Transition path real-time construction method and device for tiltrotor
By using the dual A* algorithm and tilt corridor database to plan the transition path of the tiltrotor aircraft in real time, the problem of not being able to design the path in real time in the existing technology is solved, and the flexibility and safety of flight control are improved.
Patent Information
- Application Number
- CN202611641988.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-22
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies cannot perform real-time path design during the transition flight of tiltrotor aircraft, which threatens flight safety.
By utilizing the dual A* algorithm and tilt corridor database, combined with the flight status information of the tiltrotor aircraft, a transition path is planned in real time. Considering the constraints of attitude angle, angle of attack, energy power and actuators, a transition path that meets the constraints is constructed through bidirectional A* search.
It improves the control flexibility and safety of tiltrotor aircraft, especially in the event of an emergency, it can quickly reconfigure the emergency path to ensure flight safety.
Smart Images

Figure CN123137336A_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of aircraft flight control system design technology, specifically relating to a method and apparatus for real-time construction of transition paths for tiltrotor aircraft. Background Technology
[0002] In recent years, with the development of my country's aviation industry and low-altitude economy, tiltrotor aircraft, a high-speed helicopter configuration, has emerged as a prominent low-altitude aircraft due to its unique layout combining fixed-wing and helicopter modes. The core function of a tiltrotor aircraft lies in the switching between helicopter and fixed-wing modes, a switching mode known as the transition mode. In the transition mode, the tiltrotor aircraft requires the engine nacelle and forward flight speed to be matched for control, a process known as transition path design. Currently, transition path design can only be planned from the starting point of either helicopter or fixed-wing mode, and real-time path design is not possible during the transition flight. When a tiltrotor aircraft encounters unexpected situations or strong interference, its flight safety will be severely threatened. Summary of the Invention
[0003] To address the aforementioned issues, this application provides a method and apparatus for real-time construction of transition paths for tiltrotor aircraft. The method utilizes a dual A* algorithm to search the tilt corridor database, considering attitude angle constraints, angle of attack constraints, remaining energy and power, and the remaining available range of actuators, to plan the required transition path for any state point within the tilt corridor in real time, thus meeting the real-time planning requirements for low-altitude flight environments.
[0004] The first aspect of this application provides a method for real-time construction of the transition path of a tiltrotor aircraft, mainly including:
[0005] Step S1: Obtain the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack.
[0006] Step S2: Determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode.
[0007] Step S3: Based on the preset flight performance constraints, determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor. If the current state point does not meet the preset flight performance constraints, then take the current state point as the starting point and search for the constraint boundary state point along the configuration change direction, and take the constraint boundary state point as the planning starting point. Otherwise, take the current state point as the planning starting point.
[0008] Step S4: Based on the configuration change direction and the preset tilt corridor database, take the state point where the target mode of the configuration change direction is located as the planning endpoint. The tilt corridor database is pre-built based on the tilt rotor modeling trim results. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database.
[0009] Step S5: Using the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, perform a bidirectional A* search according to a preset search interval to obtain the initial transition path;
[0010] Step S6: Perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, perform smoothing processing on the initial transition path to obtain the target transition path.
[0011] Preferably, step S2 further includes:
[0012] When a human instruction is detected, the direction of the configuration change is determined according to the human instruction;
[0013] When no manual command is detected and full program control is used, the current nacelle angle is compared with a preset angle threshold. If the current nacelle angle is less than the preset angle threshold, the configuration change direction is determined to be the first direction. If the current nacelle angle is greater than or equal to the preset angle threshold, the configuration change direction is determined to be the second direction.
[0014] Preferably, the preset angle threshold is 45 degrees.
[0015] Preferably, in step S3, the preset flight performance constraints include:
[0016] Angle of attack constraint: The angle of attack during flight shall not exceed the maximum angle of attack limit.
[0017] Attitude angle constraints: During flight, the pitch angle, roll angle, and yaw angle shall not exceed the preset attitude angle limits.
[0018] Engine power constraint: During flight, the engine's available power retains a preset power margin.
[0019] Actuator deflection constraint: the actuator deflection range retains the preset actuator margin and does not exceed the actuator deflection limit.
