A method for rapid estimation of engineering cost based on historical data regression analysis

By constructing a regression analysis model based on historical data for penetration efficiency and construction difficulty factors, the problem of deviation caused by stratigraphic variability in the cost estimation of engineering projects in coastal tidal flat areas was solved, achieving more accurate cost prediction and rapid batch pricing.

CN123138652APending Publication Date: 2026-11-20SHANGHAI ZHONGXINGZHI DIGITAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611337341.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing engineering cost estimation methods in coastal tidal flat areas neglect the spatial variability of strata, resulting in significant discrepancies between preliminary estimates and actual settlement costs, especially in areas with fluctuating penetration difficulty in silt and silty soil layers.

Method used

By constructing a regression analysis model based on historical data, the penetration efficiency factor and construction difficulty factor are extracted. Combined with the static cone penetration characteristic parameters, a multi-stage regression model is established to reflect the actual pile length and cost, including the penetration efficiency factor, construction difficulty factor, and comprehensive cost regression model.

Benefits of technology

With only design parameters and geological survey data, it is possible to more accurately estimate the actual pile length and overall cost, reduce manual adjustments based on experience, support rapid batch pricing, and the results are closer to the actual site conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123138652A_ABST
    Figure CN123138652A_ABST
Patent Text Reader

Abstract

The application discloses a kind of based on historical data regression analysis's engineering cost rapid estimation method, it is related to engineering cost estimation technical field, the present application includes constructing historical photovoltaic pile foundation engineering case database;Pretreatment data and extract cone tip resistance integral, total hammering number and other characteristic parameters;Regression calibration penetration efficiency factor and calculate construction difficulty factor;Establish the prediction model of construction difficulty factor and geologic statistical characteristics;Establish actual pile length ratio prediction model;Establish comprehensive cost regression model;Obtain the engineering data to be estimated and calculate characteristics;Substitute into model output estimated cost.The present application extracts penetration efficiency factor and construction difficulty factor, introduces stratum variation characteristics into regression model, can reflect actual pile length and cost when only having design parameters and geological exploration data, solve the problem that existing method causes large deviation of early cost estimation due to ignoring spatial variation of weak stratum.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of engineering cost estimation technology, and in particular relates to a rapid engineering cost estimation method based on historical data regression analysis. Background Technology

[0002] In the construction of photovoltaic power stations on coastal mudflats, precast concrete piles or prestressed pipe piles are commonly used as supporting foundations. The piles are driven to the design elevation or meet the hammer-driving standard through a hammer-driving method. In such projects, static cone penetration tests are a conventional in-situ testing method for obtaining continuous mechanical profiles of the soil layers, outputting a cone-tip resistance curve along the depth. The number of hammer blows recorded per unit depth of penetration during the hammer-driving process indirectly reflects the penetration resistance of the soil to the pile. The project cost generally refers to the settlement cost formed by multiplying the comprehensive unit price by the actual pile length. Due to construction uncertainties, there is often a deviation between the project cost and the budgeted cost based on the designed pile length.

[0003] In existing technologies, during the early stages of projects where only design drawings and geological survey data are available, cost consulting firms often use the method of "design pile length multiplied by a fixed comprehensive unit price" for estimation. This comprehensive unit price is often derived from statistical data of settlements of similar completed projects, or simply combines piling items from local quotas, implicitly assuming uniform geological conditions. Other practices utilize parameters such as the average static cone resistance of historical projects and the design pile length to directly predict the cost of a single pile by establishing a linear regression equation. These methods can quickly output estimated values ​​after data acquisition, and the modeling process is relatively simple.

