By constructing a drilling space envelope and using BIM 3D modeling technology, the structure of the excavation trolley and the location of the blast holes were optimized, resolving the spatial conflict between the drilling rig and the operators, realizing automatic recognition and optimization in 3D space, and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202611229055.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-13
- Publication Date
- 2026-11-20
AI Technical Summary
The existing excavation trolley design fails to systematically resolve the three-dimensional spatial conflict between the drilling rig's physical space, the operator's work space, and the excavation trolley structure, leading to frequent adjustments during the construction phase and affecting construction efficiency and quality.
By constructing a drilling space envelope and combining it with BIM 3D modeling technology, spatial conflict analysis is performed. By adjusting the structural parameters of the excavation trolley and the position of the blast holes, it is ensured that the drilling space of each blast hole does not interfere with the trolley structure. Standardized operator positions are defined to achieve automatic identification and optimization of the 3D space.
Identify and eliminate all spatial interference issues during the design phase to ensure that operators can complete drilling in a natural posture, thereby improving construction efficiency and quality, reducing labor intensity, and achieving consistent drilling quality and significant improvement in blasting effects.
Abstract
Description
Technical Field
[0001] This invention belongs to the field of tunnel construction equipment design technology, specifically relating to an optimization method for the design of excavation trolleys based on the accessibility constraints of drilling space. Background Technology
[0002] In tunnel drilling and blasting construction, the arrangement of blast holes directly affects the blasting effect and construction efficiency. The excavation rig, as the core equipment for tunnel drilling and blasting operations, determines whether the drilling rig can complete the drilling operation according to the designed posture through its structural form and spatial layout. The excavation rig typically consists of a working platform, a column support system, a beam structure, and auxiliary equipment. It provides working positions and construction space for the drilling rig and operators. Its structural design must consider multiple constraints, including the tunnel cross-section shape, the drilling rig's operating range, and ease of operation.
[0003] In existing technologies, the structural design of excavation trolleys is typically based on the overall layout of the tunnel cross-section to determine key structural parameters such as platform height, column spacing, and beam positions. Drilling rig selection is based on matching parameters such as the excavation trolley's operating range, drilling depth, and borehole diameter. Blasting hole design is completed independently based on blasting theory and surrounding rock conditions. These design tasks are carried out relatively independently within their respective fields, lacking a systematic spatial constraint transfer and collaborative optimization mechanism among the three.
[0004] Currently, the existing technologies that are relatively similar to this invention mainly fall into the following three categories: One is the excavation trolley structure design method based on cross-sectional profile.
[0005] Traditional excavation trolley design typically uses the tunnel's inner contour as a reference, employing two-dimensional cross-sectional drawings to design the platform height, width, and column arrangement. This approach avoids structural collisions by ensuring a safe clearance between the excavation trolley's outer structure and the tunnel's inner wall. A typical design process involves: determining the overall dimensions of the excavation trolley based on the tunnel's inner contour → dividing the platform height according to construction needs → arranging the column and beam support system → verifying structural strength and stability → reserving drilling rig operating space based on experience. The main design considerations of this method focus on the safe clearance between the excavation trolley's overall outer shape and the tunnel's inner wall, the ease of movement and transport of the excavation trolley, the passage space under the excavation trolley, the structural load-bearing capacity, and the coverage area of each working platform on the tunnel's excavation surface.
[0006] However, this method has obvious shortcomings in handling the location of blast holes and the drilling space: the verification of the location of blast holes is limited to empirical position adjustment on two-dimensional cross-sections, and lacks three-dimensional modeling and systematic quantitative analysis of the drilling space corresponding to each blast hole. The arrangement of the excavation trolley structure may fall exactly into the space area required for drilling rig construction, resulting in the blast hole design location being theoretically reasonable but the drilling rig on site being unable to carry out drilling in the designed posture.
[0007] The second is a BIM-based method for tunnel construction simulation and spatial coordination.
