Rockfill dam partition material parameter multi-objective inversion method

By employing a multi-objective inversion method for material parameters of rockfill dam zones, and utilizing time series clustering and multi-objective optimization algorithms, the problem of large errors in the inversion results of material parameters of rockfill dam zones in existing technologies has been solved. This method achieves high-precision inversion of material parameters of zones and improves the characterization ability of dam deformation features.

CN123139728APending Publication Date: 2026-11-20CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611087239.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-21
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing methods for inverting material parameters of rockfill dams fail to systematically exploit the temporal clustering characteristics of monitoring data, resulting in insufficient representativeness of the selected monitoring points for deformation characteristics in different areas of the dam body. Consequently, the constructed objective function is unable to fully characterize the spatial variability of the dam body, leading to significant errors in the inversion results.

Method used

A multi-objective inversion method for material parameters of rockfill dam zones was adopted. Settlement monitoring data was collected and preprocessed, time series cluster analysis was performed, typical monitoring point sets were selected, and a weighted multi-objective function was constructed in combination with the soil and rock constitutive model. The multi-objective evolutionary optimization algorithm was used to iteratively solve the problem and output the optimal compromise solution of material parameters for each filling zone.

Benefits of technology

It has achieved high-precision inversion of material parameters of rockfill dam zones from massive settlement monitoring data, improving the accuracy and consistency of the inversion results and enabling a comprehensive characterization of the spatial variation characteristics of the dam body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123139728A_ABST
    Figure CN123139728A_ABST
Patent Text Reader

Abstract

The present application relates to the cross technical field of water conservancy and geotechnical engineering, and discloses a rock-fill dam partition material parameter multi-objective inversion method, comprising the following steps: S1, collecting rock-fill dam settlement original monitoring data and completing preprocessing to obtain standardized settlement monitoring time series data set, carrying out time series clustering analysis on the standardized settlement monitoring time series data set, and screening to form a typical measuring point set; S2, calling a rock-fill dam geotechnological constitutive model to carry out finite element numerical calculation, and combining the typical measuring point set to construct a weighted multi-objective function; S3, using a multi-objective evolutionary optimization algorithm to synchronously iteratively solve the material parameters of each filling partition of the rock-fill dam, and outputting the optimal compromise solution of the material parameters of each filling area. The present application uniformly constrains the deformation fitting deviation of each area of the dam body through the weighted multi-objective function, and combines the multi-objective optimization and the TOPSIS method to screen the balanced parameter solution, so that the partition material parameter inversion error can be greatly reduced, and high-precision inversion of the rock-fill dam partition material parameters can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the interdisciplinary fields of water conservancy engineering and geotechnical engineering. Background Technology

[0002] During operation, rockfill dams are equipped with a large number of deformation monitoring sensors inside and on their surface. The settlement monitoring data collected over a long period of time is characterized by large data volume, long time span, and wide spatial distribution. How to fully mine and effectively utilize the temporal characteristic information from these massive monitoring data to achieve high-precision inversion of material parameters is an important issue currently facing the field of geotechnical engineering.

[0003] Existing methods for inverting material parameters of rockfill dams typically select a small number of representative measuring points from massive monitoring data for single-objective optimization. This fails to systematically explore the temporal clustering characteristics of the monitoring data, resulting in insufficient representativeness of the selected measuring points for the deformation characteristics of different regions of the dam. Consequently, the constructed objective function is unable to fully characterize the spatial variation characteristics of the dam, leading to significant errors in the inversion results of the partitioned material parameters. Summary of the Invention

[0004] The purpose of this invention is to provide a multi-objective inversion method for the zonal material parameters of rockfill dams, so as to solve the technical problem of ×××.

[0005] To address the aforementioned technical problems, this invention provides a multi-objective inversion method for zonal material parameters of rockfill dams, comprising the following steps: S1. Collect raw monitoring data of rockfill dam settlement and complete preprocessing to obtain a standardized settlement monitoring time series dataset. Perform time series cluster analysis on the standardized settlement monitoring time series dataset and select typical monitoring points to form a set. S2. Use the rock and soil constitutive model of the rockfill dam to carry out finite element numerical calculations, and construct a weighted multi-objective function by combining a set of typical measuring points; S3. A multi-objective evolutionary optimization algorithm is used to synchronously iterate and solve the material parameters of each filling zone of the rockfill dam, and output the optimal compromise solution of the material parameters of each filling zone.

[0006] Step S1 includes the following secondary steps: S11. Extract three types of time-series feature quantities from all measuring points in the standardized settlement monitoring time-series dataset; S12. Perform time-series clustering operation based on the time-series feature quantities of all measurement points to divide the data into multiple groups of measurement point clusters. S13. Calculate the distance between each measuring point and the corresponding cluster center. Select the measuring point closest to the cluster center from each group of measuring points. All selected measuring points together constitute a typical measuring point set.

[0007] Step S12 includes the following secondary steps: S121. The similarity distance between any two sets of settlement time series of measuring points is calculated using the dynamic time warping algorithm. S122. Construct a symmetric similarity matrix for all measuring points based on the pairwise similarity distances between all measuring points. S123. Construct a Laplace matrix for the similarity matrix of the measurement points and solve for the eigenvectors to complete the matrix dimensionality reduction process, and output the low-dimensional eigenvectors corresponding to each measurement point. S124. Perform k-means clustering operation with low-dimensional feature vectors as input to divide the area into a preset number of measurement point clusters. The preset number of measurement point clusters is equal to or greater than the number of rockfill dam filling zones.

[0008] The three types of time-series feature quantities extracted in step S11 are the mean settlement rate, the frequency domain energy distribution parameter, and the hyperbola fitting time factor. The mean settlement rate is obtained by taking the mean after the first difference of the complete settlement time series of the measuring point. The frequency domain energy distribution parameter is obtained by extracting the frequency domain energy distribution from the settlement time series of the measuring point through Fourier transform. The hyperbola fitting time factor is obtained by extracting the model time factor after fitting the settlement time series of the measuring point with a hyperbola model.

[0009] Step S2 includes the following secondary steps: S21. Establish a three-dimensional finite element numerical model of the rockfill dam, input the material parameters to be solved into the rock and soil constitutive model of the rockfill dam, and calculate the numerical simulation displacement curves at each typical measuring point. S22. Establish an independent sub-objective function for each typical measuring point. The sub-objective function is the sum of squares of the deviations between the numerically simulated displacement and the measured settlement displacement at the same measuring point. S23. Calculate the ratio of the number of monitoring points contained in each monitoring point cluster to the total number of monitoring points. Use this ratio as the weighting coefficient of the corresponding sub-objective function. Sum all the sub-objective functions with weights to generate a complete weighted multi-objective function.

