Method and system for monitoring and evaluating the ground surface environment in permafrost regions before and after engineering intervention
By unifying the intervention date and spatial zoning technology links, the problems of data comparison and disturbance boundary identification in the dynamic monitoring of the surface environment in permafrost regions have been solved, enabling efficient assessment of the dynamic monitoring of the permafrost environment and evaluation of the protection effect.
Patent Information
- Application Number
- CN202611620734.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-20
- Publication Date
- 2026-11-20
AI Technical Summary
In the dynamic monitoring of the surface environment in permafrost regions, existing technologies lack unified intervention time anchors for SAR, geothermal and ecological remote sensing data, making it difficult to compare data before and after the intervention with the same caliber. There is also a lack of unified buffer zones and ring-zone statistical frameworks between monitoring points, engineering intervention zones and target areas. Ecological remote sensing results are easily affected by seasonality and data gaps, making it difficult to identify the disturbance attenuation boundary after engineering intervention and to establish maintenance priorities.
Establish a unified technical chain for data acquisition and coordinate unification, SAR quality control, multi-scale spatial zoning, geothermal profile processing, ecological anomaly extraction and joint analysis. By unifying the intervention date, monitoring point buffer zone, engineering intervention area and target area ring zone, and combining SAR temporal deformation, geothermal profile and ecological remote sensing anomaly information, identify the disturbance response range and boundary location.
It enables direct comparison of SAR, geothermal and ecological remote sensing results under the same pre- and post-processing calibers, unified statistics of local response and engineering neighborhood effects, improved stability of ecological anomaly extraction results, and monitoring results that can directly serve the evaluation of engineering protection effectiveness and maintenance priority ranking.
Smart Images

Figure CN123139101A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of remote sensing monitoring of permafrost environment, geographic information analysis, and engineering protection assessment, and in particular to a method and system for dynamic monitoring and assessment of the surface environment in permafrost regions that integrates SAR temporal deformation, geothermal profile, and ecological remote sensing anomaly information. Background Technology
[0002] Lake shores, slopes, and engineering intervention zones in permafrost regions are often simultaneously affected by changes in thermal state, surface deformation processes, and surface ecological responses. Current technologies for dynamic monitoring and assessment of the surface environment in permafrost regions have the following limitations: First, SAR (Synthetic Aperture Radar), geothermal, and ecological remote sensing data lack a unified intervention time anchor, making it difficult to conduct comparisons between different periods using the same caliber. Second, monitoring points, engineering intervention zones, and target areas belong to different spatial objects, and existing technologies lack a unified buffer zone and ring-zone statistical framework. Third, if ecological remote sensing results are not corrected to the same monthly baseline and constrained by effective pixels, they are easily affected by seasonality and missing data. Fourth, existing technologies cannot organize nearshore anomaly core areas, high-sensitivity transition areas, disturbance attenuation areas, and peripheral background areas into zoning results that can directly serve engineering operation and maintenance.
[0003] Especially in salt lake shorelines, artificial drainage channels, and nearshore permafrost sensitive areas, the nearshore core area, transition zone, and peripheral background area often exhibit response characteristics with different directions, amplitudes, and attenuation rates. Relying solely on a single indicator or a single spatial scale makes it difficult to identify the disturbance attenuation boundary after engineering intervention, and also makes it difficult to formulate maintenance priorities and monitoring intensification recommendations. Summary of the Invention
[0004] The purpose of this invention is to address the technical deficiencies in existing technologies by establishing a unified technical chain of "data acquisition and coordinate unification—SAR quality control—multi-scale spatial zoning—geothermal profile processing—ecological anomaly extraction—joint analysis—zoning identification—operation and maintenance output," thereby enabling clear determination of the disturbance response range, boundary location, and protection effect. This invention provides a dynamic monitoring and assessment method for the surface environment in permafrost regions that integrates SAR temporal deformation, geothermal profile, and ecological remote sensing anomaly information.
[0005] Another objective of this invention is to provide a dynamic monitoring and assessment system for the surface environment in permafrost regions that integrates SAR temporal deformation, geothermal profile, and ecological remote sensing anomaly information.
[0006] The technical solution adopted to achieve the purpose of this invention is: A method for dynamic monitoring and assessment of the surface environment in permafrost regions before and after engineering intervention, comprising the following steps: Step S1: Acquire SAR vector time series data, study area boundary, monitoring points, engineering intervention spatial elements, target area boundary, geothermal profile CSV data and surface ecological remote sensing data; trim SAR data to obtain standardized SAR samples and unify spatial data coordinates. Step S2: Perform quality control on the standardized SAR samples in Step S1, divide the pre- and post-intervention periods according to the unified engineering intervention date, and calculate the mean deformation before engineering intervention, the mean deformation after intervention, and the difference before and after deformation for each SAR sample. Step S3: Based on the monitoring points, engineering intervention spatial elements, and target area boundaries in Step S1, construct the monitoring point buffer zone, engineering intervention action zone, target area cumulative buffer zone, and independent ring zone partitioning. Step S4: Calculate the number of standardized SAR samples, average deformation rate, mean SAR deformation before and after intervention, and SAR deformation difference in each partition from Step S3 to form partitioned SAR statistical results. Step S5: Calculate the geothermal difference before and after the engineering intervention date based on the monitoring points and geothermal profile CSV data in Step S1, and associate it with the zonal SAR statistical results to complete the mapping from profile to monitoring point and generate the SAR-geothermal connection table. Step S6: Using the independent ring zone partition constructed in step S3 as the spatial unit, the surface ecological remote sensing data in step S1 is used to calculate the NDVI, surface dry-wet proxy, and ecological remote sensing index anomalies of each month after intervention relative to the baseline of the same month before intervention, and the ecological anomaly results are obtained. Step S7: Align the SAR deformation difference value in step S4 with the geothermal difference value in step S5, calculate the Pearson correlation coefficient, linear regression model and goodness of fit, and identify the core sensitive area, transition area, attenuation area and background area by combining SAR deformation difference value, geothermal difference value and ecological anomaly results under the unified ring framework, and determine the disturbance attenuation boundary.
