Gas table detects lift platform pneumatic pressure regulating control device and its detection method
By using an interface gap adaptive detection and sealing control system, which combines the use of gaseous and liquid media, the problem of poor compatibility of rigid interface connections in gas meter testing is solved, achieving efficient and reliable sealing control and improving the accuracy and efficiency of test results.
Patent Information
- Application Number
- CN202611647159.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-23
- Publication Date
- 2026-11-20
AI Technical Summary
In the current gas meter testing process, the rigid connection of the interface has poor compatibility and insufficient sealing consistency, making it difficult to dynamically correct the gap sealing effect, which affects the accuracy of the test results.
An interface gap adaptive detection and sealing control system is adopted, including a multi-dimensional sensing and acquisition unit, an adaptive pressure regulation main control unit, a gas-liquid linkage execution module, and a closed-loop verification and feedback module. By combining gaseous medium pre-filling with liquid medium pressure stabilization, adaptive sealing control is achieved. The interface sealing state is dynamically adjusted by utilizing the high diffusivity of the gaseous medium and the incompressibility of the liquid medium.
It improved the sealing pass rate of gas meter interfaces of different diameters from 82% to 98.5%, shortened the single test time from 45s to 18s, enhanced the efficiency and reliability of batch testing, and ensured the accuracy and stability of test results.
Smart Images

Figure CN123137397A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of interface gap detection and sealing technology, and in particular to a pneumatic pressure regulating control device for a gas meter testing lifting platform and its testing method. Background Technology
[0002] In the current testing process for gas meters and other gas metering instruments, the interface connection generally adopts a rigid connection method that is manually adjusted. This method has the following drawbacks: First, with rigid connections, the connection between the metering instrument interface and the testing equipment interface is inconvenient, making it difficult to efficiently meet batch testing needs. Second, with rigid connections, the sealing performance of the gap at the interface is easily affected. Due to the poor compatibility of metering instrument interfaces of different diameters, manual assembly can easily lead to insufficient sealing consistency, resulting in sealing leaks or interface pressure damage. Furthermore, with a fixed rigid connection, it is difficult to dynamically correct the gap sealing effect based on the real-time state of the interface during docking, thus making it difficult to ensure the stability of the sealing posture at the testing interface, which adversely affects the accuracy of the testing results.
[0003] To address these issues, a pneumatic pressure regulating control device and its testing method for a gas meter testing platform are proposed to solve some of the problems existing in the prior art. Summary of the Invention
[0004] The purpose of this invention is to solve the problems of poor compatibility of rigid interface connections, insufficient sealing consistency, and difficulty in dynamically correcting gap sealing effects in the testing process of metering instruments in the prior art. Therefore, this invention proposes a pneumatic pressure regulating control device for a gas meter testing lifting platform and its testing method.
[0005] To address the problems existing in the prior art, the present invention adopts the following technical solution: An interface gap adaptive detection and sealing control system includes a multi-dimensional sensing and acquisition unit, an adaptive pressure regulation main control unit, a gas-liquid linkage execution module, a closed-loop verification and feedback module, and a first annular rubber bladder disposed in the interface. The multi-dimensional sensing and acquisition unit is used to collect four core operating parameters in real time: the medium pressure inside the first annular rubber bladder, the circumferential deformation distribution data of the first annular rubber bladder, the contact stress feedback signal of the interface, and the real-time leakage rate of the interface. The adaptive pressure regulating main control unit has a built-in simulation model of the sealing deformation of the first annular rubber bladder and an interface parameter library. The adaptive pressure regulating main control unit continuously compares the collected real-time operating parameters with the preset sealing reference value and automatically generates dynamic control commands. After the current sealing state of the interface fully matches the reference requirements, it triggers the next stage of medium switching action. After receiving the control command output by the adaptive pressure regulating main control unit, the gas-liquid linkage execution module sequentially introduces gaseous pre-filling medium and liquid pressure stabilizing medium into the first annular rubber bladder, driving the first annular rubber bladder to complete adaptive deformation filling. The closed-loop verification feedback module verifies the pressure holding leakage rate and contact stress stability of the interface after sealing in real time. The deviation signal is then transmitted back to the adaptive pressure regulating main control unit through the closed-loop verification feedback module to form a negative feedback closed-loop control. The pressure parameters of the medium in the first annular rubber bladder are automatically iteratively corrected until the sealing state of the interface meets the preset indicators.
[0006] Preferably, a pneumatic pressure regulating control device for a detection lifting platform is provided. The control device is equipped with an interface gap adaptive detection and sealing control system. The control device includes an outer frame. Two pipe joints are installed in the upper part of the outer frame, and the pipe joints are provided with connecting cavities. An expansion port communicating with the interior of the connecting cavity is fixedly installed at the lower end of the pipe joint. The cross-section of the expansion port is set as an inverted L-shaped structure. A threaded hose communicating with the interior of the connecting cavity is fixedly installed on the pipe joint. An adaptive sealing component is installed in the expansion port. The adaptive sealing component includes a first annular rubber bladder. A first inlet communicating with the interior of the first annular rubber bladder is fixedly installed on one side of the expansion port. A first outlet communicating with the interior of the first annular rubber bladder is fixedly installed on the other side of the expansion port. A lifting component located directly below the two pipe joints is installed in the lower part of the outer frame. The lifting component includes a base and a top plate. A scissor arm is installed between the base and the top plate. A cylinder for controlling the deformation amplitude of the scissor arm is also installed.
[0007] Preferably, a first ring plate and a second ring plate are fixedly installed on the upper and lower sides of the first annular rubber bladder, respectively. The first ring plate and the second ring plate are movably installed inside the expansion joint. The outer diameter of the first ring plate is adapted to the inner diameter of the expansion joint, and the outer diameter of the second ring plate is smaller than the inner diameter of the expansion joint.
[0008] Preferably, the top of the first ring plate is fixedly covered with a first rubber pad, and the bottom of the second ring plate is fixedly covered with a second rubber pad.
[0009] Preferably, a second annular rubber bladder is fixedly installed on the inner wall of the expansion port, and the second annular rubber bladder is located below the second rubber pad. A second inlet communicating with the inside of the second annular rubber bladder is fixedly installed on one side of the expansion port, and a second outlet communicating with the inside of the second annular rubber bladder is fixedly installed on the other side of the expansion port.
[0010] Preferably, a horizontally arranged guide rail is fixedly installed in the upper part of the outer frame, a connecting frame that is slidably connected to the guide rail is fixedly installed on the pipe joint, and a pneumatic positioning mechanism is installed on the upper part of the pipe joint.
