A port carbon pollution multi-dimensional integrated networking monitoring method and system
By dynamically selecting target monitoring nodes and forming monitoring subnetworks, the problems of insufficient monitoring and duplicate data collection in the port area monitoring network when the operating area changes are solved, and the data correlation accuracy and continuity of port area carbon pollution monitoring are improved.
Patent Information
- Application Number
- CN202611267046.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-20
AI Technical Summary
The existing port area monitoring network is difficult to dynamically adjust with changes in port operation areas and pollution diffusion directions, resulting in insufficient monitoring in key areas, duplicate data collection in non-key areas, and concentrated load on communication links. It is difficult to establish a stable correspondence between pollutant monitoring data and carbon emission data on the same spatiotemporal scale, affecting the completeness, continuity, and reliability of monitoring results.
By acquiring information on port operation events and heterogeneous monitoring node resources, target monitoring nodes are dynamically selected to form a monitoring subnet. Multidimensional monitoring data is then processed for spatiotemporal correlation, and feedback adjustments are made based on monitoring quality and network status to ensure data integrity and correlation accuracy.
It enables dynamic adjustment of port area carbon pollution monitoring results, reduces duplicate data collection and communication load issues, improves the correlation accuracy and traceability of monitoring data, and enhances the continuity and reliability of monitoring results.
Smart Images

Figure CN123140488A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of port area environmental monitoring and intelligent networking technology, and in particular to a multi-dimensional integrated network monitoring method and system for port area pollution and carbon. Background Technology
[0002] During cargo loading, unloading, storage, transshipment, vehicle transportation, and equipment auxiliary operations in the port area, the work location, intensity, and equipment operating status continuously change with the production plan. The emission status of particulate matter and gaseous pollutants, as well as the carbon emission status characterized by fuel consumption, electricity consumption, and equipment operating conditions, exhibit significant temporal and spatial differences across different work units. Furthermore, the diffusion and deposition of pollutants are also affected by factors such as wind speed, wind direction, humidity, and the distribution of port structures. To accurately grasp the carbon and pollution status of the port area, it is necessary to collaboratively collect and monitor multi-dimensional data, including pollutant concentrations, meteorological parameters, equipment operating conditions, energy consumption, and operational information.
[0003] Existing port monitoring networks are typically constructed based on monitoring equipment type or fixed spatial areas, with sampling tasks, sampling cycles, and data reporting methods for monitoring nodes largely pre-defined. When port operation areas change, mobile sources relocate, pollution diffusion directions shift, or local communication status fluctuates, existing monitoring resources struggle to be reconfigured in a timely manner to meet monitoring needs. This can lead to problems such as insufficient monitoring data in key areas, duplicate data collection in non-key areas, concentrated communication link load, and inconsistent data timeliness. Furthermore, pollutant monitoring data and carbon emission-related data often originate from different equipment or operational systems, making it difficult to establish a stable correlation under the same operational event and spatiotemporal scale. This, in turn, affects the completeness, continuity, and reliability of port pollution and carbon status monitoring results. Summary of the Invention
[0004] In view of the aforementioned problems, the first aspect of this application provides a multi-dimensional integrated network monitoring method for pollution and carbon in port areas, including: The system acquires information on port operation events and node resource information of multiple heterogeneous monitoring nodes, which are used to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data, or carbon emission-related data. Based on the port area operation event information, the corresponding target monitoring area and pollution carbon monitoring requirements are determined. Based on the target monitoring area and the pollution carbon monitoring requirements, a pollution carbon monitoring task is generated. The pollution carbon monitoring task includes the association requirement of mapping pollutant monitoring data and carbon emission related data to the same port area operation event. Based on the pollution and carbon monitoring task and the node resource information, the task matching relationship between the heterogeneous monitoring node and the pollution and carbon monitoring task is determined. Under the condition of meeting the association requirements, the target monitoring node is selected and the node task is assigned based on the task matching relationship to form a monitoring subnet for performing the pollution and carbon monitoring task. The target monitoring nodes in the monitoring subnet are controlled to execute the assigned node tasks, acquire multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon co-monitoring results corresponding to the port operation event. The execution status of the pollution and carbon monitoring task is evaluated based on the monitoring quality of the multidimensional monitoring data and the network operation status of the monitoring subnet. If the execution status does not meet the preset monitoring requirements, the target monitoring node or node task is adjusted according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
[0005] Furthermore, embodiments of this application also provide a multi-dimensional integrated network monitoring system for pollution and carbon in port areas, including: The information acquisition module is used to acquire port operation event information and node resource information of multiple heterogeneous monitoring nodes. The heterogeneous monitoring nodes are used to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data or carbon emission related data. The monitoring task generation module is used to determine the corresponding target monitoring area and carbon pollution monitoring requirements based on the port area operation event information, and generate carbon pollution monitoring tasks based on the target monitoring area and the carbon pollution monitoring requirements. The carbon pollution monitoring tasks include the association requirement of mapping pollutant monitoring data and carbon emission related data to the same port area operation event. The monitoring subnet construction module is used to determine the task matching relationship between the heterogeneous monitoring nodes and the pollution and carbon monitoring tasks based on the pollution and carbon monitoring tasks and the node resource information. Under the condition of meeting the association requirements, the module selects target monitoring nodes and assigns node tasks based on the task matching relationship to form a monitoring subnet for performing the pollution and carbon monitoring tasks. The collaborative monitoring module is used to control the target monitoring nodes in the monitoring subnet to execute the assigned node tasks, acquire multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon collaborative monitoring results corresponding to the port operation event. The feedback adjustment module is used to evaluate the execution status of the pollution and carbon monitoring task based on the monitoring quality of the multidimensional monitoring data and the network operation status of the monitoring subnet. When the execution status does not meet the preset monitoring requirements, the module adjusts the target monitoring node or node task according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
[0006] The multi-dimensional integrated network monitoring method and system for port area pollution and carbon provided in this application have the following beneficial effects: This application is driven by port operation events. It determines the target monitoring area and pollution and carbon monitoring needs based on the operation location, operation type, operation intensity and meteorological conditions. It also dynamically selects target monitoring nodes, allocates node tasks and forms a monitoring subnet by combining the monitoring capabilities, spatial coverage, operation status and communication status of heterogeneous monitoring nodes. This allows monitoring resources to be adjusted according to changes in port operation areas, equipment status and pollution diffusion conditions, thereby reducing the problems of repeated data collection in non-key areas, insufficient monitoring capabilities in key areas and concentrated local communication load.
[0007] This application sets a requirement in the pollution and carbon monitoring task to associate pollutant monitoring data and carbon emission-related data with the same port area operation event. In the process of selecting target monitoring nodes, the scope of pollutant monitoring, sampling time sequence and data attribution relationship of carbon emission-related data are considered at the same time. This can eliminate monitoring nodes or node combinations that cannot be associated with the current operation event during the networking stage, reduce the possibility of pollutant monitoring data being incorrectly associated with energy consumption data of unrelated equipment, and improve the correlation accuracy of pollution and carbon co-monitoring results and the clarity of operation event attribution.
[0008] This application improves the integrity, consistency and traceability of port area pollution and carbon monitoring data by performing time alignment, spatial correlation and data attribution verification on multidimensional monitoring data, and coordinating pollutant monitoring data, meteorological monitoring data, equipment operating condition data and carbon emission related data from different sampling periods, different spatial representations and different data sources, and retaining the corresponding event identifiers, time identifiers, spatial identifiers and data attribution information.
[0009] This application also evaluates the execution status of carbon pollution monitoring tasks based on the monitoring quality of multidimensional monitoring data and the network operation status of monitoring subnets. When there are gaps in data dimensions or correlation conditions, it makes local adjustments to the target monitoring nodes, node tasks, or data transmission paths. While retaining monitoring resources that can still provide effective data, it updates the monitoring subnets, thereby reducing task interruptions and redundant resource allocation caused by rebuilding the overall monitoring network, and improving the continuity, reliability, and efficiency of carbon pollution monitoring and monitoring resource utilization in dynamic operation scenarios in port areas. Attached Figure Description
[0010] Figure 1 This is a flowchart of the multi-dimensional integrated network monitoring method for port area pollution and carbon provided in the embodiments of this application; Figure 2 This is a schematic diagram of the structure of the multi-dimensional integrated network monitoring system for pollution and carbon in the port area provided in this application embodiment. Detailed Implementation
[0011] To make the technical solutions, the technical problems solved, and the technical effects of this application clearer, the technical solutions of this application will be described in detail and completely below with reference to the accompanying drawings in the embodiments of this application.
[0012] It is understood that the specific embodiments described herein are merely exemplary representations of the technical solutions of this application, used to explain the technical concept of this application, and are not intended to limit the scope of protection of this application. In other embodiments of this application, the technical details described below can be reasonably adjusted, replaced, or modified according to the needs and conditions of actual application scenarios. As long as they do not depart from the core inventive concept of this application, such modifications and refinements should be considered to fall within the scope of protection of this application.
[0013] In the description of this application, it should be noted that the terms "an embodiment," "an exemplary embodiment," "some embodiments," etc., mean that the specific technical features, structures, or characteristics described in connection with the embodiment or example are included in at least one implementation of the technical solution of this application. The same expressions appearing in different places throughout this application do not necessarily refer to the same embodiment.
[0014] In this application, "pollution and carbon monitoring" refers to the coordinated monitoring of the pollutant emission status and carbon emission-related status in port areas. The pollutant emission status can be characterized by data such as particulate matter concentration and gaseous pollutant concentration, while meteorological parameters are used to characterize environmental conditions affecting pollutant diffusion and deposition. Carbon emission-related status can be characterized by data such as fuel consumption, electricity consumption, operating load, operating time, and workload of port operating equipment. The inventors of this application have found that the fundamental reason for the inaccuracy of port pollution and carbon monitoring results is not merely an insufficient number of monitoring nodes, but rather the significant dynamism of port production operations. Existing monitoring networks typically employ fixed node combinations, fixed sampling cycles, and fixed data reporting relationships. With the start-up and shutdown of loading and unloading equipment, changes in operating locations, vehicle movement, changes in material types, and wind direction, the actual spatial range requiring key monitoring, data types, and sampling frequencies will change synchronously. Fixed monitoring networks struggle to keep pace with these changing monitoring needs, easily leading to insufficient monitoring capacity in key areas, repeated sampling in non-key areas, and excessive load on local communication links.
[0015] Further research revealed that the data generated by pollutant monitoring nodes, meteorological monitoring nodes, energy metering nodes, and equipment operating condition acquisition nodes differ in sampling cycle, time reference, spatial granularity, and data quality. Centralizing these data only on the central platform makes it difficult to guarantee that each type of data corresponds to the same operational event and the same monitoring area.
[0016] Based on this, this application does not adopt the approach of simply adding monitoring points or centrally overlaying monitoring data. Instead, it is driven by the port area operation events and their pollution and carbon monitoring needs. It uses the monitoring type, spatial location, sampling capacity, communication status, and computing power of different monitoring nodes as configurable monitoring resources. Based on the current operation area and monitoring needs, it dynamically selects monitoring nodes, establishes monitoring subnetworks, and allocates sampling and reporting tasks. At the same time, it associates multi-dimensional monitoring data through unified operation event identifiers, time identifiers, and spatial identifiers, and adjusts the subsequent monitoring resource configuration based on data integrity, node reliability, and network operation status. This forms a multi-dimensional integrated network monitoring scheme for pollution and carbon in dynamic port operation scenarios.
[0017] This application provides a multi-dimensional integrated network monitoring method for pollution and carbon emissions in port areas. (See attached document.) Figure 1 The method includes: Step S100: Obtain port operation event information and node resource information of multiple heterogeneous monitoring nodes. The heterogeneous monitoring nodes are used to obtain pollutant monitoring data, meteorological monitoring data, equipment operating data or carbon emission related data. Step S200: Determine the corresponding target monitoring area and carbon pollution monitoring requirements based on the port area operation event information, and generate carbon pollution monitoring tasks based on the target monitoring area and carbon pollution monitoring requirements. The carbon pollution monitoring tasks include the association requirements of mapping pollutant monitoring data and carbon emission related data to the same port area operation event. Step S300: Based on the pollution and carbon monitoring tasks and node resource information, determine the task matching relationship between heterogeneous monitoring nodes and pollution and carbon monitoring tasks. Under the condition of meeting the association requirements, select target monitoring nodes and assign node tasks based on the task matching relationship to form a monitoring subnet for performing pollution and carbon monitoring tasks. Step S400: Control the target monitoring nodes in the monitoring subnet to execute the assigned node tasks, obtain multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon co-monitoring results corresponding to the port operation events. Step S500: Based on the monitoring quality of the multidimensional monitoring data and the network operation status of the monitoring subnet, evaluate the execution status of the pollution and carbon monitoring task. If the execution status does not meet the preset monitoring requirements, adjust the target monitoring node or node task according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
[0018] The implementation process of steps S100 to S500 will be further explained below with reference to specific embodiments.
[0019] Step S100 is used to acquire port operation event information that characterizes the current production and operation status of the port area, as well as node resource information that characterizes the monitoring capabilities, data association capabilities, and current availability of each heterogeneous monitoring node. Port operation event information reflects the time, location, type, object, and participating equipment of operational activities within the port area. Node resource information reflects the types of data that each heterogeneous monitoring node can collect, its monitoring coverage, sampling capabilities, communication capabilities, real-time operating status, and the spatial areas, operational equipment, or energy metering objects to which the data acquired by the node can be associated. By simultaneously acquiring operation-side and monitoring-side information, a data foundation can be provided for subsequently determining target monitoring areas, generating pollution and carbon monitoring tasks including association requirements, and selecting target monitoring nodes that can jointly provide pollutant monitoring data and carbon emission-related data.