[0007] In the above technical solution, in step S1, the engineering intervention spatial element is one or more of linear engineering elements, planar engineering elements, or point engineering elements.
[0008] In the above technical solution, in step S2, the formula for calculating the mean deformation of each SAR sample before engineering intervention is as follows: ; In the formula, For the first Mean deformation of SAR samples before engineering intervention The number of time-phase fields before engineering intervention. For the first SAR samples in the time field The following deformation, For the phase field, where, , This is a collection of time-phase fields prior to engineering intervention; The formula for calculating the mean deformation of each SAR sample after engineering intervention is as follows: In the formula, For the first Mean deformation of SAR samples after engineering intervention The number of phase fields after engineering intervention, where, , This is a set of time-phase fields after engineering intervention; The formula for calculating the difference in deformation before and after deformation for each SAR sample is as follows: ; In the formula, For the first The difference in deformation before and after deformation of a SAR sample.
[0009] In the above technical solution, in step S3, a fixed radius monitoring point buffer is constructed with the monitoring point after unifying the spatial data coordinates in step S1 as the center, and the average difference and positive and negative response ratio of the SAR samples in each monitoring point buffer are calculated. The formula for calculating the average difference of the SAR samples is as follows: ; In the formula, For the first The average difference of the buffer zone of each monitoring point For the first Number of valid SAR samples within the buffer zone of each monitoring point; The proportion of negative response in SAR samples is expressed as follows: ; In the formula, For the first The proportion of samples within the buffer zone of each monitoring point whose difference between consecutive values is less than zero. The number of samples with negative changes; The proportion of positive response of SAR samples is expressed as: ; In the formula, For the first The proportion of samples with a greater than zero difference between consecutive values within the buffer zone of each monitoring point. The number of samples showing positive changes; Multi-distance buffering is performed on linear engineering intervention spatial elements after unifying spatial data coordinates in step S1 to obtain the average difference of the engineering streamline neighborhood at different scales. Boundary expansion is performed on surface engineering intervention spatial elements, and fixed-distance buffering is performed on point engineering intervention spatial elements. The formula for calculating the average difference of the neighborhood of engineering streamlines at different scales is as follows: ; In the formula, For scale The average difference in the neighborhood of the lower streamline. For scale The number of valid samples under the given conditions; Using the target area boundary after unifying spatial data coordinates in step S1 as the core area, cumulative buffer zones are generated level by level. Based on the cumulative buffer zones, independent annular zones are constructed, and the average difference of each annular zone is calculated. The calculation formula for the independent annular zone is as follows: ; In the formula, For the first Each independent ring band, radius The corresponding cumulative buffer, radius The corresponding cumulative buffer; The formula for calculating the average difference of each annulus is: ; In the formula, For the first The average difference of each independent annular band, For the first Number of valid SAR samples within each independent ring zone.
[0010] In the above technical solution, step S5 specifically involves establishing a binding relationship between monitoring points and geothermal profiles based on the monitoring points and geothermal profile CSV data after unifying spatial data coordinates in step S1. For each geothermal profile, multiple depth channels are averaged at a daily scale to obtain the daily average geothermal temperature. The average geothermal temperature and geothermal temperature difference before and after the preset engineering intervention date are calculated to obtain a profile temperature summary table. This summary table is then added to the zonal SAR statistical results obtained in step S4 to obtain a SAR-geothermal connection table. The formula for calculating the daily average ground temperature for each geothermal profile is as follows: ; In the formula, For the first Each section at the date of engineering intervention The average daily ground temperature, For the first Intervention date for each section project The effective depth channel count below, For the first Each section at the date of engineering intervention ,depth Temperature value at that location; The formula for calculating the average geothermal temperature of each geothermal profile before the date of engineering intervention is as follows: ; In the formula, For the first Average ground temperature of each profile prior to the date of engineering intervention. To standardize the dates for project intervention; The formula for calculating the average geothermal temperature of each geothermal profile after the date of engineering intervention is as follows: ; In the formula, For the first Average ground temperature of each profile after the date of engineering intervention; The formula for calculating the average geothermal difference before and after the engineering intervention date for each geothermal profile is as follows: ; In the formula, For the first The average geothermal difference before and after the engineering intervention date for each geothermal profile. For the first The average ground temperature after intervention in each profile, For the first Average ground temperature before intervention in each profile.
[0011] In the above technical solution, in step S6, the calculation formula for the outlier values of the ecological remote sensing indicators for each spatial unit in different months is as follows: ; In the formula, For the first Each spatial unit in the month On the indicators outliers For the first Each spatial unit in the month The baseline mean of the same month before the intervention. For the first Each spatial unit in the month The baseline mean of the same month after intervention; The calculation formula is: ; In the formula, For the first Each spatial unit in the month The mean baseline value in the same month after the intervention. For the first Each spatial unit in the month The number of years after the intervention used to build the baseline. For the first Each spatial unit in the year following intervention In the month The index value on; The calculation formula is: ; In the formula, For the first Each spatial unit in the month The baseline mean of the same month before the intervention. The number of years prior to intervention used to construct the baseline. Year before intervention In the month The index values.
[0012] In the above technical solution, the Normalized Difference Vegetation Index (NDVI), surface wet-dry proxy index, and land surface temperature (LST) are extracted. The mean baseline value of each spatial unit before intervention in different months and the effective pixel ratio of each spatial unit under different scenarios are calculated. The effective pixel ratio is subjected to quality control by setting a minimum effective pixel ratio threshold and a minimum effective pixel number threshold. Water, cloud, snow, and shadow removal are performed on the surface ecological remote sensing data. For scenarios and ring zones that meet the quality control conditions, outlier values of the index are calculated. The formula for calculating the effective pixel ratio of each spatial unit in different scenarios is as follows: ; In the formula, For the first Each spatial unit in the scene Effective pixel ratio on The effective number of pixels that pass local quality control. For the first Total number of pixels within a spatial unit.
