A computing power server cluster resource dynamic scheduling method

By identifying data dependencies and contributions of intermediate computing states in a computing server cluster and dynamically adjusting computing task nodes, the problem of unreasonable resource scheduling in existing technologies is solved, and more efficient computing state reuse and resource utilization are achieved.

CN123137944APending Publication Date: 2026-11-20BEIJING JIADUOJIABAO TECHNOLOGY DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611633402.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

The existing resource scheduling method for computing server clusters cannot dynamically adjust the composition of computing tasks based on the changing scope of computing objects, the valid status of existing computing results, and the resource status of server nodes, resulting in invalid computing and unreasonable resource scheduling.

Method used

By obtaining the intermediate computing state of continuous computing tasks in the computing server cluster and the data dependency relationship with subsequent related computing tasks, the state contribution is determined. Based on the changing trend of the state contribution during the execution of continuous computing tasks, the execution node of the computing task in the server cluster is dynamically adjusted to keep the intermediate computing state stored on the current server node during the effective residence period, thereby reducing data duplication loading and transmission.

Benefits of technology

It improves the data utilization efficiency of computing tasks, reduces the data interaction burden of server clusters, and optimizes resource utilization efficiency and scheduling flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123137944A_ABST
    Figure CN123137944A_ABST
Patent Text Reader

Abstract

The application discloses a kind of computing power server cluster resource dynamic scheduling method, it is related to computing power server cluster resource scheduling technical field, the present application includes: obtaining the continuous computing task to be executed in computing power server cluster, and the data call relationship between each computing task is determined to determine task execution relationship;In the process of computing task execution, the intermediate computing state generated in stage is acquired, and the data dependency between the intermediate computing state and the subsequent associated computing task is established;According to the reuse range of intermediate computing state, the resource demand corresponding to subsequent associated computing task and the calculation cost required for the regeneration of intermediate computing state, the state contribution degree is determined.The present application determines the state contribution degree by the supporting effect of intermediate computing state on subsequent computing task, and dynamically adjusts the computing task execution node according to the state contribution degree, reduces the data transmission caused by computing state repeated generation and node switching, improves the efficiency of computing power server cluster resource scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of computing server cluster resource scheduling technology, and in particular to a dynamic scheduling method for computing server cluster resources. Background Technology

[0002] With the development of digital engineering design, collaborative model computing, and clustered processing technologies, tasks such as collision detection, engineering quantity calculation, model analysis, and graphics rendering are usually completed collaboratively by multiple computing servers. Different computing tasks have different requirements for processors, memory, graphics computing resources, and data read / write capabilities. Using server clusters to schedule resources for continuous computing tasks has become an important way to improve engineering computing processing capabilities.

[0003] Existing computing server clusters typically use complete engineering models or pre-defined computational tasks as scheduling objects. When local components, parameters, or regions within the engineering model change, the system usually regenerates the corresponding computational tasks based on the model version change and assigns them to server nodes for execution. For example, after local pipeline adjustments in an engineering model, current technologies typically require re-executing collision detection, quantity calculations, and graphics processing tasks for the corresponding region or even the entire professional model. However, local changes in the engineering model usually only affect some related components and their corresponding calculation results, while unchanged model regions still have valid calculation results. If computational tasks are regenerated according to the complete model or fixed task granularity, a large amount of unaffected data will be repeatedly loaded, and unaffected calculation results will be repeatedly calculated, consuming processor, storage, and network transmission resources in the server cluster. Furthermore, since existing task partitioning methods are usually independent of the current data residency and resource status of server nodes, regenerated computational tasks may be assigned to server nodes that have not stored the relevant model data, requiring these server nodes to reacquire the model data before execution, further increasing the data transmission burden.

[0004] Existing resource scheduling methods for computing server clusters cannot dynamically adjust the composition of computing tasks based on the changing scope of computing objects, the valid status of existing computing results, and the resource status of server nodes. In particular, during the execution of continuous computing tasks, intermediate computing states formed by existing computing results may continue to be called by subsequent related tasks, and existing scheduling methods have difficulty in judging the continued utilization value of such intermediate computing states; this can easily lead to invalid computing and unreasonable resource scheduling. To address this, this invention proposes a dynamic resource scheduling method for computing server clusters. Summary of the Invention

[0005] The purpose of this invention is to provide a dynamic scheduling method for computing server cluster resources, which solves the problem that the resource scheduling method of computing server cluster cannot dynamically adjust the composition of computing tasks according to the changing range of computing objects, the valid status of existing computing results, and the resource status of server nodes, which easily leads to invalid computing and unreasonable resource scheduling.

