Densenet-lstm fusion network-based electric dust removal energy-saving optimization method and system

By optimizing the power supply parameters of the electrostatic precipitator system using a DenseNet-LSTM fusion network and particle swarm optimization algorithm, the problems of high power consumption and unstable dust emissions were solved, and the intelligent and energy-saving operation of the electrostatic precipitator system was realized.

CN123140306APending Publication Date: 2026-11-20CHN ENERGY JIANGXI POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610990465.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-03
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing electrostatic precipitator systems struggle to achieve real-time and precise adjustment of power supply parameters when faced with load fluctuations, changes in coal quality, or variations in flue gas temperature. This results in high power consumption, unstable dust emissions, and a lack of intelligent and autonomous operation capabilities.

Method used

A prediction model based on DenseNet-LSTM fusion network is used to predict the dust concentration and power consumption at the outlet. Multi-parameter collaborative optimization is performed through particle swarm optimization algorithm. Combined with a three-level safety protection mechanism, the power supply parameters are optimized to minimize power consumption and achieve dust emission standards.

Benefits of technology

It achieves reduced power consumption while ensuring stable dust emissions, and provides rapid response safety protection under abnormal operating conditions, thereby improving the system's intelligent and autonomous operation capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140306A_ABST
    Figure CN123140306A_ABST
Patent Text Reader

Abstract

The application provides an electric dust removal energy-saving optimization method and system based on a DenseNet-LSTM fusion network, relates to the intelligent technology field of electric dust removal of coal-fired power plants, and comprises the following steps: obtaining real-time operation parameters of a target electric dust removal system, performing standardization processing on the real-time operation parameters to obtain a standardized operation parameter set; inputting the operation parameter set into a preset prediction model to predict the outlet dust concentration and electric energy consumption of the target electric dust removal system; inputting the outlet dust concentration and electric energy consumption into a preset optimization model to perform optimization with the minimization of electric energy consumption as an optimization target and the compliance of the outlet dust concentration as a constraint condition, so as to obtain an optimal operation parameter combination; and issuing the optimal operation parameter combination to the target electric dust removal system, so that the corresponding operation is performed by the DCS control system of the target electric dust removal system. Through the collaborative architecture of the fusion of the prediction model and the particle swarm optimization, the minimization of electric energy consumption under the premise of ensuring the compliance of dust emission is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of intelligent control technology for electrostatic precipitators in coal-fired power plants, and in particular to an energy-saving optimization method and system for electrostatic precipitators based on a DenseNet-LSTM fusion network. Background Technology

[0002] Electrostatic precipitators (ESPs) are the primary technology for achieving flue gas dust removal and meeting ultra-low emission requirements in coal-fired power plants. Their operational control directly impacts the power plant's environmental compliance and power consumption. Currently, the adjustment of ESP system operating parameters relies heavily on the manual experience of operators. Operators typically adjust secondary voltage, secondary current, and pulse operating parameters manually based on measured feedback of outlet dust concentration. However, due to the strong nonlinearity, large hysteresis, and multi-parameter coupling characteristics of ESP systems, manual adjustment methods struggle to keep pace with changes in operating conditions, such as unit load fluctuations, coal quality variations, or changes in flue gas temperature and inlet dust concentration. This often leads to the use of excessively high power supply parameters to ensure emissions do not exceed limits, resulting in higher power consumption.

[0003] To address the aforementioned issues, some electrostatic precipitator (ESP) systems have adopted PID control or fixed-sequence control to achieve automatic adjustment. However, the lag time in the ESP process is relatively long. PID control, based on the current deviation, provides feedback adjustment, but when operating conditions change, its adjustment commands lag behind the changes, making it difficult to achieve proactive adjustment. Fixed-sequence control, on the other hand, cannot adapt to random fluctuations in coal quality, load, and other conditions, resulting in insufficient adjustment accuracy and a tendency for fluctuations in outlet dust concentration and short-term exceedances.

[0004] In terms of prediction technology, existing studies have attempted to predict the dust concentration at the outlet of electrostatic precipitators using mechanistic models or single neural network models. However, the electrostatic precipitator process is affected by a variety of factors, such as airflow distribution, dust particle size, dust resistivity, and voltage-current coupling. Mechanistic models cannot cover all influencing factors, and single neural network models have limited feature extraction capabilities. Neither can achieve the prediction accuracy required for real-time control, thus limiting the application of prediction results in closed-loop control.

[0005] In terms of control strategies, existing technologies typically adjust power supply parameters such as voltage, current, and pulse parameters separately, failing to achieve coordinated global optimization of these parameters while meeting the constraint of compliant dust emissions at the outlet. The coupling relationships between these parameters are not effectively decoupled, often resulting in an imbalance where one electric field parameter is too high while other electric field parameters are too low, affecting overall operating efficiency.

[0006] In terms of safety protection, existing systems lack graded response mechanisms for different levels of risk of exceeding standards in abnormal operating conditions such as sudden increases in inlet dust concentration or drastic fluctuations in operating conditions. They usually adopt a single protective action, which can easily lead to over-protection or under-protection.

[0007] In addition, most existing electrostatic precipitators operate independently and lack information exchange and coordination with other environmental protection systems such as desulfurization and denitrification in power plants. They are difficult to integrate into the overall environmental management and control system of power plants and still require on-site operation and intervention by operators. The level of intelligent and autonomous operation needs to be improved. Summary of the Invention

[0008] To address the aforementioned technical problems, this application provides an energy-saving optimization method and system for electrostatic precipitators based on a DenseNet-LSTM fusion network. The method predicts the outlet dust concentration and energy consumption using a predictive model, and employs a particle swarm optimization algorithm to minimize energy consumption while ensuring that the outlet dust concentration meets emission standards. Simultaneously, a three-level safety protection mechanism provides a rigid safety net during execution, thereby reducing energy consumption while guaranteeing that dust emissions meet standards. The technical solution is as follows: Firstly, a method for optimizing energy saving in electrostatic precipitators based on a DenseNet-LSTM fusion network is provided, including: Obtain the real-time operating parameters of the target electrostatic precipitator system, and standardize the real-time operating parameters to obtain a standardized operating parameter set; The standardized set of operating parameters is input into a preset prediction model to predict the outlet dust concentration and power consumption of the target electrostatic precipitator system. The prediction model includes a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch is used to extract the static features of the operating parameters, the LSTM branch is used to extract the temporal variation features of the operating parameters, and the skip connection structure is used to directly concatenate the input features with the output layer, bypassing the LSTM branch. The outlet dust concentration and power consumption are input into a preset optimization model. The optimization objective is to minimize power consumption, and the constraint is to meet the outlet dust concentration standard. The optimal combination of operating parameters is obtained. The optimal combination of operating parameters is sent to the target electrostatic precipitator, and the DCS control system of the target electrostatic precipitator executes the corresponding operation.

