A method for constructing a load spectrum model of a pure electric tractor in a field working condition
By using multi-parameter synchronous acquisition and Markov chain dynamic modeling, a field working condition load spectrum model of pure electric tractors was constructed, which solved the problems of single data acquisition system and poor model adaptability, and realized high-precision working condition load characteristic analysis and energy management strategy support.
Patent Information
- Application Number
- CN202611552069.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-08
- Publication Date
- 2026-11-20
AI Technical Summary
In the field operations of pure electric tractors, the existing technology has a single data acquisition system, which cannot acquire multi-dimensional parameters simultaneously, resulting in low data accuracy. The load spectrum model does not take into account dynamic switching rules, which cannot meet the requirements of high-precision energy management strategies, leading to poor adaptability of the power system design.
A field load spectrum model was constructed by employing multi-parameter synchronous acquisition, systematic data preprocessing, and Markov chain dynamic modeling. This included setting up a data acquisition platform, preprocessing data, performing time-domain, frequency-domain, and statistical analysis, and constructing a load characteristic model.
It achieves high-precision data acquisition, eliminates noise and abnormal data, accurately distinguishes different working conditions, accurately simulates dynamic switching patterns, controls model errors within 5%, and has high adaptability and accuracy, supporting battery topology design and energy management optimization.
Smart Images

Figure CN123138986A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of electric agricultural machinery operating condition modeling and data processing technology, and in particular to a method for constructing a field operating condition load spectrum model of a pure electric tractor. Background Technology
[0002] With its advantages of zero emissions, low noise, and high efficiency, pure electric tractors have become the core direction for the electrification of modern agricultural equipment. Field operation load conditions are the core foundation for matching the battery topology architecture, designing energy management strategies, and modeling the battery's multiphysics field in pure electric tractors. The accuracy of the load spectrum directly determines the scientific nature and engineering adaptability of the overall power system design.
[0003] Compared with the road conditions of traditional electric passenger vehicles, the field operation conditions of pure electric tractors are characterized by strong nonlinearity, large impact loads, long-term continuous operation, and severe environmental disturbances. The loads of different operation scenarios such as plowing, rotary tillage, and sowing vary greatly, and there are high-frequency power mutations and random disturbances.
[0004] Existing technologies still have many shortcomings: First, traditional operating condition data acquisition systems are simplistic, often using single sensors and low sampling frequencies to collect data, failing to simultaneously acquire multi-dimensional parameters of load, motor, battery, and environment, resulting in insufficient data completeness and representativeness. Second, raw field operating condition data has not undergone systematic preprocessing, and noise, anomalies, and missing data caused by the complex field environment have not been effectively removed and repaired, leading to low data accuracy. Third, the operating condition feature analysis is limited in dimensions, failing to quantify the distribution patterns of peak power, power change rate, and duration under different operating scenarios, and unable to distinguish between different operating conditions such as stable, impact, and idling. Fourth, traditional load spectrum models often use simple statistical modeling, failing to consider the dynamic switching patterns of operating conditions, resulting in poor adaptability to actual field operating conditions, large errors, and an inability to meet the development needs of dual-battery pack collaborative architecture and high-precision energy management strategies, severely restricting the optimized design and engineering application of pure electric tractor power systems.
[0005] Therefore, collecting and analyzing the load spectrum under field conditions is the prerequisite and foundation for breaking through the bottleneck of the power supply system of pure electric tractors. Summary of the Invention
[0006] The purpose of this invention is to provide a method for constructing a field load spectrum model for pure electric tractors. Through multi-parameter synchronous acquisition, systematic data preprocessing, multi-dimensional feature analysis, and Markov chain dynamic modeling, the method achieves accurate construction of the field load spectrum for all scenarios, providing reliable data support for the design and optimization of the power system of pure electric tractors.
[0007] To achieve the above objectives, this invention provides a method for constructing a load spectrum model of a pure electric tractor under field operating conditions, comprising the following steps: S1. Establish a field condition data collection platform to collect field condition data; S2. Preprocess the collected field condition data; S3. Using time-domain analysis, frequency-domain analysis, and statistical analysis, load characteristics of pre-processed field operation conditions are analyzed. S4. Based on the load characteristic analysis results of S3, construct a load spectrum model of pure electric tractors under field working conditions.
[0008] Preferably, S1 includes the following steps: S11. A pure electric tractor was selected as the test prototype. The power source of the test prototype was a single-energy lithium iron phosphate battery pack, and it was equipped with a battery management system (BMS). Typical field operation scenarios in the dryland farming area of northern China were selected as the test scenarios. The types of operations performed by the pure electric tractor in the test scenarios included plowing, rotary tilling, sowing, transportation, and turning at the edge of the field. S12. The prototype is equipped with a field condition data acquisition system, which includes a sensor module, a data acquisition module, a data storage module, and a data transmission module. The sensor module includes a load power sensor, a motor speed sensor, a battery voltage sensor, a battery current sensor, several temperature sensors, and a SOC sensor. The load power sensor is mounted on the motor output shaft to collect real-time load power during tractor operation. The motor speed sensor is mounted on the motor shaft end to collect real-time motor speed. The battery voltage and battery current sensors are integrated into the battery management system (BMS) to collect the total battery pack voltage and current. Temperature sensors are installed inside the battery pack, on the motor housing, and in the external environment to collect battery temperature, motor temperature, and ambient temperature. The SOC sensor, integrated into the BMS, collects the real-time SOC value of the battery pack. The data acquisition module is used to receive raw data collected by various sensors, convert analog signals into digital signals, and perform preliminary filtering to collect battery voltage, current, temperature, and state of charge (SOC) in real time. The data storage module uses an industrial-grade solid-state drive to store and back up the collected raw data; the data transmission module uses a 4G wireless transmission module to transmit the collected raw data to the computer terminal in real time, so that the test personnel can monitor the test status in real time and detect test anomalies in a timely manner. S13. Conduct tests on each operational scenario in sequence, following the order of plowing, rotary tilling, sowing, transportation, and turning at the edge of the field. After the test, stop data acquisition, back up the test data, shut down the test equipment, and tidy up the test site.
[0009] Preferably, in S11, the test prototype uses a permanent magnet synchronous motor with a rated power of 180kW, a rated speed of 2200r / min, and a maximum torque of 950N·m; The single-energy lithium iron phosphate battery pack has a capacity of 200kWh, a voltage rating of 600V, and a maximum discharge rate of 10C. The test was conducted during the peak season for local crop planting, with an ambient temperature of 15-28℃ and soil moisture of 18%-25%.
