A coal washing plant intelligent dosing and fan pump motor energy-saving system and method

By adopting a smart chemical dosing system in coal washing plants that coordinates energy-saving technologies with fan and pump motors, the deep coupling of chemical dosing and motor load is achieved, solving the problems of redundant power consumption by motors and waste of chemicals in coal washing plants, and realizing optimal overall cost and production stability.

CN123137246APending Publication Date: 2026-11-20SHANXI BAIJIXING ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611305514.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing chemical dosing system and motor energy-saving system of coal washing plants are independent of each other, failing to achieve coupled control of chemical consumption and power consumption. This results in redundant motor design leading to long-term ineffective power consumption, and traditional variable frequency speed control schemes are prone to causing production disturbances and chemical waste.

Method used

The system employs a smart dosing system that integrates energy-saving technologies with fan and pump motors. By real-time monitoring of all parameters and dynamic adjustment of the motor input voltage, it utilizes the power margin reserved in the motor selection, achieving deep coupling between chemical dosing and motor load. It adopts a constant speed voltage regulation energy-saving mode, along with torque compensation and power factor closed-loop control, to ensure production stability.

Benefits of technology

Without changing the pump output flow rate, reduce excess power consumption of the motor and chemical consumption to achieve optimal overall cost, avoid production disturbances and chemical waste, and improve production stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123137246A_ABST
    Figure CN123137246A_ABST
Patent Text Reader

Abstract

The application discloses a coal washing plant intelligent dosing and fan pump motor collaborative energy-saving system and method, and belongs to the field of coal washing energy-saving control. The system comprises four types of application products, namely, new plant complete assembly, old plant external hanging transformation, intelligent dosing separate installation and motor constant speed pressure regulation separate installation. The system is composed of five units, namely, data acquisition, collaborative decision, execution control, safety protection and remote monitoring. The collaborative decision unit is embedded with a medicine-electricity coupling model and a delta C economic accounting formula, and relies on real-time parameter operation to dynamically regulate pressure under the motor constant speed condition, thereby reducing the no-load loss caused by motor selection redundancy, and bidirectional linkage optimizing the medicine dosage and motor power supply voltage. The system is provided with multi-stage safety interlocking protection, and strictly follows the logic of first stabilizing the process and then saving energy. The product supports single product sales or complete project landing of the dosing module and the pressure regulating module, and is within the protection scope of the patent. The device guarantees no pipe blockage and no coarse particle running, simultaneously reduces medicine consumption and power consumption, and has excellent adaptability in project landing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of energy-saving control technology for coal washing plants, specifically to a smart chemical dosing and fan / pump motor coordinated energy-saving system and method for coal washing plants. Background Technology

[0002] In the coal washing plant production process, equipment such as jig blowers, dust removal blowers, and slurry pumps have large installed capacities and long operating times, making them the main energy-consuming units. During the equipment selection phase, due to safety redundancy considerations, the design institute generally selects motors with a higher power rating, resulting in an excessively large rated installed capacity margin. As a result, the motors operate under light load with surplus power most of the time during production, leading to a significant amount of no-load and light-load energy loss. At the same time, flocculants, coagulants, and filter aids need to be added during the coal slime settling and filtration processes, resulting in a high proportion of chemical costs.

[0003] In existing technologies, intelligent dosing equipment and motor energy-saving products are developed and installed independently, resulting in four application forms in the market: new projects with separate automatic dosing or frequency conversion energy-saving systems; scattered external retrofitting of dosing / energy-saving equipment in old coal washing plants; separate purchase and installation of intelligent dosing systems; and separate installation of motor energy-saving devices. The dosing control system only adjusts the dosage based on coal slurry concentration, without considering the impact of slurry resistance on motor load. The mainstream motor energy-saving solution is frequency conversion speed regulation, which relies on changing motor speed to save electricity. However, this easily alters pipeline flow, leading to pipe blockage, runoff, and reagent waste. Since core coal washing pumps and fans cannot operate at reduced speeds, the applicability of frequency conversion solutions is limited. Existing constant pressure energy-saving devices only target the motor's own voltage reduction control, lacking reagent cost data access and a coupled accounting logic for reagent and electricity costs. They also lack a ΔC economic verification formula, making it impossible to achieve bidirectional coordinated control of dosing amount and motor voltage regulation. This fails to optimize the overall cost of reagent and electricity consumption and cannot rely on real-time operating conditions to dynamically absorb the ineffective power consumption caused by motor design redundancy.

