Coal mine global intelligent scheduling collaborative management and control method and system based on digital twinning

By binding multi-source data from underground through a digital twin engine, alarm events are triggered, and safety management robots are controlled to automatically review potential hazards. This solves the problem of fragmented coal mine dispatching systems, realizes full-element visualization and risk warning underground, and improves safety and transportation capacity management efficiency.

CN123140451APending Publication Date: 2026-11-20HUATING COAL GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611003442.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-07
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

In existing technologies, the surface and underground dispatching systems in coal mines are fragmented, lacking the linkage support of digital twin real-world scenarios. The inspection images and operational data of safety management robots are independent, mine cars and material transport vehicles lack digital scanning and control, and the reporting of safety hazards lacks a closed-loop management throughout the entire process. The level of intelligence is insufficient, resulting in resource waste and difficulty in effectively managing safety hazards.

Method used

By acquiring multi-source heterogeneous data from underground sources through a digital twin engine, binding spatial coordinates, triggering linkage alarm events, and controlling the safety management robot to automatically drive to the hazard location for verification, the system achieves intelligent scheduling and collaborative management across the entire domain, including multi-terminal data synchronization and hierarchical access control.

Benefits of technology

It enables full-element visualization and risk warning in underground mines, reduces safety risks and resource waste, supports offline operations in weak network conditions, significantly improves transportation capacity and management efficiency, and is fully compatible with the intelligent transformation of coal mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140451A_ABST
    Figure CN123140451A_ABST
Patent Text Reader

Abstract

The application discloses a coal mine global intelligent scheduling collaborative management and control method and system based on digital twinning, relates to the technical field of industrial digital twinning and mine intelligent scheduling, and the method comprises the following steps: collecting all kinds of heterogeneous data in the mine, and uniformly binding space coordinates in a digital twinning engine; when an environmental index exceeds a standard or personnel intrude into a dangerous area, automatically linking alarm; after alarm, the position of an safety management robot is retrieved nearby, the shortest path to a hidden danger point is planned, scheduling and driving instructions are issued, the robot is enabled to rush to the scene for verification, a message is synchronously pushed to a terminal in the mine, and personnel are guided to evacuate or carry out disposal. The application realizes underground full-element visualization and early risk warning, reduces personnel safety risks, realizes real-time supervision of all kinds of illegal operations, greatly compresses collaborative time consumption, and reduces resource waste.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of industrial digital twin and intelligent mine scheduling technology, and in particular to a method and system for intelligent scheduling and collaborative management of coal mines based on digital twins. Background Technology

[0002] As a crucial pillar of the national energy system, the safe production and efficient scheduling of coal mines are directly related to the sustainable development of the industry. Among related technologies, a preliminary coal mine production control system has been established through the collaborative operation of ground monitoring screens, underground sensor networks, and personnel positioning systems.

[0003] However, in existing technologies, the ground and underground dispatching systems are fragmented, lacking the linkage support of digital twin real-world scenarios, resulting in a lack of intuitive and visual basis for dispatching decisions. Simultaneously, the inspection images and operational data of safety management robots are independent systems, unable to achieve multi-terminal, multi-view remote control, and mining trucks and material transport vehicles lack digital scanning and management mechanisms, with empty vehicle dispatch relying on manual communication, leading to significant waste of transport resources. Furthermore, the reporting, rectification, and acceptance of safety hazards lack a closed-loop management process, and the management of materials and waste in work teams still relies primarily on manual paper registration, resulting in insufficient overall intelligence and failing to meet the actual needs of safe and efficient coal mine production. Summary of the Invention

[0004] The main objective of this invention is to provide a method for intelligent scheduling and collaborative management of coal mines based on digital twins.

[0005] Another objective of this invention is to propose a coal mine intelligent scheduling and collaborative management device based on digital twins.

[0006] The third objective of this invention is to provide an electronic device.

[0007] A fourth objective of this invention is to provide a non-transitory computer-readable storage medium.

