Urban park landscape layout intelligent partitioning method and system based on digital twinning
By constructing a full-element 3D model using digital twin technology and combining it with intelligent algorithms, the problems of subjectivity and low efficiency in urban park landscape zoning design have been solved. Multi-objective optimization and simulation verification have been achieved, improving design efficiency and operational safety.
Patent Information
- Application Number
- CN202611217764.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-12
- Publication Date
- 2026-11-20
AI Technical Summary
Existing urban park landscape zoning designs suffer from strong subjectivity, low efficiency, difficulty in balancing multiple objectives, large discrepancies between design schemes and actual implementation, lack of dynamic simulation verification, resulting in operational defects and high renovation and maintenance costs.
The system adopts an intelligent zoning system for urban park landscape layout based on digital twins. Through data acquisition, digital twin modeling, intelligent zoning calculation and simulation verification modules, it constructs a full-element three-dimensional model, realizes multi-objective optimization and simulation verification closed loop, and supports three-dimensional visualization display.
It significantly improved the scientific nature and design efficiency of park landscape zoning, reduced the deviation between design and implementation, identified operational risks in advance, reduced the cost of later renovation and maintenance, and improved the efficiency of communication of solutions.
Smart Images

Figure CN123139401A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of urban landscape planning and digital twin technology, specifically relating to a method and system for intelligent zoning of urban park landscape layout based on digital twins. Background Technology
[0002] With the advancement of urban renewal and the construction of ecological garden cities, urban parks, as the core carriers of the urban green space system, directly determine the ecological benefits, service functions, and visitor experience of the parks through the scientific nature of their landscape layout and zoning. Landscape functional zoning is a core aspect of park planning, requiring simultaneous consideration of multiple objectives such as ecological protection, recreational services, landscape aesthetics, and safety carrying capacity. It is a typical multi-constraint, multi-objective spatial optimization problem.
[0003] In existing technologies, urban park landscape zoning mainly suffers from the following four core technical deficiencies: The vast majority of park landscape zoning is completed by designers based on site surveys and personal experience. The quality of the design is highly dependent on the designer's professional ability, making it difficult to achieve a quantitative balance of multiple objectives and easily leading to problems such as functional layout imbalance and insufficient ecological considerations. At the same time, the design and iteration cycle is long. The zoning design and modification of large urban parks can take several weeks, and the design efficiency is difficult to match the needs of rapid urban renewal.
[0004] Currently, most mainstream CAD and GIS-aided design tools are primarily two-dimensional planar designs, capable of handling only basic terrain and vector elements. They cannot construct fully-featured three-dimensional twin scenes that include topography, vegetation, facility distribution, and pedestrian flow dynamics. The actual operational effects of zoning schemes cannot be visually presented beforehand, leading to significant discrepancies between the design and the final result, and increasing the likelihood of oversights in the initial planning stages.
[0005] Existing design schemes struggle to simultaneously quantify and optimize multiple objectives, such as ecological carrying capacity, pedestrian capacity, service facility coverage radius, and landscape visual effects, often focusing on a single functional dimension. Some schemes prioritize recreational activities, leading to fragmented ecological spaces, while others prioritize ecological protection, resulting in insufficient service coverage, thus failing to achieve optimal synergy across multiple objectives.
[0006] In traditional design processes, the lack of dynamic simulation verification after the zoning plan is completed makes it impossible to predict operational problems such as peak-hour congestion, broken ecological corridors, blind spots in service facility coverage, and insufficient safe evacuation. Operational defects often emerge after the plan is implemented, resulting in high costs for subsequent modifications and maintenance, and even potential safety hazards.
[0007] Therefore, developing an intelligent zoning technology for urban park landscapes that can achieve full-element mapping, intelligent optimization calculation, and simulation verification closed loop is an urgent technical problem to be solved in this field. Summary of the Invention
[0008] In response to the problems raised in the background technology above, the purpose of this invention is to provide an intelligent zoning method and system for urban park landscape layout based on digital twins. This invention solves the problems of strong subjectivity, low efficiency, and difficulty in balancing multiple objectives in traditional landscape zoning by combining digital twin virtual-real mapping with intelligent algorithms. It significantly improves the scientific nature, feasibility, and design efficiency of park landscape zoning and is applicable to landscape planning and optimization scenarios of various urban parks.
