Big data driven intelligent regulation and control system and method for thermal power plant boiler
The big data-driven intelligent control system solves the problems of low data quality, insufficient model reliability, and multi-source model decision conflicts in the control of boilers in thermal power plants. It realizes the optimization of the entire life cycle and the integration of expert knowledge, thereby improving the safety and economy of boiler operation.
Patent Information
- Application Number
- CN202611267521.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-20
AI Technical Summary
The boiler control system of thermal power plants suffers from problems such as unreliable data quality, insufficient model reliability, multi-model decision conflicts, lack of full life cycle optimization, and failure to effectively integrate expert knowledge, resulting in poor control effects and difficulty in meeting the safety, economic and environmental requirements of deep peak shaving.
The intelligent control system driven by big data acquires multi-source operating data and performs unified timestamp calibration through the data acquisition and calibration module. The data purification module constructs a sensor spatiotemporal correlation graph model to identify and suppress data artifacts. The multi-model parallel inference module performs mechanistic model calculation and data-driven prediction. The trade-off coefficient solution module predicts the future Pareto front and solves the long-term optimal sequence. The optimization solution module generates control adjustment quantities. Finally, the control command output module adjusts the distributed control system of the thermal power plant.
It achieves spatiotemporal correlation verification and artifact identification and purification of multi-source data, dynamic confidence arbitration fusion, and perturbation adaptive online learning, realizing Pareto look-ahead optimization and expert knowledge self-consistency verification throughout the entire life cycle, thereby improving the safety, economy and intelligence level of boiler operation.
Smart Images

Figure CN123137233A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of intelligent control and optimization technology for thermal power plant boilers, and in particular relates to a big data-driven intelligent control system and method for thermal power plant boilers. Background Technology
[0002] With the construction of new power systems, thermal power units are transforming from primary power sources to supporting and regulating power sources, with deep peak shaving becoming the norm. Meanwhile, the development of artificial intelligence technology has provided new technological pathways for the intelligent control of boilers in thermal power plants.
[0003] Traditional boiler control in thermal power plants mainly relies on PID control and advanced process control in distributed control systems. However, boiler combustion systems have complex characteristics such as strong nonlinearity, strong coupling, large lag, and multiple disturbances. The regulation quality of traditional control methods is not good, and it is difficult to meet the multiple requirements of safety, economy and environmental protection under the background of deep peak shaving.
[0004] However, while big data-driven intelligent boiler control technology has made some progress, the following prominent problems remain: First, data quality cannot be guaranteed. Multi-source data suffers from temporal asynchrony, uneven spatial distribution, and individual sensor differences. The resulting data "artifacts" are highly similar to the fluctuation characteristics of the actual process, easily misleading the control model. Second, data-driven models lack reliability under extreme conditions. When actual operating conditions exceed the coverage of training data, model predictions may become unreliable or even dangerous. Existing systems lack an online self-evaluation mechanism for the model's "cognitive boundaries." Third, the fusion of mechanistic models and data-driven models lacks dynamic decision-making capabilities. Existing fusion strategies are mostly static serial or simple weighting, lacking an effective online arbitration mechanism when the two conflict. Fourth, the model's adaptive capability struggles to match the dynamic changes of disturbances. Existing adaptive methods often use fixed values or only make simple adjustments to the learning rate or forgetting factor, lacking the ability to dynamically perceive and match the rate of change of disturbances. Fifth, multi-objective optimization lacks a full lifecycle consideration. Existing methods focus only on Pareto optimality at the current moment, failing to consider Pareto front drift caused by long-term factors such as equipment aging, dust accumulation, and catalyst deactivation; sixth, expert tacit knowledge is not effectively integrated into intelligent decision-making. There is a lack of effective means to automatically extract and quantify the operational experience of operators and integrate it into intelligent decision-making, resulting in a cognitive gap between humans and machines; seventh, the conflict between computing resources and real-time performance is prominent. There is a conflict between the computational needs of complex models and the millisecond-level real-time requirements of industrial control, and existing static resource allocation methods cannot schedule resources on demand. Summary of the Invention
[0005] Based on this, it is necessary to provide a big data-driven intelligent control system and method for thermal power plant boilers that can achieve multi-source data spatiotemporal correlation verification and artifact recognition and purification, multi-model dynamic confidence arbitration fusion, perturbation adaptive online learning, full life cycle Pareto look-ahead optimization, and expert knowledge self-consistency verification to address the above-mentioned technical problems.
[0006] In a first aspect, this application provides a big data-driven intelligent control system for boilers in thermal power plants, comprising: The data acquisition and calibration module is used to acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data. The data cleansing module is used to input standardized time-series data into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms to obtain a cleaned data stream; The multi-model parallel inference module is used to perform mechanistic model calculations, data-driven predictions, and uncertainty quantification on the cleaned data stream in parallel to obtain theoretical calculation values, predicted values, and uncertainty measures. The trade-off coefficient solution module is used to predict the evolution trajectory of the Pareto front within a future preset time window based on the purified data stream. Based on the evolution trajectory, it solves the operating preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window, and extracts the operating preference weight corresponding to the current moment as the optimal trade-off coefficient from the operating preference weight sequence. The optimization solution module is used to construct the optimization objective function based on the optimal trade-off coefficients, and to obtain the control adjustment vector by taking the theoretical calculation value, the predicted value and the uncertainty measure as inputs to the optimization objective function. The control command output module is used to adjust the setpoint of the distributed control system of the thermal power plant according to the control adjustment vector, and obtain the setpoint adjustment command; wherein, the setpoint adjustment command is used to instruct the distributed control system of the thermal power plant to perform parameter correction of each control loop according to the control adjustment vector.
[0007] Secondly, this application also provides a big data-driven intelligent control method for boilers in thermal power plants, including: Acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data; Standardized time-series data is input into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms to obtain a purified data stream; The mechanism model calculation, data-driven prediction and uncertainty quantification are performed in parallel on the purified data stream to obtain theoretical calculation values, predicted values and uncertainty measures. Based on the purified data stream, the evolution trajectory of the Pareto front within a future preset time window is predicted. Based on the evolution trajectory, the operational preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window is obtained. The operational preference weight corresponding to the current moment as the optimal trade-off coefficient is extracted from the operational preference weight sequence. Based on the optimal trade-off coefficients, an optimization objective function is constructed, and the theoretical calculated value, predicted value, and uncertainty measure are used as inputs to the optimization objective function to obtain the control adjustment vector. Based on the control adjustment vector, the setpoint of the distributed control system of the thermal power plant is adjusted to obtain the setpoint adjustment command; the setpoint adjustment command is used to instruct the distributed control system of the thermal power plant to perform parameter correction of each control loop according to the control adjustment vector.