[0008] To achieve the above objectives, a first aspect of the present invention proposes a method for intelligent scheduling and collaborative management of coal mines based on digital twins, comprising:

[0009] S1, acquire multi-source heterogeneous data from downhole, and bind the multi-source heterogeneous data to spatial coordinates in the digital twin engine; S2, when environmental monitoring data exceeds a preset threshold or personnel positioning data enters a preset danger zone, a linkage alarm event is triggered; S3 responds to the linkage alarm event, retrieves the real-time location of the nearest security management robot, and calculates the shortest path from the security management robot to the hazard point; S4 generates robot control and scheduling instructions, controlling the safety management robot to automatically travel to the hazard location for verification, and pushes them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

[0010] Optionally, acquire multi-source heterogeneous data from downhole and perform spatial coordinate binding on the multi-source heterogeneous data in a digital twin engine, including: Gas concentration values ​​are collected using a harmful gas sensor. And obtain the real-time coordinates of personnel through UWB positioning base stations. The gas concentration value and the real-time coordinates of the personnel Bind to the corresponding spatial point in the digital twin engine.

[0011] Optionally, when environmental monitoring data exceeds a preset threshold or personnel location data enters a preset danger zone, a linkage alarm event is triggered, including: When the gas concentration value Exceeding the preset gas concentration threshold or real-time coordinates of personnel Entering the pre-designated danger zone When this occurs, a linkage alarm event is triggered.

[0012] Optionally, in response to a linked alarm event, the system retrieves the real-time location of the nearest security robot and calculates the shortest path from the security robot to the hazard location, including: Retrieve the real-time location of the nearest security robot And calculate the real-time position of the security robot. Real-time coordinates of the personnel The shortest path between them.

[0013] Optionally, robot control commands and scheduling commands are generated to control the safety management robot to automatically travel to the hazard location for verification, and push them to the underground mobile terminal via the communication network to execute evacuation or disposal tasks, including: Generate robot control instructions, which are used to control the safety management robot to automatically travel to the hidden danger point for infrared verification; generate scheduling instructions, which are pushed to the underground explosion-proof mobile terminal through the 5G network to forcibly issue the evacuation task.

[0014] To achieve the above objectives, a second aspect of the present invention proposes a coal mine intelligent scheduling and collaborative management device based on digital twins, comprising: The acquisition unit is used to acquire multi-source heterogeneous data from downhole and bind the multi-source heterogeneous data to spatial coordinates in the digital twin engine; The alarm unit is used to trigger a linkage alarm event when environmental monitoring data exceeds a preset threshold or personnel positioning data enters a preset danger zone; The calculation unit is used to respond to the linkage alarm event, retrieve the real-time location of the nearest safety management robot, and calculate the shortest path from the safety management robot to the hazard point. The execution unit is used to generate robot control instructions and scheduling instructions, control the safety management robot to automatically travel to the hidden danger point for verification, and push them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

[0015] Regarding the apparatus in the above embodiments, the specific manner in which each unit performs its operation has been described in detail in the embodiments related to the method, and will not be elaborated upon here.

[0016] To achieve the above objectives, a third aspect of this application provides an electronic device, including a processor and a memory; wherein the processor reads executable program code stored in the memory to run a program corresponding to the executable program code, so as to implement the digital twin-based intelligent scheduling and collaborative management method for coal mines as described in the first aspect embodiment.

[0017] To achieve the above objectives, the fourth aspect of this application proposes a non-transitory computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the coal mine intelligent scheduling and collaborative management method based on digital twins as described in the first aspect embodiment.

[0018] The embodiments of the present invention have the following beneficial effects: This invention enables full-element visualization and early risk warning in underground mining, reducing personnel safety risks, real-time monitoring of various violations, significantly reducing collaboration time, minimizing resource waste, supporting offline operations on weak networks, and effectively eliminating blind spots in underground management. Intelligent mining trucks can be dispatched nearby, significantly reducing empty runs and increasing transport capacity, with data traceability throughout the entire process. Coupled with a hierarchical permission mechanism to ensure system and data security, it is fully adaptable to the intelligent transformation of coal mines and has outstanding promotional value. Attached Figure Description

[0019] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the following description of the embodiments taken in conjunction with the accompanying drawings, wherein: Figure 1 A flowchart illustrating a digital twin-based intelligent scheduling and collaborative management method for coal mines, provided as an embodiment of the present invention; Figure 2 An architecture diagram of a coal mine intelligent scheduling and collaborative management system based on digital twins, provided for an embodiment of the present invention; Figure 3This is a structural diagram of a coal mine intelligent scheduling and collaborative management device based on digital twin, provided in an embodiment of the present invention. Detailed Implementation

[0020] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0021] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0022] The following description, with reference to the accompanying drawings, describes a method and apparatus for intelligent scheduling and collaborative management of coal mines based on digital twins, according to embodiments of the present invention.

