Method and system for testing an air conditioner controller with load
By connecting low-voltage power supply and high-voltage DC power supply circuits and connecting the compressor motor to the refrigeration load circuit, multi-stage test results of the air conditioner controller are obtained. This solves the problem of difficulty in conducting actual load tests of the air conditioner controller under high-voltage DC input in the existing technology, and improves the correlation and accuracy of the test results.
Patent Information
- Application Number
- CN202611309735.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-20
AI Technical Summary
Existing air conditioner controller testing methods are difficult to drive the compressor motor and connect it to the refrigeration load circuit under high-voltage DC input conditions, and it is difficult to combine the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit to form the actual load test results of the compressor.
The air conditioner controller is connected to the low-voltage power supply circuit, the high-voltage DC power supply circuit, and the compressor drive circuit, so that the compressor motor and the refrigeration load circuit form an operable connection. The low-voltage side response status is obtained through the low-voltage power supply, and the high-voltage side response status is obtained by applying the high-voltage DC input. During the high-voltage side test, the compressor motor is controlled to run, and the electrical operation status and the load operation status of the refrigeration load circuit are obtained. Finally, the actual load test results of the compressor are determined.
It enables testing under conditions close to actual air conditioner operation, improving the correlation between test results and the actual working state of air conditioners with compressors. It can reflect the low-pressure and high-pressure side status of the air conditioner controller and form a comprehensive evaluation by combining the load status of the refrigeration load circuit.
Smart Images

Figure CN123137276A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of air conditioning testing technology, and in particular to a test method and system for an air conditioning controller under load. Background Technology
[0002] The automotive air conditioning system is a crucial component of the vehicle's thermal management system. For the air conditioning controller undergoing load testing, it not only needs to complete low-voltage side functional responses such as communication, software versioning, input ports, sensors, and control signals under low-voltage power supply conditions, but also needs to drive the compressor motor under high-voltage DC input conditions. Especially after the compressor motor is connected to the refrigeration load circuit, the actual operating state of the air conditioning controller is simultaneously affected by high-voltage DC input, UVW three-phase drive output, compressor operating status, and changes in refrigerant cycle load. Therefore, relying solely on conventional low-voltage functional testing or individual electrical parameter testing is insufficient to fully reflect the test results of the air conditioning controller under actual compressor load conditions.
[0003] In the prior art, Chinese patent application CN106291315A discloses an automatic testing method for an FCT testing fixture for a household air conditioner control board. This method mainly performs automatic testing on items such as the power supply voltage, temperature sensor, stepper motor, and indoor fan of the air conditioner control board, and sends the test data to a host computer to determine whether it is qualified. This type of solution can improve the automation level of the basic function testing of the air conditioner control board, but its test content mainly focuses on the low-pressure side function of the control board and the output function of conventional actuators, which is difficult to reflect the actual state of the air conditioner controller driving the compressor motor and driving the refrigeration load circuit under high-voltage DC input conditions.
[0004] Chinese patent CN216894853U discloses a testing device for an electric vehicle air conditioning compressor. This device provides high-voltage power and low-voltage control power to the compressor under test and acquires the real-time operating status and parameters of the compressor based on testing instructions. While this type of solution primarily uses the compressor as the testing object to determine if it is faulty, it is insufficient for testing scenarios where the tested object is the air conditioning controller. This fails to adequately reflect the comprehensive testing results of the air conditioning controller under the combined effects of low-pressure response, high-voltage DC input, three-phase drive output, and changes in cooling load.
[0005] Chinese patent application CN117908517A discloses a testing platform for automotive air conditioning controllers based on a simulation system. This platform uses a control panel, conveyor belt, support mechanism, and mechanical gripper mechanism to test the air conditioning controller, thereby improving production line testing efficiency. While this approach focuses on automating controller production line testing, it doesn't fully address the scenario where the air conditioning controller drives the compressor motor to operate within the refrigeration load circuit under high-voltage DC input conditions, and how to determine the actual load test results of the compressor by combining the electrical operating status of the air conditioning controller and the load operating status of the refrigeration load circuit.
[0006] Chinese patent application CN102979712A discloses an electric compressor controller for automotive air conditioning, which involves high-voltage DC input, voltage sampling, current sampling, temperature sampling, relay control, and power circuit protection. This type of solution focuses on the circuit structure and protection reliability of the compressor controller itself, but its emphasis is not on how to perform low-pressure side testing, high-pressure side testing, and combined testing under compressor load conditions in the testing process.
[0007] Therefore, the main shortcoming of existing air conditioner controller testing schemes is that it is difficult to make the air conditioner controller actually drive the compressor motor and connect to the refrigeration load circuit under high voltage DC input conditions, and at the same time combine the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit to form the actual load test results of the compressor. Summary of the Invention
[0008] In a first aspect, the present invention provides a method for testing an air conditioner controller under load, for testing the air conditioner controller in an air conditioner under test, wherein the air conditioner under test includes an air conditioner controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor, and the method includes: S1: Connect the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit and the compressor drive circuit, and make the compressor motor and the refrigeration load circuit form an operable connection; S2: Under low-voltage power supply conditions, obtain the low-voltage side response status of the air conditioner controller, and obtain the low-voltage side test results based on the low-voltage side response status; S3: After completing the low-voltage side test, apply a high-voltage DC input to the air conditioner controller and obtain the high-voltage side test result based on the response status of the air conditioner controller to the high-voltage DC input; S4: During the high-pressure side test, the air conditioner controller is controlled to drive the compressor motor to run, so that the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor; S5: During the operation of the compressor motor, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit are obtained according to the preset operating strategy, and the actual load test result of the compressor is determined based on the electrical operating status and the load operating status. S6: After the test is completed, control the compressor motor to stop, restore the test status of the high-voltage DC input and the air conditioner controller, and output the test results.
[0009] Secondly, the present invention also provides a load-bearing air conditioner controller testing system, which uses the method described in the first aspect to test the air conditioner under test, wherein the air conditioner under test includes an air conditioner controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor, and the testing system includes: The test fixture is used to establish low-voltage connection, high-voltage connection and compressor drive connection with the air conditioner controller; A low-voltage power supply unit is connected to the test fixture and is used to provide low-voltage power to the air conditioner controller through the test fixture. A high-voltage DC power supply unit is connected to the test fixture and is used to provide a high-voltage DC input to the air conditioner controller through the test fixture. A communication acquisition unit is used to communicate with the air conditioner controller to obtain the low-pressure side response status, high-pressure side response status, and electrical operation status of the air conditioner controller; A load status acquisition unit is used to connect to the detection location of the refrigeration load circuit of the air conditioner under test in order to obtain the load operation status of the refrigeration load circuit. The test control unit is connected to the low-voltage power supply unit, the high-voltage DC power supply unit, the communication acquisition unit, and the load status acquisition unit, respectively. It is used to determine the actual load test result of the compressor based on the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit during the operation of the compressor motor driven by the air conditioner controller.
[0010] In summary, the beneficial effects of the present invention are as follows: The present invention provides a test method and system for an air conditioner controller under load. By connecting the air conditioner controller to a low-voltage power supply circuit, a high-voltage DC power supply circuit, and a compressor drive circuit, and establishing an operational connection between the compressor motor and the refrigeration load circuit, the air conditioner controller can be tested under a connection state close to that of actual air conditioner operation. This avoids the problem that relying solely on low-voltage communication, port status, or individual electrical parameter detection cannot reflect the actual load operating state of the compressor. By acquiring the low-voltage side response state of the air conditioner controller under low-voltage power supply conditions, and applying a high-voltage DC input after completing the low-voltage side test to acquire the high-voltage side response state, the test process can cover the continuous testing phase of the air conditioner controller from the low-voltage side basic response to the high-voltage side operating response. The test results can simultaneously reflect the low-voltage side and high-voltage side states of the air conditioner controller. By controlling the air conditioner controller to drive the compressor motor during the high-voltage side test, the compressor motor drives the refrigeration load circuit to form a cyclic load corresponding to its operating state. This ensures that the air conditioner controller is no longer only in an unloaded output or simulated load output state, but is tested under the condition that the compressor motor is actually running and forming a refrigeration cyclic load, thereby improving the correlation between the test results and the actual operating state of the air conditioner with compressor. By acquiring the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit according to a preset operating strategy during the operation of the compressor motor, and determining the actual load test results of the compressor based on both, this invention not only reflects the electrical operating performance of the air conditioner controller itself, but also provides a comprehensive evaluation by combining the load status of the refrigeration load circuit during compressor operation. This solves the problem that existing testing methods struggle to combine the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit to form the actual load test results of the compressor. Furthermore, this invention controls the compressor motor to stop after the test and restores the test status of the high-voltage DC input and the air conditioner controller. This allows the air conditioner controller to return to a state suitable for subsequent processing after completing the actual load test, while simultaneously outputting the test results, facilitating unified recording of low-pressure side tests, high-pressure side tests, and actual load tests. Attached Figure Description
[0011] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the embodiments of the present invention will be briefly introduced below. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort, and these are all within the protection scope of the present invention.
[0012] Figure 1 This is a schematic flowchart of the test method for an air conditioner controller under load according to the present invention.
[0013] Figure 2 This is a flowchart illustrating the method for connecting the test system to the target under test in this invention.
[0014] Figure 3 This is a flowchart illustrating the low-voltage testing method of this invention.
[0015] Figure 4 This is a flowchart illustrating the high-voltage testing method of this invention.
[0016] Figure 5 This is a flowchart illustrating the load testing method of this invention.
[0017] Figure 6 This is a structural block diagram showing the connection between the testing system and the air conditioning system in this invention. Detailed Implementation
[0018] The features and exemplary embodiments of various aspects of the present invention will now be described in detail. To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only configured to explain the present invention and are not configured to limit the present invention. For those skilled in the art, the present invention can be practiced without some of these specific details. The following description of the embodiments is merely intended to provide a better understanding of the present invention by illustrating examples of the invention.
[0019] It should be noted that, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes said element.
[0020] It should be noted that all actions involving the acquisition of signals, information, or data in this invention are carried out in compliance with the relevant data protection laws and regulations of the locality and with authorization from the owner of the relevant device.
[0021] Example 1 like Figure 1As shown, this embodiment provides a test method for an air conditioner controller under load, used to test the air conditioner controller in the air conditioner under test. The air conditioner under test includes an air conditioner controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor. The air conditioner controller is the main test object in this embodiment, and it typically includes a low-pressure interface, a high-pressure interface, and a UVW three-phase output terminal. The low-pressure interface is used to receive low-pressure power and communicate with external test equipment, the high-pressure interface is used to receive high-pressure DC input, and the UVW three-phase output terminal is used to output three-phase drive signals to the compressor motor. The compressor motor is the actuator driven by the air conditioner controller, and the refrigeration load circuit is the load circuit that supplies refrigerant circulation during compressor operation, capable of forming an actual cyclic load different from no-load or simulated load after the compressor motor starts running. The method mainly includes the following steps: S1: Connect the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit and the compressor drive circuit, and make the compressor motor and the refrigeration load circuit form an operable connection.