[0006] To solve the above-mentioned technical problems, the present invention is achieved through the following technical solution: This invention relates to a method for dynamic resource scheduling of a computing server cluster, comprising the following steps: S1. Obtain the continuous computing tasks to be executed in the computing server cluster, and determine the task execution relationship based on the data call relationship between each computing task; during the execution of the computing tasks, obtain the intermediate computing states generated in stages by each computing task, and establish the data dependency relationship between the intermediate computing states and subsequent related computing tasks. S2. Determine the reuse scope of each intermediate computing state in the subsequent computing process based on the data dependency relationship, and determine the state contribution of each intermediate computing state based on the reuse scope, the resource requirements of the subsequent associated computing tasks, and the computing cost required to regenerate the intermediate computing state after it is removed from the current server node. S3. Based on the changing trend of state contribution during the execution of continuous computing tasks, determine the corresponding effective state residence stage, and determine the continuous computing tasks corresponding to the effective state residence stage as residence task segments; during the execution of residence task segments, keep the current server node continuing to execute the corresponding computing tasks so that the intermediate computing state can be called by the subsequent associated computing tasks in the residence task segment. S4. Obtain the available computing resources status, data residency status, and task execution status of each server node in the computing server cluster; when the status contribution of the current intermediate computing status is lower than the preset condition, and there is a target server node that can meet the resource requirements of subsequent related computing tasks and support subsequent related computing tasks to call the corresponding intermediate computing status, determine the target server node based on the matching relationship between the data requirements of subsequent related computing tasks and the data residency status of each server node. S5. Schedule subsequent related computing tasks to the target server node for execution, and redetermine the corresponding state contribution based on the new intermediate computing states generated by the subsequent computing tasks, so as to dynamically adjust the execution nodes of computing tasks in the computing server cluster.

[0007] Furthermore, intermediate computation states include the staged computation results generated during the execution of computation tasks, the set of feature data that has data dependencies on subsequent related computation tasks, temporary computation parameters, and cached computation data that can be directly called by subsequent computation tasks; When establishing data dependencies between intermediate computing states and subsequent related computing tasks, the scope of calls for each intermediate computing state is determined based on the objects read by subsequent related computing tasks, the reading order, and the number of calls to the intermediate computing states.

[0008] Furthermore, when determining the state contribution of each intermediate computing state, the degree of state reuse is determined based on the calling scope of the intermediate computing state; the degree of resource support is determined based on the resource requirements of the subsequent associated computing tasks that call the intermediate computing state; the cost of state reconstruction is determined based on the computing steps, computing time, and resource consumption required for the intermediate computing state to be regenerated after it is removed from the current server node; and the state contribution is determined based on the degree of state reuse, the degree of resource support, and the cost of state reconstruction.

[0009] Furthermore, based on the changing trend of the state contribution corresponding to each intermediate computing state during the execution of continuous computing tasks, the effective residence phase in which the intermediate computing state can be continuously called by subsequent related computing tasks is determined; within the effective residence phase, the intermediate computing state is kept stored in the current server node, and the current server node continues to execute subsequent related computing tasks that have a data call relationship with the intermediate computing state.

[0010] Furthermore, when there are multiple consecutively executed subsequent related computation tasks within the computation state residency interval, the multiple subsequent related computation tasks are divided into the same residency task segment according to the data call relationship between the multiple subsequent related computation tasks. During the execution of the resident task segment, the computational tasks corresponding to the resident task segment are continuously executed by the same server node.

[0011] Furthermore, when determining the target server node, the set of intermediate computing states stored in each server node is obtained; the target data set is determined according to the data requirements of the subsequent associated computing tasks; and the target server node is determined according to the data matching relationship between the target data set and the set of intermediate computing states stored in each server node, as well as the remaining computing resources of each server node.