[0008] In their paper "Research on Simulation Application of BIM-Based Mechanized Construction of Tunnel Drilling and Blasting Method" (Science, Technology and Engineering, Vol. 23, No. 16, 2023, pp. 7074-7079), Guo Fengsong et al. addressed issues such as equipment selection, progress simulation, and adaptability analysis in the mechanized construction of railway tunnels. Utilizing the CATIA and DELMIA software modules under Dassault Systèmes' 3DEXPERIENCE platform, and closely integrating with BIM technology research hotspots, they created 3D topographic and geological models of different depth levels, as well as a structural unit library. This method subsequently conducted a series of construction equipment motion relationships and work stroke designs based on each process, and performed process analysis on key elements such as equipment selection, adaptability, and construction progress, achieving a visual representation of the complete set of equipment mechanized construction schemes in a tunnel BIM scenario. However, this method is mainly used for the visual simulation and progress analysis of the construction process, focusing on "dynamic demonstration under existing schemes" rather than "spatial constraint-driven design phase." It did not establish a spatial conflict identification rule between the drilling space envelope of the drilling rig and the excavation trolley structure guided by the spatial location of the blast hole, nor did it take the accessibility of the drilling space as a driving constraint condition for the design optimization of the excavation trolley structure.
[0009] The third is the collision prevention and working space analysis method for rock drilling rigs and drilling arms.
[0010] Regarding collision avoidance for the drill arms of a rock drilling rig, existing research has proposed a collision avoidance path planning method for collaborative drilling using an improved artificial potential field method. This method employs an improved DH method to establish a kinematic model of the drill arms of a three-arm rock drilling rig, simplifies the drill arm structure using the envelope box method, and establishes a collision detection mathematical model to address the drill arm collision interference problem caused by unreasonable path planning when the three drill arms of a three-arm rock drilling rig are drilling collaboratively. However, this method focuses on avoiding collisions between drill arms, rather than addressing the spatial interference between the drilling space envelope of the drilling rig and the overall structure of the excavation rig.
[0011] Regarding the analysis of the working space of an excavation trolley boom, Wu Yanlei et al., in their paper "Design and Working Space Analysis and Verification of Anchor Bolt Excavation Trolley Boom" (Mechanical and Electrical Engineering Technology, April 2023), designed a novel anchor bolt excavation trolley boom. Based on an improved DH method, they established a mathematical model of the boom and used the Matlab robot toolbox combined with the Monte Carlo method to obtain the point cloud map and working space parameters. They also performed boundary optimization and spatial envelope calculations for the working space. However, this method focuses on verifying the working space of the anchor bolt excavation trolley boom, rather than using the entire drilling process's spatial envelope as a driving constraint for the excavation trolley's structural design optimization. Furthermore, it does not address the ergonomic evaluation of operator positioning and operating posture.
[0012] In summary, none of the aforementioned existing technologies systematically solve the three-dimensional spatial conflict between the drilling rig's physical space, the operator's working space, the space requirements of the entire drilling process, and the excavation trolley structure. Nor do they address the ergonomic assessment of the operator's position and operating posture, resulting in frequent adjustments during the construction phase, which affects construction efficiency and quality. Summary of the Invention
[0013] The purpose of this invention is to provide a method for optimizing the design of excavation trolleys based on drilling space accessibility constraints, addressing the deficiencies and shortcomings in the prior art.
[0014] The technical solution of this invention: An optimization method for the design of excavation trolleys based on drilling space accessibility constraints includes the following steps: S1: Obtain tunnel design information: Based on the blasting design documents, obtain the design information of each blast hole in the tunnel drilling and blasting design stage; S2: Tail control point back calculation: Based on the design information of the blast hole, along the opposite direction of the blast hole direction vector, and constrained by the geometric relationship between the connection point of the drilling rig propulsion beam and the rig body, the position coordinates of the tail control point of the drilling rig are back calculated so that when the tail of the drilling rig is located at the tail control point, the propulsion direction of the drilling rig coincides with the direction of the blast hole and the drill bit can reach the blast hole opening and complete the drilling along the design direction. S3: Establish the physical space model of the drilling rig: The physical space model of the drilling rig includes the space occupied by the drilling rig body, the range of motion of the drill arm, the drill rod propulsion space, and the reserved space for construction safety; S4: Construct the drilling space envelope. Based on the position of the control point at the tail of the drilling rig and the physical space model of the drilling rig, sweep the spatial trajectory of the drilling process from positioning and advancing to exiting the borehole to construct the drilling space envelope corresponding to each borehole. S5: Establish a three-dimensional structural model of the excavation trolley, which includes the working platform, column support system, beam structure, auxiliary equipment and accessories; S6: Spatial conflict analysis. Using BIM 3D modeling technology, the spatial location and orientation model of the blast holes, the drilling space envelope model corresponding to each blast hole, and the 3D structural model of the excavation trolley are all incorporated into the same 3D coordinate system to conduct spatial conflict analysis. S7: Excavation trolley structure avoidance and adjustment. Based on the BIM 3D model, the spatial relationship between the drilling space envelope and the excavation trolley structure is automatically analyzed. When the drilling space envelope and the excavation trolley structure interfere with each other or the distance is less than the preset safety reserve distance, the structural parameters of the excavation trolley are adjusted to avoid the drilling space envelope until the drilling space envelope of all blast holes does not interfere with the excavation trolley structure and meets the safety distance requirements. S8: Scheme Output. Based on the completion of step S7, output the final excavation trolley structure scheme and blast hole design scheme.