[0022] The low-voltage power supply circuit refers to the power supply path that provides low-voltage operating power to the air conditioner controller. The high-voltage DC power supply circuit refers to the power supply path that provides high-voltage DC input to the air conditioner controller. The compressor drive circuit refers to the drive path connecting the three-phase output terminals (UVW) of the air conditioner controller to the compressor motor. A functional connection means that after receiving the drive signal output from the air conditioner controller, the compressor motor can drive the compressor to run and allow the refrigerant to circulate in the refrigeration load circuit. In practice, the above connections can be achieved using a test fixture. The test fixture may include a test clamp for mounting and positioning the air conditioner controller, a connection component for interfacing with the air conditioner controller interface, and a wiring harness or connection terminal for transmitting low-voltage signals, high-voltage power, and three-phase drive signals. After installing the air conditioner controller onto the test fixture, the signal connection part of the test fixture is connected to the low-voltage interface of the air conditioner controller, and the power connection part of the test fixture is connected to the high-voltage interface and the three-phase output terminals (UVW) of the air conditioner controller, thereby establishing the low-voltage power supply, high-voltage DC power supply, and compressor drive connections. Through this step, the air conditioner controller is no longer in a separate low-pressure test or no-load output test state, but is connected to a test environment associated with the compressor and refrigeration load circuit, providing a basis for the subsequent formation of compressor actual load test results.
[0023] In this invention, actual load refers to the physical work load borne by the compressor, which is formed by the refrigerant pressure difference, temperature difference and circulating mass flow rate, when the refrigerant continuously undergoes compression, condensation, throttling and evaporation phase change processes in a closed loop consisting of a compressor, condenser, expansion valve and evaporator connected in series under the drive of the compressor motor.
[0024] Compared to existing technologies that use only resistive or inductive elements or their combinations to simulate the electrical impedance of a motor, the "real load" described in this invention has a clear thermodynamic essence of refrigerant phase change. This allows the air conditioning controller's output current, power factor, and power module temperature rise to dynamically respond to the actual pressure-enthalpy changes of the refrigeration cycle. Furthermore, this "real load" differs from the "no-load" operating condition when the compressor is not connected to the refrigeration piping. In other words, the "real load" test conditions described in this invention aim to test the air conditioning controller under conditions close to the actual operating conditions of a real vehicle air conditioning system, ensuring the physical correlation between the test results and the loaded operating state.
[0025] S2: Under low-voltage power supply conditions, obtain the low-voltage side response status of the air conditioner controller, and obtain the low-voltage side test results based on the low-voltage side response status.
[0026] The low-pressure side response status refers to the basic status information of the air conditioning controller that can be read, fed back, or reported under low-pressure power supply conditions. This information may include communication messages, low-pressure voltage information, software version information, initial input port status information, and initial temperature information. In practice, after the low-pressure power supply unit provides low-pressure power to the air conditioning controller through the test fixture, the communication acquisition unit can read the communication messages sent out by the air conditioning controller via CAN communication, LIN communication, or other communication methods to determine whether the air conditioning controller can communicate normally. It can also read the low-pressure voltage information fed back by the air conditioning controller to determine whether the low-pressure power supply or low-pressure sampling is normal; read the software version information to confirm whether the software configuration of the air conditioning controller under test meets the test requirements; and read the initial input port status information and initial temperature information to record the basic status before the compressor runs. Through this step, the basic low-pressure side response status of the air conditioning controller can be confirmed before applying high-voltage DC input and driving the compressor motor.
[0027] S3: After completing the low-voltage side test, apply a high-voltage DC input to the air conditioning controller and obtain the high-voltage side test result based on the response status of the air conditioning controller to the high-voltage DC input.
[0028] High-voltage DC input refers to the high-voltage DC power supply applied to the high-voltage interface of the air conditioner controller, providing high-voltage side operating conditions for the air conditioner controller to subsequently drive the compressor motor. High-voltage side response status refers to the sampling, feedback, or response information generated by the air conditioner controller after receiving the high-voltage DC input. In practice, after the low-voltage side test is completed, the high-voltage DC power supply unit connects to the high-voltage interface of the air conditioner controller through the power connection part of the test fixture; subsequently, the high-voltage voltage information collected by the air conditioner controller under high-voltage DC input conditions is read, and the output status of the high-voltage DC power supply unit is obtained. If the high-voltage voltage information collected by the air conditioner controller corresponds to the output status of the high-voltage DC power supply unit, a high-voltage sampling test result can be formed and used as part of the high-voltage side test result. This step transitions the testing process from low-voltage basic response testing to high-voltage DC input response testing, providing a high-voltage side foundation for subsequent compressor drive testing.
[0029] S4: During the high-pressure side test, the air conditioner controller is controlled to drive the compressor motor to run, so that the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor.
[0030] The process of controlling the air conditioner controller to drive the compressor motor involves the test equipment or test control unit sending operating commands or writing motor test parameters to the air conditioner controller. This causes the air conditioner controller to generate a compressor drive signal, which is then output to the compressor motor through the UVW three-phase output terminals. A cyclic load refers to the actual load state formed when the refrigerant flows in the refrigeration load circuit after the compressor motor drives the compressor. In practice, the UVW three-phase output terminals of the air conditioner controller can be connected to the compressor motor using a test fixture. When the air conditioner controller outputs the compressor drive signal, the compressor motor drives the compressor, causing the refrigerant to circulate in the refrigeration load circuit. Unlike simply connecting the motor for no-load operation or using a simple simulated load, this step allows the air conditioner controller to actually drive the compressor under high-voltage DC input conditions, putting the compressor into the refrigeration load circuit operating state. This makes the test conditions closer to the actual working state of an air conditioner controller with a compressor.
[0031] S5: During the operation of the compressor motor, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit are obtained according to the preset operating strategy, and the actual load test result of the compressor is determined based on the electrical operating status and the load operating status.
[0032] The preset operating strategy refers to the pre-defined operating and data acquisition strategy for the compressor motor, such as sequential operation according to multiple target speed stages. Electrical operating status refers to the controller-side operating information exhibited by the air conditioner controller during compressor motor operation, such as actual speed, output current, and controller temperature. Load operating status refers to the load-side state of the refrigeration load circuit during compressor operation, such as compressor discharge-side pressure, compressor suction-side pressure, or other states reflecting the refrigerant cycle load. In practice, the test control unit can control the compressor motor to enter different target speed operating stages according to the preset operating strategy, and simultaneously acquire the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit during each target speed operating stage. The stage test results are then formed based on the two types of states within the same operating stage. Through this step, the actual compressor load test results are not obtained solely based on controller-side electrical parameters, but rather by combining the load status of the refrigeration load circuit during compressor operation, thus better reflecting the air conditioner controller's operation under actual compressor load conditions.
[0033] S6: After the test is completed, control the compressor motor to stop, restore the test status of the high-voltage DC input and the air conditioner controller, and output the test results.
[0034] The process involves several steps: Shutting down the compressor refers to stopping the air conditioner controller from outputting drive signals to the compressor motor, thus halting its operation. Restoring the high-voltage DC input may involve disconnecting the high-voltage DC input or removing the high-voltage DC power supply unit from the test output state. Restoring the test state of the air conditioner controller may involve restoring the motor test parameters written during the test, restoring the communication state, or restoring the temporary test mode. In practice, after the compressor's actual load test is completed, the test control unit first stops the compressor motor, then stops the high-voltage DC power supply unit from outputting or disconnects the high-voltage connection, and restores the test-related states in the air conditioner controller. Finally, it outputs the low-pressure side test results, the high-pressure side test results, and the compressor's actual load test results. Through these steps, the test process forms a complete closed loop from wiring, low-voltage testing, high-voltage testing, compressor actual load operation to test result output.
[0035] This embodiment connects the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit, and the compressor drive circuit, and establishes an operable connection between the compressor motor and the refrigeration load circuit, enabling the air conditioner controller to be tested under actual compressor load conditions. By sequentially obtaining the low-pressure side test results, the high-pressure side test results, and the actual compressor load test results, the test results can simultaneously reflect the electrical operating status of the controller side and the load operating status of the refrigeration load circuit, thus improving the correlation between the test results and the actual operating conditions with the compressor.
[0036] This embodiment describes the specific connection method of the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit, and the compressor drive circuit, mainly including the following steps: For testing scenarios suitable for R&D debugging, bench verification, temporary testing, or where rapid batch mounting is not required, test connections can be achieved using wire harnesses, connectors, terminal blocks, plug-in components, or other methods that enable electrical and conduit connections. For example... Figure 2 As shown, the specific method is as follows: S11: Connect the low-voltage interface of the air conditioner controller to the low-voltage power supply circuit so that the air conditioner controller can communicate and provide status feedback under low-voltage power supply conditions.
[0037] The low-voltage interface is used by the air conditioner controller to receive low-voltage power and exchange low-voltage signals. The low-voltage power supply circuit is the power supply path that provides low-voltage DC power to the air conditioner controller. Communication and status feedback refer to the air conditioner controller's ability to send communication messages, low-voltage information, software version information, input port status information, temperature information, and other test-related data to external test equipment via CAN communication, LIN communication, or other communication methods after low-voltage power supply. In practice, the positive and negative terminals of the low-voltage DC power supply can be connected to the low-voltage power supply terminal of the air conditioner controller, and the communication harness can be connected to the communication port of the air conditioner controller, enabling the air conditioner controller to establish a communication connection with the external test equipment after power-on. This step establishes the basic power supply and communication conditions for the air conditioner controller, providing a connection basis for subsequent acquisition of the low-voltage side response status.
[0038] S12: Connect the high-voltage interface of the air conditioner controller to the high-voltage DC power supply circuit so that the air conditioner controller can receive high-voltage DC input.
[0039] The high-voltage interface is used by the air conditioner controller to receive high-voltage DC input, and the high-voltage DC power supply circuit is the power supply path that provides high-voltage DC power to the air conditioner controller. The high-voltage DC input provides the high-voltage bus conditions for the air conditioner controller to subsequently drive the compressor motor. In practice, the positive and negative terminals of the high-voltage DC power supply unit can be connected to the high-voltage interface of the air conditioner controller via a high-voltage wiring harness, connector, or terminal, enabling the air conditioner controller to enter the high-voltage side testing state after completing the low-voltage side test. Through this step, the air conditioner controller is no longer limited to low-voltage operation but can perform high-voltage sampling, response detection, and subsequent compressor drive testing under high-voltage DC input conditions.