[0013] In the above technical solution, in step S7, the formula for calculating the Pearson correlation coefficient between the geothermal difference and the SAR deformation difference is as follows: ; In the formula, The Pearson correlation coefficient is... This is the average of the buffer values for all monitoring points. The average ground temperature difference before and after the intervention date. This represents the average of the temperature differences across all cross-sections. The linear regression model between the geothermal difference and the SAR deformation difference is expressed as follows: ; In the formula, For the regression intercept, The regression slope, For residual terms; The goodness of fit of the linear regression model between the geothermal difference and the SAR deformation difference is expressed as follows: ; In the formula, The goodness of fit of the linear regression model. Predict the temperature difference for the model; The formula for calculating the ring radius corresponding to the disturbance attenuation boundary is: ; In the formula, The ring radius corresponding to the candidate perturbation attenuation boundary. For the first The difference in deformation before and after deformation of SAR samples in an independent ring zone. , and They represent the first NDVI anomaly, surface dry / wet agent anomaly, and LST anomaly in an independent ring zone. This is the logical AND operator.
[0014] In the above technical solution, the disturbance partitioning includes a nearshore core sensitive area, a high-sensitivity transition area, a disturbance attenuation area, and a peripheral background area; Nearshore rings with significantly negative SAR deformation difference values and ecological anomalies characterized by vegetation suppression, excessive moisture, and excessive cold are identified as nearshore core sensitive areas; rings with negative SAR deformation difference values but weakening amplitude and ecological anomalies beginning to recover are identified as high-sensitivity transition areas; rings with SAR deformation difference values turning positive for the first time and ecological anomalies entering a recovery state are identified as disturbance attenuation areas; and outer rings with stable positive SAR deformation difference values and ecological anomalies tending to stabilize are identified as outer background areas.
[0015] In another aspect of the present invention, a system for implementing the dynamic monitoring and evaluation method of the surface environment in permafrost regions before and after the engineering intervention is provided. The system includes: a data acquisition and coordinate unification module for implementing step S1; a SAR quality control and event time period reconstruction module for implementing step S2; a multi-scale spatial zoning and SAR statistics module for implementing steps S3 and S4; a geothermal profile processing module for implementing step S5; an ecological anomaly extraction module for implementing step S6; and a SAR-geothermal joint analysis module and a zoning identification and boundary determination module for implementing step S7.
[0016] Compared with the prior art, the beneficial effects of the present invention are: This invention uses a unified intervention date as a time anchor point, enabling direct comparison of SAR, geothermal, and ecological remote sensing results under the same pre- and post-intervention calibers. Through a three-layer spatial structure of monitoring point buffer zone, engineering intervention zone, and target zone ring, it achieves unified statistics of local response, engineering neighborhood effect, and surrounding background area. By controlling baseline anomalies and effective pixels in the same month, it makes the ecological anomaly extraction results more stable. Through zoning identification and boundary determination, the monitoring results can directly serve the evaluation of engineering protection effectiveness, maintenance priority ranking, and monitoring intensification decision-making. Attached Figure Description
[0017] Figure 1 The diagram shows the flowchart of the dynamic monitoring and evaluation method for the surface environment of permafrost regions before and after engineering intervention according to the present invention.
[0018] Figure 2 The figure shown is a schematic diagram of the SAR global velocity field of the present invention.
[0019] Figure 3 The diagram shown is a spatial distribution diagram of the engineering streamline buffer zone of this invention.
[0020] Figure 4 The image shows the spatial distribution map of the multi-scale buffer zone of the salt lake in 2023 according to the present invention.
[0021] Figure 5 The figure shown is a statistical trend chart of the salt lake buffer in 2023 according to the present invention.
[0022] Figure 6 The figure shown is a statistical trend diagram of the annular SAR of the salt lake in 2023 according to the present invention.
[0023] Figure 7 The diagram shown is a graph illustrating the ecological anomalies and recovery transitions of the salt lake in 2023, based on the present invention. Detailed Implementation
[0024] The present invention will be further described in detail below with reference to specific embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
[0025] Example 1 A method for dynamic monitoring and assessment of the surface environment in permafrost regions before and after engineering intervention, referring to Figure 1 This includes the following steps: Step S1, Data Acquisition and Coordinate Unification: Acquire multi-source monitoring data and unify it to the metric projection coordinate system: Acquire SAR vector time series data, study area boundary data, monitoring point data, engineering intervention spatial element data, target area boundary data, geothermal profile CSV data, and surface ecological remote sensing data. Use the study area boundary for SAR vector time series data clipping to obtain standardized SAR samples. Then, unify the monitoring point data, engineering intervention spatial elements, and target area boundary to the metric projection coordinate system. Coordinate unification ensures that the point buffer, engineering action area, and ring width have clear distance significance.
[0026] Furthermore, the spatial elements for engineering intervention can be one or more of linear, planar, or point-based engineering elements. When using linear engineering elements, it is preferable to first perform multi-component splitting and degenerate segment removal before proceeding with multi-scale buffer statistics.
[0027] Step S2, intervention time segmentation and SAR quality control, dividing the pre- and post-intervention periods based on a unified intervention date and calculating deformation difference: Quality control is performed on the standardized SAR samples obtained in Step S1, constructing an effective sample set, reading all fields from the effective sample set, and based on the preset engineering intervention date... The mean deformation before engineering intervention, the mean deformation after engineering intervention, and the difference before and after deformation are calculated for each sample. The output SAR sample layer containing the fields of mean deformation before engineering intervention, mean deformation after engineering intervention, and the difference before and after deformation provides a basis for unified statistics of monitoring points, engineering intervention areas, and target ring zones.
[0028] Furthermore, the formula for calculating the mean deformation of each SAR sample before engineering intervention is as follows: ; In the formula, For the first Mean deformation of SAR samples before engineering intervention The number of time-phase fields before engineering intervention. For the first SAR samples in the time field The following deformation, For the phase field, where, , This is a set of time-phase fields before engineering intervention.
[0029] The formula for calculating the mean deformation after engineering intervention is as follows: ; In the formula, For the first Mean deformation of SAR samples after engineering intervention The number of phase fields after engineering intervention. For the phase field, where, , This is a set of time-phase fields after engineering intervention.