[0009] To achieve the above-mentioned technical objectives, the technical solution adopted by the present invention is as follows: The intelligent zoning system for urban park landscape layout based on digital twins includes a data acquisition module, a digital twin modeling module, an intelligent zoning calculation module, a simulation verification module, and an interactive output module. The output end of the data acquisition module is connected to the input end of the digital twin modeling module, and is used to collect multi-source basic data of the park site and transmit it to the digital twin modeling module. The output end of the digital twin modeling module is connected to the input ends of the intelligent zoning calculation module and the simulation verification module respectively, and is used to construct a full-element three-dimensional digital twin model of the park site, providing a twin carrier for zoning calculation and simulation verification. The output of the intelligent zoning calculation module is connected to the input of the simulation verification module. It is used to perform multi-objective intelligent zoning calculations based on twin model data to generate a preliminary landscape zoning scheme. The output of the simulation verification module is connected to the feedback input of the intelligent zoning calculation module. It is used to perform multi-dimensional simulation evaluation of the preliminary landscape zoning scheme, output the evaluation results and feed them back to the intelligent zoning calculation module for iterative optimization. The interactive output module is connected to the digital twin modeling module, the intelligent zoning calculation module and the simulation verification module respectively. It is used to visualize the twin model and the zoning scheme and receive manual adjustment instructions.
[0010] Furthermore, the digital twin modeling module has a built-in hierarchical modeling unit, and the digital twin model generated by the digital twin modeling module includes a terrain base layer, an ecological element layer, a facility element layer, and a pedestrian flow dynamic layer. The topographic base layer contains site elevation, slope, and water system data; the ecological element layer contains vegetation distribution, soil type, and ecologically sensitive area data; the facility element layer contains existing building, road, and service facility data; and the pedestrian flow dynamic layer contains pedestrian flow distribution density data at different times.
[0011] Further specifying, the intelligent partitioning calculation module includes a spatial clustering unit, a multi-objective optimization unit, and a scheme generation unit; The spatial clustering unit is used to perform spatial clustering based on the ecological, topographical, and facility elements of the twin model to generate initial partition boundaries. The multi-objective optimization unit is used to iteratively optimize the initial partition boundaries. The scheme generation unit is used to output a complete partition scheme that includes ecological conservation areas, recreational activity areas, landscape viewing areas, and service support areas.
[0012] Further specifying, the simulation verification module includes a pedestrian flow simulation unit, an ecological assessment unit, and a landscape evaluation unit; The pedestrian flow simulation unit is used to simulate the pedestrian density distribution and path congestion of different time periods in the zoning scheme. The ecological assessment unit is used to calculate the ecological connectivity, vegetation coverage, and sensitive area protection indicators of the zoning scheme. The landscape evaluation unit is used to evaluate the landscape visual corridor accessibility and landscape harmony indicators of the zoning scheme.
[0013] Furthermore, the data sources of the data acquisition module include satellite remote sensing images, UAV oblique photography data, site survey data, meteorological and soil monitoring data, and historical population flow statistics. The data acquisition module supports format conversion and unified coordinate system matching of raster data, vector data, and time-series data.
[0014] A digital twin-based intelligent zoning method for urban park landscape layout includes the following steps: S1 collects multi-source basic data of the target park site and completes data cleaning and coordinate unification; S2 constructs a full-element three-dimensional digital twin model of the park site based on multi-source basic data; S3 uses a digital twin model as its carrier and performs intelligent zoning calculations through a multi-objective optimization algorithm to generate a preliminary landscape zoning scheme. S4 imports the preliminary landscape zoning plan into the digital twin model, conducts multi-dimensional simulation verification of pedestrian flow, ecology, and landscape, and outputs quantitative evaluation results; S5 iteratively optimizes the zoning scheme based on the evaluation results, outputs the final landscape zoning scheme after meeting the preset threshold, and displays it visually.
[0015] Further specifying, the specific steps of S2 are as follows: S21 constructs a three-dimensional topographic base for the site based on topographic survey and remote sensing data, and marks elevation, slope, and water system geographic elements. S22 overlays ecological and facility vector data to generate ecological element layers and facility element layers respectively; S23 accesses historical pedestrian flow statistics to construct a dynamic pedestrian flow layer by time period; S24 merges all layers according to a unified coordinate benchmark to form an interactive, full-element digital twin model.
