A method and apparatus for improving baseline solution efficiency

By adding time period number identifiers to the baseline vectors and utilizing the visualization and rapid positioning functions of the data processing platform, the problem of finding out-of-limit baselines in baseline solving was solved, and an efficient baseline solving process was achieved.

CN123138236APending Publication Date: 2026-11-20CHINA RAILWAY NO 2 ENG GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611647107.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-23
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing baseline calculation software suffers from poor calculation quality under complex geographical environments and ionospheric interference, and is slow to find and difficult to locate out-of-limit baselines, resulting in low overall efficiency.

Method used

Each baseline vector is assigned a unique time period number, and its quality is checked through a data processing platform. Exceeding limits are highlighted using visual identifiers. Combined with the time period number, the data is quickly located and post-processed in the baseline solving software. This process is iterated until all baselines meet the required quality standards.

Benefits of technology

It significantly improves baseline calculation efficiency, shortens the time for finding out-of-limit baselines, reduces manual operation steps, and improves the reliability and consistency of data processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123138236A_ABST
    Figure CN123138236A_ABST
Patent Text Reader

Abstract

The present application belongs to the field of engineering surveying technology, and particularly relates to a method and equipment for improving baseline solution efficiency. The method comprises the following steps: extracting baseline vectors from a baseline format file derived by baseline solution software, and adding a unique time period number identifier to each baseline vector; performing baseline quality checking on all baseline vectors with the added time period number identifier in a data processing platform, including checking of repeated observation baseline residuals, independent loop closure errors and three-dimensional unconstrained adjustment baseline vector correction numbers, highlighting out-of-limit items with visualized identifiers, and supporting sorting according to the identifiers to present the out-of-limit items in a centralized manner; quickly locating corresponding out-of-limit baseline vectors in the baseline solution software according to the visualized identifiers and time period numbers of the out-of-limit items, and performing manual post-processing; re-exporting the baseline file and repeating the above steps until all checks are qualified. The present application realizes quick positioning and efficient processing of out-of-limit baseline by introducing time period number identifiers into baseline vectors, combining visualized identifiers and sorting functions, and significantly improves baseline solution efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of engineering measurement technology, and relates to baseline calculation data processing technology in static measurement of Global Navigation Satellite System (GNSS), specifically to a method and device for improving baseline calculation efficiency. Background Technology

[0002] Currently, Global Navigation Satellite System (GNSS) static measurement technology is widely used in the construction of control networks for railway, highway, water conservancy, and municipal engineering projects. This technology involves using multiple receivers to simultaneously observe satellite signals at different stations, and then performing baseline calculations on the observation data to obtain baseline vectors between the stations. Only after the baseline calculations are deemed satisfactory can subsequent two-dimensional or three-dimensional constrained network adjustment calculations be performed to ultimately obtain the precise coordinates of each control point.

[0003] In complex geographical environments such as mountainous areas in the south, the reception quality of satellite signals is significantly affected by natural factors such as mountain obstruction and tree cover. Furthermore, ionospheric activity is more active in some areas after midday, interfering with satellite signal propagation and further degrading the quality of observational data. All of these factors can lead to poor baseline resolution quality.

[0004] In practice, baseline calculation typically employs an automated overall calculation mode. After calculation, all baselines must undergo quality checks. These checks primarily include technical indicators such as the difference between repeated observation baselines, independent loop closure error, and the correction number of the baseline vector in three-dimensional unconstrained adjustment. Taking railway engineering as an example, these three indicators are mandatory technical requirements; the hydraulic engineering surveying specifications also include the synchronous loop closure error indicator. When quality checks reveal baselines exceeding limits, manual post-processing is required to improve baseline quality by adjusting calculation parameters until all indicators meet the specification requirements.

[0005] The existing technology has the following shortcomings: First, traditional network adjustment software (such as CosaGPS from Wuhan University, SYGPS from China Railway Fourth Survey and Design Institute, and EYGPS from China Railway Second Survey and Design Institute) typically outputs calculation results in text format files. The calculations for repeated baseline differences, independent loop closure errors, and 3D unconstrained adjustment generate separate text files, requiring users to open each file individually and manually scroll through them to view all the results. When dealing with large datasets, finding out-of-bounds baselines is extremely time-consuming.

[0006] Secondly, while conventional baseline calculation software (such as Leica's Infinity and LGO, Trimble's TBC, Topcon's MAGNET Tools, and Hi-Target's HBC) integrates functions for displaying repeated baseline differences, independent loop closure errors, and 3D unconstrained adjustment results, users still need to manually search for out-of-limit items. Furthermore, the tolerance standards of some foreign software are not entirely consistent with domestic technical specifications for railway engineering, which can easily lead to misjudgments. When a project involves multiple observation periods, the workload of manual searching further increases, resulting in low overall baseline calculation efficiency.