[0004] However, in coastal mudflat areas, the spatial variability of strata in silt and silty soil layers is extremely high. Static cone penetration resistance curves often show frequent alternations between soft and hard interlayers. Even for pile locations very close to each other, the actual number of penetration blows and the final pile length can differ significantly. The design pile length or average stratum parameters relied upon by the existing estimation methods are insufficient to reflect the fluctuations in penetration difficulty encountered during construction and the resulting changes in actual pile length. This often leads to significant deviations between the initial cost estimate and the final settlement cost. Therefore, the following solutions are proposed to address these issues. Summary of the Invention

[0005] The purpose of this invention is to provide a rapid cost estimation method for engineering projects based on historical data regression analysis. By extracting penetration efficiency factors and construction difficulty factors, and introducing stratigraphic variation characteristics into the regression model, this method can reflect the actual pile length and cost when only design parameters and geological survey data are available. This solves the problem that existing methods have large deviations in early cost estimation due to neglecting the spatial variation of weak strata.

[0006] To solve the above-mentioned technical problems, the present invention is achieved through the following technical solution: This invention provides a rapid method for estimating engineering costs based on historical data regression analysis, comprising the following steps: Construct a historical database containing multiple completed pile foundation engineering cases with the same pile type and the same hammering equipment. Each case includes pile type design parameters, static cone tip resistance data along the depth direction, construction hammer count monitoring data, actual pile length, and comprehensive cost. For each case, based on the static cone tip resistance data and construction hammer blow count monitoring data, static cone tip resistance characteristic parameters and total hammer blow count, including cone tip resistance integral, cone tip resistance mean, cone tip resistance variation coefficient, are extracted. Based on the total number of hammer blows and the integral of the static cone tip resistance for each case, the penetration efficiency factor is determined through regression analysis; the ratio of the actual total number of hammer blows to the predicted total number of hammer blows obtained by linear regression for each case is determined as the construction difficulty factor for that case. Using the static cone penetration characteristic parameters of each case, a first regression model is constructed to predict the construction difficulty factor; Using the design pile length and static cone penetration test characteristic parameters of each case, an actual pile length ratio regression model is constructed to predict the ratio of actual pile length to design pile length. Using the actual pile length and construction difficulty factor of each case, a comprehensive cost regression model containing the interaction term of pile length and construction difficulty factor is constructed. The comprehensive cost regression model uses the actual pile length and construction difficulty factor as independent variables. Obtain the pile design parameters and static cone tip resistance data along the depth direction of the project to be estimated, and calculate its static cone tip characteristic parameters; Substitute the static cone penetration characteristic parameters of the project to be estimated into the first regression model to obtain the predicted construction difficulty factor; substitute the design pile length and static cone penetration characteristic parameters of the project to be estimated into the actual pile length ratio regression model to obtain the predicted actual pile length ratio, and then obtain the predicted actual pile length. Substitute the predicted actual pile length and the predicted construction difficulty factor into the comprehensive cost regression model to output the estimated project cost.

[0007] Furthermore, the pile design parameters include the design pile diameter and design pile length; the static cone tip resistance data is the static cone tip resistance curve; and the construction hammer blow count monitoring data is a sequence of hammer blow counts per unit penetration depth recorded along the depth.

[0008] Furthermore, the extraction of static penetration characteristic parameters and total number of hammer blows specifically includes: The static cone tip resistance data and construction hammer blow count monitoring data were resampled at equal depth intervals and outlier removal was performed. Within the depth range corresponding to the actual pile length, calculate the integral of the static cone tip resistance, the mean value of the static cone tip resistance, and the coefficient of variation of the static cone tip resistance, as well as the cumulative total number of hammer blows, as the static cone tip characteristic parameters and the total number of hammer blows.

[0009] Furthermore, the determination of the penetration efficiency factor specifically involves: using the integral of the static penetration cone tip resistance as the independent variable and the total number of hammer blows as the dependent variable, performing linear regression to obtain the regression coefficient, and using the reciprocal of the regression coefficient as the penetration efficiency factor; The calculation of the construction difficulty factor for each case is specifically as follows: the integral of the static cone tip resistance of each case is substituted into the linear regression to obtain the predicted total number of hammer blows, and the ratio of the actual total number of hammer blows to the predicted total number of hammer blows for that case is used as the construction difficulty factor.