[0010] Preferably, in S13, the plowing depth is 30cm, the plowing width is 2.4m, the operating speed is 5km / h, and the continuous operation lasts for 8 hours. The rotary tillage operation has a tillage depth of 15cm, a tillage width of 2.2m, an operating speed of 6km / h, and can be carried out continuously for 8 hours. The sowing row spacing is 50cm, the sowing depth is 5cm, the operating speed is 4km / h, and the continuous operation lasts for 8 hours. The transport operation has a transport weight of 5t, a travel speed of 15km / h, and a continuous travel time of 10 hours. The transport roads include field roads and rural roads. The turning radius for the field turning operation is 5m. Idle speed turning and low speed turning are alternated and the operation is carried out continuously for 2 hours. The speed for idle speed turning is 800r / min and the speed for low speed turning is 1200r / min.
[0011] Preferably, in S2, the preprocessing operation includes: S21. Remove abnormal data from the original data. Abnormal data includes data that exceeds the value range, data with abnormal mutations, and duplicate data. For data that exceeds the range, a reasonable range is set based on the physical characteristics of each parameter for judgment and deletion. The reasonable range for load power is set to 0-200kW, the reasonable range for battery voltage is set to 500-650V, and the reasonable range for temperature is set to -20℃~60℃. For data with mutational anomalies, the 3σ criterion was used to perform statistical analysis on the raw data of each parameter and calculate the mean of the data. with standard deviation ; ; ; In the formula, This is the mean of the original data for this parameter; This is the standard deviation of the original data for this parameter; For the first Observations at each sampling point; The total number of samples; Judgment criteria: If the data point is deemed to be abnormal due to a mutation, it will be deleted. S22. For missing data caused by sensor malfunction or data transmission interruption, interpolation is used to complete the missing data. Specifically: When no more than 5 consecutive data points are missing, linear interpolation is used to calculate the missing value by linearly fitting the two valid data points before and after the missing data. ; In the formula, For moments when data is missing; , These represent the times before and after the missing data points, respectively; These are the missing data values to be determined. , They are time points , The corresponding valid data values; When more than 5 consecutive data points are missing, cubic spline interpolation is used to construct an interpolation curve by fitting cubic splines to the valid data points before and after the missing data, and then the missing data value is calculated. ; In the formula, It is a cubic spline interpolation function; , , , For the first The spline coefficients of each subinterval are obtained by solving the boundary conditions and the continuity conditions of the first and second derivatives of adjacent subintervals simultaneously. For the first Sub-intervals; S23. Wavelet filtering algorithm is used to reduce noise in the preprocessed data. The db4 wavelet is selected as the wavelet basis function, and three-level wavelet decomposition and reconstruction are performed on the data of each parameter. The specific processing procedure is as follows: The preprocessed raw data is decomposed into three levels of wavelet decomposition to obtain one approximation component and three detail components. The approximation component is used to reflect the overall trend of data change, while the detail components are used to reflect noise interference in the data. Thresholding is performed on the three detail components. Noise signals below the threshold in the detail components are set to zero, while valid signals above the threshold are retained. The threshold formula is as follows: ; ; In the formula: For the first Threshold for layer detail components; For the first Standard deviation of noise in layer detail components; For the first The number of wavelet coefficients in the layer detail component; For the first Layer Wavelet coefficients; These are the wavelet coefficients after thresholding. The processed approximation components and detail components are reconstructed using wavelet refactoring to obtain the filtered clean data.
[0012] Preferably, in S3, time-domain analysis, frequency-domain analysis, and statistical analysis are used to analyze the load characteristics of the pre-processed field operation conditions from the aspects of load power statistical characteristics, peak power distribution, power change rate distribution, and operation duration distribution. ; In the formula: This represents the average load power. For the first Load power values at each sampling point; The number of samples; , These represent the maximum and minimum load power, respectively. The standard deviation of load power; The coefficient of variation; Specifically, the load power statistical characteristic analysis involves selecting load power data from five typical operational scenarios—plowing, rotary tillage, sowing, transportation, and turning at the edge of the field—and conducting statistical analysis to calculate the mean, maximum, minimum, standard deviation, and coefficient of variation of the load power for each scenario, thereby quantifying the load characteristics of each scenario. The peak power distribution analysis specifically involves dividing the peak power into five intervals: 0-50kW, 50-100kW, 100-150kW, 150-200kW, and above 200kW, and then counting the frequency and percentage of peak power occurrences in each interval. The power change rate distribution analysis specifically involves dividing the power change rate into four intervals: 0-2kW / ms, 2-5kW / ms, 5-10kW / ms, and above 10kW / ms. The frequency and percentage of power change rate occurrences in each interval are then statistically analyzed. The specific analysis of the duration distribution of the operating condition is as follows: the duration of the operating condition is divided into four intervals: 0-10s, 10-60s, 60-300s, and more than 300s, and the duration of the operating condition in each interval is statistically analyzed.
[0013] Preferably, S4 includes the following steps: S41. Based on load power, peak power, power change rate and working duration, the field operation conditions of pure electric tractors are divided into stable working conditions, impact working conditions and idling working conditions. S42. A field load spectrum model is constructed using statistical characteristics and Markov chains, specifically as follows: Extract the statistical characteristic parameters for each operating condition type, including the mean, maximum, minimum and standard deviation of load power, the mean power change rate and the mean operating condition duration; ; ; ; In the formula: For the first The rate of change of load power at each sampling point; , The load power of two adjacent sampling points; The sampling time interval; This represents the average power variation. For the first The duration of each working condition; This represents the number of working conditions included in a given working condition type. This represents the average duration of the operating condition. A Markov chain state transition model is established, with steady operating condition, shock operating condition, and idling operating condition as the three states of the Markov chain. By statistically analyzing the number of transitions and the transition probability between each operating condition, a state transition matrix is constructed to reflect the switching rules between operating conditions. Among them, the number of transfers ; ; ; In the formula, , ∈{1,2,3} correspond to the three states of steady operation, shock operation, and idling operation, respectively. To be based on working conditions Transfer to working condition The number of times; This represents the total number of steps in the state sequence. To be based on working conditions Transfer to working condition The probability of; It is a 3×3 state transition matrix, and ; Based on statistical characteristic parameters and Markov chain state transition model, a load spectrum generation program was written using MATLAB software to generate load spectrum data that reflects the actual working conditions in the field, which is used to simulate the switching between different working conditions and the variation of load power.
[0014] Preferably, in S41, the power change rate of the steady working condition is ≤2kW / ms, and the duration of the working condition is ≥60s; the working condition includes uniform speed transportation operation, steady plowing operation, steady rotary tillage operation and steady sowing operation. The power change rate of the impact condition is >5kW / ms, and the duration of the condition is ≤60s; this condition includes plowing start, rotary tillage start, and acceleration turn at the edge of the field. The load power during idling is ≤10kW, and the duration of the condition is ≤30s; this condition includes idling while turning and stopping during work breaks.
[0015] Preferably, after S4, it also includes: The generated load spectrum data was compared and analyzed with the actual collected operating condition data. The analysis was conducted from three aspects: load power statistical characteristics, peak power distribution, and power change rate distribution, in order to confirm the consistency between the load spectrum data generated by the model and the actual operating condition data.