[0023] Example 1 This invention provides a method for intelligent scheduling and collaborative management of coal mines based on digital twins, such as... Figure 1 As shown, the method includes the following steps: S1 acquires multi-source heterogeneous data from downhole and binds the spatial coordinates of the multi-source heterogeneous data in the digital twin engine.

[0024] To overcome the problems of heterogeneous and scattered monitoring data, inconsistent time and space, and inability to link and coordinate various monitoring data in wells, this application completes the real-time acquisition of multi-source data in wells and combines it with high-precision digital twin scenarios to achieve unified binding of spatial coordinates, thus constructing a standardized spatiotemporal data base.

[0025] In this embodiment, the overall system adopts a four-layer architecture system with a unified underlying engine, multi-terminal adaptation and deployment, and deep integration of scenarios and systems. Specifically, it includes an underlying digital twin engine, two core twin scenarios, three integrated management systems, and a multi-terminal adaptation and deployment architecture, which realizes bidirectional access to all downhole data, unified modeling, linkage computing, and distribution across three terminals, forming a complete closed-loop collaborative management and control system.

[0026] In this embodiment, the application uses a full-scene 3D digital twin engine in the mine as the sole unified data hub of the entire system. It can access a full range of heterogeneous data from multiple sources, including personnel positioning data, mine truck UWB positioning data, ventilation and drainage operation data, electromechanical mining equipment operating data, mine safety management robot status data, monitoring data from various environmental sensors, equipment hazard data, equipment maintenance data, material ledger data, and waste recycling data. It has core capabilities such as 1:1 3D real-scene rendering, virtual-real linkage, real-time mapping, alarm triggering, weak network synchronization, and hierarchical access control. It fully supports data consistency, real-time synchronization, and full-domain linkage management across the ground dispatch screen, ground PC, and underground explosion-proof mobile terminal.

[0027] In the embodiments of this application, two core twin scenarios are constructed: personnel positioning and mine car distribution, and ventilation and drainage + electromechanical equipment + safety management robot + sensor. These scenarios fully cover the entire underground roadway, mine yard, chamber, ventilation network, drainage pipeline, substation, mining face and other scenarios, and can carry the spatial mapping and visualization of various sensing data, equipment data and robot data in real time.

[0028] In this embodiment, a high-precision hazardous gas sensor deployed underground collects the underground gas concentration value in real time. Simultaneously, based on the UWB positioning base stations covering the entire underground area, high-precision positioning of underground workers is achieved, and the three-dimensional spatial coordinates of the workers are obtained in real time. .

[0029] In this embodiment of the application, the collected gas concentration value is... Real-time coordinates of personnel Two types of core heterogeneous data, along with all other business data from the mine, are uniformly connected to the digital twin engine. Based on the engine's spatiotemporal fusion capabilities, data cleaning, spatiotemporal alignment, and unified modeling are completed.

[0030] In this embodiment, the application uses a laser point cloud and BIM fusion modeling method to complete a 1:1 high-precision 3D replica of the underground scene. Combined with LOD graded lightweight rendering technology, the scene update frequency is stably controlled at 10Hz and above. It can achieve graded on-demand loading according to different terminal performance, meeting the differentiated needs of full-precision rendering on large screens, medium-precision interaction on PCs, and lightweight browsing on underground explosion-proof mobile terminals.

[0031] In this embodiment, all collected monitoring data, positioning data, equipment operation data, robot status data, and material data are precisely mapped to the corresponding spatial points in the underground 3D scene to construct a real-time mapping relationship between the physical underground scene and the digital twin scene.

[0032] In this embodiment, the application implements standardized management and control of material data based on a built-in dynamic early warning algorithm for material inventory. This algorithm dynamically calculates the safety stock threshold for materials using a formula:

[0033] in, This represents the average daily consumption of supplies. To allow for advance replenishment of supplies, when real-time inventory is available. Less than or equal to safety stock The system automatically triggers inventory warnings, with an overall inventory warning accuracy rate of no less than 98%, ensuring a stable supply of underground materials, avoiding potential work stoppages, and achieving paperless closed-loop management of materials throughout the entire process.

[0034] In this embodiment, by integrating laser point cloud with BIM modeling, using LOD lightweight rendering, and binding multi-source data to achieve virtual-real mapping and standardized fusion of data across the entire underground domain, accurate spatial data support is provided for subsequent risk alarms, robot scheduling, and hazard verification.