[0011] Preferably, the pneumatic positioning mechanism includes a piston chamber that extends through the upper part of the pipe joint, and a vertically arranged piston column is slidably installed in the piston chamber. A third inlet communicating with the inside of the piston chamber is fixedly installed on one side of the pipe joint, and a third outlet communicating with the inside of the piston chamber is fixedly installed on the other side of the pipe joint. The third inlet and the third outlet are located below the piston column.
[0012] Preferably, a vertically downward spotlight is installed inside the pipe joint, and the spotlight is fixedly installed below the piston column inside the piston chamber. A high-transparency baffle plate is fixedly installed inside the pipe joint between the pipe joint and the piston chamber, and the lower part of the spotlight is aligned with the axis of the adaptive sealing assembly.
[0013] Preferably, a method for detecting the adaptive sealing of a gas meter interface gap is provided. This method is applicable to detecting pneumatic pressure regulating control devices on lifting platforms. The method includes the following steps: S1. Pre-docking positioning: The drive lifting component raises the gas meter under test, so that the gas meter's inlet and outlet ports are pre-fitted with the adaptive sealing components at the bottom of the two pipe joints. The initial contact position signal is collected and transmitted back to the adaptive pressure regulating main control unit. S2, Adaptive pre-filling of gaseous media: The adaptive pressure regulation main control unit calls the sealing deformation simulation model, matches the interface diameter parameters of the gas meter under test, automatically generates the initial gaseous medium pressure curve, introduces gaseous medium into the first annular rubber bladder, drives the first annular rubber bladder to expand for the first time, and adaptively fills the annular gap between the gas meter interface and the pipe joint. S3, Sealing Attitude Adaptive Calibration: The multi-dimensional sensing and acquisition unit collects the deformation data of the first annular rubber bladder around its entire circumference in real time. The adaptive pressure regulation main control unit continuously compares the real-time deformation value of the first annular rubber bladder with the preset uniform fit reference and automatically fine-tunes the input pressure of the gaseous medium until the deformation deviation of the first annular rubber bladder around its entire circumference is less than 5% compared with the reference value, and then determines that the sealing posture is qualified. S4, Adaptive switching between gas and liquid media: After confirming that the sealing posture is qualified, the adaptive pressure regulating main control unit automatically cuts off the gas medium passage and switches to the liquid medium input circuit. Based on the real-time collected contact stress signal, it adaptively adjusts the input pressure of the liquid medium so that the contact stress between the first annular rubber bladder and the interface is stably maintained within the preset range. S5, Closed-loop voltage regulation with self-correction: The closed-loop verification feedback module monitors the pressure-holding leakage rate of the gas meter's detection circuit in real time. When the leakage rate exceeds the preset threshold, it automatically triggers the adaptive pressure regulating main control unit to increase the liquid medium pressure until the leakage rate falls back to the qualified range. After completing the steady-state sealing, the gas meter's performance testing process is automatically started.
[0014] Preferably, after the detection is completed in step S5, the adaptive pressure regulating main control unit automatically controls the gas-liquid linkage execution module to release the liquid medium in the first annular rubber bladder and introduces gaseous medium to purge and recover the remaining liquid medium in the first annular rubber bladder.
[0015] Compared with the prior art, the beneficial effects of the present invention are: 1. In this invention, by setting up an interface gap adaptive detection and sealing control system, a segmented adaptive sealing scheme combining gaseous medium pre-filling and liquid medium pressure stabilization can be adopted. The high diffusivity of the gaseous medium is used to achieve rapid initial expansion and attitude calibration of the first annular rubber bladder, and then the liquid medium is switched to provide stable and lasting sealing pressure using its incompressibility. This effectively solves the technical problems of poor adaptability and insufficient sealing consistency of existing rigid connection methods for interfaces of different diameters. It is conducive to achieving a flexible adaptive sealing effect driven by gas and liquid dual media at the interface position. Simulation verification shows that the sealing qualification rate of gas meter interfaces of different diameters has increased from 82% to 98.5%, and the sealing time of a single detection has been shortened from an average of 45s to 18s, effectively improving the interface sealing efficiency and reliability in batch detection scenarios. 2. In this invention, a closed-loop control system is constructed, consisting of a multi-dimensional sensing and acquisition unit, an adaptive pressure regulation main control unit, a gas-liquid linkage execution module, and a closed-loop verification and feedback module. Using four core parameters—medium pressure, circumferential deformation distribution, contact stress, and real-time leakage rate—as sensing dimensions, this facilitates the realization of a full-link adaptive sealing control mode based on a sealing deformation simulation model and interface parameter library, with negative feedback closed-loop iterative correction as the execution guarantee. This effectively overcomes the problem in existing technologies where rigid connections cannot dynamically correct gap sealing effects. After thousands of cycles of testing, the rubber bladder's sealing performance decays by less than 3%, ensuring the continuous stability of the interface sealing posture and the accuracy and reliability of the test results during the testing process. 3. In this invention, a scissor-arm lifting assembly is used for smooth lifting drive. Combined with the adaptive compensation of the first annular rubber bladder in the adaptive sealing assembly at the interface, the device can flexibly adapt to the differences in interface spacing, diameter, height, and angle of gas meters of different specifications. Even if the gas meter interface is tilted, the tilt gap can be stably sealed by adjusting the first annular rubber bladder in the adaptive sealing assembly. Thus, the device has multiple advantages such as strong versatility, convenient operation, high sealing redundancy, and low use and maintenance costs. Attached Figure Description
[0016] The accompanying drawings, which are included to provide a further understanding of the invention and form part of this application, illustrate exemplary embodiments of the invention and, together with their description, serve to explain the invention and do not constitute an undue limitation thereof. In the drawings: Figure 1This is a perspective view of the pneumatic pressure regulating control device for the lifting platform of the present invention. Figure 2 For the present invention Figure 1 Top view of the structure; Figure 3 For the present invention Figure 2 Sectional view at point AA; Figure 4 For the present invention Figure 3 Enlarged view of point C in the middle; Figure 5 For the present invention Figure 4 Enlarged view of point D in the middle; Figure 6 For the present invention Figure 4 Enlarged view at point E in the middle; Figure 7 For the present invention Figure 2 Sectional view at point BB; Figure 8 For the present invention Figure 7 Enlarged view at point F; Figure 9 This is a perspective view of the two pipe fittings, guide rail, and connecting frame of the present invention; Figure 10 This is a perspective view of the pipe fitting of the present invention; Figure 11 This is an exploded view of the internal structure of the pipe fitting of the present invention; Figure 12 This is an exploded view of the adaptive sealing component of the present invention; Figure 13 This is a perspective view of the lifting component of the present invention; Figure 14 This is a schematic diagram of the interface gap adaptive detection and sealing control system of the present invention.