[0012] Furthermore, when multiple server nodes meet the resource requirements of subsequent associated computing tasks, the target server node is determined based on the data continuity between the intermediate computing states stored in each server node and the target data set; whereby data continuity is used to characterize whether the existing intermediate computing states in the server node can meet the data call requirements during the continuous execution of subsequent associated computing tasks.

[0013] Furthermore, after scheduling subsequent related computation tasks to the target server node for execution, the new intermediate computation state generated during the execution process of the target server node is obtained; The corresponding state contribution is redefined based on the data dependency between the new intermediate computing state and subsequent related computing tasks, and the execution nodes of subsequent computing tasks are adjusted according to the updated state contribution.

[0014] Furthermore, when determining the computation state dwell interval, the trend of the state contribution corresponding to the intermediate computation state changes with the execution of continuous computation tasks is obtained; the contribution decay stage corresponding to the intermediate computation state is determined according to the trend of the state contribution change, and the computation state dwell interval is adjusted according to the contribution decay stage. Specifically, when the number of subsequent associated computing tasks corresponding to the intermediate computing state decreases, or when the subsequent associated computing tasks of the intermediate computing state are completed, the resident priority corresponding to the intermediate computing state is reduced, so that the computing server cluster can adjust the execution node of the computing task according to the resident priority.

[0015] Furthermore, based on the contribution decay stage corresponding to the intermediate computing state, the execution order, task completion status, and data call relationship of the subsequent associated computing tasks corresponding to the intermediate computing state are obtained, and the effective residence period of the intermediate computing state in the subsequent computing process is determined. When the effective residency period exceeds the continuous execution period of the current server node to meet resource requirements, the intermediate computing state remains resided on the current server node. When the effective residency period is less than or equal to the continuous execution period of the current server node that meets the resource requirements, and there is a target server node that meets the data and computing resource requirements of the subsequent associated computing tasks, the intermediate computing state is migrated to the target server node, and the target server node continues to execute the corresponding subsequent associated computing tasks.

[0016] The present invention has the following beneficial effects: This invention acquires intermediate computing states generated during the execution of continuous computing tasks in a computing server cluster, establishes data dependencies between intermediate computing states and subsequent related computing tasks, and determines the contribution of states based on the reuse scope of intermediate computing states, the resource requirements of subsequent related computing tasks, and the cost of regenerating computing. This enables the computing server cluster to identify the actual supporting role of different intermediate computing states for subsequent computing processes, avoiding the problem of ineffective utilization of computing state value due to task scheduling based solely on the current resource occupancy of the server.

[0017] This invention determines the effective state residency stage based on the changing trend of state contribution during the execution of continuous computing tasks, and divides multiple continuous computing tasks with data calling relationships into residency task segments. During the effective state residency stage, intermediate computing states are stored in the current server node, so that subsequent related computing tasks can directly call the existing intermediate computing states, reducing data duplication, state regeneration, and data transmission caused by task node switching, and improving data utilization efficiency during the execution of continuous computing tasks.

[0018] When determining the target server node, this invention not only considers the available computing resources of the server node, but also combines the matching relationship between the existing intermediate computing state in the server node and the data requirements of subsequent related computing tasks, as well as the data continuity. This enables the task scheduling process to take into account both computing resource capabilities and the utilization of existing computing states, avoiding the allocation of tasks to server nodes that have computing resources but lack relevant intermediate computing states, and reducing the data migration pressure within the server cluster.

[0019] This invention redetermines the state contribution based on new intermediate computing states generated during subsequent computing task execution, enabling the computing server cluster to dynamically adjust task execution nodes as the computing process changes, thus matching changes in computing state value with the server resource scheduling process. Through this method, the invention reduces invalid and redundant computations, improves the reuse rate of intermediate computing states, reduces the data interaction burden on the computing server cluster, and enhances resource utilization efficiency and scheduling flexibility during continuous computing task execution. Attached Figure Description

[0020] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0021] Figure 1 This is a flowchart of the dynamic scheduling method for computing server cluster resources according to the present invention.

[0022] Figure 2 This is a flowchart of the process for determining the state contribution in this invention.

[0023] Figure 3 This is a flowchart of the calculation of state dwell adjustment based on state contribution decay in this invention. Detailed Implementation

[0024] To make the technical means, creative features, objectives and effects of this invention easier to understand, the invention will be further described below in conjunction with specific embodiments.