[0030] The formula for calculating the difference before and after deformation is: ; In the formula, For the first The difference in deformation before and after deformation of a SAR sample.
[0031] Step S3, partition construction, construct monitoring point buffer, engineering intervention area and target area independent ring zone: Based on the unified spatial data coordinates of monitoring points, engineering intervention elements and target area boundaries in step S1, construct monitoring point buffer, construct engineering intervention area based on engineering intervention spatial elements, construct target area cumulative buffer and independent ring zone partition based on target area, and calculate the average difference and positive and negative response ratio of SAR samples in each area.
[0032] Specifically, a fixed-radius monitoring point buffer zone is constructed centered on the monitoring point after unifying the spatial data coordinates in step S1. The average difference and positive / negative response ratio of SAR samples within each monitoring point buffer zone are calculated. The formula for calculating the average difference of SAR samples is as follows: ; In the formula, For the first The average difference of the buffer zone of each monitoring point For the first The number of valid SAR samples within the buffer zone of each monitoring point.
[0033] The proportion of negative response in SAR samples is expressed as follows: ; In the formula, For the first The proportion of samples within the buffer zone of each monitoring point whose difference between consecutive values is less than zero. This represents the number of samples with negative changes.
[0034] The proportion of positive response of SAR samples is expressed as: ; In the formula, For the first The proportion of samples with a greater than zero difference between consecutive values within the buffer zone of each monitoring point. This represents the number of samples showing positive changes.
[0035] Furthermore, multi-distance buffering is performed on the linear engineering intervention spatial elements after unifying coordinates in step S1 to obtain the average difference of the engineering streamline neighborhood at different scales. Boundary expansion is performed on the surface engineering intervention spatial elements, and fixed-distance buffering is performed on the point engineering intervention spatial elements.
[0036] Furthermore, the formula for calculating the average difference of the engineering streamline neighborhood at different scales is as follows: ; In the formula, For scale The average difference in the neighborhood of the lower streamline. For scale The number of valid samples under the following conditions For scale The corresponding engineering action area, For the scale.
[0037] Furthermore, taking the target area boundary after unifying spatial data coordinates in step S1 as the core area, cumulative buffer zones are generated level by level. Based on the cumulative buffer zones, independent annular zones are constructed, and the average difference of each annular zone is calculated. The calculation formula for the independent annular zone is as follows: ; In the formula, For the first Each independent ring band, radius The corresponding cumulative buffer, radius The corresponding cumulative buffer.
[0038] ; In the formula, For the first The average difference of each independent annular band, For the first Number of valid SAR samples within each independent ring zone.
[0039] Step S4, Zone Deformation Statistics: For the monitoring point buffer zone, engineering intervention zone, target area cumulative buffer zone and independent ring zone constructed in step S3, respectively, the standardized SAR sample quantity, average velocity, mean deformation before engineering intervention, mean deformation after engineering intervention and the difference before and after deformation are statistically analyzed, and the standardized statistical results required for subsequent joint analysis are generated.
[0040] Step S5, SAR index statistics, statistical analysis of the number of samples, average rate and difference before and after for each spatial unit: Based on the monitoring point data and geothermal profile CSV data after unified coordinates in step S1, establish the binding relationship between monitoring points and geothermal profiles. For each geothermal profile, average multiple depth channels at the daily scale to obtain the daily average geothermal temperature, and calculate the average geothermal temperature and geothermal temperature difference before and after the preset intervention date to obtain a profile temperature summary table, and associate it with the SAR-geothermal connection table obtained in step S4.
[0041] Furthermore, to reduce the impact of missing values, a threshold for the missing rate of profile files is set. Profiles with a missing rate higher than the threshold are removed.
[0042] The formula for calculating the daily average geothermal temperature on the date of engineering intervention for each geothermal profile is as follows: ; In the formula, For the first Each section at the date of engineering intervention The average daily ground temperature, Date of engineering intervention The effective depth channel count below, For the first Each section at the date of engineering intervention ,depth The temperature value at that location.
[0043] The formula for calculating the average geothermal temperature of each geothermal profile before the date of engineering intervention is as follows: ; In the formula, For the first Average ground temperature of each profile prior to the date of engineering intervention. To standardize the dates for project intervention.
[0044] The formula for calculating the average geothermal temperature of each geothermal profile after the date of engineering intervention is as follows: ; In the formula, For the first The average ground temperature of each profile after the date of engineering intervention.
[0045] The formula for calculating the average geothermal difference before and after the engineering intervention date for each geothermal profile is as follows: ; In the formula, For the first The average geothermal difference before and after the engineering intervention date for each geothermal profile. For the first The average ground temperature after intervention in each profile, For the first Average ground temperature before intervention in each profile.
[0046] Step S6, Ecological Anomaly Extraction: Calculate the same-month anomalies of NDVI, surface wet / dry proxy, and LST. Using independent annular zones as spatial units, extract the Normalized Difference Vegetation Index (NDVI), surface wet / dry proxy index, and LST from the surface ecological remote sensing data in Step S1. Calculate the mean baseline value of each spatial unit before intervention in different months and the effective pixel ratio of each spatial unit under different scenarios. Perform quality control on the effective pixel ratio by setting minimum effective pixel ratio threshold and minimum effective pixel number threshold. Perform water, cloud, snow, and shadow removal on the surface ecological remote sensing data. For scenarios and annular zones that meet the quality control conditions, calculate the anomaly values of the indicators to obtain the ecological scene quality table, the ecological monthly scale summary table, the annular zone same-month anomaly table, and the ecological anomaly summary table.
[0047] Furthermore, water, cloud, snow, and shadow removal were performed on the surface ecological remote sensing data, and the Normalized Difference Vegetation Index (NDVI), surface wet / dry proxy index, and surface temperature (LST) were extracted.
[0048] The formula for calculating the mean baseline value of each spatial unit before intervention in different months is as follows: ; In the formula, For the first Each spatial unit in the month The baseline mean of the same month before the intervention. For use in the first Each spatial unit in the month The number of years prior to engineering intervention used to establish the baseline. For the first Each spatial unit in the year before intervention In the month The index values.