[0040] S13: Connect the UVW three-phase output terminals of the air conditioner controller to the compressor drive circuit, so that the air conditioner controller can output a three-phase drive signal to the compressor motor.
[0041] The U, V, and W phase output terminals are the ports where the air conditioner controller outputs three-phase drive signals to the compressor motor. The compressor drive circuit is the electrical connection path for transmitting these three-phase drive signals to the compressor motor. The three-phase drive signals are generated and output by the air conditioner controller according to the compressor's operating control requirements, used to drive the compressor motor to start, accelerate, stabilize, or enter the target speed operating phase. In practice, the U, V, and W phase output terminals of the air conditioner controller can be connected to the corresponding terminals of the compressor motor via three-phase power lines, enabling the drive signals output by the air conditioner controller to be transmitted to the compressor motor. Through this step, a drive connection is established between the air conditioner controller and the compressor motor, allowing the compressor motor to be actually driven under high-voltage DC input conditions.
[0042] S14: Connect the compressor corresponding to the compressor motor to the refrigeration load circuit so that the compressor motor can drive the refrigerant to circulate in the refrigeration load circuit when it is running.
[0043] In this context, the compressor motor refers to the compressor driven by that motor. The refrigeration load circuit is the circuit through which the refrigerant circulates during compressor operation, and it may include the compressor, condenser, expansion valve, evaporator, and corresponding connecting pipes. Specifically, the high-pressure discharge side of the compressor, the condenser, expansion valve, evaporator, and the low-pressure suction side of the compressor can be connected to form a circulation path. When the compressor motor is driven by the air conditioning controller, the compressor can push the refrigerant to flow in this circulation path, forming a refrigeration cycle load corresponding to the compressor's operating state. Through this step, the compressor motor is not operating under no-load conditions, but rather drives the compressor to form an actual circulating load in the refrigeration load circuit, thus providing the conditions for subsequently obtaining the load operating state of the refrigeration load circuit and determining the actual load test results of the compressor.
[0044] This embodiment connects the low-pressure interface, high-pressure interface, and UVW three-phase output terminals of the air conditioner controller separately, and connects the compressor to the refrigeration load circuit. This allows the air conditioner controller to be tested under conditions where low-pressure power supply, high-pressure DC input, three-phase drive output, and refrigeration cycle load coexist. This connection method does not require the use of test fixtures, improving the flexibility of the method implementation. Simultaneously, since the compressor motor and refrigeration load circuit form an operational connection, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit can be collected during subsequent testing, thus providing a basis for forming actual load test results for the compressor.
[0045] For test scenarios that require quick and accurate connection positioning, test fixtures can be used to assist in the connection.
[0046] S101: Install the air conditioner controller in the test fixture, and make the connection component of the test fixture correspond to the interface position of the air conditioner controller.
[0047] The test fixture can be understood as auxiliary equipment used to position, fix, and electrically connect the air conditioner controller during testing. It may include test clamps, positioning structures, pressing structures, wiring harnesses, and connecting components. The connecting components are the parts in the test fixture used to interface with the air conditioner controller, and can employ connectors, probes, plug-in terminals, crimp terminals, or other electrical connection structures. In practice, the air conditioner controller is placed within the positioning area of the test fixture, aligning its low-voltage interface, high-voltage interface, and UVW three-phase output terminals with their corresponding connection positions in the connecting components. Then, the connecting components are reliably connected to the air conditioner controller's interface through pressing, plugging, or locking. This reduces wiring errors and inconsistencies that may occur when manually connecting each wire harness individually.
[0048] S102: The air conditioner controller is connected to the low-voltage interface of the air conditioner controller through the signal connection part in the connection component, so that the air conditioner controller is connected to the low-voltage power supply circuit and the low-voltage communication circuit.
[0049] The signal connection section is the part of the connection assembly used to transmit low-voltage power signals and low-voltage communication signals. It may include low-voltage power supply terminals, CAN communication terminals, LIN communication terminals, or other low-voltage signal terminals. In specific implementations, after the signal connection section makes contact with the low-voltage interface of the air conditioner controller, the low-voltage power supply unit can provide low-voltage power to the air conditioner controller through this connection section, and the communication acquisition unit can also communicate with the air conditioner controller through this connection section. Through this connection, the air conditioner controller can power on under low-voltage power supply conditions and feed back communication messages, low-voltage voltage, software version, initial input port status, and initial temperature information to the test equipment.
[0050] S103: Connect the air conditioner controller to the high-voltage interface through the power connection part in the connection assembly, so that the air conditioner controller is connected to the high-voltage DC power supply circuit.
[0051] The power connection section is the part of the connection assembly used to transmit high-voltage DC input, and it needs to be reliably connected to the high-voltage interface of the air conditioner controller. In practice, the high-voltage DC power supply unit provides high-voltage DC input to the high-voltage interface of the air conditioner controller through the power connection section, putting the air conditioner controller into high-voltage side test conditions. Through this connection, the high-voltage information collected by the air conditioner controller under high-voltage DC input conditions can be read and compared with the output state of the high-voltage DC power supply unit to form the high-voltage side test results.
[0052] S104: Connect the air conditioner controller to the UVW three-phase output terminal through the power connection part to establish a connection between the air conditioner controller and the compressor drive circuit.
[0053] The UVW three-phase output terminal serves as the interface for the air conditioner controller to output three-phase drive signals to the compressor motor, and the compressor drive circuit is the path for transmitting these three-phase drive signals to the compressor motor. In a specific implementation, the power connection section may also include three-phase connection terminals corresponding to the UVW three-phase output terminal, through which the air conditioner controller and the compressor motor are connected. When the air conditioner controller generates a compressor drive signal, this drive signal can be transmitted to the compressor motor via the UVW three-phase output terminal and the compressor drive circuit, causing the compressor motor to run.
[0054] S105: Connect the compressor corresponding to the compressor motor to the refrigeration load circuit so that the compressor motor can drive the refrigerant to circulate in the refrigeration load circuit when it is running.
[0055] In this context, the compressor motor refers to the compressor driven by that motor, and the refrigeration load circuit is the circuit that supplies refrigerant circulation during compressor operation. In practice, the compressor is connected to the refrigeration load circuit, which includes the condenser, expansion valve, and evaporator, enabling the compressor motor to drive the compressor to compress and deliver refrigerant. Through this connection, when the air conditioning controller drives the compressor motor, the compressor is not in an unloaded state, but rather corresponds to the actual refrigeration cycle load, resulting in a stronger correlation between the actual compressor load test results and the operating conditions.
[0056] In this embodiment, step S14: connecting the compressor corresponding to the compressor motor to the refrigeration load circuit, so that the compressor motor can drive the refrigerant to circulate in the refrigeration load circuit during operation, includes: S141: Connect the high-pressure exhaust port of the compressor to the condenser.
[0057] The high-pressure exhaust port is the outlet of the compressor where the compressed, high-temperature, high-pressure refrigerant is discharged. The condenser is a component used for heat exchange and condensation of this high-temperature, high-pressure refrigerant. In practice, the compressor's high-pressure exhaust port is connected to the condenser inlet via a pipeline, allowing the high-pressure refrigerant output from the compressor to enter the condenser.
[0058] S142: Connect the condenser to the evaporator via an expansion valve.
[0059] The expansion valve is used to throttle and reduce the pressure of the condensed refrigerant, while the evaporator is used to allow the throttled refrigerant to absorb heat and evaporate. In practice, the condenser outlet is connected to the expansion valve via a pipeline, and the expansion valve outlet is then connected to the evaporator inlet, allowing the refrigerant to enter the throttling and evaporation process after condensation.
[0060] S143: Connect the evaporator to the low-pressure suction port of the compressor.
[0061] The low-pressure suction port is the inlet for the compressor to draw in the low-pressure refrigerant returning from the evaporator. In practice, the evaporator outlet is connected to the compressor's low-pressure suction port via a pipeline, allowing the evaporated low-pressure refrigerant to return to the compressor, thus forming a circulation path.
[0062] S144: When the compressor motor is running, the refrigerant undergoes compression, condensation, throttling and evaporation processes in sequence to form a cyclic load of the refrigeration load circuit.
[0063] In practice, after the compressor motor starts running, it drives the compressor to work. The refrigerant enters the compressor from the low-pressure suction port, is compressed, and is discharged from the high-pressure discharge port. It then enters the condenser for condensation, passes through the expansion valve for throttling, and enters the evaporator for evaporation. Finally, it returns to the low-pressure suction port of the compressor. Through the above cycle, the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor, enabling the air conditioning controller's drive test to be performed under refrigerant cyclic load conditions.
[0064] like Figure 3 As shown, in this embodiment, step S2: under low-voltage power supply conditions, acquiring the low-voltage side response state of the air conditioner controller, and obtaining the low-voltage side test results based on the low-voltage side response state, includes: S21: Under low-voltage power supply conditions, read the communication messages sent by the air conditioner controller and obtain the communication test results based on the communication messages.
[0065] The communication message is the data content sent or responded to by the air conditioner controller on the communication bus, which may include message ID, status field, or other controller feedback information. In specific implementation, after the low-voltage power supply unit supplies power to the air conditioner controller, the communication acquisition unit reads the communication messages sent by the air conditioner controller through CAN communication, LIN communication, or other communication methods, and determines whether it can be read normally, whether the message format meets the preset requirements, and whether the message ID is consistent with the target controller, thereby obtaining the communication test results.
[0066] S22: Read the low-voltage information of the air conditioner controller and obtain the low-voltage power supply test result based on the low-voltage information.
[0067] The low-voltage information can be the low-voltage supply voltage value collected or fed back by the air conditioner controller. In practice, the testing equipment reads the low-voltage information fed back by the air conditioner controller and compares it with the output status of the low-voltage supply unit or a preset low-voltage range. If the low-voltage information matches the preset requirements, the corresponding low-voltage supply test result can be obtained.
[0068] S23: Read the software version information of the air conditioner controller and obtain the version test results based on the software version information.
[0069] The software version information refers to the version identifier of the internal control program or software configuration of the air conditioner controller. In practice, the testing equipment can send a version read command to the air conditioner controller through the communication acquisition unit, or read the version field in the external message of the air conditioner controller, and compare the read software version information with the target version information to obtain the version test result.
[0070] S24: Read the initial input port status information and initial temperature information of the air conditioner controller, and obtain the initial state test result based on the initial input port status information and the initial temperature information.