[0017] In the picture: 1. Multidimensional sensing and acquisition unit; 101. Medium pressure sensor; 102. Deformation sensor; 103. Contact stress sensor; 11. Adaptive pressure regulation main control unit; 12. Gas-liquid linkage execution module; 121. Air pump; 122. Circulating pump; 123. Vacuum generator; 124. Electro-controlled valve; 13. Closed-loop verification feedback module; 2. Outer frame; 21. Pipe fitting; 211. Connecting cavity; 212. Expanding interface; 22. Threaded hose; 23. Guide rail; 24. Connecting frame; 3. Adaptive sealing assembly; 31. First annular rubber bladder; 311. First inlet; 312. First outlet; 32. First annular plate; 33. Second annular plate; 34. First rubber gasket; 35. Second rubber gasket; 36. Second annular rubber bladder; 361. Second inlet; 362. Second outlet; 4. Lifting assembly; 41. Base; 42. Top plate; 43. Scissor arm; 44. Cylinder; 5. Piston chamber; 51. Piston column; 52. Third inlet; 53. Third outlet; 6. Spotlights; 61. High-transparency partitions. Detailed Implementation
[0018] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.
[0019] Example: This example provides an interface gap adaptive detection and sealing control system. See [link to example]. Figure 14 Specifically, it includes a multi-dimensional sensing and acquisition unit 1, an adaptive pressure regulation main control unit 11, a gas-liquid linkage execution module 12, a closed-loop verification and feedback module 13, and a first annular rubber bladder 31 set inside the interface. The control system monitors the sealing status of the interface in all aspects in real time through the multi-dimensional sensing and acquisition unit 1. Combined with the intelligent decision-making capability of the adaptive pressure regulation main control unit 11, it is conducive to realizing the fully automated sealing control of the first annular rubber bladder 31 from pre-filling to pressure stabilization and self-correction.
[0020] The multi-dimensional sensing and acquisition unit 1 is used to collect four core operating parameters in real time: the medium pressure inside the first annular rubber bladder 31, the circumferential deformation distribution data of the first annular rubber bladder 31, the contact stress feedback signal of the interface, and the real-time leakage rate of the interface. The multi-dimensional sensing and acquisition unit 1 consists of multiple sensors of different types, including a medium pressure sensor 101, a deformation sensor 102, a contact stress sensor 103, and a leakage rate sensor. The medium pressure reflects the degree of filling inside the first annular rubber bladder 31 and the driving ability of the transported medium. The circumferential deformation distribution data is used to evaluate the uniformity of the fit between the first annular rubber bladder 31 and the interface wall. The contact stress feedback signal directly characterizes the compression state of the interface. The real-time leakage rate is the final quantitative indicator of the sealing effect. The four parameters are interrelated and can jointly constitute a full-dimensional evaluation system of the sealing state.
[0021] The adaptive pressure regulating main control unit 11 has a built-in simulation model of the sealing deformation of the first annular rubber bladder 31 and an interface parameter library. The adaptive pressure regulating main control unit 11 continuously compares the collected real-time operating parameters with the preset sealing reference value and automatically generates dynamic control commands. After the current sealing state of the interface fully matches the reference requirements, it triggers the next stage of medium switching action. The sealing deformation simulation model is established based on the finite element analysis method. It can predict the deformation trend and contact stress distribution of the first annular rubber bladder 31 in real time according to the input interface parameters of different diameters and medium pressure values, which can provide a theoretical basis for the generation of control commands.
[0022] Specifically, the built-in sealing deformation simulation model of the adaptive pressure regulating main control unit 11 is established based on the finite element analysis method. Its input parameters include: the inner diameter of the interface is DN15~DN50, the wall thickness of the interface is 2~8mm, the rubber bladder material parameters are elastic modulus E=3.5~5.2MPa, Poisson's ratio ν=0.48~0.495, hardness Shore A 55~75, gaseous medium pressure is 0.05~0.5MPa, and liquid medium pressure is 0.1~1.0MPa.
[0023] The interface parameter library stores the geometric and material parameters of various interface specifications. The parameter types include: interface outer diameter D (mm), interface inner diameter d (mm), interface wall thickness t (mm), interface material (carbon steel / stainless steel / cast iron), connection standard (GB / T12459 / ASME B16.9), rubber bladder material model, working temperature range, and media type. The value range covers: DN15 corresponds to an outer diameter of 21.3mm and an inner diameter of 15.8mm, DN20 corresponds to an outer diameter of 26.9mm and an inner diameter of 20.9mm, DN25 corresponds to an outer diameter of 33.7mm and an inner diameter of 26.6mm, DN32 corresponds to an outer diameter of 42.2mm and an inner diameter of 35.8mm, DN40 corresponds to an outer diameter of 48.3mm and an inner diameter of 40.9mm, and DN50 corresponds to an outer diameter of 60.3mm and an inner diameter of 52.5mm.
[0024] The specific threshold values for the sealing reference are set as follows: the contact stress range is 0.15–0.35 MPa, the deformation deviation threshold is ≤5%, where the full-circumference deformation deviation is calculated by dividing the absolute value of the difference between the deformation value at each measuring point and the average deformation value by the average deformation value and then multiplying by 100%, and the acceptable leakage rate threshold is ≤1×10⁻⁶. -3 Pa·m 3 / s (measured by helium mass spectrometry leak detection method), pressure fluctuation ≤ ±0.01MPa after pressure holding and stabilization time ≥30s.
[0025] After receiving the control command output by the adaptive pressure regulating main control unit 11, the gas-liquid linkage execution module 12 sequentially introduces gaseous pre-filling medium and liquid pressure stabilizing medium into the first annular rubber bladder 31, driving the first annular rubber bladder 31 to complete adaptive deformation filling. The gas-liquid linkage execution module 12 consists of an air pump 121, a circulation pump 122, a vacuum generator 123, and an electric control valve 124. The air pump 121 performs the gaseous medium supply operation, and the circulation pump 122 performs the liquid medium supply operation. Through the cooperation of the air pump 121 and the vacuum generator 123, the negative pressure suction operation is realized. The opening and closing of each electric control valve 124 realizes the opening and closing of the corresponding pipeline. Due to the low density and high fluidity of the gaseous medium, it can quickly diffuse in the first annular rubber bladder 31 during filling, realizing preliminary expansion and attitude calibration. Due to the incompressibility of the liquid medium, it can provide a stable and uniform contact pressure after filling the first annular rubber bladder 31, ensuring the reliability and durability of the interface gap seal.
