Process route intelligent recommendation method for unstructured processing requirements

By aligning multi-source data, analyzing disturbance sensitivity, and assessing equipment dynamic capabilities, a stability assessment and recommended process route are generated. This solves the problem of combining unstructured processing requirements with real-time equipment status in a discrete workshop with multiple product types and small batches, and achieves reliable execution of the process route and disturbance resistance.

CN123140385APending Publication Date: 2026-11-20XIAN HONGYING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611614134.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies cannot effectively handle the combination of unstructured processing needs and real-time equipment status in discrete workshops with multiple product types and small batches. This leads to frequent failures of recommended routes due to disturbances such as equipment failure, tool wear, and rush orders, making reliable on-site execution impossible.

Method used

Multi-source data alignment is achieved through a clock drift correction mechanism. Semantic parsing is performed using an attention mechanism that integrates perturbation sensitivity and urgent order urgency. Candidate processes are screened by combining process knowledge graph and equipment dynamic capability credit model. Stability is evaluated using multi-hop perturbation propagation and soft board synthesis. Finally, a process route execution package with confidence is generated through a non-dominated sorting genetic algorithm.

Benefits of technology

It improves the feasibility and resilience of recommended routes under complex field conditions, reduces frequent failures and manual adjustments caused by equipment disturbances, and enhances the controllability of route switching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140385A_ABST
    Figure CN123140385A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of intelligent manufacturing process planning and intelligent processing of industrial data, and discloses a process route intelligent recommendation method for unstructured processing requirements. The method comprises the following steps: obtaining unstructured processing requirement texts and real-time equipment state data, and aligning the data through clock drift correction; analyzing the aligned data by using an attention mechanism that fuses disturbance sensitivity and urgent single urgency to obtain a disturbance sensitive demand vector; screening candidate processes by using a process knowledge graph and an equipment dynamic capability credit model; combining multi-hop disturbance propagation and soft short board synthesis to evaluate route stability; according to the stability, a non-dominated sorting genetic algorithm is used to jointly recommend process routes and to de-correlate and screen main and standby paths, and an execution package with a confidence degree and a standby path is output; due to the disturbance perception, dynamic capability screening and stability evaluation, stable process route generation is realized, and the recommendation accuracy and robustness are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of intelligent manufacturing process planning and intelligent industrial data processing, and in particular to a method for intelligent recommendation of process routes for unstructured processing needs. Background Technology

[0002] Currently, in discrete manufacturing workshops with multiple product types and small batches, order batches are small and product changes are frequent. Unstructured processing demands often enter the work order system in the form of work order texts, process notes, temporary change orders, or urgent orders jumping the queue. Real-time equipment status data, such as equipment availability, fault codes, spindle load, vibration, temperature, tool life remaining, and queue length, are reported periodically by the data acquisition gateway. Existing process route recommendations typically rely on offline matching of historical process routes, standard process templates, static time quotas, and similar order records. Process engineers manually break down the demands and then combine equipment ledgers and historical execution experience to select combinations of processes, equipment, and tools. This approach can maintain basic production scheduling when demands and equipment status are relatively stable, but the demand texts and equipment status data come from the work order system and the data acquisition gateway, respectively. The time base, event semantics, update rhythm, and reliability are inconsistent, making it difficult to uniformly reflect disturbances such as equipment failures, tool wear, and urgent orders jumping the queue in the recommendation results.

[0003] For example, when critical equipment suddenly fails, spindle load increases abnormally, or tool life is insufficient to complete the current batch, the fault codes, vibration amplitudes, temperatures, and tool life reported by the acquisition gateway only describe the instantaneous state of the equipment. However, the delivery date, accuracy requirements, material properties, and urgency of urgent orders in the work order system still exist as originally planned. If urgent orders are queued, it will cause equipment queue growth, tool change waiting, and tooling switching conflicts. Disturbances will propagate downstream along the process flow, equipment sharing, tool sharing, and logistics dependence. Since existing recommendation models are mostly based on offline matching of historical process routes, they lack joint consideration of real-time equipment availability, tool life constraints, urgent order constraints, and disturbance propagation paths. This can easily lead to the continued inclusion of unusable or soon-to-be-failed equipment in candidate routes, and may also recommend execution schemes with highly homogeneous alternative routes and uncalibrated confidence levels. This can cause recommended routes to frequently fail during on-site execution, forcing process personnel to temporarily reassign equipment, adjust processes, or reschedule production, resulting in increased waiting time, delivery delays, quality fluctuations, and increased route switching costs.

[0004] Therefore, there is an urgent need for intelligent process route recommendation methods for unstructured machining needs. In discrete workshops with multiple product types and small batches, equipment failures, tool wear, and urgent order queueing occur in real time, and the process requirement text and equipment status data come from the work order system and the data acquisition gateway, respectively, the method should still be able to jointly model unstructured machining needs with real-time equipment status, tool life, and urgent order constraints, and embed disturbance constraints into the recommendation process to dynamically generate process route execution packages with confidence and alternative paths. This will improve the executability, disturbance resistance, and controllability of route switching under complex field conditions, and reduce frequent failures and manual adjustments caused by equipment disturbance propagation. Summary of the Invention

[0005] To address the aforementioned technical shortcomings, the purpose of this invention is to propose an intelligent process route recommendation method for unstructured machining needs. This method aims to solve the technical problem that offline matching in existing technologies ignores real-time equipment availability and disturbance propagation, especially under conditions of equipment failure, tool wear, and frequent rush orders in discrete workshops with multiple product types and small batches, making it impossible to reliably execute the recommended route on-site.

[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution: The present invention provides an intelligent process route recommendation method for unstructured processing needs, wherein the method includes: Step S10: Obtain unstructured processing requirement text, real-time equipment status data, and event timestamps of the two types of data. Based on the event timestamps, use a clock drift correction mechanism to perform a multi-source data alignment task and output a unified timeline process requirement and equipment status dataset. Step S20: Based on the unified timeline process requirements and equipment status dataset, an attention mechanism that integrates disturbance sensitivity and urgent order urgency is used to perform a disturbance-sensitive semantic parsing task, and output a disturbance-sensitive demand vector; Step S30: Based on the disturbance-sensitive demand vector, a candidate process screening preprocessing task is performed using a process knowledge graph and equipment dynamic capability credit model to output a candidate process set; Step S40: Based on the candidate process set, a stability assessment mechanism combining multi-hop disturbance propagation and soft board synthesis is used to perform the process route stability assessment task and output the process route stability index. Step S50: Based on the stability index of the process route, perform joint recommendation of the process route and primary and backup path removal screening based on non-dominated sorting genetic algorithm, and output the process route execution package with confidence and alternative paths.

[0007] Preferably, step S10 specifically includes: Step S101: Obtain unstructured processing requirement text from the work order system, obtain real-time equipment status data from the acquisition gateway, and read the timestamp of the same physical event in the two types of data to determine the difference between the timestamp of the acquisition gateway and the timestamp of the work order system. Step S102: Subtract the previous clock deviation from the difference to obtain the residual alignment error. Add the product of the residual alignment error and the preset clock drift learning rate to the previous clock deviation to obtain the current clock deviation. The clock deviation during the first correction is set to 0, and the clock drift learning rate is greater than 0 and less than 1. Step S103: Using the current clock deviation correction acquisition gateway timestamp, map the unstructured processing requirement text and the real-time equipment status data to the work order system timeline, and output a unified timeline process requirement and equipment status dataset.

[0008] Preferably, step S20 specifically includes: Step S201: Extract unstructured processing requirement text and real-time equipment status data of orders from the unified time axis process requirement and equipment status dataset, encode the extracted text to obtain a word latent state sequence, and extract batch, delivery date and material hardness to form a structured constraint vector; Step S202: Combine the extracted text and device status to determine the availability of alternative equipment, accuracy redundancy, dependence on special tools, dependence on special fixtures, and material processing difficulty. These factors are then weighted and summed according to preset weights that sum to 1, and then mapped using a Sigmoid algorithm to obtain the perturbation sensitivity. The current time and a preset positive relaxation time scale are read, and the ratio of the remaining delivery time to this scale is limited to 0 to 1. The urgency of the urgent order is obtained by subtracting this ratio from 1. The perturbation sensitivity and the urgency of the urgent order are mapped as embeddings, and used together with the lexical hidden state sequence for attention scoring to obtain attention weights. Step S203: The attention weights are used to sum the word latent state sequence, and the summation result is concatenated with the structured constraint vector to output the perturbation sensitive demand vector.