[0009] In one possible implementation, the prediction model is established in the following way: Historical operating parameters of the electrostatic precipitator system are collected, and the historical operating parameters are standardized to construct an original dataset; An initial prediction model is constructed, comprising a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch consists of multiple densely connected blocks, where each layer receives feature maps from all previous layers within the block, used to extract static features from the running parameters layer by layer. The LSTM branch is composed of multiple stacked LSTM units, used to capture long-range dependencies of the running parameters over time. The input of the skip connection structure is connected to the input layer of the DenseNet branch, and the output is connected to the model's output layer, used to directly pass the raw features, which have not been processed by the LSTM branch, to the output layer. Using the inlet dust concentration, voltage, current, pulse parameters, unit load, flue gas flow rate, and flue gas temperature from historical operating parameters as input features, and the corresponding historical outlet dust concentration and historical power consumption of each electric field as labeled targets, the initial prediction model is trained to obtain the prediction model.

[0010] In one possible implementation, the training process of the prediction model includes: The original dataset is divided into a training set, a test set, and a validation set in a 3:1:1 ratio, with the sample distribution of the three datasets remaining consistent. The initial prediction model is trained using the backpropagation algorithm and the adaptive moment estimation optimizer, with the mean square error between the predicted value and the true value used as the loss function. During training, the outputs of the DenseNet branch, LSTM branch, and skip connection structure are fused in the output layer. The fusion method is that the features are concatenated and then mapped to the output space through a fully connected layer. The prediction model adopts a multi-field shared weight structure, and the prediction branches of each electric field share the same set of network parameters. The output of the prediction model includes the predicted value of the outlet dust concentration and the predicted value of the real-time power consumption of each electric field.

[0011] In one possible implementation, the optimization model employs a particle swarm optimization algorithm for optimization, and the objective function is: min P = P1 + P2 + ... + P n ; Where n is the total number of electric fields, P1 to P n These are the real-time power consumption prediction values ​​for each electric field; The constraint condition for the optimization objective function is: C export ≤C limit C export C is the predicted value of dust concentration at the outlet. limit The preset emission concentration limit is the standard.

[0012] In one possible implementation, the particle swarm optimization algorithm is configured with an optimization cycle, and the termination condition for each optimization iteration is that a preset maximum number of iterations is reached or the fitness value of the global optimal solution no longer changes. After each optimization is completed, the optimal combination of operating parameters is output and sent to the DCS control system.

[0013] In one possible implementation, the measured value of the outlet dust concentration is acquired in real time during the execution of the optimal combination of operating parameters by the DCS control system. When the measured value of the outlet dust concentration exceeds the first preset threshold, the first-level protection is activated, and at least one electric field is switched to continuous operation mode; When the measured value of the outlet dust concentration exceeds the second preset threshold, the secondary protection is activated, and the number of continuously operating electric fields is increased to more than the number corresponding to the primary protection. When the measured value of the outlet dust concentration exceeds the third preset threshold, the three-level protection is activated, and all electric fields are switched to continuous operation mode. Once the measured value of the outlet dust concentration falls back to the safe range, the optimal combination of operating parameters will be resumed. Wherein, the first preset threshold < the second preset threshold < the third preset threshold.

[0014] In one possible implementation, after the optimal combination of operating parameters is sent to the DCS control system, the execution feedback of the DCS control system is obtained in real time. The execution feedback includes the actual values ​​of the secondary voltages of each electric field, the actual values ​​of the secondary currents, the actual values ​​of the pulse operating parameters, and the operating status of the equipment. The execution feedback is compared with the optimal combination of operating parameters to determine whether the deviation between the actual value and the set value of each parameter is within the preset tolerance range. When the deviation of any parameter exceeds the preset tolerance range, an execution deviation alarm signal is generated, and the deviation parameter is fed back to the optimization model, which then performs the optimization calculation again in the next optimization cycle.

[0015] In one possible implementation, the real-time operating parameters include unit load, boiler load, flue gas flow rate, flue gas temperature, inlet dust concentration, outlet dust concentration, and secondary voltage setpoint, secondary current setpoint, actual secondary voltage value, actual secondary current value, high-voltage equipment power, pulse operating parameters, flashover frequency, ash hopper temperature, and equipment status for each electric field. The standardization process employs the Z-score standardization method, and standardization is performed according to the following formula: Z = (X -μ) / σ; Where X is the original value of one of the real-time operating parameters, μ is the mean of the parameter on the sample set, and σ is the standard deviation of the parameter on the sample set.

[0016] Secondly, an energy-saving optimization system for electrostatic precipitators based on a DenseNet-LSTM fusion network is provided, including: The data acquisition and preprocessing module is used to acquire the real-time operating parameters of the target electrostatic precipitator system, and to standardize the real-time operating parameters to obtain a standardized operating parameter set. The prediction module is equipped with a preset prediction model, which is used to predict the outlet dust concentration and power consumption of the target electrostatic precipitator based on the standardized operating parameter set; the prediction model includes DenseNet branches, LSTM branches and jump connection structures. The optimization module is equipped with a preset optimization model, which is used to find the optimal combination of operating parameters with the goal of minimizing power consumption and the constraint of meeting the standard of dust concentration at the outlet. The distribution module is used to distribute the optimal combination of operating parameters to the target electrostatic precipitator, and the DCS control system of the target electrostatic precipitator executes the corresponding operation.

[0017] In one possible implementation, a security protection module is also included, which is configured as follows: When the measured value of the outlet dust concentration exceeds the first preset threshold, a first-level protection signal is generated to switch at least one electric field to continuous operation mode. When the measured value of the outlet dust concentration exceeds the second preset threshold, a secondary protection signal is generated to increase the number of continuously operating electric fields to more than the number corresponding to the primary protection. When the measured value of the outlet dust concentration exceeds the third preset threshold, a level 3 protection signal is generated to switch all electric fields to continuous operation mode. Once the measured value of the outlet dust concentration falls back to the safe range, a recovery signal is generated to instruct the DCS control system to automatically resume the execution of the optimal combination of operating parameters. Wherein, the first preset threshold < the second preset threshold < the third preset threshold.