[0008] Thirdly, this application also provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the functions of any of the systems described above.
[0009] Fourthly, this application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, performs the functions of any of the systems described above.
[0010] The aforementioned big data-driven intelligent control system and method for thermal power plant boilers acquires multi-source operating data from the boiler through a data acquisition and calibration module, and performs unified timestamp calibration, providing standardized time-series data with consistent time references for subsequent intelligent control. A data purification module inputs this standardized time-series data into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms, identifying and suppressing data artifacts caused by spatiotemporal coupling distortion of multi-source data, providing a high-confidence purified data stream for control decisions. A multi-model parallel inference module performs parallel mechanistic model calculations, data-driven predictions, and uncertainty quantification on the purified data stream, balancing the reliability of physical constraints with the fitting accuracy of data-driven approaches, and quantifying the cognitive uncertainty of predictions. This system provides risk perception for decision-making; by using a tradeoff coefficient solution module to predict the evolution trajectory of the Pareto front within a preset time window based on purified data streams and solving for the long-term optimal sequence, the optimization perspective can be expanded from the current moment to the entire equipment lifecycle, enabling forward-looking operational preference planning; by using an optimization solution module to construct an optimization objective function based on the optimal tradeoff coefficients and solving it using theoretical calculations, predicted values, and uncertainty measures as inputs, dynamic confidence arbitration can be achieved in the event of multi-model decision conflicts, generating control adjustment vectors that take into account economy, safety, and reliability; and by using a control command output module to adjust the setpoints of the distributed control system of thermal power plants based on the control adjustment vectors, the intelligent decision results can be output to the actuators in a closed loop. This system can systematically solve the technical problems of low data quality, insufficient model reliability, multi-source model decision conflicts, and lack of full lifecycle optimization in boiler control of thermal power plants, improving the safety, economy, and intelligence level of boiler operation.
[0011] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of this application, nor is it intended to limit the scope of this application. Other features of this application will become readily apparent from the following description. Attached Figure Description
[0012] To more clearly illustrate the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0013] Figure 1 A schematic diagram of the structure of a big data-driven intelligent control device for a thermal power plant boiler provided in an embodiment of this application; Figure 2 A flowchart illustrating a big data-driven intelligent control method for boilers in thermal power plants, provided as an embodiment of this application; Figure 3This is a schematic block diagram of an example electronic device provided in the embodiments of this application. Detailed Implementation
[0014] The following description, in conjunction with the accompanying drawings, illustrates exemplary embodiments of this application, including various details to aid understanding. These should be considered merely exemplary. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of this application. Similarly, for clarity and brevity, descriptions of well-known functions and structures are omitted in the following description.
[0015] The following description, with reference to the accompanying drawings, describes a big data-driven intelligent control system and method for boilers in thermal power plants, based on embodiments of this application.
[0016] Figure 1 This is a schematic diagram of the structure of a big data-driven intelligent control device for thermal power plant boilers, provided in an embodiment of this application.
[0017] like Figure 1 As shown, the system 10 includes the following modules: The data acquisition and calibration module 11 can be used to acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data.
[0018] Specifically, the intelligent control terminal can establish a communication connection with the distributed control system of the thermal power plant through the OPC UA (OPC Unified Architecture) protocol. It reads measurement data covering the entire boiler process according to a preset sampling period, acquiring the ash content, volatile matter, fixed carbon, sulfur content, calorific value of the coal fed into the boiler, and the concentrations of nitrogen oxides, sulfur dioxide, carbon monoxide, and dust in the flue gas. The intelligent control terminal can use the system clock stamp of its source data source as a reference, and the terminal system time synchronized with the network time protocol as a unified time reference, to compensate and correct the recording time of each data point, obtaining initial calibration data with a unified timestamp. The measurement data for the entire boiler process may include, but is not limited to, furnace pressure, drum water level, main steam temperature, feedwater flow rate, total air volume, oxygen content, coal mill current, coal feeder speed, burner switching status at each level, and the opening degree of each regulating valve.
[0019] Furthermore, the intelligent control terminal can perform linear interpolation resampling on the data points in the initial calibration data with a unified timestamp that are out of sync due to different sampling periods of each data source, so that all data points are aligned to a unified time grid and standardized time series data is obtained.
[0020] Optionally, the multi-source operating data can be a set of raw measurement data from different data sources in the distributed control system of a thermal power plant, reflecting the operating status of the boiler from different aspects. Each data source in the raw measurement data set has its own independent clock reference and the sampling period is not exactly the same.
[0021] Optionally, standardized time series data can be time series data obtained by unifying the timestamps of each data point in multi-source operational data to the same time base and arranging them in chronological order.
[0022] The data purification module 12 can be used to input standardized time-series data into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms to obtain purified data streams.
[0023] Specifically, the intelligent control terminal can use the furnace structure, flue gas flow path arrangement and heating surface distribution in the boiler design drawings and thermal calculation books as graph nodes, and connect two graph nodes with physical causal relationship through directed edges. It can also label each directed edge with the theoretical transmission delay calculated based on the principles of fluid mechanics and heat transfer, as well as the physical constraint type including energy conservation, time sequence and proportional range, to obtain the sensor spatiotemporal correlation graph model.
[0024] Furthermore, the intelligent control terminal can use the standardized time-series data of each measuring point in the standardized time-series data as the feature input of the corresponding graph node, and calculate the reconstruction error between the observed value of each node and the reconstructed value predicted by the graph neural network model based on the information of adjacent nodes. The intelligent control terminal can identify nodes whose reconstruction error continuously exceeds a preset threshold as data artifact nodes, and extract adjacent nodes that point to the artifact node through directed edges and are not marked as abnormal from the sensor spatiotemporal correlation graph model as a set of reliable upstream nodes. The intelligent control terminal can substitute the observed value of each node in the set of reliable upstream nodes at the current time minus the corresponding theoretical propagation delay into the mechanism mapping function. This mechanism mapping function can include the furnace energy balance equation and the convection heating surface heat transfer equation. The mechanism mapping function can reversely calculate the replacement value of the artifact node, replace the original observed value of the artifact node with the replacement value, retain the original observed value of non-artifact nodes, and output each data point according to the corresponding node artifact labeling state after assigning the corresponding confidence weight, thus obtaining the purified data stream.
[0025] Optionally, the cleaned data stream can be the quality-cleaned time series data output after data artifact identification, reconstruction and replacement, and confidence weighting are performed on each data point in the standardized time series data.
[0026] The multi-model parallel inference module 13 can be used to perform mechanistic model calculations, data-driven predictions, and uncertainty quantification on the cleaned data stream in parallel, so as to obtain theoretical calculation values, predicted values, and uncertainty measures.