[0026] Specifically, the gas-liquid linkage execution module 12 also includes a liquid storage tank connected to the circulating pump 122. The liquid storage tank is used to store liquid media. The inlet of the first annular rubber bladder 31 is connected to the gas pump 121 and the circulating pump 122 respectively via a three-way pipe. The connection position is controlled by the corresponding solenoid valve 124 for opening and closing and flow control. The outlet of the first annular rubber bladder 31 is connected to the negative pressure suction port of the vacuum generator 123, and the connection position is controlled by another solenoid valve 124 for opening and closing and flow control. The gas pump 121 and the vacuum generator 123 are connected by a three-way pipe for opening and closing and flow control. The air outlet of the vacuum generator 123 is connected to the liquid storage tank. During the operation of the gas-liquid linkage execution module 12, when it is necessary to supply gaseous medium into the first annular rubber bladder 31, the air pump 121 is started. It is only necessary to control the opening degree (inlet flow rate) of the solenoid valve 124 connected to the air pump 121 in the inlet direction of the first annular rubber bladder 31 to be greater than the opening degree (outlet flow rate) of the solenoid valve 124 connected to the vacuum generator 123 in the outlet direction of the first annular rubber bladder 31 to realize the gas injection operation. The principle is the same when supplying liquid medium.
[0027] When the supply is switched from a gaseous medium to a liquid medium, it is only necessary to control the opening of the electronically controlled valve 124 connected to the circulation pump 122 in the inlet direction of the first annular rubber bladder 31 (the electronically controlled valve 124 connected to the air pump 121 is closed). Similarly, when the supply is switched from a liquid medium to a gaseous medium, it is only necessary to control the opening of the electronically controlled valve 124 connected to the air pump 121 in the inlet direction of the first annular rubber bladder 31 (the electronically controlled valve 124 connected to the circulation pump 122 is closed). Throughout the entire switching process, the air outlet of the vacuum generator 123 is always kept in communication with the liquid storage tank, so that the gaseous medium or liquid medium in the first annular rubber bladder 31 is eventually discharged into the liquid storage tank. A gas discharge pressure relief valve is installed on the liquid storage tank to allow smooth discharge of the gaseous medium, while the liquid medium discharged from the first annular rubber bladder 31 remains in the liquid storage tank for recycling. The timing control for switching from gaseous medium to liquid medium is: at time T0, the gaseous sealing is completed and judged to be qualified, T 0+0.5s The electronically controlled valve 124 connected to the gas path in the inlet direction is closed to cut off the gas source, T 0+1.0s Open the electronically controlled valve 124 connected to the liquid path in the inlet direction and the electronically controlled valve 124 connected in the outlet direction. During the continuous entry of the liquid medium, the gaseous medium is discharged, T 0+5.0s The pressure of the liquid medium reaches the set value and the switching is completed.
[0028] The closed-loop verification feedback module 13 verifies the pressure-holding leakage rate and contact stress stability of the interface after sealing in real time. The closed-loop verification feedback module 13 transmits the deviation signal back to the adaptive pressure regulation main control unit 11 to form a negative feedback closed-loop control, which automatically iteratively corrects the pressure parameter of the medium in the first annular rubber bladder 31 until the sealing state of the interface meets the preset index. This mechanism can ensure the self-stabilization capability of the sealing performance of the interface gap during long-term operation or when subjected to external disturbances.
[0029] Specifically, the multi-dimensional perception acquisition unit is composed of a sensor array, wherein the deformation sensors 102 include no less than 8 strain gauge sensors evenly arranged along the circumferential direction of the first annular rubber bladder 31, the interval angle between adjacent sensors is 45°, and the sampling frequency is ≥ 100Hz. This arrangement manner can fully reflect the deformation uniformity of the first annular rubber bladder 31 in the entire circumferential direction. No less than 2 medium pressure sensors 101 are arranged in the first annular rubber bladder 31, which are respectively located near the inlet direction and near the outlet direction. The two-point arrangement can monitor the uniformity of the pressure distribution inside the bladder.
[0030] This embodiment provides a pneumatic pressure regulation control device for a detection lifting platform, see Figure 1 - Figure 14Specifically, the control device is equipped with the aforementioned interface gap adaptive detection and sealing control system. The control device includes an outer frame 2. Two pipe joints 21 are installed in the upper part of the outer frame 2, and a connecting cavity 211 is provided in the pipe joint 21. An expansion port 212 communicating with the inside of the connecting cavity 211 is fixedly installed at the lower end of the pipe joint 21. The cross-section of the expansion port 212 is set as an inverted L-shaped structure. A threaded hose 22 communicating with the inside of the connecting cavity 211 is fixedly installed on the pipe joint 21. The two threaded hoses 22 are connected to the detection equipment.
[0031] An adaptive sealing assembly 3 is installed inside the expansion port 212. The adaptive sealing assembly 3 includes a first annular rubber bladder 31. A medium pressure sensor 101 is installed inside the first annular rubber bladder 31. A first inlet 311 communicating with the inside of the first annular rubber bladder 31 is fixedly installed on one side of the expansion port 212, and a first outlet 312 communicating with the inside of the first annular rubber bladder 31 is fixedly installed on the other side of the expansion port 212. The first inlet 311 is connected to the output port of the air pump 121 through a pipe, and an electric control valve 124 is installed on this pipe. The first inlet 311 is also connected to the output port of the circulating pump 122 through another pipe. An electrically controlled valve 124 is also installed on the pipeline. The first outlet 312 is connected to the negative pressure suction port of the vacuum generator 123 through a pipeline, and an electrically controlled valve 124 is installed on this pipeline. The air inlet of the vacuum generator 123 is connected to the output port of the air pump 121 through a pipeline, and an electrically controlled valve 124 is also installed on it. The air pump 121 can be used to fill the first annular rubber bladder 31 with gaseous medium, and the circulation pump 122 can be used to fill the first annular rubber bladder 31 with liquid medium. Through the cooperation of the air pump 121 and the vacuum generator 123, a negative pressure suction operation can be performed on the inside of the first annular rubber bladder 31.
[0032] A lifting assembly 4 is installed in the lower part of the outer frame 2, located directly below the two pipe joints 21. The lifting assembly 4 includes a base 41 and a top plate 42. A scissor arm 43 is installed between the base 41 and the top plate 42, and a cylinder 44 is used to control the deformation amplitude of the scissor arm 43. During the use of this device, the gas meter to be tested is placed on the top plate 42. The cylinder 44 drives the extension and retraction deformation of the scissor arm 43 to achieve the smooth lifting and lowering of the top plate 42 and the gas meter to be tested on it. This allows the gas meter interface to be precisely aligned with the adaptive sealing assembly 3 in the expansion interface 212 at the lower part of the two pipe joints 21, forming a detection circuit. This operation is convenient and efficient, and can effectively improve the convenience of testing and replacing different gas meters. The leakage rate sensor is connected in series in the detection circuit and is located on the main path of the detection medium flow. It can be a helium mass spectrometer leak detector with a sensitivity ≤1×10 -10 Pa·m 3 / s, which can accurately detect minute leaks, thereby monitoring the pressure holding status of the entire detection circuit in real time.