[0020] Preferably, in step S3, searching for constraint boundary state points along the configuration change direction includes:
[0021] When the configuration change direction is the first direction, search for the constraint boundary state point along the direction in which the nacelle angle decreases and the forward flight speed increases;
[0022] When the configuration change direction is the second direction, the constraint boundary state point is searched along the direction where the nacelle angle increases and the forward flight speed decreases.
[0023] Preferably, step S5 further includes:
[0024] Step S51: Using the planned starting point as the forward search starting point, perform a forward A* search according to a preset search interval. At the same time, using the planned ending point as the backward search starting point, perform a backward A* search according to a preset search interval.
[0025] Step S52: When the set of searched nodes in the forward A* search intersects with the set of searched nodes in the backward A* search, the optimal intersection point is determined based on the total cost corresponding to each discrete path point in the intersection.
[0026] Step S53: Connect the forward search path and the backward search path at the optimal intersection point to obtain the complete initial transition path.
[0027] Preferably, in step S5, the preset search interval refers to a search step of 5 degrees for every change in the nacelle angle. When the configuration change direction is the second direction, the nacelle angle continues to increase and the forward speed continues to decrease during the search process. When the configuration change direction is the first direction, the nacelle angle continues to decrease and the forward speed continues to increase during the search process.
[0028] Preferably, in step S6, the constraint verification of the initial transition path includes:
[0029] Determine whether each discrete path point in the initial transition path satisfies the preset flight performance constraints;
[0030] If the conditions are not met, a new intersection point is selected to determine the initial transition path.
[0031] Preferably, in step S6, smoothing the initial transition path includes:
[0032] The discrete path points in the initial transition path are interpolated using a piecewise cubic spline interpolation method to obtain a smooth target transition path.
[0033] The second aspect of this application provides a real-time transition path construction device for a tiltrotor aircraft, mainly comprising:
[0034] The flight status information acquisition module is used to acquire the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack.
[0035] The configuration change direction determination module is used to determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode.
[0036] The planning starting point determination module is used to determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor, based on the preset flight performance constraints. If the current state point does not meet the preset flight performance constraints, the current state point is used as the starting point to search for constraint boundary state points along the configuration change direction, and the constraint boundary state points are used as the planning starting point. Otherwise, the current state point is used as the planning starting point.
[0037] The planning endpoint determination module is used to determine the state point where the target mode of the configuration change direction is located as the planning endpoint based on the configuration change direction and the preset tilt corridor database. The tilt corridor database is pre-built based on the modeling and trim results of the tilt rotor. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database.
[0038] The transition path search module is used to perform a bidirectional A* search at a preset search interval, with the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, to obtain the initial transition path.
[0039] The transition path smoothing module is used to perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, the module performs smoothing processing on the initial transition path to obtain the target transition path.
[0040] This application improves the flexibility and safety of tiltrotor aircraft control. Attached Figure Description
[0041] Figure 1 This is a flowchart of a preferred embodiment of the real-time construction method for the transition path of a tiltrotor aircraft according to this application.
[0042] Figure 2 This application Figure 1 A schematic diagram of the tilting corridor in the embodiment shown.
[0043] Figure 3 This application Figure 1 A schematic diagram of the transition path in the illustrated embodiment. Detailed Implementation
[0044] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions in the embodiments of this application will be described in more detail below with reference to the accompanying drawings. In the drawings, the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The described embodiments are only some, not all, of the embodiments of this application. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this application, and should not be construed as limiting this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application. The embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0045] The first aspect of this application provides a method for real-time construction of transition paths for tiltrotor aircraft, such as... Figure 1 As shown, it mainly includes:
[0046] Step S1: Obtain the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack.
[0047] Step S2: Determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode.
[0048] Step S3: Based on the preset flight performance constraints, determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor. If the current state point does not meet the preset flight performance constraints, then take the current state point as the starting point and search for the constraint boundary state point along the configuration change direction, and take the constraint boundary state point as the planning starting point. Otherwise, take the current state point as the planning starting point.
[0049] Step S4: Based on the configuration change direction and the preset tilt corridor database, take the state point where the target mode of the configuration change direction is located as the planning endpoint. The tilt corridor database is pre-built based on the tilt rotor modeling trim results. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database.
[0050] Step S5: Using the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, perform a bidirectional A* search according to a preset search interval to obtain the initial transition path;
[0051] Step S6: Perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, perform smoothing processing on the initial transition path to obtain the target transition path.