[0010] Furthermore, when constructing the first regression model for predicting the construction difficulty factor, the coefficient of variation of static cone tip resistance, the mean static cone tip resistance, and the pile diameter are used as independent variables, and the construction difficulty factor is used as the dependent variable. The first regression model includes a logarithmic transformation term that pre-shifts the coefficient of variation of static cone tip resistance. The shift is used to ensure the validity of the domain of logarithmic operation.

[0011] Furthermore, the actual pile length ratio regression model uses the design pile length, the mean static cone tip resistance, and the coefficient of variation of static cone tip resistance as independent variables, and the ratio of the actual pile length to the design pile length as the dependent variable.

[0012] Furthermore, the comprehensive cost regression model is a linear regression model that includes the actual pile length term and the product term of the construction difficulty factor and the actual pile length.

[0013] Furthermore, when processing the static cone resistance data and construction hammer blow count monitoring data, interpolation resampling is performed at preset equal depth intervals, and outliers are removed based on neighborhood statistical characteristics and known stratigraphic interface information. The outlier determination rule is: when the depth point numerical gradient exceeds 3 times the average of the adjacent segment and there is no corresponding stratigraphic interface record, it is determined to be instrument noise and removed.

[0014] Furthermore, after obtaining the static cone tip resistance data of the project to be estimated, it is resampled within the range from the ground surface to the design pile length plus the additional depth margin, and the static cone characteristic parameters within this depth range are calculated; the additional depth margin is taken as 5% to 10% of the design pile length, which is used to cover engineering scenarios where the final pile depth exceeds the design length.

[0015] Furthermore, all pile foundation engineering cases in the historical database use the same pile type and hammering construction equipment.

[0016] The present invention has the following beneficial effects: This invention extracts penetration efficiency and construction difficulty factors from historical construction data and incorporates the stratigraphic variation characteristics implicit in hammer impact response and static penetration information into a regression model. This allows for the estimation of actual pile length and overall cost using only design parameters and geological survey curves. By using geostatistics such as the coefficient of variation of cone resistance to map construction difficulty, it reflects the differentiated impact of spatial heterogeneity in weak strata on costs, resulting in outputs that more closely reflect actual site conditions. The established multi-stage regression process is physically interpretable, and data processing and model calculations can be performed in a standardized manner within the equipment, reducing the need for manual adjustments to pile length estimates and supporting rapid batch pricing of photovoltaic array pile foundations. This helps to establish a relatively stable cost reference in the early stages.

[0017] Of course, any product implementing this invention does not necessarily need to achieve all of the advantages described above at the same time. Attached Figure Description

[0018] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a flowchart illustrating a rapid engineering cost estimation method based on historical data regression analysis according to the present invention. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Please see Figure 1 As shown, this invention is a rapid method for estimating engineering costs based on historical data regression analysis, comprising the following steps: Construct a historical database containing multiple completed pile foundation engineering cases with the same pile type and the same hammering equipment. Each case includes pile type design parameters, static cone tip resistance data along the depth direction, construction hammer count monitoring data, actual pile length, and comprehensive cost. For each case, based on the static cone tip resistance data and the construction hammer blow count monitoring data, static cone tip resistance characteristic parameters and total hammer blow count are extracted, including cone tip resistance integral, cone tip resistance mean, cone tip resistance variation coefficient. Based on the total number of hammer blows and the integral of the static cone tip resistance for each case, the penetration efficiency factor is determined through regression analysis; the ratio of the actual total number of hammer blows to the predicted total number of hammer blows obtained by linear regression for each case is determined as the construction difficulty factor for that case. Using the static cone penetration characteristic parameters of each case, a first regression model is constructed to predict the construction difficulty factor; Using the design pile length and static cone penetration test characteristic parameters of each case, an actual pile length ratio regression model is constructed to predict the ratio of actual pile length to design pile length. Using the actual pile length and construction difficulty factor of each case, a comprehensive cost regression model with an interaction term between pile length and construction difficulty factor is constructed. The comprehensive cost regression model uses the actual pile length and construction difficulty factor as independent variables. Obtain the pile design parameters and static cone tip resistance data along the depth direction of the project to be estimated, and calculate its static cone tip characteristic parameters; Substitute the static cone penetration characteristic parameters of the project to be estimated into the first regression model to obtain the predicted construction difficulty factor; substitute the design pile length and static cone penetration characteristic parameters of the project to be estimated into the actual pile length ratio regression model to obtain the predicted actual pile length ratio, and then obtain the predicted actual pile length. Substitute the predicted actual pile length and the predicted construction difficulty factor into the comprehensive cost regression model to output the estimated project cost.