[0018] The technical solutions provided in this application can achieve the following technical effects: (1) By constructing a fusion prediction model that includes DenseNet branches, LSTM branches and skip connection structures, we can make full use of DenseNet’s ability to extract static features and LSTM’s ability to capture long-term temporal dependencies to achieve high-precision prediction of outlet dust concentration and electric field power consumption. On this basis, with the goal of minimizing total power consumption and the constraint of meeting the outlet dust concentration standard, we use the particle swarm optimization algorithm to perform multi-parameter collaborative optimization in the global solution space. This avoids the problem that traditional manual parameter tuning or single parameter adjustment methods are prone to getting trapped in local optima, effectively improving the accuracy of the optimal combination of operating parameters. Under the premise of ensuring that the outlet dust concentration meets the standard stably, we achieve the minimization of power consumption.

[0019] (2) By setting three-level incremental thresholds and matching them with corresponding incremental protection actions, a rigid safety protection mechanism independent of the prediction model and optimization algorithm is constructed at the execution level. When the measured value of the outlet dust concentration exceeds the preset threshold level by level, the corresponding electric field is forcibly switched to continuous operation mode to achieve rapid dust reduction. After the dust concentration falls back to the safe range, the intelligent optimization operation is automatically restored, realizing the safety and energy saving synergy of "rigid bottom line in abnormal situation and energy saving operation in normal situation". Attached Figure Description

[0020] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the description of the embodiments of this application will be briefly introduced below. In the drawings: Figure 1 This is a flowchart of the energy-saving optimization method for electrostatic precipitators based on a DenseNet-LSTM fusion network according to an embodiment of this application; Figure 2 This is an example diagram of the predictive model structure in an embodiment of the method of this application; Figure 3 This is an example diagram of the optimization model in the embodiment of the method of this application; Figure 4 This is an example diagram of the startup security protection mechanism in an embodiment of the method of this application; Figure 5 This is a structural diagram of the electrostatic precipitator energy-saving optimization system based on the DenseNet-LSTM fusion network according to an embodiment of this application; Figure 6 This is a structural diagram of an electronic device provided in an embodiment of this application. Detailed Implementation

[0021] Exemplary embodiments of the present application will now be described in more detail with reference to the accompanying drawings. While exemplary embodiments of the present application are shown in the drawings, it should be understood that the present application may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this application will be thorough and complete, and will fully convey the scope of the present application to those skilled in the art.

[0022] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such use can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the term "comprising" and its variations should be interpreted as open-ended terms meaning "including but not limited to."

[0023] This application provides an energy-saving optimization method for electrostatic precipitators based on a DenseNet-LSTM fusion network, such as... Figure 1 As shown, the method mainly includes the following steps S101 to S104.

[0024] Step S101: Obtain the real-time operating parameters of the target electrostatic precipitator system, and standardize the real-time operating parameters to obtain a standardized operating parameter set.

[0025] The target electrostatic precipitator (ESP) system refers to the ESP equipment to be optimized for energy conservation. It is installed in the flue gas emission treatment stage of a coal-fired power plant to electrostatically remove dust from the flue gas generated by boiler combustion. Changes in the operating parameters of the ESP system directly determine its dust removal efficiency and energy consumption. To achieve autonomous energy-saving operation of the ESP system under varying operating conditions, it is first necessary to collect real-time operating parameters that reflect the system's current operating status and conditions. This provides a data foundation for subsequent predictions of outlet dust concentration and energy consumption.

[0026] In this embodiment, the operating parameters of the target electrostatic precipitator system are collected in real time by a data acquisition device deployed at the site. These real-time operating parameters include at least: unit load, flue gas flow rate, flue gas temperature, inlet dust concentration, outlet dust concentration, actual and set values ​​of the secondary voltage and secondary current of each electric field, high-voltage equipment power, pulse operation parameters, flashover frequency, ash hopper temperature, and equipment status. Specifically, the inlet and outlet dust concentrations are measured in real time by online dust concentration monitoring instruments installed at the inlet and outlet flues of the electrostatic precipitator, respectively; the secondary voltage, secondary current, and high-voltage equipment power of each electric field are collected in real time by the measurement unit integrated into the high-voltage power supply device; and the unit load, flue gas flow rate, and flue gas temperature are read from the unit's DCS control system.

[0027] Because the aforementioned operating parameters have different dimensions and significantly different numerical distribution ranges, directly inputting the raw data into the prediction model for training and prediction may lead to unbalanced gradient updates during model training due to these dimensional differences, affecting the model's convergence speed and prediction accuracy. Therefore, this application performs Z-score standardization on the collected real-time operating parameters, that is, converting the raw values ​​of each parameter into standardized scores according to the following formula: Z = (X-μ) / σ, Where X is the original value of one of the real-time operating parameters, μ is the mean of that parameter on the modeling sample set, and σ is the standard deviation of that parameter on the modeling sample set. After standardization, all operating parameters are unified to a numerical distribution range with zero mean and unit variance, thereby eliminating the impact of dimensional differences on subsequent prediction model training and prediction.

[0028] In this embodiment, the standardized operating parameters are output as a standardized operating parameter set for subsequent input into the prediction model.

[0029] Step S102: Input the standardized operating parameter set into the preset prediction model to predict the outlet dust concentration and power consumption of the target electrostatic precipitator system.

[0030] The prediction model is built in advance, and its building process includes three stages: historical data collection and preprocessing, model structure design, and model training, which are explained in detail below.

[0031] In the historical data acquisition and preprocessing stage, multi-source operating parameters of the target electrostatic precipitator system during its historical operating cycle are collected, including unit load, boiler load, flue gas flow rate, flue gas temperature, inlet dust concentration, outlet dust concentration, as well as the setpoint and actual values ​​of secondary voltage and secondary current for each electric field, high-voltage equipment power, pulse operating parameters, and flashover frequency. The collected historical operating parameters are cleaned to remove invalid data from non-steady-state conditions such as unit start-up and shutdown, and fault maintenance. The remaining valid data is then Z-score standardized and divided into training, testing, and validation sets in a 3:1:1 ratio, ensuring consistent sample distribution across the three datasets to guarantee the effectiveness and generalization ability of the model training.