[0009] Preferably, in step S202, the attention scoring adopts:

[0010] in, For order number, This refers to the lexical index of the order text; The th term in the hidden state sequence of the term The hidden state of each word element; and The embeddings are obtained by linearly mapping the disturbance sensitivity and the urgency of the urgent order, respectively. , and To map corresponding inputs to a learnable projection matrix in the same scoring space, The learnable attention scoring vector for this space, with superscript... Indicates transpose; It is the hyperbolic tangent function. This indicates that the normalized index calculation is performed on the scores of all words in the order. For the obtained first Attention weights for each word; each embedding, hidden state, projection matrix, scoring vector, and attention weight are dimensionless.

[0011] Preferably, step S30 specifically includes: Step S301: Based on the disturbance-sensitive demand vector, determine the demand characteristics, construct a process knowledge graph containing demand characteristics, processes, equipment, tools, fixtures and quality rule nodes, establish processable relationships, substitutable relationships, process sequence relationships and resource sharing relationships, and obtain the correspondence between the processes to be screened and the equipment. Step S302: For the correspondence, obtain the equipment availability status, health, load, and remaining tool life from the real-time equipment status data, and read the process quality accuracy, changeover time, and tool wear data. Combine the requirement characteristics to determine the tool life satisfaction, quality accuracy matching, equipment load penalty, clamping changeover adaptability, and tool wear cumulative correction. Convert the equipment availability status into an equipment availability flag (1 for available, 0 for faulty). Multiply the flag and the preset sensitivity index power of the health status by the above five quantities to obtain the equipment dynamic capability credit value. Step S303: Use preset capability threshold and quality threshold to filter the processes to be screened, retain processes whose equipment dynamic capability credit value is not lower than the capability threshold, whose quality accuracy matching degree is not lower than the quality threshold, whose tool life satisfaction degree is greater than 0 and who satisfy the process sequence relationship, and output the candidate process set.

[0012] Preferably, step S40 specifically includes: Step S401: Extract the sequence relationship of the processes from the candidate process set and combine the candidate process routes; obtain the health, queue delay and load of the associated equipment, the remaining tool life and new tool life, the priority and urgency of the urgent orders, as well as the sharing relationship, logistics distance and propagation time delay of equipment, tools, orders and buffer areas, and construct a perturbation propagation graph with process flow, resource sharing, order grabbing and logistics dependence as edges; Step S402: In the disturbance propagation graph, subtract the equipment health level from 1, subtract the ratio of remaining tool life to new tool life from 1, and multiply the urgency by the priority of urgent orders to obtain the corresponding disturbance source strengths; multiply the preset static coupling weight, logistics distance attenuation, downstream load amplification, and shared resource indication to obtain the edge weight; multiply the negative exponent of the ratio of propagation delay to preset positive attenuation time constant, the edge weight, and the disturbance source strength to obtain the propagation strength of each edge; multiply the propagation strengths of each edge on the path to each node and take the maximum value, then take the maximum value with the disturbance source strength of the node itself to obtain the cumulative disturbance arrival strength; Step S403: Take the logarithm of the positive health values ​​of the equipment in the candidate process route, and then take the exponent after weighting the average value according to the preset non-negative importance weights with a sum greater than 0, to obtain the weighted geometric mean; divide each health value by the preset positive softening temperature and take the negative exponent, calculate the average value, take the logarithm, and multiply it by the opposite of the softening temperature to obtain the minimum softening value; perform a convex combination of the two values ​​according to the preset short board weights of 0 to 1, multiply it by the product of the negative exponents of the cumulative disturbance arrival intensity of each equipment node in the route, and then multiply it by the negative exponent of the ratio of the cumulative queue delay of the route to the preset positive delay sensitivity scale, and output the process route stability index.

[0013] Preferably, step S50 specifically includes: Step S501: Based on the stability index of the process route, extract the process and associated equipment and tools from the candidate process set, determine the process sequence, equipment capacity, tool life and delivery constraints according to the unstructured processing requirement text and the real-time equipment status data, and use a non-dominated sorting genetic algorithm to jointly recommend the process, equipment and tool sequences that meet the constraints, with stability, estimated time and processing cost as optimization objectives, to obtain the main path and alternative paths; Step S502: Extract the device sets of the main path and the alternative paths, and calculate the vulnerability decorrelation degree:

[0014] in, Main path, As an alternative route, and For their respective equipment sets, For equipment number, The equipment importance weights are preset according to the substitutability of the process; the weights are dimensionless and non-negative, and the sum of the weights of the main path is greater than 0. The intersection symbol represents the intersection, and the summation symbol represents the summation over the marked devices. To eliminate the dimensionless vulnerability, the processing time and remaining delivery time for each path are read. The switching cost is obtained by adding the time for changeover, tool change, logistics transfer, and first piece verification to the cost-converted time equivalent. All time amounts are in minutes. Only alternative paths with a decorrelation score not lower than the preset decorrelation threshold and a processing time and switching cost sum less than the remaining delivery time are retained. Step S503: Obtain the historical execution success rate and normalized execution time variance of similar routes, determine the disturbance scenario coverage ratio, normalized prediction delay, and demand process continuity matching degree of the selected candidate paths, and perform a Sigmoid mapping with the process route stability index according to the preset confidence weight and intercept, wherein the execution time variance and prediction delay are given negative weights, and the remaining quantities are given positive weights to obtain the main path confidence; combine the main path, the selected candidate paths, and the main path confidence into a process route execution package and output it.

[0015] This invention also provides an intelligent process route recommendation system for unstructured processing needs, comprising: The multi-source data dynamic alignment module is used to acquire unstructured processing requirement text, real-time equipment status data, and event timestamps of the two types of data. Based on the event timestamps, a clock drift correction mechanism is used to perform the multi-source data alignment task and output a unified timeline process requirement and equipment status dataset. The disturbance-sensitive semantic parsing module is used to perform disturbance-sensitive semantic parsing tasks based on the unified timeline process requirements and equipment status dataset, using an attention mechanism that integrates disturbance sensitivity and urgent order urgency, and outputs a disturbance-sensitive demand vector. The dynamic capability candidate process generation module is used to perform a candidate process screening preprocessing task based on the disturbance-sensitive demand vector using a process knowledge graph and an equipment dynamic capability credit model, and output a set of candidate processes. The disturbance propagation stability assessment module is used to perform a process route stability assessment task based on the candidate process set using a stability assessment mechanism that combines multi-hop disturbance propagation and soft board synthesis, and outputs process route stability indicators. The joint recommendation execution package generation module is used to perform joint recommendation of process routes based on non-dominated sorting genetic algorithm and primary and backup path decorrelation screening according to the process route stability index, and output process route execution packages with confidence and alternative paths.

[0016] The present invention also provides an intelligent process route recommendation device for unstructured processing needs. The intelligent process route recommendation device for unstructured processing needs includes: a memory, a processor, and an intelligent process route recommendation program for unstructured processing needs stored in the memory and executable on the processor. When the intelligent process route recommendation program for unstructured processing needs is executed by the processor, it implements the above-described method.

[0017] The present invention also provides a computer program product, the computer program product including a process route intelligent recommendation program carrier for unstructured processing needs, the process route intelligent recommendation program carrier for unstructured processing needs implementing the above method when executed by a processor.

[0018] The beneficial effects of this invention are as follows: By using a clock drift correction mechanism to unify the event timestamps of the work order system and the data acquisition gateway onto the same timeline, the unstructured processing requirement text and real-time equipment status data are kept consistent on the time base. This eliminates status misalignment caused by differences in acquisition cycles and clock deviations, thereby providing accurate and synchronized input for subsequent disturbance-sensitive semantic parsing. It also avoids incorrectly associating expired equipment status with current order requirements, improving the temporal reliability of the recommendation basis.

[0019] By integrating an attention mechanism that combines disturbance sensitivity and urgency of urgent orders, the demand text is weighted and encoded, giving higher attention to terms related to equipment failure, tool wear, and tight delivery deadlines. This forms a disturbance-sensitive demand vector, which highlights the sensitivity of the current order to equipment availability and response speed. As a result, processes that meet real-time constraints are prioritized in the candidate process selection, reducing the inclusion of unavailable or soon-to-be-failed equipment in the candidate routes.