[0033] In the specific implementation process, such as Figure 3 - Figure 8 and Figure 12 As shown, a first annular rubber bladder 31 has a first annular plate 32 and a second annular plate 33 fixedly installed on its upper and lower sides, respectively. The first annular plate 32 and the second annular plate 33 are movably installed in the expansion interface 212. By setting the outer diameter of the first annular plate 32 to match the inner diameter of the expansion interface 212, the stability of the first annular rubber bladder 31 installed in the expansion interface 212 can be effectively improved. By setting the outer diameter of the second annular plate 33 to be smaller than the inner diameter of the expansion interface 212, the second annular plate 33 has sufficient adaptive tilt space when the lower gas meter interface is docked in a slightly tilted state. By fixing the rigid first annular plate 32 and the second annular plate 33 on the upper and lower sides of the first annular rubber bladder 31, the deformation of the first annular rubber bladder 31 expanding and filling the interface gap during the interface docking process is more regular, which helps to prevent the first annular rubber bladder 31 from extending downwards excessively and deviating from the sealing interface, thereby improving the stability of the device during the interface docking process to a certain extent.
[0034] In this device, the boundary conditions of the sealing deformation simulation model are as follows: a normal contact constraint is set between the first ring plate 32 and the inner wall of the expansion interface 212, using the penalty function method, with a contact stiffness of 100 N / mm; a normal contact constraint is set between the second ring plate 33 and the gas meter interface, and a fixed constraint is applied to the bottom surface; the output judgment index of the sealing deformation simulation model is: maximum equivalent stress ≤ 0.8 MPa (safety factor ≥ 2.0), maximum deformation value ≤ 0.5 mm, and contact stress distribution uniformity coefficient ≥ 0.85.
[0035] The top of the first ring plate 32 is fixedly covered with a first rubber pad 34, and the bottom of the second ring plate 33 is fixedly covered with a second rubber pad 35. A contact stress sensor 103 is embedded in the second rubber pad 35. There are no fewer than four contact stress sensors 103, which are evenly distributed around the gas meter interface. They are used to directly measure the contact stress between the sealing interface and the gas meter interface. The setting of the first rubber pad 34 and the second rubber pad 35 can provide an initial buffer and pre-sealing effect on the interface position when the lifting component 4 pushes the gas meter interface upward to contact the adaptive sealing component 3. This helps to avoid direct collision between metal parts and damage to the interface end face, thereby effectively enhancing the overall sealing reliability of the interface position.
[0036] In the specific implementation process, such as Figure 5 - Figure 8 and Figure 11 - Figure 12As shown, a second annular rubber bladder 36 is fixedly installed around the inner wall of the expansion port 212, and the second annular rubber bladder 36 is located below the second rubber pad 35. A second inlet 361 communicating with the inside of the second annular rubber bladder 36 is fixedly installed on one side of the expansion port 212, and a second outlet 362 communicating with the inside of the second annular rubber bladder 36 is fixedly installed on the other side of the expansion port 212. The air path connection of the second annular rubber bladder 36 is similar to that of the first annular rubber bladder 31. The second inlet 361 is connected to the air pump 121, and the second outlet 362 is connected to the air pump 121 through the vacuum generator 123. The second annular rubber bladder 36 serves as an auxiliary sealing element. When necessary, it can work with the first annular rubber bladder 31 to pressurize and expand, forming a double sealing barrier on the top and sides. This is beneficial for further improving the redundancy and reliability of the seal at the interface, and is especially suitable for high-pressure testing or testing scenarios with extremely stringent sealing requirements.
[0037] Specifically, the triggering condition for the dual-bag collaborative sealing control logic is: when the contact stress sensor 103 detects a contact stress < 0.15 MPa or a leakage rate > 5 × 10⁻⁶ MPa. -4 Pa·m 3 At a pressure of / s, the adaptive pressure regulating main control unit 11 automatically triggers the dual-bladder collaborative sealing control. The control logic is as follows: the adaptive pressure regulating main control unit 11 controls the gas-liquid linkage execution module 12 to fill the second annular rubber bladder 36 with a gaseous medium at a pressure of 0.05 to 0.15 MPa through the second inlet 361, so that the second annular rubber bladder 36 expands and adheres tightly to the inner wall of the expansion port 212 to form a second auxiliary sealing barrier. When the first annular rubber bladder 31 and the second annular rubber bladder 36 work together, the adaptive pressure regulating main control unit 11 increases the pressure set value of the first annular rubber bladder 31 by 10% to 20%, while the pressure of the second annular rubber bladder 36 is maintained at a level where the pressure difference with the first annular rubber bladder 31 is ≤0.05 MPa. Thus, when the main sealing performance decreases, the auxiliary seal is automatically activated to reduce the load on the main seal.
[0038] In this device, the first annular rubber bladder 31 and the second annular rubber bladder 36 are preferably made of ethylene propylene diene monomer (EPDM) rubber or fluororubber (FKM), with an oil resistance grade ≥ FKM, enabling them to adapt to the working conditions of long-term contact with hydraulic oil. In actual use, the maintenance cycle of this device is every 5000 charge-discharge cycles or every 6 months (whichever comes first). The rubber bladder is visually inspected and its hardness is tested. When the surface of the rubber bladder shows cracks with a depth > 0.5 mm, a hardness change exceeding Shore A 10 degrees, or permanent deformation (rebound rate < 90%), it is replaced. After each replacement, an unloaded sealing test needs to be performed without installing a gas meter to verify whether the sealing deformation simulation model parameters of the rubber bladder need to be updated, thereby ensuring that the sealing performance of the replaced rubber bladder meets the test requirements.
[0039] In the specific implementation process, such as Figure 4 and Figure 8 - Figure 11 As shown, a horizontally arranged guide rail 23 is fixedly installed on the upper part of the outer frame 2, and a connecting frame 24 that is slidably connected to the guide rail 23 is fixedly installed on the pipe joint 21. A pneumatic positioning mechanism is installed on the upper part of the pipe joint 21. By setting the horizontally arranged guide rail 23, the two pipe joints 21 can slide and adjust the distance along the horizontal direction, so as to adapt to the center distance difference of the interfaces of different types of gas meters and other gas metering instruments, which is beneficial to improving the versatility and compatibility of the device.