[0020] In some embodiments, step S100 includes steps S110 to S130.
[0021] Step S110: Obtain port area operation event information.
[0022] Port area operation events refer to production operations within the port area that have definite or determinable objects, locations, and time periods, and that may cause changes in pollutant emission status, energy consumption status, or equipment operating status. Port area operation events can include ship loading and unloading operations, stacking and reclaiming operations, material handling operations, vehicle loading and unloading and transportation operations, loading operations, port area road cleaning operations, and dust suppression spraying operations. Different port areas can set corresponding operation event types based on the type of cargo, production process, and equipment configuration.
[0023] Port operation event information can be obtained from the port production scheduling system, operation management system, equipment control system, vehicle management system, vessel operation plan, or on-site data acquisition terminals. For example, for loading and unloading equipment equipped with programmable logic controllers or equipment controllers, the corresponding port operation events can be determined based on equipment start / stop signals, operating speed, operating load, and operation instructions; for port vehicle transportation operations, the corresponding port operation events can be determined based on vehicle dispatch records, vehicle positioning information, and electronic fence trigger information; for operations not yet connected to the automatic control system, port operation event information can be generated through operation plan entry, mobile terminal reporting, or on-site confirmation.
[0024] Port area operation event information includes at least the event identifier, operation type, operation location, and operation time. The event identifier distinguishes different port area operation events and serves as the basis for subsequently associating data collected from different monitoring nodes. The event identifier can be generated based on one or more of the following: operation plan number, equipment number, operation batch number, and event occurrence time. For the same operation batch containing multiple consecutive operation stages, separate stage event identifiers can be generated, retaining the same operation batch association information in each stage's event identifier. This allows for the subsequent mapping of pollutant monitoring data, equipment operating data, and carbon emission-related data generated in each operation stage to the same operation process.
[0025] The work location is used to indicate the spatial location or spatial range where a port operation event occurs. The work location can be represented by berth number, yard zone number, stack number, transfer node number, belt conveyor section number, port road section, equipment location coordinates, or spatial grid number. For fixed installation equipment, the work location can be determined based on the equipment's installation location; for vehicles, mobile loading and unloading equipment, or other mobile work units, the work location can be determined based on satellite positioning devices, port positioning base stations, equipment movement trajectories, or electronic fences. When a mobile work unit traverses multiple spatial areas during the duration of a work event, the work location can be updated according to preset time intervals or spatial grid changes, allowing the work event to be associated with corresponding spatial areas at different times.
[0026] Operation time information can include the planned start time, actual start time, planned end time, actual end time, and current operation stage. For ongoing port operation events, the period from the actual start time to the current moment can be defined as the current event time period. For port operation events with planned operations but not yet started, the pre-monitoring period can be determined based on the planned start and end times, enabling subsequent steps to complete monitoring node selection and monitoring subnet configuration before the operation begins. Operation time information can also be used to define the time range within which pollutant monitoring data, equipment operating data, and carbon emission-related data belong to the current port operation event.
[0027] In some embodiments, port operation event information may further include operation intensity information, operation object information, and operation equipment information. Operation intensity information characterizes the operational load of the current port operation event and can be represented by cargo loading / unloading volume per unit time, material conveying speed, equipment operating load, number of equipment involved in the operation, number of vehicles passing through, or equipment operating time. Operation object information may include cargo type, cargo moisture content, cargo particle size characteristics, cargo stacking method, and cargo loading / unloading method. Operation equipment information may include equipment identification, equipment type, rated power, energy type, current operating status, and the operation unit to which the equipment belongs.
[0028] Equipment identification is used to establish the correspondence between port operation events and the specific equipment involved in the operation. The operating unit to which the equipment belongs indicates the berth, yard section, conveying section, transshipment node, or other production unit to which the equipment belongs. The energy type indicates whether the equipment uses electricity, diesel, liquefied natural gas, or other energy sources. This information can be used to subsequently determine the types and scope of pollutants that may be generated by the current port operation event, and to identify the sources of equipment operating data and carbon emission-related data that can be attributed to the current operation event.
[0029] When a port operation involves multiple pieces of equipment, the equipment identification, participation time, and operational steps undertaken by each piece of equipment can be recorded. For example, ship unloading operations may simultaneously involve unloading equipment, horizontal conveying equipment, and transfer equipment; the time each piece of equipment joins and leaves the current operation can be recorded separately. By recording the correspondence between operating equipment and port operation events, it is possible to avoid directly including energy consumption data from other equipment in the same area that is not participating in the current port operation event.
[0030] Step S120: Obtain node resource information of multiple heterogeneous monitoring nodes.
[0031] Heterogeneous monitoring nodes refer to monitoring equipment or data acquisition terminals that differ in terms of monitoring objects, sampling methods, installation locations, communication methods, data processing capabilities, or data-related objects. In this application's embodiments, heterogeneous monitoring nodes include one or more of the following: pollutant monitoring nodes, meteorological monitoring nodes, equipment operating condition monitoring nodes, and carbon emission-related data acquisition nodes.
[0032] Pollutant monitoring nodes are used to collect the concentration of particulate matter or gaseous pollutants in the port area air. Particulate matter concentration may include at least one of total suspended particulate matter, inhalable particulate matter, and fine particulate matter. Pollutant monitoring nodes can be fixed environmental monitoring stations, miniature air quality monitoring stations, particulate matter lidar, mobile monitoring terminals, or monitoring devices installed on port operating equipment. Different types of pollutant monitoring nodes may have different monitoring ranges, sampling cycles, and data accuracy.
[0033] The node resource information for pollutant monitoring nodes can also include the spatial representative range or effective monitoring range. For fixed pollutant monitoring nodes, the spatial representative range can be determined based on the node's installation location, the distribution of surrounding structures, and the preset monitoring radius. For particulate matter lidar, the spatial representative range can be determined based on the scanning direction, scanning angle, and effective detection distance. For mobile monitoring terminals, the spatial representative range can be determined based on the terminal's real-time location and sampling trajectory. The spatial representative range is used to determine whether the data acquired by the pollutant monitoring node can characterize the target monitoring area corresponding to the current port operation event.
[0034] Meteorological monitoring nodes are used to collect meteorological data affecting the generation, diffusion, and deposition of pollutants. Meteorological data may include at least one of wind speed, wind direction, temperature, relative humidity, atmospheric pressure, and precipitation status. Meteorological monitoring nodes can be located at fixed weather stations in the port area, micro-weather weather stations in the storage yard, berth monitoring facilities, or mobile operational equipment. For port areas with a large spatial area, multiple meteorological monitoring nodes can be set up in different operational areas to reflect spatial differences in local meteorological conditions within the port area. The node resource information of the meteorological monitoring nodes may include the spatial range that the meteorological data can represent, in order to subsequently determine whether the corresponding meteorological data is applicable to the current target monitoring area.
[0035] Equipment condition monitoring nodes are used to acquire at least one of the following data from port area operating equipment: start / stop status, operating speed, operating load, operating current, operating power, operating duration, and workload. Equipment condition monitoring nodes can be independently configured status acquisition devices, or the data can be provided by the operating equipment's controller, programmable logic controller, or equipment management platform.
[0036] The node resource information of the equipment condition monitoring node also includes the corresponding equipment identifier or work unit identifier. The corresponding equipment identifier indicates which work equipment the data collected by the equipment condition monitoring node originates from, and the corresponding work unit identifier indicates which production work unit's operating status the relevant data can characterize. When an equipment condition monitoring node acquires operating data from multiple work equipment simultaneously, the mapping relationship between each data channel and the work equipment can be recorded separately.
[0037] Carbon emission-related data acquisition nodes are used to obtain data that characterizes the energy consumption or activity levels during port operations. Carbon emission-related data may include at least one of the following: electricity consumption, fuel consumption, equipment operating time, equipment load, cargo handling volume, and vehicle mileage. These data acquisition nodes can utilize data interfaces from electricity metering devices, fuel metering devices, vehicle fuel consumption data collection terminals, equipment controllers, or the port energy management system. Carbon emission-related data can serve as the data basis for subsequent characterization of the carbon emission status of port operational events and is not limited to carbon dioxide emissions directly measured by monitoring equipment.
[0038] The node resource information for carbon emission-related data collection nodes also includes data attribution information. Data attribution information is used to identify the operating equipment, energy metering loop, vehicle, production unit, or statistical object corresponding to the carbon emission-related data. For example, the data attribution information for equipment-level electricity metering devices may include the corresponding equipment identifier; the data attribution information for power supply loop metering devices may include the loop identifier and the identifier of the equipment connected to that loop; the data attribution information for vehicle fuel consumption collection terminals may include the vehicle identifier; and the data provided by the port area energy management system may include the corresponding metering object and statistical period.
[0039] In some embodiments, data attribution information may further include attribution granularity. Attribution granularity indicates whether carbon emission-related data can be mapped to a single operating device, multiple operating devices, a production unit, or the entire port area. When carbon emission-related data corresponds to multiple operating devices, it may also record whether a mapping relationship exists between each operating device and its corresponding energy metering object, enabling data allocation. Recording data attribution information and attribution granularity allows subsequent steps to determine whether the corresponding carbon emission-related data can be accurately attributed to the current port area operation event, avoiding the direct use of energy consumption data that cannot distinguish between different operating devices or different operation events as the carbon emission-related data for the current operation event.
[0040] Node resource information includes static node attribute information and dynamic node status information. Static node attribute information describes the relatively stable monitoring capabilities and data association attributes of heterogeneous monitoring nodes, and may include at least one of the following: node identifier, node type, monitorable data type, spatial location, monitoring coverage area, allowable sampling frequency, data accuracy level, communication method, data processing capability, data storage capability, corresponding device identifier, corresponding work unit identifier, energy metering object, and data attribution granularity. Dynamic node status information describes the availability status of heterogeneous monitoring nodes at the current moment, and may include at least one of the following: online status, current task load, communication link quality, remaining power supply capacity, data upload latency, most recent data update time, and data reliability status.
[0041] Node identifiers are used to uniquely identify the corresponding heterogeneous monitoring nodes. The monitorable data types represent the monitoring parameters the node can provide. Spatial location can be the installation location of a fixed node or the real-time location of a mobile node. Monitoring coverage area represents the spatial range within which the node can effectively monitor the surrounding area, a specified direction, or a specific work unit. Allowed sampling frequency represents the range of data acquisition frequencies at which the node can stably perform data acquisition. Communication methods can include wired communication, cellular mobile communication, wireless LAN communication, and low-power wide-area network communication.
[0042] The corresponding equipment identifier and corresponding work unit identifier are used to indicate the association between the data collected by the node and the port area's operating equipment or production unit. The energy metering object is used to represent the equipment, vehicle, power supply circuit, fuel supply circuit, or other energy-using object corresponding to the carbon emission-related data collection node. Through these association attributes, it can be determined whether the data provided by different heterogeneous monitoring nodes can collectively correspond to the same port area operation event during subsequent node matching.
[0043] Online status indicates whether heterogeneous monitoring nodes can interact with data processing nodes or network control nodes. Current task load indicates the number of monitoring tasks already undertaken by the heterogeneous monitoring nodes, the degree of sampling resource utilization, communication resource utilization, or computing resource utilization. Communication link quality can be determined based on one or more of the following: data transmission success rate, transmission delay, packet loss rate, and received signal strength. Data reliability status can be determined based on node calibration status, historical data stability, abnormal data ratio, and data continuity.
[0044] Static node attribute information can be updated when heterogeneous monitoring nodes are installed, relocated, repaired, or when metering loops are adjusted or configured. When the correspondence between operating equipment and energy metering loops changes, the data attribution information of carbon emission-related data acquisition nodes is updated accordingly. Dynamic node status information can be proactively reported by heterogeneous monitoring nodes according to a preset cycle, or triggered when the node status changes. The network control node can also send status query commands to heterogeneous monitoring nodes to obtain their current operating status. If a heterogeneous monitoring node fails to report status information and respond to status query commands within a preset time period, it can be marked as unavailable to prevent nodes that cannot perform monitoring tasks from being selected as target monitoring nodes in the future.
[0045] Step S130: Standardize the port area operation event information and node resource information.
[0046] Standardization is used to eliminate differences in field names, data formats, time bases, spatial bases, equipment identifiers, and units of measurement between different data sources, so that port operation event information and node resource information can be uniformly called by subsequent steps, and data from different heterogeneous monitoring nodes can be associated with corresponding port operation events through unified identifiers.
[0047] The system performs integrity checks on port operation event information, determining whether event identifiers, operation types, operation locations, and operation times are complete. For port operation events requiring correlation of equipment operating data or carbon emission-related data, it can also check the completeness of equipment identifiers, operation unit identifiers, and energy types involved in the operation. For missing information that can be supplemented based on associated operation plans, equipment operation records, or location data, it can be extracted and supplemented from the corresponding data sources. For critical fields that cannot be supplemented, an incomplete data flag can be configured for the corresponding port operation event, so that subsequent determination of whether to generate a pollution and carbon monitoring task and the scope of data correlation can be established based on the completeness of the event information.