[0010] Step S3 includes the following secondary steps: S31. Based on the dam construction and design data, divide the rockfill dam filling zones into independent zones according to the type of filling material, extract the soil and rock material parameters to be inverted for each filling zone, and combine all parameters to generate a decision variable vector for optimization solution. S32. Select a multi-objective evolutionary algorithm to perform a global iterative search in the decision variable vector space, divide the population into individual levels through non-dominated sorting, and combine crowding distance to select and retain excellent individuals in the population and generate a new generation of population. S33. Repeatedly perform iterative search and individual selection operations until the preset convergence criterion is met, and output the Pareto optimal solution set corresponding to the material parameters of each filling zone. S34. The TOPSIS method is used to uniformly calculate all schemes in the Pareto optimal solution set, and the scheme corresponding to the maximum relative proximity is selected as the final inversion compromise solution of material parameters for each filling zone.

[0011] The multi-objective evolutionary algorithm selected in step S32 is a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm; the convergence criteria set in step S33 include two types of judgment conditions. The first type of judgment condition is that the change in Pareto front coverage rate within a consecutive preset number of iterations is less than a set threshold. The second type of judgment condition is that the total number of iterations reaches a preset maximum number of iterations. The iteration is terminated when either type of judgment condition is met.

[0012] The constitutive model of the rockfill dam rock and soil is selected from Duncan-Zhang nonlinear elastic model or Shen Zhujiang improved Cambridge model; the parameters of the rock and soil materials to be inverted are selected from elastic modulus, Poisson's ratio, friction angle, cohesion, compression index, and resilience index, and at least two of these parameters are selected in a single inversion process.

[0013] The preprocessing operation in step S1 includes two types of processing steps. The first type of processing step is wavelet transform filtering or Kalman filtering to remove noise and filter out high-frequency noise components in the original monitoring data. The second type of processing step is statistical threshold outlier removal, which identifies and removes abnormal settlement data points caused by sensor failure and transmission distortion by setting a preset numerical threshold. After processing by the two types of processing steps, a standardized settlement monitoring time series dataset is obtained.

[0014] The complete calculation process of the TOPSIS method in step S34 includes: S341. Perform weighted standardization on the objective function indices of each scheme in the Pareto optimal solution set. S342. Construct a positive ideal solution using the maximum value of each standardized index, and construct a negative ideal solution using the minimum value of each standardized index. S343. Calculate the Euclidean distance between each group of schemes and the positive ideal solution and the negative ideal solution respectively; S344. Calculate the relative proximity of each scheme based on the two sets of Euclidean distances. The scheme with the largest relative proximity value is the optimal compromise solution.

[0015] Compared with existing technologies, this invention achieves corresponding optimization and improvement through a complete technical chain: quantitative extraction of temporal features, automatic selection of typical measuring points through multi-level temporal clustering, simultaneous constraint of global deformation by weighted multi-objective functions, and solution of equilibrium parameters by multi-objective evolutionary algorithms combined with the TOPSIS method. First, this invention performs standardized preprocessing on the raw settlement monitoring data, quantitatively extracting three types of temporal features reflecting settlement rate, periodic fluctuations, and convergence trends. Then, using a temporal clustering algorithm combining dynamic time warping, spectral clustering, and k-means, all measuring points are automatically clustered according to deformation similarity. Representative measuring points are then selected from each cluster to form a typical measuring point set. This measurement point selection relies on the temporal features of the data itself, fully preserving the unique deformation patterns of different areas of the dam body, fundamentally improving the coverage and representation ability of the measuring point set for the global deformation characteristics of the dam body. Based on this, a sub-objective function based on the sum of squared displacement deviations is established for each typical measuring point, and each sub-objective function is assigned according to the proportion of measuring points in each measuring point cluster. By integrating corresponding weights into a weighted multi-objective function, the deformation fitting deviation of all typical measuring points is simultaneously considered, and the spatial variation law of dam deformation is fully restored. Finally, the independent material parameters of each filling zone are used as decision variables, and a multi-objective evolutionary algorithm is used to iteratively solve for the Pareto optimal solution set. The TOPSIS method is used to calculate the relative closeness of each scheme and select the globally optimal compromise solution. The collaborative inversion of material parameters of all filling zones is completed simultaneously. The entire set of technical means works in a coherent manner to fully explore the temporal characteristic information contained in the massive settlement monitoring data, effectively reduce the inversion deviation of material parameters of each zone of the rockfill dam, and achieve the technical goal of high-precision inversion of material parameters of rockfill dam zones based on long-term, large-scale massive monitoring data.

[0016] The above description is merely an overview of the technical solution of the present invention. In order to better understand the technical means of the present invention and to implement it in accordance with the contents of the specification, and in order to make the above and other objects, features and advantages of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description

[0017] One or more embodiments are illustrated by way of example with reference numerals in the accompanying drawings. These illustrations do not constitute a limitation on the embodiments. Elements with the same reference numerals in the drawings are denoted as similar elements. Unless otherwise stated, the figures in the drawings are not to be limited by scale.

[0018] Figure 1 This is a flowchart illustrating at least one embodiment of the present invention; Figure 2 This is a schematic diagram illustrating the core principle of time series clustering analysis in this invention; Figure 3 This is a schematic diagram of the logic flow for calculating the similarity of measurement points using the dynamic time warping algorithm in this invention; Figure 4 This is a schematic diagram of the multi-objective function construction stage in this invention. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the embodiments of this invention will be described in detail below with reference to the accompanying drawings. However, those skilled in the art will understand that many technical details are presented in the embodiments of this invention to facilitate a better understanding of this application. However, the technical solutions claimed in this application can be implemented even without these technical details and various variations and modifications based on the following embodiments. The division of the following embodiments is for ease of description and should not constitute any limitation on the specific implementation of this invention. The embodiments can be combined with and referenced by each other without contradiction.

[0020] Example 1 like Figure 1 The method for multi-objective inversion of material parameters for rockfill dam zones, as shown, includes the following steps: S1. Collect raw monitoring data of rockfill dam settlement and complete preprocessing to obtain a standardized settlement monitoring time series dataset. Perform time series cluster analysis on the standardized settlement monitoring time series dataset to screen and form a typical set of measuring points. Preprocessing uniformly eliminates noise and abnormal distortion in the raw monitoring data. Time series clustering can compress the massive amount of measuring point data, retaining only the measuring points with differentiated deformation characteristics, which greatly reduces the computational load of subsequent finite element simulation and optimization calculation. S2. Use the rock and soil constitutive model of the rockfill dam to carry out finite element numerical calculations, and construct a weighted multi-objective function by combining a set of typical measuring points. The multi-objective function is simultaneously bound to the deformation fitting requirements of all typical measuring points, which can simultaneously take into account the deformation matching requirements of different areas of the dam body. S3. A multi-objective evolutionary optimization algorithm is used to synchronously iterate and solve the material parameters of each filling zone of the rockfill dam, and output the optimal compromise solution of the material parameters of each filling zone. The synchronous solution mode can obtain the material parameter combination of all filling zones at one time, and the parameters of each zone are matched with each other to adapt to the overall deformation response of the dam body.