[0016] Preferably, the specific error requirements for verification are as follows: In the comparison of load power statistical characteristics, the relative errors of the generated load spectrum data and the actual collected data in terms of power mean, maximum value, standard deviation, and coefficient of variation are all ≤5%. ; In the formula: This is relative error; The index values generated for the load spectrum model; These are the actual collected corresponding indicator values; In the comparison of peak power distribution, the relative error of the proportion of each peak power range is ≤3%; In the comparison of power change rate distribution, the relative error of the proportion of each power change rate interval is ≤4%.
[0017] Therefore, the present invention employs the above-mentioned method for constructing a load spectrum model of a pure electric tractor under field conditions, and the beneficial effects are as follows: (1) The present invention has built a high-precision data acquisition platform for multi-parameter synchronous acquisition, covering all core operating parameters of pure electric tractors and adapting to typical operating scenarios in dryland areas of northern China; and the test parameters are standardized and the working conditions are fully covered, and the acquired data has strong authenticity and representativeness, solving the problem of single data dimension and insufficient representativeness of traditional acquisition technology.
[0018] (2) This invention combines 3σ anomaly detection, segmented interpolation, and wavelet denoising algorithm to effectively remove noise and abnormal data while retaining the core features of load mutation, thus greatly improving data accuracy and providing a high-quality data foundation for subsequent modeling.
[0019] (3) This invention realizes the refined quantification of field working conditions, analyzes the load patterns of different working conditions from multiple dimensions such as statistical distribution, dynamic mutation and duration, accurately distinguishes heavy load impact, stable operation and idling standby working conditions, and breaks through the bottleneck of vague and insufficient differentiation of traditional technical working condition feature analysis.
[0020] (4) The present invention adopts a modeling method that combines statistical features with Markov chains, which can simulate the dynamic switching law of field working conditions. The overall model error is controlled within 5%, and its adaptability and accuracy are far higher than those of traditional statistical models. It can accurately support subsequent R&D work such as battery topology design, energy management optimization, and multi-physics modeling for pure electric tractors, and has significant engineering application value.
[0021] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0022] Figure 1 This is an overall flowchart of an embodiment of the method for constructing a load spectrum model of a pure electric tractor under field working conditions according to the present invention; Figure 2 This is a field condition data acquisition system architecture diagram of an embodiment of the method for constructing a field condition load spectrum model of a pure electric tractor according to the present invention; Figure 3 This is a data preprocessing flowchart of an embodiment of the method for constructing a load spectrum model of a pure electric tractor under field working conditions according to the present invention; Figure 4 This is a comparison diagram of load power before and after filtering in an embodiment of the method for constructing a load spectrum model of a pure electric tractor under field working conditions according to the present invention. Detailed Implementation
[0023] The technical solution of the present invention will be further described below with reference to the accompanying drawings and embodiments.
[0024] Unless otherwise defined, the technical or scientific terms used in this invention shall have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms "first," "second," and similar terms used in this invention do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed following the word and their equivalents, without excluding other elements or objects.
[0025] like Figure 1 As shown, a method for constructing a load spectrum model of a pure electric tractor under field working conditions includes the following steps: S1. Establish a field condition data collection platform to collect field condition data, including the following steps: S11. Selection of test prototype and test scenario: This invention selects a certain model 1804 pure electric tractor as the test prototype. The test prototype adopts a permanent magnet synchronous motor with a rated power of 180kW, a rated speed of 2200r / min, and a maximum torque of 950N·m, which is suitable for the field operation needs of dryland areas in northern China.
[0026] The prototype is powered by a single-energy lithium iron phosphate battery pack with a capacity of 200kWh, a voltage rating of 600V, a maximum discharge rate of 10C, and is equipped with a high-precision battery management system (BMS) that can collect parameters such as battery voltage, current, temperature, and SOC in real time.
[0027] Typical field operation scenarios in the dryland farming area of northern China were selected as the test scenarios. The operation types of pure electric tractors in the test scenarios included plowing, rotary tillage, sowing, transportation, and turning at the field edge. The test site was selected as the test field in the dryland farming area of Feicheng City, Tai'an City, Shandong Province. The test time was during the peak planting season of local crops (April-May). During the test, the ambient temperature was 15-28℃, the soil moisture was 18%-25%, and the soil type was brown soil, which met the typical soil conditions of the dryland farming area in northern China, ensuring the representativeness and authenticity of the test conditions.
[0028] S12. Data Acquisition System Composition: To achieve comprehensive and accurate acquisition of field condition data, the prototype is equipped with, for example, a data acquisition system... Figure 2 The field condition data acquisition system shown includes a sensor module, a data acquisition module, a data storage module, and a data transmission module. The specific functions and parameters of each module are as follows: The sensor module uses high-precision sensors, including load power sensors, motor speed sensors, battery voltage sensors, battery current sensors, several temperature sensors, and SOC sensors.
[0029] ① Load power sensor (model: CSM P300, measurement range 0-200kW, accuracy ±0.5%), installed on the motor output shaft, used to collect real-time load power during tractor operation.
[0030] ② Motor speed sensor (model: HENGSTLER RI58-O / 1000ES.41KB, measurement range 0-3000r / min, accuracy ±1r / min), installed on the motor shaft end, used to collect the real-time speed of the motor.
[0031] ③ The battery voltage sensor (model: ADE7758, measurement range 0-700V, accuracy ±0.2%) and battery current sensor (model: LA-55P, measurement range 0-500A, accuracy ±0.3%) are integrated into the battery management system (BMS) to collect the total voltage and total current of the battery pack.
[0032] ④ Temperature sensor (model: PT100, measurement range -50℃~100℃, accuracy ±0.1℃), installed inside the battery pack (1 sensor for every 10 cells), in the motor housing, and in the external environment, to collect battery temperature, motor temperature, and ambient temperature.
[0033] ⑤ The SOC sensor (measurement accuracy ±1%) is integrated into the battery management system (BMS) and is used to collect the real-time SOC value of the battery pack.
[0034] The data acquisition module uses a high-precision data acquisition card (model: NI cDAQ-9178, sampling frequency 100Hz) to receive raw data (analog and digital signals) from various sensors, convert analog signals to digital signals, and perform preliminary filtering to ensure data accuracy. The data acquisition card supports multi-channel synchronous acquisition, capable of simultaneously acquiring more than 20 signals to meet the real-time acquisition requirements of multiple parameters such as battery voltage, current, temperature, and state of charge (SOC).
[0035] The data storage module uses an industrial-grade solid-state drive (1TB capacity, read / write speed exceeding 500MB / s) to store the collected raw data, supporting continuous storage of over 100 hours of operational data to prevent data loss. It also features a data backup function, periodically backing up the collected raw data to a USB drive to ensure data security.