[0025] Example 1

[0026] Referring to the figure, a method for dynamic resource scheduling of a computing server cluster includes the following steps: S1. Obtain the continuous computing tasks to be executed in the computing server cluster, and determine the task execution relationship based on the data call relationship between each computing task; during the execution of the computing tasks, obtain the intermediate computing states generated in stages by each computing task, and establish the data dependency relationship between the intermediate computing states and subsequent related computing tasks. Intermediate computation states include the phased computation results generated during the execution of computation tasks, the set of feature data that has data dependencies on subsequent related computation tasks, temporary computation parameters, and cached computation data that can be directly called by subsequent computation tasks; When establishing data dependencies between intermediate computing states and subsequent related computing tasks, the scope of calls for each intermediate computing state is determined based on the objects read by subsequent related computing tasks, the reading order, and the number of calls to the intermediate computing states.

[0027] Specifically, when a computing server cluster executes continuous computing tasks, there are usually data relationships between multiple computing tasks. Data generated by a preceding computing task may be used as input conditions for subsequent computing tasks to continue participating in the calculation. Therefore, this embodiment does not regard each computing task as an independent execution unit. Instead, it obtains intermediate computing states generated in stages during task execution and determines the actual scope of action of different intermediate computing states by analyzing the calls to intermediate computing states by subsequent related computing tasks.

[0028] In this embodiment, during the engineering model processing, the preceding computation task can generate a local feature data set based on the model object relationship. This local feature data set can be called by subsequent model analysis tasks, collision detection tasks, or rendering tasks. At this time, the local feature data set participates in the subsequent computation process as an intermediate computation state. By establishing data dependency relationships, the correspondence between different intermediate computation states and subsequent related computation tasks can be clarified.

[0029] S2. Determine the reuse scope of each intermediate computing state in the subsequent computing process based on the data dependency relationship, and determine the state contribution of each intermediate computing state based on the reuse scope, the resource requirements of the subsequent associated computing tasks, and the computing cost required to regenerate the intermediate computing state after it is removed from the current server node. When determining the state contribution of each intermediate computing state, the degree of state reuse is determined based on the calling scope of the intermediate computing state; the degree of resource support is determined based on the resource requirements of the subsequent associated computing tasks that call the intermediate computing state; the cost of state reconstruction is determined based on the computing steps, computing time and resource consumption required for the intermediate computing state to be regenerated after it is removed from the current server node; and the state contribution is determined based on the degree of state reuse, the degree of resource support and the cost of state reconstruction.

[0030] Specifically, the state contribution is used to characterize the degree to which the intermediate computing state supports the continuous execution of subsequent related computing tasks after it remains on the current server node; among them, the state reuse degree is used to reflect the scope of the intermediate computing state being invoked by subsequent related computing tasks; the resource support degree is used to reflect the supporting role of the intermediate computing state in the computing resources required for the execution of subsequent related computing tasks; and the state reconstruction cost is used to reflect the resource consumption incurred when the intermediate computing state is removed from the current server node and the relevant computing process needs to be re-executed.

[0031] When an intermediate computational state can be continuously invoked by multiple subsequent related computational tasks, and regenerating the intermediate computational state requires many computational steps or consumes a lot of computational resources, it indicates that the intermediate computational state has a high state contribution. Conversely, when the intermediate computational state is only invoked by a few tasks, or can be regenerated with a low computational cost, the corresponding state contribution decreases. In this way, the degree of influence of the intermediate computational state on the subsequent computational process can be used as a basis for determining whether to keep the state in place.

[0032] S3. Based on the changing trend of state contribution during the execution of continuous computing tasks, determine the corresponding effective state residence stage, and determine the continuous computing tasks corresponding to the effective state residence stage as residence task segments; during the execution of residence task segments, keep the current server node continuing to execute the corresponding computing tasks so that the intermediate computing state can be called by the subsequent associated computing tasks in the residence task segment. Based on the changing trend of the state contribution of each intermediate computing state during the execution of continuous computing tasks, the effective residence phase of the intermediate computing state that can be continuously called by subsequent related computing tasks is determined. During the effective residence phase, the intermediate computing state is kept stored in the current server node, and the current server node continues to execute the subsequent related computing tasks that have a data call relationship with the intermediate computing state.