[0020] By combining a stability assessment mechanism that integrates multi-hop disturbance propagation and soft-board synthesis, the disturbance intensity is accumulated along the process flow, resource sharing, and order grabbing paths in the candidate process route. The weighted geometric mean of equipment health and the minimum softening value are combined to make the stability index reflect both local shortcomings and global degradation trends. Then, through joint recommendation by a non-dominated sorting genetic algorithm and primary and backup path de-correlation screening, an execution package with confidence and alternative paths is output, which improves the executability and switching controllability of the recommended route in equipment failure and urgent order queue scenarios. Attached Figure Description

[0021] Figure 1 This is a flowchart illustrating the first embodiment of the intelligent process route recommendation method for unstructured processing requirements of the present invention. Detailed Implementation

[0022] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0023] Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0024] Example 1: As Figure 1 The diagram shown is a flowchart of the first embodiment of the intelligent process route recommendation method for unstructured processing requirements of the present invention, which presents the first embodiment of the intelligent process route recommendation method for unstructured processing requirements of the present invention.

[0025] In the first embodiment, the intelligent process route recommendation method for unstructured processing needs includes: Step S10: Obtain unstructured processing requirement text, real-time equipment status data, and event timestamps of the two types of data. Based on the event timestamps, use a clock drift correction mechanism to perform a multi-source data alignment task and output a unified timeline process requirement and equipment status dataset. The unstructured processing request text left in the work order system is often not neatly formatted, but rather interspersed with natural language notes, expedited markings, or verbal descriptions added afterward. These may mention order delivery dates, precision levels, material grades, batch sizes, surface quality requirements, outsourcing restrictions, and temporary order insertions. The real-time equipment status data sent from the acquisition gateway focuses more on the equipment's operational side, including equipment availability, fault codes, spindle load, vibration amplitude, temperature, remaining tool life, tool change time, equipment queue length, work-in-process task number, and tooling status. Both types of data have their own event timestamps, recording the time the work order system wrote the request event and the time the acquisition gateway captured the equipment status change, respectively. However, these two clock sources are not perfectly synchronized, and the deviation between them drifts slowly over time. The clock drift correction mechanism in this step uses the work order system's timeline as a reference to perform online deviation estimation and correction of the acquisition gateway's timestamps. In actual processing, the timestamps of the same physical event on both sides are first read, and the difference between the timestamp of the acquisition gateway and the timestamp of the work order system is calculated. This difference is then subtracted from the clock deviation of the previous round to obtain the residual alignment error. The residual alignment error is then multiplied by a preset clock drift learning rate and added to the clock deviation of the previous round to obtain the clock deviation of the current round. During the first correction, the clock deviation is set to zero, and the learning rate is a value greater than zero and less than one. After correcting the acquisition gateway timestamp using the clock deviation of the current round, the unstructured processing requirement text and real-time equipment status data are mapped onto the timeline of the work order system, forming a unified timeline dataset of process requirements and equipment status. Each record in this dataset carries requirement-side fields, equipment-side fields, the corrected timestamp, and a data quality score. The data quality score is determined by the residual alignment error, error tolerance scale, field completeness rate, and cross-source consistency, and is used to distinguish between high-confidence and low-confidence records in subsequent processing. For work order-side events and acquisition-side events, this step also determines whether they belong to the same order, the same equipment, or the same workstation based on the strength of causal binding. When a preset threshold is reached, they are bound as disturbance event records. The length of the dynamic effective time window is adjusted by the base window, the standard deviation of timestamp jitter, the device health, the jitter amplification factor, and the health penalty factor. It is used to update the disturbance event when the change in the device state vector exceeds the trigger threshold and the cooling time is met, and to end the disturbance state when the change is lower than the reset threshold.

[0026] After this round of processing, the two types of data, originally scattered across the work order system and the data acquisition gateway, are mapped onto a unified timeline. Changes in requirements, urgent order insertions, and sudden equipment status changes are no longer isolated points in time, but rather form a traceable causal relationship. Online clock skew updates prevent subsequent events from being misaligned due to clock drift between the gateway and the work order system, continuously compressing residual alignment errors to a smaller range. Data quality scoring ensures that reported data with low field completeness and cross-source consistency are not included in subsequent parsing on an equal footing with high-quality data, thus suppressing interference from missing fields and abnormal reports before entering the attention mechanism. A dynamic effective time window adjusts its length based on timestamp jitter and equipment health. When the change in the equipment state vector exceeds the trigger threshold and meets the cooldown time, a disturbance event update is triggered; when the change falls below the reset threshold, the disturbance state ends. In this way, equipment state changes are organized into discrete disturbance event records. Subsequent steps no longer face scattered timestamps and fields as input, but a unified dataset with disturbance markers, time corrections, and data quality weights. When performing disturbance-sensitive semantic parsing on the dataset in step S20, the urgency of urgent orders and the state of equipment disturbance can be seen simultaneously. The attention mechanism can map semantics such as early delivery and improved accuracy in the demand text to state changes such as increased equipment load and accelerated tool consumption in the same time context, reducing subsequent misjudgments caused by inconsistent time bases and event aliasing.

[0027] Traditional methods typically use the work order system time or data acquisition gateway time as the matching basis, or only align data according to a fixed period, lacking handling of clock drift, residual alignment errors, and cross-source event causal relationships. When equipment failure, tool wear, and urgent order queue jumping occur simultaneously, the change in requirements on the work order side may precede or follow the change in status on the data acquisition side. Fixed time windows can easily mistake different physical events for the same event, or split the same disturbance into multiple windows. Without field completeness rate and cross-source consistency scoring, missing fields or abnormal reports will enter the recommendation process along with normal data, making subsequent requirement parsing and candidate process generation based on unreliable conditions. This step aligns requirements and equipment status according to physical event relationships through online clock deviation tracking, causal binding strength judgment, dynamic effective time windows, and trigger reset thresholds. Clock deviation correction makes the timestamps of the same physical event more consistent on both sides; causal binding strength judgment avoids incorrectly associating different orders or different equipment based solely on time proximity; dynamic effective time windows automatically adjust the window length when equipment health declines or timestamp jitter increases; and trigger reset thresholds prevent disturbance states from being frequently and prematurely reset. These processes work together to reduce temporal misalignment and event aliasing, providing a more stable input for subsequent perturbation-sensitive semantic parsing.

[0028] A discrete workshop received a batch of urgent orders. The work order system wrote requirements in the morning for earlier delivery, improved accuracy, and maximizing the use of existing tooling. Simultaneously, the data acquisition gateway reported increased spindle load, increased vibration amplitude, and decreased tool life on equipment A. Because the gateway clock is a few seconds slower than the work order system's clock, direct splicing might cause requirement changes to be attributed to events prior to equipment status changes, leading to subsequent analysis assuming the equipment still had capacity. This step first corrects the timing of the two types of events using clock skew, calculating residual alignment error and data quality scores. When the urgent order event on the work order side and the load increase and accelerated tool life events on the data acquisition side meet the conditions of being on the same equipment and close in time, and the causal binding strength reaches a threshold, they are bound as disturbance event records. Subsequently, the dynamic effective time window is adjusted according to equipment health and timestamp jitter. When the state vector change exceeds the trigger threshold and the cooling time is met, the disturbance event is updated, outputting a unified timeline dataset of process requirements and equipment status. In this dataset, the urgent order requirement text and the status of equipment A, such as load, vibration, and remaining tool life, are organized into disturbance event records on the same timeline, with data quality scores and disturbance tags. In the subsequent step S20, when performing perturbation-sensitive semantic parsing on the dataset, it is possible to simultaneously see the urgency of urgent orders and the perturbation status of equipment A. Thus, in the attention mechanism, priority is given to the correlation between early delivery, improved accuracy and increased equipment load, and accelerated tool consumption, providing the same time benchmark and perturbation record basis for candidate process screening and stability assessment.

