A method for constructing a highway embankment
By generating a curve showing the change of soil settlement over time and optimizing construction parameters, the problems of settlement and noise pollution in traditional embankment construction were solved, and dynamic adjustment and cost optimization of the construction process were achieved.
Patent Information
- Application Number
- CN202611635543.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-22
- Publication Date
- 2026-11-20
AI Technical Summary
Traditional highway embankment construction methods fail to effectively analyze the settlement of each soil layer during construction, leading to excessive settlement and noise pollution problems after construction, making it difficult to meet the high-standard construction requirements in complex scenarios.
By acquiring various geological survey data, compression curves for each soil layer are generated, and the settlement changes over time are calculated. Combined with the estimated noise intensity and sound barrier solution vector, embankment construction parameters are optimized, and the construction process is dynamically adjusted to reduce the impact of settlement and noise.
It achieves controllable post-construction settlement and reduced noise pollution, optimizes construction costs, avoids rework, and meets construction requirements in complex scenarios.
Smart Images

Figure CN123139418A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of highway construction technology, and in particular to a method for constructing highway embankments. Background Technology
[0002] As transportation infrastructure expands into complex scenarios such as soft soil development areas, karst areas, and urban NIMBY areas, highway embankment construction faces multiple and higher requirements, including "controllable post-construction settlement, environmental friendliness and compliance, and economic efficiency." The traditional extensive embankment construction model is no longer suitable for the needs of high-standard construction.
[0003] In existing technologies, highway embankment construction is carried out after geological surveys. However, the entire process does not analyze the settlement of each soil layer over time during construction, nor does it incorporate the construction of sound barriers into the embankment construction. This results in problems such as excessive settlement and noise pollution after the embankment construction is completed. Summary of the Invention
[0004] To solve the above-mentioned technical problems, the present invention provides a method for constructing highway embankments. The technical solution of the present invention is as follows: A method for constructing a highway embankment includes: S1: Obtain various geological survey data of the target construction section, and generate compression curves for each soil layer of the target construction section based on the various geological survey data; S2, based on the preset construction time of the target construction section and the compression curve of each soil layer, generates the settlement variation of each soil layer over time; S3: Obtain and generate multiple sensitive points along the target construction section based on the expected vehicle type information and design information, and calculate the estimated noise intensity of each sensitive point along the line. S4. Calculate the sound barrier solution vector for each sensitive point along the line based on the estimated noise intensity and allowable noise intensity of each sensitive point along the line. S5. Based on the settlement variation of each soil layer over time, the sound barrier solution vector corresponding to each sensitive point along the line, and the multi-objective linear programming model, the optimal embankment construction parameter solution for the target construction section is generated. S6, construct the embankment of the target construction section based on the optimal embankment construction parameter solution of the target construction section.
[0005] Preferably, S1 includes: S11, acquire multiple single-hole geological survey data of multiple drilling sampling points at multiple depths of the target construction section, and the multiple single-hole geological survey data of all drilling sampling points constitute the multiple geological survey data of the target construction section. S12, based on various geological survey data, divide the target construction section into multiple soil layers and obtain multiple depth survey data for each soil layer; S13, Calculate the porosity of each soil layer under multiple preset consolidation pressures based on the preset consolidation pressure group and multiple depth survey data of each soil layer. S14, construct the compression curve of each soil layer based on the porosity of each soil layer under multiple preset consolidation pressures.
[0006] Preferably, S12 includes: S121, construct the survey vector of each borehole sampling point based on multiple single borehole geological survey data of each borehole sampling point, and treat the survey vector of each borehole sampling point as a class; S122, calculate the sum of squared deviations between every two classes, and merge the two classes with the smallest sum of squared deviations into one class; S123, iterate through S122 until the sum of squared deviations between any two classes is greater than the preset enhancement threshold, then stop the iteration; S124, treat all borehole sampling points in a class as multiple discrete points of a soil layer, construct each soil layer based on all discrete points of each soil layer, and merge multiple single-bore geological survey data of all borehole sampling points in each soil layer as multiple depth survey data of each soil layer.
[0007] Preferably, S2 includes: S21, Obtain and calculate the total stress of the embankment acting on the foundation of the target construction section based on the design information of the target construction section; S22, based on the preset slope of the project, the total stress is dispersed to obtain the additional stress of each soil layer; S23, divide the preset construction time of the target construction section into multiple time steps, and calculate the load increment of each soil layer in each time step based on the additional stress of each soil layer. S24, calculate the settlement of each soil layer at each time step based on the load increment of each soil layer at each time step, and the settlement of each soil layer at each time step constitutes the change of settlement of each soil layer over time.