[0032] In the model structure design stage, such as Figure 2As shown, an initial prediction model is constructed, comprising a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch consists of multiple densely connected blocks, where each layer within a block receives feature maps from all previous layers, used to extract static features from operating parameters layer by layer. Taking electric field operating parameters such as secondary voltage, secondary current, and pulse parameters as examples, the DenseNet branch, through dense connections, can extract high-level abstract features while preserving the original information of each parameter, and alleviates the gradient vanishing problem in deep networks. The LSTM branch consists of multiple stacked LSTM units, used to capture the long-range dependencies of operating parameters over time. Taking parameters such as unit load, flue gas flow rate, and inlet dust concentration that change over time as examples, the LSTM branch, through its gating mechanism, can effectively memorize key operating condition changes over a long time range, thus adapting to the large hysteresis characteristics of the electrostatic precipitator system. The skip connection structure connects to the input layer of the DenseNet branch and to the output layer of the model. This allows raw features, unprocessed by the LSTM branch, to be directly passed to the output layer and fused with the outputs of both the DenseNet and LSTM branches. This strengthens the transmission of key parameters within the model and further improves prediction stability. It should be noted that the prediction model in this embodiment employs a multi-electric-field shared weight structure, meaning that prediction branches for each electric field share the same set of network parameters. This significantly reduces the number of model parameters, lowers the risk of overfitting, and improves the model's adaptability under varying operating conditions.

[0033] In the model training phase, historical operating parameters such as inlet dust concentration, actual values ​​of secondary voltage and secondary current of each electric field, pulse operating parameters, unit load, flue gas flow rate, and flue gas temperature are used as input features. The corresponding historical outlet dust concentration and historical power consumption of each electric field are used as labeled targets. A backpropagation algorithm and an adaptive moment estimation optimizer are employed to train the initial prediction model, using the mean square error between the predicted values ​​and the labeled targets as the loss function. During training, the outputs of the DenseNet branch, LSTM branch, and skip connection structure are fused at the output layer. The fusion method involves feature concatenation followed by mapping to the output space through a fully connected layer. The model parameters are iteratively optimized until the loss function converges, resulting in a prediction model that meets the accuracy requirements. The output of the prediction model includes the predicted outlet dust concentration and the predicted real-time power consumption of each electric field.

[0034] Based on the trained prediction model, a standardized set of operating parameters is input into the prediction model. The DenseNet branch extracts the static features of each electric field operating parameter, and the LSTM branch extracts the time series features of the operating condition changes. The skip connection structure simultaneously transmits the original features directly to the output layer. The three features are fused in the output layer and then mapped through a fully connected layer to predict the outlet dust concentration and real-time power consumption of each electric field of the target electrostatic precipitator under the current operating conditions, providing numerical basis for subsequent optimization of the model.

[0035] Step S103: Input the outlet dust concentration and power consumption into the preset optimization model, and perform optimization with the goal of minimizing power consumption and the constraint of meeting the outlet dust concentration standard to obtain the optimal combination of operating parameters.

[0036] The optimization model is also established in advance. Its establishment process mainly includes three steps: constructing the optimization objective function, setting constraints, and configuring the optimization algorithm.

[0037] In the objective function construction phase, the sum of the real-time power consumption of each electric field in the electrostatic precipitator system is used as the total power consumption, and the following objective function is constructed: min P = P1 + P2 + … + P n , Where n is the total number of electric fields, P1 to P n These are the real-time power consumption prediction values ​​for each electric field, provided by the real-time power consumption prediction values ​​for each electric field output by the prediction model in step S102. The optimization objective function characterizes the total power consumption during the operation of the electrostatic precipitator system, hereinafter referred to as power consumption, which is the core indicator that the optimization model aims to minimize.

[0038] In the constraint setting stage, the compliance of the outlet dust concentration is used as the constraint condition, that is: C export ≤C limit , Among them, C export The predicted value of the outlet dust concentration is provided by the predicted value of the outlet dust concentration output by the prediction model in step S102; C limit This refers to the preset emission concentration limit for compliance. Taking the ultra-low emission standard for coal-fired power plants as an example, C... limit It can be set to 5 mg / m³. This constraint ensures that the optimization process is always carried out under the premise of emission compliance.

[0039] In the optimization algorithm configuration stage, particle swarm optimization (PSO) is used as the optimization engine. The decision variables (i.e., optimization parameters) of PSO include: secondary voltage setpoints, secondary current setpoints, high-energy pulse periods, low-energy pulse periods, and pulse operation ratios for each electric field. Each particle represents a set of candidate power supply parameter combinations in the decision variable space, and its position vector dimension is determined by the number of the aforementioned optimization parameters. The fitness function of PSO is constructed based on the aforementioned objective function and constraints. Specifically, when a candidate solution satisfies the constraints, the fitness value is the predicted energy consumption value; when a candidate solution does not satisfy the constraints, a penalty function is used to apply a penalty term to the fitness value, causing substandard solutions to be naturally eliminated during the optimization process.

[0040] Based on the obtained optimization model, its specific optimization process combines Figure 3 The process described below is as follows: First, current operating data is collected, including unit load, flue gas temperature, inlet dust concentration, and current voltage and current of each electric field. This data is collected in step S101, standardized, and then output by the prediction model in step S102, including predicted outlet dust concentration and predicted energy consumption. Then, the objective function min P = P1 + P2 + … + P is constructed. n And set constraint C export ≤5mg / m³.

[0041] Initialize the particle swarm by randomly generating initial positions Xi0 and initial velocities Vi0 for a population of size N within the decision variable space. Each particle's position vector represents a set of candidate optimization parameter combinations, namely, the secondary voltage setpoint, secondary current setpoint, high-energy pulse period, low-energy pulse period, and pulse operation ratio for each electric field. Simultaneously, set the initial position of each particle to its individual historical best position pBest. i Calculate the fitness value of each particle and set the position of the particle with the smallest fitness value as the global optimal position gBest.