[0016] Further specifying, the specific steps of S3 are as follows: S31 extracts spatial characteristic parameters of ecological sensitivity, terrain suitability, and facility accessibility from the twin model; S32 uses a spatial clustering algorithm to initially divide the site into blocks, forming preliminary partition boundaries; S33 sets multiple objective functions and constraints for ecological carrying capacity, service coverage radius, and landscape connectivity; S34 uses a multi-objective genetic algorithm to iteratively optimize the initial partition boundaries, generating a Pareto optimal solution set, and then selects a preliminary landscape partitioning scheme.
[0017] Further specifying, the specific steps of S4 are as follows: S41 maps the initial partitioning scheme to the digital twin model, marking the functional attributes and capacity parameters of each partition; S42 runs a pedestrian flow dynamics simulation to calculate the peak pedestrian density, path passage efficiency, and congestion risk of each zone; S43 performs an ecological benefit assessment, calculating the ecological connectivity, vegetation retention, and sensitive area protection rate of the zoning scheme; S44 conducts landscape visibility analysis to assess the landscape harmony and visual corridor unobstructedness of the zones; S45 summarizes various simulation indicators, generates a quantitative evaluation report, and marks items that do not meet the standards.
[0018] Further specifying, the specific steps of S5 are as follows: S51 compares the simulation evaluation results with preset thresholds, and outputs the final solution if all standards are met. If there are any non-compliant items in S52, the corresponding indicators will be fed back to the partition calculation stage as constraints, and the target weights will be adjusted and iterated and optimized again. The final S53 solution uses a digital twin scenario for 3D visualization, supports manual fine-tuning of partition boundaries and functional configurations, and automatically re-simulates and verifies after adjustments.
[0019] The beneficial effects of this invention are: This invention uses digital twin technology to construct a three-dimensional model that includes all elements such as terrain, ecology, facilities, and pedestrian flow, fully replicating the real features of the site. It breaks down the information barriers of two-dimensional design, making the spatial layout of the zoning scheme completely fit the actual site conditions and greatly reducing the deviation between design and implementation.
[0020] This invention uses a multi-objective optimization algorithm to automatically complete zoning calculations, which can simultaneously balance multiple objectives such as ecology, function, and landscape, avoiding subjective biases in manual design; at the same time, design efficiency is significantly improved, the scheme iteration cycle is shortened from several weeks to several hours, and planning efficiency is greatly improved.
[0021] This invention constructs a closed-loop mechanism of computation-simulation-feedback-optimization, which can simulate the actual operation of the solution during the design phase, identify and optimize problems such as crowd congestion, ecological disruption, and service blind spots in advance, effectively improving the feasibility and operational safety of the solution and reducing the cost of later modification and maintenance. Furthermore, the 3D visualization display based on the digital twin scenario can intuitively present the effect of the zoning solution, supporting real-time adjustments and instant simulation verification, facilitating communication and review between designers and decision-makers, and improving the efficiency of solution communication. Attached Figure Description
[0022] The present invention can be further illustrated by the non-limiting embodiments given in the accompanying drawings; Figure 1 This is a system module diagram of an embodiment of the intelligent zoning method and system for urban park landscape layout based on digital twins of the present invention; Figure 2 This is a flowchart illustrating the steps of an embodiment of the intelligent zoning method and system for urban park landscape layout based on digital twins of the present invention. Detailed Implementation
[0023] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be further described below with reference to the accompanying drawings and embodiments. The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention. The technical solutions of various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by the present invention. It should be understood that the specific embodiments described herein are merely for explaining the present invention and are not intended to limit the present invention.
[0024] like Figure 1 As shown, the intelligent zoning system for urban park landscape layout based on digital twins of the present invention includes a data acquisition module, a digital twin modeling module, an intelligent zoning calculation module, a simulation verification module, and an interactive output module. The output end of the data acquisition module is connected to the input end of the digital twin modeling module, and is used to collect multi-source basic data of the park site and transmit it to the digital twin modeling module. The output end of the digital twin modeling module is connected to the input ends of the intelligent zoning calculation module and the simulation verification module respectively, and is used to construct a full-element three-dimensional digital twin model of the park site, providing a twin carrier for zoning calculation and simulation verification. The output of the intelligent zoning calculation module is connected to the input of the simulation verification module. It is used to perform multi-objective intelligent zoning calculations based on twin model data to generate a preliminary landscape zoning scheme. The output of the simulation verification module is connected to the feedback input of the intelligent zoning calculation module. It is used to perform multi-dimensional simulation evaluation of the preliminary landscape zoning scheme, output the evaluation results and feed them back to the intelligent zoning calculation module for iterative optimization. The interactive output module is connected to the digital twin modeling module, the intelligent zoning calculation module and the simulation verification module respectively. It is used to visualize the twin model and the zoning scheme and receive manual adjustment instructions.