[0008] Preferably, S22 includes: S221, Obtain the length and width of the target construction section based on the design information of the target construction section, and obtain the depth of each soil layer; S222, construct the diffusion matrix of each soil layer based on the project's preset slope, total stress, depth of each soil layer, length and width of the target construction section; S223, construct the load vector for each soil layer, multiply the diffusion matrix of each soil layer by the load vector of each soil layer to obtain the actual additional stress vector of each soil layer; S224 expands the actual additional stress vector of each soil layer into a polynomial, and determines the additional stress of each soil layer based on the polynomial.
[0009] Preferably, S3 includes: S31, Obtain information on the expected vehicle types and design information for the target construction section; S32, based on the preset sensitive point types and the design information of the target construction section, generate multiple sensitive points along the target construction section; S33, Calculate the equivalent mean sound level at the preset reference position of the target construction section based on the expected vehicle type information and design information of the target construction section; S34, calculate the propagation attenuation of the equivalent mean sound level when it propagates to each sensitive point along the line, and calculate the estimated noise intensity of each sensitive point along the line based on the equivalent mean sound level and its propagation attenuation when it propagates to each sensitive point along the line.
[0010] Preferably, S34 includes: S341, the target construction section is divided into multiple sound source segments according to its length, and the equivalent mean sound level is used as the segmented equivalent mean sound level of each sound source segment; S342, take the sensitive points along the target line as the master node, and each sound source segment as a child node, wherein the sensitive points along the target line are any sensitive points along the line; S343, obtain the building density of the main node, and calculate the edge attenuation between each child node and the main node based on the building density of the main node and the preset average temperature of each child node; S344: Generate the attenuation weight of each child node based on the distance between each child node and the main node, and calculate the propagation attenuation of the equivalent mean sound level when it propagates to the sensitive point along the target line by weighting the edge attenuation between each child node and the main node with its attenuation weight. S345, calculate the difference between the equivalent mean sound level and the propagation attenuation when the equivalent mean sound level propagates to the sensitive point along the target line, and obtain the estimated noise intensity at the sensitive point along the target line.
[0011] Preferably, S4 includes: S41, calculate the difference between the estimated noise intensity and the allowable noise intensity at each sensitive point along the line as the noise excess amount at each sensitive point along the line. If the noise excess amount at any sensitive point along the line is greater than 0, it means that a sound barrier needs to be set up at any sensitive point along the line, and the sensitive point along the line is regarded as an excess sensitive point. S42, based on the shortest distance between each sensitive point exceeding the standard and the preset reference position of the target construction section, construct the functional relationship between the sound barrier height, material coefficient and the noise exceeding the standard for each sensitive point exceeding the standard; S43, solve the functional relationship for each sensitive point exceeding the standard, and obtain multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard. The multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard constitute the sound barrier solution vector corresponding to each sensitive point along the line.
[0012] Preferably, S5 includes: S51, construct settlement constraints based on the settlement changes of each soil layer over time, and construct sound barrier height constraints based on the specified sound barrier height; S52, construct the overall settlement after all soil layers are filled based on the settlement of each soil layer over time, and construct the settlement term by minimizing the overall settlement after all soil layers are filled; S53, construct the feasible region based on the sound barrier solution vector corresponding to each sensitive point along the line, and calculate the cost of each sensitive point along the line. The sound barrier cost term is constructed by minimizing the total cost of all sensitive points along the line. S54 is a multi-objective linear programming function for embankments, which is constructed from the barrier cost term, settlement term, settlement constraint and sound barrier height constraint. S55, based on the feasible region, uses the particle swarm optimization algorithm to calculate the optimal embankment construction parameter solution in the multi-objective embankment linear programming function.
[0013] All of the above-mentioned optional technical solutions can be combined arbitrarily, and the present invention will not provide a detailed description of the structure after each combination.
[0014] By means of the above solution, the beneficial effects of the present invention are as follows: Compared to traditional embankment construction methods that rely on static geological survey reports, this invention generates data on the settlement changes of each soil layer over time in the target construction section. This allows for dynamic adjustments to the optimal embankment construction parameters during subsequent calculations based on these settlement changes. Furthermore, this invention incorporates sound barrier solution vectors into the embankment construction process, avoiding post-construction issues such as excessive settlement and noise pollution that often occur with traditional methods. Additionally, predicting the settlement changes of each soil layer over time reduces rework and optimizes the cost of embankment construction in the target section.