[0027] Specifically, the intelligent control terminal can take the current operating parameters in the purification data stream as input, and use a simplified mechanism model built based on boiler design parameters and thermal calculation standards. The simplified mechanism model can include the furnace energy balance equation and the number-average temperature difference heat transfer equation of the convective heating surface. The simplified mechanism model can obtain the theoretical calculated values of the flue gas temperature at the furnace outlet and the working fluid temperature at the outlet of each heating surface through iterative solution.
[0028] Furthermore, the intelligent control terminal can input historical data sequences within a preset time window from the purification data stream into a data-driven prediction model built on a deep neural network. This model can extract local temporal features through a convolutional neural network and then capture long-range temporal dependencies through a long short-term memory network, outputting predicted values for future main steam temperature, reheat steam temperature, nitrogen oxide concentration, and boiler thermal efficiency. The intelligent control terminal can also invoke a Bayesian neural network with the same structure as the data-driven prediction model but with weights parameterized by a probability distribution. During inference, the Bayesian neural network can obtain a prediction distribution by sampling the weights multiple times and separate the random uncertainty arising from input data noise and the cognitive uncertainty arising from the input deviating from the training data distribution from this prediction distribution, outputting the cognitive uncertainty.
[0029] Optionally, the theoretical calculation value can be the numerical solution of each key state variable obtained by substituting the current operating parameters into the simplified boiler thermodynamic calculation equation.
[0030] Optionally, the predicted value can be a point estimate of the controlled variable at a future time based on historical time series data provided by a data-driven model.
[0031] Alternatively, the uncertainty metric can be the cognitive uncertainty output of a Bayesian neural network, used to characterize the reliability of the model's predictions under the current input.
[0032] The tradeoff coefficient solution module 14 can be used to predict the evolution trajectory of the Pareto front within a future preset time window based on the purified data stream, and to solve for the operating preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window based on the evolution trajectory. The operating preference weight corresponding to the current moment as the optimal tradeoff coefficient is extracted from the operating preference weight sequence.
[0033] Specifically, the intelligent control terminal can extract current operating parameters and slow variables of equipment health status from the purification data stream. These parameters and variables are then input into a Long Short-Term Memory (LSTM) network model employing a sequence-to-sequence architecture. The encoder extracts temporal features from the input parameters and variables, and the decoder maps and outputs predicted values for the ideal point coordinates, curvature, and span of the Pareto front for each day within a preset future time window. The intelligent control terminal aims to maximize the cumulative comprehensive benefit within the preset future time window by subtracting nitrogen oxide emission penalties from equipment lifespan depreciation penalties. It uses the daily operating preference weights as optimization variables and the predicted Pareto front geometric feature parameters as constraint boundaries at each moment. Through dynamic programming, it recursively solves for the operating preference weight sequence that maximizes the cumulative comprehensive benefit over time. The operating preference weight corresponding to the current moment is extracted from this sequence and output as the optimal trade-off coefficient to the optimization solution module.
[0034] Optionally, the optimal trade-off coefficient at the current moment can be the weight value at the current moment extracted from the weight sequence of operating preferences after solving the problem of maximizing the cumulative comprehensive benefits within a future preset time window. This weight value can be used to dynamically adjust the relative importance between economic and environmental objectives in subsequent optimizations.
[0035] The optimization solution module 15 can be used to construct an optimization objective function based on the optimal trade-off coefficients, and use theoretical calculation values, predicted values and uncertainty measures as inputs to the optimization objective function to solve for the control adjustment vector.
[0036] Specifically, the intelligent control terminal can use the optimal trade-off coefficient as the weighting coefficient of the squared terms of nitrogen oxide emission deviation and thermal efficiency deviation in the optimization objective function, use the theoretical calculation value output by the simplified mechanism model as the physical constraint boundary of the controlled variable, use the predicted values of each controlled variable output by the data-driven model as the benchmark of the trajectory of the controlled variable in the prediction time domain, and use the cognitive uncertainty measure output by the Bayesian neural network as the dynamic adjustment coefficient of the penalty term of the rate of change of the control quantity, thus constructing a model predictive control optimization objective function with the goal of minimizing the cumulative weighted deviation in the prediction time domain.
[0037] Furthermore, the intelligent control terminal can obtain the control quantity sequence at each moment in the prediction time domain by solving the optimization objective function under the conditions of satisfying the upper and lower limit constraints, rate of change constraints and safety boundary constraints of each control quantity, and extract the control quantity increment at the current moment as the control adjustment quantity vector.
[0038] Optionally, the control adjustment vector can be a vector composed of the adjustment increments of multiple adjustable control quantities at the current moment. The adjustable control quantities may include, but are not limited to, the total coal feed, the coal feed allocation of each layer, the total air volume, the opening degree of the secondary air damper, the opening degree of the burnout air damper, the water supply flow rate, and the desuperheating water flow rate. Each element in the control adjustment vector represents the change range that the corresponding control quantity needs to be adjusted within the current control cycle.
[0039] The control command output module 16 can be used to adjust the setpoint of the distributed control system of a thermal power plant according to the control adjustment vector, and obtain the setpoint adjustment command.
[0040] Specifically, the intelligent control terminal can algebraically superimpose the adjustment increments of each control quantity in the control adjustment vector with the current setpoint of the corresponding control loop to obtain the new setpoint of each control loop. The intelligent control terminal can then encapsulate the new setpoint of each control loop and the adjustment increments in the control adjustment vector into a setpoint adjustment command according to the data format of the OPCUA communication protocol supported by the distributed control system of the thermal power plant. The intelligent control terminal can then send the setpoint adjustment command to the corresponding control loop of the distributed control system of the thermal power plant via the OPCUA communication protocol, allowing the distributed control system to execute parameter corrections for each control loop according to the new setpoint in the command.
[0041] Optionally, the setpoint adjustment command can be used to instruct the distributed control system of a thermal power plant to perform parameter corrections for each control loop according to the control adjustment vector.