[0048] The node identifier, monitoring data type, unit of measurement, spatial coordinates, time format, equipment identifier, work unit identifier, energy metering object, and node status fields in the node resource information are standardized. For the same monitoring parameter expressed in different units of measurement, the corresponding data is converted to a preset standardized unit of measurement; for node spatial locations expressed in different coordinate systems, the corresponding locations are converted to the port area's standardized spatial coordinate system; and for time information from different systems, the corresponding times are converted to a standardized time base.
[0049] For identifiers originating from different systems but representing the same operating equipment, vehicle, or production unit, they can be converted into a unified identifier based on pre-established equipment code mapping relationships or operating unit code mapping relationships. For example, the equipment code in the equipment control system, the metering object code in the energy management system, and the operating equipment code in the production scheduling system can be mapped to the same equipment identifier. In cases where one energy metering loop corresponds to multiple operating devices, the mapping relationship between the energy metering loop and each operating device, as well as its granularity, is retained, and the corresponding energy consumption is not directly allocated to any port area operating event in step S130.
[0050] In some embodiments, a mapping relationship can be established between the monitoring coverage of heterogeneous monitoring nodes and spatial grids, production operation units, or port operation locations based on port area spatial zoning information; and a mapping relationship can be established between equipment condition monitoring nodes, carbon emission related data acquisition nodes, and operating equipment or production operation units based on equipment ledgers and energy metering topology. These mapping relationships, as part of the node resource information, provide a basis for subsequently determining whether pollutant monitoring data and carbon emission related data can correspond to the same port area operation event.
[0051] After standardization, port operation event information accurately reflects the time, space, equipment, and characteristics of current port operations. Node resource information accurately reflects the monitoring capabilities, current availability, and correspondence between node data and spatial areas, equipment, or energy measurement objects of each heterogeneous monitoring node. Therefore, subsequent steps can not only select target monitoring nodes that match the monitoring type, spatial location, and operational status, but also determine whether the pollutant monitoring data and carbon emission-related data provided by each target monitoring node can be attributed to the same port operation event. This reduces task configuration deviations caused by node offlineness, excessive node load, mismatched node capabilities, or unclear data attribution, providing an accurate data foundation for forming a monitoring subnet that meets correlation requirements.
[0052] Step S200 is used to convert port area operation events into pollution and carbon monitoring tasks that can be executed by heterogeneous monitoring nodes. Specifically, based on the operation location, time period, type, intensity, target, and equipment involved in the operation event, the target monitoring area and monitoring dimensions for pollutants, meteorological conditions, equipment operating conditions, and carbon emissions are determined. Furthermore, the correlation requirements that must be met when data from different monitoring dimensions are mapped to the same port area operation event are determined. Based on this, a pollution and carbon monitoring task is formed that includes spatial coverage requirements, sampling timing requirements, data quality requirements, and correlation requirements. This ensures that the selection of subsequent target monitoring nodes not only matches the data type to be monitored but also guarantees that the data acquired by different target monitoring nodes have a clear operational event attribution relationship.
[0053] In some embodiments, step S200 includes steps S210 to S230.
[0054] Step S210: Determine the corresponding target monitoring area based on the port area operation event information.
[0055] The target monitoring area refers to the spatial range within which pollutant monitoring data and meteorological monitoring data need to be obtained for the current port operation event. The correspondence between equipment operating data and carbon emission-related data and the port operation event is determined based on the equipment, vehicles, energy metering loops, or production operation units involved in the operation. The target monitoring area may include the core operation area where the port operation event directly occurs, as well as related monitoring areas that may be affected by the current port operation event.
[0056] The core operating area can be determined based on the operating location obtained in step S100. For example, when the port area operation event is a ship loading and unloading operation, the core operating area may include the corresponding berth, the operating range of the loading and unloading equipment, and the adjacent transfer area through which the material passes; when the port area operation event is a stack-reclaim operation, the core operating area may include the corresponding stack, the operating range of the stack-reclaim equipment, and the adjacent unloading area; when the port area operation event is a material conveying operation, the core operating area may include the conveyor belt section, the transfer station, and the unloading point; when the port area operation event is a vehicle transportation operation, the core operating area may include the road section where the vehicle is currently located, the loading area, the unloading area, and the driving path related to the current transportation task.
[0057] The associated monitoring area represents the spatial range that may be affected by the spread of pollutants from current port operations and requires coordinated monitoring with the core operation area. The associated monitoring area can be determined based on the type of operation, the object of the operation, the intensity of the operation, the location of pollutant generation, the spatial structure of the port area, and the preset impact distance. For loading / unloading, stacking / reclaiming, and transshipment operations with significant particulate matter emissions, a corresponding extended monitoring range can be formed around the core operation area; for vehicle transportation operations with continuous movement characteristics, continuous or segmented associated monitoring areas can be formed based on vehicle trajectories.
[0058] In some embodiments, the associated monitoring area can be corrected by incorporating meteorological data from the current or most recent period. Meteorological data can be provided by operational meteorological monitoring nodes or the port area meteorological information system. When wind speed reaches preset conditions, the associated monitoring area can be expanded downwind of the current wind direction; when wind direction changes, the extension direction of the associated monitoring area can be adjusted; when precipitation or significant changes in relative humidity occur, the spatial extent of the associated monitoring area can be adjusted according to actual monitoring needs.
[0059] The port area can be pre-divided into multiple spatial grids, production operation units, or monitoring zones. When determining the target monitoring area, the core operation area and related monitoring areas can be mapped to the corresponding spatial grids, production operation units, or monitoring zones, and the mapped area number can be used as the spatial identifier of the target monitoring area. When using spatial grids to represent the target monitoring area, the grid size can be set according to the port area, the distribution of operating equipment, the density of monitoring nodes, and the monitoring accuracy requirements.
[0060] For mobile operation units, the target monitoring area can be updated according to preset time intervals or changes in the spatial grid. For example, when a vehicle moves from one port area road section to another, the core operation area and related monitoring areas can be updated based on the vehicle's real-time location, allowing the pollutant monitoring range to be adjusted according to changes in the location of port operation events.
[0061] When multiple port operation events exist simultaneously that are spatially adjacent or related in their workflow, the initial target monitoring area for each event can be determined separately. These initial target monitoring areas can then be merged or associated based on their overlap and operational relationships. For initial target monitoring areas that overlap spatially and have similar monitoring data dimensions, a common target monitoring area can be formed to reduce redundant calls to subsequent monitoring nodes. For port operation events that are spatially adjacent but have different operational objects, participating equipment, or energy affiliations, their respective event identifiers and task affiliations are retained to avoid data confusion between different port operation events.
[0062] In summary, in some embodiments, the core operation area is determined based on the operation location of the port operation event, and the associated monitoring area is determined based on the operation type, operation intensity and meteorological data of the port operation event. The core operation area and the associated monitoring area are then determined as the target monitoring area.
[0063] It should be noted that the target monitoring area is mainly used to determine the spatial coverage requirements for pollutant monitoring data and meteorological monitoring data. Equipment operating condition data and carbon emission-related data also need to be correlated with current port area operation events based on the identification of the operating equipment, operating unit, or energy metering object. The data cannot be directly identified as belonging to the current port area operation event simply because the data source is located within the target monitoring area.
[0064] Step S220: Determine the carbon pollution monitoring needs based on port operation event information and target monitoring areas.
[0065] The pollution and carbon monitoring requirements describe the data dimensions needed for current port operations, as well as the spatial coverage, sampling time series, data quality, and correlation requirements for each data dimension. Pollution and carbon monitoring requirements can include pollutant monitoring requirements, meteorological monitoring requirements, equipment operating condition monitoring requirements, and carbon emission-related monitoring requirements.
[0066] Specifically, based on the type of operation, the target of the operation, the equipment involved in the operation, and the target monitoring area of the port operation event, at least one of the following is determined: pollutant monitoring needs, carbon emission-related monitoring needs, meteorological monitoring needs, and equipment operating condition monitoring needs.
[0067] Pollutant monitoring requirements are determined based on the type of operation, the object of the operation, the intensity of the operation, and the target monitoring area. These requirements indicate the types of pollutants that need to be acquired, as well as the corresponding spatial coverage and sampling sequence. For port operations that may generate particulate matter, such as bulk cargo loading and unloading, stacking and reclaiming, material handling, and vehicle transportation, pollutant monitoring requirements may include at least one of total suspended particulate matter, inhalable particulate matter, and fine particulate matter. For port operations with specific gaseous pollutant monitoring needs, corresponding gaseous pollutant monitoring requirements can also be set.
[0068] Meteorological monitoring requirements are used to acquire meteorological data that can help determine the generation, diffusion, and deposition of pollutants. These data may include at least one of wind speed, wind direction, temperature, relative humidity, atmospheric pressure, and precipitation status. For outdoor operations where pollutants are easily affected by wind direction and wind speed, wind speed and wind direction monitoring requirements can be prioritized. For operations that require analysis of material moisture content or the impact of precipitation, relative humidity or precipitation status monitoring requirements can be further specified.
[0069] Equipment condition monitoring requirements are used to obtain the operating status of the equipment involved in the current port area operation events, which may include at least one of the following: equipment start / stop status, operating speed, operating load, operating power, operating duration, and workload. When determining equipment condition monitoring requirements, based on the equipment information obtained in step S100, the identification of the equipment to be monitored and the corresponding operating time period are determined, so that the equipment condition data can establish a clear correspondence with the current port area operation events.
[0070] Carbon emission-related monitoring requirements are used to determine the energy consumption data or activity level data that need to be obtained, which may include at least one of the following: electricity consumption, fuel consumption, equipment operating time, equipment load, cargo handling volume, and vehicle mileage. For electrically powered port operation equipment, monitoring requirements for electricity consumption, operating power, or operating time can be set; for operation equipment powered by fuel oil or other fuels, monitoring requirements for fuel consumption, equipment operating time, or vehicle mileage can be set.
[0071] When determining carbon emission-related monitoring needs, it is also necessary to determine the corresponding data attribution objects. Data attribution objects can be the operating equipment, vehicles, energy metering loops, or production units involved in the current port area operation event. For cases where the same energy metering loop corresponds to multiple operating devices, the energy metering data can be directly attributed to the current port area operation event based on the energy metering object and attribution granularity obtained in step S100. Data that cannot distinguish energy consumption between the current port area operation event and other operation events is not considered data that can directly meet the current carbon emission-related monitoring needs.
[0072] The pollution and carbon monitoring requirements used to generate coordinated pollution and carbon monitoring results include at least pollutant monitoring requirements and carbon emission-related monitoring requirements. Meteorological monitoring requirements and equipment operating condition monitoring requirements can be set according to the types of port area operational events, data correlation needs, and monitoring accuracy requirements. Different monitoring dimensions are not independent of each other; rather, data correlations need to be established based on current port area operational events.
[0073] Based on the event identifier, operation time, operation location, and equipment involved in the operation of the port area operation event, the association requirements are determined. The association requirements include at least event association requirements and time association requirements, and also include at least one of spatial association requirements and equipment attribution requirements.
[0074] Therefore, the requirements for pollution and carbon monitoring also include correlation requirements. Correlation requirements are used to define the conditions that must be met for pollutant monitoring data, meteorological monitoring data, equipment operating data, and carbon emission-related data to correspond to the same port area operation event.
[0075] Event association requirements are used to ensure that data from different monitoring dimensions have the same event identifier, or can be mapped to the same port area operation event through work batch identifier, stage event identifier, or task identifier. Time association requirements are used to ensure that the sampling time, sampling period, or statistical period of data from different monitoring dimensions are within the monitoring period corresponding to the current port area operation event, and can form a corresponding relationship within a preset association time window.
[0076] Spatial correlation requirements are primarily used to define the correspondence between pollutant monitoring data and meteorological monitoring data and the target monitoring area. The monitoring coverage of pollutant monitoring nodes needs to cover all or part of the spatial range of the target monitoring area, and the effective representative range of meteorological monitoring nodes needs to be able to characterize the meteorological conditions of the corresponding target monitoring area.
[0077] Equipment attribution requirements are used to define a clear correspondence between equipment operating condition data and carbon emission-related data and the operating equipment, vehicles, energy metering loops, or production operation units involved in the current port area operation event. Data provided by equipment operating condition monitoring nodes or carbon emission-related data collection nodes only meets the equipment attribution requirements if it can be attributed to the current port area operation event based on a unified equipment identifier, operation unit identifier, energy metering object, or preset mapping relationship.
[0078] For example, for a stockpiling and reclaiming operation, pollutant monitoring data needs to come from pollutant monitoring nodes that can cover the area affected by the operation; equipment operating data needs to come from the stockpiling and reclaiming equipment involved in the current operation; and power consumption data needs to come from the corresponding stockpiling and reclaiming equipment or its associated energy metering circuit. Furthermore, the sampling or statistical period for the above data needs to correspond to the current stockpiling and reclaiming operation period. Data obtained only within the same port area but for which a spatial, temporal, or equipment correspondence cannot be established with the stockpiling and reclaiming operation does not meet the correlation requirements for current pollution and carbon monitoring.
[0079] In addition to the dimensions and correlation requirements of the data to be monitored, pollution and carbon monitoring requirements also include spatial coverage requirements, sampling timing requirements, and data quality requirements. Spatial coverage requirements are used to define the target monitoring area, spatial grid, or operational unit that pollutant monitoring data and meteorological monitoring data need to cover. For equipment operating condition data and carbon emission-related data, spatial coverage requirements can be translated into coverage requirements for corresponding equipment, vehicles, energy metering loops, or production operation units.