[0029] Step S20: Based on the unified timeline process requirements and equipment status dataset, an attention mechanism that integrates disturbance sensitivity and urgent order urgency is used to perform a disturbance-sensitive semantic parsing task, and output a disturbance-sensitive demand vector; The disturbance-sensitive demand vector is an intermediate representation parsed from the unified time-axis process demand and equipment status dataset in step S20. It integrates the unstructured processing demand text of the order and the real-time equipment status data into a single vector. To form this vector, the demand text is first lexical encoded to obtain the hidden state sequence of each lexical; simultaneously, batch size, delivery date, and material hardness are extracted from the order to form a structured constraint vector. Disturbance sensitivity is obtained by weighting and summing alternative equipment availability, precision redundancy, special tool dependence, special fixture dependence, and material machinability according to preset weights that sum to 1, and then mapping using an S-shaped function. Urgency of urgent orders is obtained by reading the current time and a preset positive relaxation time scale, limiting the ratio of the remaining delivery time to this scale to between 0 and 1, and subtracting this ratio from 1. After the disturbance sensitivity and urgency of urgent orders are mapped into embeddings, they participate in attention scoring along with the lexical hidden state sequences, enabling the attention weights to simultaneously reflect equipment substitution capability, tool dependence, material processing difficulty, and delivery pressure. Subsequently, attention weights are used to weight and sum the latent state sequences of lexical units. The summation result is then concatenated with the structured constraint vector to form a perturbation-sensitive demand vector. This vector also carries semantic ambiguity entropy, which measures the degree of dispersion of multiple process interpretations in the demand text and determines the number of subsequent alternative paths accordingly.

[0030] After attention weighting, terms related to equipment disturbance, delivery pressure, and process constraints in the demand text receive higher weights, while the weight of ordinary descriptive words is relatively reduced. Therefore, the disturbance-sensitive demand vector is no longer a uniform representation of the entire text, but rather a set of features highlighting alternative equipment, tooling dependencies, precision redundancy, and delivery pressure. Urgency of urgent orders links delivery margins with the shortest feasible processing time and changeover costs. When the remaining time is close to or less than the shortest processing time, the urgency increases, making subsequent candidate process generation more inclined to select equipment and processes that can be executed quickly. Semantic ambiguity entropy quantifies the dispersion of multiple possible interpretations in the demand text into the number of alternative paths. The more dispersed the interpretations, the more alternative paths are available, avoiding outputting only a single route when the demand boundaries are unclear. Thus, the subsequent step S30 receives a vector with attention weights, structured constraints, and an indication of the number of alternatives, making process selection more targeted and reducing candidate process bias caused by demand ambiguity and unquantified urgency pressure.

[0031] Traditional process requirement processing often relies on keyword matching, rule templates, or manual decomposition, typically only recognizing explicit fields such as material, precision, and quantity. It lacks a unified quantitative approach to assessing factors like the availability of alternative equipment, dependence on specialized tools and fixtures, and the urgency of urgent orders. In workshops with frequent equipment disturbances, the same statement about "using existing tooling as much as possible" can have different process interpretations depending on the tooling's occupancy status. Fixed rules struggle to determine which terms should influence route selection. When requirement text is ambiguous, traditional methods often only provide a primary route, with the number of alternative paths remaining constant regardless of semantic ambiguity, resulting in a lack of alternative routes when equipment malfunctions occur on-site. This step incorporates disturbance sensitivity and urgency embedding into terminological representation through attention weights and adjusts the number of alternative paths using semantic ambiguity entropy. This ensures that the requirement parsing results reflect alternative capabilities and time pressure, reducing subsequent misjudgments caused by unclear requirement boundaries.

[0032] A discrete workshop receives a batch of urgent orders. The work order system writes requirement text in the morning, demanding earlier delivery, higher precision, and maximum use of existing tooling. Simultaneously, the data acquisition gateway reports increased spindle load, increased vibration amplitude, and decreased remaining tool life on equipment A. After timeline alignment in step S10, the order's requirement text and the status of equipment A (load, vibration, remaining tool life) are organized into disturbance event records on the same timeline. Step S20 extracts the unstructured machining requirement text and real-time equipment status data from this dataset, encodes the text to obtain a latent state sequence, and extracts batch size, delivery date, and material hardness to form a structured constraint vector. Combining extracted text and equipment status, the availability of alternative equipment is low, accuracy redundancy is acceptable, dependence on specialized tools is moderate, dependence on specialized tooling is high, and material processing difficulty is high. These are weighted and summed according to preset weights and mapped using an S-shaped function to obtain the perturbation sensitivity. The current time and a preset positive relaxation time scale are read, and the ratio of the remaining delivery time to this scale is normalized to a preset interval. Subtracting this normalization result from 1 yields the urgency of the urgent order. Since the remaining time is close to the shortest feasible processing time, the urgency increases. The perturbation sensitivity and the urgency of the urgent order are mapped into embeddings, which are used together with the latent state sequence of the lexical units for attention scoring to obtain attention weights. The attention weights are used to weight and sum the latent state sequence of the lexical units, and the summation result is concatenated with the structured constraint vector to output a perturbation-sensitive demand vector. In this vector, lexical units such as difficult processing, high accuracy, tight delivery time, and specialized tooling form strong components. The semantic ambiguity entropy indicates that high accuracy and minimizing resource consumption have multiple interpretations, thus increasing the number of alternative paths. In the subsequent step S30, when performing candidate process screening preprocessing based on the disturbance-sensitive demand vector, priority will be given to equipment combinations that do not occupy the tooling and can meet the accuracy requirements.

[0033] Step S30: Based on the disturbance-sensitive demand vector, a candidate process screening preprocessing task is performed using a process knowledge graph and equipment dynamic capability credit model to output a candidate process set; The candidate process set is selected in step S30 from the disturbance-sensitive demand vector, using a process knowledge graph and a dynamic capability credit model, and consists of processes and their equipment, tools, and fixture combinations that can be used for subsequent stability assessment. The process knowledge graph serves as the constraint skeleton for generating candidate processes in this step. Its nodes include demand characteristics, processes, equipment, tools, fixtures, and quality rules, while its edges include machinability relationships, substitutability relationships, process sequence relationships, equipment sharing relationships, tool sharing relationships, quality constraint relationships, and fixture reuse relationships. The dynamic capability credit model calculates a dynamic capability credit value for each combination of equipment and processes. This credit value is not a fixed equipment capability parameter but is jointly determined by equipment availability indicators, a preset sensitivity index power of health, tool life satisfaction, quality accuracy matching, equipment load penalty, clamping and changeover adaptability, and tool wear cumulative correction. The tool life satisfaction is calculated by estimating the number of tool changes during the process based on order batch size, single-piece cutting time, auxiliary time, and remaining tool life, and then correcting this with a tool change penalty coefficient. Quality and accuracy matching is obtained by comparing the actual achievable accuracy of the equipment with the tolerance band width required by the order. Equipment load penalty is determined by the equipment load rate. Clamping and changeover adaptability is determined by the changeover time and clamping time scale. Tool wear accumulation correction is determined by the wear penalty coefficient and the proportion of tool life already consumed. The candidate process set retains only processes whose equipment dynamic capability credit value is not lower than a preset capability threshold, whose quality and accuracy matching is not lower than a preset quality threshold, whose tool life satisfaction is greater than zero, and who satisfy the process sequence relationship. These processes are then used to construct a disturbance propagation graph.

[0034] Step S30 transforms the equipment substitution, tooling dependency, and delivery pressure in the disturbance-sensitive demand vector into a dynamic credit evaluation of candidate processes. The dynamic capability credit value of equipment varies with equipment availability, health, load rate, remaining tool life, and clamping conditions. When the health of a piece of equipment decreases or its remaining tool life is insufficient, its dynamic capability credit value decreases, and the related process may be removed from the candidate set or replaced by other equipment processes. Tool life satisfaction combined with the number of tool changes during processing penalizes combinations requiring multiple tool changes due to insufficient tool life in batch processing during the candidate stage. Quality and accuracy matching ensures that equipment with insufficient accuracy redundancy will not enter the candidate set simply because other indicators are high. After filtering by process sequence constraints, the output candidate process set includes feasible processing combinations and retains a selection space consistent with demand constraints, providing the basis for the nodes and edges for the subsequent disturbance propagation stability assessment in step S40, thus avoiding the need to conduct stability assessments on a large number of already unexecutable processes.

[0035] Traditional candidate process generation is largely based on historical process routes or static equipment capability tables, typically matching by process family and equipment type. Once determined offline, these processes remain unchanged for a period. However, when equipment failures, tool wear, or rush orders occur in real time, the static candidate set may still contain equipment that is unavailable, overloaded, or about to run out of tools. Even the most precise subsequent route recommendations cannot correct this. Especially in multi-variety, small-batch workshops, order batches, auxiliary times, and tool life combinations vary significantly. Without calculating the number of tool changes and wear corrections, candidate processes may exceed delivery deadlines due to tool change waiting times. This step introduces real-time equipment status, tool life, quality matching, load, and clamping conditions during the candidate generation stage through dynamic capability credit values ​​and multiple correction factors. This allows unexecutable or poorly matched processes to be eliminated in advance, reducing the likelihood of frequent route failures under disturbances.