[0004] Higher coal slime concentration and slurry viscosity lead to higher pipeline fluid resistance, heavier loads on blowers and slurry pumps, and higher power consumption. Insufficient chemical dosing results in slurry viscosity and increased resistance, while excessive chemical dosing increases reagent costs. Traditional independent control cannot achieve global optimization of reagent and power consumption, making it difficult to utilize excess power consumption from motor selection and achieve dual energy savings while ensuring stable production. Summary of the Invention

[0005] Purpose of the invention To address the shortcomings of existing dosing systems and motor energy-saving systems, such as independent operation, lack of cost-effective coupling, frequency conversion speed regulation disrupting production conditions, redundant motor design leading to long-term ineffective power consumption, and the lack of coordinated control logic for dosing and electricity in all four types of deployed products, this invention provides a smart dosing system and method for coal washing plants that coordinates energy saving with fans and pumps. The product covers four application scenarios: integrated installation in new plants, external retrofitting of old equipment, independent installation of smart dosing systems, and independent installation of motors with constant speed and voltage regulation for energy saving. Any product, whether manufactured or used alone or in combination, falls within the scope of this patent. This invention relies on real-time monitoring of all parameters to dynamically adjust the motor input voltage, utilizing the power margin reserved in motor selection. It achieves deep coupling of reagent dosing, coal slime settling, fluid resistance, and motor load, reducing excess power consumption and reagent consumption while maintaining constant motor speed, thus ensuring continuous and stable coal washing production.

[0006] Technical solution A smart chemical dosing and fan / pump motor co-energy-saving system for coal washing plants includes four parallel independent claims, each suitable for different applications: complete installation in new plants, external upgrades in existing plants, standalone smart chemical dosing units, and standalone constant-speed voltage-regulating motor units. All products incorporate a coupled model of chemical and energy costs, along with a ΔC economic verification formula. The motors employ a constant-speed voltage-regulating energy-saving mode, equipped with torque compensation and power factor closed-loop control. This system maintains the pump output flow rate and does not disrupt flotation operations. It dynamically adjusts the voltage based on real-time data acquisition across all operating conditions to mitigate redundant power consumption in motor selection, and bidirectionally regulates the chemical dosage and motor input voltage based on comprehensive cost data. The dependent claims further refine and define the data acquisition method, voltage regulation principle, model calculation parameters, protection logic, and local offline operation function.

[0007] This invention also provides a collaborative energy-saving method for the corresponding system. It relies on the operation of any of the aforementioned hardware systems, establishes the correlation between reagent consumption and power consumption through a coupling model, determines the control strategy using the ΔC verification value, and follows the logic of stabilizing the process first and then saving energy. Under the premise of ensuring the stability of the coal washing flotation process, it digests the excess power loss of the motor design and achieves the lowest comprehensive cost of reagents and electricity.

[0008] Beneficial effects 1. The product covers four types of implementation: new complete machine installation, old factory external modification, stand-alone smart dosing, and stand-alone motor voltage regulation and energy saving. Any product, whether produced and sold separately or combined, falls within the scope of protection, and the patent protection boundary is complete. 2. Abandoning the traditional variable frequency and variable speed solution, the motor operates at a constant speed, the pump flow is stable, and it will not interfere with the flotation process. This reduces unnecessary reagent consumption from the source and avoids the production risks of pipe blockage and coarse feed. 3. Based on a unified drug-electric coupling model and ΔC verification formula, the data barrier between drug dosing and motor energy saving is broken down. By relying on real-time parameter dynamic voltage adjustment, the motor power margin reserved by the design institute is utilized, the useless power consumption under light load is reduced, and both drug cost and electricity cost are taken into account to achieve the best overall cost. 4. The old plant can be upgraded by using an external docking method, without replacing the original dosing equipment and motor body, which has low modification cost and strong applicability. 5. The slurry viscosity can be directly measured by online instruments or indirectly calculated by electrical parameters. It has strong field adaptability, and the system can operate locally in closed loop when the network is disconnected, with high operational stability. 6. Equipped with multi-level safety protection and load reverse linkage logic, it automatically switches back to the rated operating state when the operating conditions are abnormal, ensuring high production safety. Attached Figure Description

[0009] Figure 1 System overall structure diagram Figure 2 Flowchart of coordinated regulation logic Figure 3 On-site deployment diagram Figure label: 1—Data acquisition unit; 2—Collaborative decision-making unit; 3—Execution and control unit; 301—Smart dosing execution module; 302—Motor energy-saving control module; 4—Safety protection unit; 5—Remote monitoring unit; 10—Coal washing thickener; 20—Jig blower / dust removal blower; 30—Slurry pump; 40—Dosing device; 50—Collaborative energy-saving control cabinet. Detailed Implementation

[0010] In a coal washing plant with an annual processing capacity of 3 million tons, a 72-hour comparative test was conducted between a bottom flow slurry pump in the thickening tank and a jig blower. The original equipment motors were all selected one size larger than the actual operating load and were in a state of light load surplus operation for a long time. The control group used full speed at industrial frequency + manual dosing, while the experimental group used this system.