[0021] Therefore, a complete closed-loop execution logic is formed based on three layers of steps. After preprocessing and clustering, the data is directly used as the input basis for finite element simulation. A unified optimization target is built based on simulation and measured data. Finally, through iterative optimization, a compromise solution of material parameters suitable for all filling zones is output at once. The entire process forms a complete and coherent computational link. There are fixed data transfer and calling relationships between each step. The output results of each stage directly serve as the input conditions for the next stage. Each operation step cooperates with each other to complete the entire process of inverting the material parameters of the rockfill dam zones. The entire three-layer process works synergistically to achieve fully automated integrated calculation from the input of raw monitoring data to the output of zone material parameters, and to uniformly coordinate the deformation constraints of the entire dam body, ensuring that the final output parameters are adapted to the overall deformation characteristics of the dam body.

[0022] Example 2 Based on Example 1, step S1 includes the following steps: The first step is to perform the S1 preprocessing procedure: two types of processing procedures are performed on the raw monitoring data of rockfill dam settlement. The first type of process is wavelet transform filtering or Kalman filtering to remove high-frequency noise components from the raw monitoring data. Filtering can eliminate random high-frequency interference caused by temperature and sensor jitter, ensuring that the time-series deformation trend is completely preserved. The second type of process is statistical threshold outlier removal. Abnormal settlement data points caused by sensor failure and transmission distortion are identified and removed by setting a preset numerical threshold. Threshold determination standardizes and identifies abruptly distorted data to avoid outliers interfering with the accuracy of subsequent time-series feature extraction. After processing by the two types of procedures, a standardized settlement monitoring time-series dataset is obtained.

[0023] The second step involves performing the following time-series clustering and measurement point filtering operations: S11. Extract three types of time-series features from all measuring points in the standardized settlement monitoring time-series dataset. The three types of time-series features are the mean settlement rate, the frequency domain energy distribution parameter, and the hyperbolic fitting time factor. The mean settlement rate is obtained by taking the mean after the first difference of the complete settlement time series of the measuring points. The first difference quantifies the rate of settlement change and intuitively represents the speed of dam deformation development. The frequency domain energy distribution parameter is obtained by extracting the frequency domain energy distribution from the settlement time series of the measuring points through Fourier transform. The frequency domain feature can capture the periodic deformation fluctuations caused by seasonal water level and temperature. The hyperbolic fitting time factor is obtained by extracting the model time factor after fitting the settlement time series of the measuring points with a hyperbolic model. This factor quantitatively represents the degree of convergence of long-term settlement of the dam. The combination of the three types of features can completely depict the deformation law of all time series of the measuring points.

[0024] S12. Perform time-series clustering operations based on the time-series features of all measurement points to divide the data into multiple measurement point clusters; specifically, this includes the following steps: S121. The dynamic time warping algorithm is used to calculate the similarity distance between any two sets of settlement time series of measuring points. Dynamic time warping can adapt to settlement time series of different lengths and different time alignments, accurately match the similarity of curve shapes, and is not affected by sampling time misalignment. S122. Construct a symmetric similarity matrix for all measurement points based on the pairwise similarity distances between all measurement points. The symmetric matrix completely stores the deformation similarity relationships of all measurement points, providing complete basic data for dimensionality reduction and clustering. S123. Construct the Laplacian matrix for the similarity matrix of the measurement points and solve for the eigenvectors to complete the matrix dimensionality reduction process. Output the low-dimensional eigenvectors corresponding to each measurement point. Dimensionality reduction compresses the feature dimension, reduces the amount of subsequent clustering calculations, and filters out irrelevant noise features. S124. Perform k-means clustering operation with low-dimensional feature vector as input to divide the area into a preset number of measurement point clusters. The preset number of measurement point clusters is equal to or greater than the number of filling zones of the rockfill dam. The number of clusters matches the number of dam body zones to ensure that the deformation measurement points corresponding to each filling zone can form independent clusters and avoid the mixing of deformation features of different zones.

[0025] S13. Calculate the distance between each measuring point and the corresponding cluster center. Select the measuring point closest to the cluster center from each group of measuring points. Select all the measuring points to form a typical measuring point set. The smallest distance to the cluster center means that the temporal characteristics of the measuring point best fit the overall deformation law of the group. A single measuring point can completely represent the deformation characteristics of the entire cluster of measuring points, thus simplifying the number of measuring points to the maximum extent.

[0026] Therefore, the preprocessing stage standardizes the raw monitoring data through two independent processing steps, providing a unified format for subsequent feature extraction. The time-series feature extraction stage uses three differentiated mathematical models to quantify three independent time-series attributes of settlement at the measuring points: rate, periodic fluctuation, and convergence trend. The time-series clustering chain sequentially completes time-series similarity calculation, matrix construction, dimensionality compression, and clustering, relying on multi-level algorithms to group the deformation features of the measuring points. Typical measuring point selection is based on the cluster center distance quantification index. The final output set of typical measuring points corresponds to a set of deformation feature clusters, with each measuring point carrying the time-series deformation information of its corresponding group. The selection results fully cover the deformation feature types of all measuring points. This entire preprocessing-feature extraction-clustering-measuring point selection chain works together to achieve automated classification and simplification of massive measuring point data. The selected set of typical measuring points can fully carry all the differentiated deformation information of the dam body, providing an accurate and concise input data source for subsequent multi-objective fitting.

[0027] Example 3 Based on Example 1, step S2 specifically includes: S21. Establish a three-dimensional finite element numerical model of the rockfill dam, input the material parameters to be solved into the rockfill dam soil constitutive model, and calculate the numerical simulation displacement curves at each typical measuring point location; the rockfill dam soil constitutive model uses either the Duncan-Zhang nonlinear elastic model or the Shen Zhujiang improved Cambridge model, both of which are suitable for the nonlinear deformation characteristics of the rockfill dam fill material; the soil material parameters to be inverted are selected from elastic modulus, Poisson's ratio, friction angle, cohesion, compression index, and rebound index, and at least two of these parameters must be selected in a single inversion process; multi-parameter synchronous inversion can completely restore the elastic-plastic deformation mechanical properties of the fill material.

[0028] S22. Establish an independent sub-objective function for each typical measuring point. The sub-objective function is the sum of squares of the deviations between the numerically simulated displacement and the measured settlement displacement at the same measuring point. The sum of squares amplifies the quantitative difference in deformation deviation and intuitively reflects the degree of deviation in fitting at a single measuring point.

[0029] S23. Calculate the ratio of the number of measurement points contained in each measurement point cluster to the total number of monitoring measurement points. Use this ratio as the weighting coefficient of the corresponding sub-objective function. Sum all sub-objective functions with weights to generate a complete weighted multi-objective function. The proportion of the number of measurement points is used as the weight. Deformation clusters with more measurement points have higher constraint weights in the optimization process to ensure that the mainstream deformation law is matched first in the inversion.

[0030] Step S3 specifically includes: S31. Based on the dam construction and design data, the rockfill dam filling zones are divided into independent zones according to the type of filling material. The soil and rock material parameters to be inverted in each filling zone are extracted, and all parameters are combined to generate a decision variable vector for optimization solution. The parameters of each zone are independent of each other, which can accurately distinguish the differences in mechanical properties of different filling areas.