[0042] In the aforementioned big data-driven intelligent control system for thermal power plant boilers, the intelligent control terminal acquires multi-source operating data of the boiler through a data acquisition and calibration module and performs unified timestamp calibration, providing standardized time-series data with consistent time references for subsequent intelligent control. The data purification module inputs this standardized time-series data into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms, identifying and suppressing data artifacts caused by spatiotemporal coupling distortion of multi-source data, providing a high-confidence purified data stream for control decisions. The multi-model parallel inference module performs parallel mechanistic model calculations, data-driven predictions, and uncertainty quantification on the purified data stream, balancing the reliability of physical constraints with the fitting accuracy of data-driven approaches, and quantifying the cognitive uncertainty of predictions. This system provides risk perception for decision-making; by using a trade-off coefficient solution module to predict the evolution trajectory of the Pareto front within a preset time window based on purified data streams and solving for the long-term optimal sequence, the optimization perspective can be expanded from the current moment to the entire equipment lifecycle, enabling forward-looking operational preference planning; by using an optimization solution module to construct an optimization objective function based on the optimal trade-off coefficients and solving it using theoretically calculated values, predicted values, and uncertainty measures as inputs, dynamic confidence arbitration can be achieved in the event of multi-model decision conflicts, generating a control adjustment vector that balances economy, safety, and reliability; and by using a control command output module to adjust the setpoints of the distributed control system of the thermal power plant based on the control adjustment vector, the intelligent decision results can be output to the actuators in a closed loop. This system can systematically solve the technical problems of low data quality, insufficient model reliability, multi-source model decision conflicts, and lack of full lifecycle optimization in boiler control of thermal power plants, improving the safety, economy, and intelligence level of boiler operation.
[0043] In one embodiment, the tradeoff coefficient solving module may include: The trajectory prediction unit can be used to input current operating parameters and equipment health status slow variables into a trained long short-term memory network model to predict the coordinates, curvature, and span of the Pareto front within a future preset time window, thereby obtaining the evolution trajectory of the Pareto front within the future preset time window.
[0044] Optionally, the evolution trajectory can be used to characterize the evolution trend of the geometric feature parameters of the Pareto front within a future preset time window.
[0045] Specifically, the intelligent control terminal can extract the current load, coal feed rate, total air volume, oxygen content, and inlet and outlet flue gas temperatures of each heating surface from the purification data stream as current operating parameters. It also extracts the following: a heated area ash index obtained by filtering the ratio of the calculated heat transfer coefficient of the heated surface to the design value using an exponentially weighted moving average; a catalyst activity index obtained by online calculation of the nitrogen oxide concentrations at the inlet and outlet of the selective catalytic reduction denitrification system and the ammonia injection rate; and a coal mill wear index obtained by filtering the long-term trends of the coal mill current, output, and coal powder fineness parameters. The intelligent control terminal can then combine the heated area ash index, catalyst activity index, and coal mill wear index to form a slow variable representing the equipment's health status.
[0046] Furthermore, the intelligent control terminal can input the time series consisting of current operating parameters and slow variables of equipment health status using an encoder-decoder architecture long short-term memory network model. The encoder can perform nonlinear mapping on each time step of the input time series through a gating mechanism to obtain a fixed-length context vector. The decoder can use the context vector as the initial state to autoregressively output the predicted values of the coordinates, curvature, and span of the Pareto front for each day within a preset future time window. These predicted values constitute the evolution trajectory.
[0047] The sequence solving unit is used to solve the operation preference weight for each day within a preset time window in the future by dynamically programming, based on the evolution trajectory and with the goal of maximizing the cumulative comprehensive benefits, and to construct the operation preference weight sequence based on the operation preference weight.
[0048] Specifically, the intelligent control terminal can use the predicted coordinates, curvature, and span of the Pareto front for each day in the evolution trajectory as the constraint boundary of the feasible target space at that moment, and use the operational preference weights for each day as decision variables to construct a cumulative comprehensive benefit maximization problem. The intelligent control terminal can discretize the cumulative comprehensive benefit maximization problem along the time dimension into a stage-based sequential decision problem. The state of each stage is the geometric characteristic parameter of the Pareto front at that moment, and the action is the value of the operational preference weight at that moment. The intelligent control terminal can recursively calculate the optimal value function for each state starting from the last stage, and in the first stage, it can backtrack from the initial state to extract the actions that optimize the value function for each stage, obtaining a sequence of operational preference weights composed of the operational preference weights for each day within a future preset time window.
[0049] Optionally, the cumulative overall benefits may include, but are not limited to, efficiency gains, nitrogen oxide emission penalties, and equipment lifespan depletion penalties.
[0050] The coefficient determination unit is used to extract the running preference weight corresponding to the current time from the running preference weight sequence, and use the running preference weight corresponding to the current time as the optimal trade-off coefficient.
[0051] Specifically, the intelligent control terminal can index the operation preference weight value at the current position in the operation preference weight sequence based on the temporal position of the current time, and determine the operation preference weight value as the optimal trade-off coefficient at the current time.
[0052] Furthermore, the intelligent control terminal can output the optimal trade-off coefficients to the optimization solution module as relative weighting coefficients for the squared terms of nitrogen oxide emission deviation and thermal efficiency deviation in the objective function of model predictive control optimization.
[0053] In this embodiment, the intelligent control terminal can predict the Pareto front evolution trajectory through long short-term memory networks and solve the operation preference weight sequence by combining dynamic programming. This can extend the decision-making perspective of multi-objective optimization from the current moment to the entire life cycle of the equipment, and realize the forward-looking planning of operation preference weights.
[0054] In one embodiment, the expression for the optimal trade-off coefficient can be: ; In the formula, This represents the optimal trade-off coefficient. Indicates the current moment. This indicates the total duration of the future preset time window. This represents a time series function composed of the weights of the operating preferences for each day within a future preset time window. This indicates the feasible range of values for the running preference weights. This represents any point in the future within a preset time window. Indicates at time Using running preference weights Boiler thermal efficiency at that time Indicates at time Using running preference weights Nitrogen oxide emissions at that time The weighting coefficients representing the efficiency gains are... This represents the weighting coefficient for the nitrogen oxide emission penalty. This represents the weighting coefficient for the penalty of equipment lifespan loss. Indicates at time Using running preference weights The amount of equipment lifespan loss during that time.
[0055] Specifically, before the optimization solution of each control cycle begins, the intelligent control terminal can extract the operating preference weight corresponding to the current moment from the operating preference weight sequence as the optimal trade-off coefficient, and substitute this optimal trade-off coefficient into the optimization objective function of model predictive control to participate in the solution of the optimal control quantity for this cycle. The physical meaning of the optimal trade-off coefficient is: in a future preset time window, by searching for the combination of operating preference weight values that satisfy the feasible region constraints for each day, the operating preference weight corresponding to the current moment is the optimal trade-off coefficient when the cumulative comprehensive benefit within this time window, i.e., efficiency gain minus nitrogen oxide emission penalty minus equipment lifespan loss penalty, is maximized.