[0011] 1. New plant complete installation scenario: The entire set of data acquisition unit, collaborative decision-making unit, execution and control unit, safety protection unit, and remote monitoring unit are integrated and deployed; the data acquisition unit monitors the coal slime concentration and pipeline resistance in real time, and indirectly calculates the slurry viscosity by the ratio of pump current to outlet pressure; when the coal slime concentration increases, the collaborative decision-making unit first increases the flocculant dosage to prevent the slurry from becoming too thick and clogging the pipe, and performs economic verification according to ΔC=(Poriginal-Pnew)×T×Kelectricity-(Qnew-Qoriginal)×Kchemical. After confirming that the benefit ΔC>0, it combines real-time load dynamic voltage reduction to consume the redundant power of the selected motor and controls the motor to enter the voltage reduction energy-saving mode with torque compensation; when there is a tendency for siltation or a sudden drop in load, the rated voltage is immediately restored and the chemical addition is suspended.

[0012] 2. External upgrade scenario for old plant: An external collaborative controller and external communication components are used to connect with the existing dosing equipment, fan pump motors, etc. on site. The original equipment body is not replaced. The external connection collects signals and optimizes the dosing and motor voltage in real time based on the coupling model, reducing the excess power consumption of the original motor.

[0013] 3. Standalone installation of intelligent dosing scenario: The dosing control module has a built-in coupling model and ΔC calculation formula, which is combined with the on-site electrical load data to correct the dosage.

[0014] 4. Scenario of adding a motor for constant speed and voltage regulation: The motor control module is equipped with coupled accounting logic to adjust the voltage in real time based on the on-site drug consumption data, thus utilizing the motor design margin.

[0015] Test results: Under the premise of stable underflow concentration of 450g / L and constant speed operation of equipment, the overall power saving rate of motor is 22%, the reagent consumption is reduced by 16%, there is no pipe blockage or sorting abnormality, and the system operates stably and reliably.

Claims

1. A smart chemical dosing and fan / pump motor co-energy-saving system for coal washing plants, characterized in that, The system includes a data acquisition unit (1), a collaborative decision-making unit (2), an execution and control unit (3), a safety protection unit (4), and a remote monitoring unit (5). This system is used for the integrated installation of the entire unit in a newly built coal washing plant. The data acquisition unit (1) is used to collect in real time the coal slime concentration, slurry viscosity, pipeline pressure resistance, reagent dosage, and the current, voltage, load rate, and power parameters of the jigging fan, dust removal fan, and slurry pump of the coal washing plant. The viscosity of the slurry is detected by an online differential pressure viscometer or indirectly calculated by the ratio of current to outlet pressure at the rated speed of the slurry pump. The excess power loss reserved by the motor selected at the factory is monitored and digested by real-time data acquisition. The collaborative decision-making unit (2) is used to establish a coupling model of drug cost and power cost, introduce pipeline transportation safety factor as a constraint, predict pipeline resistance trend based on coal slime concentration and slurry viscosity, and find the optimal balance point between drug consumption increase and power consumption reduction under the process constraints of ensuring that the pipeline is not blocked and the coal slime does not run coarse, and output collaborative control instructions. The economic efficiency verification formula is: ΔC = (Poriginal - Pnew) × T × Kelectricity - (Qnew - Qoriginal) × Kpharmaceutical; where ΔC is the comprehensive revenue, P is the operating power, T is the operating time, Kelectricity is the electricity price, Q is the dosage of the pesticide, and Kpharmaceutical is the unit price of the pesticide; when ΔC > 0, coordinated control is implemented. The execution control unit (3) includes a smart dosing execution module (301) and a motor energy-saving control module (302), which respectively complete the adjustment of the dosage of the agent and the voltage regulation and energy-saving control of the fan pump motor; the motor energy-saving control module adopts an AC voltage regulation circuit with torque compensation and power factor closed loop, which reduces the voltage while maintaining stable output torque to ensure the constant speed and safe operation of the motor; The safety protection unit (4) is used to force the exit of the energy-saving mode under the conditions of coal slime accumulation, pipeline blockage, and sudden load change, restore the rated voltage and basic dosage, and ensure continuous and stable production. The remote monitoring unit (5) performs parameter monitoring, data statistics and threshold configuration.