[0036] A discrete workshop receives a batch of urgent orders. The work order system writes requirements such as earlier delivery, higher precision, and maximizing the use of existing tooling in the morning. Simultaneously, the data acquisition gateway reports increased spindle load, increased vibration amplitude, and decreased remaining tool life for equipment A. After unified timeline alignment in step S10 and disturbance-sensitive semantic parsing in step S20, terms like "difficult to machine," "high precision," "tight delivery," and "specialized tooling" form strong components in the disturbance-sensitive requirement vector. In step S30, the system searches the process knowledge graph for workable equipment and tools for the finish milling process. When calculating the dynamic capability credit value of equipment A, the tool life satisfaction decreases due to numerous tool changes, and the load penalty also lowers the dynamic capability credit value. Equipment B's quality and precision matching degree is below the preset quality threshold, so it is not included in the candidate list. Equipment C, after calculating the clamping and changeover adaptability, still meets the preset capability threshold and is included in the candidate process set. The output set retains equipment C and subsequent processes that satisfy the process sequence constraints, providing usable nodes for the disturbance propagation stability assessment in step S40.

[0037] Step S40: Based on the candidate process set, a stability assessment mechanism combining multi-hop disturbance propagation and soft board synthesis is used to perform the process route stability assessment task and output the process route stability index. The process route stability index is the output result of step S40, which quantifies the overall stability of each candidate process route under disturbance propagation conditions, starting from the candidate process set. It is used as one of the target components for joint recommendation in step S50. The calculation of this index relies on the disturbance propagation graph and the soft-board synthesis mechanism. The disturbance propagation graph is a directed graph structure constructed with processes in the candidate process set as nodes and process flow, equipment sharing, tool sharing, order grabbing, and logistics dependence as edges. Equipment health, the ratio of remaining tool life to new tool life, and the priority and urgency of urgent orders jointly determine the disturbance source strength of each node. Static coupling weight, logistics distance attenuation, downstream load amplification, and shared resource indication jointly determine the edge weights. The ratio of propagation delay to a preset positive attenuation time constant is transformed by a negative exponential factor and multiplied by the edge weight and disturbance source strength to obtain the propagation strength of each edge. The cumulative disturbance arrival strength is the product of the propagation strengths of all edges on all paths leading to a node, taken as the maximum value, and then multiplied by the larger value of the disturbance source strength of that node itself. It is used to describe the superposition effect of disturbances after multi-hop propagation. The soft bottleneck synthesis refers to taking the logarithm of the positive health values ​​of each device in the candidate process route, then weighting the average by a preset non-negative importance weight with a sum greater than zero, and then taking an exponent to obtain a weighted geometric mean. Simultaneously, each health value is divided by a preset positive softening temperature, the negative exponent is taken, the average is calculated, the logarithm is taken, and multiplied by the negative of the softening temperature to obtain the minimum softening value. Finally, a convex combination is performed on these two values ​​using preset bottleneck weights between zero and one to obtain the overall route health value. This overall health value is multiplied by the negative exponent of the cumulative disturbance arrival intensity of each device node in the route, and then multiplied by the negative exponent of the ratio of the cumulative queue delay to a preset positive delay sensitivity scale, ultimately outputting a process route stability index. A higher index indicates a greater likelihood that the candidate route can maintain continuous execution despite the combined effects of device disturbances, insufficient tool life, order preemption, and logistical delays; a lower index indicates a significant bottleneck in the route or severe consequences of disturbance propagation.

[0038] Step S40 integrates equipment sharing, tool sharing, order preemption, and logistics dependence from the candidate process set into the disturbance propagation graph, ensuring that stability assessment no longer focuses solely on the local capabilities of individual processes. When disturbances propagate along edges from faulty or heavily loaded equipment, the propagation delay and decay time constant determine their impact on downstream processes. Higher downstream load rates, shorter logistics distances, or more concentrated shared resources result in larger edge weights and stronger cumulative disturbance arrival. In route stability calculations, the weighted geometric mean provides an overall health trend, the softening minimum avoids masking extreme health values ​​of individual equipment by using softening temperature, and the queue delay term converts cumulative waiting time into stability reduction. After this processing, subsequent joint recommendations can see that while most equipment on a candidate route is healthy, critical bottleneck equipment experiences significant cumulative disturbances. This allows for consideration of disturbance propagation consequences during route selection and alternative path generation, reducing the possibility of overlooking downstream queuing and shared resource contention due to localized assessments. After receiving the index in step S50, it is used as a target component in the non-dominated sorting genetic algorithm. It participates in the non-dominated sorting and congestion distance calculation together with other targets such as delivery satisfaction and cost. This makes the main path and alternative paths in the final output process route execution package have comparable quantitative basis in terms of stability, and prompts the main and alternative paths to decorrelate and select route combinations with higher stability index and less equipment overlap.

[0039] Traditional route assessments typically check the availability of each device or score static reliability, rarely considering the propagation of disturbances between devices through shared tools, shared fixtures, order preemption, and logistics paths. In workshops where device disturbances are frequent, a failure in one device can increase the task queue for downstream devices sharing tools or fixtures, thus affecting other devices that initially appeared available. If only local assessments are performed, the recommended routes are prone to failure after the disturbances spread. Fixed weights or simple averaging can also mask route weaknesses, allowing critical devices with lower health to have their high scores offset by those of other devices. This step uses a multi-hop disturbance propagation mechanism to calculate the arrival intensity of disturbances along the path, softening minimum values ​​to highlight weaker devices, and incorporates queue delays into stability reduction, ensuring that the consequences of disturbance propagation are reflected before route recommendation. For example, when one device in a candidate route has a low health score but other devices have a high health score, the traditional simple averaging might give a moderately high stability score. However, the softening minimum in this step will significantly lower the overall health score of the route. At the same time, the device with low health score will act as a disturbance source and propagate disturbances to subsequent devices along the shared tool edge and process flow edge. The cumulative disturbance reaches a negative exponent of intensity, which further reduces the stability index, thus putting the route at a disadvantage in subsequent non-dominated ranking and preventing it from being incorrectly recommended.

[0040] A discrete workshop receives a batch of urgent orders. The work order system writes requirements such as earlier delivery, higher precision, and maximizing the use of existing tooling in the morning. Simultaneously, the data acquisition gateway reports increased spindle load, increased vibration amplitude, and decreased tool life for equipment A. After unified time axis alignment in step S10 and disturbance-sensitive semantic parsing in step S20, terms like "difficult to machine," "high precision," "tight delivery," and "specialized tooling" form strong components in the disturbance-sensitive requirement vector. In step S30, the system searches the process knowledge graph for workable equipment and tools for the finish milling process. When calculating the dynamic capability credit value of equipment A, the tool life satisfaction decreases due to numerous tool changes, and the load penalty also lowers the dynamic capability credit value. Equipment B's quality and precision matching degree is below the preset quality threshold, so it is not included in the candidate list. Equipment C, after calculating the clamping and changeover adaptability, still meets the preset capability threshold and is included in the candidate process set. In step S40, the system extracts the process sequence relationship from the candidate process set and combines it to create a candidate process route that includes finish milling by equipment C, drilling by equipment D, and inspection by equipment E. When constructing the disturbance propagation graph, equipment C and equipment D share the same dedicated tool. Equipment E has a long queue ahead of it. Although equipment A is not in the candidate route, its failure propagates the disturbance to equipment C through the tool-sharing edge and the order preemption edge. Equipment C has a low ratio of remaining tool life to new tool life, indicating a high disturbance source strength. Equipment D has a high downstream load rate, increasing the edge weight from equipment C to equipment D. The queue delay of equipment E increases the cumulative queue delay term of the route. When calculating the cumulative disturbance arrival strength, the disturbance from equipment C is transmitted to equipment D via the tool-sharing edge, and then to equipment E via the process flow edge. The maximum value is obtained by multiplying the propagation strengths of each edge on the path, and then taking the larger value with the disturbance source strength of equipment E itself. In the route stability calculation, equipment C has a low health level. Softening the minimum value term significantly reduces the overall health level of the route. Multiplying this by the negative exponent of the cumulative disturbance arrival strength of each equipment node and the negative exponent of the ratio of the cumulative queue delay to the preset positive delay sensitivity scale, the final output is a low process route stability index. After receiving the index in step S50, the route is compared with the alternative routes with less overlap with the equipment in the non-dominated sorting genetic algorithm. Since the stability index of the route is low and it shares the tool with the alternative routes, the primary and backup path decorrelation screening will reduce the priority of the route as the primary path and increase the weight of the alternative paths to reduce the difficulty of on-site switching.