[0056] Furthermore, the intelligent control terminal can use the optimal trade-off coefficient as the weight ratio of the squared term of nitrogen oxide emission deviation to the squared term of thermal efficiency deviation in the optimization objective function. When the optimal trade-off coefficient approaches 1, the optimization objective focuses on maximizing thermal efficiency; when the optimal trade-off coefficient approaches 0, the optimization objective focuses on minimizing nitrogen oxide emissions; when the optimal trade-off coefficient takes an intermediate value, the optimization objective weighs the two objectives, thereby achieving forward-looking multi-objective optimization decision-making based on the benefits of the entire life cycle.
[0057] In this embodiment, the intelligent control terminal can reverse the determination of the optimal trade-off coefficient at the current moment by taking the maximization of the cumulative comprehensive benefits within a future preset time window as the goal, and use the coefficient for real-time optimization of model predictive control. This enables the current control decision to be consistent with the long-term planning goal of the entire life cycle, and achieves a dynamic balance between immediate and long-term benefits in multi-objective optimization.
[0058] In one embodiment, the construction of the sensor spatiotemporal correlation graph model may include the following steps: A directed graph is constructed by using boiler sensor measuring points and virtual computing nodes obtained through thermodynamic calculations as graph nodes, and the physical causal relationships between graph nodes as graph edges.
[0059] Specifically, the intelligent control terminal can obtain the furnace structural dimensions, spatial arrangement of each stage of heating surface, and flue gas flow path parameters based on boiler design drawings and thermal calculations. Each physical sensor measurement point arranged in the furnace, flue, and steam-water pipes is designated as a graph node, and the equivalent radiative heating surface, convective heating surface heat exchange point, and working fluid state calculation point defined in the thermal calculation standard are designated as virtual calculation nodes. The intelligent control terminal can incorporate both graph nodes and virtual calculation nodes into a graph node set, and connect any two graph nodes with a direct physical causal relationship using directed edges. The direction of the directed edges is determined by the energy transfer direction in the physical process, resulting in a directed graph describing the multi-parameter causal topological relationships of the boiler.
[0060] By labeling each graph edge with theoretical propagation delay, causality strength coefficient, and physical constraint type, the attribute parameters of the directed graph are obtained.
[0061] Specifically, the intelligent control terminal can use the basic principles of fluid mechanics and heat transfer to calculate the theoretical transmission delay of the signal from the upstream graph node to the downstream graph node on each directed edge, based on the flue gas flow velocity and the working fluid flow velocity as a reference, and determine the value of the causal intensity coefficient according to the degree of influence of the upstream graph node on the downstream graph node.
[0062] Furthermore, the intelligent control terminal can label the physical constraint types, including energy conservation constraints, temporal sequence constraints, and proportional range constraints, for each graph edge according to the boiler design specifications, and use theoretical propagation delay, causal strength coefficient, and physical constraint type as edge attributes of the directed graph to obtain a complete set of attribute parameters.
[0063] An initial graph neural network model is constructed based on the directed graph and attribute parameters.
[0064] Specifically, the intelligent control terminal can use a directed graph as the network topology, use the causal strength coefficient in the attribute parameters as the initial value of the message passing weight of each edge in the initial graph neural network model, and use the theoretical transmission delay as the basis for the alignment of temporal features between adjacent nodes to construct an initial graph neural network model based on the message passing mechanism. The input of the initial graph neural network model based on the message passing mechanism can be the data sequence of each graph node within a preset time window, and the output is the reconstructed prediction value of each graph node.
[0065] Optionally, the graph neural network model can use a directed graph as the network topology, the causal strength coefficient in the attribute parameters as the edge weights, and the theoretical propagation delay as the basis for aligning temporal features.
[0066] Historical operating data of the boiler is acquired, and based on this data, the initial graph neural network model is trained to obtain a trained graph neural network model.
[0067] Specifically, the intelligent control terminal can obtain historical operating data from the power plant's historical database, including data sequences from various sensor measuring points within multiple consecutive time windows. These historical operating data sequences within each consecutive time window are manually confirmed to be in an abnormal operating state. The intelligent control terminal can use the historical operating data as a training set, with minimizing the reconstruction error of each graph node as the training objective. It then updates the network parameters of the initial graph neural network model using a backpropagation algorithm until the reconstruction error on the validation set no longer decreases, at which point training stops, resulting in a fully trained graph neural network model.
[0068] Optionally, the historical operating data of the boiler can be the operating data records stored in the historical database of the thermal power plant, which contain the data sequence of each sensor measuring point within a continuous time window and have been manually confirmed to be without abnormalities.
[0069] By solidifying and storing the directed graph, attribute parameters, and trained graph neural network model, a spatiotemporal correlation graph model of the sensor is obtained.
[0070] Specifically, the intelligent control terminal can serialize a data structure including a graph node set, a directed edge set, and the corresponding theoretical propagation delay, causality strength coefficient, and physical constraint type into a first structured file, and serialize the network structure and trained weight parameters of the trained graph neural network model into a second structured file. The intelligent control terminal can then associate and store the first and second structured files to obtain a sensor spatiotemporal correlation graph model.
[0071] In this embodiment, the intelligent control terminal can construct a sensor spatiotemporal correlation graph model that includes a directed graph, attribute parameters, and a graph neural network model. This model can provide a structured prior knowledge carrier for the spatiotemporal consistency verification of multi-source data and enable the graph neural network model to complete training and inference under the topological constraints and attribute guidance of the directed graph. This provides a computational basis for anomaly identification and data artifact determination in the subsequent data purification module.
[0072] In one embodiment, the data cleansing module may include: The abnormal node identification unit is used to perform consistency verification on standardized time-series data and obtain candidate abnormal nodes that violate spatiotemporal correlation constraints.
[0073] Specifically, the intelligent control terminal can perform spatiotemporal consistency verification on standardized time-series data based on the theoretical propagation delay and physical constraint type of each graph edge labeled in the sensor spatiotemporal correlation graph model. The intelligent control terminal can extract standardized time-series data within a preset time window centered on each sampling moment, and calculate the correlation coefficient between the data change characteristics of the upstream node of each graph edge at a point ahead of the current moment by a theoretical propagation delay and the data change characteristics of the downstream node at the current moment. When the correlation coefficient is lower than a preset correlation coefficient threshold, the intelligent control terminal can mark the graph edge as a violated correlation edge, and mark nodes simultaneously associated with multiple violated correlation edges as candidate abnormal nodes.
[0074] Optionally, candidate anomalous nodes that violate spatiotemporal correlation constraints can be nodes in standardized time series data that do not satisfy the physical laws specified by the theoretical propagation delay and physical constraint type in the sensor spatiotemporal correlation graph model. These nodes may have readings that are inconsistent with the physical process due to sensor failure, data transmission errors, or data artifacts.
[0075] The data artifact determination unit is used to input standardized time-series data into the trained graph neural network model in the sensor spatiotemporal correlation graph model, calculate the reconstruction error of each node, and mark the nodes whose reconstruction error continuously exceeds the first threshold as data artifact nodes.