[0031] S32. A multi-objective evolutionary algorithm is selected to perform a global iterative search in the decision variable vector space. The population is divided into individual levels by non-dominated sorting, and excellent individuals within the population are selected and retained by crowding distance to generate a new generation of population. Non-dominated sorting distinguishes the fitting quality of parameter solutions by level, and crowding distance maintains the uniformity of solution set distribution to avoid local convergence of optimization results. The multi-objective evolutionary algorithm is either a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm. Both types of algorithms support multi-objective synchronous equilibrium optimization.

[0032] S33. Iterative search and individual selection operations are performed repeatedly until the preset convergence criteria are met, and the Pareto optimal solution set corresponding to the material parameters of each filling zone is output. The convergence criteria include two types of judgment conditions. The first type of judgment condition is that the change in Pareto front coverage rate within a consecutive preset number of iterations is less than a set threshold. The second type of judgment condition is that the total number of iterations reaches the preset maximum number of iterations. The iteration is terminated when either type of judgment condition is met. The dual convergence conditions take into account both computational accuracy and computational efficiency, and avoid meaningless iterations.

[0033] S34. The TOPSIS method is used to uniformly calculate all schemes within the Pareto optimal solution set, and the scheme corresponding to the maximum relative proximity is selected as the final inversion compromise solution for the material parameters of each filling zone; the complete calculation process of the TOPSIS method includes: S341. Perform weighted standardization on the objective function indices of each scheme in the Pareto optimal solution set; standardization eliminates the differences in displacement magnitudes at different measuring points and unifies the calculation scale of indices. S342. Construct a positive ideal solution using the maximum value of each standardized index and a negative ideal solution using the minimum value of each standardized index; establish a unified evaluation benchmark for positive and negative ideal solutions to achieve horizontal comparison of multiple schemes. S343. Calculate the Euclidean distance between each group of solutions and the positive ideal solution and the negative ideal solution respectively; the Euclidean distance quantifies the degree of deviation of each parameter solution from the optimal and worst fitting states; S344. Calculate the relative closeness of each scheme based on two sets of Euclidean distances. The scheme with the largest relative closeness value is the optimal compromise solution. The closeness is used to balance the fitting deviation of all measurement points and output a unique parameter combination that achieves global equilibrium.

[0034] Therefore, based on the finite element simulation stage, two types of optional soil and rock constitutive models are set up, and the range of standardized parameters to be inverted is defined to achieve quantitative output of numerical deformation curves. The multi-objective function adopts a hierarchical weighted structure, with each typical measuring point independently configured with a sub-objective function. The weights are objectively assigned according to the scale of the measuring point cluster, achieving unified constraints on the deformation deviation of all measuring points. In the optimization solution stage, the independent material parameter combinations of each filling zone are used as decision variables. Two types of evolutionary algorithms are used to complete the global search, and dual convergence judgment conditions are set to control the iteration termination, outputting a Pareto optimal solution set containing multiple sets of equilibrium parameter combinations. The TOPSIS method determines a unique compromise solution from the Pareto optimal solution set through four fixed operation steps: standardization, ideal solution construction, distance calculation, and proximity solution. The entire solution process adopts quantitative calculation rules, and the output results of each stage have fixed numerical judgment criteria. In this embodiment, the entire solution chain is linked and coordinated, synchronously constraining the deformation fitting deviation of multiple regions of the dam body. The output zonal material parameters can evenly match the measured deformation response of all regions of the dam body, realizing the integrated and accurate inversion of the mechanical parameters of the filling material in multiple zones.

[0035] Example 4 In conjunction with the above embodiments, the following steps are included: Time series cluster analysis was performed on the massive settlement monitoring data collected during the operation of the rockfill dam. Based on the clustering results, typical monitoring points that can represent the deformation characteristics of different areas were selected from the massive monitoring data. Based on the selected typical measurement points, a multi-objective function is constructed that can simultaneously fit the deformation process of all selected measurement points. A multi-objective optimization algorithm was used to simultaneously invert the material parameters of different filling zones of the rockfill dam to obtain the optimal solution of material parameters for each filling zone.

[0036] Time-series cluster analysis was performed on the massive amount of settlement monitoring data collected during the operation of the rockfill dam, including: Extract time-series features from each measuring point in massive settlement monitoring data. These time-series features include settlement development rate characteristics, settlement periodic fluctuation characteristics, and settlement convergence trend characteristics. Based on the time series features of each measuring point, a time series clustering algorithm is used to divide all measuring points into several clusters with similar deformation features; For each cluster of measuring points, the measuring point closest to the cluster center is selected as the representative measuring point of the cluster. Multiple representative measuring points constitute a typical set of measuring points that can characterize the deformation features of different regions.

[0037] The specific implementation of time series clustering algorithms includes: The similarity distance between any two time series of measurement points is calculated using a dynamic time warping algorithm. Construct a similarity matrix for all measurement points based on the similarity distance between them; The dimensionality of the similarity matrix of measurement points is reduced by using spectral clustering, and low-dimensional feature representations of the time series of measurement points are extracted. Based on low-dimensional feature representation, the k-means clustering algorithm is used to divide all measurement points into a preset number of measurement point clusters.

[0038] The characteristics of settlement development rate are characterized by calculating the mean of settlement monitoring data after first-order difference; the characteristics of settlement periodic fluctuation are characterized by the frequency domain energy distribution extracted by Fourier transform; and the characteristics of settlement convergence trend are characterized by the time factor determined by hyperbolic fitting model.

[0039] A multi-objective function is constructed based on the selected typical measurement points, including: The deformation process curve corresponding to each typical measuring point is compared with the numerical simulation curve calculated based on the constitutive model of the rockfill dam; For each typical measurement point, a sub-objective function is constructed with the goal of minimizing the deviation between the numerical simulation curve and the measured curve; By weighting and integrating the sub-objective functions corresponding to each typical measurement point, a multi-objective function that can simultaneously fit the deformation process of all preferred measurement points is constructed.

[0040] The mathematical expression for a multi-objective function is: the objective function equals the weighted sum of the sub-objective functions corresponding to each typical measurement point. in, For the first The sub-objective function corresponding to each typical measuring point is the sum of the squares of the deviations between the numerically simulated displacement and the measured displacement at that measuring point. The weight of each sub-objective function is determined based on the proportion of the number of measurement points contained in the corresponding measurement point cluster to the total number of measurement points; In the formula, This represents the total number of typical measuring points. For the first The number of measurement points contained in a measurement point cluster For the first Numerical simulation of displacement at each measuring point For the first The measured displacement at each measuring point.

[0041] A multi-objective optimization algorithm was used to simultaneously invert material parameters for different filling zones of the rockfill dam, including: The rockfill dam is divided into several independent filling zones according to the type of filling material, and the material parameters of different filling zones are independent of each other; The material parameters of each filling area are combined to form the decision variable vector of the optimization problem; A multi-objective optimization algorithm based on Pareto optimality is used to perform a global search in the decision variable space; Excellent individuals on the Pareto front were selected by non-dominated sorting and crowding distance calculation; The global search and excellent individual selection process is iteratively executed until the convergence criterion is met, and the Pareto optimal solution set of material parameters for each filling area is obtained.