[0007] Third, none of the existing software programs mentioned above have a rapid mechanism for locating out-of-limit baselines. After discovering an out-of-limit item, users cannot quickly determine from the check results which baselines with large errors caused the out-of-limit item. They need to repeatedly compare the baseline vector data and manually trace it, resulting in low location efficiency and severely restricting the overall efficiency of baseline solution.

[0008] To address the aforementioned issues, this invention provides a solution that enables rapid location and efficient processing of out-of-limit baselines by adding time period number identifiers to baseline vectors and combining this with a data processing platform that features fast sorting and visual identifiers, thereby significantly improving the overall efficiency of baseline calculation. Summary of the Invention

[0009] The purpose of this invention is to overcome the shortcomings of existing technologies, such as slow speed of finding out-of-limit baselines, difficulty in positioning, and low overall efficiency of baseline calculation due to lack of information exchange between the data processing platform and the baseline calculation software, and to provide a method and device to improve the efficiency of baseline calculation.

[0010] In a first aspect, the present invention provides a method for improving baseline solution efficiency, comprising the following steps: Step S1: Extract baseline vectors from the baseline format file exported by the baseline calculation software, and add a unique time period number identifier to each baseline vector. The time period number is used to characterize the observation time period information of the baseline vector. Step S2: In the data processing platform, a quality check is performed on all baseline vectors with added time period number identifiers. The quality check includes at least a check for repeated baseline differences, a check for independent loop closure errors, and a check for the correction number of three-dimensional unconstrained adjustment baseline vectors. The out-of-limit items in the check results are highlighted with visual identifiers. At the same time, it is supported to sort the out-of-limit items according to the visual identifiers for centralized presentation. Step S3: Based on the visual identifier of the out-of-limit item and its corresponding time period number, quickly locate and lock the out-of-limit baseline vector corresponding to the time period number in the baseline calculation software, and perform manual post-processing operation on the out-of-limit baseline vector to make the various quality indicators of the out-of-limit baseline vector meet the specification limit requirements. Step S4: Export the manually post-processed baseline data back to a baseline format file, and repeat steps S1 to S3 until the quality check results of all baseline vectors under the baseline solution project are qualified.

[0011] In the above method, step S1 adds a time period number identifier to each baseline vector, adding a time dimension attribute to the baseline data that originally only had spatial location attributes. This time period number identifier serves as the data foundation for subsequent rapid location and tracing, making accurate location of out-of-limit baselines possible. Step S2 replaces manual item-by-item verification with automated quality checks and highlights out-of-limit items with visual identifiers. Combined with a one-click sorting function, out-of-limit items are presented in a centralized manner, fundamentally eliminating the need for manual line-by-line searching in traditional methods and significantly shortening the search time for out-of-limit baselines. Step S3 uses the time period number as a common data label between the data processing platform and the baseline solution software, building an information bridge between the two. Users can directly locate the corresponding observation data in the baseline solution software based on the time period number, avoiding repeated verification and invalid operations caused by information asymmetry in traditional methods. Step S4 ensures the comprehensive qualification of the final results through a closed-loop iterative process. The rapid location function remains effective in each iteration, making the cumulative time cost of multiple processing rounds far lower than that of traditional methods. The four steps described above work together in a coordinated manner to significantly improve the efficiency of baseline solution.

[0012] Preferably, the naming rule for the time period number identifier is: date-hour, occupying 5 characters. The baseline synchronization observation time information can be obtained from the baseline format file (asc file or xml file, thus obtaining the time period number of each baseline vector). This naming rule is concise and clear, and the combination of date and hour is unique and intuitive. Engineers can directly identify the specific date and time of observation from the time period number without consulting additional information, reducing the cognitive burden of identification. It also facilitates indexing and retrieving data by time period in the baseline calculation software.

[0013] Preferably, the data format of each baseline vector is: start point, end point, DX, DY, DZ, Dxx, Dyy, Dzz, Dxy, Dxz, Dyz, and time period number; wherein DX, DY, and DZ are the components of the baseline vector in each coordinate direction, and Dxx, Dyy, Dzz, Dxy, Dxz, and Dyz are the variance-covariance matrix elements of the baseline vector. This data format, while fully retaining all data fields of the baseline solution results, adds a time period number field at the end, making it compatible with the data export formats of various existing baseline solution software. It achieves the technical solution of this invention without requiring major adjustments to the existing workflow, demonstrating good compatibility and promotional value.