[0022] The pile design parameters include the design pile diameter and design pile length; the static cone tip resistance data is the static cone tip resistance curve; the construction hammer blow count monitoring data is the hammer blow count sequence recorded along the depth per unit penetration depth.

[0023] Extracting static cone penetration characteristic parameters and total number of hammer blows specifically includes: The static cone tip resistance data and construction hammer blow count monitoring data were resampled at equal depth intervals and outlier removal was performed. Within the depth range corresponding to the actual pile length, calculate the integral of the static cone tip resistance, the mean value of the static cone tip resistance, the coefficient of variation of the static cone tip resistance, and the cumulative total number of hammer blows, as characteristic parameters and total number of hammer blows for static penetration testing.

[0024] The penetration efficiency factor is determined as follows: using the static cone tip resistance integral as the independent variable and the total number of hammer blows as the dependent variable, a linear regression is performed to obtain the regression coefficient, and the reciprocal of the regression coefficient is used as the penetration efficiency factor. The construction difficulty factor for each case is calculated as follows: the integral of the static cone tip resistance of each case is substituted into the linear regression to obtain the predicted total number of hammer blows, and the ratio of the actual total number of hammer blows to the predicted total number of hammer blows for that case is used as the construction difficulty factor.

[0025] When constructing the first regression model for predicting the construction difficulty factor, the coefficient of variation of static cone tip resistance, the mean static cone tip resistance, and the pile diameter are used as independent variables, and the construction difficulty factor is used as the dependent variable. The first regression model includes a logarithmic transformation term that pre-shifts the coefficient of variation of static cone tip resistance. The shift is used to ensure the validity of the domain of logarithmic operation.

[0026] The actual pile length ratio regression model uses the design pile length, the mean static cone tip resistance, and the coefficient of variation of static cone tip resistance as independent variables, and the ratio of actual pile length to design pile length as the dependent variable.

[0027] The comprehensive cost regression model is a linear regression model that includes the actual pile length term and the product term of the construction difficulty factor and the actual pile length.

[0028] When processing static cone resistance data and construction hammer blow count monitoring data, interpolation resampling is performed at preset equal depth intervals, and outliers are removed based on neighborhood statistical characteristics and known stratigraphic interface information. The outlier determination rule is: when the depth point numerical gradient exceeds 3 times the average of the adjacent segment and there is no corresponding stratigraphic interface record, it is determined to be instrument noise and removed.

[0029] After obtaining the static cone tip resistance data of the project to be estimated, the data is resampled within the range from the ground surface to the design pile length plus the additional depth margin, and the static cone characteristic parameters within this depth range are calculated. The additional depth margin is taken as 5% to 10% of the design pile length, which is used to cover engineering scenarios where the final pile depth exceeds the design length.

[0030] The historical database of pile foundation projects uses the same pile type and hammering equipment.

[0031] The specific application of this embodiment is as follows: S1. Construct a database of historical photovoltaic pile foundation engineering cases. Data from multiple completed photovoltaic pile foundation projects was collected, with each case corresponding to one or a group of identical piles, and stored in the data processing equipment; the required data includes: Pile design parameters: Design pile diameter Design pile length ; Geological data: Static cone tip resistance curve obtained along the centerline of the pile location , This describes the depth and the corresponding soil layer layers. Construction monitoring records: During the pile driving process, the data for each unit penetration depth... The recorded real-time hammer strikes constitute a sequence. ,in For the first Each record depth point Take 0.1m; Completion record: Actual pile length determined based on pile top elevation and pile end elevation. ; Cost data: The final audited comprehensive cost of this pile. (Includes all costs such as materials, piling, and pile splicing).

