Power equipment life cycle asset management system based on private chain
By using a private blockchain-based power equipment lifecycle asset management system, the problems of data source consistency and difficulty in verifying equipment status in existing technologies have been solved. This enables reliable management and panoramic recording of equipment status, ensuring the accuracy and traceability of equipment status.
Patent Information
- Application Number
- CN202611182021.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-05
- Publication Date
- 2026-11-20
AI Technical Summary
Existing power equipment lifecycle management systems lack joint verification of numerical consistency, equipment identity correspondence, and time continuity between different data sources. This leads to errors in ledgers, inaccurate sensors, or duplicate work orders potentially directly altering equipment status, and makes it difficult to generate recalcible on-chain records of equipment status.
A power equipment lifecycle asset management system based on a private blockchain is adopted, including a trusted asset acquisition module, an asset topology version management module, a lifespan status analysis module, an operation and maintenance task matching module, and an asset status migration module. Through the verification of multi-source equipment data and the management of topology relationships, a trusted status signal and equivalent lifespan consumption are formed, enabling the recalculation and correction of equipment status.
It achieves trusted verification and on-chain evidence storage of multi-source data, ensuring the accuracy and traceability of device status, avoiding duplicate order dispatch and illegal status migration, and providing trusted management and panoramic recording of the entire device lifecycle.
Smart Images

Figure CN123140397A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of green electricity trading and blockchain data processing technology, specifically to a power equipment lifecycle asset management system based on a private blockchain. Background Technology
[0002] Full life-cycle asset management of power equipment is a technology that continuously links the ledgers, status, operation and maintenance and financial data generated during the process of equipment procurement, installation and commissioning, operation monitoring, maintenance and renovation to decommissioning and scrapping, and implements status evaluation, task scheduling and asset status control accordingly.
[0003] Existing patent CN113222426A discloses a power equipment quality lifecycle management system based on blockchain and IoT, which collects equipment information through multiple business nodes and writes it into a consortium blockchain. However, this solution mainly focuses on cross-stage information aggregation and on-chain evidence storage, and fails to form a closed loop between multi-source data trusted verification, dynamic asset topology version, operational stress transfer, equivalent lifecycle accumulation, repeated event intervals, and concurrent state migration. It is difficult to guarantee that the lifecycle conclusion and asset status can be recalculated, corrected, and not registered repeatedly.
[0004] To address the aforementioned issues, it is necessary to propose a power equipment lifecycle asset management system based on a private blockchain. Summary of the Invention
[0005] The technical problem this invention aims to solve is that existing power equipment lifecycle management systems typically directly aggregate data from equipment ledgers, operational monitoring, inspection tests, and maintenance work orders. This lacks joint verification of numerical consistency, equipment identity correspondence, and temporal continuity across different data sources. Incorrect ledgers, malfunctioning sensors, or duplicate work orders can directly alter equipment status. Furthermore, existing systems often fail to generate time-varying asset topology versions based on equipment connection relationships, shared auxiliary system relationships, and equipment replacement relationships, making it difficult to determine the impact path of upstream equipment or public auxiliary system anomalies on the target equipment's lifecycle status. In addition, equipment maintenance, shutdown, decommissioning, and scrapping status operations are scattered across different business platforms, easily leading to duplicate order dispatches, duplicate registrations, unauthorized migrations, or concurrent overwriting. While on-chain records are immutable, on-chain status lacks verifiable off-chain computational basis.
[0006] To address the aforementioned technical issues, this invention provides a power equipment lifecycle asset management system based on a private blockchain, comprising a trusted asset acquisition module, an asset topology version management module, a lifecycle status analysis module, an operation and maintenance task matching module, an asset status migration module, and a private blockchain evidence storage and traceability module.
[0007] The asset trusted acquisition module is used to receive multi-source equipment data sent by the asset ledger system, operation monitoring system, integrated online monitoring device, mobile inspection terminal, test report system, maintenance work order system, spare parts management system and procurement and finance system. It performs asset identification binding, time alignment, unit conversion, cumulative quantity difference, original message digest calculation and multi-source consistency verification on the multi-source equipment data to generate time-slice asset data packets carrying trusted status signals.
[0008] The asset identification binding process includes: using a candidate key composed of manufacturing number, factory number, installation location code, and external system equipment code to search for the corresponding asset master object in the asset master object table; when the candidate key is uniquely matched, the external message is bound to the corresponding asset identifier; when no match is found, an asset code missing signal is output; when multiple asset master objects are matched, an asset code conflict signal is output. For equipment replacement scenarios, the effective time intervals for the old and new equipment are limited according to the switching time in the handover record, and the current time slice is truncated at the switching time.
[0009] The multi-source consistency verification includes: establishing numerical residual channels between online monitoring data and operation monitoring data, numerical residual channels between online monitoring data and inspection or test data, interval residual channels between actual operation data and equipment rated boundaries, and status residual channels between asset ledger status and on-site operation status; determining the data credibility of the current time slice based on historical manual review samples, data source certificate status, timestamp continuity, and external quality codes of each residual channel; and outputting a credible signal, a signal to be reviewed, or an invalid signal based on the credibility threshold and invalid threshold formed by historical valid samples and historical invalid samples.
[0010] Data carrying trusted signals or signals to be verified is encapsulated into the time-slice asset data packet; data carrying invalid signals is not included in subsequent lifetime state calculations, only the original message digest, invalidity reason, and manual verification task identifier are saved. The time-slice asset data packet includes at least the asset identifier, time-slice start and end times, runtime, status quantity, technical document version, data source quality code, certificate digest, original message hash value, interface rule version, and trusted status signal.
[0011] The asset topology version management module is used to read the time-slice asset data package, asset master object, primary wiring model, equipment installation relationship, shared auxiliary system relationship, replacement relationship and maintenance dependency relationship, and establish an asset topology snapshot with version number, using the asset master object as the equipment node and the electrical connection relationship, installation subordination relationship, shared auxiliary system relationship, replacement relationship and maintenance dependency relationship as relationship edge.
[0012] When the asset topology version management module detects changes in device deployment / deployment status, connection relationships, installation locations, device replacement relationships, shared auxiliary system status, or work order isolation range, it truncates the current time slice at the corresponding change time point and creates a new asset topology snapshot based on the changed device nodes and relationship edges. Each asset topology snapshot includes at least a topology version number, a valid time interval, a device node table, a relationship edge table, a switch status table, relationship edge input values, a time slice asset data packet hash set, and the hash of the previous topology version.
[0013] The asset topology version management module is also used to verify the asset ledger status against on-site operational data. When the equipment recorded in the asset ledger is in a decommissioned, scrapped, or not installed state, and two consecutive sampling points of the operational monitoring data or online monitoring data exceed the corresponding measurement resolution, an asset status conflict signal is output. When the switch remote signaling is off, and two consecutive sampling points of the corresponding line power in the same direction exceed the power resolution, a topology conflict signal is output. When the same manufacturing number corresponds to multiple operational asset identifiers within the same valid time interval, an asset identity conflict signal is output. When a conflict occurs, the affected time slice carries a freeze marker and does not proceed to the final lifespan conclusion or asset status migration.
[0014] The lifetime status analysis module is used to read time-slice asset data packets carrying trusted signals or signals to be verified, as well as the corresponding asset topology snapshots. Based on the device type, it calls the status indicator table bound to the technical file version, calculates the status impact vector of the device node, the time-slice equivalent lifetime consumption increment, and the cumulative equivalent lifetime consumption, and outputs the lifetime status signal.
[0015] The status indicator table records at least the indicator name, the direction of indicator deterioration, the warning value, the limit value, the unit of measurement, the data source priority, and the rule version. For indicators where a larger value indicates a worse equipment condition, the normalization impact is zero when the measured value is not higher than the warning value; when the measured value is between the warning value and the limit value, linear normalization is performed according to the position of the measured value relative to the warning value and the limit value; when the measured value reaches or exceeds the limit value, the normalization impact is one. For indicators where a smaller value indicates a worse equipment condition, normalization is performed in the opposite direction.