[0076] Specifically, the intelligent control terminal can use historical data segments from standardized time-series data that have been manually confirmed to be anomaly-free as a training set, the graph structure of the sensor spatiotemporal correlation graph model as the network topology, and the data sequences of each node within a preset time window as node feature inputs to train the graph neural network model. This allows the graph neural network model to learn the information transmission patterns between nodes under normal operating conditions. In real-time operation, the intelligent control terminal can predict the actual observation value of each node and calculate the reconstruction error using the trained graph neural network model. The intelligent control terminal can mark nodes whose reconstruction errors continuously exceed a first threshold as data artifact nodes.
[0077] Optionally, the graph neural network model can be a neural network model that uses the graph structure of the sensor spatiotemporal correlation graph model as the network topology, uses the data sequence of nodes within the time window as the feature input, learns the information transmission pattern between nodes under normal working conditions through the message passing mechanism, and outputs the reconstructed predicted value of each node.
[0078] Optionally, the first threshold can be a quantile threshold determined based on the statistical distribution of the reconstruction error of each node in the training set, which can be used to distinguish the boundary between normal fluctuations and abnormal deviations.
[0079] Optionally, data artifact nodes can be used to characterize the measurement point locations corresponding to data segments in standardized time-series data that are inconsistent with the actual physical process due to spatiotemporal coupling distortion of multi-source data.
[0080] The mechanism constraint reconstruction unit is used to obtain the associated nodes that are adjacent to the data artifact nodes and are not candidate anomaly nodes, and to calculate the replacement value of the data artifact nodes at the current time based on the observation value of the associated nodes and the preset physical mechanism mapping function.
[0081] Specifically, the intelligent control terminal can extract all adjacent nodes that point to the data artifact node through directed edges and are not candidate anomaly nodes from the sensor spatiotemporal correlation graph model as a set of reliable upstream nodes. The intelligent control terminal can take the observed value of each node in the reliable upstream node set at the current moment minus the corresponding theoretical propagation delay as input, and substitute it into a preset physical mechanism mapping function. The physical mechanism mapping function can include the furnace energy balance equation and the convective heating surface heat transfer equation, which can be used to reverse the calculation of the theoretical value of the downstream node based on the physical state of the upstream node. This theoretical value is the replacement value of the data artifact node at the current moment.
[0082] Optionally, the substitute value can be a theoretical value calculated by the physical mechanism mapping function based on the observation values of each node in the set of trusted upstream nodes. The substitute value is used to replace the original observation value of the data artifact node.
[0083] The confidence weighting output unit is used to replace the original observation values of the data artifact nodes with substitute values to obtain pre-cleaned time series data. It assigns confidence weights to the data corresponding to the data artifact nodes in the pre-cleaned time series data, assigns default weights to the non-data artifact nodes, and performs weighted fusion on the pre-cleaned time series data based on the confidence weights and default weights to obtain the cleaned data stream.
[0084] Specifically, the intelligent control terminal can replace the original observations of data artifact nodes with substitute values to obtain pre-cleaned time-series data. The intelligent control terminal can calculate the confidence weight of the data points corresponding to the data artifact nodes in the pre-cleaned time-series data based on the reconstruction error of the data points corresponding to the data artifact nodes; the intelligent control terminal can also assign default weights to data points in the pre-cleaned time-series data that do not correspond to data artifact nodes. The intelligent control terminal can then multiply each data point in the pre-cleaned time-series data by its corresponding confidence weight and output the result to obtain the cleaned data stream.
[0085] In this embodiment, the intelligent control terminal can identify candidate abnormal nodes through spatiotemporal consistency verification, determine data artifact nodes through graph neural networks and reconstruct replacement values by combining physical mechanism mapping functions, and assign confidence weights based on reconstruction errors for weighted output. This enables the automatic identification and suppression of data artifacts generated by spatiotemporal coupling distortion of multi-source data.
[0086] In one embodiment, the expression for the substitution value can be: ; In the formula, Indicates the substitution value, Indicates the data artifact node, Indicates the current moment. In the spatiotemporal correlation graph model of sensors, directed edges point to data artifact nodes. Furthermore, it does not belong to the set of trusted upstream nodes formed by the adjacent nodes of the candidate abnormal node. Represents the set of trusted upstream nodes Any node in, Indicates from node To the data artifact node Theoretical propagation delay, Represents a node At any moment Observations at that location Indicates a set of trusted upstream nodes The input data set consists of the observations of each node at the corresponding time point. This represents the mapping function of the physical mechanism.
[0087] Specifically, the intelligent control terminal can retrieve all neighboring nodes that point to the data artifact node through directed edges and are not marked as candidate anomalies from the sensor spatiotemporal correlation graph model based on the unique identifier of the data artifact node. The intelligent control terminal can then construct a set of trusted upstream nodes from these unmarked neighboring nodes. The intelligent control terminal can then obtain the time-series data of each upstream node in the trusted upstream node set. Observations at All the acquired observations together constitute the input data set. The intelligent control terminal substitutes the input data set into the physical mechanism mapping function. The physical mechanism mapping function can be constructed based on the boiler thermal calculation principle and can include the furnace energy balance equation and the convective heating surface heat transfer equation. It is used to inversely calculate the theoretical value of the downstream node at the current moment based on the physical state of the upstream node. The output of the physical mechanism mapping function is the replacement value of the data artifact node at the current moment.
[0088] In this embodiment, the intelligent control terminal can reverse the calculation of the replacement value of the data artifact node by using the observation value of the trusted upstream node and the physical mechanism mapping function. This enables the reconstruction process to follow the inherent physical laws of the boiler and ensures the physical rationality and interpretability of the replacement value.
[0089] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages of other steps.
[0090] Based on the same inventive concept, this application also provides a method for implementing the big data-driven intelligent control system for thermal power plant boilers described above. The solution provided by this method is similar to the implementation scheme described in the above system. Therefore, the specific limitations of one or more big data-driven intelligent control methods for thermal power plant boilers provided below can be found in the above-described limitations of a big data-driven intelligent control system for thermal power plant boilers, and will not be repeated here.