[0025] Specifically, this system adopts a microservice architecture deployed on a cloud server, with five functional modules interacting through a unified data bus. During implementation, the computing power and storage environment are configured first, followed by the deployment of the data acquisition module, digital twin modeling module, intelligent zoning calculation module, simulation verification module, and interactive output module. The interface protocols and data flow rules for each module are configured. The system connects to a front-end web interface, supporting users to upload data, retrieve plans, and view simulation results. This system uses the digital twin model as its core data foundation, constructing a closed-loop data link: data input—modeling support—intelligent calculation—simulation verification—feedback optimization. Each module operates independently, with forward data flow generating plans and reverse feedback enabling iterative optimization, forming a complete self-consistent technical system. The modular architecture of this system facilitates individual upgrades and maintenance, and the closed-loop linkage mechanism enables fully automated processing of landscape zoning. Compared to traditional manual design, overall design efficiency is significantly improved; simultaneously, it avoids errors caused by manual data transmission, significantly improving the consistency of plan data.
[0026] In the practical application of this embodiment, the digital twin modeling module has a built-in layered modeling unit, and the digital twin model generated by the digital twin modeling module includes a terrain base layer, an ecological element layer, a facility element layer, and a dynamic pedestrian flow layer. The topographic base layer contains site elevation, slope, and water system data; the ecological element layer contains vegetation distribution, soil type, and ecologically sensitive area data; the facility element layer contains existing building, road, and service facility data; and the pedestrian flow dynamic layer contains pedestrian flow distribution density data at different times.
[0027] Specifically, the digital twin modeling module employs a GIS + 3D engine joint construction, generating four types of layers. The terrain base layer is generated based on 1:1000 DEM elevation data and orthophotos, using triangulation to reconstruct site elevation, slope, water system, and other geomorphic features with a spatial accuracy of 0.5m. The ecological element layer overlays vegetation survey vectors and soil type data, assigning attributes such as canopy closure and ecological sensitivity to each patch. The facility element layer imports vector coordinates of buildings, roads, and service facilities, labeling facility capacity and service radius parameters. The pedestrian flow dynamic layer incorporates time-segmented pedestrian flow statistics, generating three types of temporal density grids. Working principle: Layered modeling achieves decoupled management of spatial data, allowing each layer to be independently edited, updated, and displayed / hidden. Fusion under a unified coordinate system ensures accurate spatial matching, balancing model integrity and maintainability. The digital twin model fully replicates the natural and artificial features of the site, achieving over 95% element restoration accuracy, providing a precise, multi-dimensional data foundation for subsequent zoning calculations and simulation verification, avoiding information loss caused by single layers.
[0028] In the practical application of this embodiment, the intelligent partitioning calculation module includes a spatial clustering unit, a multi-objective optimization unit, and a scheme generation unit; The spatial clustering unit is used to perform spatial clustering based on the ecological, topographical, and facility elements of the twin model to generate initial partition boundaries. The multi-objective optimization unit is used to iteratively optimize the initial partition boundaries. The scheme generation unit is used to output a complete partition scheme that includes ecological conservation areas, recreational activity areas, landscape viewing areas, and service support areas.