[0016] The lifespan state analysis module generates a local state influence vector in a fixed order of thermal stress, electrical stress, insulation or mechanical stress, and environmental and defect effects. For target equipment with upstream electrical equipment, shared auxiliary systems, or maintenance-dependent equipment, the state influence vector of the upstream equipment is multiplied by the actual load, received power, or shared auxiliary system usage of the corresponding relation edge, and then summed element by element. This summation is then combined with the local state influence vector of the target equipment and normalized to obtain the state influence vector of the target equipment.
[0017] When a closed-loop relationship exists in the asset topology snapshot, the lifetime state analysis module updates the state influence vector of each device node in a synchronous iterative manner; when the maximum change of each element of the state influence vector in two adjacent rounds does not exceed the convergence condition determined according to the resolution of the corresponding measurement device, the converged state influence vector is output; when the maximum number of iterations is reached but convergence is still not achieved, the state influence recursion non-converged signal is output and the corresponding time slice is frozen.
[0018] The lifespan status analysis module calculates the equivalent lifespan consumption increment for each time slice based on the actual duration of the time slice and the lifespan stress index in the equipment's technical file. For lifespan stress indices with larger values indicating worse equipment condition, the ratio of the measured value to the warning value is used as the stress ratio; for lifespan stress indices with smaller values indicating worse equipment condition, the ratio of the warning value to the measured value is used as the stress ratio. When the stress ratio is no greater than one, it is treated as a single step; when the stress ratio is greater than one, the lifespan consumption of the time slice is amplified according to the actual ratio. The equivalent lifespan consumption increment of each time slice is accumulated sequentially over time to form the cumulative equivalent lifespan consumption.
[0019] The life status analysis module compares the life consumption since the most recent effective maintenance, the cumulative equivalent life consumption, and the critical defect signal with the maintenance interval in the maintenance strategy, the rated life in the equipment technical file, and the non-conforming conditions, and outputs maintenance due signal, decommissioning candidate signal, emergency shutdown signal, attention signal, or normal operation signal.
[0020] The operation and maintenance task matching module is used to generate candidate operation and maintenance tasks based on the life status signal, state influence vector and cumulative equivalent life consumption, and match the candidate operation and maintenance tasks with existing work orders, power outage windows, personnel qualifications, maintenance tools, spare parts inventory and asset topology constraints.
[0021] The candidate maintenance tasks include at least a task identifier, target asset identifier, trigger time slice, trigger signal, main impact category, suggested task type, estimated working hours, required personnel qualifications, spare parts code, allowed execution time interval, and asset topology version number. The maintenance task matching module sorts the candidate maintenance tasks according to trigger signal priority, signal generation time, and non-repeatable task sequence number.
[0022] The maintenance task matching module first performs an asset time interval verification, deducting the execution time interval of the same asset that has already been occupied by a previous work order, and checks whether the target asset and its dependent devices are in a topology state that allows isolation. Then, it performs a resource verification, deducting the man-hours, maintenance tools, and spare parts quantity already occupied by previous tasks within the same time interval. If the target asset time interval, dependent device status, and resource quantity all meet the requirements, an executable task signal is output; if only some resources meet the requirements, a task signal to be supplemented is output; if there are topology conflicts, critical data pending verification, or insufficient critical spare parts, a frozen task signal is output.
[0023] When the same defect is repeatedly reported by multiple data sources, the operation and maintenance task matching module uses the asset identifier, defect location, defect type, time slice range, and original message hash set as the merging key; when the merging key is the same and the time ranges intersect, a main task is generated and the remaining reporting records are written into the evidence set of the main task.
[0024] The asset status migration module is used to establish a cumulative equivalent life consumption axis according to the reliable time slice sequence of the same asset, to establish asset event units for inspection, defect confirmation, maintenance, technical transformation, shutdown, decommissioning and scrapping events, and to allocate non-overlapping asset event intervals with left closed and right open to the asset event units.
[0025] The starting point of the asset event interval is equal to the maximum end point of the previously allocated asset event intervals for the same asset. The end point of the asset event interval is equal to the sum of the starting point and the equivalent lifetime consumption of the time slice covered by the current asset event unit. When the proposed end point exceeds the cumulative equivalent lifetime consumption end point corresponding to the latest time slice associated with the current asset event unit, a lifetime interval conflict signal is output, and the corresponding asset event unit is put into a frozen state.
[0026] The asset state migration module establishes an asset state machine, which includes states such as pending installation, installation and commissioning, in operation, under maintenance, out of service and stored, decommissioned and awaiting disposal, and scrapped. The asset state machine restricts allowed operations between different asset states based on preset state migration relationships; specifically, a scrapped state cannot be restored to an operational state.
[0027] The status operation request submitted by the external platform includes at least the requesting platform identifier, asset identifier, asset event unit identifier, operation type, request event range, previous status summary, request timestamp, incremental operation sequence number within the platform, and requester certificate summary. The asset status migration module performs overlap detection and exclusive locking on the request event range, and verifies the previous status summary, current asset status, incremental operation sequence number within the platform, and global status operation sequence number within the locked range.
[0028] When the verification is successful, the asset state migration module completes asset state migration, platform operation sequence number update, global state operation sequence number update, and state migration record generation within the same transaction; outputs a duplicate operation signal when request event intervals overlap; outputs a concurrent conflict signal when the state summary or operation sequence number changes before and after locking; and outputs a state rejection signal when the requested operation does not conform to the allowed migration relationship of the asset state machine.
[0029] The private chain evidence storage and traceability module is used to write data summaries of time-slice asset data packets, asset topology snapshots, lifespan status analysis results, operation and maintenance tasks, asset event units, and state migration records into the private chain, and generate full lifespan asset traceability results based on asset identifiers and asset event relationships.
[0030] The private blockchain comprises nodes deployed in the asset management department, production operations department, maintenance department, and audit or finance department, respectively. Each private blockchain node only allows nodes holding valid digital certificates issued by the member management institution to access it, and state transition transactions are jointly endorsed by the corresponding business nodes according to the endorsement policy in the blockchain governance configuration file.
[0031] Original telemetry messages, inspection data, test reports, maintenance work orders, purchase contracts, and financial documents are stored in an off-chain database with access control. The private blockchain stores object types, object identifiers, object hash values, off-chain storage addresses, access permission summaries, technical rule versions, topology version numbers, and state transition records. When the storage location of an off-chain object changes, only a new storage address mapping record is added; the original object hash value and historical state transition records are not modified.
[0032] The smart contract verifies the computation result summary, topology version number, execution node signature, and endorsement result. If the execution node signature verification fails, the computation rule version does not exist, the set of input object hash values is incomplete, or the recalculated hash value of the off-chain object is inconsistent with the hash value of the on-chain object, the smart contract refuses the state transition and outputs a data integrity exception signal; related asset event units that are still in a deployable state are transferred to a frozen state, and records of scrapped states are not deleted, but an exception marker is added.
[0033] The modules collaborate according to the following data path: the time-slice asset data packets output by the asset trusted acquisition module serve as input to the asset topology version management module and the lifetime status analysis module; the asset topology snapshots and relational edge inputs output by the asset topology version management module serve as the calculation basis for the lifetime status analysis module; the state influence vector, cumulative equivalent lifetime consumption, and lifetime status signal output by the lifetime status analysis module serve as the task generation basis for the operation and maintenance task matching module; the operation and maintenance tasks and their execution results serve as input to the asset state migration module for establishing asset event units and executing state migrations; the state migration records output by the asset state migration module, along with the aforementioned data object summaries, are sent to the private chain evidence storage and traceability module.