[0015] In step S1, the design information includes the three-dimensional spatial coordinates of the borehole, the borehole orientation parameters, and the borehole design depth.
[0016] In step S6, the spatial conflict analysis includes: Spatial interference determination: When the drilling space envelope and the excavation trolley structure overlap, it is determined that spatial interference exists; Construction restriction determination: When the distance between the drilling space envelope and the excavation trolley structure is less than the preset safety reserve distance, it is determined to be a construction restriction state; Construction reachability determination: When there is no spatial conflict between the drilling space envelope and the excavation trolley structure and the spacing meets the safety requirements, it is determined to be a construction reachable state.
[0017] In step S4, the drilling space envelope includes the physical space of the drilling rig body, the drilling arm movement space, the drill rod propulsion space, and the reserved space for construction safety.
[0018] It also includes the steps for defining the standard drilling position for operators: Based on the constructed drilling space envelope, and according to the spatial position and direction of the blast hole and the layout of the drilling rig's operating handle, determine the standard position coordinates and facing direction of the operators on the side or rear of the drilling rig.
[0019] It also includes an ergonomic verification step: based on the operator's body size parameters, a work posture space model is constructed, and the standard standing position is verified to have an interference-free space that meets ergonomic requirements to accommodate the operator's body and range of motion.
[0020] If, during the ergonomic school verification process, the standard station space interferes with the excavation trolley structure or does not meet ergonomic requirements, the station position or the elevation of the excavation trolley platform shall be adjusted until the requirements are met.
[0021] In step S7, the structural parameter adjustment of the excavation trolley includes at least one of the following: adjusting the platform height and width, optimizing the column layout, and adjusting the beam elevation and orientation.
[0022] When the structural parameters of the excavation trolley cannot meet the spatial constraints, the blast hole parameters are adjusted in reverse. The reverse adjustment includes at least one of the following: fine-tuning of the spatial position of the blast hole, optimization of the blast hole angle, and reconstruction of the distribution of the blast hole on the cross section.
[0023] After reversing the adjustment of the borehole parameters, S2 to S7 are executed again to conduct a new round of spatial analysis and verification.
[0024] The beneficial effects of this invention are: This invention constructs a complete drilling space envelope for each borehole in three-dimensional space, encompassing the physical space of the drilling rig, the range of motion of the drill arm, the space for the drill rod to advance, and the safety reserved space. It also establishes automatic collision recognition rules between the drilling space envelope and the trolley structure, enabling all spatial interference problems to be automatically identified and located during the design phase.
[0025] By utilizing the ample structural redundancy of the trolley structure under load constraints, and through active adjustment of structural parameters such as column position, beam elevation, and platform width, it is ensured that the drilling space of each blast hole is completely free from interference with the trolley structure, and all blast holes can be drilled by the rig. This fundamentally eliminates on-site modifications and scheme adjustments caused by spatial interference during the construction phase.
[0026] This invention establishes a technical chain of "bomb hole design parameters → reverse calculation of drilling rig positioning → determination of ergonomically sound standard drilling positions for operators → verification of the adequacy and ergonomic suitability of the positions." In three-dimensional space, a standardized and comfortable drilling position is predefined for each borehole. Based on human body size parameters, a work posture space model is constructed to ensure that operators can complete drilling operations in a natural standing posture, truly achieving "comfortable drilling," significantly reducing labor intensity, and improving operational safety and construction quality.
[0027] This invention predefines a fixed and clearly defined standard drilling position for each blast hole, ensuring a definite geometric relationship between the drilling rig's support point, the direction of advancement, and the blast hole's axis. Construction personnel no longer need to temporarily find their positions; they can complete each borehole in a fixed and comfortable standard posture, truly achieving "easy-to-find location." Each blast hole is precisely constructed according to the designed angle and depth, ensuring consistent and controllable drilling quality for different blast holes on the same cross-section, and significantly improving blasting effects.