[0042] The multi-objective optimization algorithm adopts a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm. The convergence criterion is that the change in the coverage of the Pareto front is less than a preset threshold or the number of iterations reaches a preset maximum value for several consecutive generations.

[0043] After obtaining the Pareto optimal solution set, the process also includes: selecting the optimal compromise solution from the Pareto optimal solution set as the final inversion result. The optimal compromise solution is determined using the TOPSIS method, specifically including calculating the Euclidean distance between each solution in the Pareto optimal solution set and the positive ideal solution and the negative ideal solution. For the first The distance from each solution to the ideal solution. For the first The distance from each solution to the negative ideal solution. Indicates the first The positive ideal solution value of each indicator (take the maximum value of the indicator). Indicates the first The negative ideal solution value of each indicator (take the minimum value of the indicator); Indicates the first The first scheme is in the The weighted standardized value of each indicator.

[0044] The relative proximity of each solution is calculated based on the Euclidean distance, and the solution with the highest relative proximity is selected as the optimal compromise solution.

[0045] The constitutive model of the rockfill dam adopts either the Duncan-Zhang nonlinear elastic model or the Shen Zhujiang improved Cambridge model. The material parameters include at least two of the following: elastic modulus, Poisson's ratio, friction angle, cohesion, compression index, and springback index.

[0046] Settlement monitoring data is collected by deformation monitoring sensors embedded inside and on the surface of the dam. The placement of the monitoring sensors is optimized based on the structural characteristics and stress distribution of the dam. The raw monitoring data is processed by filtering, noise reduction and outlier removal to form a time series dataset.

[0047] Secondly, the present invention also provides a multi-objective inversion system for zonal material parameters of rockfill dams that takes into account the temporal characteristics of monitoring data. The system includes the following modules: The time series clustering analysis module is used to perform time series clustering analysis on the massive settlement monitoring data collected during the operation of the rockfill dam. Based on the clustering results, typical monitoring points that can represent the deformation characteristics of different regions are selected from the massive monitoring data. The multi-objective function construction module is used to construct a multi-objective function that can simultaneously fit the deformation process of all selected typical measurement points based on the selected typical measurement points; The synchronous inversion optimization module is used to perform synchronous inversion of material parameters for different filling zones of the rockfill dam using a multi-objective optimization algorithm, so as to obtain the optimal solution of material parameters for each filling zone.

[0048] Example 5 The above embodiments include the following three core steps: First, time series cluster analysis was performed on the massive settlement monitoring data collected during the operation of the rockfill dam. Based on the clustering results, typical monitoring points that can represent the deformation characteristics of different areas were selected from the massive monitoring data. Then, based on the selected typical measurement points, a multi-objective function that can simultaneously fit the deformation process of all selected measurement points is constructed. Furthermore, a multi-objective optimization algorithm is employed to simultaneously invert the material parameters of different filling zones of the rockfill dam, obtaining the optimal solutions for the material parameters of each filling zone. The specific implementation methods of each step are described in detail below.

[0049] In the first core step, time-series cluster analysis is performed on the massive amount of settlement monitoring data collected during the operation of the rockfill dam. Based on the clustering results, typical monitoring points that can represent the deformation characteristics of different areas are selected from the massive monitoring data. The specific implementation of this step includes the following steps: The first step is the acquisition and preprocessing of settlement monitoring data. Settlement monitoring data is collected using deformation monitoring sensors embedded inside and on the surface of the dam. The placement of these sensors is optimized based on the dam's structural characteristics and stress distribution. Sensors are deployed at key locations on the dam, such as the crest, upstream and downstream slopes, and toes, forming a monitoring network covering the entire dam. The collected raw monitoring data undergoes filtering, denoising, and outlier removal to form a time-series dataset, providing a high-quality data foundation for subsequent time-series clustering analysis. Filtering and denoising can employ methods such as wavelet transform or Kalman filtering to effectively remove noise interference from the monitoring data. Outlier removal uses statistical analysis and preset thresholds to identify and address abnormal data points caused by sensor malfunctions or data transmission errors.

[0050] The second step is the extraction of time-series features. The time-series features of each monitoring point in the massive settlement monitoring data include three types: settlement development rate, settlement periodic fluctuation, and settlement convergence trend. The settlement development rate is characterized by calculating the mean of the settlement monitoring data after first-order differencing. This feature reflects the overall development trend and velocity level of dam deformation at the monitoring point. The settlement periodic fluctuation is characterized by the frequency domain energy distribution extracted by Fourier transform. This feature reflects the periodic fluctuation pattern of dam deformation at the monitoring point, which is usually related to factors such as seasonal water level changes and temperature changes. The settlement convergence trend is characterized by the time factor determined by a hyperbolic fitting model. This feature reflects the degree of convergence and development trend of dam deformation at the monitoring point. By fitting the settlement time curve using a hyperbolic model, the final convergence value and convergence time of dam deformation can be predicted. For each monitoring point, the above three time-series features are calculated to form the feature vector representation of that monitoring point.

[0051] The third step is time series clustering analysis. Based on the time series characteristics of each measurement point, a time series clustering algorithm is used to divide all measurement points into several clusters with similar deformation characteristics. The specific implementation of the time series clustering algorithm includes the following four sub-steps: The first sub-step involves using the Dynamic Time Warping (VTW) algorithm to calculate the similarity distance between any two time series at different measurement points. VTW is a similarity measurement method capable of handling inconsistencies in time series length. It uses dynamic programming to find the optimal matching path between two time series and calculates the similarity distance between them. This algorithm effectively captures the similarity in shape between the measurement point time series, rather than simply comparing the numerical differences at corresponding time points.

[0052] Sub-step two involves constructing a similarity matrix for all measurement points based on the similarity distances between them. This similarity matrix is ​​a symmetric matrix where each element represents the similarity distance between the corresponding time series of measurement points. The diagonal elements of the matrix are zero, indicating that the similarity distance between a measurement point and itself is zero.

[0053] Step three involves using spectral clustering to reduce the dimensionality of the similarity matrix of the measurement points, extracting low-dimensional feature representations of the time series data. Spectral clustering maps the measurement points from a high-dimensional feature space to a low-dimensional feature space by calculating the Laplacian matrix and eigenvectors of the similarity matrix, while preserving the similarity relationships between the points. This step effectively reduces the computational complexity of clustering and eliminates the influence of noise features on the clustering results.

[0054] Sub-step four involves using the k-means clustering algorithm, based on low-dimensional feature representation, to divide all measuring points into a predetermined number of clusters. The predetermined number is set according to the dam's zoning and engineering experience, typically equal to or slightly more than the number of fill areas in a rockfill dam, ensuring that each fill area has at least one representative measuring point. The k-means clustering algorithm iteratively optimizes the allocation of measuring points to the nearest cluster center, forming several clusters with similar deformation characteristics.