[0091] Figure 2 This is a schematic diagram of the structure of a big data-driven intelligent control method for thermal power plant boilers provided in an embodiment of this application, as shown below. Figure 2 As shown, it includes: S1. Acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data; S2. Input the standardized time-series data into the sensor spatiotemporal correlation graph model constructed based on the physical mechanism and spatiotemporal correlation verification mechanism to obtain the purified data stream; S3. Perform parallel mechanism model calculations, data-driven predictions, and uncertainty quantifications on the purified data stream to obtain theoretical calculation values, predicted values, and uncertainty measures. S4. Based on the purified data stream, predict the evolution trajectory of the Pareto front within the future preset time window. According to the evolution trajectory, solve for the operating preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window, and extract the operating preference weight corresponding to the current moment as the optimal trade-off coefficient from the operating preference weight sequence. S5. Based on the optimal trade-off coefficients, construct the optimization objective function, and use the theoretical calculated value, predicted value, and uncertainty measure as inputs to the optimization objective function to solve for the control adjustment vector; S6. Based on the control adjustment vector, adjust the setpoint of the distributed control system of the thermal power plant to obtain the setpoint adjustment command; wherein, the setpoint adjustment command is used to instruct the distributed control system of the thermal power plant to perform parameter correction of each control loop according to the control adjustment vector.
[0092] According to embodiments of this application, this application also provides an electronic device, a readable storage medium, and a computer program product.
[0093] Figure 3A schematic block diagram of an example electronic device 300 that can be used to implement embodiments of this application is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processors, cellular phones, smartphones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely illustrative and are not intended to limit the implementation of the application described and / or claimed herein.
[0094] like Figure 3 As shown, the electronic device 300 includes a computing unit 301, which can perform various appropriate actions and processes based on a computer program stored in ROM (Read-Only Memory) 302 or a computer program loaded from storage unit 308 into RAM (Random Access Memory) 303. The RAM 303 may also store various programs and data required for the operation of the electronic device 300. The computing unit 301, ROM 302, and RAM 303 are interconnected via a bus 304. An I / O (Input / Output) interface 305 is also connected to the bus 304.
[0095] Multiple components in electronic device 300 are connected to I / O interface 305, including: input unit 306, such as keyboard, mouse, etc.; output unit 307, such as various types of displays, speakers, etc.; storage unit 308, such as disk, optical disk, etc.; and communication unit 309, such as network card, modem, wireless transceiver, etc. Communication unit 309 allows electronic device 300 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.
[0096] The computing unit 301 can be various general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of the computing unit 301 include, but are not limited to, CPUs (Central Processing Units), GPUs (Graphics Processing Units), various special-purpose AI (Artificial Intelligence) computing chips, various computing units running machine learning model algorithms, DSPs (Digital Signal Processors), and any suitable processor, controller, microcontroller, etc. The computing unit 301 performs the various methods and processes described above, such as a big data-driven intelligent control method for thermal power plant boilers. For example, in some embodiments, the big data-driven intelligent control method for thermal power plant boilers can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as storage unit 308. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 300 via ROM 302 and / or communication unit 309. When the computer program is loaded into RAM 303 and executed by the computing unit 301, one or more steps of the methods described above can be performed. Alternatively, in other embodiments, computing unit 301 may be configured to perform the aforementioned big data-driven intelligent control method for thermal power plant boilers by any other suitable means (e.g., by means of firmware).
[0097] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, FPGAs (Field Programmable Gate Arrays), ASICs (Application-Specific Integrated Circuits), ASSPs (Application-Specific Standard Products), SOCs (System-on-Chips), CPLDs (Complex Programmable Logic Devices), computer hardware, firmware, software, and / or combinations thereof. These various implementations may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.
[0098] The program code used to implement the methods of this application may be written in any combination of one or more programming languages. This program code may be provided to a processor or controller of a general-purpose computer, special-purpose computer, or other programmable data processing device, such that when executed by the processor or controller, the functions / operations specified in the flowcharts and / or block diagrams are implemented. The program code may be executed entirely on a machine, partially on a machine, as a standalone software package partially on a machine and partially on a remote machine, or entirely on a remote machine or server.
[0099] In the context of this application, a machine-readable medium can be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, apparatus, or device. A machine-readable medium can be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium can be, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, RAM, ROM, EPROM (Electrically Programmable Read-Only Memory) or flash memory, optical fiber, CD-ROM (Compact Disc Read-Only Memory), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.
[0100] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device for displaying information to the user (e.g., a CRT (Cathode-Ray Tube) or LCD (Liquid Crystal Display) monitor); and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the computer. Other types of devices can also be used to provide interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including sound input, voice input, or tactile input).
[0101] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or computing systems that include middleware components (e.g., application servers), or computing systems that include frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include LANs (Local Area Networks), WANs (Wide Area Networks), the Internet, and blockchain networks.
[0102] Computer systems can include clients and servers. Clients and servers are generally geographically separated and typically interact via communication networks. The client-server relationship is created by computer programs running on the respective computers and having a client-server relationship with each other. A server can be a cloud server, also known as a cloud computing server or cloud host, a hosting product within the cloud computing service system that addresses the shortcomings of traditional physical hosts and VPS (Virtual Private Server) services, such as high management difficulty and weak business scalability. Servers can also be servers for distributed systems or servers incorporating blockchain technology.
[0103] It's important to note that artificial intelligence (AI) is the study of enabling computers to simulate certain human thought processes and intelligent behaviors (such as learning, reasoning, thinking, and planning). It encompasses both hardware and software technologies. AI hardware technologies generally include sensors, dedicated AI chips, cloud computing, distributed storage, and big data processing. AI software technologies primarily include computer vision, speech recognition, natural language processing, machine learning / deep learning, big data processing, and knowledge graph technologies.
[0104] The various numerical designations such as "first," "second," etc., used in this application are merely for ease of description and are not intended to limit the scope of the embodiments of this application, nor do they indicate the order of events.
[0105] At least one in this application can also be described as one or more, and multiple can be two, three, four or more, and this application does not impose any limitation. In the embodiments of this application, for a technical feature, the technical features in that technical feature are distinguished by "first", "second", "third", "A", "B", "C" and "D", and there is no order or size among the technical features described by "first", "second", "third", "A", "B", "C" and "D".
[0106] It should be understood that the various forms of processes shown above can be used to rearrange, add, or delete steps. For example, the steps described in this application can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution disclosed in this application can be achieved, and this is not limited herein.
[0107] The specific embodiments described above do not constitute a limitation on the scope of protection of this application. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the scope of protection of this application.