[0014] Preferably, in step S2, the visualization identifier specifically involves setting a pass / fail identifier column in the verification result table of the data processing platform. When the repeated observation baseline difference of a baseline vector exceeds the limit, the pass / fail identifier column generates a first symbol; when the total closure error of an independent loop exceeds the limit, the pass / fail identifier column generates a second symbol; and when the coordinate component closure error of an independent loop exceeds the limit, the pass / fail identifier column generates a third symbol. By setting a dedicated pass / fail identifier column and presenting the exceedance judgment results in a symbolic manner, users do not need to check whether each value exceeds the limit one by one; they can complete the pass / fail judgment based solely on the symbols, reducing the risk of human error and improving the efficiency and reliability of the verification work.

[0015] Preferably, the first symbol is X, the second symbol is X, and the third symbol is x. Different types of exceedances are distinguished by the capitalization of X and x. Specifically, in the repeated baseline difference test, X indicates that the repeated observation baseline difference exceeds the limit; in the independent loop closure error test, X indicates that the loop's total length closure error exceeds the limit, and x indicates that the coordinate component closure error exceeds the limit. Users can intuitively distinguish the specific category of the exceedance by the capitalization of the symbols, and can preliminarily determine the nature of the exceedance without entering the detailed information page, further improving the readability and recognition efficiency of the verification results.

[0016] Preferably, in step S2, the sorting is as follows: by clicking any column header in the check result table of the data processing platform, all cells in that column are automatically sorted in ascending or descending order according to their numerical value or identifier type, thereby centrally displaying the out-of-limit items at the top or bottom of the table. Clicking the column header triggers the sorting, making the operation extremely simple and requiring no additional menu operations or command input, thus lowering the barrier to entry. Simultaneously, because the out-of-limit items are centrally displayed, users can quickly browse an overview of all out-of-limit items without scrolling, making this function particularly efficient when dealing with large amounts of data.

[0017] Preferably, in step S2, the independent loop closure error check further includes: when an out-of-limit independent loop is detected, calculating all baseline combinations involved in the out-of-limit independent loop using a search algorithm, and calculating the coordinate component closure error W for each combination. x W y W z The system calculates and displays the total closure error W of the loop, and shows each combination and its corresponding time period number in the detailed data display box. Through a search algorithm, it automatically calculates and displays each baseline combination and its time period number. Users can directly view the time period number of each constituent baseline of the out-of-limit loop in the detailed data, and quickly determine which baseline and which component contains a large error that is the main cause of the out-of-limit error by combining the closure error data of each coordinate component. This provides precise guidance for subsequent manual post-processing operations, avoiding blind trial-and-error processing.

[0018] Preferably, in step S3, the manual post-processing operation includes at least one of the following methods: deleting satellites, changing the solution mode, changing the satellite elevation angle, and windowing. These post-processing methods are all conventional parameter tuning techniques in the field of baseline solution, characterized by mature operation, predictable results, and wide applicability. Furthermore, they do not require specific hardware or additional software tools and can be directly implemented in existing baseline solution software, resulting in low implementation costs.

[0019] Preferably, in step S1, the baseline vector is extracted from a baseline format file exported by the baseline solving software. The baseline format file includes an ASCII file or an XML file. Both ASCII and XML formats are data exchange formats commonly supported by mainstream baseline solving software, widely covering software products from major domestic and international manufacturers such as Leica, Trimble, Topcon, and Hi-Target. Using these formats as data sources enables the technical solution of this invention to be adaptable to the vast majority of existing operational scenarios.

[0020] In a second aspect, the present invention provides a device for improving baseline calculation efficiency, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, it implements the method described in the first aspect. This device, by running the computer program stored in the memory, automatically performs steps such as adding time period numbers to the baseline vector, quality checks, sorting and presenting out-of-limit items, and iterative loop control. This significantly reduces manual operation steps, improves the consistency and reliability of data processing, and lowers the experience threshold for operators, thus showing promising prospects for industrial applications.

[0021] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. This invention provides a method to improve baseline calculation efficiency. By adding a unique time period identifier to each baseline vector, the baseline data acquires a traceable time dimension attribute. Furthermore, the data processing platform visually highlights out-of-limit items and supports one-click sorting for centralized presentation. This solves the technical problems of slow out-of-limit baseline search speed and the need for manual line-by-line browsing in existing technologies, significantly shortening the search time for out-of-limit baselines and substantially improving baseline calculation efficiency. Engineering practice has proven that the baseline calculation efficiency using this invention is several times higher than that of conventional methods.