[0042] Enter the iterative optimization loop. For each iteration t, perform the following operations in sequence: First, calculate the fitness value F(Xi(t)) of each particle in the current iteration. The fitness value is calculated by summing the predicted power consumption of each electric field in the real-time power consumption output by the prediction model in step S102, and at the same time, determine whether the current candidate solution satisfies the constraint condition C. export ≤5mg / m³, if not satisfied, a penalty function is applied. Then, for each particle, its current fitness value is compared with its individual historical best position pBest. i The fitness values ​​are compared, and if the current one is better, then pBest is updated. iFor the entire swarm, compare the current fitness value of all particles with the fitness value of the global best position gBest, and set the position of the particle with the smallest fitness value as the new gBest. Finally, update the particle swarm velocity according to the formula Vi(t+1)=ωVi(t)+c1r1(pBest). i The formulas -Xi(t))+c2r2(gBest-Xi(t)) and the position update formula Xi(t+1)=Xi(t)+Vi(t+1) update the velocity and position of each particle, where ω is the inertia weight, c1 and c2 are acceleration factors, and r1 and r2 are random numbers in the interval [0,1]. If the current iteration number has not reached the preset maximum iteration number and the fitness value of the global optimal solution is still changing, then the next iteration is continued; otherwise, the iteration is terminated, and the position vector corresponding to the current global optimal particle is output as the optimal combination of running parameters.

[0043] After the iteration terminates, the position vector corresponding to the globally optimal particle is output as the optimal combination of operating parameters. This optimal combination of operating parameters includes the optimal values ​​of the secondary voltage setpoint, secondary current setpoint, high-energy pulse period, low-energy pulse period, and pulse operation ratio for each electric field. This optimal combination of operating parameters is then sent to the DCS control system for execution, and the DCS control system adjusts the high-voltage power supply device of the corresponding electric field according to the received setpoint.

[0044] In this embodiment, the optimization cycle is set to 2.5 minutes per cycle. That is, whenever a new set of standardized operating parameters is input into the prediction model and the prediction is completed, the optimization model initiates the above-mentioned optimization calculation and outputs the optimal combination of operating parameters to the DCS control system for execution within 2.5 minutes. After each round of optimization is completed, the process returns to step S101 to execute the next round of optimization, thereby achieving rapid tracking and dynamic adjustment of fluctuations in operating conditions such as unit load and coal quality changes. Thus, while ensuring that the outlet dust concentration meets emission standards, the power consumption of the electrostatic precipitator system is minimized.

[0045] Step S104: The optimal combination of operating parameters is sent to the target electrostatic precipitator system, and the DCS control system of the target electrostatic precipitator system executes the corresponding operation.

[0046] After particle swarm optimization and outputting the optimal combination of operating parameters, this optimal combination is sent to the DCS control system of the target electrostatic precipitator. The DCS control system then adjusts the high-voltage power supply device of the corresponding electric field in real time based on the received setpoints. Specifically, the output optimal combination of operating parameters includes the secondary voltage setpoint, secondary current setpoint, high-energy pulse period, low-energy pulse period, and pulse operation ratio for each electric field, which can be sent to the DCS control system via industrial Ethernet or fieldbus. Upon receiving this parameter combination, the DCS control system sends the corresponding secondary voltage and secondary current setpoints to the controllers of the high-voltage power supply devices for each electric field according to their respective field numbers. Simultaneously, it sends the pulse parameters, such as the high-energy pulse period, low-energy pulse period, and pulse operation ratio, to the high-voltage pulse control unit of each electric field. The high-voltage power supply device controller adjusts the conduction angle or duty cycle of its internal power switching devices to ensure that the actual output secondary voltage and secondary current track the setpoints. The high-voltage pulse control unit adjusts the pulse power supply period and duty cycle based on the received pulse parameters to achieve energy-saving power supply in pulse operation mode.

[0047] During the execution of the optimal combination of operating parameters by the DCS control system, the measured value of the outlet dust concentration is acquired in real time. Based on the measured value of the outlet dust concentration, it is determined whether to activate the safety protection mechanism. The process of activating the safety protection mechanism is as follows: First, the measured value of the outlet dust concentration is obtained in real time by an online dust concentration monitor installed at the outlet flue of the electrostatic precipitator, and the measured value is continuously judged.

[0048] When the measured dust concentration at the outlet exceeds the first preset threshold, Level 1 protection is activated. Under Level 1 protection, at least one electric field is switched to continuous operation mode, meaning that the high-voltage power supply device of the electric field continuously supplies power at full load and no longer executes the pulse operation parameters or energy-saving power supply parameters output by the optimization model, so as to quickly enhance the dust removal capacity of the electric field.

[0049] When the measured dust concentration at the outlet continues to rise and exceeds the second preset threshold, the secondary protection is activated. Under secondary protection, the number of continuously operating electric fields is increased to more than the number corresponding to primary protection, that is, more electric fields are switched to continuous operation mode than under primary protection, in order to further enhance the overall dust removal capacity.

[0050] When the measured dust concentration at the outlet rises further and exceeds the third preset threshold, level three protection is activated. Under level three protection, all electric fields are switched to continuous operation mode, and all electric fields are continuously powered at full load to maximize the overall dust removal efficiency and ensure that the dust concentration at the outlet quickly drops back to a safe range.

[0051] Once the measured dust concentration at the outlet falls back to a safe range, the current level of protection is lifted, and each electric field that has been switched to continuous operation mode is gradually restored to the optimal combination of operating parameters. The restoration process is carried out in reverse order of the protection levels to ensure a smooth transition during the restoration process and continuous compliance with emission standards.

[0052] like Figure 4 As shown, to facilitate the explanation of the process of activating the safety protection mechanism, this embodiment takes an electrostatic precipitator system with three electric fields as an example, and sets the first preset threshold < the second preset threshold < the third preset threshold, and the first preset threshold = 8 mg / m³, the second preset threshold = 8.5 mg / m³, and the third preset threshold = 9 mg / m³, with a safety range of [0, 7 mg / m³]. When: When the measured dust concentration at the outlet exceeds 8 mg / m³, the first-level protection is activated, switching the first electric field to continuous operation mode; When the measured value of the dust concentration at the outlet exceeds 8.5 mg / m³, the secondary protection is activated, and the first and second electric fields are switched to continuous operation mode simultaneously. When the measured dust concentration at the outlet exceeds 9 mg / m³, the three-level protection is activated, and the three electric fields are switched to continuous operation mode. Once the measured dust concentration at the outlet drops back to [0, 7 mg / m³], the system will automatically resume executing the optimal combination of operating parameters.

[0053] It should be noted that for electrostatic precipitators with more or fewer electric fields, those skilled in the art can configure the protection levels according to the same incremental principle to switch one, more or all electric fields to continuous operation mode.