Claims
1. A big data-driven intelligent control system for boilers in thermal power plants, characterized in that, The system includes: The data acquisition and calibration module is used to acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data. The data purification module is used to input the standardized time-series data into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms to obtain a purified data stream; The multi-model parallel inference module is used to perform mechanistic model calculations, data-driven predictions, and uncertainty quantifications on the purified data stream in parallel to obtain theoretical calculation values, predicted values, and uncertainty measures. The trade-off coefficient solution module is used to predict the evolution trajectory of the Pareto front within a future preset time window based on the purified data stream, solve for the operating preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window based on the evolution trajectory, and extract the operating preference weight corresponding to the current moment as the optimal trade-off coefficient from the operating preference weight sequence. The optimization solution module is used to construct an optimization objective function based on the optimal trade-off coefficients, and to solve for the control adjustment vector by taking the theoretical calculated value, the predicted value, and the uncertainty measure as inputs to the optimization objective function. The control command output module is used to adjust the setpoint of the distributed control system of the thermal power plant according to the control adjustment vector to obtain the setpoint adjustment command; wherein, the setpoint adjustment command is used to instruct the distributed control system of the thermal power plant to perform parameter correction of each control loop according to the control adjustment vector.
2. The system according to claim 1, characterized in that, The purification data stream includes current operating parameters and slow variables related to equipment health status; The module for solving the tradeoff coefficients includes: The trajectory prediction unit is used to input the current operating condition parameters and the slow variables of the equipment health status into a trained long short-term memory network model to predict the coordinates, curvature, and span of the Pareto front within a future preset time window, thereby obtaining the evolution trajectory of the Pareto front within the future preset time window; wherein, the evolution trajectory is used to characterize the evolution trend of the geometric feature parameters of the Pareto front within the future preset time window. The sequence solving unit is used to solve the operation preference weight for each day within a future preset time window by dynamic programming, based on the evolution trajectory and with the goal of maximizing the cumulative comprehensive benefits, and to construct the operation preference weight sequence based on the operation preference weight; wherein, the cumulative comprehensive benefits include efficiency gains, nitrogen oxide emission penalties and equipment lifespan loss penalties; The coefficient determination unit is used to extract the running preference weight corresponding to the current time from the running preference weight sequence, and use the running preference weight corresponding to the current time as the optimal trade-off coefficient.
3. The system according to claim 2, characterized in that, The expression for the optimal trade-off coefficient is: ; In the formula, This represents the optimal trade-off coefficient. Indicates the current moment. This indicates the total duration of the future preset time window. This represents a time series function composed of the weights of the operating preferences for each day within a future preset time window. This indicates the feasible range of values for the running preference weights. This represents any point in the future within a preset time window. Indicates at time Using running preference weights Boiler thermal efficiency at that time Indicates at time Using running preference weights Nitrogen oxide emissions at that time The weighting coefficients representing the efficiency gains are... This represents the weighting coefficient for the nitrogen oxide emission penalty. This represents the weighting coefficient for the penalty of equipment lifespan loss. Indicates at time Using running preference weights The amount of equipment lifespan loss during that time.
4. The system according to claim 1, characterized in that, The method for constructing the sensor spatiotemporal correlation graph model includes: A directed graph is constructed by using boiler sensor measuring points and virtual computing nodes obtained through thermodynamic calculations as graph nodes and the physical causal relationships between the graph nodes as graph edges. Theoretical propagation delay, causality strength coefficient, and physical constraint type are labeled for each edge of the graph to obtain the attribute parameters of the directed graph; Based on the directed graph and the attribute parameters, an initial graph neural network model is constructed; wherein, the initial graph neural network model uses the directed graph as the network topology, the causal strength coefficient in the attribute parameters as the edge weight, and the theoretical propagation delay as the basis for temporal feature alignment; Historical operating data of the boiler is acquired, and the initial graph neural network model is trained based on the historical operating data to obtain a trained graph neural network model. The directed graph, the attribute parameters, and the trained graph neural network model are solidified and stored to obtain the sensor spatiotemporal correlation graph model.
5. The system according to claim 1, characterized in that, The data cleansing module includes: An abnormal node identification unit is used to perform consistency verification on the standardized time-series data to obtain candidate abnormal nodes that violate spatiotemporal correlation constraints; The data artifact determination unit is used to input the standardized time series data into the trained graph neural network model in the sensor spatiotemporal correlation graph model, calculate the reconstruction error of each node, and mark the nodes whose reconstruction error continuously exceeds the first threshold as data artifact nodes. The mechanism constraint reconstruction unit is used to obtain the associated nodes that are adjacent to the data artifact node and do not belong to the candidate abnormal node, and to calculate the replacement value of the data artifact node at the current time based on the observation value of the associated node and the preset physical mechanism mapping function. The confidence weighting output unit is used to replace the original observation value of the data artifact node with the substitution value to obtain pre-cleaned time series data, assign confidence weights to the data corresponding to the data artifact node in the pre-cleaned time series data, assign default weights to non-data artifact nodes, and perform weighted fusion on the pre-cleaned time series data based on the confidence weights and the default weights to obtain the cleaned data stream.
6. The system according to claim 5, characterized in that, The expression for the substitution value is: ; In the formula, Indicates the substitution value, This represents the data artifact node. Indicates the current moment. In the spatiotemporal correlation graph model of sensors, directed edges point to data artifact nodes. Furthermore, it does not belong to the set of trusted upstream nodes formed by the neighboring nodes of the candidate abnormal node. Represents the set of trusted upstream nodes Any node in, Indicates from node To the data artifact node Theoretical propagation delay, Represents a node At any moment Observations at that location Indicates a set of trusted upstream nodes The input data set consists of the observations of each node at the corresponding time point. This represents the mapping function of the physical mechanism.
7. A big data-driven intelligent control method for boilers in thermal power plants, characterized in that, The method includes: Acquire multi-source operating data of the boiler and uniformly calibrate the timestamps of the multi-source operating data to obtain standardized time-series data; The standardized time-series data is input into a sensor spatiotemporal correlation graph model constructed based on physical mechanisms and spatiotemporal correlation verification mechanisms to obtain a purified data stream; The purified data stream is subjected to parallel mechanistic model calculations, data-driven predictions, and uncertainty quantification to obtain theoretical calculated values, predicted values, and uncertainty measures. Based on the purified data stream, the evolution trajectory of the Pareto front within a future preset time window is predicted. According to the evolution trajectory, the operational preference weight sequence that maximizes the cumulative comprehensive benefits within the future preset time window is obtained. The operational preference weight corresponding to the current moment as the optimal trade-off coefficient is extracted from the operational preference weight sequence. Based on the optimal trade-off coefficients, an optimization objective function is constructed, and the theoretically calculated value, the predicted value, and the uncertainty measure are used as inputs to the optimization objective function to obtain the control adjustment vector. Based on the control adjustment vector, the setpoint of the distributed control system of the thermal power plant is adjusted to obtain a setpoint adjustment command; wherein, the setpoint adjustment command is used to instruct the distributed control system of the thermal power plant to perform parameter correction of each control loop according to the control adjustment vector.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that, When the processor executes the computer program, it performs the function of the method described in claim 7.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it performs the function of the method described in any one of claims 7.