[0035] S2, when environmental monitoring data exceeds a preset threshold or personnel location data enters a preset danger zone, a linkage alarm event is triggered.

[0036] In order to promptly identify two types of safety hazards—excessive underground gas levels and personnel entering dangerous areas—and quickly notify management personnel across the entire area, this application monitors spatiotemporal data in real time based on preset thresholds and dangerous area rules, and automatically triggers multi-terminal linkage alarms.

[0037] In this embodiment, standardized risk assessment rules are pre-configured within the digital twin engine, and a safe gas concentration threshold adapted to downhole safety production standards is explicitly set. At the same time, based on the layout of underground roadways, equipment distribution, and operating procedures, complete pre-defined hazardous areas are delineated. It includes various risk areas such as high-risk operation areas, equipment restricted areas, and risk retention areas, forming a quantifiable, unified, and automatically executable risk assessment standard.

[0038] In this embodiment, the application strictly controls the alarm latency across the entire link based on a hidden danger early warning response timeliness algorithm. The latency calculation formula corresponding to this algorithm is as follows:

[0039] in, The sensor data sampling period For on-site data transmission delay, To reduce the computational latency of the digital twin engine, To reduce the latency of multi-terminal information push, this application optimizes the alarm time across the entire link through algorithm optimization. Strictly control it to within 3 seconds.

[0040] In this embodiment, the application ensures the accuracy of early warnings through a calculation formula, making the overall early warning accuracy of the system no less than 95%, thereby achieving rapid identification and proactive prevention of downhole risks.

[0041] In this embodiment of the application, when the real-time collected gas concentration value Exceeding the system's preset gas concentration threshold Upon detection of a gas exceeding safety limits in the underground environment, this application will immediately determine that there is a safety hazard and automatically trigger an environmental over-limit alarm event.

[0042] In this embodiment of the application, when the downhole worker's real-time three-dimensional coordinates Intrusion into the system's preset danger zone In the event of abnormal behavior such as prolonged stay in high-risk areas, unauthorized departure from post, or unauthorized operation, this application will immediately trigger a personnel violation-related alarm event.

[0043] In this embodiment, after an alarm event is triggered, the application simultaneously marks the location of potential hazards and the location of abnormal personnel in two twin scenarios, and activates a multi-early warning mechanism including pop-up alarms, audible and visual alarms, and terminal vibration alarms. The alarm information is pushed to the ground dispatch screen, the ground PC, and the underground explosion-proof mobile terminal in real time, realizing full-domain visual early warning of risks.

[0044] In this embodiment, by configuring risk discrimination rules, using early warning timeliness algorithms to control alarm latency, and simultaneously visualizing alarms across multiple terminals while retaining complete logs, rapid identification of downhole risks, full-domain early warning, and full-process traceability are achieved.

[0045] S3 responds to the linkage alarm event, retrieves the real-time location of the nearest security management robot, and calculates the shortest path from the security management robot to the hazard point.

[0046] In order to quickly deploy nearby available security robots and plan efficient travel routes, and to cope with weak network and network outage environments underground, this application retrieves the robot's location after an alarm is triggered and uses a combined optimization model to calculate the optimal path.

[0047] In this embodiment, upon triggering any type of linked alarm event, the application immediately activates a fully automatic alarm response mechanism. Based on real-time synchronized global device data from a digital twin engine, it quickly retrieves the real-time spatial location of all online available mining safety management robots underground. It automatically eliminates faulty, offline, and operational robots, and accurately selects the available safety management robots closest to the potential hazard location, achieving optimal matching of inspection resources.

[0048] In this embodiment of the application, the robot's real-time position is obtained through screening. Coordinates of personnel hazard corresponding to the alarm By combining multi-dimensional scenario data such as the topology of underground tunnels, tunnel capacity, equipment distribution, and obstacles, the optimal and shortest travel path of the robot is iteratively solved based on an intelligent optimization model.

[0049] In this embodiment, the application employs a mining truck intelligent scheduling optimization algorithm to achieve globally optimal scheduling and path calculation. The algorithm's core objective is to minimize the weighted transportation time, and the corresponding objective function is:

[0050] in, Number the idle minecarts and robots. Tasks pending handling. To facilitate passage through the alley, As a task priority, For equipment via alleyway To the mission Path length, This represents the estimated waiting time for passage.