[0080] Sampling timing requirements define the start time, end conditions, sampling period, and data reporting period for monitoring tasks. Monitoring tasks can be initiated for a preset duration before a port operation event begins to obtain pre-operation environmental background data; monitoring data can be continuously acquired during the port operation event; and the task can continue for a preset duration after the port operation event ends to obtain monitoring data during the pollutant concentration recovery process. Different monitoring dimensions can have different sampling periods set based on the data change rate and data source update cycle.
[0081] Data quality requirements define the completeness, timeliness, continuity, and reliability that subsequent monitoring data should meet. Data quality requirements may include at least one of the following: allowable data missing percentage, maximum data upload latency, minimum number of valid samples, minimum node reliability, and minimum spatial coverage. Data quality requirements are used for subsequent selection of target monitoring nodes and also for evaluating the execution status of the pollution and carbon monitoring task in step S500.
[0082] In some embodiments, task priorities can be determined based on the importance of port operation events, pollutant emission risks, the location of target monitoring areas, and the difficulty of data correlation. Higher-priority carbon pollution monitoring needs can be configured with higher spatial coverage requirements, shorter sampling periods, stricter data quality requirements, or more complete correlation requirements. Task priorities can also be used to address the resource allocation order when multiple carbon pollution monitoring tasks simultaneously request the same heterogeneous monitoring node.
[0083] Step S230: Generate a pollution and carbon monitoring task based on the target monitoring area and pollution and carbon monitoring requirements.
[0084] Carbon pollution monitoring tasks are structured task data used for subsequent node matching, node task allocation, and monitoring subnet construction. Each carbon pollution monitoring task corresponds to at least one port area operation event and is configured with a corresponding task identifier. The task identifier can be generated based on the event identifier of the port area operation event, the target monitoring area identifier, and the task generation time, so as to maintain the correlation between carbon pollution monitoring tasks and port area operation events during subsequent data acquisition, data transmission, and data processing.
[0085] A pollution and carbon monitoring task should at least include a task identifier, associated event identifiers, target monitoring area, dimensions of data to be monitored, spatial coverage requirements, sampling timing requirements, data quality requirements, and correlation requirements. It may further include task priority and task continuity conditions. Dimensions of data to be monitored are used to define the data types that need to be provided by heterogeneous monitoring nodes. Spatial coverage requirements define the monitoring location, target area, operating equipment, or energy metering object corresponding to each data dimension. Sampling timing requirements define the sampling and reporting time of the monitoring data. Data quality requirements define the quality conditions that the task execution results should meet. Correlation requirements define the event, time, space, and equipment attribution conditions that must be met for pollutant monitoring data and carbon emission-related data to correspond to the same port area operation event.
[0086] For pollution and carbon monitoring tasks involving multiple target monitoring areas, multiple monitoring data dimensions, or multiple monitoring time periods, the task can be divided into multiple task units according to the monitoring data dimensions, monitoring spatial range, and associated time windows. Each task unit corresponds to at least one type of data to be monitored, as well as the corresponding monitoring spatial range, data ownership object, and sampling time sequence requirements.
[0087] Pollutant monitoring task units can correspond to one or more spatial grids within the target monitoring area; meteorological monitoring task units can correspond to the target monitoring area where meteorological data needs to be acquired; equipment condition monitoring task units can correspond to one or more pieces of equipment involved in the current port area operation event; carbon emission related monitoring task units can correspond to operating equipment, vehicles, energy metering loops, or production operation units.
[0088] In some embodiments, a pollution and carbon monitoring task includes at least one pollution and carbon correlation monitoring unit. The pollution and carbon correlation monitoring unit is formed by combining multiple task units corresponding to the same port area operation event and the same associated time window, and having a corresponding relationship in terms of target monitoring area, operating equipment, or energy metering object. It represents a set of correlated tasks for implementing coordinated pollution and carbon monitoring of the same port area operation event within a defined monitoring period.
[0089] Each pollution and carbon correlation monitoring unit includes at least a pollutant monitoring task unit and a carbon emission-related monitoring task unit corresponding to the same port area operation event and the same associated time window, and may also include a meteorological monitoring task unit and an equipment operating condition monitoring task unit. The pollutant monitoring task unit is used to acquire pollutant monitoring data within the corresponding target monitoring area, and the carbon emission-related monitoring task unit is used to acquire energy consumption data or activity level data that can be attributed to the current port area operation event.
[0090] The pollution and carbon correlation monitoring unit is configured with corresponding correlation requirements. Each task unit belonging to the same pollution and carbon correlation monitoring unit needs to be able to establish a temporal correspondence through correlation event identifiers and correlation time windows, and meet the corresponding spatial correlation requirements or equipment affiliation requirements according to the task unit type. By setting up pollution and carbon correlation monitoring units, the correspondence between pollutant monitoring tasks and carbon emission-related monitoring tasks can be clearly defined during the task generation stage, avoiding subsequent data combinations without clear operational affiliation, where monitoring nodes are selected separately based on data type.
[0091] The duration of the task can be determined based on the status of port area operation events and monitoring data. While a port area operation event is still in progress, the carbon pollution monitoring task can continue. After the port area operation event ends, the pre-set delay monitoring can continue until the pre-set delay duration is reached or the pollutant monitoring data returns to a relatively stable state. When a port area operation event is canceled, the operation location changes significantly, the equipment involved in the operation is replaced, or the energy metering object changes, the corresponding carbon pollution monitoring task can be updated or regenerated.
[0092] Step S200 transforms information on port operation events in terms of time, space, operating equipment, and energy use into a pollution and carbon monitoring task with clearly defined monitoring data dimensions, spatial coverage, sampling sequence, data quality, and correlation requirements. This allows subsequent steps to not only select target monitoring nodes based on the monitoring capabilities of individual nodes but also to determine whether data from multiple target monitoring nodes can collectively correspond to the same port operation event. This provides a foundation for forming a monitoring subnetwork that meets the correlation requirements between pollutant monitoring data and carbon emission-related data.
[0093] Step S300 is used to determine the execution capability and data association capability of each heterogeneous monitoring node for the pollution and carbon monitoring task generated in step S200 and the node resource information obtained in step S100. Under the condition of meeting the association requirements of the pollution and carbon monitoring task, target monitoring nodes are selected, node tasks are assigned, and a monitoring subnetwork is formed. The selection of target monitoring nodes considers not only what kind of data the node can collect, what spatial range it can cover, and whether it is currently available, but also whether the data provided by different target monitoring nodes can be correlated to the same port area operation event through event identifiers, monitoring periods, target monitoring areas, operating equipment, or energy metering objects. Thus, the formed monitoring subnetwork can collaboratively acquire pollutant monitoring data and carbon emission-related data with clear correlations around the current port area operation event.
[0094] It should be noted that in step S300, meeting the correlation requirements means that, based on the monitoring coverage, sampling timing capability, and data attribution attributes of the candidate monitoring nodes, it is determined that the data provided by the candidate node combination after executing the node task meets the correlation requirements; step S400 further verifies whether the actually obtained multidimensional monitoring data meets the correlation requirements.
[0095] In some embodiments, step S300 includes steps S310 to S340.
[0096] Step S310: Select candidate monitoring nodes based on the pollution and carbon monitoring tasks and node resource information.
[0097] The pollution and carbon monitoring task generated in the aforementioned step S200 may include multiple task units, each of which is defined by the type of data to be monitored, the monitoring spatial range, the data belonging object, the sampling time sequence requirements, the data quality requirements, and the correlation requirements.
[0098] For each task unit, based on the data type to be monitored corresponding to the pollution and carbon monitoring task, initial candidate monitoring nodes with the corresponding data acquisition capabilities are selected from multiple heterogeneous monitoring nodes. For pollutant monitoring task units, initial candidate monitoring nodes capable of acquiring the corresponding particulate matter concentration or gaseous pollutant concentration are selected from pollutant monitoring nodes; for meteorological monitoring task units, initial candidate monitoring nodes capable of acquiring the corresponding meteorological parameters are selected from meteorological monitoring nodes; for equipment condition monitoring task units, initial candidate monitoring nodes capable of acquiring the corresponding operating status of the equipment are selected from equipment condition monitoring nodes; and for carbon emission-related monitoring task units, initial candidate monitoring nodes capable of acquiring carbon emission-related data acquisition nodes capable of acquiring the corresponding energy consumption data or activity level data are selected from carbon emission-related data acquisition nodes.
[0099] Candidate monitoring nodes are selected from the initial candidate monitoring nodes based on their monitoring coverage, sampling capacity, online status, current task load, communication link quality, and data reliability. Sampling capacity can be determined based on the allowed sampling frequency, continuous sampling duration, and currently available sampling resources of the heterogeneous monitoring nodes. When an initial candidate monitoring node can normally perform data acquisition within the time period required by the pollution and carbon monitoring task, and meets the corresponding requirements for spatial coverage, sampling timing, node operating status, and communication status, that initial candidate monitoring node is designated as a candidate monitoring node for the corresponding task unit.
[0100] For pollutant monitoring task units, the effective monitoring range of candidate monitoring nodes needs to cover all or part of the spatial range of the target monitoring area corresponding to the task unit. Node spatial adaptability can be determined based on the overlap between the node's monitoring coverage area and the target monitoring area, and is not limited to judging solely based on the straight-line distance between the node's installation location and the operating location.
[0101] For example, for fixed pollutant monitoring nodes, their ability to characterize the pollutant status of the target monitoring area can be determined based on the node's installation location and spatial representation range; for particulate matter lidar, the coverage relationship between the scanning space and the target monitoring area can be determined based on the scanning direction, scanning angle, and effective detection distance; for mobile monitoring nodes, their ability to perform the corresponding task can be determined based on the node's current location, predetermined movement trajectory, and the time required to reach the target monitoring area.
[0102] For meteorological monitoring task units, the effective representative range of candidate meteorological monitoring nodes needs to cover or characterize the meteorological conditions of the target monitoring area. When multiple meteorological monitoring nodes can provide the required meteorological data, selection can be made based on the distance between the node and the target monitoring area, the influence of local structures, the degree of data continuity, and the current communication status.
[0103] For equipment condition monitoring task units, in addition to requiring nodes to obtain the corresponding equipment condition parameters, the corresponding equipment identifier or corresponding work unit identifier in the node resource information must also match the work equipment information in the current port area operation event. Nodes that can obtain data for the same type of equipment but correspond to other work equipment will not be considered as valid candidate monitoring nodes for the current equipment condition monitoring task unit.
[0104] For carbon emission-related monitoring task units, in addition to requiring nodes to acquire corresponding energy consumption data or activity level data, it is also required that the data attribution information of the nodes has a clear correspondence with the current port area operation events. The operating equipment, vehicles, energy metering loops, or production operation units corresponding to the carbon emission-related data acquisition nodes need to be consistent with the operating equipment or operation units recorded in the current port area operation events, or the correspondence can be determined through the mapping relationship established in step S130.
[0105] When carbon emission-related data acquisition nodes provide energy metering data shared by multiple operating devices, it is necessary to determine whether this metering data has a reliable mapping relationship that can be assigned to the current port area operation event. For example, the energy consumption corresponding to the current port area operation event can be determined based on the independent operating status, operating period, power records, or metering branch data of each operating device. If the energy consumption corresponding to the current port area operation event cannot be distinguished from that of other operation events, then the node will not be directly identified as a valid candidate monitoring node for the current carbon emission-related monitoring task unit.
[0106] Heterogeneous monitoring nodes that are unavailable online, have reached their node load limit, have communication links that cannot meet data upload timeliness requirements, or whose most recent valid data is older than a preset timeframe, will not be included in the candidate monitoring node range. Through this screening, nodes that, although matching data types, fail to meet requirements for spatial coverage, device affiliation, sampling timing, or current operating status can be excluded.
[0107] For candidate monitoring nodes used to obtain equipment operating data or carbon emission-related data, it is determined whether the data obtained by the candidate monitoring node can be attributed to port operation events based on the corresponding operating equipment, vehicle, energy metering object, or production operation unit.
[0108] Step S320: Determine the task matching relationship between candidate monitoring nodes and pollution and carbon monitoring tasks.
[0109] The task matching relationship is determined based on the suitability of the candidate monitoring nodes in terms of monitoring capabilities, spatial coverage, sampling timing, data attribution, node operation status, and communication status.
[0110] Task matching relationships are used to indicate the suitability of candidate monitoring nodes to perform corresponding task units, and the degree to which the data provided by candidate monitoring nodes meets the correlation requirements of pollution and carbon monitoring tasks. Task matching relationships can be determined based on one or more of the following: monitoring capability matching, spatial coverage matching, sampling time sequence matching, data quality matching, data attribution matching, node operating status, and communication status.
[0111] Monitoring capability matching indicates whether the data types, allowed sampling frequencies, and data accuracy levels provided by candidate monitoring nodes meet the requirements of the task unit. Spatial coverage matching indicates the extent to which the effective monitoring range of pollutant monitoring nodes or meteorological monitoring nodes covers the target monitoring area. Sampling timing matching indicates whether candidate monitoring nodes can perform sampling at the start time, duration, and sampling period required by the task unit.