[0052] This embodiment provides a real-time transition path construction method for tiltrotor aircraft. By acquiring current flight status information and determining the direction of configuration change, and combining preset flight performance constraints to judge the current state point, if the current state point does not meet the constraints, the method automatically searches for the constraint boundary state point as the planning starting point, thereby realizing the ability to start transition path planning at any state point.
[0053] This method uses the state point of the target mode in the configuration change direction as the planning endpoint and performs a bidirectional A* search using a tilt corridor database to quickly construct a transition path that meets the constraints. Compared to traditional methods that can only start planning from the helicopter or fixed-wing mode starting point, this embodiment significantly improves the flexibility and real-time performance of transition path planning. It is particularly suitable for emergency path reconstruction scenarios when the aircraft deviates from the predetermined path or encounters sudden interference, effectively ensuring flight safety.
[0054] This application involves a bidirectional A* search algorithm, which is an optimal path planning method that starts from both the beginning and the end point and searches in opposite directions. The bidirectional A* algorithm begins with two search fronts, and at each step, selects the side with the smallest evaluation function value for node expansion. When the two search trees meet at a certain node, all search nodes, including that node, constitute a candidate optimal path. The bidirectional A* algorithm reduces computational complexity, the number of search nodes, and memory usage, while guaranteeing a globally optimal solution. The tilt corridor is the region of speed and tilt angle (nacelle angle) that allows safe flight for tiltrotor or vertical takeoff and landing aircraft when transitioning from helicopter mode to fixed-wing mode or vice versa. Figure 2 As shown, the current nacelle angle obtained in step S1 of this application is 60 degrees, the current forward speed is 25 m / s, and the current angle of attack is 3 degrees.
[0055] In some alternative implementations, step S2 further includes:
[0056] When a human instruction is detected, the direction of the configuration change is determined according to the human instruction;
[0057] When no manual command is detected and full program control is used, the current nacelle angle is compared with a preset angle threshold. If the current nacelle angle is less than the preset angle threshold, the configuration change direction is determined to be the first direction. If the current nacelle angle is greater than or equal to the preset angle threshold, the configuration change direction is determined to be the second direction.
[0058] This embodiment describes a method for determining the direction of configuration change: prioritizing responses to manual commands, and automatically determining the direction of configuration change by comparing the current nacelle angle with a preset angle threshold when no manual commands are available and full program control is employed. This design balances the flexibility of manual intervention and automatic control, allowing pilots to directly specify the transition direction in special circumstances, while the system can make autonomous decisions during normal flight. This scheme is simple and reliable, with minimal computational overhead, and does not burden the real-time performance of the flight control system, while providing a clear search direction for subsequent path planning.
[0059] In some alternative implementations, the preset angle threshold is 45 degrees.
[0060] This value matches the typical configuration switching critical point for tiltrotor aircraft. In actual flight, the area around 45 degrees nacelle angle is usually where the control efficiency of helicopter mode and fixed-wing mode is comparable. Using this as the boundary for determining the direction of configuration change ensures that the aircraft remains controllable during the transition. This setting conforms to the physical characteristics of tiltrotor aircraft, making the determination of the direction of configuration change more accurate and reasonable.
[0061] exist Figure 2 In the embodiment shown, the current nacelle angle of the tiltrotor is 60 degrees, which is greater than the preset angle threshold of 45 degrees. Therefore, the configuration change direction is determined to be the second direction, that is, it needs to transition to helicopter mode. In step S4, the state point where the target mode is located is used as the planning endpoint. For example, the endpoint of the transition path in helicopter mode is 90 degrees and the forward flight speed is 15m / s. Figure 3 In the current state, the current state point has deviated from the original transition path.
[0062] Step S3 is used to determine the planning starting point. Normally, the current state point is the planning starting point. If the current state point does not meet the preset flight performance constraints, it is necessary to use the current state point as the planning starting point, search for the constraint boundary, and use the constraint boundary state point as the planning starting point.
[0063] In some alternative implementations, in step S3, the preset flight performance constraints include:
[0064] Angle of attack constraint: The angle of attack during flight shall not exceed the maximum angle of attack limit.
[0065] Attitude angle constraints: During flight, the pitch angle, roll angle, and yaw angle shall not exceed the preset attitude angle limits.