[0054] During the execution of the optimal operating parameter combination by the DCS control system, it continuously acquires execution feedback such as the actual values ​​of secondary voltage, secondary current, pulse operation parameters, and equipment operating status, and compares these actual values ​​with the corresponding optimal setpoints in real time. When the deviation between the actual value and the setpoint of a certain parameter exceeds the preset tolerance range, the DCS control system executes the following tolerance handling logic: First, it starts a continuous deviation timer. If the deviation recovers to the tolerance range within a preset time, it continues to execute the current parameter combination. If the deviation continues to exceed the tolerance range for more than a preset time, it is determined to be an execution anomaly. The DCS control system generates an execution deviation alarm signal and attempts to reissue the parameter combination. If three consecutive reissues still fail to control the deviation within the tolerance range, the DCS control system automatically abandons the current optimal parameter combination, maintains the valid parameters of the previous cycle, and sends the execution anomaly information to the upper-level monitoring system.

[0055] During the execution of the optimal operating parameter combination by the DCS control system, the system cyclically receives the latest optimal parameter combination from the optimization model every 2.5 minutes, and updates the setpoints of each high-voltage power supply device in real time based on the latest received parameter combination, thereby achieving online continuous optimization. If no new optimal parameter combination is received within any optimization cycle, the DCS control system maintains the currently executed parameter combination to ensure that the electrostatic precipitator system can continue to operate stably under abnormal conditions.

[0056] It should be noted that the sequence numbers of the steps in the above embodiments do not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application. In practical applications, all the above possible implementation methods can be arbitrarily combined in a combined manner to form possible embodiments of this application, which will not be described in detail here.

[0057] Based on the above embodiments of the electrostatic precipitator energy-saving optimization method based on DenseNet-LSTM fusion network, this application also provides an electrostatic precipitator energy-saving optimization system based on DenseNet-LSTM fusion network, based on the same inventive concept.

[0058] Figure 5 This is a structural diagram of the electrostatic precipitator energy-saving optimization system based on the DenseNet-LSTM fusion network provided in the embodiments of this application. The system consists of a data acquisition layer, a data preprocessing layer, a core model layer, and an execution and application layer from top to bottom.

[0059] The data acquisition layer and data preprocessing layer are combined to form a data acquisition and preprocessing module. The data acquisition layer, through online dust concentration monitors, high-voltage power supply measurement units, flue gas online monitoring instruments deployed at the electrostatic precipitator system site, and interfaces communicating with the unit's DCS, collects real-time operating parameters such as unit load, flue gas flow rate, flue gas temperature, inlet dust concentration, outlet dust concentration, actual and set values ​​of secondary voltages and currents of each electric field, high-voltage equipment power, pulse operating parameters, flashover frequency, ash hopper temperature, and equipment status according to a unified sampling period. The collected data is then transmitted to the data preprocessing layer. The data preprocessing layer timestamps the received multi-source operating parameters, removes invalid data from non-steady-state conditions such as unit start-up, shutdown, and fault maintenance, and then uses the Z-score standardization method to standardize the valid data, unifying the operating parameters to a zero-mean, unit-variance value distribution range to eliminate the impact of dimensional differences on subsequent model training and prediction accuracy. The standardized operating parameters constitute a standardized operating parameter set, which is output to the core model layer.

[0060] The core model layer is equipped with a prediction model and an optimization model. These models are used to predict the outlet dust concentration and power consumption of the target electrostatic precipitator system based on the standardized operating parameter set output by the data preprocessing layer. The optimization objective is to minimize power consumption, and the constraint is to meet the standard for outlet dust concentration. The optimal combination of operating parameters is then obtained.

[0061] The core model layer specifically includes a prediction module, an optimization module, and a distribution module.

[0062] The prediction module deploys a pre-trained DenseNet-LSTM fusion prediction model. This model includes a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch consists of multiple densely connected blocks, where each layer receives feature maps from all previous layers within that block, used to extract static features from the operating parameters layer by layer. The LSTM branch is composed of multiple stacked LSTM units, used to capture long-range dependencies of operating parameters over time. The skip connection structure connects to the input layer of the DenseNet branch and to the model's output layer, directly transmitting the raw features (not processed by the LSTM branch) to the output layer for fusion with the outputs of the DenseNet and LSTM branches. During operation, the DenseNet branch extracts static features of each electric field operating parameter, the LSTM branch extracts time-series features of operating condition changes, and the skip connection structure simultaneously transmits the raw features directly to the output layer. These three features are fused at the output layer and then mapped through a fully connected layer to predict the outlet dust concentration and real-time power consumption of each electric field under the current operating conditions of the target electrostatic precipitator system.

[0063] The optimization module deploys a pre-configured particle swarm optimization model. It receives the predicted exit dust concentration and real-time power consumption of each electric field from the prediction module. Using the sum of these predicted values ​​as the energy consumption, it constructs the objective function min P = P1 + P2 + … + P n And with the constraint that the predicted value of the outlet dust concentration meets the standard C export ≤Cl imit The optimization module uses the particle swarm optimization algorithm for iterative optimization. After the iteration terminates, the position vector corresponding to the globally optimal particle is taken as the optimal combination of running parameters and output by the distribution module to the execution and application layers.

[0064] The execution and application layer is used to send the optimal combination of operating parameters output by the core model layer to the DCS control system of the target electrostatic precipitator for execution, and to perform real-time monitoring and protection through three levels of safety protection during the execution process.

[0065] The execution and application layer includes the DCS control execution module, also known as the DCS control system. The DCS control system receives the optimal combination of operating parameters output by the core model layer optimization module. It then decomposes this parameter combination according to the numbering of each electric field, sending the secondary voltage and secondary current setpoints to the controllers of the high-voltage power supply devices in each electric field. It also sends pulse parameters such as the high-energy pulse period, low-energy pulse period, and pulse operation ratio to the high-voltage pulse control units of each electric field. Based on the received setpoints, the high-voltage power supply device controller adjusts the conduction angle or duty cycle of its internal power switching devices to ensure that the actual output secondary voltage and secondary current track the setpoints. The high-voltage pulse control unit adjusts the pulse power supply period and duty cycle based on the received pulse parameters to achieve energy-saving power supply in pulse operation mode.