[0034] Compared with the prior art, the beneficial effects of the present invention are: This invention verifies asset data through multi-source residuals, certificate status, and time continuity. It uses versioned asset topology to fix historical connection relationships and combines state impact recursion and equivalent lifetime accumulation to form a recalculated lifetime basis. It restricts duplicate order dispatch, duplicate maintenance, and illegal state migration through operation and maintenance resource matching, non-overlapping asset event intervals, asset state machines, and atomic transactions. It adopts on-chain digests and off-chain raw data collaborative storage to achieve cross-departmental trusted evidence storage, correction traceability, and full life cycle traceability. Attached Figure Description
[0035] To facilitate understanding by those skilled in the art, the present invention will be further described below with reference to the accompanying drawings: Figure 1 This is a system block diagram of the power equipment lifecycle asset management system based on a private blockchain in an embodiment of the present invention; Figure 2 This is a schematic diagram illustrating the principle of multi-source data trust verification and time-slice data packet generation in an embodiment of the present invention; Figure 3 This is one of the schematic diagrams illustrating the time-slice topological snapshot and green electricity component recursion in the embodiments of the present invention; Figure 4 This is the second schematic diagram of the time-slice topological snapshot and green electricity component recursion in the embodiments of the present invention; Figure 5 This is a diagram showing the results of multi-source data consistency and reliability determination in the embodiments of the present invention; Figure 6 This is a diagram showing the time-slice topology input and node green electricity component recursion results in an embodiment of the present invention; Figure 7 This is a diagram showing the range of rights and state transition results in the embodiments of the present invention. Detailed Implementation
[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are merely some embodiments of the present invention, and not all embodiments. Other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are all within the scope of protection of the present invention.
[0037] This invention provides a private blockchain-based asset management system for the entire lifecycle of power equipment. It is applicable to the procurement, warehousing, installation, commissioning, operation, inspection, condition-based maintenance, technical upgrades, shutdown, decommissioning, and scrapping management of transformers, circuit breakers, switchgear, power cables, instrument transformers, relay protection devices, metering terminals, and station auxiliary equipment. The system does not simply write equipment ledgers and maintenance work orders onto the blockchain. Instead, it first organizes data from operation monitoring, online monitoring, inspection tests, maintenance work orders, procurement finance, and equipment ledgers into verifiable time-slice asset data packages. Then, based on the actual equipment connection relationships, operating status, and maintenance events, it creates versioned asset topology snapshots, calculates the impact of equipment status and equivalent lifespan consumption, and finally controls asset state transitions through an asset state machine, writing the calculation basis and state transition summary into the private blockchain.
[0038] In this embodiment, a private chain refers to a distributed ledger that allows only nodes registered with a member management organization and obtaining digital certificates to access it, and whose transaction submission permissions are controlled by a preset endorsement policy; an asset master object refers to a data object that uses a unique asset identifier as the primary key and is associated with the device model, manufacturing number, installation location, technical parameters, financial attributes, and current status. In this embodiment, the time-slice asset data package refers to a data object formed by uniformly encapsulating multi-source device data within a time interval during which device connection relationships, operating status, data source certificate status, and work order status remain continuously valid; In this embodiment, an asset topology snapshot refers to a versioned relationship diagram formed within a continuous and valid time interval based on electrical connections, installation dependencies, shared auxiliary systems, and maintenance dependencies between devices. In this embodiment, the state influence vector refers to a data vector that records the proportion of thermal stress, electrical stress, insulation or mechanical stress, and environmental and defect influences according to a preset influence category order. In this embodiment, the equivalent life consumption refers to the life consumption obtained by converting the actual operating time according to the stress ratio of over-temperature, overload, vibration or insulation degradation; the asset event interval refers to the non-overlapping interval on the cumulative equivalent life consumption axis of a single device, represented in a left-closed and right-open form and uniquely bound to an asset event unit.
[0039] It should be noted that the full lifecycle in this embodiment is not divided into static stages solely based on the purchase date and scrap date. Instead, it utilizes continuous operating data, maintenance records, and topology versions to jointly determine the reliable state of the equipment within each time slice. When the equipment state is corrected, the system retains the original state record and generates a replacement record, without overwriting the original event. This ensures that the changes in the equipment's state from warehousing to scrapping have a recalcible technical basis.
[0040] Please see Figure 1 , Figure 1 This is a system block diagram of a power equipment lifecycle asset management system based on a private blockchain, as described in an embodiment of the present invention.
[0041] like Figure 1 As shown, the system includes an asset trusted acquisition module, an asset topology version management module, a lifespan status analysis module, an operation and maintenance task matching module, an asset status migration module, and a private chain evidence storage and traceability module. Each module can be deployed within the same server cluster, or separately deployed in the site-side edge gateway, production management server, operation and maintenance management server, and private chain node. Data messages transmitted between modules must carry at least the asset identifier, time slice identifier, topology version number, object hash value, and trusted status signal.
[0042] The trusted asset acquisition module is used to collect and uniformly process raw data generated throughout the entire lifecycle of power equipment. The hardware of this module includes an edge acquisition gateway with a processor, memory, communication interface, and non-volatile memory, as well as a data access server that communicates with the edge acquisition gateway. The edge acquisition gateway establishes data interfaces with ERP or EAM asset ledgers, SCADA or DCS operation monitoring systems, integrated online monitoring devices, mobile inspection terminals, test report systems, maintenance work order systems, spare parts management systems, and financial procurement systems. The data access server stores interface adaptation rules, equipment registry entries, unit conversion tables, certificate status tables, and manual verification samples.
[0043] Each external message includes at least the source system identifier, external device identifier, event occurrence time, collection time, field name, field value, unit field, quality code, interface operation sequence number, and message signature. The trusted asset acquisition module first uses the manufacturing number, factory number, installation location code, and external system device code to form candidate keys, and performs a unique matching in the asset master object table. If only one asset master object is matched by a candidate key, the corresponding asset identifier is written; if no match is found, an asset code missing signal is output; if two or more asset master objects are matched, an asset code conflict signal is output. For equipment replacement scenarios, the old and new equipment are only valid before and after the switchover time point given in the handover record. The time slice containing the switchover time point is truncated, and it is not allowed to bind two operating asset master objects simultaneously at the same installation location within the same valid interval.
[0044] The quality code and status code of the external system are numerically converted by the interface adaptation rules. The conversion rules are not inferred temporarily by the acquisition module, but are registered with the interface version and generate a rule version number. Table 1 shows the general quality code mapping used in this embodiment; when the external system uses other codes, the interface adaptation rules must explicitly list the correspondence between the external code and the standard status in Table 1. Codes not listed in the mapping table are treated as invalid.
[0045] Electricity is uniformly converted to kWh, active power to kW, current to A, voltage to kV, runtime to h, and temperature to ℃. External systems inputting percentages have their error limit divided by 100 before being written to the decimal error field; when inputting in Fahrenheit, subtract 32 first, then multiply by 5 / 9; runtime inputting in seconds is divided by 3600. Time fields are uniformly converted to Coordinated Universal Time (UTC) millisecond timestamps; messages whose time zones or time formats cannot be recognized are not included in time slice calculations.
[0046] The device registry records the nominal sampling period and minimum resolution of each data source. The cumulative running quantity is calculated by subtracting adjacent valid readings to obtain the time slice increment. When the cumulative reading rolls back, the module queries records of device replacement, counter reset, or range switching. If a valid record exists, accumulation resumes from the switching point; otherwise, an abnormal cumulative quantity signal is output. The time slice boundary is jointly determined by the asset status change time, device connection relationship change time, work order status change time, data source certificate status change time, and running direction change time exceeding the measurement resolution. When a measured value is missing from the cumulative reading boundary, linear interpolation is performed only if the interval between adjacent readings does not exceed twice the nominal sampling period and there are no status change events in between. Values exceeding the specified interval, crossing a no-record reset event, or the interpolation result exceeding the device range are all marked as missing.