[0033] Specifically, during the execution of continuous computing tasks, the role of the same intermediate computing state varies at different task stages. In the early stages of the generation of the intermediate computing state, its contribution is relatively high because multiple subsequent related computing tasks may need to call the state. As some subsequent related computing tasks are completed, the number of tasks calling the state decreases, and the contribution of the state gradually decreases.

[0034] This embodiment determines the effective dwell stage where the intermediate computing state can continue to play a role based on the changes in the state contribution during task execution. During this stage, the intermediate computing state is stored in the current server node first, so that subsequent related computing tasks can directly call the existing computing state and avoid data reloading due to changes in the server node.

[0035] When there are multiple consecutively executed subsequent related computation tasks within the computation state residency interval, the multiple subsequent related computation tasks are divided into the same residency task segment according to the data call relationship between the multiple subsequent related computation tasks. During the execution of the resident task segment, the computational tasks corresponding to the resident task segment are continuously executed by the same server node.

[0036] Specifically, when multiple subsequent related computation tasks all depend on the same intermediate computation state, the multiple tasks are divided into the same resident task segment, so that the multiple tasks can be completed continuously on the same server node; for example, when multiple computation tasks need to call the same model feature data set, there is no need to reselect the server node after each task is completed, thereby reducing the problem of repeated transmission of intermediate computation state between server nodes.

[0037] S4. Obtain the available computing resources status, data residency status, and task execution status of each server node in the computing server cluster; when the status contribution of the current intermediate computing status is lower than the preset condition, and there is a target server node that can meet the resource requirements of subsequent related computing tasks and support subsequent related computing tasks to call the corresponding intermediate computing status, determine the target server node based on the matching relationship between the data requirements of subsequent related computing tasks and the data residency status of each server node. When determining the target server node, obtain the set of intermediate computing states stored in each server node; determine the target data set based on the data requirements of subsequent associated computing tasks; determine the target server node based on the data matching relationship between the target data set and the set of intermediate computing states stored in each server node, as well as the remaining computing resources of each server node.

[0038] Specifically, when selecting server nodes, scheduling is not based solely on the remaining computing resources of the server nodes, but rather on a comprehensive consideration of the intermediate computing states already stored on the server nodes and the data requirements of subsequent related computing tasks. When a server node has already stored some or all of the intermediate computing states required by subsequent computing tasks, the process of re-acquiring data can be reduced, enabling subsequent computing tasks to be executed more continuously.

[0039] When multiple server nodes meet the resource requirements of subsequent associated computing tasks, the target server node is determined based on the data continuity between the intermediate computing states stored in each server node and the target data set. Here, data continuity is used to characterize whether the existing intermediate computing states in the server node can meet the data call requirements during the continuous execution of subsequent associated computing tasks.

[0040] Specifically, data continuity is used to determine whether the current data state stored by the server node can directly support the execution of subsequent related computing tasks. When multiple server nodes have computing resources that meet the requirements for task execution, the server node that can maintain the continuous call of the intermediate computing state is selected first to reduce the data transmission burden caused by node switching.

[0041] S5. Schedule subsequent related computing tasks to the target server node for execution, and redetermine the corresponding state contribution based on the new intermediate computing states generated by the subsequent computing tasks, so as to dynamically adjust the execution nodes of computing tasks in the computing server cluster.

[0042] After scheduling subsequent related computation tasks to the target server node for execution, obtain the new intermediate computation state generated during the execution process on the target server node; The corresponding state contribution is redefined based on the data dependency between the new intermediate computing state and subsequent related computing tasks, and the execution nodes of subsequent computing tasks are adjusted according to the updated state contribution.

[0043] Specifically, the resource scheduling process in this embodiment is a dynamic cyclic process. During the execution of subsequent associated computing tasks, new intermediate computing states will be continuously generated, and the scope of calling existing intermediate computing states will also change. Therefore, by re-acquiring new intermediate computing states and redetermining the corresponding state contribution, the computing server cluster can dynamically adjust the task execution nodes according to the changes in the computing process, thereby achieving the matching between computing resources and computing states.