[0028] This invention transforms the traditional design model, which relies on repeated trial and error based on manual experience, into a quantitative design model based on rule-based automatic calculation by constructing a closed-loop iterative optimization process: "Blast hole design → tail control point back calculation → drilling space envelope construction → standard station definition → BIM spatial analysis → interference identification → trolley or blast hole adjustment → iteration until interference-free operation." All spatial conflict issues are identified and eliminated in advance during the design phase, avoiding work stoppages, design changes, and rework caused by spatial interference during the construction phase. This truly achieves "high-quality blast holes," fundamentally improving the operational efficiency and engineering quality of tunnel drilling and blasting construction.
[0029] While maintaining the load-bearing capacity and safety of the trolley structure, this invention systematically solves the three core problems in traditional design: the inability to identify spatial interference, the lack of ergonomics for operators, and the lack of standardization of drilling positions. It has significant technological advancements and engineering application value. Detailed Implementation
[0030] An optimization method for the design of excavation trolleys based on drilling space accessibility constraints includes the following steps: S1: Obtain tunnel design information: Based on the blasting design documents, obtain the design information of each blast hole in the tunnel drilling and blasting design stage; The design information includes the three-dimensional spatial coordinates of the borehole, the borehole orientation parameters, and the borehole design depth.
[0031] The specific steps are as follows: Obtain complete design information for each blast hole during the tunnel drilling and blasting design phase, including: The three-dimensional spatial coordinates (X, Y, Z) of the blast hole on the tunnel cross section; Gun hole orientation parameters (inclination angle α and azimuth angle β); The depth of the gun hole design is L.
[0032] The above parameters are derived from the blasting design documents and serve as the initial input data for this application.
[0033] S2: Tail control point back calculation: Based on the design information of the blast hole, along the opposite direction of the blast hole direction vector, and constrained by the geometric relationship between the connection point of the drilling rig propulsion beam and the rig body, the position coordinates of the tail control point of the drilling rig are back calculated so that when the tail of the drilling rig is located at the tail control point, the propulsion direction of the drilling rig coincides with the direction of the blast hole and the drill bit can reach the blast hole opening and complete the drilling along the design direction. The specific steps are as follows: Based on the geometric relationship of the blast holes, the position of the control point at the tail of the drilling rig is calculated.
[0034] Specifically: Given the borehole coordinates P1 (x1, y1, z1), borehole direction vector V (vx, vy, vz), and the geometric dimensions of the drilling rig (total length l, range of drill arm length, etc.), along the opposite direction of the borehole direction vector V, and constrained by the geometric relationship between the connection point of the drilling rig propulsion beam and the rig body, calculate the position coordinates of the control point P_tail of the drilling rig tail, such that when the drilling rig tail is located at P_tail, the drilling rig propulsion direction coincides with the borehole direction V, and the drill bit can just reach the borehole opening P1 and complete drilling along the designed direction.
[0035] The tail control point is used to uniquely determine the spatial positioning and attitude of the drilling rig when it is working in that blast hole.
[0036] S3: Establish the physical space model of the drilling rig: The physical space model of the drilling rig includes the space occupied by the drilling rig body, the range of motion of the drill arm, the drill rod propulsion space, and the reserved space for construction safety; The specific steps are as follows: The selected drilling rig type is modeled as a three-dimensional solid with real geometric dimensions.
[0037] The drilling rig's physical space model includes: Space occupied by the drilling rig: The actual external dimensions of the main body of the drilling rig (length, width, and height); Drill arm range of motion: The spatial area covered by the movement trajectory of each joint of the drill arm during drilling; Drill pipe advance space: The volume of space swept by the drill pipe during the entire process of advancing from the starting position to the bottom of the borehole; Safety clearance during construction: A safety distance reserved around the drilling rig to prevent equipment collisions and ensure operational safety.
[0038] This model is used to express the actual space occupancy characteristics of the drilling rig throughout the entire drilling process, and serves as the basic data for subsequent spatial analysis.
[0039] S4: Construct the drilling space envelope. Based on the position of the control point at the tail of the drilling rig and the physical space model of the drilling rig, sweep the spatial trajectory of the drilling process from positioning and advancing to exiting the borehole to construct the drilling space envelope corresponding to each borehole. The drilling space envelope encompasses the physical space of the drilling rig body, the movement space of the drill arm, the drilling rod propulsion space, and the reserved space for construction safety.