[0047] The asset trusted acquisition module establishes multi-source residual channels for the same asset and the same time slice. These include residuals between online monitoring values and SCADA operating values, residuals between online monitoring values and inspection or test values, residuals between actual operating values and the rated boundaries in the technical archives, and status residuals between the asset ledger status and the on-site operating status. For two numerical channels, the normalized residual is calculated with the absolute difference between the two values as the numerator and the maximum of the absolute values of the two values and the corresponding minimum resolution as the denominator. When neither value exceeds the minimum resolution, the residual is recorded as 0. For rated closed interval verification, the residual is recorded as 0 when the measured value is within the closed interval, and 0 when it is outside the interval. The residual is calculated with the distance from the measured value to the nearest boundary as the numerator and the larger of the absolute value of the rated upper limit and the minimum resolution as the denominator.
[0048] The reliability of the data in the current time slice is calculated using the following formula: In the formula, Indicates the asset serial number; Indicates the time slice number; and All represent the residual channel number; Assets In time slice The set of residual channels that actually have valid inputs; and They represent the first The two original input values in each residual channel are time-aligned and unit-converted; This represents the larger of the two input data sources corresponding to the minimum resolution; This represents the normalized residual calculated from the two original input values, and its value is not less than 0. Indicates the current version of the interface adaptation and trust determination rules; Indicates in rule version Next, the Each residual channel represents the standard deviation of historical manually reviewed samples of the same equipment type; This indicates the smallest positive number to prevent division by zero; the residual field retains 6 decimal places. ; Indicates the first The weights of each residual channel, and the sum of the weights of each available channel is 1; When there are fewer than two historical review samples, the sample standard deviation is not calculated; instead, the weights of each available channel are set to equal... ; This indicates the validity of the certificate. It is set to 1 if the message signature can be verified up to the registered root certificate, the certificate is valid within the event time and has not been revoked, otherwise it is set to 0. This indicates a time continuity indicator. It is set to 1 when the timestamp is strictly incremental and the interval between adjacent timestamps does not exceed twice the nominal sampling period; otherwise, it is set to 0. This represents the data source quality indicator obtained from Table 1, with 1, 0.5, and 0 for normal, suspicious, and invalid states, respectively. Assets In time slice The data reliability is defined as [0,1].
[0049] When any residual channel has fewer than two verified samples, all available residual channels are weighted equally. After all available channels have at least two samples, the weights are updated based on the sample standard deviation. The confidence threshold is the minimum confidence level of historical valid samples, and the invalidity threshold is the maximum confidence level of historical invalid samples. When both types of samples exist and the invalidity threshold is less than the confidence threshold, a confidence signal is output if the confidence level is greater than or equal to the confidence threshold; an invalid signal is output if the confidence level is less than or equal to the invalidity threshold; and a verification signal is output for the open interval between the two thresholds. When either type of sample is empty, a verification signal is uniformly output. When the two thresholds overlap, the previous valid rule version is used, and the sample overlap signal is output; if there is no previous version, a verification signal is still output.
[0050] Please see Figure 2 , Figure 2 This is a schematic diagram illustrating the principle of multi-source device data trust verification and time-slice asset data packet generation. (For example...) Figure 2 As shown, messages from each external system sequentially undergo interface adaptation, time alignment, unit conversion, asset code binding, cumulative quantity differentiation, original message digest, consistency verification, and credibility calculation. Data carrying trusted signals or signals to be reviewed are encapsulated into time-slice asset data packets. These data packets include at least the asset identifier, time slice start and end times, running quantity, status quantity, technical document version, data source quality code, certificate digest, original message hash value, interface rule version, and trusted status signal. Invalid data is not written into subsequent status calculation inputs; only the original message digest, invalidity reason, and manual review task identifier are saved.
[0051] Please see Figure 3 , Figure 3 This is a diagram showing the results of data consistency and reliability assessment from multiple sources.
[0052] Figure 3 Part (a) in the text represents the state curves of the same asset formed by the online monitoring device, the SCADA operation system, and the inspection or testing system within a continuous time slice. Figure 6 Part (b) in the diagram represents the three normalized residual channels between online monitoring data, SCADA data, inspection data, and rated model data. Each residual value is written into the residual matrix according to a unified time index.
[0053] Figure 6Part (c) represents the data credibility of each residual channel after weighting based on historical review samples, as well as the credibility threshold and invalidity threshold in the current rule version. A credible signal is output for time slices where the credibility reaches the credibility threshold; an invalid signal is output for time slices where the credibility is not higher than the invalidity threshold; and a signal to be reviewed is output for time slices between the two thresholds.
[0054] It should be noted that, Figure 6 The curves and values shown are used to illustrate the correspondence between the original input, residual calculation, and trusted state signal, and do not constitute fixed limitations on device temperature, sampling period, or thresholds. In actual operation, the residual value is directly calculated from the original data of the corresponding time slice, the weight is calculated from historical review samples of the same interface version and the same device type, and the trusted threshold and invalid threshold are read from the corresponding rule version. Therefore, there is no situation where a trusted result is given first and then the threshold is set in reverse.
[0055] It should be noted that the asset trusted acquisition module does not only verify message signatures. Message signatures can only prove that a message comes from a certain registration node, but cannot prove that the temperature, current, status, or maintenance conclusion in the message is consistent with the actual situation on site. This embodiment combines equipment identity verification, time continuity verification, numerical consistency verification, and rated boundary verification. Before the data enters the life status analysis, it outputs a trusted, pending verification, or invalid signal, thereby preventing erroneous ledgers, inaccurate sensors, or duplicate work orders from directly changing the asset status.
[0056] The asset topology version management module is used to create asset topology snapshots based on asset master objects, equipment installation relationships, primary wiring models, shared auxiliary system relationships, and maintenance dependencies. The hardware for this module is a topology computing server configured with a processor, memory, network interfaces, and a graph database. Asset master objects are treated as device nodes, and electrical connection relationships, installation dependencies, shared cooling or DC system relationships, replacement relationships, and maintenance dependencies are treated as edges. Each edge records at least the sending node, receiving node, relationship type, effective start and end time, data source, load direction, metering value, and relationship record hash value.
[0057] The asset topology version management module uses the device status and connection relationships at the start of a time slice as the initial state. When changes are detected within the time slice in switch status, device activation / deactivation status, installation location, replacement relationships, shared auxiliary system status, or work order isolation range, the original time slice is truncated at the point of change, and a new asset topology snapshot is created. Each asset topology snapshot includes at least a topology version number, a valid time interval, a device node table, a relationship edge table, a switch status table, load or energy transfer volume, a time slice asset data packet hash set, and a hash of the previous topology version. The topology version number is generated from the region identifier, valid start time, and node edge set summary. Unrecorded connection relationship changes are not allowed within the same version.
[0058] The module performs cross-validation between asset status and on-site operational data. When the asset ledger records equipment as decommissioned, scrapped, or not installed, and two consecutive sampling points of SCADA or online monitoring data exceed the corresponding measurement resolution, an asset status conflict signal is output. When the switch remote signaling is off, and two consecutive samplings of line power in the same direction exceed the power resolution, a topology conflict signal is output. When the same manufacturing number corresponds to two operational asset identifiers within the same valid interval, or when the same installation location is bound to two asset master objects without a replacement relationship within the same valid interval, an asset identity conflict signal is output. When the replacement times of old and new equipment overlap and there is no handover record, a replacement relationship conflict signal is output. In the event of any of the above conflicts, the affected time slice remains frozen and does not proceed to the final lifespan conclusion or state transition.
[0059] Please see Figure 4 , Figure 4 This is a schematic diagram of an asset topology snapshot. Figure 4 In this model, nodes A and B represent the main transformer and circuit breaker group, respectively; node C represents the substation busbar or aggregation unit; nodes D and E represent downstream cables, distribution terminals, or user-side equipment; and auxiliary system nodes represent cooling, DC, or fire protection systems shared by multiple devices. The arrows on the relationship edges are determined according to the actual load direction or maintenance dependency direction within the current time slice. When the actual direction is opposite to the direction of the basic model, the module swaps the sending and receiving nodes and writes a reverse identifier in the relationship edge.