[0036] The data transmission module adopts a 4G wireless transmission module (model: EC200S), which supports real-time data transmission. It is used to transmit the collected raw data to the computer terminal in real time, so that the test personnel can monitor the test status in real time and detect test anomalies in a timely manner. At the same time, it supports offline transmission function. After the test, the data in the storage module can be imported into the computer terminal for subsequent data processing.
[0037] S13. Experimental Design: To ensure that the collected operating condition data is comprehensive, accurate, and representative, a detailed test plan was developed, clearly defining the test procedures, test parameters, and test precautions, as follows: Experimental Procedure: Before the experiment, a comprehensive inspection of the prototype machine was conducted, including the motor, battery, sensors, and data acquisition system, to ensure normal operation. Sensors were calibrated to ensure the accuracy of the collected data. The prototype machine was then driven into the experimental field, and operating parameters (such as tillage depth, tillage width, and sowing row spacing) were adjusted to meet the experimental requirements. During the experiment, each operational scenario was conducted sequentially in the order of plowing, rotary tillage, sowing, transportation, and turning at the field edge. Each operational scenario was operated continuously for at least 8 hours to ensure that the collected data covered all typical working conditions within that scenario. After the experiment, data acquisition was stopped, the experimental data was backed up, the experimental equipment was shut down, and the experimental site was cleaned up.
[0038] Test parameters: The specific test parameters for each work scenario are as follows: ① The plowing depth is 30cm, the plowing width is 2.4m, the working speed is 5km / h, and the continuous working time is 8 hours.
[0039] ② The rotary tillage operation has a tillage depth of 15cm, a tillage width of 2.2m, an operating speed of 6km / h, and a continuous operation time of 8 hours.
[0040] ③ The sowing row spacing is 50cm, the sowing depth is 5cm, the operating speed is 4km / h, and the continuous operation lasts for 8 hours.
[0041] ④ The transport weight is 5t, the driving speed is 15km / h, and the continuous driving time is 10 hours. The transport roads include field roads and rural roads.
[0042] ⑤ The turning radius for the field turning operation is 5m. Idle speed turning and low speed turning are alternated and the operation is carried out continuously for 2 hours. The speed for idle speed turning is 800r / min and the speed for low speed turning is 1200r / min.
[0043] Test Precautions: ① During the test, assign a dedicated person to monitor the test status and promptly handle any abnormalities (such as sensor failure, data acquisition interruption, etc.) to ensure the smooth progress of the test; ② Avoid conducting the test in rainy or windy weather to prevent environmental factors from affecting the accuracy of the test data; ③ During the test, keep the operating parameters stable and avoid manually adjusting parameters such as operating speed and tillage depth to ensure consistency of working conditions; ④ After the test, promptly maintain and service the data acquisition system and sensors to extend the service life of the equipment.
[0044] S2. Due to the complex field working environment, the raw data collected by sensors contains abnormal data, missing data, and noisy data. These data can affect the accuracy of subsequent load characteristic analysis. Therefore, it is necessary to preprocess the raw data to ensure its integrity, accuracy, and validity. For example... Figure 3As shown, the preprocessing of the collected field condition data in this invention includes three steps: data cleaning, data completion, and data filtering. The specific processing flow is as follows: S21. Data Cleaning: The core of data cleaning is to remove outliers from the original data. Outliers include data that exceeds the range of values, data with abrupt changes, and duplicate data. The specific processing methods are as follows: For data exceeding the specified range, reasonable ranges are set based on the physical characteristics of each parameter for judgment and deletion. Specifically, the reasonable range for load power is set to 0-200kW (the rated power of the test prototype is 180kW, and considering impact load, the upper limit is set to 200kW), the reasonable range for battery voltage is set to 500-650V (the rated voltage of the battery pack is 600V), and the reasonable range for temperature is set to -20℃ to 60℃ (the ambient temperature in the field test is 15-28℃, and the battery and motor temperatures will not exceed this range). Data exceeding the above ranges are all judged as abnormal data.
[0045] For data with mutational anomalies, the 3σ criterion was used to perform statistical analysis on the raw data of each parameter and calculate the mean of the data. with standard deviation : ; ; In the formula, This is the mean of the original data for this parameter; This is the standard deviation of the original data for this parameter; For the first Observations at each sampling point; This represents the total number of samples taken.
[0046] Judgment criteria: When the data exceeds Scope If the data point is deemed to be a sudden and abnormal data point, it will be deleted. For example, during normal operation, the load power change rate is generally no more than 5kW / ms. If the power suddenly jumps from 10kW to 150kW (change rate of 70kW / ms), it will be deemed to be a sudden and abnormal data point and deleted.
[0047] To address duplicate data, a deduplication method is used to remove duplicate records, preventing them from affecting subsequent analysis. For example, due to a data acquisition card malfunction, multiple consecutive sets of identical data may appear; such data is deleted.
[0048] After data cleaning, approximately 3.2% of the original data was deleted, ensuring the rationality and accuracy of the remaining data.
[0049] S22. Data Completion: Due to sensor malfunctions, data transmission interruptions, etc., the original data may contain missing data. Missing data will affect the integrity of the data; therefore, it is necessary to complete the missing data. This data completion uses interpolation methods. Based on the valid data before and after the missing data, two methods are used for completion: linear interpolation and cubic spline interpolation, as detailed below: Linear interpolation: When the number of missing data points is small, i.e., no more than 5 consecutive missing data points, linear interpolation is used. Based on the two valid data points before and after the missing data point, the value of the missing data is calculated through linear fitting. ; In the formula, For moments when data is missing; , These represent the times before and after the missing data points, respectively; These are the missing data values to be determined. , They are time points , The corresponding valid data value. For example, if the load power data is missing at a certain moment, and the power at the previous moment was 20kW and the power at the next moment was 25kW, and one data point is missing, then the value of the missing data is (20+25) / 2=22.5kW.
[0050] Cubic spline interpolation: When there is a large amount of missing data, i.e. more than 5 consecutive data points are missing, cubic spline interpolation is used to fit cubic splines to the valid data points before and after the missing data, construct a smooth interpolation curve, calculate the missing data value, and ensure that the interpolated data is consistent with the trend of the original data, thus avoiding excessive interpolation error.
[0051] The formula for cubic spline fitting is: ; In the formula, It is a cubic spline interpolation function; , , , For the first The spline coefficients of each subinterval are obtained by solving the boundary conditions and the continuity conditions of the first and second derivatives of adjacent subintervals simultaneously. For the first Sub-intervals.
[0052] After data completion, the missing data completion rate reached 100%, ensuring data integrity and providing complete data support for subsequent load characteristic analysis.