[0066] The execution and application layer also includes a safety protection module and an operation evaluation and visualization module. The safety protection module is equipped with a safety protection mechanism: it acquires the measured value of the outlet dust concentration in real time and compares it with a three-level incremental threshold to generate a corresponding level of protection signal. This signal is sent to the DCS control system, which then forcibly switches the corresponding electric field to continuous operation mode based on the protection signal level. When the measured value of the outlet dust concentration falls back to the safe range, the safety protection module generates a recovery signal, and the DCS control system automatically resumes the optimal combination of operating parameters based on the recovery signal. The operation evaluation and visualization module is used to statistically analyze and display the operating indicators of the electrostatic precipitator system in real time, including automatic operation rate, optimization execution success rate, outlet dust compliance rate, comprehensive power consumption, energy saving rate, and number of safety protection actions. The operation evaluation and visualization module also generates statistical reports at different time scales such as minutes, hours, and days / months / years, and visualizes them through electrostatic precipitator-themed dashboards in the form of trend curves and indicator dashboards. The operation evaluation and visualization module also provides a data upload interface for uploading operation data to the ecological and environmental protection intelligent management and control platform, so as to achieve unified deployment and horizontal benchmarking with modules such as desulfurization, denitrification, and carbon management.

[0067] In addition, the execution and application layer includes a sequential control and communication protection module, used to enable one-click activation and deactivation of AI optimization functions, independent switching and manual bias setting of single electric fields, automatic flashover suppression, fault state maintenance, and abnormal reset. The sequential control and communication protection module also includes a heartbeat detection unit, which sends heartbeat messages to the DCS control system at a preset frequency. When the DCS control system fails to receive a valid heartbeat message for a preset duration threshold, the sequential control and communication protection module generates a switching signal, controlling the DCS control system to seamlessly switch to manual control mode and send an alarm signal. After communication is restored, in response to an externally input one-click activation command, the sequential control and communication protection module controls the DCS control system to re-enter the AI ​​optimization operation mode. The sequential control and communication protection module also includes a flashover suppression unit, used to automatically reduce the secondary voltage setting value of the corresponding electric field when the number of electric field flashovers exceeds a preset flashover threshold, and gradually restore it to the corresponding setting value in the current optimal operating parameter combination after the flashover subsides.

[0068] The electrostatic precipitator energy-saving optimization system based on DenseNet-LSTM fusion network provided in this embodiment is used to execute the electrostatic precipitator energy-saving optimization method based on DenseNet-LSTM fusion network provided in the above embodiment. Its implementation method and principle are the same. For details of the implementation method of each module, please refer to the relevant description of the above method embodiment, which will not be repeated here.

[0069] Based on the same inventive concept, embodiments of this application also provide an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the electrostatic precipitator energy-saving optimization method based on the DenseNet-LSTM fusion network of any of the above embodiments.

[0070] In an exemplary embodiment, an electronic device is provided, such as Figure 6 As shown, Figure 6 The illustrated electronic device includes a processor and a memory. The processor and memory are connected, for example, via a bus. Optionally, the electronic device may also include a transceiver, which integrates software programs or hardware such as applications, application programming interfaces (APIs), middleware, and kernels. It should be noted that in practical applications, the transceiver is not limited to one unit, and the structure of this electronic device does not constitute a limitation on the embodiments of this application.

[0071] The processor can be a CPU (Central Processing Unit), a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute the various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processor can also be a combination that implements computational functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.

[0072] A bus can include a pathway for transmitting information between the aforementioned components or connecting these devices to hardware such as input / output interfaces, display devices, and communication interfaces. The bus can be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of representation, Figure 6 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.

[0073] The memory may be ROM (Read Only Memory) or other types of static storage devices capable of storing static information and instructions, RAM (Random Access Memory) or other types of dynamic storage devices capable of storing information and instructions, or EEPROM (Electrically Erasable Programmable Read Only Memory), CD-ROM (Compact Disc Read Only Memory) or other optical disc storage, optical disc storage (including compressed optical discs, laser discs, optical discs, digital universal optical discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium capable of carrying or storing desired program code in the form of instructions or data structures and accessible by a computer, but not limited to these.

[0074] The memory stores computer program code that executes the scheme of this application, and its execution is controlled by a processor. The processor executes the computer program code stored in the memory to implement the content shown in the foregoing method embodiments.

[0075] Among them, electronic devices include, but are not limited to: mobile terminals such as mobile phones, laptops, digital radio receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), and in-vehicle terminals (such as in-vehicle navigation terminals), as well as fixed terminals such as digital TVs and desktop computers. Figure 6 The electronic device shown is merely an example and should not impose any limitation on the functionality and scope of use of the embodiments of this application.

[0076] Based on the same inventive concept, this application also provides a storage medium storing a computer program, wherein the computer program is configured to execute the electrostatic precipitator energy-saving optimization method based on the DenseNet-LSTM fusion network of any of the above embodiments at runtime.

[0077] Those skilled in the art will clearly understand that the specific working process of the systems, devices, and modules described above can be referred to the corresponding process in the foregoing method embodiments. For the sake of brevity, it will not be repeated here.

[0078] Those skilled in the art will understand that the technical solution of this application, or all or part of it, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several program instructions to cause an electronic device (e.g., a personal computer, server, or network device) to execute all or part of the steps of the methods described in the embodiments of this application when running the program instructions. The aforementioned storage medium includes various media capable of storing program code, such as a USB flash drive, portable hard drive, read-only memory (ROM), random access memory (RAM), magnetic disk, or optical disk.

[0079] Alternatively, all or part of the steps of the foregoing method embodiments can be implemented by hardware (such as electronic devices like personal computers, servers, or network devices) associated with program instructions. The program instructions can be stored in a computer-readable storage medium. When the program instructions are executed by the processor of the electronic device, the electronic device executes all or part of the steps of the methods described in the embodiments of this application.

[0080] The above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit it. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that within the spirit and principles of this application, modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein; and these modifications or substitutions do not cause the corresponding technical solutions to leave the protection scope of this application.

Claims

1. A method for optimizing energy saving in electrostatic precipitators based on a DenseNet-LSTM fusion network, characterized in that, include: Obtain the real-time operating parameters of the target electrostatic precipitator system, and standardize the real-time operating parameters to obtain a standardized operating parameter set; The standardized set of operating parameters is input into a preset prediction model to predict the outlet dust concentration and power consumption of the target electrostatic precipitator system. The prediction model includes a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch is used to extract the static features of the operating parameters, the LSTM branch is used to extract the temporal variation features of the operating parameters, and the skip connection structure is used to directly concatenate the input features with the output layer, bypassing the LSTM branch. The outlet dust concentration and power consumption are input into a preset optimization model. The optimization objective is to minimize power consumption, and the constraint is to meet the outlet dust concentration standard. The optimal combination of operating parameters is obtained. The optimal combination of operating parameters is sent to the target electrostatic precipitator, and the DCS control system of the target electrostatic precipitator executes the corresponding operation.