[0060] For electrical edges with actual energy or load metering, the impact transmission quantity uses the actual downstream received power or current load; when only upstream transmission is available, the transmission quantity is used as a temporary upper limit and a loss confirmation flag is written. For shared auxiliary system edges, the impact transmission quantity is allocated according to the actual usage or rated capacity ratio of each device within the same time slice; when actual usage is missing, empirical ratios are not used as substitutes, but a shared relationship verification signal is output. The resulting relationship edge input quantity serves as the basis for calculating the recursive state impact vector of the lifetime state analysis module.
[0061] It should be noted that the asset topology snapshot retains the hash of the previous version and writes the set of hashes of the time-slice asset data packets into the current version, so that any historical lifetime conclusion can locate the valid device connection relationship at that time. When the device is later relocated, modified or replaced, the new version will not overwrite the old version, avoiding the conclusion drift caused by using the current topology to deduce the historical state.
[0062] The lifespan status analysis module calculates the equipment's state impact vector, cumulative equivalent lifespan consumption, and lifespan status signals based on trusted time-slice asset data packets and asset topology snapshots. The module's hardware is a status analysis server configured with a processor, memory, model storage, and matrix operation units. The module first calls the corresponding status indicator table based on the equipment type. The status indicator table records the indicator name, deterioration direction, warning value, limit value, unit, data source priority, and rule version. Warning values and limit values are derived from the equipment's technical specifications, type test reports, enterprise maintenance procedures, or approved status evaluation standards, and are bound to the technical document version.
[0063] For indicators where a larger value indicates a worse state, the normalization effect is set to 0 when the measured value is less than or equal to the warning value; when the measured value is between the warning value and the limit value, the normalization effect is calculated by subtracting the warning value from the measured value and then dividing by the difference between the limit value and the warning value; when the measured value is greater than or equal to the limit value, the normalization effect is set to 1. For indicators where a smaller value indicates a worse state, the opposite calculation method is used: 0 when the measured value is greater than or equal to the warning value; 0 when the measured value is between the limit value and the warning value; and 1 when the measured value is less than or equal to the limit value. An abnormal indicator configuration signal is output when the warning value equals the limit value or the units are inconsistent, and no normalization is performed. Binary state quantities are treated as 0 for normal and 1 for abnormal; Level 3 defect codes are treated as 1 / 3 for general defects, 2 / 3 for severe defects, and 1 for critical defects; unidentified defect codes are treated as invalid data.
[0064] The module forms a local state influence vector in a fixed order of thermal stress, electrical stress, insulation or mechanical stress, and environmental and defect effects. For nodes with upstream electrical equipment, shared auxiliary systems, or maintenance-dependent equipment, the upstream influence is recursively derived along the relational edges of the asset topology snapshot. The state influence vector of the target device node is calculated according to the following formula: In the formula, Indicates the asset topology snapshot in time slice To device node The set of valid upstream nodes that transmit state effects; Indicates upstream node To device node The dimensionless relationship influence intensity: For an electrical connection side, take the actual received power of that side divided by "the product of the rated capacity of the connection side and the duration of the time slice"; For shared auxiliary system edges, divide the actual usage of the target device by the rated supply of the shared system; for maintenance dependency edges, take 1 if the dependency is in a valid state, otherwise take 0; write 1 if any ratio exceeds 1. Represents device node The local operating influence intensity is taken as the ratio of the actual load of the equipment to the rated load and limited to [0,1]. When the rated load or the actual load is missing, a local influence intensity missing signal is output and not supplemented with empirical values. Represents the smallest positive number to prevent the normalized denominator from being 0, taking the device... The minimum recordable positive value for the relevant load ratio field; This represents the normalized denominator representing the influence strength of the current node; This indicates the influence of local state on weights; Indicates upstream node The corresponding state affects the weight; This represents a four-dimensional local state influence vector formed by local temperature, current, vibration, insulation test, environmental and defect data, with each element converted to [0,1] using a piecewise rule; Indicates upstream node The state influence vector; Represents device node In time slice The state influence vector.
[0065] When excluded When the intensity of all external influences is 0, Set it to zero vector and output a signal that has no effective effect on the input signal.
[0066] When the asset topology snapshot forms a closed loop, the module uses the state influence vector of all nodes from the previous round to synchronously update the results of the next round. Convergence is determined when the maximum change in each element of the vector between two adjacent rounds is not greater than the proportion of the minimum resolution of the relevant measuring device to the total input of the current node; the maximum number of iterations is twice the number of device nodes and not less than 10. If convergence is not achieved after reaching the maximum number of iterations, the output state influence is used to recursively derive the non-converged signal and the corresponding time slice is frozen; if the topology version changes, the current iteration is terminated and recalculated under the new version.
[0067] Please see Figure 5 , Figure 5This is a schematic diagram illustrating the recursive propagation of the equipment status impact vector along the asset topology. Node C receives the impact quantities from upstream equipment and shared auxiliary systems, and merges them with the impact quantities from local defects, test anomalies, and overdue maintenance to form the status impact vector. When node C transmits the impact quantities to nodes D and E, all downstream relationships within the same node share the same impact proportion; the specific impact quantity is determined by the actual load or usage of the corresponding relationship edge. Therefore, the system not only records the monitoring values of individual devices but also retains the impact path of upstream equipment or common auxiliary system anomalies on the status judgment of downstream devices.
[0068] The equivalent lifetime consumption increment of the equipment in each time slice is calculated according to the following formula: In the formula, Indicates equipment In time slice Inner The measured values of each life stress index after reliable verification; Indicates from device The current technical document version reads the first Warning values for each indicator; This indicates the direction of the indicator's deterioration; a value of +1 indicates a worsening situation, and a value of -1 indicates a worsening situation. when hour, and All values must be greater than 0; otherwise, an abnormal indicator configuration signal will be output. Indicates the first The stress ratio of each life stress index; Indicates equipment In time slice The set of life stress indicators that simultaneously satisfy "measured values are valid, credible states are not invalid, and warning values exist with consistent units"; Indicates time slice The actual duration, in hours, is calculated by subtracting the start time from the end time of the time slice and then converting the result. Indicates equipment In time slice The equivalent lifetime consumption increment within the time frame, in hours; When the stress ratio is not greater than 1, the corresponding factor is treated as 1; when the stress ratio is greater than 1, the life consumption is amplified according to the actual ratio. Indicates time slice The end time; Indicates the cumulative cutoff time; Indicates equipment Deadline The cumulative equivalent life consumption.
[0069] like If empty, the time slice will only accumulate the actual duration and write a missing life stress index marker.
[0070] The lifespan status analysis module compares the cumulative equivalent lifespan consumption with the rated lifespan in the equipment's technical file, the maintenance interval in the maintenance strategy, the cumulative lifespan consumption corresponding to the most recent effective maintenance, and the current critical defect signal. When the lifespan consumption since the most recent maintenance reaches the maintenance interval, a maintenance expiration signal is output; when the cumulative lifespan consumption reaches the rated lifespan, an irreparable critical defect exists, or the main insulation or mechanical structure fails as confirmed by testing, a decommissioning candidate signal is output; when any normalized influence value reaches 1 and the protection device operates or the test conclusion is unqualified, an emergency shutdown signal is output; in other cases, an in-operation normal signal or a warning signal is output. Maintenance intervals, rated lifespan, and unqualified conclusions are all read from the corresponding rule version and are not set temporarily during the calculation process.
[0071] It should be noted that the equivalent lifespan consumption does not replace the lifespan model provided by the equipment manufacturer. Instead, it organizes the warning boundaries and actual operating time in the existing technical documentation of this equipment into a unified cumulative axis. For equipment with a manufacturer-specific aging model, the system writes the output of the specific model as a lifespan stress index into the index set. For equipment without a specific model, the above-mentioned scaling rule is adopted, and the general estimation mark is explicitly retained.