[0071] The initial input port status information refers to the input port status read before the compressor starts running, such as the initial status of fault detection ports, switch ports, or sensor ports; the initial temperature information refers to the temperature data of the air conditioning controller before the compressor motor starts running. In practice, the test equipment can read the initial input port status and initial temperature fed back by the air conditioning controller under low-voltage power supply conditions, use them as the low-voltage side baseline status, and provide temperature rise reference data for subsequent temperature rise testing.
[0072] S25: Generate the low-voltage side test result based on one or more of the communication test result, the low-voltage power supply test result, the version test result, and the initial state test result.
[0073] In practice, the test control unit can summarize the above-mentioned multiple test items to form the low-pressure side test results. These results may include whether each item meets preset requirements, or they may include the read values, comparison results, or recorded information for each item. In this way, the low-pressure side test results can comprehensively reflect the basic response status of the air conditioning controller under low-pressure power supply conditions.
[0074] In this embodiment, step S2: obtaining the low-voltage side response status of the air conditioner controller under low-voltage power supply conditions, and obtaining the low-voltage side test results based on the low-voltage side response status includes: S26: Input a preset level signal to at least one of the fault detection port, switch port and sensor port of the air conditioner controller.
[0075] The preset level signal can be a high-level signal or a low-level signal, used to simulate external fault conditions, switch conditions, or sensor conditions. In practice, the low-voltage analog circuit or external signal simulation unit in the test fixture can apply the preset level signal to the corresponding port of the air conditioner controller, causing the air conditioner controller to enter the corresponding input recognition state.
[0076] S27: Read the reporting information generated by the air conditioner controller based on the preset level signal.
[0077] The reported information is the port status information fed back by the air conditioner controller through communication messages after recognizing a preset level signal. In specific implementation, the communication acquisition unit reads the reported information generated by the air conditioner controller based on the preset level signal to obtain the air conditioner controller's recognition result of the analog input.
[0078] S28: Compare the reported information with the corresponding target message to obtain the input port simulation test results of the corresponding port.
[0079] The target message is the expected feedback message corresponding to the preset level signal. In practice, if the test equipment inputs a preset level signal to the fault detection port, the target message should reflect the corresponding state of that fault detection port; if the test equipment inputs a preset level signal to a switch port or sensor port, the target message should reflect the corresponding switch state or sensor state. By comparing the reported information with the target message, the test result of whether the port can correctly identify the analog input and provide feedback can be obtained.
[0080] S29: The simulation test results of the input port are used as part of the low-voltage side test results.
[0081] This step ensures that the low-voltage side test results include not only basic information such as communication, low-voltage, software version, and initial state, but also the response results of fault detection ports, switch ports, and sensor ports to analog input signals, thus making the low-voltage side test content more complete.
[0082] like Figure 4 As shown, in this embodiment, step S3: after completing the low-voltage side test, applying a high-voltage DC input to the air conditioner controller, and obtaining the high-voltage side test result based on the air conditioner controller's response to the high-voltage DC input, includes: S31: After completing the low-voltage side test, connect the high-voltage DC input to the air conditioning controller.
[0083] The high-voltage DC input is provided by the high-voltage DC power supply unit and connected to the high-voltage interface of the air conditioner controller through the power connection part of the test fixture. In practice, after the low-voltage side test is completed, the test control unit controls the high-voltage DC power supply unit to output the high-voltage DC input, so that the air conditioner controller enters the high-voltage side test state.
[0084] S32: Read the high voltage information collected by the air conditioner controller under high voltage DC input conditions.
[0085] Among them, the high-voltage information is the voltage information obtained by the air conditioner controller itself after sampling the high-voltage DC input, which can reflect the sampling or feedback status of the high-voltage side of the air conditioner controller. In specific implementation, the communication acquisition unit can read the high-voltage information fed back by the air conditioner controller.
[0086] S33: Obtain the output status of the high voltage DC input.
[0087] The output status of the high-voltage DC input can be the actual voltage value output by the high-voltage DC power supply unit, the output enable status, or other information that can characterize the high-voltage DC input status. In practice, the test control unit can directly read the output status of the high-voltage DC power supply unit, or obtain the output status through the high-voltage sampling and detection unit.
[0088] S34: Obtain the high-voltage sampling test results based on the correspondence between the high-voltage information and the output state of the high-voltage DC input.
[0089] In practice, if the high-voltage information collected by the air conditioner controller matches the output status of the high-voltage DC power supply unit, it indicates that the air conditioner controller's sampling or feedback of the high-voltage DC input meets the test requirements; if the two deviate significantly, a corresponding high-voltage sampling anomaly result can be generated. Through this comparison, the high-voltage sampling test result can be obtained.
[0090] S35: The high-voltage sampling test results are used as part of the high-voltage side test results.
[0091] Therefore, the high-voltage side test results can reflect the response status of the air conditioning controller under high-voltage DC input conditions, providing a test basis for subsequent compressor drive operation.
[0092] like Figure 5 As shown, in this embodiment, step S4: during the high-pressure side test, controlling the air conditioning controller to drive the compressor motor to run, so that the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor, includes: S41: Write the motor test parameters corresponding to the compressor motor to the air conditioner controller.
[0093] Among them, motor test parameters refer to the parameters used to enable the air conditioning controller to drive the compressor motor according to test requirements. These parameters may include compressor motor type, target speed, operating stage, startup parameters, or other parameters related to compressor testing. In practice, the test control unit can write the motor test parameters to the air conditioning controller through the communication acquisition unit, causing the air conditioning controller to enter the corresponding compressor motor test control state.
[0094] S42: Based on the motor test parameters, control the air conditioner controller to generate a compressor drive signal.
[0095] The compressor drive signal is a three-phase drive output signal generated by the air conditioning controller based on motor test parameters, used to drive the compressor motor. In specific implementation, the air conditioning controller performs drive control calculations based on the written motor test parameters and generates a compressor drive signal corresponding to the target operating state.
[0096] S43: Output the compressor drive signal to the compressor motor through the UVW three-phase output terminal of the air conditioner controller.
[0097] The UVW three-phase output terminal is the port through which the air conditioner controller outputs three-phase drive signals to the compressor motor. In practice, the power connection part of the test fixture connects the UVW three-phase output terminal to the compressor motor, enabling the compressor drive signal to be output to the compressor motor.
[0098] S44: The compressor is driven by the compressor motor to run, so that the refrigerant in the refrigeration load circuit circulates.
[0099] In practice, after receiving the compressor drive signal, the compressor motor drives the compressor to run. The compressor compresses the refrigerant and pushes the refrigerant to circulate in the refrigeration load circuit.
[0100] S45: Based on the operating state of the compressor motor, the refrigeration load circuit is configured to form a corresponding cyclic load.
[0101] The operating status of the compressor motor can include speed, start-up status, or continuous operation status. Different operating statuses will create different cyclic load states in the refrigeration load circuit. Through this step, a correspondence is established between the drive output of the air conditioner controller and the actual load changes in the refrigeration load circuit, so that the subsequent compressor load test results can reflect the load operation status.
[0102] In this embodiment, step S5: During the operation of the compressor motor, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit are obtained according to a preset operating strategy, and the actual load test result of the compressor is determined based on the electrical operating status and the load operating status, including: S51: Control the compressor motor to sequentially enter multiple target speed operation stages according to the preset operation strategy.
[0103] The preset operating strategy is a pre-defined sequence of compressor motor operation and test phases. Multiple target speed operating phases can include different speed stages such as 1000 rpm, 2000 rpm, 3000 rpm, 4000 rpm, 5000 rpm, and 6000 rpm. In practice, the test control unit sends speed control commands to the air conditioning controller, causing the compressor motor to sequentially enter each target speed operating phase according to the preset order.
[0104] S52: During each target speed operation phase, obtain the electrical operating status of the air conditioning controller.
[0105] The electrical operating status may include one or more of the following: actual speed, output current, and controller temperature. In specific implementation, during each target speed operation phase, the communication acquisition unit reads information such as the actual speed, output current, or controller temperature fed back by the air conditioning controller to obtain the controller-side operating status under that speed phase.
[0106] S53: At each target speed operating stage, obtain the load operating status of the cooling load circuit.
[0107] The load operating status may include compressor discharge side pressure, compressor suction side pressure, or other information that reflects the refrigerant cycle load status. In specific implementations, the load status acquisition unit can be connected to the detection location of the refrigeration load circuit to acquire the corresponding load operating status when the compressor motor is at different target speed stages.
[0108] S54: Based on the electrical operating state and the load operating state under the same target speed operating stage, obtain the stage test results corresponding to the target speed operating stage.
[0109] In practice, the test control unit processes the electrical operating status and load operating status collected during the same target speed operation phase to obtain the phase test results. For example, during a certain target speed phase, the actual speed, output current, controller temperature, and pressure status of the cooling load circuit can be recorded to form a set of test data for that phase.
[0110] S55: Determine the actual load test result of the compressor based on the stage test results corresponding to multiple target speed operation stages.
[0111] In practice, the test control unit summarizes the stage test results corresponding to each target speed operating phase to obtain the compressor's actual load test results. This result can reflect the electrical operating status and corresponding cooling load status of the air conditioning controller under multiple compressor operating phases, avoiding the judgment of the air conditioning controller's load operation based solely on a single speed or a single instantaneous data point.
[0112] In this embodiment, step S5: during the operation of the compressor motor, acquiring the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit according to a preset operating strategy, and determining the compressor actual load test result based on the electrical operating status and the load operating status includes: S56: Before the compressor motor starts running, determine the temperature rise reference temperature based on the initial temperature read during the low-pressure side test process.
[0113] The temperature rise reference temperature refers to the temperature baseline of the air conditioning controller before the compressor motor starts running. In practice, the initial temperature read during the low-pressure side test can be used as the temperature rise reference temperature for subsequent calculations of temperature changes after the compressor starts running.
[0114] S57: After the compressor motor enters the target speed operation stage of 6000 rpm, control the compressor motor to run continuously at 6000 rpm for 2 minutes.
[0115] The 6000 rpm target speed operating phase, which is maintained for 2 minutes, is used to ensure that the air conditioning controller operates at a relatively high compressor speed under actual load conditions for a certain period of time. In practice, the test control unit controls the air conditioning controller to drive the compressor motor into the 6000 rpm operating phase and maintains this operating state for 2 minutes.
[0116] S58: After running continuously for 2 minutes, read the operating temperature of the air conditioning controller.
[0117] The "post-operation temperature" refers to the temperature information of the air conditioner controller after the compressor motor has been running continuously at 6000 rpm for 2 minutes. In practice, the communication acquisition unit reads the post-operation temperature fed back by the air conditioner controller.
[0118] S59: Obtain the temperature rise of the air conditioning controller after operation based on the difference between the temperature after operation and the temperature rise reference temperature.