[0040] The pneumatic positioning mechanism includes a piston chamber 5 that extends through the upper part of the pipe joint 21, and a vertically arranged piston column 51 that is slidably installed in the piston chamber 5. A third inlet 52 that communicates with the interior of the piston chamber 5 is fixedly installed on one side of the pipe joint 21, and a third outlet 53 that communicates with the interior of the piston chamber 5 is fixedly installed on the other side of the pipe joint 21. The third inlet 52 and the third outlet 53 are located below the piston column 51. The air path connection in the piston chamber 5 is similar to the air path connection of the first annular rubber bladder 31. The third inlet 52 is connected to the air pump 121, and the third outlet 53 is connected to the air pump 121 through the vacuum generator 123. When the pipe joint 21 is adjusted to a predetermined position, the piston chamber 5 can be inflated by controlling the air intake of the third inlet 52, thereby driving the piston column 51 to push upward along the piston chamber 5 and press against the upper part of the outer frame 2. This not only provides auxiliary support in the height direction of the pipe joint 21, but also effectively ensures the stability of the pipe joint 21 after the position is adjusted.
[0041] In the specific implementation process, such as Figure 4 , Figure 8 and Figure 11 As shown, a vertically downward spotlight 6 is installed inside the pipe joint 21, and the spotlight 6 is fixedly installed below the piston column 51 inside the piston chamber 5. A high-transparency baffle 61 is fixedly installed inside the pipe joint 21 and disposed between the pipe joint 21 and the piston chamber 5. The high-transparency baffle 61 ensures the penetration of the light beam and can also physically isolate the spotlight 6 from the connecting cavity 211, which is beneficial to ensuring airtightness and electrical safety. The spotlight 6 uses an LED light source with an IP67 protection rating. By aligning the lower part of the spotlight 6 with the axis of the adaptive sealing component 3, the indicator beam emitted by the spotlight 6 can be projected downward along the central axis of the adaptive sealing component 3 during operation. This allows the operator to visually judge whether the gas meter interface is aligned with the axis of the adaptive sealing component 3 by the beam landing point when the lifting component 4 lifts the gas meter to be tested, which is beneficial to achieving fast and accurate pre-docking positioning operation.
[0042] This embodiment provides a method for detecting adaptive sealing of gas meter interface gaps, see [link to relevant documentation]. Figure 1 - Figure 14 Specifically, the testing method applies to the above-mentioned pneumatic pressure regulating control device for the lifting platform, and the testing method includes the following steps: S1. Pre-docking positioning: The driving lifting component 4 drives the gas meter under test to rise, so that the gas meter's inlet and outlet interfaces are pre-fitted with the adaptive sealing components 3 at the bottom of the two pipe joints 21. The initial contact position signal is collected and transmitted back to the adaptive pressure regulating main control unit 11. The adaptive pressure regulating main control unit 11 determines whether the interface has entered the effective docking range based on the transmitted contact position signal. If a deviation occurs, a position correction prompt is issued. S2, Adaptive pre-filling of gaseous media: The adaptive pressure regulating main control unit 11 calls the sealing deformation simulation model, matches the interface diameter parameters of the gas meter under test, automatically generates the initial gaseous medium pressure curve, introduces the gaseous medium into the first annular rubber bladder 31, drives the first annular rubber bladder 31 to undergo the first expansion, adaptively fills the annular gap between the gas meter interface and the pipe joint 21. The gaseous medium is preferably compressed air or nitrogen, which uses its high diffusivity to quickly fill the internal space of the first annular rubber bladder 31, providing a good initial attitude for subsequent accurate calibration. S3, Sealing Attitude Adaptive Calibration: The multidimensional sensing and acquisition unit 1 collects the deformation data of the entire circumference of the first annular rubber bladder 31 in real time. The adaptive pressure regulation main control unit 11 continuously compares the real-time deformation value of the first annular rubber bladder 31 with the preset uniform bonding reference and automatically fine-tunes the input pressure of the gaseous medium until the deformation deviation of the entire circumference of the first annular rubber bladder 31 is less than 5% compared with the reference value, and the sealing posture is deemed qualified. In this step, the multidimensional sensing and acquisition unit 1 obtains spatially resolved deformation data through multiple deformation sensors 102 distributed along the circumference of the first annular rubber bladder 31 to ensure that local uneven bonding is detected and corrected. The deformation sensor 102 can be a strain gauge array or a fiber optic grating sensor. S4, Adaptive switching between gas and liquid media: After confirming that the sealing posture is qualified, the adaptive pressure regulating main control unit 11 automatically cuts off the gas medium passage and switches to the liquid medium input circuit. Based on the real-time collected contact stress signal, it adaptively adjusts the input pressure of the liquid medium so that the contact stress between the first annular rubber bladder 31 and the interface is stably maintained within the preset range. The liquid medium is preferably hydraulic oil or other incompressible fluid. Its high bulk elastic modulus provides a stable and long-lasting high-pressure sealing force for the sealing interface. Furthermore, the incompressibility of the liquid medium significantly improves the overall stiffness of the first annular rubber bladder 31, which is beneficial to further enhance the pressure-resistant sealing capability at the interface. S5, Closed-loop voltage regulation with self-correction: The closed-loop verification feedback module 13 monitors the pressure-holding leakage rate of the gas meter detection circuit in real time. When the leakage rate exceeds the preset threshold, the adaptive pressure regulating main control unit 11 is automatically triggered to increase the liquid medium pressure until the leakage rate falls back to the qualified range. After the steady-state sealing is completed, the gas meter performance testing process is automatically started. This closed-loop correction mechanism runs through the entire testing process, so that even if a small seal loosening or pressure drift occurs during the gas meter performance testing, the entire system can autonomously sense and compensate in real time, which helps to ensure the accuracy and repeatability of the test data.
[0043] After step S5 is completed, the adaptive pressure regulating main control unit 11 automatically controls the gas-liquid linkage execution module 12 to release the liquid medium in the first annular rubber bladder 31 and introduce gaseous medium to purge and recover the residual liquid medium in the first annular rubber bladder 31. After purging at the maximum flow rate for 3 seconds, the purging operation is completed. This purging and recovery step can, on the one hand, restore the first annular rubber bladder 31 to its initial relaxed state, so as to facilitate the smooth disassembly and replacement of the gas meter. On the other hand, it can also ensure the operational stability during subsequent repeated processes.
[0044] Specifically, the detection method also includes abnormal operating condition handling logic: When any sensor signal is lost for three consecutive sampling cycles (30ms), the adaptive voltage regulation main control unit 11 automatically switches to backup sensor data or historical data prediction model for compensation. If all backup data is unavailable, an audible and visual alarm is issued and the detection process is automatically terminated to ensure safety. If the reading of the medium pressure sensor 101 does not rise to 80% of the set value within 5 seconds after the adaptive pressure regulating main control unit 11 issues a pressurization command, it is determined that the pressurization has failed, and all electronic control valves 124 are automatically closed and an alarm is triggered. If the leakage rate still exceeds the preset threshold after the closed-loop verification feedback module 13 increases the liquid medium pressure three times in a row, it will determine that the seal has failed, automatically depressurize and alarm, and record the fault data for subsequent analysis. When the pressure in any circuit exceeds 120% of the set upper limit, the corresponding electronically controlled valve 124 will be automatically opened to release pressure. At the same time, the adaptive pressure regulating main control unit 11 will cut off all pump sources to prevent overpressure damage to the equipment.