[0015] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, the preferred embodiments of the present invention are described in detail below with reference to the accompanying drawings. Attached Figure Description
[0016] Figure 1 This is a flowchart illustrating a highway embankment construction method provided by the present invention. Detailed Implementation
[0017] The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and are not intended to limit the scope of the invention.
[0018] The highway embankment construction method provided in this invention can be executed by any computer, mobile terminal, or server with computing capabilities. Figure 1 As shown in the figure, an embodiment of the present invention provides a method for constructing a highway embankment, which includes: S1: Obtain various geological survey data of the target construction section, and generate compression curves for each soil layer of the target construction section based on the various geological survey data.
[0019] Specifically, various types of geological survey data include: depth, water content, soil density, compressibility index, and particle type.
[0020] In one specific embodiment, S1 includes: S11, acquire multiple single-hole geological survey data from multiple drilling sampling points at multiple depths of the target construction section, and construct multiple geological survey data for the target construction section from the multiple single-hole geological survey data of all drilling sampling points.
[0021] Specifically, borehole sampling points are pre-dug boreholes used for soil sampling, and the depth of each borehole sampling point is different. The data types of the various single-bore geological survey data from the borehole sampling points are consistent with those of various geological survey data.
[0022] S12, based on various geological survey data, divides the target construction section into multiple soil layers and obtains multiple depth survey data for each soil layer.
[0023] Specifically, the criteria for soil layer division are determined by a combination of geological survey data, including depth, moisture content, and particle type.
[0024] In one specific embodiment, S12 includes: S121, construct the survey vector of each borehole sampling point based on multiple single-bore geological survey data of each borehole sampling point, and treat the survey vector of each borehole sampling point as a class.
[0025] Specifically, the survey vector for each borehole sampling point is formed by sorting multiple single-bore geological survey data in a preset order. For example, the survey vector for a certain borehole sampling point can be represented as: [Depth 1, Water Content 1, Particle Type 1].
[0026] S122, calculate the sum of squared deviations increment between every two classes, and merge the two classes with the smallest sum of squared deviations increment into one class.
[0027] Specifically, the formula for calculating the sum of squared deviations D for a certain class is: ;in, This represents the i-th element in this class. Let T represent the mean of all elements in the class, T denote the transpose, and n represent the total number of elements in the class. When calculating the increment of the sum of squared deviations between two classes, first merge the two classes into a new class, calculate the sum of squared deviations of this new class, then sum the sums of squared deviations of the two classes to obtain the cumulative sum, and finally calculate the difference between the sum of squared deviations of the new class and the cumulative sum to obtain the increment of the sum of squared deviations between the two classes.
[0028] S123, iterate through S122 until the sum of squared deviations between any two classes increases more than the preset enhancement threshold, then stop iterating.
[0029] Specifically, the preset enhancement threshold is a pre-determined historical experience value.
[0030] S124, treat all borehole sampling points in a class as multiple discrete points of a soil layer, construct each soil layer based on all discrete points of each soil layer, and merge multiple single-bore geological survey data of all borehole sampling points in each soil layer as multiple depth survey data of each soil layer.
[0031] Specifically, when constructing a soil layer based on all discrete points of a soil layer, the first step is to obtain the survey vector corresponding to each discrete point of the soil layer. Based on the survey vector corresponding to each discrete point, the discrete point with the smallest depth in the soil layer is taken as the lower boundary of the soil layer, and the discrete point with the largest depth in the soil layer is taken as the upper boundary of the soil layer. The soil layer is formed by the area between the lower boundary and the upper boundary.
[0032] Assuming that the soil layer has multiple depth survey data including three depths, the three depth survey data can be represented as: [depth 10, water content 20%, soil density 5%, compression index 0.4], [depth 12, water content 18%, soil density 6%, compression index 0.5] and [depth 15, water content 20%, soil density 4%, compression index 0.6].
[0033] S13, based on the preset consolidation pressure group and the multiple depth survey data of each soil layer, calculate the porosity of each soil layer under multiple preset consolidation pressures.
[0034] Specifically, the preset consolidation pressure group includes multiple preset consolidation pressures. When calculating the porosity Q of a soil layer under a specific preset consolidation pressure, the formula is: Where C represents the compression index of the soil layer (obtained by calculating the average of the compression indices from various depths of the soil layer), and p represents the preset consolidation pressure. This represents the average of multiple preset consolidation pressures in the preset consolidation pressure group. This indicates the preset standard void ratio.
