model of the mine and deduce the mining process to determine the allocation ratio of each mining area; Specifically, based on the three-dimensional geological model of the mine, the differences in lithology, water and mud content, and blasting parameters of each mining area are analyzed to deduce the mining process and preliminarily determine the allocation ratio of each mining area. S3. Control raw material quality fluctuations by using a quality-weighted average algorithm to calculate the blending ratio of ore in each mining area, and control raw material quality fluctuations by combining source selection with homogeneous blending. The particle size distribution of the ore was obtained through blasting tests, and the blending parameters for each mining area and after breaking down oversized stones were determined by the mass-weighted average particle size.
[0033] S4. Construct a dynamic control model. Based on the raw material quality fluctuation index, construct a dynamic control model to control the composition and particle size of the ore in real time, so that the ore enters the coarse crushing workshop in a homogeneous and balanced manner. S5. Ore source identification, vehicle verification and unloading guidance: Ore source identification, vehicle verification and unloading guidance are completed through location identification and intelligent access control; The specific steps are as follows: the source of the ore is identified through GPS satellite positioning, mine video, and drone aerial photography; vehicle identity verification, quality review, and unloading guidance are completed through intelligent access control. S6. Incoming material control and processing: Incoming material data is transmitted to the central control DCS module 7, which links the coarse crushing workshop process, and the semi-finished material is homogenized through crushing, conveying and stacking.
[0034] The data on the type and quantity of incoming materials are transmitted in real time to the central control DCS module 7, and the process parameters of the coarse crushing workshop are adjusted accordingly. After crushing and conveying, the materials enter the semi-finished product stacking module 8 to achieve uniform mixing of semi-finished products.
[0035] Multiple mining areas' ore mixes are loaded into trucks according to various configuration ratios such as A:B:C, B:C:D, C:D:E, and E:A:B, and weight deviations are corrected at ±0.3%. The ore mix results are monitored with a query node every 30 minutes and a cycle of 120 minutes, with a tolerance of ±10%. If the deviation exceeds the tolerance, the coarse crushing gate is closed, and vehicles are prohibited from entering the coarse crushing workshop to unload ore.
[0036] Specifically, in this application, the technology for the joint control of the mine (stock yard) and the primary crushing workshop (i.e., the joint control module 4 of the primary crushing workshop) is as follows: As the raw material interface of the sand and gravel system, the establishment of the intelligent scheduling and control system between the mine and the coarse crushing workshop aims to achieve quantitative matching and production of ore according to the principle of homogenization by quantitatively controlling the amount of material coming into each mining area, and ultimately achieve the goal of stacked homogenized storage of ore in the semi-finished product warehouse (i.e., semi-finished product stacked storage module 8).
[0037] The technical control method and control objective of the joint control between the mine (stock yard) and the primary crushing workshop (i.e., the joint control module 4 of the mine primary crushing workshop) are as follows: Based on the mining plan, the quantity of loading equipment in each mining area is intelligently controlled through the ore homogenization control module 2 to match the quantity of ore loaded in each mining area with the required proportion of primary crushing production; through satellite positioning and navigation, the incoming material information is accurately controlled, and the mine cars are intelligently guided to unload at the appropriate machine port according to the homogenization treatment production matching plan to achieve precise blending production; based on the incoming material information, the primary crushing workshop starts the appropriate process production to achieve precise removal of soil and weak particles and green and efficient production.
[0038] The mine (material yard) and primary crushing workshop joint control technology (i.e., mine primary crushing workshop joint control module 4) is composed of an intelligent equipment scheduling system (mine primary crushing workshop joint control module 4) and a mine car intelligent positioning and guidance identification system (i.e., positioning identification module 5). Its core mechanism is: based on the mining plan, quantitatively control the configuration of loading and unloading equipment in each mining area, and achieve dynamic adaptation of the incoming material ratio to the homogenized production requirements through mine car weighing; its control principle is as follows: The real-time tracking of the transport vehicle's trajectory is achieved through mine cameras (i.e., mine camera unit 16), drone aerial photography (i.e., drone aerial photography unit 17), and GPS satellite positioning system (i.e., GPS satellite positioning unit 15). The loading location of each vehicle is intelligently compared with the three-dimensional geological model of the mine to determine the category of the material's region.
[0039] A smart access control module 6 is installed at the entrance of the mine weighbridge to verify the identity of transport vehicles according to the preset material source configuration ratio (such as a 1:1:1 or 1:1:2 ratio of materials of types A, B, and C). If the material source type does not match the configuration ratio (such as mistakenly loading type D material), the smart access control module 6 will guide the vehicle back for rescheduling; after successful verification, the access control will automatically open and guide the vehicle to the designated inlet for unloading.
[0040] During transportation, the access control system (i.e., smart access control module 6) performs a secondary verification of the ore quality. If the measured quality matches the system instructions, the vehicle is released; if the difference exceeds the control range, a manual verification and data correction mechanism is triggered to ensure that the raw material quality is accurate and controllable.
[0041] The access control system (intelligent access control module 6) transmits data such as material type and quantity to the central control room DCS control system (i.e., central control DCS control module 7) in real time via fiber optic cable. This provides a reliable basis for adjusting process parameters in the coarse crushing workshop, enabling precise production organization based on demand. See the detailed technical schematic diagram for reference. Figure 4 : A three-dimensional geological model is constructed through mine geological survey, followed by ore classification. The ore classification includes categories A1 to A3, B1 to B3, and C1 to C3. The constructed three-dimensional geological model, combined with the classified ore, is used for mine planning and mining. During the mine planning and mining process, if any anomalies occur in the ore, the three-dimensional geological model is revised. The ore mixing scheme is determined through mine planning and mining (such as A1 + B3, A2 + B1, etc.). Then, intelligent scheduling of loading equipment is used for transportation. During the intelligent scheduling of loading equipment, the mine car positioning and guidance system and the access control system work together with the unloading guidance system to guide the loading equipment to unload to the corresponding coarse crushing grade, including coarse crushing grade 1#, coarse crushing grade 2#... coarse crushing grade n#. Finally, through the reasonable combination of the corresponding coarse crushing grades, the material is homogenized and stacked in the semi-finished product warehouse.