[0049] The formula for calculating the effective pixel ratio of each spatial unit in different scenarios is as follows: ; In the formula, For the first Each spatial unit in the scene Effective pixel ratio on The effective number of pixels that pass local quality control. For the first Total number of pixels within a spatial unit.
[0050] Quality control of the effective pixel ratio is performed by setting a minimum effective pixel ratio threshold and a minimum effective pixel count threshold.
[0051] ; In the formula, For the first Each spatial unit in the month The baseline mean for the same month after the engineering intervention. For the first Each spatial unit in the month The number of years following the engineering intervention used to build the baseline. For the first Each spatial unit in the year following engineering intervention In the month The index values.
[0052] To control for seasonal effects, outliers in the month following engineering intervention were compared to the baseline for the same month before intervention. The formula for calculating outliers for each spatial unit in different months is as follows: ; In the formula, For the first Each spatial unit in the month On the indicators Outlier.
[0053] Step S7, Zone Identification and Boundary Determination: Identify the core sensitive area, transition area, attenuation area, and background area. Align the average difference of SAR samples obtained in Step S4 with the geothermal difference in Step S5 to construct a profile-level coupled sample set. Calculate the Pearson correlation coefficient, linear regression model, and goodness of fit of the linear regression model between temperature state changes and SAR deformation to determine the coupling direction and strength between temperature changes and deformation changes. Under a unified ring-zone framework, comprehensively compare the differences before and after deformation, the ratio of positive and negative changes, geothermal difference, and ecological anomalies of SAR samples obtained according to Steps S2 to S6 to identify the nearshore core sensitive area, high-sensitivity transition area, disturbance attenuation area, and peripheral background area. Determine the disturbance attenuation boundary according to the candidate boundary rules. Evaluate the engineering protection effect and provide operation and maintenance suggestions based on the ring-zone radius of the disturbance attenuation boundary.
[0054] Furthermore, the formula for calculating the Pearson correlation coefficient between the geothermal change and SAR deformation is as follows: ; In the formula, The Pearson correlation coefficient is... This is the average of the buffer values for all monitoring points. This represents the average temperature difference across all cross-sections.
[0055] The linear regression model between geothermal change and SAR deformation is expressed as follows: ; In the formula, For the regression intercept, The regression slope, This is the residual term.
[0056] The goodness of fit of the linear regression model between the geothermal change and SAR deformation is expressed as follows: ; In the formula, The goodness of fit of the linear regression model. Predict the temperature difference for the model.
[0057] Furthermore, the nearshore ring with a significantly negative SAR difference and ecological anomalies manifested as vegetation suppression, excessive moisture, and excessive cold is identified as the nearshore core sensitive area; the ring with a negative SAR difference but a weakening amplitude and ecological anomalies beginning to recover is identified as the high-sensitivity transition zone; the ring with a SAR difference that turns positive for the first time and ecological anomalies entering a recovery state is identified as the disturbance attenuation zone; and the outer ring with a stable positive SAR difference and ecological anomalies tending to stabilize is identified as the outer background area.
[0058] The formula for calculating the ring radius corresponding to the disturbance attenuation boundary is: ; In the formula, The ring radius corresponding to the candidate perturbation attenuation boundary. For the first The radius of each independent ring, For the first The difference in deformation before and after deformation of SAR samples in an independent ring zone. , and They represent the first NDVI anomaly, surface dry / wet agent anomaly, and LST anomaly in an independent ring zone. It is a logical AND operator, indicating that multiple conditions that it connects must be true simultaneously.
[0059] When the difference between the deformation and the deformation of the SAR sample turns positive for the first time and the main ecological anomaly indicators enter the recovery state simultaneously, the corresponding ring zone can be used as the starting ring zone of the disturbance attenuation zone.
[0060] Example 2 A dynamic monitoring and evaluation system for the surface environment of permafrost regions before and after engineering intervention includes: a data acquisition and coordinate unification module, used to implement step S1, acquiring SAR vector time-series data, study area boundary data, monitoring point data, engineering intervention spatial element data, target area boundary data, geothermal profile CSV data, and surface ecological remote sensing data, and cropping the SAR vector time-series data to unify the monitoring point data, engineering intervention spatial elements, and target area boundary coordinates; a SAR quality control and event time period reconstruction module, used to implement step S2, performing quality control on SAR samples, calculating the mean deformation before intervention, the mean deformation after intervention, and the difference before and after deformation for each sample based on a preset intervention date; and a multi-scale spatial zoning and SAR... The R statistics module is used to implement steps S3 and S4, constructing monitoring point buffer zones, engineering intervention zones, target area cumulative buffer zones, and independent annular zones, and statistically analyzing the number of SAR samples, average rate, mean before intervention, mean after intervention, and difference before and after intervention. The geothermal profile processing module is used to implement step S5, establishing the binding relationship between monitoring points and geothermal profiles and a profile temperature summary table. The ecological anomaly extraction module is used to implement step S6, calculating the scene and annular zone calculation index anomalies. The SAR-geothermal joint analysis module and the zone identification and boundary determination module are used to implement step S7, constructing a profile-level coupled sample set, identifying the nearshore core sensitive area, high-sensitivity transition area, disturbance attenuation area, and peripheral background area, and determining the disturbance attenuation boundary.
[0061] Example 3 This embodiment is an application of the dynamic monitoring and evaluation method for the surface environment of permafrost regions before and after engineering intervention described in Embodiment 1, specifically as follows: Acquire SAR vector time series samples, study area boundaries, monitoring points, engineering intervention streamlines, target area boundaries, geothermal profile CSV, and Landsat Collection 2 Level-2 ecological results. Upon verification, the actual unified intervention date used in the project was October 1, 2020. The SAR quality control thresholds were coherence ≥ 0.35 and RMSE ≤ 10.0. There were a total of 235 SAR temporal fields, including 95 fields before intervention and 140 fields after intervention. The monitoring point buffer radius was 50m, the engineering streamline buffer radius sequence was 30m, 50m, 100m, 150m, and 200m, and the target area cumulative buffer radius sequence was 0m, 30m, 50m, 100m, 150m, 200m, 500m, 1000m, 2000m, 5000m, and 10000m. The ground temperature profile missing rate threshold was 0.60. The local quality control of ecological remote sensing adopted a scene cloud cover threshold of 80.0, a minimum effective pixel ratio of 0.15, and a minimum effective pixel count of 500.