[0053] S23. Data Filtering: The raw data contains a large amount of noise (mainly caused by sensor errors, environmental interference, equipment vibration, etc.). Noise can cause excessive data fluctuations and affect the accuracy of load characteristic analysis. Therefore, it is necessary to filter the preprocessed data to remove noise interference.
[0054] This step uses a wavelet filtering algorithm to reduce noise in the preprocessed data. The db4 wavelet is selected as the wavelet basis function, and the data of each parameter is decomposed and reconstructed at three levels of wavelet decomposition. The specific processing procedure is as follows: Wavelet decomposition: The preprocessed raw data is decomposed into three levels of wavelets to obtain one approximation component (low-frequency component) and three detail components (high-frequency components). The approximation component (low-frequency component) is used to reflect the overall trend of data change, and the detail components (high-frequency components) are used to reflect noise interference in the data.
[0055] Thresholding: Thresholding is performed on the three detail components (high-frequency components). A reasonable threshold is set to set the noise signal in the detail components (high-frequency components) that is less than the threshold to zero, and retain the effective signal that is greater than the threshold to reduce noise interference.
[0056] The threshold calculation formula is: ; ; In the formula: For the first Threshold for layer detail components; For the first Standard deviation of noise in layer detail components; For the first The number of wavelet coefficients in the layer detail component; For the first Layer Wavelet coefficients; These are the wavelet coefficients after thresholding.
[0057] Wavelet reconstruction: The processed approximation components (low-frequency components) and detail components (high-frequency components) are reconstructed using wavelets to obtain clean, filtered data, ensuring the smoothness and accuracy of the data while preserving its core features.
[0058] Taking load power data as an example, the comparison before and after filtering is as follows: Figure 4 As shown, the fluctuation of the filtered load power data is significantly reduced, noise interference is effectively suppressed, and the abrupt change characteristics and overall trend of load power are preserved, which meets the needs of subsequent load characteristic analysis.
[0059] S3. Field working condition load characteristic analysis: Using time-domain analysis, frequency-domain analysis, and statistical analysis, we conducted load characteristic analysis on preprocessed field operation conditions from aspects such as load power statistical characteristics, peak power distribution, power change rate distribution, and operation duration distribution. This analysis clarified the load differences and common characteristics of different operation scenarios, providing data support for subsequent research.
[0060] ; ; ; ; In the formula: This represents the average load power. For the first Load power values at each sampling point; The number of samples; , These represent the maximum and minimum load power, respectively. The standard deviation of load power; is the coefficient of variation.
[0061] I. Statistical analysis of load power characteristics is as follows: Load power data for five typical operational scenarios—plowing, rotary tillage, sowing, transportation, and turning at the edge of the field—were selected for statistical analysis. The mean, maximum, minimum, standard deviation, and coefficient of variation of the load power for each scenario were calculated to quantify the load characteristics of each scenario. The statistical results are shown in Table 1. Table 1 Parameter Statistical Results
[0062] The statistical results show that: The plowing operation had the strongest load power, with an average of 85.6kW and a maximum of 192.3kW (close to the rated power of the test prototype). The coefficient of variation was 0.42, indicating that the plowing operation had a large load power and significant fluctuations. The main reason was that the soil resistance was uneven during the plowing process, and there were frequent load changes, which is a typical heavy-load impact condition.
[0063] Rotary tillage had the second highest load power, with an average of 62.8 kW and a maximum of 156.7 kW. The coefficient of variation was 0.38. The load fluctuation was slightly lower than that of plowing, mainly because the rotary tillage depth was shallower and the soil resistance was relatively uniform, but there were still some sudden load changes.
[0064] The load power of the transportation operation is relatively stable, with an average of 45.2kW and a maximum of 78.9kW. The coefficient of variation is 0.18, which is the working condition with the smallest load fluctuation among the five operating scenarios. The main reason is that during the transportation operation, the load is mainly the weight of the transported goods, the driving speed is relatively stable, and the load power changes slowly.
[0065] The load power of the sowing operation is relatively low, with an average of 32.5kW and a maximum of 65.8kW. The coefficient of variation is 0.25, and the load fluctuation is moderate. The main reason is that the load of the sowing operation is mainly the resistance of the seeder. The resistance is relatively uniform, but there are sudden situations such as the seeder getting blocked, which can cause sudden changes in the load.
[0066] The load power fluctuation is greatest during field turning operations, with a coefficient of variation of 0.56, an average of 28.7kW, a maximum of 98.6kW, and a minimum of 0kW (when turning at idle). The main reason is that during field turning, the tractor needs to start, stop, and turn frequently, and the load power quickly rises from the idle state to a certain value and then drops rapidly, showing a high frequency of sudden changes.
[0067] II. Peak power distribution analysis is as follows: Peak power is a core indicator for measuring the instantaneous discharge capability of a pure electric tractor's power supply system. Analyzing the distribution of peak power can clarify the distribution pattern of impact loads during field operations. This invention divides peak power into five intervals: 0-50kW, 50-100kW, 100-150kW, 150-200kW, and above 200kW. The frequency and proportion of peak power in each interval are statistically analyzed, and the results are shown in Table 2. Table 2 Peak Power Distribution
[0068] The peak power distribution results show that: Peak power occurred most frequently in the 0-50kW range, accounting for 48.2% of the total. These peak power events were mainly concentrated in light-load, stable operating conditions such as sowing, turning at the edge of the field (idling), and transportation. These operating conditions have lower requirements for the instantaneous discharge capacity of the battery and mainly need to meet the energy supply demand.
[0069] Peak power in the 50-100kW range accounted for 32.7% of the occurrences, mainly concentrated in rotary tillage, transportation (acceleration), and plowing (stable phase). These operating conditions are medium load conditions, which have certain requirements on the battery's energy supply and instantaneous discharge capacity.
[0070] Peak power in the 100-150kW range accounted for 15.3% of the occurrences, mainly concentrated in plowing (impact stage) and rotary tillage (impact stage). These operating conditions are heavy-load conditions, which have high requirements for the instantaneous discharge capacity of the battery and require the battery to be able to withstand a discharge rate of 10C or higher.
[0071] Peak power in the 150-200kW range accounted for 3.5% of the occurrences, mainly concentrated in extreme impact conditions such as plowing start and rotary tilling start. These conditions place extremely high demands on the instantaneous discharge capacity of the battery, requiring the battery to withstand a discharge rate of around 20C, which is a key condition restricting the power performance of pure electric tractors.
[0072] The number of times the peak power exceeded 200kW accounted for only 0.3%, mainly due to extreme and sudden situations that occurred during the test (such as excessive soil hardness or severe blockage of the seeder). These were accidental operating conditions and had little impact on the overall load characteristics.