[0029] Specifically, the intelligent zoning calculation module adopts a two-level computing architecture. First, the spatial clustering unit extracts three types of spatial grid parameters—ecological sensitivity, terrain suitability, and facility accessibility—from the twin model. It then uses the K-means spatial clustering algorithm to initially divide the site into 8-12 continuous initial zones, ensuring that the boundaries conform to the natural terrain and ecological patches. Next, the multi-objective optimization unit uses ecological carrying capacity, service coverage, and landscape coordination as objective functions, with minimum zone area and road connectivity as constraints, and iteratively optimizes using the NSGA-II genetic algorithm. Finally, the scheme generation unit selects the scheme with the highest comprehensive score from the Pareto solution set. The intelligent zoning calculation module first achieves coarse division based on the site background through unsupervised clustering, ensuring spatial continuity and natural adaptability. Then, it uses a heuristic optimization algorithm to achieve multi-objective fine-tuning, quantifying and balancing multiple needs. The two-stage combination considers both spatial rationality and objective optimization. It can simultaneously optimize more than three core objectives, improving overall benefits by more than 18%. The zone boundaries conform to the natural characteristics of the site, avoiding the rigid cutting and subjective bias of artificial design, significantly improving the spatial rationality of the zoning scheme.
[0030] In the practical application of this embodiment, the simulation verification module includes a pedestrian flow simulation unit, an ecological assessment unit, and a landscape evaluation unit; The pedestrian flow simulation unit is used to simulate the pedestrian density distribution and path congestion of different time periods in the zoning scheme. The ecological assessment unit is used to calculate the ecological connectivity, vegetation coverage, and sensitive area protection indicators of the zoning scheme. The landscape evaluation unit is used to evaluate the landscape visual corridor accessibility and landscape harmony indicators of the zoning scheme.
[0031] Specifically, the simulation verification module includes three types of simulation engines, all based on digital twin models. The pedestrian flow simulation unit incorporates a social force model, taking into account peak pedestrian volume and entrance / exit flow parameters to simulate pedestrian density distribution and congestion points at different times. The ecological assessment unit uses a landscape ecological index algorithm to calculate ecological connectivity, patch fragmentation, and vegetation cover. The landscape evaluation unit uses a viewpoint analysis algorithm to select core viewpoints and calculate the unobstructedness of the visual corridor. During implementation, the functional parameters of the zoning scheme are mapped to the twin model, boundary conditions are set, and the three types of simulations are run in parallel, outputting quantitative indicators and marking non-compliance items.
[0032] The simulation verification module leverages the virtual-real mapping characteristics of digital twins to reproduce real-world operating scenarios in digital space. It uses specialized algorithms to quantitatively verify the solution, enabling pre-design operational simulation and early exposure of operational risks. It can identify more than three types of operational risks during the design phase, reducing the need for later modifications. All evaluation indicators are quantifiable and traceable, avoiding the subjectivity of manual evaluation and significantly improving the reliability of solution implementation.
[0033] In practical applications of this embodiment, the data sources of the data acquisition module include satellite remote sensing images, UAV oblique photography data, site survey data, meteorological and soil monitoring data, and historical population flow statistics. The data acquisition module supports format conversion and unified coordinate system matching of raster data, vector data, and time-series data.
[0034] Specifically, the data acquisition module interfaces with five types of data sources, supporting multi-format data access. Satellite remote sensing and UAV oblique photography data are processed through orthorectification and stitching to generate high-resolution base maps; site survey data are acquired via RTK to generate high-precision terrain control points; meteorological and soil data come from time-series monitoring results from site monitoring stations; and historical pedestrian flow data comes from visitor flow statistics systems of surrounding commercial areas and similar parks. After all data is accessed, it undergoes unified noise reduction, coordinate transformation, and format standardization processing, and is unified to a coordinate system.
[0035] The data acquisition module comprehensively covers all dimensions of site space, ecology, facilities, and operation through the fusion and complementarity of multi-source heterogeneous data. Deviations from a single data source can be corrected by other data, ensuring the integrity and accuracy of the basic data. Technical benefits: The dimensionality and accuracy of the basic data are significantly improved, ensuring the accuracy of the twin model and zoning scheme from the source and avoiding design deviations caused by a single data source.
[0036] A digital twin-based intelligent zoning method for urban park landscape layout includes the following steps: S1 collects multi-source basic data of the target park site and completes data cleaning and coordinate unification; S2 constructs a full-element three-dimensional digital twin model of the park site based on multi-source basic data; S3 uses a digital twin model as its carrier and performs intelligent zoning calculations through a multi-objective optimization algorithm to generate a preliminary landscape zoning scheme. S4 imports the preliminary landscape zoning plan into the digital twin model, conducts multi-dimensional simulation verification of pedestrian flow, ecology, and landscape, and outputs quantitative evaluation results; S5 iteratively optimizes the zoning scheme based on the evaluation results, outputs the final landscape zoning scheme after meeting the preset threshold, and displays it visually.