[0041] Step S50: Based on the stability index of the process route, perform joint recommendation of the process route and primary and backup path removal screening based on non-dominated sorting genetic algorithm, and output the process route execution package with confidence and alternative paths.

[0042] The process route execution package is the structured result of step S50, containing the main path, the selected alternative paths, and the confidence score of the main path. Both the main path and alternative paths are represented by a sequence of triplets consisting of operations, equipment, and tools. Each triplet corresponds to an operation and its executing equipment and tool. The confidence score of the main path is not a simple application of historical success rates, but rather considers the historical execution success rate of similar routes, normalized execution time variance, the coverage ratio of disturbance scenarios for selected alternative paths, normalized prediction delay, demand-process continuity matching degree, and the process route stability index output in step S40. Execution time variance and prediction delay are weighted negatively, while the remaining quantities are weighted positively. This is then mapped using a sigmoid function with pre-set confidence weights and intercepts. Alternative paths are selected based on vulnerability decorrelation, calculated using the equipment sets of the main path and alternative paths. Equipment importance weights are preset according to the substitutability of operations; the weights are dimensionless and non-negative, and the sum of the main path weights is greater than zero. Only alternative paths with a decorrelation score not lower than a preset decorrelation score threshold and a processing time plus switching cost less than the remaining delivery time are retained. Switching cost is calculated by adding the time for changeover, tool change, logistics transfer, first-piece verification, and cost-converted time equivalents, all measured in minutes. A non-dominated sorting genetic algorithm, optimizing stability, estimated processing time, and processing cost, performs joint recommendations within a sequence of processes, equipment, and tools that satisfies constraints on process order, equipment capacity, tool life, and delivery time, resulting in the primary path and alternative paths. The mutation and crossover probabilities in the algorithm are adjusted based on perturbation risk and stability, respectively, ensuring that high-perturbation-risk routes have higher mutation probabilities and high-stability routes have lower crossover probabilities. The overall utility is calculated by weighting the following factors: process route stability, confidence level, demand-process continuity matching degree, ratio of expected completion time to historical average completion time, ratio of expected processing cost to historical average cost, disturbance risk, switchover cost, and normalized constraint violation quantity. Demand-process continuity matching degree measures the gap between the actual achievable capability of the route and the order demand indicators. Constraint violation quantity is a composite of all constraint violations and normalized according to scale parameters, while also being adjusted by a constraint violation risk amplification factor and stability correction. The final execution package includes a confidence level for the main path and switchover conditions and applicable disturbance scenarios for alternative paths, allowing for selection in the field during equipment failures or increased tool wear.

[0043] After receiving the process route stability index output from step S40, step S50 extracts the processes and associated equipment and tools from the candidate process set. Based on the unstructured processing requirement text and real-time equipment status data, it determines the process sequence, equipment capacity, tool life, and delivery constraints. A non-dominated sorting genetic algorithm is used to jointly recommend sequences of processes, equipment, and tools that meet the constraints. The algorithm optimizes stability, estimated processing time, and processing cost. It retains multiple non-dominated route solutions through non-dominated sorting, rather than selecting a local optimum based on a single index. The mutation probability is adjusted according to the disturbance risk, allowing for more exploration near high-risk routes, while the crossover probability is adjusted according to stability, preventing stable routes from being excessively fragmented. After obtaining the main path and alternative paths, the equipment sets for the main path and alternative paths are extracted, and the vulnerability decorrelation is calculated. Only alternative paths with a decorrelation score not lower than a preset decorrelation threshold and a processing time and switching cost sum less than the remaining delivery time are retained. This screening process makes it easier to retain alternative paths with less overlap with the main path. It also calculates switchover costs and time window margins to prevent alternative paths from existing but failing to complete the switchover before the delivery deadline. Subsequently, the historical execution success rate and normalized execution time variance of similar routes are obtained. The perturbation scenario coverage ratio, normalized predicted latency, and requirement-process continuity matching degree of the screened alternative paths are determined. These are then mapped to process route stability indicators using a S-shaped function with pre-set confidence weights and intercepts to obtain the main path confidence score. This confidence score, combined with historical success rate, scenario coverage, time variance, latency, and requirement matching, and corrected using Bayesian calibration, ensures that the main path and alternative paths in the final execution package have comparable reliability indicators. Finally, the main path, the screened alternative paths, and the main path confidence score are combined into a process route execution package and output. This provides a basis for path switching in the field when equipment failure or tool wear intensifies, reducing the need for manual adjustments due to the lack of available alternatives after the main path fails.

[0044] Traditional process route recommendations often employ single-objective sorting, greedy selection, or static rules. Typically, a main route is given first, and alternative routes are manually assigned based on experience. These alternative routes may share critical equipment with the main route, rendering them ineffective in switching when equipment fails. If switchover costs, equipment changeover time, tool changeover time, and first-piece quality verification time are not incorporated into the decision-making process, alternative routes may become unexecutable due to insufficient switchover time windows. Furthermore, multi-objective interactions are often simplified to weighted summations with fixed weights, making it difficult to adapt to changes in disturbance risk. This step addresses multi-objective conflicts using a non-dominated sorting genetic algorithm. It uses vulnerability-based correlation constraints to limit equipment overlap in alternative routes, assesses the executability of alternative routes based on switchover time window margins, and adjusts mutation and crossover probabilities based on disturbance risk and stability, ensuring the output execution package better reflects the on-site switchover requirements under equipment disturbances. In traditional methods, when alternative routes share critical equipment with the main route, a failure of that equipment renders both the main and alternative routes ineffective, requiring temporary on-site adjustments and causing delivery delays. This step calculates the intersection of the device sets and introduces device importance weights to eliminate candidate paths with decorrelation scores below a preset threshold, ensuring that the retained candidate paths effectively complement the main path at the device level. Simultaneously, traditional methods do not consider switchover costs and time windows, potentially recommending candidate paths with sufficient processing time but insufficient switchover time. This step adds the time for changeover, tool change, logistics transfer, and first-piece verification to the equivalent time for cost conversion to obtain the switchover cost, and checks whether the sum of processing time and switchover cost is less than the remaining delivery time, thus ensuring that the candidate path is executable before the delivery date. Furthermore, traditional confidence calculations often rely on a single historical success rate, without considering current disturbance scenario coverage and stability indicators. This step uses a sigmoid function mapping to fuse multiple positive and negative indicators, and then corrects them with Bayesian calibration, making the confidence score more accurately reflect the reliability under current operating conditions.