[0045] Specifically, the working principle of this invention is as follows: Before testing, according to the model and specifications of the gas meter to be tested, the distance between the two pipe joints 21 is adjusted by sliding along the guide rail 23 to match the position of the gas meter's inlet and outlet interfaces. The corresponding interface diameter parameters are retrieved from the interface parameter library of the adaptive pressure regulating main control unit 11. The gas meter to be tested is placed on the top plate 42, and the cylinder 44 is activated to drive the scissor arm 43 to extend, causing the top plate 42 and the gas meter to rise smoothly. The operator uses the indicator beam projected downward by the spotlight 6 to help judge the alignment of the gas meter interface with the axis of the adaptive sealing component 3, thus achieving rapid pre-positioning.
[0046] After the gas meter interface rises to contact the adaptive sealing component 3, the multi-dimensional sensing and acquisition unit 1 collects the initial contact position signal and sends it back to the adaptive pressure regulating main control unit 11 to confirm that it has entered the effective docking range. Subsequently, the adaptive pressure regulating main control unit 11 activates the pneumatic positioning mechanism, and pushes the piston column 51 upward along the piston cavity 5 by introducing compressed gas into the third inlet 52, pressing it against the upper part of the outer frame 2 to provide auxiliary support and position limitation for the pipe joint 21. The adaptive pressure regulating main control unit 11 simultaneously calls the sealing deformation simulation model, automatically generates the initial gaseous medium pressure curve according to the current interface diameter parameters, and controls the gas-liquid linkage execution module 12 to introduce compressed air into the first annular rubber bladder 31 through the first inlet 311, driving the first annular rubber bladder 31 to undergo the first expansion. Its outer wall expands radially outward, adaptively filling the gap between the gas meter interface and the expansion interface 212. The posture of the second ring plate 33 adaptively fits the gas meter interface under the pushing action of the first annular rubber bladder 31.
[0047] During the expansion of the first annular rubber bladder 31, the multidimensional sensing and acquisition unit 1 collects the full-circumference deformation distribution data in real time through the deformation sensor 102 arranged along the circumference of the rubber bladder. The adaptive pressure regulating main control unit 11 continuously compares the real-time deformation value with the preset uniform fit benchmark, automatically fine-tunes the input pressure of the gaseous medium, and performs targeted pressure compensation adjustment until the full-circumference deformation deviation is less than 5%, and the sealing posture is deemed qualified.
[0048] Subsequently, the adaptive pressure regulating main control unit 11 automatically cuts off the gaseous medium passage and switches to the liquid medium input circuit. Hydraulic oil is injected into the first annular rubber bladder 31 through the first inlet 311. Due to the incompressibility of the liquid medium, the overall rigidity of the first annular rubber bladder 31 is significantly improved, generating uniform and lasting contact stress between it and the interface wall. The multi-dimensional sensing and acquisition unit 1 provides real-time feedback of the contact stress signal, and the adaptive pressure regulating main control unit 11 dynamically adjusts the liquid medium pressure to keep the contact stress stably within the preset range. In scenarios with higher sealing requirements, the second annular rubber bladder 36 can also be pressurized simultaneously through the second inlet 361 to expand and form a second auxiliary sealing barrier, further improving the sealing redundancy.
[0049] After sealing is completed, the closed-loop verification feedback module 13 continuously monitors the pressure holding leakage rate of the detection circuit. When the leakage rate exceeds the threshold, the deviation signal is immediately sent back to the adaptive pressure regulating main control unit 11, triggering the automatic upward adjustment and correction of the liquid medium pressure until the leakage rate falls back to the qualified range. This closed-loop self-correction mechanism runs continuously throughout the gas meter performance testing process to ensure the long-term stability of the sealing state.
[0050] After the test is completed, the adaptive pressure regulating main control unit 11 controls the gas-liquid linkage execution module 12 to release the liquid medium in the first annular rubber bladder 31 and introduce gas medium for purging. The liquid medium remaining in the first annular rubber bladder 31 is pushed and recycled to the liquid medium circulation system, so that the first annular rubber bladder 31 returns to its initial relaxed state. After the material is unloaded, the next test cycle begins.
[0051] The above are merely preferred embodiments of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. A pneumatic pressure regulating control device for a detection lifting platform, characterized in that: It includes a multi-dimensional sensing and acquisition unit (1), an adaptive pressure regulation main control unit (11), a gas-liquid linkage execution module (12), a closed-loop verification feedback module (13), and a first annular rubber bladder (31) set in the interface. The multidimensional sensing and acquisition unit (1) consists of a medium pressure sensor (101), a deformation sensor (102), a contact stress sensor (103), and a leakage rate sensor. It is used to collect four core operating parameters in real time: the medium pressure in the first annular rubber bladder (31), the circumferential deformation distribution data of the first annular rubber bladder (31), the contact stress feedback signal of the interface, and the real-time leakage rate of the interface. The adaptive pressure regulating main control unit (11) has a built-in simulation model of the sealing deformation of the first annular rubber bladder (31) and an interface parameter library. The adaptive pressure regulating main control unit (11) continuously compares the collected real-time operating parameters with the preset sealing reference value and automatically generates dynamic control commands. After the current sealing state of the interface fully matches the reference requirements, it triggers the next stage of medium switching action. The gas-liquid linkage execution module (12) consists of a gas pump (121), a circulation pump (122), a vacuum generator (123), and an electric control valve (124). After receiving the control command output by the adaptive pressure regulating main control unit (11), it sequentially introduces gaseous pre-filling medium and liquid pressure stabilizing medium into the first annular rubber bladder (31) to drive the first annular rubber bladder (31) to complete adaptive deformation filling. The closed-loop verification feedback module (13) verifies the pressure leakage rate and contact stress stability of the interface after sealing in real time. The deviation signal is transmitted back to the adaptive pressure regulating main control unit (11) through the closed-loop verification feedback module (13) to form a negative feedback closed-loop control. The pressure parameters of the medium in the first annular rubber bladder (31) are automatically iteratively corrected until the sealing state of the interface meets the preset index. The control device also includes an outer frame (2), with two pipe joints (21) installed in the upper part of the outer frame (2), and a connecting cavity (211) provided in the pipe joint (21). An expansion port (212) communicating with the inside of the connecting cavity (211) is fixedly installed at the lower end of the pipe joint (21), and the cross-section of the expansion port (212) is set as an inverted L-shaped structure. A threaded hose (22) communicating with the inside of the connecting cavity (211) is fixedly installed on the pipe joint (21), and an adaptive sealing assembly (3) is installed in the expansion port (212). The adaptive sealing assembly (3) includes a first annular rubber bladder ( 31), a first inlet (311) communicating with the inside of the first annular rubber bladder (31) is fixedly installed on one side of the expansion port (212), and a first outlet (312) communicating with the inside of the first annular rubber bladder (31) is fixedly installed on the other side of the expansion port (212). A lifting assembly (4) located directly below the two pipe joints (21) is installed in the lower part of the outer frame (2), and the lifting assembly (4) includes a base (41) and a top plate (42). A scissor arm (43) is installed between the base (41) and the top plate (42), and a cylinder (44) for controlling the deformation amplitude of the scissor arm (43).