[0055] The fourth step is the selection of typical measurement points. For each measurement point cluster, the measurement point closest to the cluster center is selected as the representative measurement point of the cluster. Multiple representative measurement points constitute a set of typical measurement points that can characterize the deformation features of different regions. The distance is calculated using Euclidean distance or Mahalanobis distance, depending on the distribution characteristics of the feature vectors. The size of the set of typical measurement points is equal to the number of measurement point clusters. Only one representative measurement point is selected for each measurement point cluster, and this representative measurement point is the monitoring point that best represents the deformation features in that cluster.

[0056] In the second core step, based on the selected typical measurement points, a multi-objective function is constructed that can simultaneously fit the deformation process of all selected measurement points. The specific implementation of this step includes the following aspects: The first aspect involves obtaining the numerical simulation curves. The deformation process curves corresponding to each typical measuring point are compared with the numerical simulation curves calculated based on the constitutive model of the rockfill dam. The constitutive model of the rockfill dam adopts either the Duncan-Zhang nonlinear elastic model or the Shen Zhujiang improved Cambridge model, selected according to the actual engineering conditions and computational accuracy requirements. Material parameters include at least two of the following: elastic modulus, Poisson's ratio, friction angle, cohesion, compression index, and springback index; appropriate parameter combinations are selected for different constitutive models. A three-dimensional numerical model of the rockfill dam is established using the finite element analysis method. The mesh is generated according to the actual engineering topography, geological strata distribution, and dam structure zoning. The material parameters are input into the constitutive model for numerical simulation calculations, obtaining the numerical simulation deformation curves at each typical measuring point location.

[0057] The second aspect involves the construction of sub-objective functions. For each typical measurement point, a sub-objective function is constructed with the goal of minimizing the deviation between the numerical simulation curve and the measured curve. The sub-objective function employs the least squares criterion, and its specific expression is the sum of squares of the deviations between the numerically simulated displacement and the measured displacement at that measurement point. This sub-objective function reflects the degree of fit between the numerical simulation results and the measured data at a specific measurement point; the smaller the deviation, the more accurate the parameter inversion results at that measurement point.

[0058] The third aspect involves the integration of multiple objective functions. The sub-objective functions corresponding to each typical measuring point are weighted and integrated to construct a multi-objective function that can simultaneously fit the deformation process of all preferred measuring points. The mathematical expression of the multi-objective function is the weighted sum of the sub-objective functions corresponding to each typical measuring point, where the sub-objective function corresponding to the i-th typical measuring point is the sum of the squares of the deviations between the numerically simulated displacement and the measured displacement at that measuring point. The weight of each sub-objective function is determined based on the proportion of the number of measuring points contained in the corresponding measuring point cluster to the total number of measuring points. This weighting strategy ensures that the sub-objective functions corresponding to measuring point clusters containing more measuring points have larger weights, thus enabling the inversion results to better reflect the deformation characteristics of most measuring points.

[0059] In the third core step, a multi-objective optimization algorithm is used to simultaneously invert the material parameters of different filling zones of the rockfill dam, obtaining the optimal solutions for the material parameters of each filling zone. The specific implementation of this step includes the following: The first part involves the division of the filling zones and the construction of decision variables. The rockfill dam is divided into several independent filling zones based on the type of filling material, with material parameters independent of each other. Based on the dam's design documents and construction data, regions with different filling materials within the dam are identified, such as the main rockfill zone, secondary rockfill zone, transition zone, and panel zone. Each filling zone has an independent set of material parameters, and the parameters between different filling zones do not affect each other. The material parameters of each filling zone are combined to form the decision variable vector for the optimization problem; the dimension of the vector is equal to the sum of the number of material parameters for all filling zones.

[0060] The second part covers the global search in multi-objective optimization algorithms. A Pareto optimality-based multi-objective optimization algorithm is employed to perform a global search within the decision variable space. This algorithm utilizes either a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm. The non-dominated sorting genetic algorithm uses a non-dominated sorting mechanism to hierarchically evaluate individuals in the population, determining their rank on the Pareto front based on their dominance relationships. The decomposition-based multi-objective evolutionary algorithm improves the convergence speed and solution quality by decomposing the multi-objective problem into several sub-problems for collaborative optimization.

[0061] The third part involves the selection of superior individuals. Superior individuals on the Pareto front are selected using non-dominated ranking and crowding distance calculations. Non-dominated ranking stratifies individuals based on their dominance relationships, with individuals at each stratum not dominating each other. Crowding distance calculation measures the distribution density among individuals within the same stratum; individuals with larger crowding distances better maintain the diversity of the Pareto solution set. By comprehensively considering both the non-dominated stratum and crowding distance, superior individuals are selected to enter the next generation of the population.

[0062] The fourth part is the iterative convergence judgment. The process iteratively executes a global search and excellent individual selection until the convergence criterion is met, obtaining the Pareto optimal solution set for the material parameters of each filling area. The convergence criterion is that the change in coverage of the Pareto front is less than a preset threshold for several consecutive generations, or the number of iterations reaches a preset maximum value. The change in coverage of the Pareto front reflects the evolutionary degree of the Pareto solution set across consecutive generations. When the change in coverage is less than the preset threshold, the algorithm is considered to have converged; when the number of iterations reaches the preset maximum value, the iteration is forcibly terminated.

[0063] The fifth part concerns the selection of the optimal compromise solution. After obtaining the Pareto optimal solution set, the optimal compromise solution is selected from it as the final inversion result. The optimal compromise solution is determined using the TOPSIS method, which specifically involves calculating the Euclidean distance between each solution in the Pareto optimal solution set and the positive ideal solution and the negative ideal solution. Based on the Euclidean distance, the relative closeness of each solution is calculated, and the solution with the highest relative closeness is selected as the optimal compromise solution. The positive ideal solution is a virtual solution where all objective function values ​​are optimal, and the negative ideal solution is a virtual solution where all objective function values ​​are worst. The relative closeness reflects how close each solution is to the positive ideal solution and how far it is from the negative ideal solution; a higher relative closeness indicates a better solution.

[0064] Through the coordinated implementation of the above three core steps, this invention achieves multi-objective inversion identification of material parameters for different zones of a rockfill dam. First, the method selects typical measuring points from massive monitoring data using time-series clustering analysis, ensuring that the data used for inversion can comprehensively characterize the deformation features of different regions of the dam. Then, by constructing a multi-objective function, it achieves synchronous fitting of the deformation process of all typical measuring points, avoiding local bias problems caused by single-point inversion. Finally, through multi-objective optimization algorithms and Pareto optimality theory, it obtains the optimal solutions for material parameters in each filling zone, significantly improving the inversion accuracy of the zoned material parameters.

[0065] Example 6 Based on the above embodiments, taking a high rockfill dam project as an example, the specific application process of the multi-objective inversion method for zonal material parameters of rockfill dams that considers the temporal characteristics of monitoring data will be explained in detail.