[0045] A discrete workshop receives a batch of urgent orders. The work order system writes requirements such as earlier delivery, higher precision, and maximizing the use of existing tooling in the morning. Simultaneously, the data acquisition gateway reports increased spindle load, increased vibration amplitude, and decreased tool life for equipment A. After unified time axis alignment in step S10 and disturbance-sensitive semantic parsing in step S20, terms like "difficult to machine," "high precision," "tight delivery," and "specialized tooling" form strong components in the disturbance-sensitive requirement vector. In step S30, the system searches the process knowledge graph for workable equipment and tools for the finish milling process. When calculating the dynamic capability credit value of equipment A, the tool life satisfaction decreases due to numerous tool changes, and the load penalty also lowers the dynamic capability credit value. Equipment B's quality and precision matching degree is below the preset quality threshold, so it is not included in the candidate list. Equipment C, after calculating the clamping and changeover adaptability, still meets the preset capability threshold and is included in the candidate process set. In step S40, the system extracts the process sequence relationship from the candidate process set and combines it to create a candidate process route that includes finish milling by equipment C, drilling by equipment D, and inspection by equipment E. When constructing the disturbance propagation graph, equipment C and equipment D share the same dedicated tool. Equipment E has a long queue ahead of it. Although equipment A is not in the candidate route, its failure propagates the disturbance to equipment C through the tool-sharing edge and the order preemption edge. Equipment C has a low ratio of remaining tool life to new tool life, indicating a high disturbance source strength. Equipment D has a high downstream load rate, increasing the edge weight from equipment C to equipment D. The queue delay of equipment E increases the cumulative queue delay term of the route. When calculating the cumulative disturbance arrival strength, the disturbance from equipment C is transmitted to equipment D via the tool-sharing edge, and then to equipment E via the process flow edge. The maximum value is obtained by multiplying the propagation strengths of each edge on the path, and then taking the larger value with the disturbance source strength of equipment E itself. In the route stability calculation, equipment C has a low health level. Softening the minimum value term significantly reduces the overall health level of the route. Multiplying this by the negative exponent of the cumulative disturbance arrival strength of each equipment node and the negative exponent of the ratio of the cumulative queue delay to the preset positive delay sensitivity scale, the final output is a low process route stability index. After receiving the indicator in step S50, the algorithm compares the route with candidate routes that have less overlap with the equipment in the non-dominated sorting genetic algorithm. Since the route has a low stability index and shares tools with candidate routes, the primary / secondary path decorrelation screening will reduce the priority of this route as the primary path and increase the weight of candidate routes. The algorithm searches in sequences that satisfy constraints on process sequence, equipment capacity, tool life, and delivery time, with stability, estimated processing time, and processing cost as optimization objectives, to obtain the primary path and candidate paths. Then, the equipment sets of the primary and candidate paths are extracted, and the vulnerability decorrelation is calculated. It is found that the candidate path uses equipment D, F, and G, and only shares equipment D with the primary path's equipment C, D, and E, with a decorrelation higher than a preset threshold. Simultaneously, the switching cost of the candidate path is calculated, including changeover, tool change, logistics transfer, and the time and cost equivalent of first-piece verification. The sum of processing time and switching cost is less than the remaining delivery time, therefore, the candidate path is retained.Next, the historical execution success rate and normalized execution time variance of similar routes are obtained. The disturbance scenario coverage ratio, normalized prediction delay, and demand process continuity matching degree of the selected candidate paths are determined. These are then mapped to the process route stability indicators using a S-shaped function with pre-set confidence weights and intercepts to obtain the main path confidence score. The final execution package includes the main path with its confidence score, and the candidate paths with switching conditions and applicable disturbance scenarios, allowing for selection in the field when equipment failure or increased tool wear occurs.

[0046] Example 2: Furthermore, the present invention provides an intelligent process route recommendation system for unstructured processing needs, employing the intelligent process route recommendation method for unstructured processing needs described in the above embodiments, which can solve the technical problem of intelligent process route recommendation for unstructured processing needs. The beneficial effects of the intelligent process route recommendation system for unstructured processing needs provided by the present invention are the same as those of the intelligent process route recommendation method for unstructured processing needs provided in the above embodiments, and other technical features of the intelligent process route recommendation system for unstructured processing needs are the same as those disclosed in the methods of the above embodiments, and will not be repeated here.

[0047] Example 3: This invention provides an intelligent process route recommendation device for unstructured processing needs. The device includes at least one processor and a memory communicatively connected to the processor. The memory stores instructions executable by the processor, which are then executed to enable the processor to perform the intelligent process route recommendation method for unstructured processing needs described in Example 1. This intelligent process route recommendation device for unstructured processing needs can include, but is not limited to, mobile terminals such as mobile phones, laptops, digital radio receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), and in-vehicle terminals (e.g., in-vehicle navigation terminals), as well as fixed terminals such as digital TVs and desktop computers. This intelligent process route recommendation device for unstructured processing needs is merely an example and should not limit the functionality or scope of the invention. A process route intelligent recommendation device for unstructured machining needs may include a processing unit (e.g., a central processing unit, a graphics processing unit, etc.) that can perform various appropriate actions and processes based on a program stored in read-only memory or a program loaded from a storage device into random access memory. The random access memory also stores various programs and data required for the operation of the process route intelligent recommendation device for unstructured machining needs. The processing unit, read-only memory, and random access memory are interconnected via a bus. An I / O interface is also connected to the bus. Typically, the following systems can be connected to the I / O interface: input devices including touchscreens, touchpads, keyboards, mice, image sensors, microphones, accelerometers, gyroscopes, etc.; output devices including liquid crystal displays (LCDs), speakers, vibrators, etc.; storage devices including magnetic tapes, hard disks, etc.; and communication devices. The communication device allows the process route intelligent recommendation device for unstructured machining needs to communicate wirelessly or wiredly with other devices to exchange data. While a process route intelligent recommendation device for unstructured machining needs with various systems has been described, it should be understood that implementation or possession of all described systems is not required. It can be implemented alternatively or with more or fewer systems.

[0048] Example 4: This invention also provides a computer program product, including a computer program carrier, which, when executed by a processor, implements the steps of the intelligent process route recommendation method for unstructured processing needs as described above. The computer program product provided by this invention can solve the technical problem of intelligent process route recommendation for unstructured processing needs. Compared with the prior art, the beneficial effects of the computer program product provided by this invention are the same as those of the intelligent process route recommendation method for unstructured processing needs provided in the above embodiments, and will not be repeated here.

[0049] In particular, according to the embodiments disclosed in this invention, the processes described above with reference to the flowcharts can be implemented as a computer software program carrier. For example, embodiments disclosed in this invention include a computer program product comprising a computer program carrier carried on a computer-readable medium. In such embodiments, the computer program carrier can be downloaded and installed from a network via a communication device, or installed from a storage device, or installed from a read-only memory. When the computer program carrier is executed by a processing device, it performs the functions defined in the methods of the embodiments disclosed in this invention.

[0050] It should be understood that the various parts disclosed in this invention can be implemented using hardware, software, firmware, or a combination thereof. In the description of the above embodiments, specific features, structures, materials, or characteristics may be combined in any suitable manner in one or more embodiments or examples.

[0051] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the present invention and its equivalents, the present invention also intends to include these modifications and variations.

Claims

1. A method for intelligently recommending process routes for unstructured processing needs, characterized in that, The methods include: Step S10: Obtain unstructured processing requirement text, real-time equipment status data, and event timestamps of the two types of data. Based on the event timestamps, use a clock drift correction mechanism to perform a multi-source data alignment task and output a unified timeline process requirement and equipment status dataset. Step S20: Based on the unified timeline process requirements and equipment status dataset, an attention mechanism that integrates disturbance sensitivity and urgent order urgency is used to perform a disturbance-sensitive semantic parsing task, and output a disturbance-sensitive demand vector; Step S30: Based on the disturbance-sensitive demand vector, a candidate process screening preprocessing task is performed using a process knowledge graph and equipment dynamic capability credit model to output a candidate process set; Step S40: Based on the candidate process set, a stability assessment mechanism combining multi-hop disturbance propagation and soft board synthesis is used to perform the process route stability assessment task and output the process route stability index. Step S50: Based on the stability index of the process route, perform joint recommendation of the process route and primary and backup path removal screening based on non-dominated sorting genetic algorithm, and output the process route execution package with confidence and alternative paths.

2. The intelligent process route recommendation method for unstructured processing requirements as described in claim 1, characterized in that, Step S10 specifically includes: Step S101: Obtain unstructured processing requirement text from the work order system, obtain real-time equipment status data from the acquisition gateway, and read the timestamp of the same physical event in the two types of data to determine the difference between the timestamp of the acquisition gateway and the timestamp of the work order system. Step S102: Subtract the previous clock deviation from the difference to obtain the residual alignment error. Add the product of the residual alignment error and the preset clock drift learning rate to the previous clock deviation to obtain the current clock deviation. The clock deviation during the first correction is set to 0, and the clock drift learning rate is greater than 0 and less than 1. Step S103: Using the current clock deviation correction acquisition gateway timestamp, map the unstructured processing requirement text and the real-time equipment status data to the work order system timeline, and output a unified timeline process requirement and equipment status dataset.