[0037] In the practical application of this embodiment, the specific steps of S2 are as follows: S21 constructs a three-dimensional topographic base for the site based on topographic survey and remote sensing data, and marks elevation, slope, and water system geographic elements. S22 overlays ecological and facility vector data to generate ecological element layers and facility element layers respectively; S23 accesses historical pedestrian flow statistics to construct a dynamic pedestrian flow layer by time period; S24 merges all layers according to a unified coordinate benchmark to form an interactive, full-element digital twin model.
[0038] Specifically, the model construction is performed in four layered steps. The first step constructs a 3D terrain base based on topographic survey and DEM data, generating an elevation surface using an irregular triangular mesh algorithm, with the relative terrain error controlled within 0.3m. The second step overlays ecological and facility vector data, precisely matching vector elements to the terrain base through spatial registration, and simultaneously assigning various attribute parameters. The third step incorporates historical pedestrian flow statistics, generating pedestrian density raster for different time periods through spatial interpolation. The fourth step merges the four layers according to a unified coordinate benchmark, constructing an interactive 3D twin scene. The model construction adopts a bottom-up layered modeling approach, layering from the basic terrain to upper-level elements, ensuring both the uniformity of the spatial benchmark and the independent management of each element, balancing the model's accuracy and maintainability. The constructed twin model has high spatial accuracy, comprehensive element dimensions, and a spatial matching error of less than 0.5m, fully supporting subsequent zoning calculations and simulation verification.
[0039] In the practical application of this embodiment, the specific steps of S3 are as follows: S31 extracts spatial characteristic parameters of ecological sensitivity, terrain suitability, and facility accessibility from the twin model; S32 uses a spatial clustering algorithm to initially divide the site into blocks, forming preliminary partition boundaries; S33 sets multiple objective functions and constraints for ecological carrying capacity, service coverage radius, and landscape connectivity; S34 uses a multi-objective genetic algorithm to iteratively optimize the initial partition boundaries, generating a Pareto optimal solution set, and then selects a preliminary landscape partitioning scheme.
[0040] Specifically, the zoning calculation is performed in four steps. The first step extracts three types of spatial feature parameters from the twin model to generate a 10m resolution raster dataset. The second step uses the K-means spatial clustering algorithm for cluster analysis to generate initial zoning boundaries, with the number of clusters set to 8-12 based on the site size. The third step sets three objective functions and constraints such as minimum zoning area and ecological protection red lines. The fourth step calls the NSGA-II multi-objective genetic algorithm for iterative optimization, setting the population size to 100 and iterations to 200 generations, finally selecting the optimal solution using the entropy weight method. First, unsupervised clustering is used to automatically divide the site's natural features, ensuring the spatial continuity of the zoning. Then, a heuristic optimization algorithm is used to find the optimal solution for multiple objectives in the solution space, achieving a quantitative balance of multiple needs.
[0041] In the practical application of this embodiment, step S4 specifically includes: S41 maps the initial partitioning scheme to the digital twin model, marking the functional attributes and capacity parameters of each partition; S42 runs a pedestrian flow dynamics simulation to calculate the peak pedestrian density, path passage efficiency, and congestion risk of each zone; S43 performs an ecological benefit assessment, calculating the ecological connectivity, vegetation retention, and sensitive area protection rate of the zoning scheme; S44 conducts landscape visibility analysis to assess the landscape harmony and visual corridor unobstructedness of the zones; S45 summarizes various simulation indicators, generates a quantitative evaluation report, and marks items that do not meet the standards.
[0042] Specifically, the simulation verification is performed in five steps. The first step maps the boundaries and functional attributes of the preliminary zoning scheme to a digital twin model, configuring the capacity and control parameters for each zone. The second step runs a pedestrian flow dynamics simulation, calculating pedestrian density, traffic efficiency, and congestion risk points for each zone. The third step performs an ecological benefit assessment, calculating connectivity, vegetation retention rate, and sensitive area protection rate. The fourth step conducts landscape view analysis, calculating the visible area ratio and visual corridor unobstructedness. The fifth step summarizes the quantitative indicators, generates an assessment report, and marks non-compliant items. Based on the virtual-real mapping capability of the twin model, the scheme is comprehensively quantitatively verified from three core dimensions: function, ecology, and landscape, simulating the scheme's performance under real-world operating conditions and accurately identifying potential problems. This design allows for comprehensive verification of the scheme's operational performance during the design phase, identifying more than three types of problems in advance, such as pedestrian congestion, ecological fragmentation, and landscape blind spots, thus avoiding design flaws during later operation.