[0051] In this embodiment of the application, the optimization algorithm can ensure that the overall system scheduling response time does not exceed 5 seconds and the path optimization rate is not less than 35%, effectively avoiding problems such as road congestion, ineffective detours, and path reversals, and greatly improving the efficiency of hidden danger review and scheduling.

[0052] In this embodiment, to adapt to the complex working conditions of weak network and intermittent network outages in underground mines, this application incorporates a weak network data conflict resolution algorithm, employing a dual arbitration mechanism of service priority and timestamp to handle data conflicts. The specific judgment logic is as follows: Less than Then retain the data ,like equal Then retain the timestamp. Larger data, of which Prioritize business operations, especially security alerts. The highest level.

[0053] In this embodiment, the conflict resolution mechanism can ensure that the downhole equipment can operate continuously for no less than 72 hours without network access, and that incremental breakpoints can be resumed and synchronized after the network is restored. The overall network synchronization success rate is no less than 99.5%, and the conflict resolution accuracy rate reaches 100%. This ensures that the robot's location data, hidden danger point data, and path calculation data are accurate and reliable in a weak network environment, and provides stable algorithm support for the automatic driving verification of the robot.

[0054] In this embodiment, by selecting the nearest normally operating robot, iteratively optimizing the path using multi-dimensional parameters, and resolving data conflicts in weak networks by prioritizing and adding timestamps, a reliable driving route is quickly output, supporting the robot to rush to the hazard location for verification, thus laying the foundation for subsequent evacuation or disposal tasks.

[0055] S4 generates robot control and scheduling instructions, controlling the safety management robot to automatically travel to the hazard location for verification, and pushes them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

[0056] In order to automatically verify potential hazards, issue personnel handling instructions, and form a complete safety handling closed loop, this application generates robot control instructions based on the optimal path and links multiple terminals to complete human-machine collaborative management.

[0057] In this embodiment, based on the optimal driving path obtained through optimization calculation, this application automatically generates standardized and refined control instructions for the mining safety management robot. The instructions include full-dimensional control parameters such as driving direction, driving speed, fixed-point stopping, perspective switching, hazard capture, and infrared verification, so as to accurately control the mining safety management robot to autonomously drive to the hazard location to carry out refined verification work.

[0058] In this embodiment, the mining safety management robot is equipped with a UWB+5G fusion positioning module and a high-precision infrared acquisition module. After arriving at the hazard location, it automatically completes verification operations such as infrared detection, high-definition image capture, and secondary acquisition of environmental parameters. At the same time, the system supports free switching between multiple perspectives such as front view, panoramic view, and magnification.

[0059] In this embodiment, the stability of video transmission is ensured by a low-latency transmission algorithm for mining safety management robots. The corresponding latency calculation formula for the algorithm is as follows:

[0060] in, For encoding delay, For network transmission latency, To reduce decoding latency, a layered encoding / decoding + timestamp frame synchronization mechanism is used to control end-to-end video latency to within 150ms, with a frame drop rate of less than one percent, enabling low-latency, high-definition, and visualized remote review of potential hazards.

[0061] In this embodiment, the application simultaneously generates underground personnel dispatch and disposal instructions, and accurately pushes emergency evacuation instructions, risk warning instructions, and hidden danger disposal instructions to the corresponding underground explosion-proof mobile terminals through the underground 5G high-speed communication network, forcibly issuing personnel evacuation tasks and realizing rapid personnel management in risk scenarios.

[0062] In this embodiment, the application is based on a multi-terminal two-way interaction mechanism to realize the two-way flow of instructions between the ground dispatch screen, the ground PC terminal, and the underground explosion-proof mobile terminal. The ground can issue various instructions for inspection, rectification, transportation, and recycling, and the underground terminal can complete the entire process of signing, execution, and feedback. The entire process is traceable and the responsibility is traceable, which increases the coverage of underground operations by more than 40% and completely eliminates management blind spots.

[0063] In this embodiment, this step fully integrates three major integrated management systems. The hazard closed-loop management system completes the entire closed-loop process of hazard review, rectification, re-inspection, and cancellation, automatically generating a safety ledger. The equipment maintenance management system realizes equipment anomaly alarms, automatic work order generation, and preventive maintenance control, achieving full lifecycle management of equipment based on a one-machine-one-code system. The material supply and waste recycling management system completes the allocation of work materials, inventory updates, waste classification and transfer, and environmental protection ledger generation, with the waste point positioning accuracy not exceeding 0.5 meters and the waste dispatch response time not exceeding 8 seconds.