[0062] Reference Figure 2First, the global SAR velocity field within the study area was acquired and cropped. Quality control was then performed, and the average deformation before intervention, the average deformation after intervention, and the difference between the two were calculated. After screening, this embodiment obtained approximately 2,537,760 valid SAR samples, with a global average difference of approximately 9.332; among them, approximately 1,700,405 samples showed positive changes, and approximately 837,355 samples showed negative changes.
[0063] Reference Figure 3 Multi-scale action zones are constructed centered on the engineering intervention flow lines; simultaneously, such as Figure 4 As shown, a cumulative buffer zone and an independent ring zone are constructed with the 2023 target area of the salt lake as the core area.
[0064] Reference Figure 5 SAR statistics were performed on the cumulative buffer zone of the target area. The average difference of the 30m buffer zone was about 7.841, and the average difference of the 200m buffer zone was about 8.842, indicating that there is a significant scale difference between the adjacent area and the outer area of the project. Figure 5 The data shows that as the buffer distance increases, the cumulative average deformation rate of the buffer zone gradually increases from a stronger negative value in the nearshore area, indicating that the negative deformation in the nearshore or adjacent areas of the project becomes more obvious, while the overall negative deformation is weakened after the outer area is added. Figure 5 b shows that the average difference between the pre- and post-intervention values is negative in each cumulative buffer zone, and gradually approaches zero as the buffer distance increases, indicating that the negative changes after the intervention are mainly concentrated in the nearshore or adjacent areas of the project. Figure 5 c shows that the proportion of negative responses decreases overall as the cumulative buffer distance increases, indicating that the proportion of negative response samples is relatively high in the nearshore area, while the proportion of positive or weak response samples in the peripheral background area gradually increases. Figure 5 The data in d shows that the number of sample points increases significantly with the increase of buffer distance, indicating that the statistics of large-scale buffers have a higher sample size, but at the same time they will introduce more peripheral background information, thus diluting the nearshore disturbance signal.
[0065] Reference Figure 6 At the independent annular scale of the target area, the average difference of the 0-30m annular zone is approximately -16.995, the average difference of the 500-1000m annular zone is approximately 1.539, and the average difference of the 1000-2000m annular zone is approximately 8.591, indicating that the nearshore annular zone is mainly in a negative change, while the outer annular zone has entered the positive recovery zone. Figure 6 The data shows that the average deformation rate of different independent rings gradually increases from negative to positive as the distance from the shore increases, and turns to positive in the outer ring. This indicates that the deformation response has obvious distance gradient characteristics. The nearshore ring is dominated by negative deformation, while the outer ring gradually enters a state of relative recovery or background stability. Figure 6b shows that the average difference between the intervention and pre-intervention values of the independent annulus changes from negative to positive with increasing distance. Specifically, the average difference for the 0–30 m annulus is approximately -16.995, for the 500–1000 m annulus is approximately 1.539, and for the 1000–2000 m annulus is approximately 8.591. This indicates that the negative disturbance is most pronounced in the nearshore region and begins to shift towards a positive recovery state near 500–1000 m. Figure 6 The data shows that the proportion of negative response decreases continuously from nearshore to the periphery, while the proportion of positive response gradually increases, exhibiting a crossover characteristic near the 500–1000 m ring. This suggests that this distance range may correspond to a critical transition zone between negative disturbance attenuation and peripheral background recovery. Overall, the SAR deformation response of the target area shows a clear range attenuation pattern, with the nearshore ring being the main negative disturbance zone, the 500–1000 m area being a transition zone, and the region beyond 1000 m gradually showing relative recovery or background stability characteristics.
[0066] The geothermal profile was standardized on a daily scale to obtain the geothermal temperature difference before and after the profile, and invalid files with a missing rate higher than 0.60 were removed. Then, the buffer mean of monitoring points was aligned with the geothermal difference to establish a linear regression model. The calculated Pearson correlation coefficient was approximately -0.0736, the regression slope was approximately -0.002417, the intercept was approximately -0.673789, and the goodness of fit R² was approximately 0.0054. These results indicate a quantifiable coupling relationship between geothermal changes and SAR deformation changes.
[0067] In this embodiment, the ecological remote sensing results use the intervention boundary date of 2020-10-01, consistent with SAR. Preferably, outliers in the month following the intervention relative to the baseline of the same month before the intervention are used to express ecological changes. The ecological results report shows that a total of 454 source scenes were retrieved, 98 sets of composite results were obtained on the same day, and 1439 segment-scene records passed local quality control.
[0068] Reference Figure 7 We analyzed the ecological anomalies and deformation responses of the salt lake at the independent circumferential scale in 2023. Figure 7 a shows the distance variation characteristics of vegetation index anomalies, surface wet-dry proxy anomalies, and surface temperature anomalies within different independent ring zones. Figure 7 The upper part of the figure shows that the vegetation index anomaly is significantly negative in the nearshore ring zone of 0–30 m, and then gradually increases with the increase of the distance from the outer boundary, and approaches or is slightly higher than zero in the outer ring zone, indicating that there is a certain vegetation inhibition phenomenon in the nearshore area, and the inhibition effect gradually weakens with the increase of distance. Figure 7 The middle part indicates that the surface wet-dry proxy anomaly is negative in the 0–30 m annulus, and begins to approach or turn positive near 30–50 m, indicating that the nearshore annulus exhibits a wet anomaly, while the wet-dry state gradually recovers to the background state after offshore. Figure 7 The lower part of a shows that the LST anomaly is negative in the 0–30 m and 30–50 m rings, and turns positive after 50–100 m, indicating that the nearshore area has obvious cold characteristics, and the surface temperature anomaly changes from a cold anomaly to a background or warm state within a short distance.