[0040] In this step, before constructing the drilling space envelope, the entire space occupied by the drilling rig during the entire process of completing a single borehole is defined as the drilling space. This space includes the equipment's physical space, movement space, and safety reserve space; it is a complete three-dimensional spatial region, not a single location or path.
[0041] For each borehole, based on the position of the control point at the tail of the drilling rig and the physical space model of the drilling rig, the spatial trajectory of the entire drilling process from positioning and advancing to exiting the borehole is swept to generate the drilling space envelope corresponding to that borehole. The geometry of the drilling space envelope is related to the position and orientation of the borehole and the type of drilling rig; different boreholes correspond to different drilling space shapes.
[0042] The above operations are performed sequentially on all blast holes to form a complete drilling space distribution system for the entire tunnel cross section.
[0043] It also includes the steps for defining the standard drilling position for operators: Based on the constructed drilling space envelope, and according to the spatial position and direction of the blast hole and the layout of the drilling rig's operating handle, determine the standard position coordinates and facing direction of the operators on the side or rear of the drilling rig.
[0044] The specific steps for defining the standard drilling station for operators are as follows: Based on the constructed drilling space envelope, the standard drilling position for operators corresponding to each blast hole is further defined: Standard position determination: Based on the spatial location and direction of the blast hole and the layout of the drilling rig's operating handles, determine the specific position coordinates P_op (x_op, y_op, z_op) and facing direction of the operator on the side or rear of the drilling rig. This position allows the operator to complete the operation and monitoring of the drilling rig with a natural arm span and field of vision.
[0045] S5: Establish a three-dimensional structural model of the excavation trolley, which includes the working platform, column support system, beam structure, auxiliary equipment and accessories; The establishment of the three-dimensional structural model of the excavation trolley specifically includes: Work platform: Location, elevation, width, and thickness of each platform; Column support system: cross-sectional dimensions, spatial arrangement, and connection method of each column; Beam structure: cross-sectional dimensions, elevation, and spatial orientation of each beam; Auxiliary equipment and accessories: ladders, guardrails, equipment supports and other accessories.
[0046] The model should accurately reflect the actual spatial position and geometric dimensions of each structural component of the trolley, serving as the target object for spatial conflict analysis.
[0047] S6: Spatial conflict analysis. Using BIM 3D modeling technology, the spatial location and orientation model of the blast holes, the drilling space envelope model corresponding to each blast hole, and the 3D structural model of the excavation trolley are all incorporated into the same 3D coordinate system to conduct spatial conflict analysis. In this step, BIM 3D modeling technology (such as software platforms like Revit and CATIA) is specifically used to integrate the following objects into the same 3D coordinate system: Three-dimensional model of tunnel cross-section and inner contour; Model of the spatial location and orientation of the gun hole; The drilling space envelope model corresponding to each blast hole; Standard drilling position and working posture space model for operators; Three-dimensional model of the excavation trolley structure.
[0048] This enables the digital representation and visualization analysis of construction spaces, providing a unified data platform for subsequent spatial conflict analysis.
[0049] Spatial conflict analysis includes: Spatial interference determination: When the drilling space envelope and the excavation trolley structure overlap, it is determined that spatial interference exists; Construction restriction determination: When the distance between the drilling space envelope and the excavation trolley structure is less than the preset safety reserve distance, it is determined to be a construction restriction state; Construction reachability determination: When there is no spatial conflict between the drilling space envelope and the excavation trolley structure and the spacing meets the safety requirements, it is determined to be a construction reachable state.
[0050] Spatial conflict analysis specifically includes: Based on the BIM 3D model, an automatic spatial relationship analysis is performed on the drilling space envelope and the trolley structure. The core judgment rules are as follows: Spatial interference determination: When the drilling space envelope of a certain blast hole overlaps with the trolley structure (platform, column, beam, etc.), it is determined that there is spatial interference, and the blast hole cannot be drilled according to the design. Construction restriction determination: When the distance between the drilling space envelope and the trolley structure is less than the preset safety reserve distance, it is determined to be a construction restriction state, and structural avoidance adjustment is required; Construction reachability determination: When the drilling space envelope and the trolley structure have no spatial conflict and the spacing meets the safety requirements, it is determined to be a construction reachable state.
[0051] At the same time, the standard drilling station space for operators is independently checked: if the station space interferes with the trolley structure, or if the station space does not meet the ergonomic requirements, it is also determined that it does not meet the design requirements and needs to be adjusted accordingly.