[0022] 2. This invention provides a device to improve baseline calculation efficiency. Through the coordinated operation of memory, processor and computer program, it automatically performs baseline vector extraction and time period number addition, quality check and iterative control, realizes automated and semi-automated processing of baseline quality check and over-limit stop, reduces the experience threshold of operators, ensures the consistency and reliability of data processing, and has good industrial application prospects and promotion value. Attached Figure Description

[0023] Figure 1 This is a flowchart of the overall method of the present invention.

[0024] Figure 2 This is a flowchart of the baseline quality check and post-excessive processing of the present invention. Detailed Implementation

[0025] The present invention will now be described in further detail with reference to specific embodiments. However, this should not be construed as limiting the scope of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.

[0026] This invention provides a method for improving baseline solution efficiency, such as... Figures 1-2 As shown, the core concept of this method is to add a unique time period number to each baseline vector, perform quality checks through a data processing platform, and highlight out-of-limit items visually. The time period number is then used to quickly locate out-of-limit baselines in the baseline calculation software for post-processing. This process is iterated until all baselines pass quality checks. This method effectively solves the technical problems of slow out-of-limit baseline search, difficult location, and low calculation efficiency in existing technologies.

[0027] Step S1: Extract baseline vectors from the baseline format file exported by the baseline solving software (all baseline vectors under the baseline solving project can be obtained), and add a unique time period number to each baseline vector. The time period number is used to characterize the observation time period information of the baseline vector.

[0028] In the actual implementation process, the first step is to obtain the project data from the baseline calculation software. Different manufacturers' baseline calculation software has different data export formats. For example, Leica Infinity and LGO software, Trimble TBC software can all export baseline files in .asc format; Topcon MAGNET Tools software can export baseline files in .xml format. Regardless of the software and format used, the exported baseline format file can calculate the basic information of each baseline, such as the start point number, end point number, component values ​​of each coordinate direction, and variance-covariance matrix elements. The file also records the synchronous observation start time of each baseline.

[0029] The key to this step is to extract the synchronous observation start time information corresponding to each baseline from the baseline format file while acquiring the baseline vectors, and then process this information into a time period number identifier, which is added to the data record of each baseline vector. The uniqueness of the time period number identifier is reflected in the fact that baseline vectors acquired in different observation periods within the same project have different time period numbers, thus enabling each baseline vector to be uniquely traced through the time period number.

[0030] As a preferred implementation, the time period numbering follows a date-hour format, with a 5-character space. For example, baseline data synchronously observed starting at 8:10 AM on July 27, 2026, would be named 27-08. This naming convention is concise and clear, facilitating quick identification of the observation date and time period by engineers. It should be noted that this naming convention is only one preferred implementation of the present invention, and those skilled in the art can use other time period numbering formats according to actual needs, as long as they can uniquely identify different observation time periods.

[0031] In this step, each baseline vector after adding the time period number preferably adopts the following data format: Start Point, End Point, DX, DY, DZ, Dxx, Dyy, Dzz, Dxy, Dxz, Dyz, Time Period Number. Where DX, DY, and DZ are the components of the baseline vector in each coordinate direction, in meters; Dxx, Dyy, Dzz, Dxy, Dxz, and Dyz are the variance-covariance matrix elements of the baseline vector, in square centimeters. This data format, while retaining all the original baseline calculation results, adds a time period number field, providing a data foundation for subsequent rapid positioning.

[0032] By adding time period numbers, the baseline vector data, which originally only had spatial attributes (start point, end point, coordinate components), gained a time dimension attribute. This improvement itself is not complicated, but it provides an indispensable data foundation for the subsequent rapid location and tracing functions of the entire solution, and is a prerequisite for solving the problem of slow search for out-of-limit baselines.

[0033] Step S2: In the data processing platform, perform quality checks on all baseline vectors with added time period number identifiers. The quality checks include at least repeated observation baseline difference checks, independent loop closure error checks, and three-dimensional unconstrained adjustment baseline vector correction number checks. The out-of-limit items in the check results are highlighted with visual identifiers. At the same time, it supports sorting the out-of-limit items according to the visual identifiers for centralized presentation.

[0034] In practice, the data processing platform preferably uses a software interface built with table controls, such as a DataGridView control, to present all data in a two-dimensional table format. Each row of this table represents a record of a baseline vector, and each column represents a data field. Those skilled in the art should understand that any table control with multi-column data display and sorting capabilities can be used to implement the functionality of this step.

[0035] After obtaining all baseline vectors with added time periods, the data processing platform performs quality checks according to the following three technical indicators: (a) Checking for poor baseline after repeated observations.