[0072] The maintenance task matching module generates candidate maintenance tasks based on the lifespan status signals, status impact vectors, and cumulative equivalent lifespan consumption output by the lifespan status analysis module. These tasks are then matched against existing work orders, outage windows, personnel qualifications, spare parts inventory, and equipment topology constraints. The hardware for this module is an maintenance management server configured with a processor, memory, task queue, and resource database. Candidate maintenance tasks must include at least the following: task identifier, target asset identifier, trigger time slice, trigger signal, main impact category, suggested task type, estimated working hours, required qualifications, spare parts code, allowed execution time interval, and asset topology version number.
[0073] The module sorts candidate tasks according to trigger signal priority, signal generation time, and non-repeatable task sequence number. Tasks corresponding to emergency shutdown signals take priority over critical defect tasks, critical defect tasks take priority over maintenance due tasks, and maintenance due tasks take priority over high-priority inspection tasks. Under the same priority, tasks are sorted from earliest to latest signal generation time; if the times are the same, tasks are sorted from smallest to largest task sequence number. The sorting rules and priority table are saved with the maintenance strategy version; any priority adjustment generates a new version without changing the original sorting criteria of already generated tasks.
[0074] The task matching process performs a two-level occupancy check. The first level is asset time interval check, where the module first deducts the execution time interval of the same asset that has already been occupied by a previous work order, and checks whether the target asset and its upstream or downstream dependent devices are in a topology state that allows for isolation. The second level is resource check, where the module further deducts the man-hours, maintenance tools, and spare parts quantity that have already been occupied by previous tasks within the same time interval. An executable task signal is generated only when the target asset time interval, dependent device status, and resource quantity all meet the requirements; a task signal to be supplemented is generated when there are partial resources; and a frozen task signal is generated when there are topology conflicts, critical defect data to be reviewed, or insufficient critical spare parts.
[0075] When the same defect is repeatedly reported by online monitoring, manual inspection, and test reports, the module uses the asset identifier, defect location, defect type, time slice range, and original message hash set as the merging key. When the merging key is the same and the time ranges overlap, a main task is generated and other reported records are written to the evidence set; if the defect location or type is different, even if it occurs in the same time slice, separate tasks are generated. This avoids the same fault being repeatedly assigned by multiple systems, while not compressing the handling scope of different faults.
[0076] Please see Figure 6 , Figure 6 This is a graph showing the recursive results of the influence of time slice operation inputs and device status.
[0077] Figure 6 (a) represents the compositional changes of thermal stress, electrical stress, insulation or mechanical stress, and environmental and defect influences within a continuous time slice; (b) stores the proportion of each influence category in different time slices in a matrix format; (c) represents the differences in the state influence vectors of nodes C, D, and E; and (d) represents the data surface formed by the changes in the health index of different nodes over time. After reading the above results, the operation and maintenance task matching module writes the category with the highest influence proportion into the task reason field and locates the temperature measurement, insulation test, mechanical inspection, or environmental remediation task to be performed based on the corresponding indicator source.
[0078] It should be noted that the operation and maintenance task matching module does not directly dispatch tasks based on a single health score. Candidate tasks must be associated with the original time slice that triggered the task, the asset topology version, the trusted status signal, and the status impact category; data pending review can only generate frozen tasks or review tasks, and cannot directly generate equipment scrapping or asset value reduction instructions.
[0079] The asset state transition module is used to establish asset event units, allocate non-overlapping asset event intervals, and control equipment state changes through an asset state machine. The hardware carrier of this module is an asset state management server that configures a processor, transaction database, interval index, and concurrency lock manager. An asset event unit includes at least the following: event unit identifier, asset identifier, event type, associated work order, time slice set, topology version number, start and end points of cumulative equivalent lifetime consumption, current state, previous event unit identifier, successor event unit identifier set, request platform sequence number mapping, and most recent global state operation sequence number.
[0080] For the same asset, the module establishes a cumulative equivalent lifetime consumption axis according to the time sequence of the trusted time slices, and assigns left-closed, right-open asset event intervals for events such as inspection, defect confirmation, maintenance, technical upgrade, outage, and decommissioning. The starting point of the interval is equal to the maximum ending point of the previously assigned intervals for the same asset, and the ending point of the interval is equal to the sum of the starting point of the interval and the equivalent lifetime consumption of the time slice covered by this event. The proposed ending point must not exceed the cumulative equivalent lifetime consumption ending point corresponding to the latest time slice of the event; if it exceeds this, a lifetime interval conflict signal is output and the event unit is put into a frozen state. Adjacent intervals can share endpoints, but two intervals are considered to overlap if they intersect each other.
[0081] When equipment undergoes maintenance and a new status baseline is established, the module does not reset the historical cumulative axis. Instead, it writes a maintenance boundary marker at the end of the maintenance event and uses the "life consumption since the most recent maintenance" as the input for judging subsequent maintenance cycles. When an event unit needs to be split into multiple work orders, a split point is set within the original asset event interval. Each sub-interval is continuous and non-overlapping, and the parent event unit identifier is recorded. Multiple event units are allowed to be merged only if the asset identifier, event type, current status, and executing entity are the same and the intervals are continuous. Event units that have been scrapped or revoked cannot be merged again.
[0082] The asset state machine in this embodiment includes the following states: pending installation, installation and commissioning, in operation, maintenance, outage and storage, decommissioning and awaiting disposal, and scrapped. The pending installation state can be migrated to the installation and commissioning state or the decommissioning and awaiting disposal state; the installation and commissioning state can be migrated to the in operation state, maintenance state, or decommissioning and awaiting disposal state; the in operation state can be migrated to the maintenance state, outage and storage state, or decommissioning and awaiting disposal state; the maintenance state can be migrated to the in operation state, outage and storage state, or decommissioning and awaiting disposal state; the outage and storage state can be migrated to the in operation state, maintenance state, or decommissioning and awaiting disposal state; the decommissioning and awaiting disposal state can only be migrated to the scrapped state or, if there is an approval record, the decommissioning can be revoked and the asset returned to the outage and storage state; the scrapped state cannot be restored to an operational state.
[0083] Status operation requests submitted by external platforms must include at least the requesting platform identifier, asset identifier, event unit identifier, operation type, request event range, request quantity, previous status digest read when the request was generated, request timestamp, incremental operation sequence number within the platform, and requester certificate digest. Character fields are first normalized to Unicode, then encoded in UTF-8, with 4 bytes preceding each character; cumulative equivalent lifetime consumption is expressed in h and retained to 6 decimal places; time is expressed as Coordinated Universal Time (UTC) in milliseconds; fields are concatenated in a fixed order and then used to generate the request digest using SHA-256. The status authorization result is determined according to the following formula: In the formula, Indicates the current state of the operation request; The result of the three pre-verifications is represented by the state, the number of operable items, and the previous state summary. Indicates a request The final authorization result is set to 1, which means that all verification conditions are met and authorization is granted, and 0 means that at least one verification condition is not met and authorization is rejected. This indicates an indicator function; it takes the value 1 if the condition within the parentheses is true, and 0 otherwise. This indicates the current asset status read from the asset status database during the verification process; Indicates the type of operation in the request; This represents the ordered set of "state-permitted operations" pairs registered in the current asset state machine rule version; Indicates the length of the asset event range covered by the request, or the number of operations explicitly stated in the request; This indicates the length or number of intervals that the current event unit can still operate on after deducting locked intervals and accepted operations; This represents the hash value of the previous state record read and carried when the request is generated; This represents the hash value of the current state record read from the private chain ledger when the server performs verification; This indicates the platform's request for an incrementing operation sequence number submitted for the current asset. This represents the sequence number of the most recently accepted operation in the platform request sequence number mapping; Indicates the sequence number of the most recent global state operation read when the request was generated; This indicates the sequence number of the current global state operation read from the asset state database after the transaction is locked; This indicates a conflict between the requested event interval and the locked or completed event interval. The value is 0 if the requested event interval does not overlap with the locked or completed event interval, and 1 if they overlap.