[0052] This analysis method is essentially an automatic conflict identification method between three-dimensional spatial bodies, which is different from the manual experience judgment of traditional two-dimensional cross-sections.
[0053] S7: Excavation trolley structure avoidance and adjustment. Based on the BIM 3D model, the spatial relationship between the drilling space envelope and the excavation trolley structure is automatically analyzed. When the drilling space envelope and the excavation trolley structure interfere with each other or the distance is less than the preset safety reserve distance, the structural parameters of the excavation trolley are adjusted to avoid the drilling space envelope until the drilling space envelope of all blast holes does not interfere with the excavation trolley structure and meets the safety distance requirements. Adjusting the structural parameters of the excavation trolley includes at least one of the following: adjusting the platform height and width, optimizing the column layout, and adjusting the beam elevation and orientation.
[0054] When the structural parameters of the excavation trolley cannot meet the spatial constraints, the blast hole parameters are adjusted in reverse. The reverse adjustment includes at least one of the following: fine-tuning of the spatial position of the blast hole, optimization of the blast hole angle, and reconstruction of the distribution of the blast hole on the cross section.
[0055] In this step, the excavation trolley structure is optimized based on the spatial analysis results of step S6.
[0056] Optimization strategies include: Adjust the platform height and width to avoid areas with high-frequency drilling operations; Optimize the placement of the drilling columns to avoid densely populated areas within the drilling space. Adjust the elevation and direction of the crossbeam to avoid the drilling space envelope of each blast hole; Optimize the spatial layout of auxiliary equipment to avoid encroaching on the standard standing space of operators.
[0057] The optimization principle is that the trolley structure must not encroach on the main drilling space area, nor should it occupy the standard drilling station space for operators. During the optimization process, since the load borne by the excavation trolley in actual use (the trolley's own weight, the drilling rig's weight, and a small amount of personnel and material load) is not large relative to the cross-sectional bearing capacity of the main structural components such as columns and beams, the trolley structure has sufficient structural redundancy under load constraints. The structural parameters such as the column position, beam elevation, and platform width all have considerable room for adjustment, and can actively avoid the drilling space while meeting the structural bearing requirements.
[0058] The specific steps for reverse adjustment of the borehole parameters are as follows: When the trolley structure adjustment cannot meet the spatial constraints (such as being limited by the structural stress system or the tunnel cross-section space), the borehole parameters are adjusted in reverse, including: Fine-tuning of the spatial position of the gun hole; Optimization and adjustment of the borehole angle; Reconstruction of the distribution of blast holes on the cross-section.
[0059] After adjustment, repeat steps S2 to S6 to conduct a new round of spatial analysis and verification.
[0060] S8: Scheme Output. Based on the completion of step S7, output the final excavation trolley structure scheme and blast hole design scheme.
[0061] It also includes an ergonomic verification step: based on the operator's body size parameters, a work posture space model is constructed, and the standard standing position is verified to have an interference-free space that meets ergonomic requirements to accommodate the operator's body and range of motion.
[0062] The specific steps for the ergonomics school verification process are as follows: Based on the operator's body size parameters (height, arm span, shoulder width, etc.), construct a spatial model of the operator's working posture (including standing height, arm extension range, field of vision cone, etc.) and verify whether there is enough non-interference space around the standard standing position to accommodate the operator's body and range of working movements.
[0063] If, during the ergonomic school verification process, the standard station space interferes with the excavation trolley structure or does not meet ergonomic requirements, the station position or the elevation of the excavation trolley platform shall be adjusted until the requirements are met.
[0064] This step requires an ergonomic suitability assessment: Based on ergonomic standards, assess whether the operator's body posture (neck flexion angle, arm lifting height, waist flexion angle, etc.) when operating the drilling rig in this position is within a comfortable working range. If it does not meet the ergonomic requirements, adjust the position or the elevation of the trolley platform until the requirements are met.
[0065] Through the above steps, a standardized drilling position that conforms to ergonomics is predefined for each blast hole, so that operators do not need to find the position on the spot during construction.
[0066] After reversing the adjustment of the borehole parameters, S2 to S7 are executed again to conduct a new round of spatial analysis and verification.