[0112] Data quality matching indicates whether the calibration status, historical data stability, data continuity, and proportion of abnormal data of the candidate monitoring node meet the data quality requirements of the task unit. Node operating status indicates the current remaining sampling capacity, computing power, storage capacity, and task load of the candidate monitoring node. Communication status indicates the communication reachability, transmission latency, transmission success rate, and link stability between the candidate monitoring node and the edge gateway, data processing node, or other monitoring nodes.
[0113] Data attribution matching indicates whether the data provided by candidate monitoring nodes can be attributed to the current port area operation event. For equipment condition monitoring nodes, data attribution matching can be determined based on whether the node's corresponding equipment identifier matches the identification of the operating equipment in the port area operation event. For carbon emission related data collection nodes, data attribution matching can be determined based on the correspondence between the energy metering object, the data attribution granularity, and the operating equipment or production unit involved in the current port area operation event.
[0114] For multiple task units within the same pollution and carbon correlation monitoring unit, it is also necessary to determine the correlation and compatibility relationships between different candidate monitoring nodes. The correlation and compatibility relationships indicate whether the data provided by multiple candidate monitoring nodes can jointly meet the correlation requirements of the pollution and carbon monitoring task.
[0115] The association and adaptation relationships between multiple candidate monitoring nodes include at least event association and time association relationships, and may also include spatial association and device affiliation relationships. Event association relationships indicate whether the data generated by candidate monitoring nodes after performing their node tasks can be configured with the same associated event identifier. Time association relationships indicate whether the sampling or statistical periods of different nodes fall within the monitoring period of the same port area operation event, and whether they can be aligned within a preset association time window.
[0116] Spatial association adaptation is used to indicate whether the effective monitoring range of pollutant monitoring nodes can cover the target monitoring area corresponding to the current port operation event, and whether the data of the corresponding meteorological monitoring nodes can characterize the meteorological conditions of the area. Equipment affiliation adaptation is used to indicate whether equipment condition monitoring nodes and carbon emission related data acquisition nodes correspond to the operating equipment, vehicles, energy metering loops, or production operation units participating in the current port operation event.
[0117] In one implementation, the matching status of monitoring capabilities, spatial coverage, sampling timing, data quality, data attribution, node operation status, and communication status can be quantified to obtain the matching index value of the candidate monitoring node relative to the corresponding task unit, and then the comprehensive matching degree can be determined based on the matching index value.
[0118] Different types of task units can be configured with different weights for matching indicators. For example, for pollutant monitoring task units, the weights of spatial coverage matching and data quality matching can be increased; for task units that require high-frequency reporting, the weights of sampling timing matching and communication status can be increased; and for equipment condition monitoring task units and carbon emission-related monitoring task units, the weight of data attribution matching can be increased.
[0119] Task matching relationships can be represented by an association matrix or a bipartite graph between task units and candidate monitoring nodes. In the association matrix, one type of index corresponds to the task unit, and the other type of index corresponds to the candidate monitoring node. The matrix elements are used to record whether the candidate monitoring node meets the basic conditions of the corresponding task unit, as well as the corresponding comprehensive matching degree and data attribution matching result.
[0120] When represented using a bipartite graph, one type of vertices corresponds to task units, and the other type corresponds to candidate monitoring nodes. There are connecting edges between task units and candidate monitoring nodes, indicating that the candidate monitoring node can execute the corresponding task unit. The attributes of the connecting edges can include overall matching degree, spatial coverage, expected resource consumption, communication cost, and data attribution matching result.
[0121] For pollution and carbon correlation monitoring units, monitoring dimension coverage relationships can also be established. The monitoring dimension coverage relationship is used to record the monitoring dimensions that each candidate monitoring node can provide for the pollution and carbon correlation monitoring unit, as well as whether the corresponding data meets the requirements of event correlation, time correlation, spatial correlation, or equipment attribution.
[0122] Candidate monitoring nodes are considered to effectively cover the corresponding monitoring dimension only if they can provide data for that dimension, and this data can be correlated with data from other monitoring dimensions according to the correlation requirements of the pollution and carbon monitoring task. Therefore, the task matching relationship reflects not only whether a single node possesses a certain data collection capability, but also whether multiple candidate monitoring nodes, when combined, can jointly form pollution and carbon collaborative monitoring data corresponding to the current port area operation event.
[0123] Step S330: Select target monitoring nodes based on task matching relationships and assign node tasks to target monitoring nodes.
[0124] The selection of target monitoring nodes should ensure that each task unit in the pollution and carbon monitoring mission obtains corresponding monitoring resources, and that pollutant monitoring data and carbon emission-related data belonging to the same pollution and carbon correlation monitoring unit can meet the correlation requirements. At the same time, the node tasks undertaken by the target monitoring node should not exceed its sampling capacity, communication capacity, data processing capacity, or storage capacity.
[0125] For each task unit, candidate monitoring nodes can be sorted based on their overall matching degree, and nodes that meet the task requirements can be selected as target monitoring nodes. When a pollutant monitoring task unit needs to cover multiple spatial grids or multiple monitoring locations, multiple target monitoring nodes whose monitoring ranges can jointly cover the corresponding spatial range can be selected. For task units with high data continuity requirements or where node anomalies may lead to the loss of critical monitoring data, primary target monitoring nodes and backup target monitoring nodes can be configured.
[0126] Multiple candidate node combinations are formed based on task matching relationships. Each candidate node combination includes one or more candidate monitoring nodes for each task unit in the pollution and carbon monitoring task, and records the task unit corresponding to each candidate monitoring node, the types of monitoring data that can be provided, the monitoring coverage, the data belonging to, the sampling period, the node task load, and the data transmission path.
[0127] The candidate node combination includes at least candidate monitoring nodes for providing pollutant monitoring data and candidate monitoring nodes for providing carbon emission-related data, and may also include candidate monitoring nodes for providing meteorological monitoring data or equipment operating condition data. When the same candidate monitoring node can provide multiple types of monitoring data, it can simultaneously execute multiple task units.
[0128] From multiple candidate node combinations, feasible node combinations that meet the correlation requirements are identified. A feasible node combination refers to a candidate node combination that meets the requirements of the pollution and carbon monitoring task in terms of monitoring data dimension, spatial coverage, data attribution, time correspondence, node task load, and data transmission path.
[0129] Each feasible combination of nodes must satisfy at least the following conditions: Pollutant monitoring data and carbon emission-related data are each provided by at least one candidate monitoring node; The monitoring coverage of one or more candidate monitoring nodes used to provide pollutant monitoring data collectively covers the corresponding monitoring spatial range required by the pollution and carbon monitoring task; The candidate monitoring nodes used to provide carbon emission-related data have data attribution relationships with the port area operation events corresponding to the operating equipment, vehicles, energy metering objects, or production operation units. Pollutant monitoring data and carbon emission-related data correspond to the same port area operation event, and the corresponding sampling time period or statistical time period can form a corresponding relationship within a preset associated time window; The node task load of each candidate monitoring node does not exceed the corresponding node load limit, and each candidate monitoring node has an available data transmission path.
[0130] Candidate node combinations that do not simultaneously meet the above conditions will not be considered feasible. For example, if a candidate node combination can provide pollutant monitoring data and energy consumption data, but the monitoring coverage of the pollutant monitoring nodes cannot cover the corresponding monitoring spatial range required by the pollution and carbon monitoring task, or if the energy consumption data cannot be attributed to the current port area operation event, then the candidate node combination is not considered a feasible node combination.
[0131] After determining one or more feasible node combinations, a target node combination is selected from the feasible node combinations based on the monitoring coverage, data reliability, number of node calls, node task load, and communication resource consumption corresponding to each feasible node combination, and the candidate monitoring nodes in the target node combination are determined as the target monitoring nodes.
[0132] Specifically, the target monitoring area coverage, data reliability status of candidate monitoring nodes, number of candidate monitoring nodes, task load of each candidate monitoring node, and expected communication resource consumption can be determined for each feasible node combination. Based on this information, each feasible node combination can be compared. While meeting the correlation requirements of the pollution and carbon monitoring task and the execution requirements of each task unit, feasible node combinations with higher monitoring coverage, higher data reliability, fewer node calls, more balanced node task load distribution, and lower communication resource consumption can be prioritized. The candidate monitoring nodes in the selected feasible node combinations will then be designated as the target monitoring nodes.
[0133] In some embodiments, a step-by-step screening, combinatorial search, integer programming or heuristic search method can be used to determine feasible node combinations from multiple candidate node combinations, and select target node combinations from feasible node combinations, and determine the candidate monitoring nodes in the target node combinations as target monitoring nodes. This application does not limit the specific combination screening and selection method.
[0134] When a candidate monitoring node can provide multiple monitoring data or simultaneously meet the requirements of multiple task units, it can be selected as the common target monitoring node for multiple task units, provided its node resources allow. For example, a composite monitoring node with the capability to collect particulate matter and meteorological parameters can simultaneously undertake both pollutant monitoring and meteorological monitoring task units. When using a common target monitoring node, it is necessary to record the task units it undertakes and the corresponding sampling parameters separately.
[0135] When multiple port operation events have partially overlapping target monitoring areas, and the same meteorological monitoring node or pollutant monitoring node can meet the requirements of multiple pollution and carbon monitoring tasks, the node can simultaneously undertake multiple pollution and carbon monitoring tasks. When a node executes multiple tasks, it needs to configure corresponding task identifiers, associated event identifiers, or pollution and carbon associated monitoring unit identifiers respectively, and ensure that the total task load of the node does not exceed the allowable load limit.
[0136] A node task is a specific operation assigned to a target monitoring node and performed by it during the execution of a pollution and carbon monitoring task. A node task may include at least one of the following: sampling task, data preprocessing task, data verification task, data aggregation task, and data relay task.
[0137] Assign at least one of the following to each target monitoring node: sampling task, data preprocessing task, data aggregation task, and data relay task. Configure task identifier, associated event identifier, monitoring parameters, sampling period, and data reporting period for each node task.
[0138] The sampling task instructs target monitoring nodes to collect monitoring data according to the set data type, sampling period, start time, and end conditions. Data preprocessing tasks may include data format conversion, unit conversion, preliminary identification of abnormal data, and data compression. The data verification task uses the data acquired by the target monitoring nodes to verify the consistency of similar or related data from other target monitoring nodes. The data aggregation task receives data uploaded by other target monitoring nodes in the same monitoring subnet and caches, encapsulates, or forwards multiple data streams. The data relay task forwards monitoring data or control information when direct communication between target monitoring nodes and data processing nodes is not possible.
[0139] The type of node task is determined based on the node resource information of the target monitoring node and the requirements of the pollution and carbon monitoring task. Target monitoring nodes with only data acquisition capabilities can undertake sampling tasks; target monitoring nodes with edge computing capabilities can undertake both sampling and data preprocessing tasks; target monitoring nodes with stable communication connections and high data processing capabilities can undertake data aggregation tasks; and target monitoring nodes located in communication coverage areas and with data forwarding capabilities can undertake data relay tasks.
[0140] When assigning node tasks to target monitoring nodes, you can configure task identifier, associated event identifier, task unit identifier, pollution and carbon associated monitoring unit identifier, monitoring parameters, sampling period, data reporting period, data receiving address, task start conditions, and task end conditions.
[0141] When target monitoring nodes collect or process monitoring data, they encapsulate the node identifier, task identifier, associated event identifier, and corresponding task unit identifier along with the monitoring data. Through these identifiers, pollutant monitoring data, meteorological monitoring data, equipment operating condition data, and carbon emission-related data acquired by different target monitoring nodes can be mapped to the same port area operation event in step S400.
[0142] Step S340: Form a monitoring subnet based on the target monitoring nodes and node tasks.
[0143] A monitoring subnet is formed based on the network configuration. The monitoring subnet is a logical network that organizes target monitoring nodes through subnet identifiers and node task correspondence.
[0144] A monitoring subnet is a logical network formed by one or more target monitoring nodes undertaking the same pollution and carbon monitoring task, based on a unified subnet identifier, node task correspondence, and data transmission relationship. Forming a monitoring subnet does not require changing the original physical connection structure of each target monitoring node. Instead, by establishing a unified subnet identifier, member node relationships, task correspondence, and data transmission relationship, target monitoring nodes belonging to different monitoring systems or using different communication methods can work collaboratively around the same port area operation events.
[0145] The monitoring subnet shall include at least one or more target monitoring nodes for performing pollutant monitoring tasks and carbon emission-related monitoring tasks, and may also include target monitoring nodes for performing meteorological monitoring tasks, equipment condition monitoring tasks, data preprocessing tasks, data verification tasks, data aggregation tasks, or data relay tasks.
[0146] The network configuration of the monitoring subnet includes subnet identifier, associated event identifier, member node list, node task correspondence and data transmission path, and may further include associated task identifier, association relationship between task units, sampling parameters, data reporting parameters and task effective time period.
[0147] Subnet identifiers are used to distinguish monitoring subnets formed for different pollution and carbon monitoring tasks. The member node list records the target monitoring nodes included in the monitoring subnet. The node task mapping records the task units and task types undertaken by each target monitoring node. The association relationships between task units record the association requirements between pollutant monitoring task units, carbon emission-related monitoring task units, and optional meteorological monitoring task units and equipment condition monitoring task units.
[0148] When forming a monitoring subnet, the data transmission path can be determined based on the communication methods and reachability of the target monitoring nodes. Target monitoring nodes that can communicate directly with the edge gateway or data processing node can report monitoring data using direct transmission; target monitoring nodes that cannot communicate directly but can establish connections with other target monitoring nodes can report monitoring data through nodes that undertake data relay tasks.