[0119] In practice, the temperature rise data of the air conditioning controller after the compressor operates under actual load can be obtained by subtracting the temperature rise reference temperature from the operating temperature.
[0120] S510: Obtain the temperature rise test result based on the temperature rise after operation, and use the temperature rise test result as part of the compressor actual load test result.
[0121] This step allows the temperature change of the air conditioner controller after high-speed, real-load operation to be incorporated into the compressor's real-load test results, so that the compressor's real-load test results include not only the electrical operating status and load operating status, but also the temperature rise performance after continuous operation.
[0122] Compared with existing technologies that generally use resistance / inductance to simulate load or no-load operation, this embodiment forms a complete refrigerant circulation loop (i.e., a real load loop) by sequentially connecting the high-pressure exhaust port, condenser, expansion valve, evaporator and low-pressure suction port of the compressor. This means that the air conditioning controller does not bear a simple electrical impedance load during the test, but a full dynamic thermodynamic load that can truly reflect the refrigerant compression process, condensation heat release process, throttling and pressure reduction process and evaporation heat absorption process.
[0123] The shaft power consumed by the compressor under real load is directly related to the actual exhaust / intake pressure, while the resistive / inductive simulated load can only reflect fixed impedance characteristics. This invention enables the electrical operating states of the air conditioning controller, such as output current and power factor, to dynamically change with the pressure fluctuations of the refrigeration load circuit, and the test results closely match the actual operating data of the vehicle air conditioning system. Under real refrigerant cycle load, the heat generated by the continuous operation of the compressor and the heat dissipation effect of the refrigeration system will have a real impact on the power module of the air conditioner controller and the ambient temperature. The temperature rise test conducted in this invention at 6000 rpm for 2 minutes is based on the actual thermodynamic cycle. However, the temperature rise characteristics of the resistive / inductive simulated load differ from those of the real operating conditions by orders of magnitude because it cannot generate actual heat exchange and pressure-enthalpy changes. This invention establishes a real physical coupling relationship between electrical operating conditions (current, speed) and load operating conditions (exhaust / intake pressure), thereby enabling the determination of electrical and load correlation under the same target speed stage. This is a technical effect that cannot be achieved by existing single simulated load or no-load test methods.
[0124] In this embodiment, S5 further includes: when the compressor motor is running stably at the target speed and the refrigeration load circuit is in the first load state, changing the refrigeration load circuit from the first load state to the second load state.
[0125] The target speed is the compressor motor speed setting value corresponding to the current dynamic load test. For the compressor motor to operate stably at the target speed, the actual speed of the compressor motor must enter the allowable speed range corresponding to the target speed and remain within a preset stabilization time. Specifically, the test control unit sends the motor test parameters corresponding to the target speed to the air conditioning controller and reads the actual speed fed back by the air conditioning controller; when the continuously acquired actual speeds are all within the allowable speed range, it is determined that the compressor motor is operating stably at the target speed.
[0126] The first load state and the second load state are two different load operating states corresponding to the refrigeration load circuit, which can be determined based on at least one of the compressor suction side pressure, discharge side pressure, and suction-discharge pressure difference. In specific implementation, the load parameter ranges corresponding to the first load state and the second load state can be preset respectively. When the load operating parameters acquired by the load state acquisition unit enter the corresponding load parameter range, it is determined that the refrigeration load circuit is in the corresponding load state.
[0127] In practice, after the compressor motor operates stably at the target speed and the refrigeration load circuit is in the first load state, the test control unit controls the load adjustment component of the refrigeration load circuit to change its operating state, causing the refrigeration load circuit to change from the first load state to the second load state. The load adjustment component may include a flow regulation component for changing the refrigerant flow state and / or a heat exchange regulation component for changing the heat exchange state of the refrigeration load circuit; for example, the load operating state of the refrigeration load circuit can be changed by adjusting the opening of the expansion valve and / or the heat exchange state of the condensing side and the evaporating side.
[0128] During the process of the cooling load circuit changing from the first load state to the second load state, the actual speed of the compressor motor and the output current of the air conditioner controller are obtained.
[0129] In practice, starting from the moment the refrigeration load circuit begins to change from the first load state, the communication acquisition unit continuously reads the actual speed and output current fed back by the air conditioner controller according to the preset sampling period until the refrigeration load circuit enters the second load state and the actual speed and output current enter the corresponding stable state, thereby forming the actual speed data sequence and output current data sequence corresponding to the load change process.
[0130] The speed response characteristics are determined based on the change in the actual speed relative to the target speed, and the drive response characteristics are determined based on the change in the output current during load changes.
[0131] The speed response characteristics are used to record the change in actual speed during load changes. These characteristics may include at least one of the following: the maximum speed deviation of the actual speed relative to the target speed, the magnitude of speed change, and the speed recovery time required for the actual speed to recover to the allowable range corresponding to the target speed. In practice, the test control unit calculates the difference between the actual speed and the target speed at each sampling moment and determines the maximum speed deviation based on multiple differences. It can also determine the speed recovery time based on the moment when the actual speed re-enters and remains within the allowable speed range.
[0132] The drive response characteristics are used to record the change in the output current of the air conditioner controller during load changes, and may include at least one of the following: output current change amplitude, peak output current, and time required for the output current to return to stability. In specific implementation, the test control unit determines the output current change amplitude based on the stable output current before the load change and the output current during the load change, determines the peak output current based on the sampled output current data, and determines the time required for the output current to return to stability based on the moment the output current enters the stable current range corresponding to the second load state.
[0133] Based on the speed response characteristics and the drive response characteristics, the dynamic load test results of the air conditioning controller are obtained.
[0134] In practice, the test control unit records the speed response characteristics and drive response characteristics corresponding to the same load change process, and compares them with the corresponding preset allowable ranges to determine whether each response characteristic meets the test requirements. Based on the comparison results of each response characteristic, a dynamic load test result is formed, and the dynamic load test result is used as part of the compressor's actual load test result.
[0135] In this embodiment, based on the dynamic load test, the next target load state is determined according to the dynamic response of the air conditioning controller under the current target load state.
[0136] The current target load state refers to the termination state of the load change corresponding to the current dynamic load test, and can be characterized by at least one of the following: intake side pressure, exhaust side pressure, and intake-exhaust pressure difference. In practice, multiple candidate target load states can be established in advance according to the load level, and each candidate target load state corresponds to a different range of load operating parameters.
[0137] While the compressor motor is running at the target speed, the refrigeration load circuit is changed from the first load state to the current target load state, and the current dynamic response characteristics are determined based on the speed response characteristics and drive response characteristics obtained during the load change process.
[0138] The current dynamic response characteristics are a set of response data formed by the speed response characteristics and drive response characteristics corresponding to the same load change process. In specific implementation, one or more of the following can be recorded according to the current target load state to form the current dynamic response characteristics: maximum speed deviation, speed recovery time, output current change amplitude, peak output current, and time required for output current to stabilize.
[0139] The next target load state is determined based on the difference between the current dynamic response characteristics and the preset boundary response conditions.
[0140] The preset boundary response condition is a response condition used to determine whether the air conditioning controller has reached the dynamic load capacity boundary, and can be set according to the speed response characteristics and / or drive response characteristics. For example, the preset boundary response condition may include at least one of the following: the maximum speed deviation reaches the corresponding boundary allowable value, the speed recovery time reaches the corresponding boundary allowable value, and the peak output current reaches the corresponding boundary allowable value.
[0141] In practice, the test control unit compares the current dynamic response characteristics with preset boundary response conditions. When the current dynamic response characteristics do not yet meet the preset boundary response conditions, the next target load state is determined based on the response difference between the current dynamic response characteristics and the preset boundary response conditions. The response difference can be determined based on the difference or proportion between the current speed response characteristics and / or drive response characteristics and the corresponding boundary allowable value.
[0142] In one implementation, a correspondence between response differences and load adjustment amounts can be pre-established. When the response difference is large, a larger load adjustment amount is determined; when the response difference decreases, a smaller load adjustment amount is determined. The next target load state is obtained based on the current target load state and the determined load adjustment amount. Alternatively, from a set of pre-set candidate target load states, the next candidate target load state that is higher than the current target load state can be selected according to the load level.
[0143] If the current dynamic response characteristics do not meet the preset boundary response conditions, the cooling load circuit is reset to the first load state.
[0144] In practice, the test control unit adjusts the load adjustment component of the cooling load circuit and continuously acquires the load operating status through the load status acquisition unit; when the acquired load operating parameters re-enter the allowable range corresponding to the first load status, the first load status is determined to be re-established.
[0145] Subsequently, maintaining the same target speed as the previous test, the cooling load circuit is changed from the newly established first load state to the next target load state. The corresponding actual speed and output current are then acquired to determine the next dynamic response characteristics.
[0146] Based on the difference between the next dynamic response characteristics and the preset boundary response conditions, the subsequent target load state is determined, and the first load state is established, load changes are performed, and dynamic response characteristics are obtained repeatedly.
[0147] In practice, after each dynamic load test is completed, the test control unit determines whether the obtained dynamic response characteristics meet the preset boundary response conditions. If not, the target load state is determined based on the dynamic response characteristics and the next dynamic load test is executed. If it meets the conditions, the target load state is stopped from being increased further.
[0148] The test control unit records the target load state and corresponding dynamic response characteristics according to the execution order of each test. When the dynamic response characteristic corresponding to a certain target load state meets the preset boundary response condition, and the dynamic response characteristics corresponding to all previous target load states do not meet the preset boundary response condition, the target load state is determined as the target load state corresponding to the first time the dynamic response characteristic meets the preset boundary response condition, and the dynamic load capacity boundary of the air conditioning controller is determined based on the target load state.
[0149] The dynamic load capacity boundary is: the cooling load state or the load parameters corresponding to the first time the dynamic response characteristics reach the preset boundary response conditions.
[0150] In this embodiment, the current load state of the cooling load circuit is obtained before the cooling load circuit changes from the first load state to the second load state.
[0151] The current load status refers to the actual load operating state of the refrigeration load circuit before this dynamic load response test, and can be determined based on at least one of the compressor suction side pressure, discharge side pressure, and suction-discharge pressure difference. In specific implementation, the load status acquisition unit acquires the pressure data of the compressor suction side and discharge side respectively, and the test control unit determines the current load status based on the pressure data.
[0152] Adjust the cooling load circuit according to the deviation between the current load state and the first load state, and update the current load state during the adjustment process until the current load state enters the allowable range corresponding to the first load state.
[0153] The allowable range corresponding to the first load state is one or more allowable intervals of load parameters corresponding to the first load state. In specific implementation, the test control unit compares the deviation between the current intake pressure, exhaust pressure and / or intake-exhaust pressure difference and the parameter range corresponding to the first load state, and adjusts the load adjustment parameters according to the deviation.