[0073] III. The power change rate distribution analysis is as follows: The power change rate is a core indicator describing the degree of load change. The larger the power change rate, the more drastic the load change, and the higher the requirements for the battery's instantaneous discharge capacity and power response speed. In this step, the power change rate is divided into four intervals: 0-2kW / ms (stable change), 2-5kW / ms (moderate change), 5-10kW / ms (drastic change), and above 10kW / ms (extremely drastic change). The frequency and proportion of power change rate occurrences in each interval are statistically analyzed, and the results are shown in Table 3.
[0074] Table 3 Distribution of Power Change Rate
[0075] The results of the power change rate distribution show that: The number of occurrences of power change rate in the range of 0-2kW / ms accounted for 56.8%, mainly concentrated in stable working conditions such as transportation and sowing operations. In these working conditions, the load changes are gradual and the requirements for the power response speed of the battery are relatively low.
[0076] The number of occurrences with power change rate in the range of 2-5 kW / ms accounted for 27.5%, mainly concentrated in rotary tillage and plowing operations (stable stage). These operating conditions have moderate load changes and require a certain power response speed from the battery.
[0077] The number of occurrences of power change rate in the range of 5-10kW / ms accounted for 13.2%, mainly concentrated in the plowing impact stage and rotary tillage impact stage. These working conditions involve drastic load changes, which place high demands on the battery's power response speed and instantaneous discharge capacity.
[0078] The number of occurrences with a power change rate of more than 10kW / ms accounted for 2.5%, mainly concentrated in extreme conditions such as plowing start and turning at the end of the field (acceleration). These conditions involve extremely drastic load changes, with the power change rate reaching up to 25kW / ms. They place extremely high demands on the battery's instantaneous discharge capacity and power response speed, and are conditions that need to be considered when designing energy management strategies.
[0079] IV. The specific analysis of the duration distribution of the operating condition is as follows: The duration of operating conditions is an important indicator for describing the stability of field operation conditions. Different operating conditions of varying durations have different impacts on battery energy supply and lifespan. Therefore, it is necessary to conduct statistical analysis on the duration of each typical operating condition. This step divides the operating condition duration into four intervals: 0-10s (short-term operating condition), 10-60s (medium-term operating condition), 60-300s (long-term operating condition), and over 300s (ultra-long-term operating condition). The duration percentage of each interval is statistically analyzed, and the results are shown in Table 4. Table 4. Distribution of Operating Condition Duration
[0080] The results of the duration distribution of the operating conditions show that: The duration of long-term operation (60-300s) accounted for the highest proportion, reaching 42.3%, mainly concentrated in continuous operation conditions such as plowing, rotary tillage, and transportation. These conditions require the battery to supply energy stably for a long time, and have high requirements for the battery's energy density and range.
[0081] The duration of medium-duration operating conditions (10-60s) accounted for 35.7%, mainly concentrated in sowing operations and transportation operations (speed change). These operating conditions have a medium duration and place certain requirements on the battery's energy supply and instantaneous discharge capacity.
[0082] The duration of short-term operating conditions (0-10s) accounted for 18.5%, mainly concentrated in impact conditions such as turning at the edge of the field, starting plowing, and starting rotary tillage. These conditions are short in duration but involve drastic load changes, requiring extremely high instantaneous discharge capacity of the battery.
[0083] The duration of ultra-long operating conditions (over 300 seconds) accounted for 3.5%, mainly concentrated in transportation operations (long-distance constant speed driving). These conditions require the battery to output energy stably for a long time, which places high demands on the battery's range and stability.
[0084] S4. Based on the load characteristic analysis results of S3, construct a load spectrum model of pure electric tractors under field working conditions.
[0085] Based on the above load characteristic analysis results and combined with the actual needs of pure electric tractor field operations, a load spectrum model for pure electric tractor field operation conditions is constructed. This model can comprehensively reflect the load characteristics of field operation conditions and provide reliable operating condition inputs for subsequent topology design, energy management strategy optimization, and multiphysics coupling modeling. The model includes the following steps: S41. Classification of Operating Conditions: Based on parameters such as load power, peak power, power change rate, and operating duration, the operating conditions of pure electric tractors in the field are classified into three categories: steady operating conditions, impact operating conditions, and idling operating conditions. The definitions and characteristics of each type of operating condition are as follows: The load power is stable under stable operating conditions, with a power change rate of ≤2kW / ms and a duration of ≥60s. These operating conditions include uniform speed transportation, stable plowing, stable rotary tillage, and stable sowing. These operating conditions account for 58.7% of the total operating conditions. The core requirement is stable energy supply, which places high demands on the energy density of the battery.
[0086] The load power of the impact condition changes drastically, with a power change rate >5kW / ms and a duration ≤60s. This condition includes plowing start, rotary tillage start, and acceleration turn at the edge of the field. This type of condition accounts for 16.0% of the total conditions. The core requirement is instantaneous power supply, which places extremely high demands on the battery's power density and instantaneous discharge capacity.
[0087] The load power during idling is ≤10kW, and the duration is ≤30s. This condition includes idling while turning and stopping during work breaks. This type of condition accounts for 25.3% of the total conditions, and its core requirement is a stable low-power supply, which has a relatively small impact on the battery's range.
[0088] S42. A field load spectrum model is constructed using statistical characteristics and Markov chains, specifically as follows: Statistical characteristic parameters for each operating condition type are extracted, including the mean, maximum, minimum, and standard deviation of load power, the mean power change rate, and the mean operating condition duration, etc., as the basic parameters of the load spectrum model. The calculation formula is as follows: ; ; ; In the formula: For the first The rate of change of load power at each sampling point; , The load power of two adjacent sampling points; The sampling time interval; The average rate of change of power; For the first The duration of each working condition; This represents the number of working conditions included in a given working condition type. This represents the average duration of the operating condition.
[0089] A Markov chain state transition model is established, with three operating conditions—steady condition, shock condition, and idling condition—representing the three states of the Markov chain. By statistically analyzing the number of transitions and probabilities between each condition, a state transition matrix is constructed to reflect the switching patterns between operating conditions. For example, the transition probability from steady condition to shock condition, and the transition probability from shock condition to steady condition, etc.
[0090] Among them, the number of transfers ; ; ; In the formula, , ∈{1,2,3} correspond to the three states of steady operation, shock operation, and idling operation, respectively. To be based on working conditions Transfer to working condition The number of times; This represents the total number of steps in the state sequence. To be based on working conditions Transfer to working condition The probability of; It is a 3×3 state transition matrix, and For example, the probability of transitioning from a steady operating condition to a shock operating condition is... The probability of transitioning from a shock condition to a stable condition is .
[0091] Based on statistical characteristic parameters and Markov chain state transition model, a load spectrum generation program was written using MATLAB software to generate load spectrum data that reflects the actual working conditions in the field. This data is used to simulate the switching between different working conditions and the variation law of load power, and has a high consistency with the actual collected working condition data.