[0066] In this engineering example, the rockfill dam is over 100 meters high and several hundred meters long at the crest. The dam's fill material is divided into three main filling zones: the main rockfill zone, the secondary rockfill zone, and the transition zone. More than a double-digit number of settlement monitoring sensors are deployed inside and on the surface of the dam, forming a monitoring network covering the entire dam. This rockfill dam has been in operation for many years, accumulating a large amount of settlement monitoring data. Now, it is necessary to use this monitoring data to invert and identify the material parameters of each filling zone in order to assess the dam's safety status and predict its response characteristics under extreme conditions.

[0067] First, settlement monitoring data was collected and preprocessed. Raw settlement monitoring data collected during the operation of the rockfill dam was exported from the monitoring database, covering both the dam construction and operation periods. The raw data underwent an integrity check, removing missing data and outliers caused by sensor malfunctions or data transmission errors. Wavelet transform was used to filter and denoise the monitoring data, removing high-frequency noise components. The processed data formed a time-series dataset, providing a high-quality data foundation for subsequent analysis.

[0068] Then, time-series feature quantities are extracted. For each monitoring point, three time-series feature quantities are calculated: settlement development rate feature, settlement periodic fluctuation feature, and settlement convergence trend feature. The settlement development rate feature is obtained by taking the mean value after performing a first-order difference on the settlement data of the monitoring point, reflecting the overall development trend of dam deformation at that location. The settlement periodic fluctuation feature is obtained by performing a Fourier transform on the settlement data of the monitoring point and extracting the characteristic parameters of the frequency domain energy distribution, reflecting the periodic fluctuation law of dam deformation at that location. The settlement convergence trend feature is obtained by performing hyperbolic fitting on the settlement time curve of the monitoring point and extracting the time factor in the fitted model, reflecting the convergence degree and development trend of dam deformation at that location. The three feature quantities of each monitoring point are combined to form the feature vector representation of that monitoring point.

[0069] Next, time series clustering analysis is performed. The dynamic time warping algorithm is used to calculate the pairwise similarity distance between all measuring points, constructing a measuring point similarity matrix. Spectral clustering is then used to reduce the dimensionality of the similarity matrix, extracting low-dimensional feature representations of the measuring point time series. Based on these low-dimensional feature representations, the k-means clustering algorithm is used to divide all measuring points into three clusters, corresponding to the three filling areas of the dam. The measuring points within each cluster have similar deformation characteristics, representing the deformation characteristics of the dam within the same filling area. For each cluster, the measuring point closest to the cluster center is selected as the representative measuring point of that cluster; these three representative measuring points constitute a typical measuring point set.

[0070] Then, a multi-objective function was constructed. The Duncan-Zhang nonlinear elastic model was adopted as the constitutive model, and the elastic modulus and Poisson's ratio were selected as the material parameters to be inverted. Based on engineering experience and indoor geotechnical test results, the range of material parameters for each filling area was determined. A three-dimensional numerical model of the rockfill dam was established using the finite element analysis method. The material parameters were input into the model for numerical simulation calculations, and the numerical simulation deformation curves at each typical measuring point were obtained. For each typical measuring point, a sub-objective function was constructed to calculate the sum of squares of the deviations between the numerical simulation displacement and the measured displacement at that measuring point. The three sub-objective functions were weighted and integrated to construct a multi-objective function. The weight of each sub-objective function was determined according to the proportion of the number of measuring points contained in the corresponding measuring point cluster to the total number of measuring points.

[0071] Finally, a multi-objective optimization algorithm is used for simultaneous inversion. The three filling zones of the rockfill dam are treated as independent optimization regions, and the material parameters of each zone are treated as independent decision variables, collectively forming the decision variable vector for the optimization problem. A non-dominated sorting genetic algorithm is used to perform a global search within the decision variable space, selecting optimal individuals through non-dominated sorting and crowding distance calculation. The global search and optimal individual selection process is iteratively executed until the convergence criterion is met, obtaining the Pareto optimal solution set for the material parameters of each filling zone. The TOPSIS method is used to select the optimal compromise solution from the Pareto optimal solution set as the final inversion result. The output material parameters include the elastic modulus and Poisson's ratio of each filling zone.

[0072] The verification results of this embodiment show that the partitioned material parameters obtained by the method of this invention can accurately reflect the material properties of each filling area of ​​the dam body, and are in good agreement with the results of indoor geotechnical tests. This method effectively solves the problem that traditional single-point inversion methods cannot fully reveal the spatial variation characteristics of the dam body, and significantly improves the inversion accuracy of partitioned material parameters.

[0073] Example 7 Based on the above embodiments, an apparatus is designed to implement this, which includes three core functional modules: a time series clustering analysis module, a multi-objective function construction module, and a synchronous inversion optimization module.

[0074] The time-series clustering analysis module is used to perform time-series clustering analysis on the massive settlement monitoring data collected during the operation of the rockfill dam. Based on the clustering results, it selects typical monitoring points that can represent the deformation characteristics of different areas from the massive monitoring data. This module includes a data acquisition submodule, a feature extraction submodule, a clustering analysis submodule, and a monitoring point selection submodule. The data acquisition submodule is responsible for reading the raw settlement monitoring data from the monitoring database and performing preprocessing such as filtering, noise reduction, and outlier removal. The feature extraction submodule is responsible for calculating the settlement development rate characteristics, settlement periodic fluctuation characteristics, and settlement convergence trend characteristics of each monitoring point. The clustering analysis submodule is responsible for implementing core algorithms such as dynamic time warping, similarity matrix construction, spectral clustering dimensionality reduction, and k-means clustering. The monitoring point selection submodule is responsible for selecting representative monitoring points from each monitoring point cluster to form a set of typical monitoring points.

[0075] The multi-objective function construction module is used to construct a multi-objective function that can simultaneously fit the deformation process of all selected typical measuring points. This module includes a numerical simulation submodule, a sub-objective function construction submodule, and a weighted integration submodule. The numerical simulation submodule is responsible for calling finite element analysis software to perform numerical simulation calculations based on the set constitutive model and material parameters, obtaining the numerical simulation deformation curves at each typical measuring point. The sub-objective function construction submodule is responsible for constructing a sub-objective function for each typical measuring point, with the objective of minimizing the deviation between the numerical simulation curve and the measured curve. The weighted integration submodule is responsible for weighted integration of the sub-objective functions to construct the complete multi-objective function.

[0076] The synchronous inversion optimization module employs a multi-objective optimization algorithm to simultaneously invert the material parameters of different filling zones of a rockfill dam, obtaining the optimal material parameter solutions for each filling zone. This module internally includes a decision variable construction submodule, a global search submodule, an individual selection submodule, and a convergence judgment submodule. The decision variable construction submodule is responsible for combining the material parameters of each filling zone to construct the decision variable vector for the optimization problem. The global search submodule is responsible for performing a global search within the decision variable space using a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm. The individual selection submodule is responsible for selecting excellent individuals on the Pareto front through non-dominated sorting and crowding distance calculation. The convergence judgment submodule is responsible for determining whether the convergence criterion is met, and outputting the Pareto optimal solution set if the convergence criterion is met. This module also includes an optimal compromise solution selection submodule, responsible for selecting the optimal compromise solution from the Pareto optimal solution set as the final inversion result using the TOPSIS method.