[0154] The load adjustment parameters may include at least one of the following: expansion valve opening, refrigerant flow rate adjustment parameters, condenser-side heat exchange adjustment parameters, and evaporator-side heat exchange adjustment parameters. After adjustment, the current load state is obtained again; if it still does not enter the allowable range corresponding to the first load state, adjustment continues based on the updated deviation until it enters the corresponding allowable range.
[0155] The second load state is determined based on the preset load change characteristics.
[0156] The preset load change feature is used to define the load change process from the first load state to the second load state, and may include at least one of the target load change direction, target load change amount, target load change rate, and target load change duration.
[0157] In practice, the load parameters corresponding to the second load state can be determined based on the load parameters corresponding to the first load state and the preset load change. For example, when using the intake and exhaust pressure difference to characterize the load state, the range of intake and exhaust pressure difference corresponding to the second load state can be determined based on the intake and exhaust pressure difference corresponding to the first load state and the preset pressure difference change.
[0158] The control cooling load circuit changes from the first load state to the second load state according to the preset load change characteristics.
[0159] In practice, the test control unit determines the control parameters of the load adjustment component based on the preset load change characteristics, and controls the load adjustment component to change its operating state, so that the load operating parameters change from the first load state to the second load state according to the corresponding change direction and process.
[0160] Obtain the actual load change characteristics of the cooling load circuit during the transition from the first load state to the second load state.
[0161] In practice, the load status acquisition unit continuously acquires the intake side pressure, exhaust side pressure and / or intake and exhaust pressure difference according to a preset sampling period. The test control unit determines at least one of the following based on the continuously acquired load operating parameters: actual load change direction, actual load change amount, actual load change rate and actual load change time, thus forming actual load change characteristics.
[0162] Dynamic load test results are obtained based on actual load change characteristics, speed response characteristics, and drive response characteristics.
[0163] In practice, the test control unit records the actual load change characteristics, speed response characteristics, and drive response characteristics corresponding to the same load change process, and compares the actual load change characteristics with preset load change characteristics. If the actual load change characteristics meet the preset load change requirements, a dynamic load test result is generated based on the speed response characteristics and drive response characteristics corresponding to that test. This embodiment first confirms that the actually applied load change meets the preset load change requirements, and then uses the corresponding controller response data to form the test result.
[0164] In this embodiment, when the controller temperature of the air conditioner controller is in the first temperature state, the cooling load circuit is controlled to change from the first load state to the second load state according to the preset load change characteristics, and the corresponding first dynamic response characteristics are obtained.
[0165] The first temperature state is the controller temperature state used to establish a dynamic response comparison benchmark. In specific implementation, multiple controller temperatures can be continuously acquired according to a preset sampling period before the compressor motor enters actual load operation. When the change between the multiple controller temperatures meets the preset temperature stability condition, the initial temperature is determined based on the multiple controller temperatures. The first temperature range is determined based on the initial temperature and the preset temperature allowable deviation, and the state in which the controller temperature is within the first temperature range is determined as the first temperature state.
[0166] Under the first temperature condition, a first load condition is established first, and then the cooling load circuit is changed to a second load condition according to the preset load change characteristics. The actual load change characteristics, output current and actual speed corresponding to the load change process are obtained.
[0167] When the actual load change characteristics meet the preset load change requirements, the first output current response characteristic is determined based on the output current, and the first actual speed response characteristic is determined based on the actual speed. The two are then combined to form the first dynamic response characteristic.
[0168] The air conditioning controller drives the compressor motor to run continuously, so that the controller temperature of the air conditioning controller increases relative to the first temperature state.
[0169] In practice, the test control unit reads the controller temperature fed back by the air conditioner controller according to a preset sampling period during continuous operation, and determines the temperature change status of the controller based on the obtained controller temperature.
[0170] Among them, the candidate temperature state is the temperature state used for dynamic load response testing during the controller temperature rise process after the first temperature state. Multiple candidate temperature states can be set sequentially according to the direction of temperature rise, and each candidate temperature state can correspond to a candidate temperature range.
[0171] When the controller temperature enters the candidate temperature range corresponding to a candidate temperature state, the first load state is re-established.
[0172] In practice, the current load state is acquired and the cooling load circuit is adjusted until the current load state enters the allowable range corresponding to the first load state. Subsequently, while the controller temperature is still within the temperature range corresponding to the current candidate temperature state, the cooling load circuit is changed from the first load state to the second load state according to the same preset load change characteristics as in the first temperature state.
[0173] During the load change process, the output current and actual speed are obtained using the same sampling method as under the first temperature state, and the candidate dynamic response characteristics corresponding to the current candidate temperature state are determined.
[0174] For the remaining candidate temperature states, the above process is repeated in the order in which the controller temperature increases, thereby obtaining the candidate dynamic response characteristics corresponding to the multiple candidate temperature states.
[0175] Each candidate dynamic response feature is compared with the first dynamic response feature to obtain the dynamic response change state corresponding to each candidate temperature state.
[0176] In practice, the test control unit compares the output current response characteristics corresponding to each candidate temperature state with the output current response characteristics corresponding to the first temperature state, and compares the actual speed response characteristics corresponding to each candidate temperature state with the actual speed response characteristics corresponding to the first temperature state. Based on the two comparison results, the dynamic response change state of the corresponding candidate temperature state is formed.
[0177] In this embodiment, the first dynamic response feature and each candidate dynamic response feature include the output current response feature and the actual speed response feature, respectively.
[0178] The output current response characteristics may include at least one of the following: the output current change amplitude, the peak output current, and the time required for the output current to recover to a stable state; the actual speed response characteristics may include at least one of the following: the maximum speed deviation of the actual speed relative to the target speed and the speed recovery time required for the actual speed to recover to the allowable range corresponding to the target speed.
[0179] In practice, the output current variation range can be determined based on the difference between the stable output current before the load change and the output current during or after the load change; the peak output current can be determined based on the maximum value among multiple continuously collected output currents during the load change; and the time required for the output current to recover to stability can be determined based on the time difference between the moment when the load begins to change and the moment when the output current enters and remains within the corresponding stable range.
[0180] The maximum speed deviation can be determined based on the deviation between the actual speed and the target speed at each sampling moment during the load change process, and the maximum value among multiple speed deviations is selected; the speed recovery time can be determined based on the time difference between the moment when the load begins to change and the moment when the actual speed re-enters and remains within the allowable range corresponding to the target speed.
[0181] For each candidate temperature state, the change in output current response is determined based on the change in the output current response characteristics corresponding to that candidate temperature state relative to the output current response characteristics in the first dynamic response characteristics.
[0182] In practice, the output current change amplitude, peak output current and / or time required for the output current to recover to stability corresponding to the candidate temperature state are compared with the same type of output current response parameters under the first temperature state, and the output current response change is determined based on the difference or change ratio between the corresponding parameters.
[0183] The actual speed recovery change is determined based on the change in the actual speed response characteristics corresponding to the candidate temperature state relative to the actual speed response characteristics in the first dynamic response characteristics.
[0184] In practice, the maximum speed deviation and / or speed recovery time corresponding to the candidate temperature state are compared with the maximum speed deviation and / or speed recovery time corresponding to the first temperature state, and the actual speed recovery change is determined based on the difference or change ratio between the corresponding parameters.
[0185] The candidate dynamic response composite state corresponding to the candidate temperature state is determined based on the changes in output current response and actual speed recovery.
[0186] The candidate dynamic response comprehensive state is the state information obtained by associating the output current response change and the actual speed recovery change corresponding to the same candidate temperature state. In specific implementation, the comparison results corresponding to the output current response change and the comparison results corresponding to the actual speed recovery change can be combined to form the comprehensive state data corresponding to the candidate temperature state.
[0187] Determine whether the overall state of the candidate dynamic response meets the preset correlation drift condition.
[0188] The preset associated drift conditions include a first type of drift requirement corresponding to the output current response and a second type of drift requirement corresponding to the actual speed response. To avoid normal sampling fluctuations being identified as response drift, allowable variations or allowable variation ratios can be preset for each response parameter.
[0189] In specific implementation, when at least one of the following conditions is met: the output current change amplitude corresponding to the candidate temperature state increases relative to the first temperature state and reaches the corresponding preset allowable change amount; the peak output current increases and reaches the corresponding preset allowable change amount; and the time required for the output current to recover to stability is extended and reaches the corresponding preset allowable change amount; and at the same time, when at least one of the following conditions is met: the maximum speed deviation corresponding to the candidate temperature state increases and reaches the corresponding preset allowable change amount; and the speed recovery time is extended and reaches the corresponding preset allowable change amount, the candidate dynamic response comprehensive state is determined to satisfy the preset correlation drift condition.
[0190] The test control unit makes judgments sequentially according to the temperature increase order corresponding to the candidate temperature states. When a candidate dynamic response comprehensive state meets the preset correlation drift condition, and none of the previous candidate temperature states with temperatures lower than this candidate temperature state meet the preset correlation drift condition, the candidate temperature state is determined as the second temperature state.
[0191] Based on the difference between the first dynamic response characteristics under the first temperature state and the dynamic response characteristics under the second temperature state, the thermal state dynamic load response test results of the air conditioning controller are obtained.
[0192] In practice, the test control unit records the output current response characteristics and actual speed response characteristics corresponding to the second temperature state, the output current response characteristics and actual speed response characteristics corresponding to the first temperature state, the output current response characteristics and actual speed response characteristics corresponding to the second temperature state, and the differences between the corresponding parameters, and forms the thermal dynamic load response test results based on the above data.
[0193] In this embodiment, the air conditioner controller is subjected to dynamic load response testing under multiple controller temperature conditions.
[0194] The initial temperature of the air conditioner controller is obtained before the compressor motor starts running, and a first temperature state is determined based on the initial temperature.
[0195] The initial temperature is the temperature of the air conditioner controller before the compressor motor enters actual load operation. In specific implementation, multiple controller temperatures are continuously acquired according to a preset sampling period. When the change between the multiple controller temperatures meets a preset temperature stability condition, the initial temperature is determined based on the multiple controller temperatures. Then, a first temperature range is determined based on the initial temperature and the preset allowable temperature deviation, and the state in which the controller temperature is within the first temperature range is defined as the first temperature state.
[0196] When the controller temperature of the air conditioner controller is in the first temperature state and the compressor motor is running at the target speed, the cooling load circuit is changed from the first load state to the second load state. The first output current response state corresponding to the air conditioner controller and the first actual speed response state corresponding to the compressor motor are obtained, and the first dynamic response characteristic is determined based on the first output current response state and the first actual speed response state.