[0036] The baseline quality inspection requirements are shown in Table 1 below.

[0037] Table 1: Baseline Quality Inspection Requirements

[0038] Note: In the table This represents the baseline length mean square error. 'a' represents the fixed error in mm, 'b' is the proportional error coefficient in mm / km, 'n' is the number of sides of the closed loop, and 'd' is the baseline length in km. Different values ​​for 'a' and 'b' are used for measurement items of different accuracy levels. For example, for a second-order railway control network, the fixed error 'a' = 5 mm and the proportional error coefficient 'b' = 2 mm / km; for a third-order control network, 'a' = 5 mm and 'b' = 3 mm / km.

[0039] V Δx V Δy V Δz This represents the absolute value of the corrections for each component of the baseline vector in the three-dimensional unconstrained adjustment.

[0040] Repeated observation baseline difference check: Repeated observation baselines refer to multiple baseline vectors obtained by observing the same baseline (i.e., the same start and end points) multiple times in different observation periods or under different observation schemes. For each repeated baseline, the data processing platform calculates the difference in its baseline length and compares it with the limit specified in the standard. The limit for repeated observation baseline difference is... When the actual difference exceeds this limit, it is determined that the difference of the repeated observation baseline exceeds the limit.

[0041] Independent Loop Closure Check: An independent observation loop is a closed loop composed of independent baseline vectors obtained from asynchronous observations. For each independent loop, the data processing platform calculates its component closure error W in the X, Y, and Z coordinate directions. x W y W z And the total closure error W along the loop. The limits for each component are... , , The limit W for the total closure error of the loop is , where n is the number of sides of the closed loop. When the closure error of any coordinate component exceeds the limit, it is determined that the independent loop has a coordinate component closure error exceeding the limit; when the closure error of the entire loop exceeds the limit, it is determined that the closure error of the entire loop exceeds the limit.

[0042] 3D Unconstrained Adjustment Baseline Vector Correction Check: 3D unconstrained adjustment is an adjustment calculation performed using baseline vectors as observations without introducing external constraints. After adjustment, each coordinate component of each baseline vector will receive a correction. The data processing platform automatically calculates the correction for each component of each baseline vector and compares it with the limits specified in the standard. When the absolute value of any correction exceeds the limit, the baseline vector correction is deemed to be out of limit.

[0043] After the above three checks are completed, the data processing platform presents the check results in a visual manner. Specifically, a pass / fail indicator column is set in the check result table. For each checked baseline or each checked independent loop, the system automatically determines whether it is pass / fail and generates the corresponding indicator symbol in the pass / fail indicator column. As a preferred implementation, when the repeated observation baseline difference of a baseline exceeds the limit, an X symbol is generated in the pass / fail indicator column; when the total closure error of an independent loop exceeds the limit, an X symbol is generated in the pass / fail indicator column; when the coordinate component closure error of an independent loop exceeds the limit, an x ​​symbol is generated in the pass / fail indicator column. The case distinction between the X and x symbols allows engineers to easily identify the specific type of exceedance without having to check the values ​​one by one.

[0044] Building upon the visual identifiers, the data processing platform further supports sorting of out-of-limit items. Users simply click the column header of the "Pass / Fail" column in the inspection results table, and the system automatically sorts all cells in that column by identifier type, placing all out-of-limit items containing the "X" or "x" symbol at the top or bottom of the table. Similarly, users can click the header of any other column (e.g., the start or end column) to sort that column by point number, allowing users to easily find all relevant baselines. The sorting function is implemented based on the table control's own sorting mechanism, requiring no additional complex algorithms.

[0045] This step automates quality checks, replacing the tedious process of manually verifying values ​​item by item, thus improving accuracy and efficiency. Visual symbols make identifying out-of-limit items intuitive and quick. A one-click sorting function presents all out-of-limit items centrally, completely eliminating the time-consuming step of manually searching line by line. This efficiency advantage is particularly pronounced when dealing with large amounts of project data.

[0046] Step S3: Based on the visual identifier of the out-of-limit item and its corresponding time period number, quickly locate and lock the out-of-limit baseline vector corresponding to the time period number in the baseline calculation software, and perform manual post-processing operations on the out-of-limit baseline vector to ensure that the various quality indicators of the out-of-limit baseline vector meet the specification tolerance requirements.

[0047] In the specific implementation process, after the user discovers an out-of-limit item through step S2, the baseline involved in that out-of-limit item needs to be repaired. The core of this step is to use time period numbers to bridge the gap between the data processing platform and the baseline calculation software.