[0044] Example 2

[0045] In the above embodiments, during the execution of continuous computing tasks, the supporting role of intermediate computing states for subsequent related computing tasks is not constant. As some related tasks are completed or data access requirements decrease, the reuse value of intermediate computing states gradually declines. Existing resource scheduling methods for computing server clusters typically determine the timing of task migration or resource release based on the current resource occupancy of server nodes. This method cannot determine the effective residence time of intermediate computing states by considering the changing process of their contribution value. This can easily lead to intermediate computing states with high reuse value being migrated prematurely, or intermediate computing states that have lost their utilization value continuing to occupy server resources. Therefore, it is necessary to dynamically determine the effective residence period of intermediate computing states based on their contribution decay process and adjust the execution nodes of computing tasks. To solve this problem, in this embodiment, when determining the residence interval of computing states, the trend of the state contribution degree corresponding to the intermediate computing state changes with the execution process of continuous computing tasks is obtained. The contribution decay stage corresponding to the intermediate computing state is determined based on the trend of the state contribution degree change, and the residence interval of computing states is adjusted based on the contribution decay stage. Specifically, when the number of subsequent associated computing tasks corresponding to the intermediate computing state decreases, or when the subsequent associated computing tasks of the intermediate computing state are completed, the resident priority corresponding to the intermediate computing state is reduced, so that the computing server cluster can adjust the execution node of the computing task according to the resident priority.

[0046] Specifically, the contribution decay phase indicates a phase in which the supporting role of the intermediate computing state for subsequent computing processes gradually decreases. During this phase, although the intermediate computing state may still be called by some subsequent related computing tasks, the necessity for it to continue to maintain the current server node will decrease as the calling demand decreases. Therefore, the computing state residence interval can be adjusted according to the contribution decay phase.

[0047] Based on the contribution decay stage corresponding to the intermediate computing state, obtain the execution order, task completion status and data call relationship of the subsequent associated computing tasks corresponding to the intermediate computing state, and determine the effective residence period of the intermediate computing state in the subsequent computing process. Specifically, the effective dwell time is used to represent the scope of task execution in which the intermediate computing state can still support subsequent related computing tasks. It is not limited to a fixed time length, but is determined based on the execution status of subsequent related computing tasks and the calling relationship of the intermediate computing state.

[0048] When the effective residency period exceeds the continuous execution period of the current server node to meet resource requirements, the intermediate computing state remains resided on the current server node. When the effective residency period is less than or equal to the continuous execution period of the current server node that meets the resource requirements, and there is a target server node that meets the data and computing resource requirements of the subsequent associated computing tasks, the intermediate computing state is migrated to the target server node, and the target server node continues to execute the corresponding subsequent associated computing tasks.

[0049] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of the invention. Various changes and modifications can be made to the invention without departing from its spirit and scope, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of protection of this invention is defined by the appended claims and their equivalents.

Claims

1. A method for dynamic resource scheduling of a computing server cluster, characterized in that, Includes the following steps: S1. Obtain the continuous computing tasks to be executed in the computing server cluster, and determine the task execution relationship based on the data call relationship between each computing task; During the execution of computing tasks, the intermediate computing states generated at each stage of the computing tasks are obtained, and the data dependencies between the intermediate computing states and subsequent related computing tasks are established. S2. Determine the reuse scope of each intermediate computing state in the subsequent computing process based on the data dependency relationship, and determine the state contribution of each intermediate computing state based on the reuse scope, the resource requirements of the subsequent associated computing tasks, and the computing cost required to regenerate the intermediate computing state after it is removed from the current server node. S3. Based on the changing trend of state contribution during the execution of continuous computing tasks, determine the corresponding effective state residence stage, and determine the continuous computing task corresponding to the effective state residence stage as the residence task segment. During the execution of the resident task segment, the current server node continues to execute the corresponding computing task so that the intermediate computing state can be invoked by the subsequent related computing tasks in the resident task segment. S4. Obtain the available computing resources status, data residency status, and task execution status of each server node in the computing server cluster; when the status contribution of the current intermediate computing status is lower than the preset condition, and there is a target server node that can meet the resource requirements of subsequent related computing tasks and support subsequent related computing tasks to call the corresponding intermediate computing status, determine the target server node based on the matching relationship between the data requirements of subsequent related computing tasks and the data residency status of each server node. S5. Schedule subsequent related computing tasks to the target server node for execution, and redetermine the corresponding state contribution based on the new intermediate computing states generated by the subsequent computing tasks, so as to dynamically adjust the execution nodes of computing tasks in the computing server cluster.

2. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, The intermediate computing state includes the stage computing results generated during the execution of the computing task, the feature data set that has data dependency relationship with subsequent related computing tasks, temporary computing parameters, and cached computing data for direct invocation by subsequent computing tasks; When establishing the data dependency relationship between the intermediate computing state and subsequent associated computing tasks, the calling scope corresponding to each intermediate computing state is determined based on the reading objects, reading order, and number of calls of the intermediate computing state by the subsequent associated computing tasks.

3. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, When determining the state contribution of each intermediate computing state, the degree of state reuse is determined based on the calling scope of the intermediate computing state; the degree of resource support is determined based on the resource requirements of the subsequent associated computing tasks that call the intermediate computing state. The state reconstruction cost is determined based on the required computation steps, computation time, and resource consumption for regenerating the intermediate computation state after it leaves the current server node; the state contribution is determined based on the state reuse level, resource support level, and state reconstruction cost.

4. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, Based on the trend of state contribution changes of each intermediate computing state during the execution of continuous computing tasks, the effective residence phase of the intermediate computing state that can be continuously invoked by subsequent associated computing tasks is determined. During the effective residency phase, the intermediate computing state is stored on the current server node, and the current server node continues to execute subsequent associated computing tasks that have a data call relationship with the intermediate computing state.

5. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, When there are multiple consecutively executed subsequent related computation tasks within the computation state dwell interval, the multiple subsequent related computation tasks are divided into the same dwell task segment according to the data calling relationship between the multiple subsequent related computation tasks. During the execution of the resident task segment, the computing tasks corresponding to the resident task segment are continuously executed by the same server node.

6. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, When determining the target server node, the set of intermediate computing states stored in each server node is obtained; the target data set is determined according to the data requirements corresponding to the subsequent associated computing tasks; the target server node is determined according to the data matching relationship between the target data set and the set of intermediate computing states stored in each server node, as well as the remaining computing resources of each server node.

7. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, When multiple server nodes meet the resource requirements of subsequent associated computing tasks, the target server node is determined based on the data continuity between the intermediate computing states stored in each server node and the target data set; wherein, the data continuity is used to characterize whether the existing intermediate computing states in the server node can meet the data call requirements during the continuous execution of subsequent associated computing tasks.

8. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, After scheduling subsequent related computation tasks to the target server node for execution, obtain the new intermediate computation state generated during the execution process on the target server node; The corresponding state contribution is redefined based on the data dependency between the new intermediate computing state and subsequent related computing tasks, and the execution nodes of subsequent computing tasks are adjusted according to the updated state contribution.

9. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, When determining the computation state dwell interval, the trend of the state contribution corresponding to the intermediate computation state as the continuous computation task is obtained; the contribution decay stage corresponding to the intermediate computation state is determined according to the trend of the state contribution; and the computation state dwell interval is adjusted according to the contribution decay stage. Specifically, when the number of subsequent associated computing tasks corresponding to the intermediate computing state decreases, or when the subsequent associated computing tasks of the intermediate computing state are completed, the resident priority corresponding to the intermediate computing state is reduced, so that the computing server cluster can adjust the computing task execution node according to the resident priority.

10. The method for dynamic scheduling of computing server cluster resources according to claim 1, characterized in that, Based on the contribution decay stage corresponding to the intermediate computing state, the execution order, task completion status, and data call relationship of the subsequent associated computing tasks corresponding to the intermediate computing state are obtained, and the effective residence period of the intermediate computing state in the subsequent computing process is determined. When the effective residency period exceeds the continuous execution period for the current server node to meet resource requirements, the intermediate computing state remains resided on the current server node. When the effective dwell period is less than or equal to the continuous execution period of the current server node that meets the resource requirements, and there is a target server node that meets the data requirements and computing resource requirements of the subsequent associated computing tasks, the intermediate computing state is migrated to the target server node, and the target server node continues to execute the corresponding subsequent associated computing tasks.