[0149] When multiple transmission paths are available, the data transmission path can be selected based on link stability, transmission latency, current communication load, and data importance. For pollutant monitoring data, equipment status change data, or other data with high timeliness requirements, paths with lower transmission latency can be prioritized; for energy consumption data with longer statistical periods, paths with lower communication resource consumption can be selected while meeting task timeliness requirements.
[0150] In some embodiments, a data aggregation node can be determined from the target monitoring nodes. The data aggregation node can be determined based on the node's computing power, communication link quality, power supply stability, and spatial location. Other target monitoring nodes send the collected monitoring data to the data aggregation node, which performs data caching, preliminary verification, and unified reporting.
[0151] When data aggregation nodes aggregate monitoring data, they retain the original node identifiers, task identifiers, associated event identifiers, sampling time and spatial identifiers of the monitoring data, and do not change the event attribution relationship of the data due to aggregation or forwarding. When the target monitoring nodes in the monitoring subnet can communicate stably with the data processing nodes, a data aggregation node may not be set up, and each target monitoring node can directly report data.
[0152] A single heterogeneous monitoring node can join multiple monitoring subnets, provided its sampling, communication, and data processing capabilities allow. When a heterogeneous monitoring node joins multiple monitoring subnets, it is necessary to save the subnet identifier, task identifier, associated event identifier, and node task configuration for each monitoring subnet separately, and execute the corresponding node tasks according to task priority and sampling sequence to avoid confusion of monitoring data from different port area operation events.
[0153] After the monitoring subnet is formed, the network configuration is associated with and stored in relation to the corresponding pollution and carbon monitoring tasks, and the network configuration is sent to the corresponding target monitoring nodes, edge gateways, or data processing nodes. The target monitoring nodes execute node tasks according to the network configuration. In step S400, multi-dimensional monitoring data corresponding to the target monitoring area is obtained accordingly, and spatiotemporal correlation processing is performed according to the associated event identifiers and correlation requirements.
[0154] Step S300 allows for further assessment, based on the premise that the monitoring capabilities, spatial coverage, and operational status of heterogeneous monitoring nodes meet the requirements, whether the data provided by different nodes can collectively correspond to the same port area operation event. This enables the selection of a combination of target monitoring nodes. Compared to selecting various monitoring nodes separately and then centrally aggregating the data, this step eliminates node combinations with unclear data attribution or those failing to meet spatiotemporal correlation requirements during the network setup phase. It avoids incorrectly combining pollutant monitoring data with energy consumption data from unrelated equipment, reduces redundant node calls and localized task load concentration, and improves the effectiveness and reliability of the monitoring subnet in performing pollution and carbon co-monitoring tasks.
[0155] Step S400 is used to control the target monitoring nodes in the monitoring subnet to execute corresponding node tasks according to the network configuration formed in step S300, and to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data, and carbon emission-related data related to the current port area operation event within the target monitoring area. Multidimensional monitoring data from different sources are uniformly labeled, standardized in format, time-aligned, and spatially correlated. Based on the correlation requirements in the pollution and carbon monitoring task, it is determined whether pollutant monitoring data and carbon emission-related data can jointly correspond to the same port area operation event. On the basis of satisfying the corresponding event, time, space, and equipment attribution relationships, pollution and carbon collaborative monitoring results corresponding to the port area operation event are formed, avoiding the combination of data without operation attribution relationships simply because different types of data were collected at similar times.
[0156] In some embodiments, step S400 includes steps S410 to S440.
[0157] Step S410: Control the target monitoring node to execute node tasks according to the network configuration of the monitoring subnet and obtain multi-dimensional monitoring data corresponding to the target monitoring area.
[0158] The network control node or data processing node sends node tasks to the corresponding target monitoring node based on the subnet identifier, member node list, and node task correspondence of the monitoring subnet. Node tasks may include task identifier, associated event identifier, task unit identifier, pollution and carbon associated monitoring unit identifier, monitoring parameters, sampling period, data reporting period, task start conditions, task end conditions, and data receiving address.
[0159] After receiving a node task, the target monitoring node verifies the node identifier, task identifier, and task parameters, and executes the corresponding task when it matches its own monitoring capabilities and current operating status. For node tasks started according to a planned time, the target monitoring node starts data acquisition when the planned start time is reached; for node tasks started according to the status of operating equipment, data acquisition can be started when the operating equipment is detected to have entered the operating state; for node tasks started according to the status of port area operation events, data acquisition can be started after receiving the event start information.
[0160] During task execution, target monitoring nodes acquire monitoring data according to the sampling period configured in the node task, and send the monitoring data to the data aggregation node, edge gateway, or data processing node according to the data reporting period. Different types of target monitoring nodes can use different sampling and reporting periods, and it is not required that all target monitoring nodes complete sampling at the same time.
[0161] Multidimensional monitoring data includes various types of data such as pollutant monitoring data, meteorological monitoring data, equipment operating condition data, and carbon emission-related data.
[0162] Pollutant monitoring data may include at least one of the following: total suspended particulate matter concentration, inhalable particulate matter concentration, fine particulate matter concentration, and gaseous pollutant concentration required by the mission. Data acquired by fixed pollutant monitoring nodes corresponds to the node's installation location and the spatial range it represents; data acquired by mobile pollutant monitoring nodes also includes the real-time location corresponding to the sampling time; data acquired by particulate matter lidar may include scanning direction, scanning distance, or scanning spatial units to determine the spatial range corresponding to the scan data.
[0163] Meteorological monitoring data may include at least one of wind speed, wind direction, temperature, relative humidity, atmospheric pressure, and precipitation status. Meteorological monitoring data is used to characterize the meteorological conditions of the corresponding time period and spatial region for pollutant monitoring data. Data acquired by meteorological monitoring nodes can be correlated with one or more target monitoring areas based on the effective representative range of the node.
[0164] Equipment operating data may include at least one of the following: start / stop status of the operating equipment, operating speed, operating load, operating current, operating power, operating duration, and workload. The equipment operating data carries a corresponding equipment identifier or work unit identifier to determine which operating equipment or production unit within the current port area operation event the data originates from.
[0165] Carbon emission-related data may include at least one of the following: electricity consumption, fuel consumption, equipment operating time, equipment load, cargo handling volume, and vehicle mileage. Carbon emission-related data carries corresponding equipment identification, vehicle identification, energy metering object, or work unit identification to indicate the object to which the data belongs.
[0166] For metering devices that output cumulative energy consumption or cumulative fuel consumption, the cumulative metering value corresponding to each sampling time can be retained, and the energy consumption for the corresponding time interval can be determined based on the difference in cumulative metering values between adjacent valid sampling times. For metering devices that directly output consumption for a statistical period, the start and end times of that statistical period can be retained for subsequent correlation with monitoring periods of port operation events.
[0167] When the target monitoring node performs data preprocessing tasks, it can perform message verification, format conversion, unit conversion, preliminary identification of abnormal data, and data compression on the raw data. For data that is out of range, fails message verification, lacks sampling time, or lacks key data attribution identifiers, anomaly flags can be configured. Data preprocessing is only used to ensure that the data can be identified and used in subsequent processing and does not replace the overall evaluation of monitoring quality performed in step S500.
[0168] When a target monitoring node undertakes a data aggregation task, it can receive data sent by other target monitoring nodes in the same monitoring subnet, cache and encapsulate the data, and then upload it uniformly. When a target monitoring node undertakes a data relay task, it forwards monitoring data according to the data transmission path in the network configuration. During data aggregation and data relay, the node identifier, task identifier, associated event identifier, sampling time, spatial identifier, and data ownership information carried in the original data are retained.
[0169] Step S420: Identify, configure, and standardize the multidimensional monitoring data.
[0170] After receiving multidimensional monitoring data, the data processing node configures a unified data identifier for each data item based on the network configuration, node task correspondence, and identifier mapping relationship established in step S100. The data identifier may include at least one of the following: associated event identifier, task identifier, task unit identifier, pollution and carbon associated monitoring unit identifier, node identifier, data type identifier, time identifier, spatial identifier, equipment identifier, and energy metering object.
[0171] The associated event identifier indicates the port operation event corresponding to the monitoring data. The task identifier indicates the pollution and carbon monitoring task to which the monitoring data belongs. The task unit identifier indicates the specific monitoring data dimension and task requirements corresponding to the monitoring data. The pollution and carbon associated monitoring unit identifier indicates which group of data needs to be collaboratively associated. The node identifier indicates the data acquisition node or data source node. The data type identifier distinguishes between pollutant monitoring data, meteorological monitoring data, equipment operating condition data, and carbon emission-related data, as well as the specific monitoring parameters in each type of data.
[0172] The time signature can include the sampling time, sampling period, statistical period, and data reception time. For data directly collected by the target monitoring node, the sampling time recorded by the target monitoring node is used as the data sampling time; for data forwarded by data aggregation nodes or data relay nodes, the original sampling time recorded by the target monitoring node is retained, and the data aggregation time, data forwarding time, or data reception time is not used to replace the sampling time. The data reception time can be recorded separately for subsequent calculation of data upload latency.
[0173] Spatial identifiers are used to represent the spatial location, spatial grid, production operation unit, or equipment location corresponding to monitoring data. For fixed pollutant monitoring nodes and meteorological monitoring nodes, spatial identifiers can be determined based on the node installation location and effective representative range; for mobile monitoring nodes, spatial identifiers can be determined based on the node location corresponding to the sampling time; for pollutant monitoring nodes with scanning capabilities, spatial identifiers corresponding to each scanning data can be determined based on the mapping relationship between the scanning direction, scanning distance, and port area spatial grid.
[0174] Equipment operating data is correlated with the corresponding equipment identification and the equipment information in the current port area operation event. Carbon emission related data is assigned to the appropriate object based on equipment identification, vehicle identification, energy metering object, or operation unit identification. In cases where an energy metering object corresponds to multiple pieces of equipment, the mapping relationship between the energy metering object and each piece of equipment is maintained, and all energy consumption data is not directly attributed to the current port area operation event simply because the corresponding energy metering device is located within the target monitoring area.
[0175] Standardization processes can include unifying data fields, units of measurement, time formats, and spatial coordinates. For the same monitoring parameters expressed in different units of measurement, the data is converted to a preset unified unit of measurement; for time information from different target monitoring nodes, the corresponding time is converted to a unified time reference; and for location data expressed in different coordinate systems, the corresponding location is converted to a unified spatial coordinate system for the port area.
[0176] After the identification configuration and standardization process is completed, all multi-dimensional monitoring data have identification information that can be used to trace the data source, sampling time, spatial range, equipment ownership, and port operation event ownership, providing a foundation for subsequent data association processing.
[0177] Step S430: Based on the correlation requirements of the pollution and carbon monitoring task, perform time alignment, spatial correlation, and data attribution verification on the multidimensional monitoring data.
[0178] Since different types of target monitoring nodes have different sampling cycles and data update methods, the data processing node first sets up associated time windows according to the monitoring period and sampling sequence requirements of the pollution and carbon monitoring task. The associated time windows can be divided using a fixed time length, or they can be divided according to the operation stage, equipment status change time, or operation location change time of port operation events.
[0179] For continuous monitoring data with a sampling frequency higher than the frequency of the associated time window division, corresponding statistical results can be calculated based on the valid sampled values within the associated time window. Statistical results may include average, maximum, minimum, cumulative, or other statistical values appropriate to the corresponding monitoring parameters. For data with a sampling frequency lower than the frequency of the associated time window division, valid data closer to the associated time window can be mapped to the corresponding associated time window, provided that the preset maximum time interval is not exceeded.
[0180] For discrete state data such as equipment start / stop status, the most recent valid state can be maintained until the next state change. For cumulative energy metering data, the energy consumption for the corresponding time interval can be determined based on the difference between adjacent cumulative metering values, and then the energy consumption for each associated time window can be determined based on the overlap between this time interval and associated time windows. Data obtained through interpolation, state maintenance, or statistical transformation is configured with corresponding processing identifiers to distinguish between directly collected data and processed data.
[0181] After time alignment is completed, the spatial association between pollutant monitoring data, meteorological monitoring data, and the target monitoring area is determined based on spatial identifiers. For data with the same spatial grid number or work unit number, spatial association can be established directly; for cases where the monitoring coverage of pollutant monitoring nodes partially overlaps with the target monitoring area, pollutant monitoring data can be associated with the corresponding spatial grid or work unit based on the coverage relationship.
[0182] When multiple meteorological monitoring nodes can characterize the meteorological conditions of the same target monitoring area, the corresponding meteorological data can be selected based on the effective representative range of the node, the distance between the node and the target monitoring area, the continuity of the data, and the reliability status of the node. Alternatively, the data from multiple meteorological monitoring nodes can be combined according to preset rules.
[0183] For equipment operating data, determine whether the data originates from the equipment involved in the current port area operation event based on equipment identification, work unit identification, and port area operation event information. For carbon emission-related data, determine whether the data can be attributed to the current port area operation event based on energy metering object, equipment identification, vehicle identification, work unit identification, and data attribution granularity.
[0184] When the energy metering object corresponds to only one piece of equipment or one work unit in the current port area operation event, the corresponding energy consumption data can be directly associated with the current port area operation event. When the energy metering object corresponds to multiple pieces of equipment, the energy consumption data corresponding to the current port area operation event can be determined based on the equipment's operating status, operating period, independent power records, or other preset allocation criteria. If no reliable allocation criteria exist, the corresponding energy consumption data will not be directly used as the carbon emission-related data for the current port area operation event.