[0069] Figure 7 b further provides the independent annular locations where different indicators first turned positive. The results show that the surface wet / dry proxy anomaly first turned positive in the 30–50 m annularity, the LST anomaly in the 50–100 m annularity, the vegetation index anomaly in the 500–1000 m annularity, and the SAR deformation anomaly in the 2000–3000 m annularity. These results indicate that the response scales of different indicators to shoreline disturbances are not consistent. The recovery distances for wet / dry conditions and surface temperature are relatively short, vegetation recovery has a certain lag, and the spatial extent of the SAR deformation response is larger. In summary, the nearshore annularity of the salt lake mainly exhibits vegetation suppression, excessive wetness, and coldness, while the outer annularity gradually enters a state of ecological restoration or background stability. If the common positive turn of multiple indicators is used as the criterion for disturbance attenuation, the SAR deformation index has a strong constraining effect on the candidate disturbance attenuation boundary.
[0070] Furthermore, considering only the characteristics of ecological anomaly recovery, the earliest ring zone simultaneously exhibiting non-negative NDVI, non-negative surface dry-wet proxy, and non-negative LST is 150-200m.
[0071] Further integrating the SAR difference before and after and the ecological anomaly recovery status, the first ring of the candidate boundary rule is 500-1000m. Accordingly, this embodiment preferably identifies 0-50m as the nearshore core sensitive area, 50-200m as the high-sensitivity transition area, 200-1000m as the disturbance attenuation area, and the area beyond 1000m as the peripheral background area.
[0072] This embodiment ultimately outputs a global statistics table, a monitoring point statistics table, an engineering action zone statistics table, a target area cumulative buffer statistics table, an independent ring zone statistics table, a geothermal profile summary table, an ecological anomaly summary table, a joint analysis parameter table, and attached figures, and forms a protection zoning map, a disturbance attenuation boundary map, and an operation and maintenance suggestion table.
[0073] The above description is only a preferred embodiment of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention, characterized in that, Includes the following steps: Step S1: Acquire SAR vector time series data, study area boundary, monitoring points, engineering intervention spatial elements, target area boundary, geothermal profile CSV data and surface ecological remote sensing data; trim SAR data to obtain standardized SAR samples and unify spatial data coordinates. Step S2: Perform quality control on the standardized SAR samples in Step S1, divide the pre- and post-intervention periods according to the unified engineering intervention date, and calculate the mean deformation before engineering intervention, the mean deformation after intervention, and the difference before and after deformation for each SAR sample. Step S3: Based on the monitoring points, engineering intervention spatial elements, and target area boundaries in Step S1, construct the monitoring point buffer zone, engineering intervention action zone, target area cumulative buffer zone, and independent ring zone partitioning. Step S4: Calculate the number of standardized SAR samples, average deformation rate, mean SAR deformation before and after intervention, and SAR deformation difference in each partition from Step S3, and form the partitioned SAR statistical results. Step S5: Calculate the geothermal difference before and after the engineering intervention date based on the monitoring points and geothermal profile CSV data in Step S1, and associate it with the zonal SAR statistical results to complete the mapping from profile to monitoring point and generate the SAR-geothermal connection table. Step S6: Using the independent ring zone partition constructed in step S3 as the spatial unit, the surface ecological remote sensing data in step S1 is used to calculate the NDVI, surface dry-wet proxy, and ecological remote sensing index anomalies of each month after intervention relative to the baseline of the same month before intervention, and the ecological anomaly results are obtained. Step S7: Align the SAR deformation difference value in step S4 with the geothermal difference value in step S5, calculate the Pearson correlation coefficient, linear regression model and goodness of fit, and identify the core sensitive area, transition area, attenuation area and background area by combining SAR deformation difference value, geothermal difference value and ecological anomaly results under the unified ring framework, and determine the disturbance attenuation boundary.
2. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 1, characterized in that, In step S1, the engineering intervention spatial element is one or more of linear engineering elements, planar engineering elements, or point engineering elements.
3. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 1, characterized in that, In step S2, the formula for calculating the mean deformation of each SAR sample before engineering intervention is as follows: ; In the formula, For the first Mean deformation of SAR samples before engineering intervention The number of time-phase fields before engineering intervention. For the first SAR samples in the time field The following deformation, For the phase field, where, , This is a collection of time-phase fields prior to engineering intervention. The formula for calculating the mean deformation of each SAR sample after engineering intervention is as follows: ; In the formula, For the first Mean deformation of SAR samples after engineering intervention The number of phase fields after engineering intervention. For the phase field, where, , This is a collection of time-phase fields after engineering intervention; The formula for calculating the difference in deformation before and after deformation for each SAR sample is as follows: ; In the formula, For the first The difference in deformation before and after deformation of a SAR sample.
4. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 2, characterized in that, In step S3, a fixed-radius monitoring point buffer is constructed with the monitoring point after unifying the spatial data coordinates in step S1 as the center, and the average difference and positive and negative response ratio of the SAR samples in each monitoring point buffer are calculated. The formula for calculating the average difference of the SAR samples is as follows: ; In the formula, For the first The average difference of the buffer zone of each monitoring point For the first Number of valid SAR samples within the buffer zone of each monitoring point; The proportion of negative response in SAR samples is expressed as follows: ; In the formula, For the first The proportion of samples within the buffer zone of each monitoring point whose difference between consecutive values is less than zero. The number of samples with negative changes; The proportion of positive response of SAR samples is expressed as: ; In the formula, For the first The proportion of samples with a greater than zero difference between consecutive values within the buffer zone of each monitoring point. The number of samples showing positive changes; Multi-distance buffering is performed on linear engineering intervention spatial elements after unifying spatial data coordinates in step S1 to obtain the average difference of the engineering streamline neighborhood at different scales. Boundary expansion is performed on surface engineering intervention spatial elements, and fixed-distance buffering is performed on point engineering intervention spatial elements. The formula for calculating the average difference of the neighborhood of engineering streamlines at different scales is as follows: ; In the formula, For scale The average difference in the neighborhood of the lower streamline. For scale The number of valid samples under the given conditions; Using the target area boundary after unifying spatial data coordinates in step S1 as the core area, cumulative buffer zones are generated level by level. Based on the cumulative buffer zones, independent annular zones are constructed, and the average difference of each annular zone is calculated. The calculation formula for the independent annular zone is as follows: ; In the formula, For the first Each independent ring band, radius The corresponding cumulative buffer, radius The corresponding cumulative buffer; The formula for calculating the average difference of each annulus is: ; In the formula, For the first The average difference of each independent annular band, For the first Number of valid SAR samples within each independent ring zone.
5. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 1, characterized in that, Specifically, step S5 involves establishing a binding relationship between monitoring points and geothermal profiles based on the unified spatial data coordinates of the monitoring points and the geothermal profile CSV data in step S1. For each geothermal profile, multiple depth channels are averaged at a daily scale to obtain the daily average geothermal temperature. The average geothermal temperature and the geothermal temperature difference before and after the preset engineering intervention date are calculated to obtain a profile temperature summary table. This summary table is then added to the zonal SAR statistical results obtained in step S4 to obtain a SAR-geothermal connection table. The formula for calculating the daily average ground temperature for each geothermal profile is as follows: ; In the formula, For the first Each section at the date of engineering intervention The average daily ground temperature, For the first Intervention date for each section project The effective depth channel count below, For the first Each section at the date of engineering intervention ,depth Temperature value at that location; The formula for calculating the average geothermal temperature of each geothermal profile before the date of engineering intervention is as follows: ; In the formula, For the first Average ground temperature of each profile prior to the date of engineering intervention. To standardize the dates for project intervention; The formula for calculating the average geothermal temperature of each geothermal profile after the date of engineering intervention is as follows: ; In the formula, For the first Average ground temperature of each profile after the date of engineering intervention; The formula for calculating the average geothermal difference before and after the engineering intervention date for each geothermal profile is as follows: ; In the formula, For the first The average geothermal difference before and after the engineering intervention date for each geothermal profile. For the first The average ground temperature after intervention in each profile, For the first Average ground temperature before intervention in each profile.
6. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 1, characterized in that, In step S6, the formula for calculating the outlier values of the ecological remote sensing indicators for each spatial unit in different months is as follows: ; In the formula, For the first Each spatial unit in the month On the indicators outliers For the first Each spatial unit in the month The baseline mean of the same month before the intervention. For the first Each spatial unit in the month The baseline mean of the same month after intervention; The calculation formula is: ; In the formula, For the first Each spatial unit in the month The mean baseline for the same month after the intervention. For the first Each spatial unit in the month The number of years after the intervention used to build the baseline. For the first Each spatial unit in the year following intervention In the month The index value on; The calculation formula is: ; In the formula, For the first Each spatial unit in the month The baseline mean of the same month before the intervention. The number of years prior to intervention used to construct the baseline. Year before intervention In the month The index values.
7. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 6, characterized in that, Normalized Difference Vegetation Index (NDVI), surface wet / dry proxy index, and land surface temperature (LST) were extracted. The mean baseline value of each spatial unit before intervention in different months and the effective pixel ratio of each spatial unit under different scenarios were calculated. The effective pixel ratio was subjected to quality control by setting minimum effective pixel ratio threshold and minimum effective pixel number threshold. Water, cloud, snow, and shadow removal were performed on the surface ecological remote sensing data. For scenarios and ring zones that meet the quality control conditions, outlier values of the index were calculated. The formula for calculating the effective pixel ratio of each spatial unit in different scenarios is as follows: ; In the formula, For the first Each spatial unit in the scene Effective pixel ratio on The effective number of pixels that pass local quality control. For the first Total number of pixels within a spatial unit.
8. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 1, characterized in that, In step S7, the formula for calculating the Pearson correlation coefficient between the geothermal difference and the SAR deformation difference is as follows: ; In the formula, The Pearson correlation coefficient is... This is the average of the buffer values for all monitoring points. The average ground temperature difference before and after the intervention date. This represents the average of the temperature differences across all cross-sections. The linear regression model between the geothermal difference and the SAR deformation difference is expressed as follows: ; In the formula, For the regression intercept, The regression slope, For residual terms; The goodness of fit of the linear regression model between the geothermal difference and the SAR deformation difference is expressed as follows: ; In the formula, The goodness of fit of the linear regression model. Predict the temperature difference for the model; The formula for calculating the ring radius corresponding to the disturbance attenuation boundary is: ; In the formula, The ring radius corresponding to the candidate perturbation attenuation boundary. For the first Each independent ring radius, For the first The difference in deformation before and after deformation of SAR samples in an independent ring zone. , and They represent the first NDVI anomaly, surface dry / wet agent anomaly, and LST anomaly in an independent ring zone. This is the logical AND operator.
9. The method for dynamic monitoring and evaluation of the surface environment in permafrost regions before and after engineering intervention as described in claim 8, characterized in that, The disturbance zoning includes a nearshore core sensitive zone, a high-sensitivity transition zone, a disturbance attenuation zone, and a peripheral background zone; Nearshore rings with significantly negative SAR deformation difference values and ecological anomalies characterized by vegetation suppression, excessive moisture, and excessive cold are identified as nearshore core sensitive areas; rings with negative SAR deformation difference values but weakening amplitude and ecological anomalies beginning to recover are identified as high-sensitivity transition areas; rings with SAR deformation difference values turning positive for the first time and ecological anomalies entering a recovery state are identified as disturbance attenuation areas; and outer rings with stable positive SAR deformation difference values and ecological anomalies tending to stabilize are identified as outer background areas.
10. A system for implementing the dynamic monitoring and evaluation method for the surface environment of permafrost regions before and after engineering intervention as described in claim 1, characterized in that, The system includes: a data acquisition and coordinate unification module for implementing step S1; a SAR quality control and event time period reconstruction module for implementing step S2; a multi-scale spatial partitioning and SAR statistics module for implementing steps S3 and S4; a geothermal profile processing module for implementing step S5; an ecological anomaly extraction module for implementing step S6; and a SAR-geothermal joint analysis module and a partition identification and boundary determination module for implementing step S7.