[0035] S14, construct the compression curve of each soil layer based on the porosity of each soil layer under multiple preset consolidation pressures.
[0036] Specifically, based on the porosity of a soil layer under multiple preset consolidation pressures, the least squares method is used to fit the multiple preset consolidation pressures and porosity of the soil layer to obtain the compression curve of the soil layer.
[0037] S2 generates the settlement variation of each soil layer over time based on the preset construction time of the target construction section and the compression curve of each soil layer.
[0038] In one specific embodiment, S2 includes: S21, Obtain and calculate the total stress of the embankment acting on the foundation of the target construction section based on the design information of the target construction section.
[0039] Specifically, when calculating the total stress exerted by the embankment on the foundation of the target construction section, the design information of the target construction section is first collected manually in advance, including the number of vehicles passing through per hour, standard speed, length, width, estimated construction time, construction map (used to obtain sensitive points along the route), the preset height of the embankment, and the weight of standard fill material. Then, based on the design information of the target construction section, the weight of the standard fill material is obtained, and the weight of the standard fill material is multiplied by the gravity constant to obtain the self-weight stress. Afterwards, based on the preset height of the embankment in the design information of the target construction section, the preset height of the target embankment is multiplied by the weight of the standard fill material and the gravity constant to obtain the average pressure of the base. The average pressure of the base is multiplied by the preset stress distribution coefficient to obtain the total load stress of the target construction section. The sum of the total load stress and the self-weight stress is calculated to obtain the total stress exerted by the embankment on the foundation of the target construction section.
[0040] S22, based on the preset slope of the project, the total stress is dispersed to obtain the additional stress of each soil layer.
[0041] Specifically, distributing the total stress into the additional stress of each soil layer helps to rationally arrange the filling rate (a parameter in the optimal embankment construction parameter solution), thereby achieving a dynamic balance between "filling-preloading-settlement" and fundamentally reducing uneven settlement after construction.
[0042] In one specific embodiment, S22 includes: S221, based on the design information of the target construction section, obtain the length and width of the target construction section, and obtain the depth of each soil layer.
[0043] Specifically, when determining the depth of a soil layer, the lower and upper boundaries of the soil layer are obtained, and the absolute difference between the lower and upper boundaries is calculated. This absolute difference is then used as the depth of the soil layer.
[0044] S222, construct the diffusion matrix of each soil layer based on the project's preset slope, total stress, depth of each soil layer, length and width of the target construction section.
[0045] Specifically, the element in the Xth row and Yth column of the diffusion matrix for a given soil layer represents the diffused load transferred from the Xth soil layer to the Yth soil layer, following a top-down order, with that soil layer as the last layer. Therefore, the diffusion matrix is a lower triangular matrix (because loads can only be transferred from top to bottom), and all diagonal elements are 1. The calculation of the element in the Xth row and Yth column of the diffusion matrix for this soil layer... When, the formula is: Where B represents the total stress, This indicates the preset slope of the project (preferred value is 2). This represents the depth of the Xth soil layer. This represents the depth of the Y-th soil layer.
[0046] S223, construct the load vector for each soil layer, multiply the diffusion matrix of each soil layer by the load vector of each soil layer to obtain the actual additional stress vector of each soil layer.
[0047] Specifically, when constructing the load vector for a soil layer, the total stress is divided by the depth of the soil layer to obtain the load coefficient of that soil layer. Then, a multi-row load vector is constructed (the number of rows is the number of the soil layer), where each element is the load coefficient of that soil layer. The diffusion matrix of the soil layer is multiplied by the load vector of that soil layer to obtain the actual additional stress vector of that soil layer (a multi-row vector with the number of rows being the number of the soil layer).
[0048] S224 expands the actual additional stress vector of each soil layer into a polynomial, and determines the additional stress of each soil layer based on the polynomial.
[0049] Specifically, assuming the actual additional stress vector of this soil layer is When (the soil layer is the third soil layer), it can be expanded into a polynomial as follows: ;in, This indicates the load factor of the soil layer. This represents the element in the second row and first column of the diffusion matrix of this soil layer. This represents the element in the 3rd row and 1st column of the diffusion matrix of this soil layer. This represents the element in the 3rd row and 2nd column of the diffusion matrix for this soil layer. Then, calculations are performed. and The additional stress of the soil layer is obtained.
[0050] S23 divides the preset construction time of the target construction section into multiple time steps, and calculates the load increment of each soil layer in each time step based on the additional stress of each soil layer.