[0042] The mine joint control central module 1 of this invention aims to solve the problem of raw material quality fluctuations through systematic means, achieving stable, high-quality, energy-efficient, and coordinated production in sand and gravel processing. The specific implementation path is as follows: First, considering the differences in quality and particle size distribution of different raw materials, a comprehensive database covering the particle size of ore, the content of soil and weak rock, and the moisture content of each mining area is established to provide a data foundation for raw material regulation. Second, a quality-weighted average algorithm is used to accurately calculate the blending ratio of each mining area. By combining source optimization with homogeneous blending, raw material quality fluctuations are controlled at the source. Based on this, a dynamic regulation model based on functional indices is constructed to achieve real-time and precise control of key physical indicators, ensuring that raw materials enter the sand and gravel processing system in a homogeneous and balanced manner. The mine joint control central module 1 can effectively solve the problem of fluctuations in the technical indicators of finished aggregate quality caused by raw material fluctuations, ultimately achieving the green production regulation goals of stable production, improved product quality, and energy conservation and emission reduction.
Claims
1. A mine linkage control system for multi-mining area raw material coordination, characterized in that: It includes a mine joint control central module (1), a ore homogenization control module (2), a mine three-dimensional geological model module (3), a mine coarse crushing workshop joint control module (4), a positioning and identification module (5), an intelligent access control module (6), a central control DCS control module (7), and a semi-finished product stacking module (8). The ore homogenization control module (2), the mine three-dimensional geological model module (3), the mine coarse crushing workshop joint control module (4), and the central control DCS control module (7) are all connected to the mine joint control central module (1) via industrial Ethernet / 4G wireless. The positioning and identification module (5) is connected to the intelligent access control module (6) by signal, and the intelligent access control module (6) is connected to the mine coarse crushing workshop joint control module (4) by signal; The central control DCS control module (7) is connected to the coarse crushing workshop execution equipment signal of the mine coarse crushing workshop joint control module (4), and the semi-finished product stacking and storage module (8) is set at the coarse crushing workshop discharge end of the mine coarse crushing workshop joint control module (4).
2. The mine linkage control system for multi-mining area raw material coordination according to claim 1, characterized in that: The mine joint control central module (1) has a built-in comprehensive mineral database (9), a quality weighted average algorithm unit (10), and a dynamic control model unit (11).
3. The mine linkage control system for multi-mining area raw material coordination according to claim 1, characterized in that: The mineral homogenization control module (2) is equipped with a particle size detection unit (12), a soil and weak particle detection unit (13) and a moisture content detection unit (14).
4. The mine linkage control system for multi-mining area raw material coordination according to claim 1, characterized in that: The positioning and identification module (5) includes a GPS satellite positioning unit (15), a mine camera unit (16), and a drone aerial photography unit (17).
5. The mine linkage control system for multi-mining area raw material coordination according to claim 1, characterized in that: The intelligent access control module (6) includes a vehicle identity verification unit (18), a quality verification unit (19), and an unloading guidance unit (20).
6. The mine linkage control system for multi-mining area raw material coordination according to claim 1, characterized in that: The joint control module (4) of the mine's primary crushing workshop is equipped with a periodic monitoring unit (21).
7. A mine linkage control method for multi-mining area raw material coordination, implemented based on the mine linkage control system for multi-mining area raw material coordination as described in any one of claims 1-6, characterized in that, Includes the following steps: S1. Establish a database, collect data on particle size, soil and weak rock content and moisture content of ore from each mining area, and establish a comprehensive database of ore from multiple mining areas (9). S2. Determine the allocation ratio, analyze the differences in ore materials in each mining area based on the three-dimensional geological model of the mine and deduce the mining process to determine the allocation ratio of each mining area; S3. Control raw material quality fluctuations by using a quality-weighted average algorithm to calculate the blending ratio of ore in each mining area, and control raw material quality fluctuations by combining source selection with homogeneous blending. S4. Construct a dynamic control model. Based on the raw material quality fluctuation index, construct a dynamic control model to control the composition and particle size of the ore in real time, so that the ore enters the coarse crushing workshop in a homogeneous and balanced manner. S5. Ore source identification, vehicle verification and unloading guidance: Ore source identification, vehicle verification and unloading guidance are completed through location identification and intelligent access control; S6. Incoming material control and processing: The incoming material data is transmitted to the central control DCS control module (7), which links the coarse crushing workshop process, and the semi-finished material is homogenized through crushing, conveying and stacking.
8. The mine linkage control method for multi-mining area raw material coordination according to claim 7, characterized in that: The particle size distribution of the ore was obtained through blasting tests, and the blending parameters for each mining area and after breaking down oversized stones were determined by the mass-weighted average particle size.
9. The mine linkage control method for multi-mining area raw material coordination according to claim 7, characterized in that: The materials are loaded and matched according to the preset ratio of the multi-mining area, and the weight deviation is corrected at ±0.3%. When the matching result exceeds ±10% deviation, the coarse crushing gate is closed and unloading is prohibited.
Citation Information
Patent Citations
Intelligent mine scheduling system
CN112037503A
Intelligent control method for quantitative homogeneous matching of ores
CN113359635A
A method for processing glass raw materials with homogenization of multiple mineral sources
CN114276010B
Mineral aggregate quantitative homogenizing feeding system capable of adjusting stock bin
CN216063697U