2. The method according to claim 1, characterized in that, The prediction model is established in the following way: Historical operating parameters of the electrostatic precipitator system are collected, and the historical operating parameters are standardized to construct an original dataset; An initial prediction model is constructed, which includes a DenseNet branch, an LSTM branch, and a skip connection structure. The DenseNet branch consists of multiple dense connection blocks. Each layer in each dense connection block receives feature maps output by all previous layers in that block, which are used to extract static features from the running parameters layer by layer. The LSTM branch is composed of multiple stacked LSTM units and is used to capture the long-range dependencies of running parameters over time. The input end of the skip connection structure is connected to the input layer of the DenseNet branch, and the output end is connected to the model output layer, which is used to directly pass the raw features that have not been processed by the LSTM branch to the output layer. Using the inlet dust concentration, voltage, current, pulse parameters, unit load, flue gas flow rate, and flue gas temperature from historical operating parameters as input features, and the corresponding historical outlet dust concentration and historical power consumption of each electric field as labeled targets, the initial prediction model is trained to obtain the prediction model.

3. The method according to claim 2, characterized in that, The training process of the prediction model includes: The original dataset is divided into a training set, a test set, and a validation set in a 3:1:1 ratio, with the sample distribution of the three datasets remaining consistent. The initial prediction model is trained using the backpropagation algorithm and the adaptive moment estimation optimizer, with the mean square error between the predicted value and the true value used as the loss function. During training, the outputs of the DenseNet branch, LSTM branch, and skip connection structure are fused in the output layer. The fusion method is that the features are concatenated and then mapped to the output space through a fully connected layer. The prediction model adopts a multi-field shared weight structure, and the prediction branches of each electric field share the same set of network parameters. The output of the prediction model includes the predicted value of the outlet dust concentration and the predicted value of the real-time power consumption of each electric field.

4. The method according to claim 1, characterized in that, The optimization model employs a particle swarm optimization algorithm for optimization, and the objective function is: min P = P1+ P2+ ... + P n ; Where n is the total number of electric fields, P1 to P n These are the real-time power consumption prediction values ​​for each electric field; The constraint condition for the optimization objective function is: C export ≤C limit C export C is the predicted value of dust concentration at the outlet. limit The preset emission concentration limit is the standard.

5. The method according to claim 4, characterized in that, The particle swarm optimization algorithm is configured with an optimization cycle, and the termination condition for each optimization iteration is that the preset maximum number of iterations is reached or the fitness value of the global optimal solution no longer changes. After each optimization is completed, the optimal combination of operating parameters is output and sent to the DCS control system.

6. The method according to claim 1, characterized in that, During the execution of the optimal combination of operating parameters by the DCS control system, the measured value of the outlet dust concentration is acquired in real time. When the measured value of the outlet dust concentration exceeds the first preset threshold, the first-level protection is activated, and at least one electric field is switched to continuous operation mode; When the measured value of the outlet dust concentration exceeds the second preset threshold, the secondary protection is activated, and the number of continuously operating electric fields is increased to more than the number corresponding to the primary protection. When the measured value of the outlet dust concentration exceeds the third preset threshold, the three-level protection is activated, and all electric fields are switched to continuous operation mode. Once the measured value of the outlet dust concentration falls back to the safe range, the optimal combination of operating parameters will be resumed. Wherein, the first preset threshold < the second preset threshold < the third preset threshold.

7. The method according to claim 1, characterized in that, After the optimal combination of operating parameters is sent to the DCS control system, the execution feedback of the DCS control system is obtained in real time. The execution feedback includes the actual values ​​of the secondary voltage of each electric field, the actual values ​​of the secondary current, the actual values ​​of the pulse operating parameters, and the operating status of the equipment. The execution feedback is compared with the optimal combination of operating parameters to determine whether the deviation between the actual value and the set value of each parameter is within the preset tolerance range. When the deviation of any parameter exceeds the preset tolerance range, an execution deviation alarm signal is generated, and the deviation parameter is fed back to the optimization model, which then performs the optimization calculation again in the next optimization cycle.

8. The method according to claim 1, characterized in that, The real-time operating parameters include unit load, boiler load, flue gas flow rate, flue gas temperature, inlet dust concentration, outlet dust concentration, as well as the secondary voltage setpoint, secondary current setpoint, actual secondary voltage, actual secondary current, high-voltage equipment power, pulse operating parameters, flashover frequency, ash hopper temperature, and equipment status of each electric field. The standardization process employs the Z-score standardization method, and standardization is performed according to the following formula: Z = (X -μ) / σ; Where X is the original value of one of the real-time operating parameters, μ is the mean of the parameter on the sample set, and σ is the standard deviation of the parameter on the sample set.

9. An energy-saving optimization system for electrostatic precipitators based on a DenseNet-LSTM fusion network, characterized in that, include: The data acquisition and preprocessing module is used to acquire the real-time operating parameters of the target electrostatic precipitator system, and to standardize the real-time operating parameters to obtain a standardized set of operating parameters. The prediction module is equipped with a preset prediction model, which is used to predict the outlet dust concentration and power consumption of the target electrostatic precipitator based on the standardized operating parameter set; the prediction model includes DenseNet branches, LSTM branches and jump connection structures. The optimization module is equipped with a preset optimization model, which is used to find the optimal combination of operating parameters with the goal of minimizing power consumption and the constraint of meeting the standard of dust concentration at the outlet. The distribution module is used to distribute the optimal combination of operating parameters to the target electrostatic precipitator, and the DCS control system of the target electrostatic precipitator executes the corresponding operation.

10. The system according to claim 9, characterized in that, It also includes a security protection module, which is configured as follows: When the measured value of the outlet dust concentration exceeds the first preset threshold, a first-level protection signal is generated to switch at least one electric field to continuous operation mode. When the measured value of the outlet dust concentration exceeds the second preset threshold, a secondary protection signal is generated to increase the number of continuously operating electric fields to more than the number corresponding to the primary protection. When the measured value of the outlet dust concentration exceeds the third preset threshold, a level 3 protection signal is generated to switch all electric fields to continuous operation mode. Once the measured value of the outlet dust concentration falls back to the safe range, a recovery signal is generated to instruct the DCS control system to automatically resume the execution of the optimal combination of operating parameters. Wherein, the first preset threshold < the second preset threshold < the third preset threshold.