[0051] Specifically, in this embodiment of the invention, one time step is one day. The load increment of a certain soil layer in each time step is obtained by dividing the additional stress of that soil layer by the number of time steps.
[0052] S24, calculate the settlement of each soil layer at each time step based on the load increment of each soil layer at each time step, and the settlement of each soil layer at each time step constitutes the change of settlement of each soil layer over time.
[0053] Specifically, based on the content of the above embodiments, the settlement of the soil layer at the j-th time step is calculated. When, the formula is: ;in, Z represents the load increment of the soil layer at the j-th time step, and Z represents the depth of the soil layer. It represents the sum of the additional stresses of all soil layers preceding this soil layer.
[0054] S3: Obtain and generate multiple sensitive points along the target construction section based on the expected vehicle type information and design information, and calculate the estimated noise intensity of each sensitive point along the section.
[0055] Specifically, the types of sensitive points along the route in this embodiment of the invention include schools, hospitals, and residential areas.
[0056] In one specific embodiment, S3 includes: S31, obtain information on the expected vehicle types and design information for the target construction section.
[0057] Specifically, the expected vehicle types and design information for the target construction section were collected manually in advance. The expected vehicle types included vehicle models.
[0058] S32 generates multiple sensitive points along the target construction section based on the preset sensitive point types and the design information of the target construction section.
[0059] Specifically, buildings with pre-defined sensitive point types include schools, hospitals, and residential areas. The system searches the construction map within the design information of the target construction section to determine if any buildings of the pre-defined sensitive point type exist within the noise propagation area (radius of 200 meters) of the target construction section. If such buildings exist, they are designated as sensitive points along the route.
[0060] S33, based on the expected vehicle type information and design information of the target construction section, calculate the equivalent mean sound level at the preset reference position of the target construction section.
[0061] Specifically, in this embodiment of the invention, the preset reference position of the target construction section is the centerline position of the target construction section. The vertical distance between the centerline position of the target construction section and the embankment is obtained, and the reciprocal of this vertical distance is calculated as the distance attenuation coefficient. When calculating the equivalent mean sound level at the centerline position of the target construction section, the vehicle model (large vehicle, medium vehicle, or small vehicle) in the expected vehicle type information of the target construction section is first obtained. Then, the standard speed and corresponding standard sound effect level of each vehicle model are obtained. Next, the number of vehicles passing through per hour in the design information of the target construction section is obtained. The mean value of the standard sound effect levels of all vehicle models is calculated to obtain the mean sound effect level. The mean sound effect level is multiplied by the number of vehicles passing through per hour and multiplied by the distance attenuation coefficient to obtain the equivalent mean sound level at the preset reference position of the target construction section.
[0062] S34, calculate the propagation attenuation of the equivalent mean sound level when it propagates to each sensitive point along the line, and calculate the estimated noise intensity of each sensitive point along the line based on the equivalent mean sound level and its propagation attenuation when it propagates to each sensitive point along the line.
[0063] In one specific embodiment, S34 includes: S341 divides the target construction section into multiple sound source segments according to its length, and uses the equivalent mean sound level as the segmented equivalent mean sound level for each sound source segment.
[0064] Specifically, in this embodiment of the invention, when the target construction road section is divided into multiple sound source segments according to its length, the target construction road is equally divided into 100 sound source segments.
[0065] S342, take the sensitive points along the target line as the master node, and take each sound source segment as a child node, wherein the sensitive points along the target line are any sensitive points along the line.
[0066] For ease of description, this embodiment of the invention takes the calculation of the estimated noise intensity of sensitive points along the target line as an example to illustrate how to calculate the estimated noise intensity of each sensitive point along the line.
[0067] S343, obtain the building density of the master node, and calculate the edge attenuation between each child node and the master node based on the building density of the master node and the preset average temperature of each child node.
[0068] Specifically, the building density of sensitive points (i.e., main nodes) along the target highway is obtained based on pre-set survey information surrounding the highway. When calculating the edge attenuation between a child node and the main node, the building density of the main node is first multiplied by a pre-set density factor (typically 0.3) to obtain the ground factor of the main node. Then, the pre-set average temperature of the child node is input into a pre-trained temperature mapping neural network to obtain the air attenuation coefficient of the child node. The historical average temperature of the main node is obtained (through historical meteorological data), and the temperature difference between the pre-set average temperature of the child node and the historical average temperature of the main node is calculated. This temperature difference is multiplied by the air attenuation coefficient of the child node to obtain the temperature attenuation of the child node. The ground factor of the main node is multiplied by an empirical building factor (typically 0.2) to obtain the density attenuation. The sum of the temperature attenuation and density attenuation of the child node is calculated to obtain the edge attenuation between the child node and the main node.