[0084] Before state transition, the asset state transition module acquires an exclusive lock on the request event range and re-verifies the previous state summary, current state, platform operation sequence number, and most recent global state operation sequence number within the lock. If any value changes before or after locking, the transaction is rolled back and a concurrency conflict signal is output; if ranges overlap, a duplicate operation signal is output; if the state machine does not allow it, a state rejection signal is output; during authorization, range locking, asset state transition, platform sequence number update, global sequence number increment, and state transition record generation are completed within the same transaction. If a network retransmission occurs and the request summary is identical to the accepted request, only the original processing result is returned, and the state transition is not repeated.
[0085] Please see Figure 7 , Figure 7 This is a diagram showing the asset event intervals and state transition results. Figure 7 Part (a) indicates that events E1 to E5 occupy non-overlapping intervals on the cumulative equivalent lifetime consumption axis, with a maintenance boundary marker distinguishing lifetime consumption before and after maintenance; part (b) indicates the interval overlap detection results between multiple external operation requests; and part (c) indicates the number of allowed transitions between asset states within a single operating cycle. Transitions outside the state machine's allowed range are not written to the success status. When a decommissioned asset requests commissioning again, a status rejection signal is output, and the request summary is retained.
[0086] It should be noted that the asset event range is used to resolve the underlying issue of duplicate occupancy when different systems use different work order numbers, defect numbers, or asset event numbers. The asset state machine is used to restrict the business sequence of state changes, and the exclusive lock and previous state summary are used to restrict concurrent submissions. The three work together to ensure that the same equipment will not be registered twice for maintenance, decommissioning, or scrapping within the same lifespan range.
[0087] The private blockchain evidence storage and traceability module is used to write summaries of time-slice asset data packets, asset topology snapshots, lifespan status analysis results, operation and maintenance tasks, asset event units, and state transition records into the private blockchain, and respond to full lifespan queries based on asset identifiers and event relationships. This module includes a member identity management unit, a private blockchain communication unit, a smart contract execution unit, an on-chain summary unit, an off-chain access control unit, and a traceability result generation unit. Private blockchain nodes are deployed in the asset management department, production operation department, maintenance department, and audit or finance department, respectively. The number of nodes and endorsement thresholds are read from the blockchain governance configuration file. In this embodiment, state transition transactions require endorsement from at least the asset management node and the production operation node; when maintenance conclusions are involved, endorsement from the maintenance node is also required; and when scrapping and asset value reduction are involved, endorsement from the audit or finance node is also required.
[0088] Original telemetry messages, inspection images, test reports, maintenance work orders, purchase contracts, and financial documents are stored in an access-controlled off-chain database. On-chain storage includes object type, object identifier, off-chain storage address, access permission summary, object hash value, technical rule version, topology version number, and state transition records. Off-chain objects use the same field normalization and SHA-256 rules as state operation requests to generate object hashes. The content addressing identifier consists of the object type, asset identifier, and object hash. When an off-chain storage location is migrated, only a new storage address mapping record is added; the original object hash and historical state records are not modified.
[0089] State transition records include at least the following: operation request summary or internal calculation result summary, pre-migration state, post-migration state, asset event range, trigger signal, requester certificate summary, platform operation sequence number, global state operation sequence number, execution node identifier, execution timestamp, hash value of the previous state record, and hash value of the current record. Smart contracts categorize state changes into two types: internal calculation triggers and external business requests. Emergency shutdown, maintenance expiration, or decommissioning candidate signals output by the lifespan state analysis module, lifespan range conflict signals output by the asset state transition module, and off-chain data integrity anomaly signals are submitted after the calculation result summary, topology version, and execution node signature verification are passed. External installation, commissioning, maintenance completion, shutdown, decommissioning, or scrapping requests are only submitted as successful requests when the asset state transition module outputs an authorization result of 1.
[0090] The execution node signature is generated by the node's private key registered with the member management organization. The smart contract verifies the signature based on the public key in the node certificate and checks that the certificate is valid and has not been revoked at the execution timestamp. The internal computation result digest at least covers the input object hash value set, computation rule version, output state impact vector digest, cumulative equivalent lifetime consumption, trigger signal, and topology version number. If signature verification fails, rule version does not exist, input object hash set is incomplete, or the recalculated hash value of the off-chain object is inconsistent with the on-chain record, the smart contract refuses state transition and outputs a data integrity exception signal; related asset event units that are still in a deployable state are transferred to a frozen state, and scrapped records are not deleted but instead have an exception marker added for audit review.
[0091] When asset managers, operators, maintenance personnel, or auditors submit a traceability query, the private blockchain evidence storage and traceability module first determines the readable fields based on the user certificate and access permission digest. Then, it reads the current status and event relationships using the asset identifier, and searches backwards along the previous event unit identifier for records of warehousing, installation, commissioning, inspection, defects, maintenance, modification, shutdown, decommissioning, and scrapping. Based on the time slice set, it reads the corresponding trusted status signal, asset topology version, status impact vector digest, and equivalent lifetime calculation basis. Queries with original data permissions can read off-chain messages and recalculate hashes; queries without original data permissions only obtain the device model, event time, current status, status transition path, rule version, and verification pass result.
[0092] It should be noted that in this embodiment, the private blockchain serves the functions of member admission, cross-departmental consistent notarization, and state transition constraints. The original high-frequency operational data is not directly written entirely onto the blockchain. By storing object summaries, rule versions, topology versions, and previous and subsequent state hashes on the blockchain, high-frequency telemetry data avoids occupying on-chain storage, while also enabling the status of critical assets to be recalculated and verified based on the original off-chain data.
[0093] Second embodiment: To illustrate the data flow between modules, the operating data of a main transformer within a 15-minute time slice is used as an example. The online temperature monitoring value is 92℃, the SCADA temperature value is 90℃, the infrared inspection temperature value is 91℃, and the rated model corresponding temperature is 89℃; the measurement resolution is 0.1℃, and the residual channels are approximately 0.021739, 0.010989, and 0.032609, respectively. The residual standard deviations corresponding to historical manually reviewed samples are 0.03, 0.04, and 0.05, respectively. After inverse normalization, the weights of the three channels are approximately 0.425532, 0.319149, and 0.255319, respectively. When the equipment certificate is valid, the time is continuous, and the external quality code is normal, the credibility is approximately 0.979137. If the credibility threshold in the current rule version is 0.92 and the invalidity threshold is 0.58, then the time slice outputs a credibility signal and forms a time slice asset data package. The thresholds are derived from the minimum confidence level of historical valid samples and the maximum confidence level of historical invalid samples in this rule version.
[0094] The asset topology version management module reads the current connection relationships of the main transformer, busbar, cooling system, and downstream cables, confirms that the switch remote signaling is consistent with the actual power direction, and forms a corresponding asset topology snapshot. The life status analysis module reads the temperature warning value of 85℃, rated current of 800A, and vibration warning value of 4.5mm / s from the technical file; the measured current for this time slice is 840A and the vibration is 4.8mm / s. According to the equivalent life consumption formula, the temperature stress ratio is 92 / 85, the current stress ratio is 840 / 800, the vibration stress ratio is 4.8 / 4.5, and the time slice duration is 0.25h. The calculated equivalent life consumption increment for this time slice is approximately 0.303059h. This increment, along with the time slice identifier, topology version, and trusted signal, is sent to the maintenance task matching module.
[0095] When the cumulative equivalent life consumption of the equipment since the most recent maintenance reaches the maintenance interval registered in the maintenance strategy, and the current thermal stress impact accounts for the highest proportion, the maintenance task matching module generates a temperature measurement verification and cooling system inspection task. If a maintenance work order for the same equipment and the same part already exists within the same time interval, the online monitoring and infrared inspection records of this time are written into the original work order evidence set, and no duplicate work order is assigned. After the task is completed and the maintenance conclusion is uploaded, the asset status migration module allocates the corresponding asset event interval on the cumulative equivalent life consumption axis, verifies the previous status summary, platform serial number, and interval conflict, and after authorization, migrates the equipment status from the in-operation status to the maintenance status; after the maintenance acceptance is passed, it is migrated back to the in-operation status, and a new maintenance boundary marker is written at the end of the maintenance event.