[0197] The first load state and the second load state are two different load operating states corresponding to the refrigeration load circuit, which can be determined based on the compressor suction side pressure, compressor discharge side pressure, suction and discharge pressure difference, or other parameters that can characterize the load size of the refrigeration load circuit.
[0198] In practice, after the compressor motor runs at the target speed and the refrigeration load circuit is in the first load state, the load of the refrigeration load circuit is adjusted to change from the first load state to the second load state. During the load change process, the communication acquisition unit reads the output current fed back by the air conditioner controller and the actual speed of the compressor motor, and forms the first output current response state and the first actual speed response state, respectively.
[0199] The first output current response state characterizes the change in the output current of the air conditioner controller during a load change in the refrigeration load circuit; the first actual speed response state characterizes the change in the actual speed of the compressor motor relative to the target speed. The test control unit determines the first dynamic response characteristic based on the first output current response state and the first actual speed response state.
[0200] The first output current response state characterizes the change in the output current of the air conditioner controller during a load change in the refrigeration load circuit; the first actual speed response state characterizes the change in the actual speed of the compressor motor relative to the target speed. In specific implementation, the test control unit determines at least one of the following based on the first output current response state: the output current change amplitude, the peak output current, and the time required for the output current to stabilize. It also determines at least one of the following based on the first actual speed response state: the maximum speed deviation of the actual speed relative to the target speed, and the speed recovery time. The determined output current response characteristics and actual speed response characteristics are then combined accordingly to obtain the first dynamic response characteristic.
[0201] The air conditioner controller is controlled to drive the compressor motor to run continuously, so that the controller temperature of the air conditioner controller increases relative to the first temperature state.
[0202] In practice, after obtaining the first dynamic response characteristic, the test control unit continues to control the air conditioner controller to drive the compressor motor to operate in the refrigeration load circuit. During continuous operation, the communication acquisition unit continuously or according to a preset acquisition cycle reads the controller temperature of the air conditioner controller to obtain the change status of the controller temperature.
[0203] During the temperature rise of the controller, the compressor motor is controlled to run at the same target speed as the first temperature state under multiple candidate temperature states, and the refrigeration load circuit is changed from the first load state to the second load state in the same load change mode as the first temperature state. The candidate output current response state and the candidate actual speed response state corresponding to each candidate temperature state are obtained respectively, and the candidate dynamic response characteristics corresponding to each candidate temperature state are determined based on the candidate output current response state and the candidate actual speed response state.
[0204] The candidate temperature states are those used for dynamic load response testing as the controller temperature rises from the first temperature state. Multiple candidate temperature states can be determined sequentially according to the order in which the controller temperature changes.
[0205] In practice, when the air conditioner controller reaches a candidate temperature state, the test control unit controls the compressor motor to run at the same target speed as under the first temperature state, and resets the refrigeration load circuit to the first load state. Then, following the same load change pattern as under the first temperature state, the refrigeration load circuit is changed from the first load state to the second load state. During this load change process, the candidate output current response state and the candidate actual speed response state are acquired to determine the candidate dynamic response characteristics corresponding to the candidate temperature state.
[0206] For subsequent candidate temperature states, the dynamic load response test can be repeated in the above manner to obtain the candidate dynamic response characteristics corresponding to multiple candidate temperature states.
[0207] Each candidate dynamic response feature is compared with the first dynamic response feature, and the controller temperature state corresponding to the first time the candidate dynamic response feature satisfies the preset response drift condition is determined as the second temperature state.
[0208] The preset response drift condition is a judgment condition used to determine whether the change of the candidate dynamic response feature relative to the first dynamic response feature meets the preset requirements.
[0209] In practice, the test control unit compares each candidate dynamic response feature with the first dynamic response feature sequentially according to the temperature change order corresponding to the candidate temperature state. When a candidate dynamic response feature meets a preset response drift condition, and none of the candidate dynamic response features obtained before that candidate temperature state meet the preset response drift condition, the candidate temperature state is determined as the second temperature state.
[0210] Based on the difference between the first dynamic response characteristics under the first temperature state and the dynamic response characteristics under the second temperature state, the thermal state dynamic load response test result of the air conditioner controller is obtained, and the thermal state dynamic load response test result is used as part of the compressor actual load test result.
[0211] In practice, the test control unit can record the first temperature state, the second temperature state, the first dynamic response characteristics, and the dynamic response characteristics corresponding to the second temperature state, and generate the thermal dynamic load response test results based on the comparison results of the dynamic response characteristics under the two temperature states.
[0212] In this embodiment, the first dynamic response feature and each of the candidate dynamic response features respectively include the output current response feature and the actual speed response feature.
[0213] The output current response characteristic is determined based on the change in output current of the air conditioner controller during the change of the refrigeration load circuit from the first load state to the second load state; the actual speed response characteristic is determined based on the change in actual speed of the compressor motor during the load change.
[0214] For each candidate temperature state, the change in output current response is determined based on the change in the output current response characteristic corresponding to the candidate temperature state relative to the output current response characteristic in the first dynamic response characteristics.
[0215] In practice, the test control unit can compare the output current response characteristics corresponding to the candidate temperature state with the output current response characteristics corresponding to the first temperature state, and determine the change in output current response based on the difference, change ratio, or change state between the two.
[0216] The actual speed recovery change is determined based on the change in the actual speed response characteristics corresponding to the candidate temperature state relative to the actual speed response characteristics in the first dynamic response characteristics.
[0217] In practice, the test control unit can compare the actual speed response characteristics corresponding to the candidate temperature state with the actual speed response characteristics corresponding to the first temperature state, and determine the actual speed recovery change based on the difference, change ratio, or change state between the two.
[0218] The candidate dynamic response composite state corresponding to the candidate temperature state is determined based on the changes in the output current response and the changes in the actual rotational speed recovery.
[0219] The candidate dynamic response composite state is a comprehensive state information formed based on the output current response change and the actual speed recovery change under the same candidate temperature state. In specific implementation, the test control unit correlates the output current response change and the actual speed recovery change corresponding to the same candidate temperature state to form the candidate dynamic response composite state corresponding to that candidate temperature state.
[0220] Determine whether the candidate dynamic response integrated state meets the preset correlation drift condition, and determine the controller temperature state corresponding to the first time the candidate dynamic response integrated state meets the preset correlation drift condition as the second temperature state.
[0221] Among them, the preset correlation drift condition can be determined according to the preset change requirements corresponding to the output current response characteristics and the actual speed response characteristics.
[0222] In practice, the test control unit sequentially determines whether the overall dynamic response state of each candidate temperature state meets the preset correlation drift condition according to the temperature change sequence corresponding to the multiple candidate temperature states. When the current candidate dynamic response state meets the preset correlation drift condition, and none of the previous candidate dynamic response states meet the preset correlation drift condition, the current candidate temperature state is determined as the second temperature state.
[0223] The preset correlation drift condition is used to characterize that, under the same target speed and the same load change mode, the output current response of the air conditioner controller changes by a preset value and the actual speed response of the compressor motor changes by a preset value.
[0224] In practice, the same target speed is used in the first temperature state and each candidate temperature state, and dynamic load response tests are performed according to the same first load state, second load state and load change mode to obtain the output current response characteristics and actual speed response characteristics corresponding to each controller temperature state.
[0225] In this embodiment, the output current response characteristics include at least one of the following: the magnitude of the output current change after the cooling load circuit changes from the first load state to the second load state, the peak output current, and the time required for the output current to recover and stabilize.
[0226] Among them, the output current change range can be determined based on the output current before and after the load state change; the peak output current can be the maximum output current detected during the load state change; the time required for the output current to recover to stability can be the time taken from the start of the cooling load circuit changing from the first load state to the second load state until the output current enters the corresponding stable range.
[0227] In practice, the communication acquisition unit acquires the output current of the air conditioner controller during load changes according to a preset sampling period, and determines one or more of the following based on the acquired multiple output current data: the magnitude of output current change, the peak output current, and the time required for the output current to recover to a stable state.
[0228] The actual speed response characteristics include at least one of the following: the maximum speed deviation of the actual speed relative to the target speed after the cooling load circuit changes from the first load state to the second load state, and the speed recovery time required for the actual speed to recover to the allowable range corresponding to the target speed.
[0229] The maximum speed deviation can be determined based on the deviation between the actual speed and the target speed during the load state change process; the speed recovery time can be the time elapsed from the first load state to the second load state after the self-cooling load circuit starts to change until the actual speed re-enters the allowable range corresponding to the target speed.
[0230] In practice, the communication acquisition unit acquires the actual speed of the compressor motor according to the preset sampling period, the test control unit calculates the speed deviation between the actual speed and the target speed at each sampling time, and determines the maximum speed deviation and speed recovery time based on multiple speed deviations.
[0231] The preset associated drift conditions include at least one of the following: an increase in the amplitude of the output current change corresponding to the candidate temperature state, an increase in the peak output current, and an extension of the time required for the output current to recover and stabilize, and at least one of the following: an increase in the maximum speed deviation corresponding to the candidate temperature state and an extension of the speed recovery time.
[0232] In practice, for each candidate temperature state, the test control unit compares the output current change amplitude, peak output current, or time required for the output current to recover to stability corresponding to the candidate temperature state with the parameters corresponding to the first temperature state, and compares the maximum speed deviation or speed recovery time corresponding to the candidate temperature state with the parameters corresponding to the first temperature state.
[0233] When at least one parameter in the output current response characteristics meets the corresponding preset change requirement, and at least one parameter in the actual speed response characteristics meets the corresponding preset change requirement, it can be determined that the candidate dynamic response comprehensive state corresponding to the candidate temperature state meets the preset correlation drift condition.
[0234] Example 2 like Figure 6 As shown, this embodiment provides a load-bearing air conditioner controller testing system for testing an air conditioner under test using the method described in any of the foregoing embodiments. The air conditioner under test includes an air conditioner controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor.
[0235] The testing system includes testing fixtures, a low-voltage power supply unit, a high-voltage DC power supply unit, a communication acquisition unit, a load status acquisition unit, and a test control unit.
[0236] The testing fixture is used to establish low-voltage, high-voltage, and compressor drive connections with the air conditioning controller. In specific implementations, the testing fixture may include a test clamp, a connecting assembly, a signal connection part, and a power connection part. The signal connection part is used to connect to the low-voltage interface of the air conditioning controller, and the power connection part is used to connect to the high-voltage interface and the UVW three-phase output terminals of the air conditioning controller.
[0237] The low-voltage power supply unit is connected to the test fixture and is used to provide low-voltage power to the air conditioner controller through the test fixture. In specific implementation, the low-voltage power supply unit can provide low-voltage DC power to the air conditioner controller through the signal connection part in the test fixture, enabling the air conditioner controller to complete low-voltage side communication and status feedback.