[0067] This application adopts a cyclic iterative design process, as follows: Input the initial borehole design parameters; Reverse calculate the control points at the tail of each blast hole; Construct the drilling space envelope for each blast hole and the standard positions for operators; Establish a BIM 3D spatial model; Perform spatial collision analysis and ergonomic school verification; Identify spatial interference and ergonomic non-compliance items; Prioritize adjusting the trolley structure to avoid obstacles; if this still fails, adjust the borehole parameters. Repeat steps S2 through S7 until all drilling spaces for all blast holes do not interfere with the trolley structure and all operators' standard positions meet ergonomic requirements. Output the final excavation trolley structure scheme and blast hole design scheme.
[0068] This iterative mechanism ensures that construction accessibility is controlled in advance during the design phase, avoiding spatial conflict issues from being exposed only during the construction phase.
[0069] The advantages of this invention are as follows: First, to achieve systematic identification and avoidance of three-dimensional spatial interference problems. Traditional two-dimensional cross-section-based design methods can only verify the gap between the outer contour of the trolley structure and the inner wall of the tunnel at a specific cross section. They cannot identify the axial interference between the crossbeam or column extending along the tunnel axis and the drilling space envelope of the drilling rig, nor can they reflect the attitude interference caused by the drilling rig deflecting its body to reach the design angle.
[0070] This invention constructs a complete drilling space envelope for each borehole in three-dimensional space, encompassing the physical space of the drilling rig, the range of motion of the drill arm, the space for the drill rod to advance, and the safety reserved space. It also establishes automatic collision recognition rules between the drilling space envelope and the trolley structure, enabling all spatial interference problems to be automatically identified and located during the design phase.
[0071] By utilizing the ample structural redundancy of the trolley structure under load constraints, and through active adjustment of structural parameters such as column position, beam elevation, and platform width, it is ensured that the drilling space of each blast hole is completely free from interference with the trolley structure, and all blast holes can be drilled by the rig. This fundamentally eliminates on-site modifications and scheme adjustments caused by spatial interference during the construction phase.
[0072] Secondly, it achieves quantitative design and assurance of ergonomic comfort for operators. Traditional design methods do not take into account the ergonomic space requirements of operators, forcing them to work in restricted and contorted postures during construction, resulting in high labor intensity and reduced operational accuracy.
[0073] This invention establishes a technical chain of "bomb hole design parameters → reverse calculation of drilling rig positioning → determination of ergonomically sound standard drilling positions for operators → verification of the adequacy and ergonomic suitability of the positions." In three-dimensional space, a standardized and comfortable drilling position is predefined for each borehole. Based on human body size parameters, a work posture space model is constructed to ensure that operators can complete drilling operations in a natural standing posture, truly achieving "comfortable drilling," significantly reducing labor intensity, and improving operational safety and construction quality.
[0074] Third, to achieve standardization of drilling sites and consistent, controllable construction quality. In traditional construction, when the same blast hole is drilled by different workers, the temporary search for the position can lead to large deviations. The offset of the drilling rig support point causes the actual drilling angle to deviate from the design value, resulting in a large dispersion in the drilling quality of each blast hole.
[0075] This invention predefines a fixed and clearly defined standard drilling position for each blast hole, ensuring a definite geometric relationship between the drilling rig's support point, the direction of advancement, and the blast hole's axis. Construction personnel no longer need to temporarily find their positions; they can complete each borehole in a fixed and comfortable standard posture, truly achieving "easy-to-find location." Each blast hole is precisely constructed according to the designed angle and depth, ensuring consistent and controllable drilling quality for different blast holes on the same cross-section, and significantly improving blasting effects.
[0076] Fourth, it achieves a dual improvement in design and construction efficiency. This invention transforms the traditional design model, which relies on repeated trial and error based on manual experience, into a quantitative design model based on rule-based automatic calculation by constructing a closed-loop iterative optimization process: "Blast hole design → tail control point back calculation → drilling space envelope construction → standard station definition → BIM spatial analysis → interference identification → trolley or blast hole adjustment → iteration until interference-free operation." All spatial conflict issues are identified and eliminated in advance during the design phase, avoiding work stoppages, design changes, and rework caused by spatial interference during the construction phase. This truly achieves "high-quality blast holes," fundamentally improving the operational efficiency and engineering quality of tunnel drilling and blasting construction.
[0077] In summary, this invention, while maintaining the load-bearing capacity and safety of the trolley structure, systematically solves the three core problems in traditional design: the inability to identify spatial interference, the lack of ergonomics for operators, and the lack of standardization in drilling positions. It has significant technological advancements and engineering application value.