3. The intelligent process route recommendation method for unstructured processing needs as described in claim 1, characterized in that, Step S20 specifically includes: Step S201: Extract unstructured processing requirement text and real-time equipment status data of orders from the unified time axis process requirement and equipment status dataset, encode the extracted text to obtain a word latent state sequence, and extract batch, delivery date and material hardness to form a structured constraint vector; Step S202: Combine the extracted text and device status to determine the availability of alternative equipment, accuracy redundancy, dependence on special tools, dependence on special fixtures, and material processing difficulty. These factors are then weighted and summed according to preset weights that sum to 1, and then mapped using a Sigmoid algorithm to obtain the perturbation sensitivity. The current time and a preset positive relaxation time scale are read, and the ratio of the remaining delivery time to this scale is limited to 0 to 1. The urgency of the urgent order is obtained by subtracting this ratio from 1. The perturbation sensitivity and the urgency of the urgent order are mapped as embeddings, and used together with the lexical hidden state sequence for attention scoring to obtain attention weights. Step S203: The attention weights are used to sum the word latent state sequence, and the summation result is concatenated with the structured constraint vector to output the perturbation sensitive demand vector.

4. The intelligent process route recommendation method for unstructured processing requirements as described in claim 3, characterized in that, In step S202, the attention scoring is performed using: in, For order number, This refers to the lexical index of the order text; The th term in the hidden state sequence of the term The hidden state of each word element; and The embeddings are obtained by linearly mapping the disturbance sensitivity and the urgency of the urgent order, respectively. , and To map corresponding inputs to a learnable projection matrix in the same scoring space, The learnable attention scoring vector for this space, with superscript... Indicates transpose; It is the hyperbolic tangent function. This indicates that the normalized index calculation is performed on the scores of all words in the order. For the obtained first Attention weights for each word; each embedding, hidden state, projection matrix, scoring vector, and attention weight are dimensionless.

5. The intelligent process route recommendation method for unstructured processing requirements as described in claim 1, characterized in that, Step S30 specifically includes: Step S301: Based on the disturbance-sensitive demand vector, determine the demand characteristics, construct a process knowledge graph containing demand characteristics, processes, equipment, tools, fixtures and quality rule nodes, establish processable relationships, substitutable relationships, process sequence relationships and resource sharing relationships, and obtain the correspondence between the processes to be screened and the equipment. Step S302: For the correspondence, obtain the equipment availability status, health, load, and remaining tool life from the real-time equipment status data, and read the process quality accuracy, changeover time, and tool wear data. Combine the requirement characteristics to determine the tool life satisfaction, quality accuracy matching, equipment load penalty, clamping changeover adaptability, and tool wear cumulative correction. Convert the equipment availability status into an equipment availability flag (1 for available, 0 for faulty). Multiply the flag and the preset sensitivity index power of the health status by the above five quantities to obtain the equipment dynamic capability credit value. Step S303: Use preset capability threshold and quality threshold to filter the processes to be screened, retain processes whose equipment dynamic capability credit value is not lower than the capability threshold, whose quality accuracy matching degree is not lower than the quality threshold, whose tool life satisfaction degree is greater than 0 and who satisfy the process sequence relationship, and output the candidate process set.

6. The intelligent process route recommendation method for unstructured processing needs as described in claim 1, characterized in that, Step S40 specifically includes: Step S401: Extract the sequence relationship of the processes from the candidate process set and combine the candidate process routes; obtain the health, queue delay and load of the associated equipment, the remaining tool life and new tool life, the priority and urgency of the urgent orders, as well as the sharing relationship, logistics distance and propagation time delay of equipment, tools, orders and buffer areas, and construct a perturbation propagation graph with process flow, resource sharing, order grabbing and logistics dependence as edges; Step S402: In the disturbance propagation graph, subtract the equipment health level from 1, subtract the ratio of remaining tool life to new tool life from 1, and multiply the urgency by the priority of urgent orders to obtain the corresponding disturbance source strengths; multiply the preset static coupling weight, logistics distance attenuation, downstream load amplification, and shared resource indication to obtain the edge weight; multiply the negative exponent of the ratio of propagation delay to preset positive attenuation time constant, the edge weight, and the disturbance source strength to obtain the propagation strength of each edge; multiply the propagation strengths of each edge on the path to each node and take the maximum value, then take the maximum value with the disturbance source strength of the node itself to obtain the cumulative disturbance arrival strength; Step S403: Take the logarithm of the positive health values ​​of the equipment in the candidate process route, and then take the exponent after weighting the average value according to the preset non-negative importance weights with a sum greater than 0, to obtain the weighted geometric mean; divide each health value by the preset positive softening temperature and take the negative exponent, calculate the average value, take the logarithm, and multiply it by the opposite of the softening temperature to obtain the minimum softening value; perform a convex combination of the two values ​​according to the preset short board weights of 0 to 1, multiply it by the product of the negative exponents of the cumulative disturbance arrival intensity of each equipment node in the route, and then multiply it by the negative exponent of the ratio of the cumulative queue delay of the route to the preset positive delay sensitivity scale, and output the process route stability index.

7. The intelligent process route recommendation method for unstructured processing requirements as described in claim 1, characterized in that, Step S50 specifically includes: Step S501: Based on the stability index of the process route, extract the process and associated equipment and tools from the candidate process set, determine the process sequence, equipment capacity, tool life and delivery constraints according to the unstructured processing requirement text and the real-time equipment status data, and use a non-dominated sorting genetic algorithm to jointly recommend the process, equipment and tool sequences that meet the constraints, with stability, estimated time and processing cost as optimization objectives, to obtain the main path and alternative paths; Step S502: Extract the device sets of the main path and the alternative paths, and calculate the vulnerability decorrelation degree: in, Main path, As an alternative route, and For their respective equipment sets, For equipment number, The equipment importance weights are preset according to the substitutability of the process; the weights are dimensionless and non-negative, and the sum of the weights of the main path is greater than 0. The intersection symbol represents the intersection, and the summation symbol represents the summation over the marked devices. To eliminate the dimensionless vulnerability, the processing time and remaining delivery time for each path are read. The switching cost is obtained by adding the time for changeover, tool change, logistics transfer, and first piece verification to the cost-converted time equivalent. All time amounts are in minutes. Only alternative paths with a decorrelation score not lower than the preset decorrelation threshold and a processing time and switching cost sum less than the remaining delivery time are retained. Step S503: Obtain the historical execution success rate and normalized execution time variance of similar routes, determine the disturbance scenario coverage ratio, normalized prediction delay, and demand process continuity matching degree of the selected candidate paths, and perform a Sigmoid mapping with the process route stability index according to the preset confidence weight and intercept, wherein the execution time variance and prediction delay are given negative weights, and the remaining quantities are given positive weights to obtain the main path confidence; combine the main path, the selected candidate paths, and the main path confidence into a process route execution package and output it.

8. A process route intelligent recommendation system for unstructured processing needs, applied to the process route intelligent recommendation method for unstructured processing needs as described in any one of claims 1 to 7, characterized in that, The system includes: The multi-source data dynamic alignment module is used to acquire unstructured processing requirement text, real-time equipment status data, and event timestamps of the two types of data. Based on the event timestamps, a clock drift correction mechanism is used to perform the multi-source data alignment task and output a unified timeline process requirement and equipment status dataset. The disturbance-sensitive semantic parsing module is used to perform disturbance-sensitive semantic parsing tasks based on the unified timeline process requirements and equipment status dataset, using an attention mechanism that integrates disturbance sensitivity and urgent order urgency, and outputs a disturbance-sensitive demand vector. The dynamic capability candidate process generation module is used to perform a candidate process screening preprocessing task based on the disturbance-sensitive demand vector using a process knowledge graph and an equipment dynamic capability credit model, and output a set of candidate processes. The disturbance propagation stability assessment module is used to perform a process route stability assessment task based on the candidate process set using a stability assessment mechanism that combines multi-hop disturbance propagation and soft board synthesis, and outputs process route stability indicators. The joint recommendation execution package generation module is used to perform joint recommendation of process routes based on non-dominated sorting genetic algorithm and primary and backup path decorrelation screening according to the process route stability index, and output process route execution packages with confidence and alternative paths.

9. A process route intelligent recommendation device for unstructured processing needs, characterized in that, The intelligent process route recommendation device for unstructured processing needs includes: a memory, a processor, and an intelligent process route recommendation program for unstructured processing needs stored in the memory and executable on the processor. When the intelligent process route recommendation program for unstructured processing needs is executed by the processor, it implements the intelligent process route recommendation method for unstructured processing needs according to any one of claims 1 to 7.

10. A computer program product, characterized in that, The computer program product includes a process route intelligent recommendation program carrier for unstructured processing needs. When the process route intelligent recommendation program carrier for unstructured processing needs is executed by a processor, it implements a process route intelligent recommendation method for unstructured processing needs as described in any one of claims 1 to 7.