2. A system for energy-saving retrofitting of an old coal washing plant with external chemical dosing and motor coordination, characterized in that: The system includes an external collaborative controller and an external communication interface component. This system is used to upgrade existing equipment by adding it as an external component, without replacing the original dosing unit, fan, pump, or motor. The external collaborative controller has a built-in chemical-electricity cost coupling model and ΔC economic verification formula. It connects to the existing dosing equipment and fan / pump motor in use on site through the external communication interface component. It relies on real-time parameter acquisition and dynamic voltage adjustment to eliminate redundant power consumption in motor selection, and realizes collaborative control of dosing and voltage regulation of existing equipment.

3. An independent intelligent dosing control system for coal washing plants based on a chemical-electric coupling algorithm, characterized in that, The control module incorporates a chemical energy cost coupling model and ΔC calculation formula, and independently controls the dosage of the chemical based on comprehensive cost accounting data in a closed loop. It can be installed and operated independently without the motor voltage regulation unit.

4. An independent constant speed pressure regulating energy-saving control system for blowers and pumps in a coal washing plant, characterized in that, The electronic control unit is equipped with a chemical energy cost coupling model and ΔC verification formula. The motor maintains a constant rated speed and dynamically adjusts the input voltage according to the comprehensive cost parameters, eliminating the useless power consumption caused by the excess power of the motor selection. It can be installed and used independently without the dosing unit.

5. The system according to claim 1 or 2, characterized in that, The intelligent dosing execution module (301) includes at least one of a frequency conversion metering pump, an electromagnetic drive pump, or a pneumatic regulating valve, used to adjust the dosage and frequency of flocculant, coagulant, and filter aid.

6. The system according to claim 1 or 4, characterized in that, The collaborative decision-making unit (2) executes the pre-judgment logic: first, it judges whether the coal slime concentration and slurry viscosity are within the safe range, and then determines the energy-saving voltage regulation range and the reagent addition correction amount in combination with the electrical load rate.

7. The system according to any one of claims 1 to 4, characterized in that, The collaborative decision-making unit (2) executes the reverse linkage protection logic: when the motor load rate drops by more than the threshold within a preset time, it is determined to be a risk of pipeline emptying or flow interruption, and the agent addition is stopped immediately.

8. The system according to any one of claims 1 to 4, characterized in that, The system supports independent operation locally when the network is disconnected, and the collaborative decision-making unit (2) can independently complete closed-loop control without being in the cloud.

9. A method for intelligent chemical dosing and coordinated energy saving of fan and pump motors in a coal washing plant, characterized in that, The system described in any one of claims 1 to 4 is implemented by comprising the following steps: (1) Real-time collection of coal slime concentration, slurry viscosity, pipeline resistance, reagent dosage and electrical operating parameters of blower and slurry pump, and real-time monitoring of motor excess load loss; slurry viscosity is obtained by online detection or indirectly calculated by the ratio of pump current to outlet pressure; (2) The collaborative decision-making unit establishes a cost coupling model of medicine and electricity, substitutes it into the economic verification formula ΔC=(P original - P new)×T×K electricity -(Q new - Q original)×K medicine to calculate the comprehensive benefit and predict the trend of resistance change; (3) Under the premise of ensuring that the pipe is not blocked and the coal slurry does not leak, the dosage of the reagent should be adjusted first to stabilize the coal slurry settling state. (4) After the slurry resistance stabilizes, the motor voltage is adjusted by combining the power factor and torque compensation to consume the excess power consumption of the selected motor and achieve constant speed synergistic energy saving. (5) When a sudden drop in motor load is detected, immediately stop adding chemicals and implement reverse linkage protection; (6) When coal slime concentration, load, or pressure becomes abnormal, the safety protection mechanism shall be activated to ensure stable coal washing production; (7) Energy consumption, drug consumption and operating status are displayed in real time through remote monitoring unit.

10. The method according to claim 9, characterized in that, The dosage of the chemical agent is coupled with the voltage regulation range of the motor in a two-way manner: the optimized dosing ensures sufficient sedimentation of coal slime, stabilizes fluid resistance, and thus stabilizes the motor load, thereby simultaneously improving the energy-saving depth of voltage regulation.