[0048] Let's take the example of an independent loop closure error exceeding the limit. When an independent loop is determined to be exceeding the limit, its information is highlighted on the data processing platform interface. When the user clicks on the detailed information area of ​​the exceeding loop, the data processing platform displays a list of all baselines involved in that loop, with each baseline followed by a corresponding time period number. For example, an exceeding loop might consist of three baselines: AB, BC, and AC, with corresponding time period numbers of 09-09, 03-19, and 31-21, respectively.

[0049] At this point, by combining the calculation results of the independent loop closure error, the user can directly observe in which time period each baseline in the closed loop over-limit combination was observed, and can preliminarily determine which baseline or several baselines are over-limited due to low solution accuracy.

[0050] Furthermore, on the 3D unconstrained adjustment results page of the data processing platform, users can sequentially enter the names of the baseline points that caused the independent loop closure error to exceed the limit. The system will then automatically filter out all baselines containing that point name, along with their corresponding time period numbers and correction values. By identifying the baseline through the time period number and viewing the correction values ​​of the baselines, users can quickly compare and pinpoint the baseline with the larger correction value (the one with the larger error needs further post-processing). This baseline is the one most likely to cause the closure error to exceed the limit.

[0051] After locking onto the target baseline, the user determines the baseline synchronization observation date and start time based on the time period number corresponding to the baseline. By opening the baseline calculation software, the user can quickly locate the relevant baselines under the observation date and perform manual post-processing operations on them.

[0052] Manual post-processing operations include, but are not limited to, the following methods: Firstly, satellites can be removed. If a satellite has poor signal quality throughout the observation period, or if the residual data of that satellite is significantly larger than expected, it can be removed from the solution to improve the solution quality.

[0053] Secondly, change the solution mode. Different solution modes (such as different frequency combinations, ionosphere-free combinations, etc.) process the observation data differently. When the solution result of one mode is not good, you can switch to another mode to re-solve.

[0054] Third, change the satellite elevation angle. By increasing the satellite elevation angle cutoff value, observations from low-elevation-angle satellites that are significantly affected by multipath effects can be filtered out, thus improving the reliability of the solution.

[0055] Fourth, windowing processing. The observation data is analyzed, and the time period that causes large residuals is truncated or masked to remove the data from the severely disturbed time period, while retaining the data from the better quality time period for calculation.

[0056] After the above operations are completed, the user performs baseline calculation again. The component corrections of the target baseline are significantly reduced, thus enabling the out-of-limit baseline to pass the quality check.

[0057] This step, through precise location of time slot numbers, reduces the time to find the target baseline from minutes to seconds, significantly improving computational efficiency. The correction sorting and comparison functions provided by the data processing platform help users accurately identify the baselines most in need of post-processing, avoiding invalid post-processing of qualified baselines. The time slot number serves as a common data tag between the data processing platform and the baseline computation software, enabling information exchange between the two software systems.

[0058] Step S4: Export the manually post-processed baseline solution project as a baseline format file again, and repeat steps S1 to S3 until the quality check results of all baseline vectors under the baseline solution project are qualified.

[0059] In the specific implementation process, after the user completes the manual post-processing operation of a certain out-of-limit baseline, the baseline calculation is rerun in the baseline calculation software, and the new calculation results are exported as a baseline format file (such as an .asc or .xml format file). Subsequently, the baseline vector is extracted again according to the method in step S1 and time period numbers are added, and a comprehensive quality check is performed according to the method in step S2.

[0060] At this point, the data processing platform re-checks the baseline quality of all baseline vectors (three technical indicators). For baselines that have undergone targeted post-processing, the check result should change from exceeding the limit to being acceptable. Simultaneously, because updates to baseline data may affect the closure error calculation results of other baselines forming closed loops, there is a ripple effect; that is, a previously acceptable repeated baseline or independent loop may become out of limit due to data updates. This comprehensive re-check is precisely to capture these changes and ensure that no problems are overlooked.

[0061] Repeat steps S1 to S3, checking for all checks to be passed after each iteration. The iteration terminates when the data processing platform shows that the repeated observation baseline differences for all baselines, the closure errors of all independent loops, and the 3D unconstrained adjustment corrections for all baseline vectors all meet the specification limits. At this point, all baseline vectors have passed the quality check, and subsequent 3D or 2D constrained network adjustment calculations and the final coordinate results and accuracy information can be output.