[0069] S344 generates the attenuation weight of each child node based on the distance between each child node and the main node, and calculates the propagation attenuation of the equivalent mean sound level when it propagates to the sensitive point along the target line by weighting the edge attenuation between each child node and the main node with its attenuation weight.
[0070] Specifically, the distance between each child node and the main node is normalized to obtain the decay weight of each child node.
[0071] S345, calculate the difference between the equivalent mean sound level and the propagation attenuation when the equivalent mean sound level propagates to the sensitive point along the target line, and obtain the estimated noise intensity at the sensitive point along the target line.
[0072] S4. Based on the estimated noise intensity and allowable noise intensity of each sensitive point along the line, calculate the sound barrier solution vector corresponding to each sensitive point along the line.
[0073] In one specific embodiment, S4 includes: S41, calculate the difference between the estimated noise intensity and the allowable noise intensity at each sensitive point along the line as the noise excess amount at each sensitive point along the line. If the noise excess amount at any sensitive point along the line is greater than 0, it means that a sound barrier needs to be set up at any sensitive point along the line, and the sensitive point along the line is regarded as an excess sensitive point.
[0074] The permissible noise intensity is the pre-defined permissible noise intensity around each sensitive point along the line.
[0075] S42, based on the shortest distance between each sensitive point exceeding the standard and the preset reference position of the target construction section, construct the functional relationship between the sound barrier height, material coefficient and the noise exceeding the standard for each sensitive point exceeding the standard.
[0076] Specifically, the shortest distance between a certain sensitive point exceeding the standard and the preset reference position of the target construction section is the vertical distance between the sensitive point exceeding the standard and the centerline position of the target construction section. The functional relationship between the sound barrier height, material coefficient, and noise exceedance amount of a certain sensitive point exceeding the standard can be expressed as: Where M represents the material coefficient, d represents the shortest distance between the sensitive point exceeding the standard and the preset reference position of the target construction section, and H represents the sound barrier height of the sensitive point exceeding the standard. This represents the amount of noise exceeding the standard at the sensitive point, and ln() represents the logarithmic function with base e.
[0077] S43, solve the functional relationship for each sensitive point exceeding the standard, and obtain multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard. The multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard constitute the sound barrier solution vector corresponding to each sensitive point along the line.
[0078] Specifically, when solving the functional relationship for each sensitive point exceeding the standard, the height of the sound barrier must be less than the specified height, and the material coefficient must be in the range of [0.3, 1]. Assuming that the sound barrier solution vector corresponding to a sensitive point exceeding the standard has two solutions, the sound barrier solution vector corresponding to that sensitive point can be expressed as: ([sound barrier height of solution 1, material coefficient of solution 1], [sound barrier height of solution 2, material coefficient of solution 2]).
[0079] S5 generates the optimal embankment construction parameter solution for the target construction section based on the settlement variation of each soil layer over time, the sound barrier solution vector corresponding to each sensitive point along the line, and the multi-objective linear programming model.
[0080] In one specific embodiment, S5 includes: S51, Settlement constraints are constructed based on the settlement changes of each soil layer over time, and sound barrier height constraints are constructed based on the specified sound barrier height.
[0081] Specifically, settlement constraints can be expressed as: ;in, This represents the maximum allowable settlement at each time step. Let represent the settlement of the k-th soil layer at time step t. The sound barrier height constraint can be expressed as: Where h represents the height parameter of the sound barrier. This indicates the specified height of the sound barrier.
[0082] S52, construct the overall settlement after all soil layers are filled based on the settlement of each soil layer over time, and construct the settlement term by minimizing the overall settlement after all soil layers are filled.
[0083] Specifically, the settlement term CJ can be expressed as: ;in, The curve function representing the settlement of the k-th soil layer over time is constructed (by fitting, referring to the method for constructing a compression curve), where t represents the time parameter (in this embodiment, it represents the t-th time step). The filling rate parameter of the k-th soil layer is an unknown, and N represents the total number of soil layers.
[0084] S53. Construct a feasible region based on the sound barrier solution vector corresponding to each sensitive point along the line, and calculate the cost of each sensitive point along the line. The sound barrier cost term is constructed by minimizing the total cost of all sensitive points along the line.