Claims
1. A method for optimizing the design of excavation trolleys based on drilling space accessibility constraints, characterized in that... Includes the following steps: S1: Obtain tunnel design information: Based on the blasting design documents, obtain the design information of each blast hole in the tunnel drilling and blasting design stage; S2: Tail control point back calculation: Based on the design information of the blast hole, along the opposite direction of the blast hole direction vector, and constrained by the geometric relationship between the connection point of the drilling rig propulsion beam and the rig body, the position coordinates of the tail control point of the drilling rig are back calculated so that when the tail of the drilling rig is located at the tail control point, the propulsion direction of the drilling rig coincides with the direction of the blast hole and the drill bit can reach the blast hole opening and complete the drilling along the design direction. S3: Establish the physical space model of the drilling rig: The physical space model of the drilling rig includes the space occupied by the drilling rig body, the range of motion of the drill arm, the drill rod propulsion space, and the reserved space for construction safety; S4: Construct the drilling space envelope. Based on the position of the control point at the tail of the drilling rig and the physical space model of the drilling rig, sweep the spatial trajectory of the drilling process from positioning and advancing to exiting the borehole to construct the drilling space envelope corresponding to each borehole. S5: Establish a three-dimensional structural model of the excavation trolley, which includes the working platform, column support system, beam structure, auxiliary equipment and accessories; S6: Spatial conflict analysis. Using BIM 3D modeling technology, the spatial location and orientation model of the blast holes, the drilling space envelope model corresponding to each blast hole, and the 3D structural model of the excavation trolley are all incorporated into the same 3D coordinate system to conduct spatial conflict analysis. S7: Excavation trolley structure avoidance and adjustment. Based on the BIM 3D model, the spatial relationship between the drilling space envelope and the excavation trolley structure is automatically analyzed. When the drilling space envelope and the excavation trolley structure interfere with each other or the distance is less than the preset safety reserve distance, the structural parameters of the excavation trolley are adjusted to avoid the drilling space envelope until the drilling space envelope of all blast holes does not interfere with the excavation trolley structure and meets the safety distance requirements. S8: Scheme Output. Based on the completion of step S7, output the final excavation trolley structure scheme and blast hole design scheme.
2. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 1, characterized in that: In step S1, the design information includes the three-dimensional spatial coordinates of the borehole, the borehole orientation parameters, and the borehole design depth.
3. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 1, characterized in that: In step S6, the spatial conflict analysis includes: Spatial interference determination: When the drilling space envelope and the excavation trolley structure overlap, it is determined that spatial interference exists; Construction restriction determination: When the distance between the drilling space envelope and the excavation trolley structure is less than the preset safety reserve distance, it is determined to be a construction restriction state; Construction reachability determination: When there is no spatial conflict between the drilling space envelope and the excavation trolley structure and the spacing meets the safety requirements, it is determined to be a construction reachable state.
4. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 1, characterized in that: In step S4, the drilling space envelope includes the physical space of the drilling rig body, the drilling arm movement space, the drill rod propulsion space, and the reserved space for construction safety.
5. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 1, characterized in that: It also includes the steps for defining the standard drilling position for operators: Based on the constructed drilling space envelope, and according to the spatial position and direction of the blast hole and the layout of the drilling rig's operating handle, determine the standard position coordinates and facing direction of the operators on the side or rear of the drilling rig.
6. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 5, characterized in that: It also includes an ergonomic verification step: based on the operator's body size parameters, a work posture space model is constructed, and the standard standing position is verified to have an interference-free space that meets ergonomic requirements to accommodate the operator's body and range of motion.
7. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 6, characterized in that: If, during the ergonomic school verification process, the standard station space interferes with the excavation trolley structure or does not meet ergonomic requirements, the station position or the elevation of the excavation trolley platform shall be adjusted until the requirements are met.
8. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 1, characterized in that: In step S7, the structural parameter adjustment of the excavation trolley includes at least one of the following: adjusting the platform height and width, optimizing the column layout, and adjusting the beam elevation and orientation.
9. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 8, characterized in that: When the structural parameters of the excavation trolley cannot meet the spatial constraints, the blast hole parameters are adjusted in reverse. The reverse adjustment includes at least one of the following: fine-tuning of the spatial position of the blast hole, optimization of the blast hole angle, and reconstruction of the distribution of the blast hole on the cross section.
10. The method for optimizing the design of excavation trolleys based on drilling space accessibility constraints according to claim 9, characterized in that: After reversing the adjustment of the borehole parameters, S2 to S7 are executed again to conduct a new round of spatial analysis and verification.