[0062] This step ensures that the final results are fully qualified through a closed-loop iterative process, avoiding the risk of new problems caused by partial modifications. Second, in each iteration, the rapid positioning function of the data processing platform continues to operate, resulting in very little additional time overhead required for multiple rounds of iteration, and the overall efficiency is still far higher than that of traditional methods. Third, this method has a clear process and standardized operations, is easy to implement standardized work, and is conducive to improving the quality management level of engineering survey data processing.

[0063] Specific Application Case Embodiment 1 A specific application example of the present invention is given below to further illustrate the implementation process and effects of the present invention.

[0064] The control network of a certain railway engineering project adopts GNSS static survey technology for data acquisition, with a total of 40 control points arranged, and multiple observation sessions are arranged for simultaneous observation. After the baseline solution is completed, all baseline vector data including the session numbers are extracted, totaling 328 baselines.

[0065] The above data is imported into the data processing platform for quality inspection. In the formula for the mean square error of the baseline length, the fixed error a=5mm, and the proportional error coefficient b=1mm / km. On the repeated observation baseline difference inspection page, no X symbol appears in the qualification identification column of all repeated baselines, indicating that all repeated observation baseline differences are qualified.

[0066] In the data processing software, the independent loop closure difference inspection is carried out. On the independent loop closure difference inspection page, X and x symbols appear in the qualification identification columns of multiple independent loops, indicating that there is a situation where the independent loop closure difference exceeds the limit. The user clicks the column header of the qualification identification column to sort, and all out-of-limit loops are centrally displayed at the top of the table.

[0067] An analysis was conducted on an independent loop with excessive closure error. The detailed data for this loop consisted of BM283-JM17A, JM17A-JM18, BM283-JM18, and three baselines. In the detailed data display area, the system showed that the Z-coordinate component closure error of this loop exceeded the limit, and listed the time periods for each of the relevant baselines: 09-09, 03-19, and 31-21. The Z-component corrections for baseline BM283-JM17A (time period 09-09) and baseline BM283-JM18 (time period 31-21) were 15.1 mm and -7.6 mm, respectively. Based on this, the user determined that the absolute value of the Z-component correction for baseline BM283-JM17A (time period 09-09) was the largest, and it was the main factor causing the excessive closure error of this independent loop. Analysis of the independent loop closure error calculation results shows that the two baselines BM283-JM17A (time period: 09-09) and BM283-JM18 (time period: 31-21) cause the z-component closure error to exceed the limit. The z-component correction of BM283-JM17A (time period: 09-09) is 15.1 mm, and the z-component correction of BM283-JM18 (time period: 31-21) is -7.6 mm. The absolute value of the z-component correction of the BM283-JM17A (time period: 09-09) baseline vector is larger, requiring manual post-processing of this baseline. Since the baseline is clearly observed at 9:00 AM on the 9th according to the time period number, the baseline can be quickly post-processed in the baseline solution software. By deleting satellites, changing the solution mode, changing the satellite altitude solution, and windowing, the z-component correction of the baseline is reduced, thereby meeting the independent loop closure error limit requirements.

[0068] The user opens the baseline calculation software, locates the relevant baseline data within the software, and performs manual post-processing on the baseline. This involves satellite deletion and adjusting the satellite cutoff elevation angle from 15 degrees to 20 degrees to remove observation data from low-elevation-angle satellites that are significantly affected by multipath effects. The baseline is then recalculated. After the calculation is completed, a three-dimensional unconstrained adjustment baseline vector correction is checked. The Z-component correction of the baseline is reduced from 15.1 mm to 3.2 mm, meeting the specification tolerance requirements.

[0069] The user re-exported the baseline file in .asc format from the baseline solution software, and then extracted the baseline vector containing the time period number through the data processing platform again, performing a comprehensive quality check. The aforementioned independent loop closure error was found to be acceptable. Following the same method, other out-of-limit loops discovered during the check were processed one by one. After several rounds of iteration, the repeated observation baseline difference, independent loop closure error, and 3D unconstrained adjustment baseline vector correction of all baselines met the specification requirements. The baseline quality check was all passed, and the user could proceed to the subsequent constrained network adjustment calculation stage.

[0070] Comparison of conventional methods Comparative Example 1 To more clearly illustrate the technical effects of the present invention, the following is a brief description of the case where the same engineering project is processed using conventional methods.