[0032] S2. Historical Data Preprocessing and Feature Parameter Extraction The computer processor will execute the following sub-steps to process each case one by one; S201: Data alignment and resampling; for each case curves and Sequence, in depth range to Inside, with To ensure uniform spacing, linear interpolation was used for resampling to obtain sequences with equal depth intervals. and , , This represents the total number of points after interpolation; if a certain depth interval has no... The measured value is marked as a null value and the matching pair corresponding to that point is discarded in subsequent steps; S202: Anomaly detection and removal; calculation of adjacent depth points If the absolute value of the gradient at a certain point exceeds three times the average of the adjacent segment and there is no corresponding stratigraphic interface record, it is determined to be noise from the penetration test instrument, and that point and its corresponding boundary are removed. ;right If an isolated zero point between non-zero values ​​occurs within a continuous depth segment and there is no record of stopping the hammer and splicing the pile, it is considered a record error and is discarded. S203: Calculate case-level feature parameters; Definition To meet Based on the maximum index, extract the following features: Design length-to-diameter ratio ; Integral of cone tip resistance within the actual pile length range ; Mean cone tip resistance and coefficient of variation ,in for Standard deviation; Actual total number of hammer blows ; Ratio of actual pile length to designed pile length ; So far, the collected data , , , , All have been converted into feature quantities and stored.

[0033] S3, Penetration Efficiency Factor Regression calibration This step involves extracting the physical relationship between the number of hammer blows and the penetration resistance from historical data to construct a baseline hammer blow model. S301: Establish a linear regression equation; under the same pile type and hammering equipment conditions, there is a proportional relationship between the total number of hammer blows and the resistance integral; using case studies... As the independent variable, Establish a linear regression model with the variable as the dependent variable: In equation (1), The slope The intercept; S302: Robust regression parameter estimation; using iterative weighted least squares or the Random Sample Consensus Algorithm (RANSAC) for all historical cases. The data points are fitted, residual outliers are automatically removed, and the optimal coefficients are obtained. and Define the penetration efficiency factor: This comprehensively reflects the macroscopic penetration resistance characteristics of the soil layers in this area to a specific pile type; Robust regression is implemented using iterative weighted least squares: initially, ordinary least squares fitting is used to calculate the residuals for each sample; weights are assigned to samples based on the residuals, with larger residuals receiving smaller weights; regression coefficients are refitted based on the new weights, and this iteration is repeated until the coefficient change is less than the convergence threshold. This method can effectively suppress the interference of individual abnormal construction cases on the overall regression accuracy and is suitable for the highly discrete nature of engineering data.

[0034] S303: Generate construction difficulty factor; for each historical case, calculate its baseline predicted number of hammer blows: And define the construction difficulty factor: Dimensionless, representing the degree to which the actual number of hammer blows deviates from the theoretical average due to heterogeneity caused by local formation interlayers, lenses, etc.; historical data here. and Further refined into This ensures no data is missed.

[0035] S4, Construction Difficulty Factor Predictive regression model The project to be estimated lacks construction hammer data, therefore it is necessary to establish... Mapping between the data and readily available geostatistical features; selection of the cone tip resistance variation coefficient. mean and pile diameter As the independent variable, the result calculated using equation (2) Establish a regression equation with the variable as the dependent variable: In equation (3), The intercept is... , , The regression coefficients for each feature are defined; each coefficient is determined by performing multivariate least squares fitting on historical datasets; this model makes explicit the stratigraphic variation information implicit in historical construction difficulties, thus enabling... It can be predicted through conventional geological survey data.

[0036] A fixed offset of 0.01 is added to the logarithmic transformation term to avoid the problem that logarithmic operations are meaningless when the local strata are homogeneous and the coefficient of variation approaches 0. The offset value is much smaller than the typical coefficient of variation in engineering (usually 0.2~0.8), and will not have a significant impact on the regression results. It is only used to ensure the stability of numerical calculations.