[0085] Specifically, when calculating the cost of a sensitive point along the route, the mapping relationship between the material coefficient parameters and the commercial material prices of the sensitive point is first obtained (by fitting historical experience data). Then, the material coefficient parameters in the feasible region are input into the mapping relationship to obtain the commercial material price parameters of the sensitive point. Finally, the product of the commercial material price parameters and the sound barrier height parameters of the sensitive point is calculated as the cost of the sensitive point.
[0086] S54 is a multi-objective linear programming function for embankments, constructed from the barrier cost term, settlement term, settlement constraint, and sound barrier height constraint.
[0087] Specifically, the cumulative barrier cost and settlement terms yield a functional form, with settlement constraints and sound barrier height constraints serving as functional constraints. The functional form and functional constraints together constitute a multi-objective embankment linear programming function.
[0088] S55, based on the feasible region, uses the particle swarm optimization algorithm to calculate the optimal embankment construction parameter solution in the multi-objective embankment linear programming function.
[0089] Specifically, the optimal embankment construction parameter solution includes: the filling rate of each soil layer, the height of the sound barrier at each sensitive point along the route, and its material coefficient.
[0090] S6, construct the embankment of the target construction section based on the optimal embankment construction parameter solution of the target construction section.
[0091] Specifically, assuming the optimal embankment construction parameters for the target construction section are: (the sound barrier height at the first sensitive point along the route is 3m, with a material coefficient of 0.75 (corresponding to perlite board), the sound barrier height at the second sensitive point along the route is 2.5m, with a material coefficient of 0.6 (corresponding to micro-perforated board), the filling rate of the first soil layer is 0.3m / day, and the filling rate of the second soil layer is 0.5m / day), then during the embankment construction of the target construction section, the sound barrier height at the first sensitive point along the route is 3m, with perlite board as the material; the sound barrier height at the second sensitive point along the route is 2.5m, with micro-perforated board as the material; the filling rate of the first soil layer is 0.3m / day; and the filling rate of the second soil layer is 0.5m / day.
[0092] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A method for constructing highway embankments, characterized in that, include: S1: Obtain various geological survey data of the target construction section, and generate compression curves for each soil layer of the target construction section based on the various geological survey data; S2, based on the preset construction time of the target construction section and the compression curve of each soil layer, generates the settlement variation of each soil layer over time; S3: Obtain and generate multiple sensitive points along the target construction section based on the expected vehicle type information and design information, and calculate the estimated noise intensity of each sensitive point along the line. S4. Calculate the sound barrier solution vector for each sensitive point along the line based on the estimated noise intensity and allowable noise intensity of each sensitive point along the line. S5. Based on the settlement variation of each soil layer over time, the sound barrier solution vector corresponding to each sensitive point along the line, and the multi-objective linear programming model, the optimal embankment construction parameter solution for the target construction section is generated. S6, construct the embankment of the target construction section based on the optimal embankment construction parameter solution of the target construction section.
2. The method for constructing a highway embankment according to claim 1, characterized in that, S1 includes: S11, acquire multiple single-hole geological survey data of multiple drilling sampling points at multiple depths of the target construction section, and the multiple single-hole geological survey data of all drilling sampling points constitute the multiple geological survey data of the target construction section. S12, based on various geological survey data, divide the target construction section into multiple soil layers and obtain multiple depth survey data for each soil layer; S13, Calculate the porosity of each soil layer under multiple preset consolidation pressures based on the preset consolidation pressure group and multiple depth survey data of each soil layer. S14, construct the compression curve of each soil layer based on the porosity of each soil layer under multiple preset consolidation pressures.
3. The method for constructing a highway embankment according to claim 2, characterized in that, S12 includes: S121, construct the survey vector of each borehole sampling point based on multiple single borehole geological survey data of each borehole sampling point, and treat the survey vector of each borehole sampling point as a class; S122, calculate the sum of squared deviations between every two classes, and merge the two classes with the smallest sum of squared deviations into one class; S123, iterate through S122 until the sum of squared deviations between any two classes is greater than the preset enhancement threshold, then stop the iteration; S124, treat all borehole sampling points in a class as multiple discrete points of a soil layer, construct each soil layer based on all discrete points of each soil layer, and merge multiple single-bore geological survey data of all borehole sampling points in each soil layer as multiple depth survey data of each soil layer.