[0092] This invention also includes load spectrum model verification: To verify the accuracy and rationality of the constructed field load spectrum model, the generated load spectrum data was compared and analyzed with the actual collected load data. Verification was conducted from three aspects: load power statistical characteristics, peak power distribution, and power change rate distribution, to confirm the consistency between the model-generated load spectrum data and the actual load data. The specific error requirements for verification were as follows: In the comparison of load power statistical characteristics, the relative errors of the generated load spectrum data and the actual collected data in terms of power mean, maximum value, standard deviation, and coefficient of variation are all ≤5%.
[0093] ; In the formula: This is relative error; The index values generated for the load spectrum model; These are the actual collected corresponding indicator values. The relative errors of the power mean, maximum value, standard deviation, and coefficient of variation should be within the acceptable range. .
[0094] In the comparison of peak power distribution, the relative error of the proportion of each peak power range is ≤3%.
[0095] In the comparison of power change rate distribution, the relative error of the proportion of each power change rate interval is ≤4%.
[0096] The verification results are as follows: Comparison of load power statistical characteristics: The relative errors of the power mean, maximum value, standard deviation and coefficient of variation of the generated load spectrum data and the actual collected data are all ≤5%, indicating that the load spectrum model can accurately reflect the load power statistical characteristics of the actual working conditions.
[0097] Peak power distribution comparison: The relative error between the generated load spectrum data and the actual collected data in each peak power range is ≤3%, indicating that the load spectrum model can accurately reflect the peak power distribution law of the actual working condition.
[0098] Comparison of power change rate distribution: The relative error between the generated load spectrum data and the actual collected data in each power change rate interval is ≤4%, indicating that the load spectrum model can accurately reflect the load change characteristics of the actual working conditions.
[0099] The verification results show that the constructed field load spectrum model can accurately simulate the actual working conditions of pure electric tractors in the field, with high accuracy and rationality. It can be used as the working condition input for subsequent topology design, energy management strategy optimization, and multi-physics coupling modeling, providing reliable data support for subsequent research.
[0100] Therefore, the present invention adopts the above-mentioned method for constructing a load spectrum model of pure electric tractor field conditions, which can accurately and comprehensively obtain real working condition data of pure electric tractors in multiple field scenarios. Through refined data processing and load characteristic quantitative analysis, combined with Markov chain to construct a high-precision dynamic load spectrum model, it effectively solves the problems of poor adaptability and large error of traditional working condition models, and can provide reliable working condition support for the optimized design and engineering application of electric tractor power systems.
[0101] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.
Claims
1. A method for constructing a load spectrum model of a pure electric tractor under field working conditions, characterized in that, Includes the following steps: S1. Establish a field condition data collection platform to collect field condition data; S2. Preprocess the collected field condition data; S3. Using time-domain analysis, frequency-domain analysis, and statistical analysis, load characteristics of pre-processed field operation conditions are analyzed. S4. Based on the load characteristic analysis results of S3, construct a load spectrum model of pure electric tractors under field working conditions.
2. The method for constructing a field load spectrum model for a pure electric tractor according to claim 1, characterized in that, S1 includes the following steps: S11. A pure electric tractor was selected as the test prototype. The power source of the test prototype was a single-energy lithium iron phosphate battery pack, and it was equipped with a battery management system (BMS). Typical field operation scenarios in the dryland farming area of northern China were selected as the test scenarios. The types of operations performed by the pure electric tractor in the test scenarios included plowing, rotary tilling, sowing, transportation, and turning at the edge of the field. S12. The prototype is equipped with a field condition data acquisition system, which includes a sensor module, a data acquisition module, a data storage module, and a data transmission module. The sensor module includes a load power sensor, a motor speed sensor, a battery voltage sensor, a battery current sensor, several temperature sensors, and a SOC sensor. The load power sensor is mounted on the motor output shaft to collect real-time load power during tractor operation. The motor speed sensor is mounted on the motor shaft end to collect real-time motor speed. The battery voltage and battery current sensors are integrated into the battery management system (BMS) to collect the total battery pack voltage and current. Temperature sensors are installed inside the battery pack, on the motor housing, and in the external environment to collect battery temperature, motor temperature, and ambient temperature. The SOC sensor, integrated into the BMS, collects the real-time SOC value of the battery pack. The data acquisition module is used to receive raw data collected by various sensors, convert analog signals into digital signals, and perform preliminary filtering to collect battery voltage, current, temperature, and state of charge (SOC) in real time. The data storage module uses an industrial-grade solid-state drive to store and back up the collected raw data; the data transmission module uses a 4G wireless transmission module to transmit the collected raw data to the computer terminal in real time, so that the test personnel can monitor the test status in real time and detect test anomalies in a timely manner. S13. Conduct tests on each operational scenario in sequence, following the order of plowing, rotary tilling, sowing, transportation, and turning at the edge of the field. After the test, stop data acquisition, back up the test data, shut down the test equipment, and tidy up the test site.
3. The method for constructing a field load spectrum model for a pure electric tractor according to claim 2, characterized in that, In S11, the test prototype uses a permanent magnet synchronous motor with a rated power of 180kW, a rated speed of 2200r / min, and a maximum torque of 950N·m; The single-energy lithium iron phosphate battery pack has a capacity of 200kWh, a voltage rating of 600V, and a maximum discharge rate of 10C. The test was conducted during the peak season for local crop planting, with an ambient temperature of 15-28℃ and soil moisture of 18%-25%.
4. The method for constructing a field load spectrum model for a pure electric tractor according to claim 3, characterized in that, In S13, the plowing depth is 30cm, the plowing width is 2.4m, the operating speed is 5km / h, and the continuous operation lasts for 8 hours. The rotary tillage operation has a tillage depth of 15cm, a tillage width of 2.2m, an operating speed of 6km / h, and can be carried out continuously for 8 hours. The sowing row spacing is 50cm, the sowing depth is 5cm, the operating speed is 4km / h, and the continuous operation lasts for 8 hours. The transport operation has a transport weight of 5t, a travel speed of 15km / h, and a continuous travel time of 10 hours. The transport roads include field roads and rural roads. The turning radius for the field turning operation is 5m. Idle speed turning and low speed turning are alternated and the operation is carried out continuously for 2 hours. The speed for idle speed turning is 800r / min and the speed for low speed turning is 1200r / min.