[0077] The three modules work together to achieve multi-objective inversion and identification of material parameters for rockfill dam zones. The time series clustering analysis module selects typical measuring points from massive monitoring data, providing a high-quality data foundation for subsequent inversion; the multi-objective function construction module constructs a multi-objective function that can simultaneously fit the deformation process of all typical measuring points, achieving a comprehensive characterization of the spatial variability of the dam body; the synchronous inversion optimization module uses a multi-objective optimization algorithm to perform synchronous inversion and obtain the optimal solution for material parameters in each filling zone.

[0078] Those skilled in the art will understand that the above embodiments can be modified in form and detail in practical applications without departing from the spirit and scope of the invention.

Claims

1. A multi-objective inversion method for zonal material parameters of rockfill dams, characterized in that, Includes the following steps: S1. Collect raw monitoring data of rockfill dam settlement and complete preprocessing to obtain a standardized settlement monitoring time series dataset. Perform time series cluster analysis on the standardized settlement monitoring time series dataset and select typical monitoring points to form a set. S2. Use the rock and soil constitutive model of the rockfill dam to carry out finite element numerical calculations, and construct a weighted multi-objective function by combining a set of typical measuring points; S3. A multi-objective evolutionary optimization algorithm is used to synchronously iterate and solve the material parameters of each filling zone of the rockfill dam, and output the optimal compromise solution of the material parameters of each filling zone.

2. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 1, characterized in that, Step S1 includes the following secondary steps: S11. Extract three types of time-series feature quantities from all measuring points in the standardized settlement monitoring time-series dataset; S12. Perform time-series clustering operation based on the time-series feature quantities of all measurement points to divide the data into multiple groups of measurement point clusters. S13. Calculate the distance between each measuring point and the corresponding cluster center. Select the measuring point closest to the cluster center from each group of measuring points. All selected measuring points together constitute a typical measuring point set.

3. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 2, characterized in that, Step S12 includes the following secondary steps: S121. The similarity distance between any two sets of settlement time series of measuring points is calculated using the dynamic time warping algorithm. S122. Construct a symmetric similarity matrix for all measuring points based on the pairwise similarity distances between all measuring points. S123. Construct a Laplace matrix for the similarity matrix of the measurement points and solve for the eigenvectors to complete the matrix dimensionality reduction process, and output the low-dimensional eigenvectors corresponding to each measurement point. S124. Perform k-means clustering operation with low-dimensional feature vectors as input to divide the area into a preset number of measurement point clusters. The preset number of measurement point clusters is equal to or greater than the number of rockfill dam filling zones.

4. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 2, characterized in that, The three types of time-series feature quantities extracted in step S11 are the mean settlement rate, the frequency domain energy distribution parameter, and the hyperbola fitting time factor. The mean settlement rate is obtained by taking the mean after the first difference of the complete settlement time series of the measuring point. The frequency domain energy distribution parameter is obtained by extracting the frequency domain energy distribution from the settlement time series of the measuring point through Fourier transform. The hyperbola fitting time factor is obtained by extracting the model time factor after fitting the settlement time series of the measuring point with a hyperbola model.

5. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 1, characterized in that, Step S2 includes the following secondary steps: S21. Establish a three-dimensional finite element numerical model of the rockfill dam, input the material parameters to be solved into the rock and soil constitutive model of the rockfill dam, and calculate the numerical simulation displacement curves at each typical measuring point. S22. Establish an independent sub-objective function for each typical measuring point. The sub-objective function is the sum of squares of the deviations between the numerically simulated displacement and the measured settlement displacement at the same measuring point. S23. Calculate the ratio of the number of monitoring points contained in each monitoring point cluster to the total number of monitoring points. Use this ratio as the weighting coefficient of the corresponding sub-objective function. Sum all the sub-objective functions with weights to generate a complete weighted multi-objective function.

6. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 1, characterized in that, Step S3 includes the following secondary steps: S31. Based on the dam construction and design data, divide the rockfill dam filling zones into independent zones according to the type of filling material, extract the soil and rock material parameters to be inverted for each filling zone, and combine all parameters to generate a decision variable vector for optimization solution. S32. Select a multi-objective evolutionary algorithm to perform a global iterative search in the decision variable vector space, divide the population into individual levels through non-dominated sorting, and combine crowding distance to select and retain excellent individuals in the population and generate a new generation of population. S33. Repeatedly perform iterative search and individual selection operations until the preset convergence criterion is met, and output the Pareto optimal solution set corresponding to the material parameters of each filling zone. S34. The TOPSIS method is used to uniformly calculate all schemes in the Pareto optimal solution set, and the scheme corresponding to the maximum relative proximity is selected as the final inversion compromise solution of material parameters for each filling zone.

7. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 6, characterized in that, The multi-objective evolutionary algorithm selected in step S32 is a non-dominated sorting genetic algorithm or a decomposition-based multi-objective evolutionary algorithm; the convergence criteria set in step S33 include two types of judgment conditions. The first type of judgment condition is that the change in Pareto front coverage rate within a consecutive preset number of iterations is less than a set threshold. The second type of judgment condition is that the total number of iterations reaches a preset maximum number of iterations. The iteration is terminated when either type of judgment condition is met.

8. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 5, characterized in that, The constitutive model of the rockfill dam rock and soil is selected from Duncan-Zhang nonlinear elastic model or Shen Zhujiang improved Cambridge model; the parameters of the rock and soil materials to be inverted are selected from elastic modulus, Poisson's ratio, friction angle, cohesion, compression index, and resilience index, and at least two of these parameters are selected in a single inversion process.

9. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 1, characterized in that, The preprocessing operation in step S1 includes two types of processing steps. The first type of processing step is wavelet transform filtering or Kalman filtering to remove noise and filter out high-frequency noise components in the original monitoring data. The second type of processing step is statistical threshold outlier removal, which identifies and removes abnormal settlement data points caused by sensor failure and transmission distortion by setting a preset numerical threshold. After processing by the two types of processing steps, a standardized settlement monitoring time series dataset is obtained.

10. The multi-objective inversion method for zonal material parameters of rockfill dams as described in claim 6, characterized in that, The complete calculation process of the TOPSIS method in step S34 includes: S341. Perform weighted standardization on the objective function indices of each scheme in the Pareto optimal solution set. S342. Construct a positive ideal solution using the maximum value of each standardized index, and construct a negative ideal solution using the minimum value of each standardized index. S343. Calculate the Euclidean distance between each group of schemes and the positive ideal solution and the negative ideal solution respectively; S344. Calculate the relative proximity of each scheme based on the two sets of Euclidean distances. The scheme with the largest relative proximity value is the optimal compromise solution.