[0185] For multidimensional monitoring data belonging to the same pollution and carbon correlation monitoring unit, further correlation requirement verification should be performed. Correlation requirement verification should include at least event correlation verification and time correlation verification, and may also include spatial correlation verification and equipment attribution verification.
[0186] Event correlation verification is used to determine whether data from different monitoring dimensions have the same associated event identifier, or whether they can be mapped to the same port area operation event through work batch identifier, stage event identifier, or task identifier. Time correlation verification is used to determine whether the sampling time, sampling period, or statistical period of data from different monitoring dimensions are within the monitoring period of the same port area operation event, and whether they fall into the same or overlapping associated time windows.
[0187] Spatial correlation verification is used to determine whether the effective monitoring range corresponding to pollutant monitoring data covers the target monitoring area of the current port operation event, and whether the corresponding meteorological data can characterize the meteorological conditions of the target monitoring area. Equipment attribution verification is used to determine whether equipment operating data and carbon emission-related data correspond to the operating equipment, vehicles, energy metering loops, or production operation units involved in the current port operation event.
[0188] When pollutant monitoring data and carbon emission-related data can be correlated to the same port area operation event, fall within the same monitoring period, and respectively meet the target monitoring area coverage requirements and equipment attribution requirements, the corresponding data will be identified as data that meets the correlation requirements.
[0189] When pollution and carbon monitoring tasks are divided into pollution and carbon correlation monitoring units, the correlation integrity of the corresponding data can be checked according to the monitoring data dimensions and correlation requirements of each pollution and carbon correlation monitoring unit. The correlation integrity check is used to determine whether valid data has been obtained for all the monitoring data dimensions required by the pollution and carbon correlation monitoring unit, and whether the data of different monitoring dimensions meet the corresponding correlation requirements.
[0190] When a pollution-carbon correlation monitoring unit obtains at least valid pollutant monitoring data and carbon emission-related data, and the corresponding data meets the correlation requirements in terms of event, time, space, and equipment attribution, the pollution-carbon correlation monitoring unit is determined to be in a complete correlation state. Depending on the task settings, if meteorological monitoring data or equipment operating condition data is configured as a required data dimension, corresponding valid data must also be obtained to determine the pollution-carbon correlation monitoring unit to be in a complete correlation state.
[0191] When a pollution and carbon correlation monitoring unit lacks the required monitoring data dimensions, or when the corresponding data has been obtained but the data does not meet the correlation requirements, the pollution and carbon correlation monitoring unit is identified as having an incomplete correlation status. For incomplete correlation status, the missing data dimensions or unmet correlation conditions are recorded.
[0192] Unmet association conditions may include data not corresponding to the same port area operation event, sampling or statistical periods of different data not overlapping, pollutant monitoring data not covering the target monitoring area, carbon emission related data not being attributed to the current operating equipment, and equipment operating condition data lacking valid equipment identification.
[0193] For pollution and carbon correlation monitoring units with incomplete correlation, the acquired monitoring data and their identification information can be retained, but pollutant monitoring data and carbon emission-related data that cannot meet the correlation requirements will not be directly combined into complete pollution and carbon co-monitoring data. The correlation integrity status, missing data dimensions, and unmet correlation conditions are associated and stored with the corresponding task identifier or pollution and carbon correlation monitoring unit identifier, and provided to step S500.
[0194] After completing the data association processing, multidimensional monitoring data that meet the association requirements can be organized according to the associated event identifier, associated time window, and spatial identifier to form multidimensional pollution and carbon association data corresponding to port operation events. Each multidimensional pollution and carbon association data record retains the node identifier, sampling time, data belonging object, data processing identifier, and anomaly identifier of each data item, so as to trace the source and processing process of each data item.
[0195] Step S440: Generate pollution and carbon co-monitoring results corresponding to port operation events based on multidimensional pollution and carbon correlation data.
[0196] Based on the multidimensional pollution and carbon correlation data corresponding to the pollution and carbon correlation monitoring units in a complete correlation state, the pollutant emission status and carbon emission correlation status are determined to generate pollution and carbon co-monitoring results.
[0197] When generating pollution and carbon co-monitoring results, multidimensional pollution and carbon correlation data that meets the correlation requirements of the pollution and carbon monitoring task are used. For pollution and carbon correlation monitoring units that are in an incomplete correlation state, partial monitoring records can be generated, and missing data dimensions or unmet correlation conditions can be marked in the partial monitoring records, but these will not be regarded as complete pollution and carbon co-monitoring results.
[0198] The results of pollution and carbon co-monitoring should include at least the status of pollutant emissions and carbon emission-related status, and may also include the corresponding meteorological status and equipment operating status.
[0199] Pollutant emission status is used to characterize the concentration and spatiotemporal changes of pollutants within the target monitoring area during the execution of a current port operation event. Pollutant emission status may include at least one of the following: pollutant concentration within each spatial grid or operation unit, concentration variation range, peak concentration, peak occurrence time, spatial distribution of pollutants, and concentration change relative to background levels.
[0200] The background level before the operation can be determined based on valid pollutant monitoring data within a preset time period before the start of the port operation event. If no pre-monitoring period is configured, valid data from the corresponding background monitoring nodes in the target monitoring area within a comparable time period can be used as a reference. The background level reflects the environmental state before the operation event and is not used to replace the actual monitoring data during the current port operation event.
[0201] Carbon emission-related status is used to characterize the energy consumption or activity level corresponding to the current port area operation event, and may include at least one of the following: instantaneous equipment power, time period electricity consumption, time period fuel consumption, equipment operating time, equipment load, cargo handling volume, vehicle mileage, and energy consumption per unit of operation.
[0202] In embodiments where applicable emission factors are configured and the energy type, fuel type, and corresponding consumption can be determined, the estimated carbon emissions of the current port operation event can be determined based on energy consumption and the corresponding emission factors. The emission factors are pre-configured according to the actual accounting rules and energy type used. The estimated carbon emissions are calculated based on energy consumption data and do not represent carbon dioxide emissions directly measured by heterogeneous monitoring nodes.
[0203] The results of pollution and carbon co-monitoring can be organized according to port operation events, operation stages, associated time windows, target monitoring areas, or pollution and carbon co-monitoring units, while preserving the correlation between different monitoring dimensions. For example, equipment operating status, energy consumption status, and meteorological status can be recorded within the time period corresponding to changes in pollutant concentration. This correlation is used to characterize the synchronous changes of different monitoring data in the same port operation event, without directly assuming a necessary causal relationship between changes in pollutant concentration and equipment load or energy consumption.
[0204] The results of co-monitoring of pollution and carbon can also include data integrity status, data source information, and correlation verification results. Data integrity status indicates whether the monitoring data dimensions required to form the current results are complete. Data source information records the target monitoring nodes and data ownership objects corresponding to each data point. Correlation verification results indicate whether each data point meets the correlation requirements in terms of event, time, space, and equipment ownership.
[0205] Step S400 allows for the mapping of data from different sampling periods, spatial representations, and business systems to the same port area operation event, while preserving the original sources and data attribution relationships of multidimensional monitoring data. This step not only performs general time alignment and spatial aggregation but also verifies the attribution of carbon emission-related data based on the operating equipment and energy metering objects. This avoids incorrectly combining pollutant monitoring data within the target monitoring area with energy consumption data generated by other operating equipment, improving the accuracy, completeness, and traceability of the pollution-carbon co-monitoring results.
[0206] Step S500 is used to evaluate the actual execution of the pollution and carbon monitoring task based on the multidimensional monitoring data obtained in step S400, the integrity status of the association of each pollution and carbon-related monitoring unit, and the operation records of the monitoring subnetwork. The evaluation includes not only whether the monitoring data is complete, continuous, timely, and effective, but also whether the pollutant monitoring data and carbon emission-related data can be correlated to the same port area operation event according to the association requirements of the pollution and carbon monitoring task. When the monitoring quality, association integrity status, or network operation status does not meet the preset monitoring requirements, the affected task unit or pollution and carbon-related monitoring unit is identified, the missing data dimensions, unmet association conditions, and corresponding anomaly causes are identified, and the target monitoring node or node task is adjusted to address the association gap in order to update the monitoring subnetwork. Thus, while preserving as much of the original effective monitoring resources and established data associations as possible, the normal execution of the pollution and carbon monitoring task is restored.
[0207] In some embodiments, step S500 includes steps S510 to S540.
[0208] Step S510: Determine the monitoring quality of the pollution and carbon monitoring task based on multidimensional monitoring data and associated complete status.
[0209] Monitoring quality refers to the degree to which the data actually obtained by the monitoring subnetwork meets the spatial coverage requirements, sampling timing requirements, data quality requirements, and correlation requirements of the pollution and carbon monitoring task. Monitoring quality can be determined separately for task units, pollution and carbon correlation monitoring units, correlation time windows, or target monitoring areas, or it can be determined based on the results of various evaluations to determine the overall monitoring quality of the pollution and carbon monitoring task.
[0210] The evaluation criteria for monitoring quality may include at least one of the following: data completeness, data timeliness, data continuity, data consistency, spatiotemporal coverage, and correlation completeness.
[0211] Data completeness is used to represent the completeness of the actual valid monitoring data obtained relative to the data that should be obtained for a pollution and carbon monitoring task. For task units executed according to a fixed sampling cycle, data completeness can be determined based on the expected number of samplings and the actual number of valid samplings within the corresponding monitoring period. For data acquisition tasks triggered by changes in equipment status, data completeness can be determined based on the number of status changes that should be recorded and the number of valid status changes that are actually recorded. Data with message verification failures, sensor over-range, unrecognizable data formats, missing sampling times, or missing key attribution identifiers will not be considered valid monitoring data for completeness evaluation.
[0212] Data timeliness indicates whether the time elapsed from the completion of sampling to the arrival of monitoring data at the data processing node meets the data upload timeliness requirements of the pollution and carbon monitoring task. The data upload delay can be determined based on the sampling time of the monitoring data and the reception time recorded by the data processing node. When the data upload delay does not exceed the maximum allowable delay for the corresponding task unit, the corresponding data meets the timeliness requirements; when the data upload delay exceeds the maximum allowable delay, the corresponding data is marked as delayed data.
[0213] For data with high time sensitivity, such as pollutant concentration, equipment start-up and shutdown status, and operating load, a relatively short maximum allowable delay can be set; for data such as electricity consumption, fuel consumption, or cargo handling volume obtained according to statistical periods, a maximum allowable delay can be set according to the update period of the corresponding data source.
[0214] Data continuity is used to indicate whether monitoring data is continuous throughout the duration of a pollution and carbon monitoring task. It can be determined based on the number of associated time windows with continuously available valid data, the number of associated time windows with consecutive missing data, the longest consecutive missing duration, or the maximum time interval between adjacent valid data points. For task units that require continuous tracking of pollutant concentration changes or equipment operating status changes, the longest consecutive missing duration can be used as the primary evaluation criterion.
[0215] Data consistency is used to determine whether there are persistent abnormal differences between data of the same or related monitoring dimensions. For monitoring nodes of the same type with overlapping monitoring ranges, the differences between corresponding monitoring data within the same associated time window can be compared. When the data differences are within the allowable range set according to the node measurement accuracy, spatial distance, and monitoring object, the corresponding data can be considered consistent; when the data differences continuously exceed the allowable range, the corresponding data or target monitoring node is marked as pending verification.
[0216] For equipment operating data and carbon emission-related data, a reasonableness check can be performed based on the physical correspondence between the data. For example, when equipment operating data indicates that the equipment is in a stopped state, but energy metering data with a clear correspondence to the equipment shows a continuous increase during the same period, the corresponding data can be marked as pending verification. When performing this verification, the standby power consumption of the equipment, the operating status of auxiliary equipment, and the energy metering range can be considered to avoid misjudging normal standby energy consumption as abnormal data.
[0217] Spatiotemporal coverage is used to represent the extent to which effective monitoring data covers the spatial area and temporal range required for pollution and carbon monitoring tasks. Spatial coverage can be determined based on the number of spatial grids for which effective pollutant monitoring data is obtained and the number of spatial grids required for task coverage, or it can be determined based on the coverage relationship between the actual effective monitoring range of the target monitoring node and the target monitoring area. Temporal coverage can be determined based on the number of associated time windows for which effective data is obtained and the number of associated time windows required for task coverage.
[0218] The degree of association completeness is used to indicate whether a pollution and carbon association monitoring unit meets the association requirements. It can be determined based on the number of pollution and carbon association monitoring units in a complete association state and the total number of pollution and carbon association monitoring units that should be formed, or it can be determined based on the number of missing data dimensions, the number of unmet association conditions, and the number of time windows in a continuous incomplete association state.
[0219] For key pollution-carbon correlation monitoring units in pollution and carbon monitoring tasks, obtaining both valid pollutant monitoring data and valid carbon emission-related data simultaneously, with both types of data meeting the correlation requirements in terms of event, time, space, and equipment attribution, can be considered a necessary condition for the corresponding pollution-carbon correlation monitoring unit to meet the monitoring quality requirements. If any necessary data dimension of the pollutant monitoring data or carbon emission-related data is missing, or if the two types of data cannot be correlated to the same port area operation event, even if the completeness and timeliness of other monitoring data meet the requirements, it can be determined that the monitoring quality of the corresponding pollution-carbon correlation monitoring unit does not meet the requirements.