[0064] In this application embodiment, the entire application is based on a multi-terminal hierarchical permission security management mechanism, which strictly isolates the operation permissions, data viewing permissions, and equipment control permissions of personnel in various positions, prevents unauthorized operations, and comprehensively ensures the standardization and safety of downhole robot review operations, personnel handling operations, and material scheduling operations. Ultimately, it constructs a complete intelligent closed-loop control system for downhole risk identification, alarm, scheduling, review, handling, and archiving.

[0065] Example 2 This invention relates to a digital twin-based intelligent scheduling and collaborative management system for the entire coal mine, such as... Figure 2 As shown, the system adopts a unified underlying engine, multi-terminal adaptation and deployment, and deep integration of scenarios and systems architecture. With the underground full-scenario digital twin engine as the unified data hub, the data of each module is bidirectionally accessed, uniformly modeled, linked for calculation, and distributed to three terminals, forming a closed-loop collaborative system. The overall architecture is divided into four layers: underlying engine, two major twin scenarios, three major management systems, and multi-terminal adaptation.

[0066] Underlying support: a full-scene 3D digital twin engine for underground mining.

[0067] As the system's sole data hub, it provides unified access to all data, including personnel positioning, mine truck UWB, ventilation and drainage, electromechanical mining equipment, safety management robots, sensors, hidden dangers, maintenance, materials, and waste. It offers 1:1 3D real-scene rendering, virtual-real linkage, real-time mapping, alarm triggering, weak network synchronization, and hierarchical access control capabilities, supporting three-terminal same-source, real-time synchronization, and full-domain linkage.

[0068] Two core twin scenarios.

[0069] Twin scenario of personnel positioning and mine car distribution: covering the entire tunnel, yard, and chamber, it presents personnel location, trajectory, regional distribution, danger zone intrusion alarm, and timeout; it displays mine car UWB centimeter-level positioning, empty and loaded car status, load, driving trajectory, idle status, and QR code records, and supports heat distribution, one-click positioning, and abnormal highlight alarm.

[0070] A virtualized scenario integrating ventilation and drainage systems, electromechanical equipment, safety management robots, and sensors: covering ventilation networks, drainage pipelines, main water pumps, fans, substations, and mining faces; real-time display of ventilation parameters, drainage parameters, electromechanical and mining equipment operation data, real-time location of safety management robots, inspection trajectories, multi-view video streams, and hazard capture; integration with sensor data for gas, carbon monoxide, dust, roof pressure, and water hazards, with real-time highlighting, pop-up alarms, and simultaneous push notifications across multiple devices when exceeding limits.

[0071] Three integrated management systems.

[0072] Hazard Closed-Loop Management System: It realizes a closed loop of the entire process of hazard reporting, dispatching, rectification, review and cancellation, with full traceability and record keeping; it supports structured data collection and uploading by personnel or robots, intelligent dispatching, status flow, automatic generation of ledgers, and deep linkage with the twin scenario, and clicking on the hazard will automatically jump to the corresponding location.

[0073] Equipment maintenance management system: One machine, one code, full lifecycle management, including equipment ledger, operating parameters, fault records, maintenance plans, work assignment, acceptance and archiving; equipment alarms automatically trigger work orders, and twin scenes are highlighted to achieve preventive maintenance and reduce operation with defects.

[0074] Material Supply and Waste Recycling Management System: Material Supply Module: Demand submission, multi-level approval, outbound transportation, barcode signing, inventory warning, consumption statistics, cost traceability, paperless closed loop throughout the entire process, real-time synchronization of inventory data, and threshold warning.

[0075] Waste recycling module: Classification and management of gangue, scrap steel, grease waste, and construction waste; underground reporting, twin point marking, intelligent vehicle dispatch, transfer to the surface, warehousing and disposal, and generation of environmental protection ledgers; the whole process is recorded by scanning codes and is compliant and traceable.

[0076] Terminal form.

[0077] The system includes a ground-based dispatch dashboard, a ground-based PC terminal, and an underground explosion-proof mobile terminal; all three terminals share the same data source, are synchronized in real time, have interoperable business functions, and offer hierarchical access control.