2. The pneumatic pressure regulating control device for a detection lifting platform according to claim 1, characterized in that: The first annular rubber bladder (31) has a first annular plate (32) and a second annular plate (33) fixedly installed on its upper and lower sides respectively. The first annular plate (32) and the second annular plate (33) are movably installed in the expansion port (212). The outer diameter of the first annular plate (32) is adapted to the inner diameter of the expansion port (212), and the outer diameter of the second annular plate (33) is smaller than the inner diameter of the expansion port (212).
3. The pneumatic pressure regulating control device for a detection lifting platform according to claim 2, characterized in that: The top of the first ring plate (32) is fixedly covered with a first rubber pad (34), and the bottom of the second ring plate (33) is fixedly covered with a second rubber pad (35).
4. The pneumatic pressure regulating control device for a detection lifting platform according to claim 3, characterized in that: A second annular rubber bladder (36) is fixedly installed on the inner wall of the expansion port (212), and the second annular rubber bladder (36) is located below the second rubber pad (35). A second inlet (361) communicating with the inside of the second annular rubber bladder (36) is fixedly installed on one side of the expansion port (212), and a second outlet (362) communicating with the inside of the second annular rubber bladder (36) is fixedly installed on the other side of the expansion port (212).
5. The pneumatic pressure regulating control device for a detection lifting platform according to claim 4, characterized in that: The upper part of the outer frame (2) is fixedly installed with a horizontally arranged guide rail (23), and the pipe joint (21) is fixedly installed with a connecting frame (24) that is slidably connected to the guide rail (23). The upper part of the pipe joint (21) is equipped with a pneumatic positioning mechanism.
6. The pneumatic pressure regulating control device for a detection lifting platform according to claim 5, characterized in that: The pneumatic positioning mechanism includes a piston chamber (5) that extends through the upper part of the pipe joint (21), and a vertically arranged piston column (51) is slidably installed in the piston chamber (5). A third inlet (52) communicating with the inside of the piston chamber (5) is fixedly installed on one side of the pipe joint (21), and a third outlet (53) communicating with the inside of the piston chamber (5) is fixedly installed on the other side of the pipe joint (21). The third inlet (52) and the third outlet (53) are located below the piston column (51).
7. The pneumatic pressure regulating control device for a detection lifting platform according to claim 6, characterized in that: A vertically downward spotlight (6) is installed inside the pipe joint (21), and the spotlight (6) is fixedly installed below the piston column (51) inside the piston chamber (5). A high-transparency partition (61) is fixedly installed inside the pipe joint (21) between the pipe joint (21) and the piston chamber (5). The lower part of the spotlight (6) is aligned with the axis of the adaptive sealing assembly (3).
8. The pneumatic pressure regulating control device for a detection lifting platform according to claim 7, characterized in that: The first inlet (311) is connected to the output port of the air pump (121) through a pipe, and an electric control valve (124) is installed on the pipe. The first inlet (311) is connected to the output port of the circulating pump (122) through another pipe, and an electric control valve (124) is also installed on the pipe. The first outlet (312) is connected to the negative pressure suction port of the vacuum generator (123) through a pipe, and an electric control valve (124) is installed on the pipe. The air inlet of the vacuum generator (123) is connected to the output port of the air pump (121) through a pipe, and an electric control valve (124) is also installed on the pipe.
9. A method for detecting the adaptive sealing of a gas meter interface gap, characterized in that: The detection method is applicable to the pneumatic pressure regulating control device for the detection lifting platform as described in any one of claims 1-8, and the detection method includes the following steps: S1. Pre-docking positioning: The drive lifting component (4) lifts the gas meter under test, so that the gas meter’s inlet and outlet ports are pre-fitted with the adaptive sealing component (3) at the bottom of the two pipe joints (21), and the initial contact position signal is collected and transmitted back to the adaptive pressure regulating main control unit (11). S2, Adaptive pre-filling of gaseous media: The adaptive pressure regulating main control unit (11) calls the sealing deformation simulation model, matches the interface diameter parameters of the gas meter under test, automatically generates the initial gas medium pressure curve, introduces gas medium into the first annular rubber bladder (31), drives the first annular rubber bladder (31) to expand for the first time, and adaptively fills the annular gap between the gas meter interface and the pipe joint (21). S3, Sealing Attitude Adaptive Calibration: The multi-dimensional sensing and acquisition unit (1) collects the deformation data of the first annular rubber bladder (31) around the entire circumference in real time. The adaptive pressure regulating main control unit (11) continuously compares the real-time deformation value of the first annular rubber bladder (31) with the preset uniform fit reference and automatically fine-tunes the input pressure of the gaseous medium until the deformation deviation of the first annular rubber bladder (31) around the entire circumference is less than 5% compared with the reference value. The sealing posture is then determined to be qualified. The calculation method of the deformation deviation around the entire circumference is the absolute value of the difference between the deformation value of each measuring point and the average deformation value divided by the average deformation value and then multiplied by 100%. S4, Adaptive switching between gas and liquid media: After confirming that the sealing posture is qualified, the adaptive pressure regulating main control unit (11) automatically cuts off the gas medium passage and switches to the liquid medium input circuit. Based on the contact stress signal collected in real time, it adaptively adjusts the input pressure of the liquid medium so that the contact stress between the first annular rubber bladder (31) and the interface is stably maintained within the preset range. S5, Closed-loop voltage regulation with self-correction: The closed-loop verification feedback module (13) monitors the pressure-holding leakage rate of the gas meter detection circuit in real time. When the leakage rate exceeds the preset threshold, it automatically triggers the adaptive pressure regulating main control unit (11) to increase the liquid medium pressure until the leakage rate falls back to the qualified range. After completing the steady-state sealing, it automatically starts the gas meter performance testing process.
10. The method for detecting adaptive sealing of gas meter interface gap according to claim 9, characterized in that: After the detection is completed in step S5, the adaptive pressure regulating main control unit (11) automatically controls the gas-liquid linkage execution module (12) to release the liquid medium in the first annular rubber bladder (31) and introduce gaseous medium to purge and recover the liquid medium remaining in the first annular rubber bladder (31).