4. The method for constructing a highway embankment according to claim 1, characterized in that, S2 includes: S21, Obtain and calculate the total stress of the embankment acting on the foundation of the target construction section based on the design information of the target construction section; S22, based on the preset slope of the project, the total stress is dispersed to obtain the additional stress of each soil layer; S23, divide the preset construction time of the target construction section into multiple time steps, and calculate the load increment of each soil layer in each time step based on the additional stress of each soil layer. S24, calculate the settlement of each soil layer at each time step based on the load increment of each soil layer at each time step, and the settlement of each soil layer at each time step constitutes the change of settlement of each soil layer over time.
5. A method for constructing a highway embankment according to claim 4, characterized in that, S22 includes: S221, Obtain the length and width of the target construction section based on the design information of the target construction section, and obtain the depth of each soil layer; S222, construct the diffusion matrix of each soil layer based on the project's preset slope, total stress, depth of each soil layer, length and width of the target construction section; S223, construct the load vector for each soil layer, multiply the diffusion matrix of each soil layer by the load vector of each soil layer to obtain the actual additional stress vector of each soil layer; S224 expands the actual additional stress vector of each soil layer into a polynomial, and determines the additional stress of each soil layer based on the polynomial.
6. The method for constructing a highway embankment according to claim 1, characterized in that, S3 includes: S31, Obtain information on the expected vehicle types and design information for the target construction section; S32, based on the preset sensitive point types and the design information of the target construction section, generate multiple sensitive points along the target construction section; S33, Calculate the equivalent mean sound level at the preset reference position of the target construction section based on the expected vehicle type information and design information of the target construction section; S34, calculate the propagation attenuation of the equivalent mean sound level when it propagates to each sensitive point along the line, and calculate the estimated noise intensity of each sensitive point along the line based on the equivalent mean sound level and its propagation attenuation when it propagates to each sensitive point along the line.
7. A method for constructing a highway embankment according to claim 6, characterized in that, S34 includes: S341, the target construction section is divided into multiple sound source segments according to its length, and the equivalent mean sound level is used as the segmented equivalent mean sound level of each sound source segment; S342, take the sensitive points along the target line as the master node, and each sound source segment as a child node, wherein the sensitive points along the target line are any sensitive points along the line; S343, obtain the building density of the main node, and calculate the edge attenuation between each child node and the main node based on the building density of the main node and the preset average temperature of each child node; S344: Generate the attenuation weight of each child node based on the distance between each child node and the main node, and calculate the propagation attenuation of the equivalent mean sound level when it propagates to the sensitive point along the target line by weighting the edge attenuation between each child node and the main node with its attenuation weight. S345, calculate the difference between the equivalent mean sound level and the propagation attenuation when the equivalent mean sound level propagates to the sensitive point along the target line, and obtain the estimated noise intensity at the sensitive point along the target line.
8. A method for constructing a highway embankment according to claim 1, characterized in that, S4 includes: S41, calculate the difference between the estimated noise intensity and the allowable noise intensity at each sensitive point along the line as the noise excess amount at each sensitive point along the line. If the noise excess amount at any sensitive point along the line is greater than 0, it means that a sound barrier needs to be set up at any sensitive point along the line, and the sensitive point along the line is regarded as an excess sensitive point. S42, based on the shortest distance between each sensitive point exceeding the standard and the preset reference position of the target construction section, construct the functional relationship between the sound barrier height, material coefficient and the noise exceeding the standard for each sensitive point exceeding the standard; S43, solve the functional relationship for each sensitive point exceeding the standard, and obtain multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard. The multiple sets of solutions for the sound barrier height and material coefficients corresponding to each sensitive point exceeding the standard constitute the sound barrier solution vector corresponding to each sensitive point along the line.
9. A method for constructing a highway embankment according to claim 1, characterized in that, S5 includes: S51, construct settlement constraints based on the settlement changes of each soil layer over time, and construct sound barrier height constraints based on the specified sound barrier height; S52, construct the overall settlement after all soil layers are filled based on the settlement of each soil layer over time, and construct the settlement term by minimizing the overall settlement after all soil layers are filled; S53, construct the feasible region based on the sound barrier solution vector corresponding to each sensitive point along the line, and calculate the cost of each sensitive point along the line. The sound barrier cost term is constructed by minimizing the total cost of all sensitive points along the line. S54 is a multi-objective linear programming function for embankments, which is constructed from the barrier cost term, settlement term, settlement constraint and sound barrier height constraint. S55, based on the feasible region, uses the particle swarm optimization algorithm to calculate the optimal embankment construction parameter solution in the multi-objective embankment linear programming function.