[0071] In conventional methods, while some foreign baseline calculation software can perform baseline quality checks and network adjustment calculations, users still need to use domestically developed GNSS network adjustment software for baseline quality checks due to differences in technical tolerance requirements and domestic standards. However, mainstream domestic network adjustment software (such as Wuhan University's CosaGPS, China Railway Eryuan Engineering Group's EYGPS, and China Railway Fourth Survey and Design Institute Group's SYGPS) generates repeated observation baseline difference result files, independent loop closure error result files, and 3D unconstrained adjustment result files as separate text files in Notepad format, each containing hundreds or even thousands of lines of data records. Users need to open each file one by one, scrolling through them line by line to manually determine if each value exceeds the limit. When an independent loop closure error exceeds the limit, users need to manually record the point names involved, then manually check the relevant baseline vector corrections in the unconstrained adjustment calculation file to determine which observation period corresponds to the excess. Due to the lack of baseline period number information, users often need to repeatedly check multiple data sets or files to finally locate the specific excess baseline. Once the location is complete, manual post-processing can be performed in the baseline calculation software. After each post-processing, the user needs to re-execute the entire search process described above to verify the repair effect and check whether any new out-of-limit items have been introduced. Typically, processing an out-of-limit loop requires several minutes of manual search time. If the quality of the field baseline data is poor, the entire baseline calculation quality optimization process for the project may take a very long time.

[0072] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for improving baseline solution efficiency, characterized in that, Includes the following steps: Step S1: Extract baseline vectors from the baseline format file exported by the baseline solving software, and add a unique time period number identifier to each baseline vector. The time period number identifier is used to characterize the observation time period information of the baseline vector. Step S2: In the data processing platform, perform quality checks on all the baseline vectors with added time period number identifiers. The quality checks include at least repeated observation baseline difference checks, independent loop closure error checks, and three-dimensional unconstrained adjustment baseline vector correction number checks. The out-of-limit items in the check results are highlighted with visual identifiers. At the same time, it supports sorting the out-of-limit items according to the visual identifiers for centralized presentation. Step S3: Based on the visual identifier of the out-of-limit item and its corresponding time period number, quickly locate and lock the out-of-limit baseline vector corresponding to the time period number in the baseline calculation software, and perform manual post-processing operation on the out-of-limit baseline vector to make the various quality indicators of the out-of-limit baseline vector meet the specification limit requirements. Step S4: Export the manually post-processed baseline solution project as a baseline format file again, and repeat steps S2 to S3 until the quality check results of all baseline vectors under the baseline solution project are qualified.

2. The method for improving baseline solution efficiency according to claim 1, characterized in that, The naming rule for the time period identifier is: date-hour, with a space of 5 characters.

3. The method for improving baseline solution efficiency according to claim 1, characterized in that, The data format for each baseline vector is: start point, end point, DX, DY, DZ, Dxx, Dyy, Dzz, Dxy, Dxz, Dyz, time period number; Where DX, DY, and DZ are the components of the baseline vector in each coordinate direction, and Dxx, Dyy, Dzz, Dxy, Dxz, and Dyz are the variance-covariance matrix elements of the baseline vector.

4. The method for improving baseline solution efficiency according to claim 1, characterized in that, In step S2, the visualization identifier specifically involves setting a qualified identifier column in the verification result table of the data processing platform. When the repeated observation baseline difference of a certain baseline vector exceeds the limit, the qualified identifier column generates a first symbol; when the total closure error of a certain independent loop exceeds the limit, the qualified identifier column generates a second symbol; and when the coordinate component closure error of a certain independent loop exceeds the limit, the qualified identifier column generates a third symbol.

5. The method for improving baseline solution efficiency according to claim 4, characterized in that, The first symbol is X, the second symbol is X, and the third symbol is x.

6. The method for improving baseline solution efficiency according to claim 1, characterized in that, In step S2, the sorting is as follows: by clicking on any column header of the inspection result table in the data processing platform, all cells in that column are automatically sorted in ascending or descending order according to numerical value or identifier type, so that the out-of-limit items are displayed at the top or bottom of the table.

7. The method for improving baseline solution efficiency according to claim 1, characterized in that, In step S2, the independent loop closure difference check further includes: When an out-of-bounds independent loop is detected, a search algorithm is used to calculate all baseline combinations involved in the out-of-bounds independent loop, and the coordinate component closure error W for each combination is calculated. x W y W z The total closure difference W of the loop is displayed, and each combination and its corresponding time period number are shown in the detailed data display box.

8. The method for improving baseline solution efficiency according to claim 1, characterized in that, In step S3, the manual post-processing operation includes at least one of the following methods: deleting satellites, changing the solution mode, changing the satellite elevation angle, and windowing processing.

9. The method for improving baseline solution efficiency according to claim 1, characterized in that, In step S1, the baseline vector is extracted from the baseline format file exported by the baseline solving software. The baseline format file includes an ASCII file or an XML file.

10. An apparatus for improving baseline calculation efficiency, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the method as described in any one of claims 1 to 9.