[0066] Engine power constraint: During flight, the engine's available power retains a preset power margin.
[0067] Actuator deflection constraint: the actuator deflection range retains the preset actuator margin and does not exceed the actuator deflection limit.
[0068] This embodiment specifies the content of the preset flight performance constraints, covering four aspects: angle of attack constraints, attitude angle constraints, engine power constraints, and actuator deflection constraints. These constraints limit the transition path from different dimensions of flight safety: angle of attack constraints prevent stalling, attitude angle constraints ensure controllable flight attitude, engine power constraints ensure power redundancy, and actuator deflection constraints prevent control surface saturation. By comprehensively considering the above multi-dimensional constraints, the feasibility of the constructed transition path in actual flight can be effectively guaranteed, avoiding safety accidents caused by exceeding the limits of a single constraint.
[0069] In a specific example, to ensure flight safety, the maximum stall angle of attack of a tiltrotor aircraft should not exceed 8 degrees, the pitch angle should not exceed 8 degrees, the engine's remaining power should not be less than 25%, and the actuator deflection margin should not be less than 25%.
[0070] In some optional implementations, step S3, searching for constraint boundary state points along the configuration change direction, includes:
[0071] When the configuration change direction is the first direction, search for the constraint boundary state point along the direction in which the nacelle angle decreases and the forward flight speed increases;
[0072] When the configuration change direction is the second direction, the constraint boundary state point is searched along the direction where the nacelle angle increases and the forward flight speed decreases.
[0073] This embodiment illustrates a specific method for searching constraint boundary state points along the configuration change direction. Specifically, when the configuration changes to a fixed-wing mode, the search proceeds along the direction where the nacelle angle decreases and the forward velocity increases; conversely, when the configuration changes to a helicopter mode, the search proceeds along the direction where the nacelle angle increases and the forward velocity decreases. This search direction perfectly aligns with the physical laws governing the two transition modes of a tiltrotor aircraft. The fixed-wing mode requires acceleration to generate lift, while the helicopter mode requires deceleration to match the rotor's lift characteristics. Searching the constraint boundaries along this direction allows for the rapid location of the nearest state point that satisfies the flight performance constraints, thus providing an effective starting position for subsequent bidirectional A* searches.
[0074] Step S4 is used to determine the planning endpoint. This step requires determining the tilt corridor beforehand based on the tiltrotor modeling and trim results. Based on the trim results, a trim attitude angle database, a trim angle of attack database, a trim engine power database, and a trim actuator deflection database are constructed, and these databases are provided in the form of interpolation tables. In fact, in step S3, setting flight performance constraints is also part of constructing the tilt corridor. The tilt corridor limit range is determined based on the flight performance database, and the planning endpoints for both the helicopter and fixed-wing modes are determined based on the constraints.
[0075] Then, in step S5, path planning is performed using bidirectional A* search.
[0076] In some alternative implementations, step S5 further includes:
[0077] Step S51: Using the planned starting point as the forward search starting point, perform a forward A* search according to a preset search interval. At the same time, using the planned ending point as the backward search starting point, perform a backward A* search according to a preset search interval.
[0078] Step S52: When the set of searched nodes in the forward A* search intersects with the set of searched nodes in the backward A* search, the optimal intersection point is determined based on the total cost corresponding to each discrete path point in the intersection.
[0079] Step S53: Connect the forward search path and the backward search path at the optimal intersection point to obtain the complete initial transition path.
[0080] This embodiment illustrates the specific process of bidirectional A* search, including parallel execution of forward and backward searches, determination of the intersection point, and path stitching. By simultaneously performing searches from both the planning start and end points, the number of search nodes is significantly reduced compared to unidirectional A* search, lowering computational complexity and shortening path planning time. In selecting the intersection point, the optimal intersection point is determined based on minimizing the total cost, ensuring the global optimality of the stitched complete path. This scheme satisfies the real-time planning requirements for tiltrotor aircraft transition paths while guaranteeing path quality.
[0081] In this embodiment, the cost function of A* search typically involves energy, attitude angle, and angle of attack. Considering performance constraints, this application adopts dual A* search for real-time planning to construct a transition path with minimal energy consumption and minimal changes in attitude angle and angle of attack.