[0078] Example 3 This invention provides a digital twin-based intelligent scheduling and collaborative management device 10 for the entire coal mine, such as... Figure 3 As shown, the device includes: The acquisition unit 100 is used to acquire multi-source heterogeneous data from downhole and bind the multi-source heterogeneous data to spatial coordinates in the digital twin engine; Alarm unit 200 is used to trigger a linkage alarm event when environmental monitoring data exceeds a preset threshold or personnel positioning data enters a preset danger zone; The calculation unit 300 is used to respond to the linkage alarm event, retrieve the real-time location of the nearest safety management robot, and calculate the shortest path from the safety management robot to the hazard point. The execution unit 400 is used to generate robot control instructions and scheduling instructions, control the safety management robot to automatically drive to the hidden danger point for verification, and push them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

[0079] Regarding the apparatus in the above embodiments, the specific manner in which each unit performs its operation has been described in detail in the embodiments related to the method, and will not be elaborated upon here.

[0080] Example 4 To implement the methods of the above embodiments, the present invention also provides an electronic device, which includes a memory and a processor; wherein the processor reads executable program code stored in the memory to run a program corresponding to the executable program code, so as to implement the various steps of the methods described above.

[0081] Example 5 To implement the above embodiments, this application also proposes a non-transitory computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the method described in the foregoing embodiments.

[0082] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

[0083] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0084] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

Claims

1. A method for intelligent scheduling and collaborative management of coal mines based on digital twins, characterized in that, include: S1, acquire multi-source heterogeneous data from downhole, and bind the multi-source heterogeneous data to spatial coordinates in the digital twin engine; S2, when environmental monitoring data exceeds a preset threshold or personnel positioning data enters a preset danger zone, a linkage alarm event is triggered; S3 responds to the linkage alarm event, retrieves the real-time location of the nearest security management robot, and calculates the shortest path from the security management robot to the hazard point; S4 generates robot control and scheduling instructions, controlling the safety management robot to automatically travel to the hazard location for verification, and pushes them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

2. The method according to claim 1, characterized in that, The process of acquiring multi-source heterogeneous data from downhole and binding spatial coordinates of this data in a digital twin engine includes: Gas concentration values ​​are collected using a harmful gas sensor. And obtain the real-time coordinates of personnel through UWB positioning base stations. The gas concentration value and the real-time coordinates of the personnel Bind to the corresponding spatial point in the digital twin engine.

3. The method according to claim 1, characterized in that, When environmental monitoring data exceeds a preset threshold or personnel location data enters a preset danger zone, a linkage alarm event is triggered, including: When the gas concentration value Exceeding the preset gas concentration threshold or real-time coordinates of personnel Entering the pre-designated danger zone When this occurs, a linkage alarm event is triggered.

4. The method according to claim 1, characterized in that, The response to the alarm event retrieves the real-time location of the nearest security robot and calculates the shortest path from the security robot to the hazard point, including: Retrieve the real-time location of the nearest security robot And calculate the real-time position of the security robot. Real-time coordinates of the personnel The shortest path between them.

5. The method according to claim 1, characterized in that, The generated robot control commands and scheduling commands control the safety management robot to automatically travel to the hazard location for verification, and push them to the underground mobile terminal via the communication network to execute evacuation or disposal tasks, including: Generate robot control instructions, which are used to control the safety management robot to automatically travel to the hidden danger point for infrared verification; generate scheduling instructions, which are pushed to the underground explosion-proof mobile terminal through the 5G network to forcibly issue the evacuation task.

6. A coal mine intelligent scheduling and collaborative management device based on digital twins, characterized in that, include: The acquisition unit is used to acquire multi-source heterogeneous data from downhole and bind the multi-source heterogeneous data to spatial coordinates in the digital twin engine; The alarm unit is used to trigger a linkage alarm event when environmental monitoring data exceeds a preset threshold or personnel positioning data enters a preset danger zone; The calculation unit is used to respond to the linkage alarm event, retrieve the real-time location of the nearest safety management robot, and calculate the shortest path from the safety management robot to the hazard point. The execution unit is used to generate robot control instructions and scheduling instructions, control the safety management robot to automatically travel to the hidden danger point for verification, and push them to the underground mobile terminal through the communication network to execute evacuation or disposal tasks.

7. An electronic device, characterized in that, Including processor and memory; The processor reads executable program code stored in the memory to run a program corresponding to the executable program code, so as to implement the method as described in any one of claims 1-5.

8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When the program is executed by the processor, it implements the method as described in any one of claims 1-5.