5. The method for constructing a field load spectrum model for a pure electric tractor according to claim 4, characterized in that, In S2, the preprocessing operations include: S21. Remove abnormal data from the original data. Abnormal data includes data that exceeds the value range, data with abnormal mutations, and duplicate data. For data that exceeds the range, a reasonable range is set based on the physical characteristics of each parameter for judgment and deletion. The reasonable range for load power is set to 0-200kW, the reasonable range for battery voltage is set to 500-650V, and the reasonable range for temperature is set to -20℃~60℃. For data with mutational anomalies, the 3σ criterion was used to perform statistical analysis on the raw data of each parameter and calculate the mean of the data. with standard deviation : ; ; In the formula, This is the mean of the original data for this parameter; This is the standard deviation of the original data for this parameter; For the first Observations at each sampling point; The total number of samples; Judgment criteria: If the data point is deemed to be abnormal due to a sudden change, it will be deleted. S22. For missing data caused by sensor malfunction or data transmission interruption, interpolation is used to complete the missing data. Specifically: When no more than 5 consecutive data points are missing, linear interpolation is used to calculate the missing value based on a linear fit between the two valid data points before and after the missing data point. ; In the formula, For moments when data is missing; , These represent the times before and after the missing data points, respectively; These are the missing data values to be determined. , They are time points , The corresponding valid data values; When more than 5 consecutive data points are missing, cubic spline interpolation is used. A cubic spline is fitted to the valid data points before and after the missing data to construct an interpolation curve, and the missing data value is calculated. ; In the formula, It is a cubic spline interpolation function; , , , For the first The spline coefficients of each subinterval are obtained by solving the boundary conditions and the continuity conditions of the first and second derivatives of adjacent subintervals simultaneously. For the first Sub-intervals; S23. Wavelet filtering algorithm is used to reduce noise in the preprocessed data. The db4 wavelet is selected as the wavelet basis function, and three-level wavelet decomposition and reconstruction are performed on the data of each parameter. The specific processing procedure is as follows: The preprocessed raw data is decomposed into three levels of wavelet decomposition to obtain one approximation component and three detail components. The approximation component is used to reflect the overall trend of data change, while the detail components are used to reflect noise interference in the data. Thresholding is performed on the three detail components. Noise signals in the detail components that are less than the threshold are set to zero, while valid signals that are greater than the threshold are retained. The threshold calculation formula is as follows: ; ; In the formula: For the first Threshold for layer detail components; For the first Standard deviation of noise in layer detail components; For the first The number of wavelet coefficients in the layer detail component; For the first Layer Wavelet coefficients; These are the wavelet coefficients after thresholding. The processed approximation components and detail components are reconstructed using wavelet refactoring to obtain the filtered clean data.
6. The method for constructing a field load spectrum model for a pure electric tractor according to claim 5, characterized in that, In S3, time-domain analysis, frequency-domain analysis, and statistical analysis methods are used to analyze the load characteristics of the pre-processed field operation conditions from the aspects of load power statistical characteristics, peak power distribution, power change rate distribution, and operation duration distribution. ; ; ; ; In the formula: This represents the average load power. For the first Load power values at each sampling point; The number of samples; , These represent the maximum and minimum load power, respectively. The standard deviation of load power; The coefficient of variation; Specifically, the load power statistical characteristic analysis involves selecting load power data from five typical operational scenarios—plowing, rotary tillage, sowing, transportation, and turning at the edge of the field—and conducting statistical analysis to calculate the mean, maximum, minimum, standard deviation, and coefficient of variation of the load power for each scenario, thereby quantifying the load characteristics of each scenario. The peak power distribution analysis specifically involves dividing the peak power into five intervals: 0-50kW, 50-100kW, 100-150kW, 150-200kW, and above 200kW, and then counting the frequency and percentage of peak power occurrences in each interval. The power change rate distribution analysis specifically involves dividing the power change rate into four intervals: 0-2kW / ms, 2-5kW / ms, 5-10kW / ms, and above 10kW / ms, and statistically analyzing the frequency and proportion of power change rate occurrences in each interval. The specific analysis of the duration distribution of the operating condition is as follows: the duration of the operating condition is divided into four intervals: 0-10s, 10-60s, 60-300s, and more than 300s, and the duration of the operating condition in each interval is statistically analyzed.
7. The method for constructing a field load spectrum model for a pure electric tractor according to claim 6, characterized in that, S4 includes the following steps: S41. Based on load power, peak power, power change rate and working duration, the field operation conditions of pure electric tractors are divided into stable working conditions, impact working conditions and idling working conditions. S42. A field load spectrum model is constructed using statistical characteristics and Markov chains, specifically as follows: Extract the statistical characteristic parameters for each operating condition type, including the mean, maximum, minimum, and standard deviation of load power, the mean power change rate, and the mean operating condition duration: ; ; ; In the formula: For the first The rate of change of load power at each sampling point; , The load power of two adjacent sampling points; The sampling time interval; The average rate of change of power; For the first The duration of each working condition; This represents the number of working conditions included in a given working condition type. This represents the average duration of the operating condition. A Markov chain state transition model is established, with steady operating condition, shock operating condition, and idling operating condition as the three states of the Markov chain. By statistically analyzing the number of transitions and the transition probability between each operating condition, a state transition matrix is constructed to reflect the switching rules between operating conditions. Among them, the number of transfers ; ; ; In the formula, , ∈{1,2,3} correspond to the three states of steady operation, shock operation, and idling operation, respectively. To be based on working conditions Transfer to working condition The number of times; This represents the total number of steps in the state sequence. To be based on working conditions Transfer to working condition The probability of; It is a 3×3 state transition matrix, and ; Based on statistical characteristic parameters and Markov chain state transition model, a load spectrum generation program was written using MATLAB software to generate load spectrum data that reflects the actual working conditions in the field, which is used to simulate the switching between different working conditions and the variation of load power.
8. The method for constructing a field load spectrum model for a pure electric tractor according to claim 7, characterized in that, In S41, the power change rate under steady operating conditions is ≤2kW / ms, and the duration of the operating conditions is ≥60s; this operating condition includes uniform speed transport operation, steady plowing operation, steady rotary tillage operation, and steady sowing operation. The power change rate of the impact condition is >5kW / ms, and the duration of the condition is ≤60s; this condition includes plowing start, rotary tillage start, and acceleration turn at the edge of the field. The load power during idling is ≤10kW, and the duration of the condition is ≤30s; this condition includes idling while turning and stopping during work breaks.
9. The method for constructing a field load spectrum model for a pure electric tractor according to claim 7, characterized in that, S4 is followed by: The generated load spectrum data was compared and analyzed with the actual collected operating condition data. The analysis was conducted from three aspects: load power statistical characteristics, peak power distribution, and power change rate distribution, in order to confirm the consistency between the load spectrum data generated by the model and the actual operating condition data.
10. The method for constructing a field load spectrum model for a pure electric tractor according to claim 9, characterized in that, The specific error requirements for verification are as follows: In the comparison of load power statistical characteristics, the relative errors of the generated load spectrum data and the actual collected data in terms of power mean, maximum value, standard deviation, and coefficient of variation are all ≤5%. ; In the formula: This is relative error; The index values generated for the load spectrum model; These are the actual collected corresponding indicator values; In the comparison of peak power distribution, the relative error of the proportion of each peak power range is ≤3%; In the comparison of power change rate distribution, the relative error of the proportion of each power change rate interval is ≤4%.