[0082] In some optional implementations, in step S5, the preset search interval refers to a search step of 5 degrees for every change in the nacelle angle. When the configuration change direction is the second direction, the nacelle angle continues to increase and the forward speed continues to decrease during the search process. When the configuration change direction is the first direction, the nacelle angle continues to decrease and the forward speed continues to increase during the search process.
[0083] This embodiment defines the search interval for the bidirectional A* search as a 5-degree change in the nacelle angle as one search step, and clarifies the changing trends of the nacelle angle and forward velocity under different configuration change directions. The 5-degree search interval achieves a good balance between path accuracy and computational efficiency, ensuring the smoothness of the transition path while avoiding the waste of computational resources caused by overly dense searches. Simultaneously, limiting the changing trends of the nacelle angle and forward velocity ensures that the search process always proceeds along physically feasible directions, avoiding invalid paths that violate the dynamic characteristics of tiltrotor aircraft, thus improving search efficiency.
[0084] Finally, the initial transition path obtained by the bidirectional A* search is constrained and smoothed to obtain the final target transition path, such as... Figure 3 As shown.
[0085] In some optional implementations, step S6, constraining the initial transition path, includes:
[0086] Determine whether each discrete path point in the initial transition path satisfies the preset flight performance constraints;
[0087] If the conditions are not met, a new intersection point is selected to determine the initial transition path.
[0088] This embodiment requires determining whether each discrete path point in the path meets the preset flight performance constraints. If not, a new intersection point is selected. This verification mechanism serves as a dual guarantee for path planning, further confirming its safety after path generation. When the initially searched path exceeds the constraints, path adjustment is performed by reselecting an intersection point, avoiding the expensive computational overhead of directly abandoning and replanning, thus improving the success rate and robustness of path planning.
[0089] In some alternative implementations, step S6, smoothing the initial transition path, includes:
[0090] The discrete path points in the initial transition path are interpolated using a piecewise cubic spline interpolation method to obtain a smooth target transition path.
[0091] This embodiment employs piecewise cubic spline interpolation to smooth the discrete path points in the initial transition path. Since the path obtained through bidirectional A* search consists of discrete nodes, direct execution may cause control command jumps, affecting flight quality. Piecewise cubic spline interpolation generates a continuous and smooth transition path, resulting in a gradual change in the relationship between the nacelle angle and forward velocity. This facilitates tracking and execution by the flight control system, improving the comfort and stability of the transition process while reducing impact damage to actuators.
[0092] A second aspect of this application provides a tiltrotor aircraft transition path real-time construction apparatus corresponding to the above-described method, characterized in that it includes:
[0093] The flight status information acquisition module is used to acquire the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack.
[0094] The configuration change direction determination module is used to determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode.
[0095] The planning starting point determination module is used to determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor, based on the preset flight performance constraints. If the current state point does not meet the preset flight performance constraints, the current state point is used as the starting point to search for constraint boundary state points along the configuration change direction, and the constraint boundary state points are used as the planning starting point. Otherwise, the current state point is used as the planning starting point.
[0096] The planning endpoint determination module is used to determine the state point where the target mode of the configuration change direction is located as the planning endpoint based on the configuration change direction and the preset tilt corridor database. The tilt corridor database is pre-built based on the modeling and trim results of the tilt rotor. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database.
[0097] The transition path search module is used to perform a bidirectional A* search at a preset search interval, with the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, to obtain the initial transition path.
[0098] The transition path smoothing module is used to perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, the module performs smoothing processing on the initial transition path to obtain the target transition path.
[0099] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for real-time construction of transition paths for a tiltrotor aircraft, characterized in that, include: Step S1: Obtain the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack. Step S2: Determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode. Step S3: Based on the preset flight performance constraints, determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor. If the current state point does not meet the preset flight performance constraints, then take the current state point as the starting point and search for the constraint boundary state point along the configuration change direction, and take the constraint boundary state point as the planning starting point. Otherwise, take the current state point as the planning starting point. Step S4: Based on the configuration change direction and the preset tilt corridor database, take the state point where the target mode of the configuration change direction is located as the planning endpoint. The tilt corridor database is pre-built based on the tilt rotor modeling trim results. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database. Step S5: Using the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, perform a bidirectional A* search according to a preset search interval to obtain the initial transition path; Step S6: Perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, perform smoothing processing on the initial transition path to obtain the target transition path.
2. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 1, characterized in that, Step S2 further includes: When a human instruction is detected, the direction of the configuration change is determined according to the human instruction; When no manual command is detected and full program control is used, the current nacelle angle is compared with a preset angle threshold. If the current nacelle angle is less than the preset angle threshold, the configuration change direction is determined to be the first direction. If the current nacelle angle is greater than or equal to the preset angle threshold, the configuration change direction is determined to be the second direction.
3. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 2, characterized in that, The preset angle threshold is 45 degrees.
4. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 1, characterized in that, In step S3, the preset flight performance constraints include: Angle of attack constraint: The angle of attack during flight shall not exceed the maximum angle of attack limit. Attitude angle constraints: During flight, the pitch angle, roll angle, and yaw angle shall not exceed the preset attitude angle limits. Engine power constraint: During flight, the engine's available power retains a preset power margin. Actuator deflection constraint: the actuator deflection range retains the preset actuator margin and does not exceed the actuator deflection limit.
5. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 1, characterized in that, In step S3, searching for constraint boundary state points along the configuration change direction includes: When the configuration change direction is the first direction, search for the constraint boundary state point along the direction in which the nacelle angle decreases and the forward flight speed increases; When the configuration change direction is the second direction, the constraint boundary state point is searched along the direction where the nacelle angle increases and the forward flight speed decreases.
6. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 1, characterized in that, Step S5 further includes: Step S51: Using the planned starting point as the forward search starting point, perform a forward A* search according to a preset search interval. At the same time, using the planned ending point as the backward search starting point, perform a backward A* search according to a preset search interval. Step S52: When the set of searched nodes in the forward A* search intersects with the set of searched nodes in the backward A* search, the optimal intersection point is determined based on the total cost corresponding to each discrete path point in the intersection. Step S53: Connect the forward search path and the backward search path at the optimal intersection point to obtain the complete initial transition path.
7. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 6, characterized in that, In step S5, the preset search interval refers to a search step of 5 degrees for every change in the nacelle angle. When the configuration change direction is the second direction, the nacelle angle continues to increase and the forward speed continues to decrease during the search process. When the configuration change direction is the first direction, the nacelle angle continues to decrease and the forward speed continues to increase during the search process.
8. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 6, characterized in that, Step S6, constraining the initial transition path, includes: Determine whether each discrete path point in the initial transition path satisfies the preset flight performance constraints; If the conditions are not met, a new intersection point is selected to determine the initial transition path.
9. The method for real-time construction of transition paths for tiltrotor aircraft according to claim 1, characterized in that, Step S6, smoothing the initial transition path includes: The discrete path points in the initial transition path are interpolated using a piecewise cubic spline interpolation method to obtain a smooth target transition path.
10. A device for real-time construction of transition paths for a tiltrotor aircraft, characterized in that, include: The flight status information acquisition module is used to acquire the current flight status information of the tiltrotor aircraft. The current flight status information includes at least the current nacelle angle, the current forward speed, and the current angle of attack. The configuration change direction determination module is used to determine the configuration change direction based on the current flight status information. The configuration change direction includes a first direction for transitioning from helicopter mode to fixed-wing mode and a second direction for transitioning from fixed-wing mode to helicopter mode. The planning starting point determination module is used to determine whether the current state point containing the current flight state information is within the preset flight performance constraint range given by the tilt corridor, based on the preset flight performance constraints. If the current state point does not meet the preset flight performance constraints, the current state point is used as the starting point to search for constraint boundary state points along the configuration change direction, and the constraint boundary state points are used as the planning starting point. Otherwise, the current state point is used as the planning starting point. The planning endpoint determination module is used to determine the state point where the target mode of the configuration change direction is located as the planning endpoint based on the configuration change direction and the preset tilt corridor database. The tilt corridor database is pre-built based on the modeling and trim results of the tilt rotor. The tilt corridor database includes at least the trim attitude angle database, the trim angle of attack database, the trim engine power database, and the trim actuator deflection database. The transition path search module is used to perform a bidirectional A* search at a preset search interval, with the planned starting point as the forward search starting point and the planned ending point as the backward search starting point, to obtain the initial transition path. The transition path smoothing module is used to perform constraint verification on the initial transition path. If the initial transition path meets the preset constraint conditions, the module performs smoothing processing on the initial transition path to obtain the target transition path.