[0037] S5, actual pile length ratio Predictive regression model Actual pile length Determined by the final hammer penetration standard, it is related to the design length. The difference is affected by the soil resistance level; based on the design pile length Mean cone tip resistance and coefficient of variation As the independent variable, Establish a regression equation with the variable as the dependent variable: In equation (4), The intercept is... , , The regression coefficients are derived from fitting historical data.

[0038] S6, Comprehensive Cost Regression estimation model The overall cost of pile foundations is driven by both the actual pile length and the difficulty of penetration; this is based on actual costs from historical cases. Actual pile length and construction difficulty factors Construct a multiple linear regression model with interaction terms: In equation (5), For fixed cost components, The benchmark cost coefficient representing the unit pile length. Characterize the additional machine shifts and fuel consumption costs caused by the increased difficulty; determine the coefficients through regression analysis of historical data. , , ; At this point, historical data , and its derivatives Everything was utilized.

[0039] After all regression models were fitted, goodness-of-fit tests and residual analysis were performed: the coefficient of determination R² was calculated, requiring R² ≥ 0.75 for the construction difficulty model and R² ≥ 0.85 for the cost model; at the same time, a residual distribution chart was plotted, outliers with residuals exceeding 2 times the standard deviation were removed, and the model was refitted to ensure the statistical reliability of the output results.

[0040] S7. Data Acquisition and Feature Calculation of the Project to be Estimated For newly approved photovoltaic pile foundation projects, obtain the on-site design parameters: pile diameter. Design pile length Static cone penetration curves at the sampling site Using the same method as S2, for In depth to ( Within the set additional safety depth margin, samples are resampled at 0.1m intervals, and the mean cone tip resistance along this depth segment is calculated. and coefficient of variation .

[0041] S8. Perform rapid cost estimation for engineering projects. Will , , , Substitute them sequentially into the trained regression model: Predicting construction difficulty factors using equation (3) ; Predict the pile length ratio using equation (4) And calculate the predicted actual pile length. ; Will and Substitute into equation (5) to directly output the estimated cost of the pile. ; For all the pile foundations of the entire photovoltaic array, steps S7 and S8 can be executed in batches to obtain the total cost. This method regresses static penetration data, historical construction hammer response and cost data layer by layer, which not only maintains physical interpretability, but also extracts the cost increment information caused by stratum variation through the innovative indicator of construction difficulty factor, providing an accurate and rapid cost estimation tool for pile foundation engineering in the early stage when only design geological survey data is available.

[0042] In the description of this specification, references to terms such as "an embodiment," "example," "specific example," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.

[0043] The preferred embodiments of the present invention disclosed above are merely illustrative of the invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the invention to the specific implementations described. Clearly, many modifications and variations can be made based on the content of this specification. This specification selects and specifically describes these embodiments to better explain the principles and practical applications of the invention, thereby enabling those skilled in the art to better understand and utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims

1. A rapid method for estimating engineering costs based on historical data regression analysis, characterized in that, The estimation method includes the following steps: Construct a historical database containing multiple completed pile foundation engineering cases with the same pile type and the same hammering equipment. Each case includes pile type design parameters, static cone tip resistance data along the depth direction, construction hammer count monitoring data, actual pile length, and comprehensive cost. For each case, based on the static cone tip resistance data and construction hammer blow count monitoring data, static cone tip resistance characteristic parameters and total hammer blow count, including cone tip resistance integral, cone tip resistance mean, cone tip resistance variation coefficient, are extracted. Based on the total number of hammer blows and the integral of the static cone tip resistance for each case, the penetration efficiency factor is determined by regression analysis, and the construction difficulty factor for each case is calculated based on the penetration efficiency factor. The ratio of the actual total number of hammer blows for each case to the predicted total number of hammer blows obtained by linear regression is determined as the construction difficulty factor for that case. Using the static cone penetration characteristic parameters of each case, a first regression model for predicting the construction difficulty factor is constructed, which includes the interaction term between pile length and construction difficulty factor. Using the design pile length and static cone penetration test characteristic parameters of each case, an actual pile length ratio regression model is constructed to predict the ratio of actual pile length to design pile length. Using the actual pile length and construction difficulty factor of each case, a comprehensive cost regression model is constructed, with the actual pile length and construction difficulty factor as independent variables. Obtain the pile design parameters and static cone tip resistance data along the depth direction of the project to be estimated, and calculate its static cone tip characteristic parameters; Substitute the static cone penetration characteristic parameters of the project to be estimated into the first regression model to obtain the predicted construction difficulty factor; substitute the design pile length and static cone penetration characteristic parameters of the project to be estimated into the actual pile length ratio regression model to obtain the predicted actual pile length ratio, and then obtain the predicted actual pile length. Substitute the predicted actual pile length and the predicted construction difficulty factor into the comprehensive cost regression model to output the estimated project cost.

2. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 1, characterized in that, The pile design parameters include the design pile diameter and design pile length; the static cone tip resistance data is the static cone tip resistance curve; and the construction hammer blow count monitoring data is a sequence of hammer blow counts per unit penetration depth recorded along the depth.

3. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 2, characterized in that, Extracting static cone penetration characteristic parameters and total number of hammer blows specifically includes: The static cone tip resistance data and construction hammer blow count monitoring data were resampled at equal depth intervals and outlier removal was performed. Within the depth range corresponding to the actual pile length, calculate the integral of the static cone tip resistance, the mean value of the static cone tip resistance, and the coefficient of variation of the static cone tip resistance, as well as the cumulative total number of hammer blows, as the static cone tip characteristic parameters and the total number of hammer blows.

4. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 3, characterized in that, The specific method for determining the penetration efficiency factor is as follows: taking the integral of the static penetration cone tip resistance as the independent variable and the total number of hammer blows as the dependent variable, performing linear regression to obtain the regression coefficient, and using the reciprocal of the regression coefficient as the penetration efficiency factor. The calculation of the construction difficulty factor for each case is specifically as follows: the integral of the static cone tip resistance of each case is substituted into the linear regression to obtain the predicted total number of hammer blows, and the ratio of the actual total number of hammer blows to the predicted total number of hammer blows for that case is used as the construction difficulty factor.

5. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 4, characterized in that, When constructing the first regression model for predicting the construction difficulty factor, the coefficient of variation of static cone tip resistance, the mean static cone tip resistance, and the pile diameter are used as independent variables, and the construction difficulty factor is used as the dependent variable. The first regression model includes a logarithmic transformation term that pre-shifts the coefficient of variation of static cone tip resistance. The shift is used to ensure the validity of the domain of logarithmic operation.

6. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 5, characterized in that, The actual pile length ratio regression model uses the design pile length, the mean static cone tip resistance, and the coefficient of variation of static cone tip resistance as independent variables, and the ratio of actual pile length to design pile length as the dependent variable.

7. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 6, characterized in that, The comprehensive cost regression model is a linear regression model that includes the actual pile length term and the product term of the construction difficulty factor and the actual pile length.

8. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 7, characterized in that, When processing the static cone resistance data and construction hammer blow count monitoring data, interpolation resampling is performed at preset equal depth intervals, and outliers are removed based on neighborhood statistical characteristics and known stratigraphic interface information. The outlier determination rule is: when the depth point numerical gradient exceeds 3 times the average of the adjacent segment and there is no corresponding stratigraphic interface record, it is determined to be instrument noise and removed.

9. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 8, characterized in that, After obtaining the static cone tip resistance data of the project to be estimated, the data is resampled within the range from the ground surface to the design pile length plus the additional depth margin, and the static cone characteristic parameters within this depth range are calculated. The additional depth margin is taken as 5% to 10% of the design pile length, which is used to cover engineering scenarios where the final pile depth exceeds the design length.

10. The method for rapid estimation of engineering costs based on historical data regression analysis according to claim 9, characterized in that, The historical database contains pile foundation engineering cases that use the same pile type and hammering equipment.