[0043] In the practical application of this embodiment, the specific steps of S5 are as follows: S51 compares the simulation evaluation results with preset thresholds, and outputs the final solution if all standards are met. If there are any non-compliant items in S52, the corresponding indicators will be fed back to the partition calculation stage as constraints, and the target weights will be adjusted and iterated and optimized again. The final S53 solution uses a digital twin scenario for 3D visualization, supports manual fine-tuning of partition boundaries and functional configurations, and automatically re-simulates and verifies after adjustments.
[0044] Specifically, iterative optimization is performed in three steps. The first step compares the simulation indicators with preset thresholds one by one; if all indicators meet the standards, the final solution is output; otherwise, it enters the iteration phase. The second step converts the non-compliant items into new constraints, adjusts the target weights, and feeds them back to the partition calculation phase. After iterative optimization, another simulation is performed for verification. The third step visualizes the compliant solution through a 3D engine, supporting manual drag-and-drop fine-tuning of partition boundaries. After adjustment, a rapid simulation verification is automatically triggered. Once confirmed as qualified, partition drawings, indicator reports, and 3D results are output. By employing a hybrid optimization mechanism of automatic iteration and manual fine-tuning, automatic closed-loop iteration ensures all quantitative indicators meet the standards, while manual intervention preserves design flexibility, achieving a combination of algorithmic objectivity and design experience. The human-machine collaborative mode balances efficiency and flexibility, reducing the response time for solution adjustments to the hour level, significantly improving the efficiency of solution communication and modification.
[0045] The above embodiments are merely illustrative of the principles and effects of the present invention and are not intended to limit the invention. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in the present invention should still be covered by the claims of the present invention.
Claims
1. A smart zoning system for urban park landscape layout based on digital twins, characterized by: It includes a data acquisition module, a digital twin modeling module, an intelligent partitioning calculation module, a simulation verification module, and an interactive output module; The output end of the data acquisition module is connected to the input end of the digital twin modeling module, and is used to collect multi-source basic data of the park site and transmit it to the digital twin modeling module. The output end of the digital twin modeling module is connected to the input ends of the intelligent zoning calculation module and the simulation verification module respectively, and is used to construct a full-element three-dimensional digital twin model of the park site, providing a twin carrier for zoning calculation and simulation verification. The output of the intelligent zoning calculation module is connected to the input of the simulation verification module. It is used to perform multi-objective intelligent zoning calculations based on twin model data to generate a preliminary landscape zoning scheme. The output of the simulation verification module is connected to the feedback input of the intelligent zoning calculation module. It is used to perform multi-dimensional simulation evaluation of the preliminary landscape zoning scheme, output the evaluation results and feed them back to the intelligent zoning calculation module for iterative optimization. The interactive output module is connected to the digital twin modeling module, the intelligent zoning calculation module and the simulation verification module respectively. It is used to visualize the twin model and the zoning scheme and receive manual adjustment instructions.
2. The intelligent zoning system for urban park landscape layout based on digital twins as described in claim 1, characterized in that: The digital twin modeling module has a built-in hierarchical modeling unit, and the digital twin model generated by the digital twin modeling module includes a terrain base layer, an ecological element layer, a facility element layer, and a dynamic human flow layer. The topographic base layer contains site elevation, slope, and water system data; the ecological element layer contains vegetation distribution, soil type, and ecologically sensitive area data; the facility element layer contains existing building, road, and service facility data; and the pedestrian flow dynamic layer contains pedestrian flow distribution density data at different times.
3. The intelligent zoning system for urban park landscape layout based on digital twins according to claim 1, characterized in that: The intelligent partitioning calculation module includes a spatial clustering unit, a multi-objective optimization unit, and a scheme generation unit; The spatial clustering unit is used to perform spatial clustering based on the ecological, topographical, and facility elements of the twin model to generate initial partition boundaries. The multi-objective optimization unit is used to iteratively optimize the initial partition boundaries. The scheme generation unit is used to output a complete partition scheme that includes ecological conservation areas, recreational activity areas, landscape viewing areas, and service support areas.