[0096] The modules described above can be implemented by a general-purpose processor executing program instructions stored in a computer-readable storage medium, or by an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or a combination thereof. The division of modules is a logical division based on data processing functions. In actual deployment, they can be merged into the same server or distributed across edge gateways, production management servers, operation and maintenance management servers, and private chain nodes. The time-slice asset data packets used by the asset topology version management module must originate from the asset trusted acquisition module; the relational edges and topology versions used by the lifetime status analysis module must originate from the asset topology version management module; the lifetime status signals and cumulative equivalent lifetime consumption used by the operation and maintenance task matching module must originate from the lifetime status analysis module; external state migrations must be authorized by the asset state migration module; and the state records submitted by the private chain must carry the corresponding calculation result summary, topology version, and execution node signature.
[0097] It should be understood that the above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit the scope of protection of the present invention. Equivalent substitutions, modifications, or combinations made by those skilled in the art to the described technical solutions without departing from the concept of the present invention should all fall within the scope of protection of the present invention. The scope of protection of the present invention is defined by the claims.
Claims
1. A power equipment lifecycle asset management system based on a private blockchain, characterized in that, include: The trusted asset acquisition module is used to perform asset identification binding, time-slice division and consistency verification on multi-source device data, and generate time-slice asset data packets carrying trusted status signals; The asset topology version management module is used to create versioned asset topology snapshots based on device connection relationships and status changes. The lifetime status analysis module is used to calculate the status impact vector and cumulative equivalent lifetime consumption based on the time slice asset data package and asset topology snapshot, and output the lifetime status signal. The operation and maintenance task matching module is used to match operation and maintenance resources and generate task signals based on the lifespan status signal; The asset state transition module is used to establish asset event intervals and verify state operation requests through the asset state machine. The private blockchain evidence storage and traceability module is used to write data object summaries and state transition records into the private blockchain and generate asset traceability results.
2. The power equipment lifecycle asset management system based on a private blockchain as described in claim 1, characterized in that, The asset trusted acquisition module receives external messages from asset ledgers, operation monitoring, online monitoring, inspection and testing, maintenance work orders, spare parts, and procurement and financial systems. It binds asset identifiers using candidate keys composed of manufacturing number, factory number, installation location code, and external equipment code. It performs unit conversion, time alignment, cumulative quantity difference, and original message digest calculation on the messages and establishes numerical residual channels and status residual channels. Based on the historical verification samples, message certificate status, time continuity, and quality code of each residual channel, it determines the data trustworthiness and outputs a trusted signal, a signal to be verified, or an invalid signal.
3. The power equipment lifecycle asset management system based on a private blockchain as described in claim 1, characterized in that, The asset topology version management module uses the asset master object as the device node and electrical connection relationship, installation subordination relationship, shared auxiliary system relationship, replacement relationship and maintenance dependency relationship as relationship edge; When the device's commissioning / decommissioning status, connection relationship, installation location, shared auxiliary system status, or work order isolation range changes, the current time slice is truncated at the point of change, and a new asset topology snapshot is created. The asset topology snapshot includes the topology version number, effective time interval, device node table, relationship edge table, switch status table, relationship edge input, time slice asset data packet hash set, and previous topology version hash.
4. The power equipment lifecycle asset management system based on a private blockchain according to claim 3, characterized in that, The life state analysis module forms a local state influence vector according to a fixed order of thermal stress, electrical stress, insulation or mechanical stress, and environmental and defect effects. For target equipment with upstream electrical equipment, shared auxiliary systems, or maintenance-dependent equipment, the state influence vector of each upstream node is multiplied by the corresponding relational edge input, and then accumulated element by element. This is then merged with the local state influence vector and normalized to obtain the state influence vector of the target equipment. When there is a closed-loop relationship in the asset topology snapshot, the state influence vector of each equipment node is updated in a synchronous iterative manner. After reaching the convergence condition determined based on the measurement resolution, the calculation result is output.
5. The power equipment lifecycle asset management system based on a private blockchain according to claim 4, characterized in that, The life status analysis module reads warning values, limit values, and the direction of index deterioration from the status index table bound to the equipment technical file version, and performs segmented normalization on each status index; it multiplies the actual duration of the time slice by the stress ratio of each life stress index to obtain the time slice equivalent life consumption increment, and accumulates it in chronological order to obtain the cumulative equivalent life consumption; it compares the life consumption since the most recent effective maintenance, the cumulative equivalent life consumption, and the critical defect signal with the maintenance interval, rated life, and non-conforming conditions, and outputs maintenance due signal, decommissioning candidate signal, emergency shutdown signal, attention signal, or normal operation signal.
6. The power equipment lifecycle asset management system based on a private blockchain as described in claim 1, characterized in that, The maintenance task matching module generates candidate maintenance tasks based on the life status signal, the status influence vector, and the cumulative equivalent life consumption, and sorts them according to the trigger signal priority, signal generation time, and task sequence number. First, it deducts the execution time interval of the same asset that has been occupied by a previous work order and verifies the isolation status of dependent equipment. Then, it deducts the man-hours, maintenance tools, and spare parts that have been occupied by previous tasks in the same time interval, and outputs the executable task signal, the task to be supplemented signal, or the frozen task signal. For duplicate reports with the same asset identification, defect location, defect type, and time range, they are merged into a main task and the evidence set is saved.
7. The power equipment lifecycle asset management system based on a private blockchain according to claim 1, characterized in that, The asset status transition module establishes a cumulative equivalent life consumption axis according to the trusted time slice sequence of the same asset, and assigns left-closed and right-open asset event intervals to inspection, defect confirmation, maintenance, technical transformation, shutdown and decommissioning events. The starting point of the asset event interval is the maximum end point of the previously allocated interval for the same asset, and the end point is the sum of the starting point and the equivalent lifetime consumption of the current event's time slice. When the proposed allocation end point exceeds the cumulative equivalent lifetime consumption end point corresponding to the latest time slice of the current event, a lifetime interval conflict signal is output and the corresponding asset event unit is frozen.
8. The power equipment lifecycle asset management system based on a private blockchain according to claim 1, characterized in that, The asset state machine includes the following states: pending installation, installation and commissioning, in operation, under maintenance, out of service and sealed, decommissioned and awaiting disposal, and scrapped. External state operation requests include the requesting platform identifier, asset identifier, asset event unit identifier, operation type, request event range, previous state summary, request timestamp, incremental operation sequence number within the platform, and requester certificate summary. The asset state migration module performs overlap detection and exclusive locking on the request event interval, and completes state migration, platform operation sequence number update, global state operation sequence number update and state migration record generation within the same transaction.
9. The power equipment lifecycle asset management system based on a private blockchain according to claim 1, characterized in that, The private chain includes private chain nodes deployed in the asset management department, production operation department, maintenance department, and audit or finance department respectively; state transition transactions are jointly endorsed by the corresponding nodes according to the endorsement strategy in the chain governance configuration file; original telemetry messages, inspection data, test reports, maintenance work orders, and procurement financial vouchers are stored in an off-chain database with access control, and the private chain stores object identifiers, object hash values, off-chain storage addresses, access permission summaries, rule versions, topology version numbers, and state transition records.
10. The power equipment lifecycle asset management system based on a private blockchain according to claim 9, characterized in that, The private chain evidence storage and traceability module determines the readable fields based on the queryer's certificate and access permission digest. It reads the current status and asset event relationships using the asset identifier, and reads records of warehousing, installation, commissioning, inspection, defects, maintenance, modification, shutdown, decommissioning, and scrapping along the previous asset event unit identifier. It also reads the trusted status signal, asset topology version, status impact vector digest, and equivalent lifetime calculation basis based on the associated time slice. When the hash value of the off-chain object is inconsistent with the hash value of the on-chain object, a data integrity anomaly signal is output and the associated asset event unit that is still in the commissionable state is frozen.
Citation Information
Patent Citations
Power equipment quality full-life management and control system based on block chain and Internet of Things
CN113222426A