[0238] The high-voltage DC power supply unit is connected to the test fixture and is used to provide high-voltage DC input to the air conditioner controller through the test fixture. In specific implementation, the high-voltage DC power supply unit provides high-voltage DC input to the high-voltage interface of the air conditioner controller through the power connection part in the test fixture, enabling the air conditioner controller to enter the high-voltage side test state and have the power supply conditions to drive the compressor motor.
[0239] The communication acquisition unit is used to communicate with the air conditioning controller to obtain the low-pressure side response status, high-pressure side response status, and electrical operating status of the air conditioning controller. In specific implementations, the communication acquisition unit can read data sent or fed back by the air conditioning controller through CAN communication, LIN communication, or other communication methods, including communication messages, low-pressure voltage information, software version information, high-pressure voltage information, actual speed, output current, and controller temperature, etc.
[0240] The load status acquisition unit is used to connect to the detection location of the refrigeration load circuit of the air conditioner under test to obtain the load operating status of the refrigeration load circuit. In specific implementations, the load status acquisition unit can be connected to the compressor discharge side, the compressor suction side, or other detection locations in the refrigeration load circuit to obtain information that reflects the load status of the refrigeration cycle.
[0241] The test control unit is connected to the low-voltage power supply unit, the high-voltage DC power supply unit, the communication acquisition unit, and the load status acquisition unit, respectively. It is used to determine the actual load test result of the compressor based on the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit during the operation of the compressor motor driven by the air conditioner controller. In specific implementation, the test control unit can control the low-voltage power supply unit, the high-voltage DC power supply unit, and the air conditioner controller to sequentially complete the low-voltage test, high-voltage test, compressor operation test, and test status recovery according to a preset test procedure, and summarize the collected electrical operating status and load operating status to form the test result.
[0242] The aforementioned testing system provides the hardware and control foundation for the aforementioned test method of air conditioner controller under load, enabling the air conditioner controller to be uniformly powered, uniformly collected, and uniformly controlled during low-pressure side testing, high-pressure side testing, and compressor actual load operation testing, thereby generating compressor actual load test results.
[0243] The above description is merely a specific embodiment of the present invention. Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the specific working processes of the systems, modules, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here. It should be understood that the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the protection scope of the present invention.
Claims
1. A test method for an air conditioner controller under load, characterized in that, A method for testing an air conditioning controller in an air conditioner under test, wherein the air conditioner under test includes an air conditioning controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor, the method comprising: S1: Connect the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit and the compressor drive circuit, and make the compressor motor and the refrigeration load circuit form an operable connection; S2: Under low-voltage power supply conditions, obtain the low-voltage side response status of the air conditioner controller, and obtain the low-voltage side test results based on the low-voltage side response status; S3: After completing the low-voltage side test, apply a high-voltage DC input to the air conditioner controller and obtain the high-voltage side test result based on the response status of the air conditioner controller to the high-voltage DC input; S4: During the high-pressure side test, the air conditioner controller is controlled to drive the compressor motor to run, so that the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor; S5: During the operation of the compressor motor, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit are obtained according to the preset operating strategy, and the actual load test result of the compressor is determined based on the electrical operating status and the load operating status. S6: After the test is completed, control the compressor motor to stop, restore the test status of the high-voltage DC input and the air conditioner controller, and output the test results.
2. The test method for an air conditioner controller under load according to claim 1, characterized in that, Step S1: Connecting the air conditioner controller to the low-voltage power supply circuit, the high-voltage DC power supply circuit, and the compressor drive circuit, and making the compressor motor and the refrigeration load circuit form an operable connection, including: S11: Connect the low-voltage interface of the air conditioner controller to the low-voltage power supply circuit so that the air conditioner controller can communicate and provide status feedback under low-voltage power supply conditions; S12: Connect the high-voltage interface of the air conditioner controller to the high-voltage DC power supply circuit so that the air conditioner controller can receive high-voltage DC input; S13: Connect the UVW three-phase output terminals of the air conditioner controller to the compressor drive circuit, so that the air conditioner controller can output a three-phase drive signal to the compressor motor; S14: Connect the compressor corresponding to the compressor motor to the refrigeration load circuit so that the compressor motor can drive the refrigerant to circulate in the refrigeration load circuit when it is running.
3. The test method for an air conditioner controller under load according to claim 2, characterized in that, Step S14: Connecting the compressor corresponding to the compressor motor to the refrigeration load circuit, so that the compressor motor can drive the refrigerant to circulate in the refrigeration load circuit during operation, includes: S141: Connect the high-pressure exhaust port of the compressor to the condenser; S142: Connect the condenser to the evaporator via an expansion valve; S143: Connect the evaporator to the low-pressure suction port of the compressor; S144: When the compressor motor is running, the refrigerant undergoes compression, condensation, throttling and evaporation processes in sequence to form a cyclic load of the refrigeration load circuit.
4. The test method for an air conditioner controller under load according to claim 1, characterized in that, S2: Under low-voltage power supply conditions, acquiring the low-voltage side response status of the air conditioner controller, and obtaining the low-voltage side test results based on the low-voltage side response status, including: S21: Under low-voltage power supply conditions, read the communication messages sent by the air conditioner controller and obtain the communication test results based on the communication messages; S22: Read the low-voltage information of the air conditioner controller and obtain the low-voltage power supply test result based on the low-voltage information; S23: Read the software version information of the air conditioner controller and obtain the version test results based on the software version information; S24: Read the initial input port status information and initial temperature information of the air conditioner controller, and obtain the initial state test result based on the initial input port status information and the initial temperature information; S25: Generate the low-voltage side test result based on one or more of the communication test result, the low-voltage power supply test result, the version test result, and the initial state test result.
5. The test method for an air conditioner controller under load according to claim 4, characterized in that, S2: Under low-voltage power supply conditions, acquiring the low-voltage side response status of the air conditioner controller, and obtaining the low-voltage side test results based on the low-voltage side response status, including: S26: Input a preset level signal to at least one of the fault detection port, switch port and sensor port of the air conditioner controller; S27: Read the reporting information generated by the air conditioner controller based on the preset level signal; S28: Compare the reported information with the corresponding target message to obtain the input port simulation test result of the corresponding port; S29: The simulation test results of the input port are used as part of the low-voltage side test results.
6. The test method for an air conditioner controller under load according to claim 1, characterized in that, S3: After completing the low-voltage side test, a high-voltage DC input is applied to the air conditioner controller, and the high-voltage side test results are obtained based on the air conditioner controller's response to the high-voltage DC input, including: S31: After completing the low-voltage side test, connect the high-voltage DC input to the air conditioner controller; S32: Read the high voltage information collected by the air conditioner controller under high voltage DC input conditions; S33: Obtain the output status of the high-voltage DC input; S34: Obtain the high-voltage sampling test results based on the correspondence between the high-voltage information and the output state of the high-voltage DC input; S35: The high-voltage sampling test results are used as part of the high-voltage side test results.
7. The test method for an air conditioner controller under load according to claim 1, characterized in that, S4: During the high-pressure side test, controlling the air conditioning controller to drive the compressor motor to run, so that the refrigeration load circuit forms a cyclic load corresponding to the operating state of the compressor motor, includes: S41: Write motor test parameters corresponding to the compressor motor into the air conditioner controller; S42: Based on the motor test parameters, control the air conditioner controller to generate a compressor drive signal; S43: Output the compressor drive signal to the compressor motor through the UVW three-phase output terminal of the air conditioner controller; S44: The compressor motor drives the compressor to run, causing the refrigerant in the refrigeration load circuit to circulate. S45: Based on the operating state of the compressor motor, the refrigeration load circuit is configured to form a corresponding cyclic load.
8. The test method for an air conditioner controller under load according to claim 1, characterized in that, S5: During the operation of the compressor motor, the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit are obtained according to a preset operating strategy, and the actual load test result of the compressor is determined based on the electrical operating status and the load operating status, including: S51: Control the compressor motor to sequentially enter multiple target speed operation stages according to the preset operation strategy; S52: During each target speed operation phase, obtain the electrical operating status of the air conditioning controller; S53: At each target speed operating stage, obtain the load operating status of the cooling load circuit; S54: Based on the electrical operating state and the load operating state under the same target speed operating stage, obtain the stage test results corresponding to the target speed operating stage; S55: Determine the actual load test result of the compressor based on the stage test results corresponding to multiple target speed operation stages.
9. The test method for an air conditioner controller under load according to claim 8, characterized in that, The step of acquiring the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit according to a preset operating strategy during the operation of the compressor motor, and determining the actual load test result of the compressor based on the electrical operating status and the load operating status includes: When the compressor motor is running stably at the target speed and the refrigeration load circuit is in the first load state, the refrigeration load circuit is changed from the first load state to the second load state. During the process of the refrigeration load circuit changing from the first load state to the second load state, the actual speed of the compressor motor and the output current of the air conditioner controller are obtained; The speed response characteristics are determined based on the change of the actual speed relative to the target speed, and the drive response characteristics are determined based on the change of the output current in the cooling load circuit from the first load state to the second load state. Based on the speed response characteristics and the drive response characteristics, the dynamic load test results of the air conditioning controller are obtained.
10. A test system for an air conditioner controller under load, characterized in that, The air conditioner under test is tested using the method described in any one of claims 1 to 9. The air conditioner under test includes an air conditioner controller, a compressor motor, and a refrigeration load circuit corresponding to the compressor motor. The test system includes: The test fixture is used to establish low-voltage connection, high-voltage connection and compressor drive connection with the air conditioner controller; A low-voltage power supply unit is connected to the test fixture and is used to provide low-voltage power to the air conditioner controller through the test fixture. A high-voltage DC power supply unit is connected to the test fixture and is used to provide a high-voltage DC input to the air conditioner controller through the test fixture. A communication acquisition unit is used to communicate with the air conditioner controller to obtain the low-pressure side response status, high-pressure side response status, and electrical operation status of the air conditioner controller; A load status acquisition unit is used to connect to the detection location of the refrigeration load circuit of the air conditioner under test in order to obtain the load operation status of the refrigeration load circuit. The test control unit is connected to the low-voltage power supply unit, the high-voltage DC power supply unit, the communication acquisition unit, and the load status acquisition unit, respectively. It is used to determine the actual load test result of the compressor based on the electrical operating status of the air conditioner controller and the load operating status of the refrigeration load circuit during the operation of the compressor motor driven by the air conditioner controller.
Citation Information
Patent Citations
Electric compressor controller for automobile air conditioner
CN102979712A
Automatic testing method for household air conditioner control panel FCT (functional circuit test) detection tool
CN106291315A
Automobile air conditioner controller detection platform based on simulation system
CN117908517A
Detection device for air conditioner compressor of electric automobile
CN216894853U