4. The intelligent zoning system for urban park landscape layout based on digital twins according to claim 1, characterized in that: The simulation verification module includes a pedestrian flow simulation unit, an ecological assessment unit, and a landscape evaluation unit. The pedestrian flow simulation unit is used to simulate the pedestrian density distribution and path congestion of different time periods in the zoning scheme. The ecological assessment unit is used to calculate the ecological connectivity, vegetation coverage, and sensitive area protection indicators of the zoning scheme. The landscape evaluation unit is used to evaluate the landscape visual corridor accessibility and landscape harmony indicators of the zoning scheme.
5. The intelligent zoning system for urban park landscape layout based on digital twins according to claim 1, characterized in that: The data sources of the data acquisition module include satellite remote sensing images, UAV oblique photography data, site survey data, meteorological and soil monitoring data, and historical population flow statistics. The data acquisition module supports format conversion and unified coordinate system matching of raster data, vector data, and time series data.
6. A method for intelligent zoning of urban park landscape layout based on digital twins, implemented based on the system described in claim 1, characterized in that, Includes the following steps: S1 collects multi-source basic data of the target park site and completes data cleaning and coordinate unification; S2 constructs a full-element three-dimensional digital twin model of the park site based on multi-source basic data; S3 uses a digital twin model as its carrier and performs intelligent zoning calculations through a multi-objective optimization algorithm to generate a preliminary landscape zoning scheme. S4 imports the preliminary landscape zoning plan into the digital twin model, conducts multi-dimensional simulation verification of pedestrian flow, ecology, and landscape, and outputs quantitative evaluation results; S5 iteratively optimizes the zoning scheme based on the evaluation results, outputs the final landscape zoning scheme after meeting the preset threshold, and displays it visually.
7. The intelligent zoning method for urban park landscape layout based on digital twins according to claim 6, characterized in that: The specific steps of S2 are as follows: S21 constructs a three-dimensional topographic base for the site based on topographic survey and remote sensing data, and marks elevation, slope, and water system geographic elements. S22 overlays ecological and facility vector data to generate ecological element layers and facility element layers respectively; S23 accesses historical pedestrian flow statistics to construct a dynamic pedestrian flow layer by time period; S24 merges all layers according to a unified coordinate benchmark to form an interactive, full-element digital twin model.
8. The intelligent zoning method for urban park landscape layout based on digital twins according to claim 6, characterized in that: The specific steps of S3 are as follows: S31 extracts spatial characteristic parameters of ecological sensitivity, terrain suitability, and facility accessibility from the twin model; S32 uses a spatial clustering algorithm to initially divide the site into blocks, forming preliminary partition boundaries; S33 sets multiple objective functions and constraints for ecological carrying capacity, service coverage radius, and landscape connectivity; S34 uses a multi-objective genetic algorithm to iteratively optimize the initial partition boundaries, generating a Pareto optimal solution set, and then selects a preliminary landscape partitioning scheme.
9. The intelligent zoning method for urban park landscape layout based on digital twins according to claim 6, characterized in that: The specific steps of S4 are as follows: S41 maps the initial partitioning scheme to the digital twin model, marking the functional attributes and capacity parameters of each partition; S42 runs a pedestrian flow dynamics simulation to calculate the peak pedestrian density, path passage efficiency, and congestion risk of each zone; S43 performs an ecological benefit assessment, calculating the ecological connectivity, vegetation retention, and sensitive area protection rate of the zoning scheme; S44 conducts landscape visibility analysis to assess the landscape harmony and visual corridor unobstructedness of the zones; S45 summarizes various simulation indicators, generates a quantitative evaluation report, and marks items that do not meet the standards.
10. The intelligent zoning method for urban park landscape layout based on digital twins according to claim 6, characterized in that, The specific steps of S5 are as follows: S51 compares the simulation evaluation results with preset thresholds, and outputs the final solution if all standards are met. If there are any non-compliant items in S52, the corresponding indicators will be fed back to the partition calculation stage as constraints, and the target weights will be adjusted and iterated and optimized again. The final S53 solution uses a digital twin scenario for 3D visualization, supports manual fine-tuning of partition boundaries and functional configurations, and automatically re-simulates and verifies after adjustments.