[0220] Different task units can adopt different monitoring quality evaluation criteria. For example, pollutant monitoring task units can focus on evaluating spatial coverage, data continuity, and data timeliness; meteorological monitoring task units can focus on evaluating data continuity and spatial representativeness; equipment condition monitoring task units can focus on evaluating data completeness and its correspondence with operating equipment; and carbon emission-related monitoring task units can focus on evaluating the completeness of statistical periods, the clarity of data attribution, and its correlation with port operation events.
[0221] In some embodiments, the monitoring quality evaluation results can be converted into corresponding quality indicator values, and the indicator weights can be configured according to the task unit type, the importance of data dimensions, and the task priority to obtain the comprehensive monitoring quality of the task unit or pollution-carbon related monitoring unit. Alternatively, one or more key evaluation contents can be set as necessary conditions. When any necessary condition is not met, it is directly determined that the monitoring quality of the corresponding task unit or pollution-carbon related monitoring unit does not meet the requirements.
[0222] Step S520: Determine the network operating status based on the operation records of the monitoring subnet.
[0223] Network operational status indicates whether the target monitoring nodes and their data transmission relationships within the monitoring subnet can continue to support the carbon pollution monitoring task. Network operational status can be determined based on at least one of the following: node operational status, node task load, communication link status, and data transmission status.
[0224] The node's operational status can include its online status, power supply status, device self-test status, calibration status, and the most recent status update time. A target monitoring node can be identified as online when it reports status information according to a preset cycle and responds normally to status query commands. A target monitoring node can be identified as offline or unreachable when it fails to report status information or respond to status query commands within a preset time period.
[0225] For target monitoring nodes capable of outputting fault codes or self-test results, the type of fault can be used to determine whether the node still possesses some task execution capabilities. For example, if the data acquisition function of a target monitoring node is normal but its communication function is abnormal, monitoring data can be temporarily cached, and data upload can be restored by adjusting the data relay task or data transmission path; if the sensor function of a target monitoring node is abnormal, other nodes need to be selected to undertake the corresponding sampling task.
[0226] Node task load represents the resource consumption of a target monitoring node by its sampling, data preprocessing, data verification, data aggregation, and data relay tasks. Node task load can be determined based on the number of tasks currently undertaken by the target monitoring node, the degree of resource consumption for sampling, computing, storage, and communication.
[0227] When a target monitoring node participates in multiple monitoring subnets simultaneously, the resource consumption of each monitoring subnet can be calculated separately. When the node's task load approaches or reaches the allowed load limit recorded in the node's resource information, the target monitoring node can be marked as high-load, and it can be determined whether it can continue to stably execute the current node task.
[0228] The communication link status can be determined based on one or more of the following: data transmission success rate, packet loss rate, number of retransmissions, transmission delay, received signal strength, and number of link interruptions. For target monitoring nodes using multi-hop transmission, the link status between the target monitoring node and the relay node, the relay node and the data aggregation node, and the data aggregation node and the data processing node can be evaluated separately to determine the specific link segment where the communication anomaly occurred.
[0229] Data transmission status indicates whether the target monitoring node has completed data transmission according to the data reporting cycle configured in the node task. If the target monitoring node is online but fails to generate valid data for multiple consecutive reporting cycles, it is necessary to combine the node operation records to determine whether the corresponding anomaly is caused by a sampling function malfunction, no data update of the monitored object, failure to upload data cache, or an abnormal data transmission path, in order to avoid judging whether the node task is executed normally solely based on the node's online status.
[0230] In some embodiments, the availability of nodes can be determined based on the node operating status, node task load, and communication link status of each target monitoring node, and the overall network operating status of the monitoring subnet can be determined based on the availability of target monitoring nodes undertaking key task units in the monitoring subnet, the number of available data transmission paths, and the distribution of communication load.
[0231] When a backup target monitoring node or backup data transmission path is configured for the same task unit, the current availability status of the backup resources can also be included in the network operation status evaluation. If the current target monitoring node or main data transmission path malfunctions, but the backup resources can take over the corresponding task within the allowed time, the monitoring subnet can be determined to be in a recoverable state.
[0232] Step S530: Evaluate the execution status of the pollution and carbon monitoring task based on the monitoring quality, the integrity of the association, and the network operation status, and determine the association gaps.
[0233] The execution status of the carbon pollution monitoring task indicates whether the current monitoring subnet has completed multi-dimensional data acquisition, data transmission, and data association according to the carbon pollution monitoring task generated in step S200. During evaluation, the monitoring quality determined in step S510 is compared with the spatial coverage requirements, sampling timing requirements, data quality requirements, and association requirements in the carbon pollution monitoring task. Furthermore, the network operation status determined in step S520 is compared with the node status and communication conditions required for the monitoring subnet to normally execute node tasks.
[0234] When all necessary task units in the carbon pollution monitoring task meet their corresponding monitoring requirements, all carbon pollution-related monitoring units are in a fully associated state, and the target monitoring nodes and data transmission paths in the monitoring subnet can execute node tasks normally, it can be determined that the execution status of the carbon pollution monitoring task meets the preset monitoring requirements. At this time, the current monitoring subnet and node task configuration are maintained, and steps S400 and S500 are continued to be executed in subsequent monitoring cycles.
[0235] When the monitoring quality of some non-critical task units falls below the corresponding requirements, but the pollutant monitoring data and carbon emission-related data still meet the correlation requirements, and the monitoring subnetwork can continue to provide effective pollution and carbon co-monitoring data, the pollution and carbon monitoring task can be determined to be in a downgraded execution state. For the downgraded execution state, it can be determined whether to immediately update the monitoring subnetwork based on the affected data dimensions, duration, and task priority.
[0236] The execution status of the pollution and carbon monitoring task does not meet the preset monitoring requirements when any of the following situations exist: key task units cannot obtain effective monitoring data; pollution and carbon correlation monitoring units lack pollutant monitoring data or carbon emission-related data; pollutant monitoring data and carbon emission-related data cannot be correlated to the same port area operation event; the target monitoring area does not meet the preset spatial coverage requirements; the target monitoring node undertaking the key node task is offline or malfunctioning; or the monitoring subnet does not have a data transmission path that meets the timeliness requirements.
[0237] For carbon pollution monitoring tasks whose execution status does not meet the requirements, identify the affected task units or carbon pollution-related monitoring units, and determine the cause of the anomaly based on the monitoring quality evaluation results, the integrity of the association, node operation records, and communication link status. Causes of anomalies may include target monitoring node offline, node failure, excessive node task load, insufficient spatial coverage, insufficient sampling frequency, missing continuous data, excessive data upload delay, persistent data inconsistency, interrupted data transmission path, or node resource conflicts between multiple carbon pollution monitoring tasks.
[0238] Based on the identification of the causes of the above anomalies, it is further determined whether the corresponding anomalies have caused a correlation gap in the pollution and carbon correlation monitoring unit. A correlation gap refers to the state in which the pollution and carbon correlation monitoring unit cannot form complete pollution and carbon co-monitoring data due to the lack of necessary data dimensions or failure to meet correlation requirements.
[0239] When the execution status of a pollution and carbon monitoring task does not meet the preset monitoring requirements, a data dimension gap or a correlation condition gap is determined based on the execution status. A correlation gap can include both data dimension gaps and correlation condition gaps. A data dimension gap refers to a lack of essential data from pollutant monitoring data, carbon emission-related data, meteorological monitoring data, or equipment operating condition data in the pollution and carbon correlation monitoring unit. A correlation condition gap refers to situations where corresponding monitoring data has been obtained, but the data does not meet the requirements for event correlation, temporal correlation, spatial correlation, or equipment attribution.
[0240] For example, when pollutant monitoring nodes go offline, resulting in a lack of effective pollutant concentration data in the target monitoring area, a gap in pollutant monitoring data dimension is formed; when energy consumption data provided by carbon emission-related data collection nodes cannot distinguish between the current operating equipment and other equipment, a gap in equipment attribution condition is formed; when the effective time periods of pollutant monitoring data and energy consumption data do not fall within the same associated time window, a gap in time association condition is formed; when pollutant monitoring nodes can still collect data normally but their effective monitoring range no longer covers the relocated operating area, a gap in spatial association condition is formed.
[0241] When identifying correlation gaps, record the corresponding pollution and carbon correlation monitoring unit identifier, missing data dimension, unmet correlation conditions, gap start time, affected target monitoring area, corresponding operating equipment, and the target monitoring node or communication link causing the correlation gap. This information is used in step S540 to determine the target monitoring nodes and node tasks that need adjustment.
[0242] Step S540: Adjust the target monitoring node or node task according to the associated gap, and update the monitoring subnet.
[0243] To address data dimension gaps, select supplementary or alternative monitoring nodes that can provide missing monitoring data and whose provided data meets correlation requirements. To address correlation condition gaps, adjust the sampling period, sampling location, or data transmission path of the target monitoring node, or select alternative monitoring nodes that can restore event correlations, temporal correlations, spatial correlations, or device affiliation relationships. Update the monitoring subnet based on the adjusted target monitoring nodes and node tasks.
[0244] Adjustments to the monitoring subnet should prioritize local repair methods targeting correlation gaps. Local repair refers to retaining the target monitoring nodes and their tasks that can still provide valid data and meet correlation requirements, and selecting supplementary or replacement nodes only for missing data dimensions, unmet correlation conditions, or corresponding anomalies, or adjusting node tasks and data transmission relationships, thereby restoring the data correlation integrity of the corresponding pollution and carbon correlation monitoring units.
[0245] Based on the correlation gaps identified in step S530, candidate nodes that can be used to repair the correlation gaps are determined from the heterogeneous monitoring nodes obtained in step S100. The task matching relationships established in step S320 can be used to select supplementary or replacement nodes from the candidate monitoring nodes of the corresponding task units. When the current status of a candidate monitoring node, the target monitoring area, or port operation event information changes, the task matching relationship is re-determined based on the latest node resource information.
[0246] When pollutant monitoring data is lacking, select pollutant monitoring nodes from the candidate monitoring nodes that meet the data type requirements and whose effective monitoring range can cover the affected target monitoring area. The selection process may also consider the spatial relationship between the node and the target monitoring area, sampling frequency, data reliability, and communication status.
[0247] When carbon emission-related data is lacking, select carbon emission-related data collection nodes that have a clear correspondence with the operating equipment, vehicles, energy metering loops, or production units involved in the current port area operation event. Nodes that can only provide the overall energy consumption of the port area but cannot attribute the data to the current port area operation event will not be considered as effective nodes for filling the gap.
[0248] When equipment condition data is lacking, select the equipment condition monitoring node that can obtain the current operating status of the equipment and whose corresponding equipment identifier or work unit identifier matches the current port area operation event. When meteorological monitoring data is lacking, select the meteorological monitoring node whose effective representative range can cover or characterize the corresponding target monitoring area.
[0249] When selecting nodes to fill data dimension gaps, it is necessary to determine not only whether the node can provide the missing data dimensions, but also whether the corresponding data can meet the correlation requirements with other monitoring data already obtained in the pollution and carbon correlation monitoring unit. Nodes that can provide the corresponding data but cannot restore the event, time, space, or equipment attribution relationships are not considered as effective supplementary or replacement nodes.
[0250] When the gap in the correlation condition is caused by the non-overlapping time ranges of different monitoring data, the sampling start time, sampling period, statistical period or data reporting period can be adjusted within the allowable sampling frequency range of the target monitoring node. Alternatively, an alternative node whose sampling sequence can match the current correlation time window can be selected.
[0251] When the gap in correlation conditions is caused by the pollutant monitoring range not covering the target monitoring area, a pollutant monitoring node that can cover the unmonitored area can be selected, or the scanning direction, scanning range, or sampling location of the target monitoring node with scanning capabilities can be adjusted. For mobile monitoring nodes, the node's movement path or sampling location can be adjusted as long as its mobility and mission time constraints permit.
[0252] When the gap in correlation conditions is caused by carbon emission-related data that cannot be attributed to the current operating equipment, energy metering nodes at the equipment level or work unit level can be selected, or activity level data collection nodes that can provide corresponding equipment runtime, equipment load, cargo handling volume, or vehicle mileage can be selected. Only data sources that can establish a clear data attribution relationship are used to recover the carbon emission-related data of the current pollution-carbon correlation monitoring unit.
[0253] When a target monitoring node is still available, but its workload is too high, causing sampling delays or data upload delays, some of the task units undertaken by the target monitoring node can be transferred to other target monitoring nodes. Alternatively, data preprocessing tasks, data aggregation tasks, or data relay tasks can be assigned to other nodes with the corresponding capabilities.
[0254] When a communication link fails but the target monitoring node can still collect data normally, data relay or data aggregation tasks can be reassigned, allowing monitoring data to be uploaded to the data processing node via other available target monitoring nodes, edge gateways, or data transmission paths. When adjusting the transmission path, the associated event identifiers, task identifiers, node identifiers, sampling time, spatial identifiers, and data attribution information carried by the original monitoring data should be retained to avoid changes in communication paths affecting data correlation.
[0255] When the same heterogeneous monitoring node performs multiple pollution and carbon monitoring tasks at the same time, and the key task units cannot meet the requirements due to node resource conflicts, the task order undertaken by the node can be adjusted or the low-priority node tasks can be transferred to other nodes according to the task priority, severity of associated gaps and duration of the pollution and carbon monitoring tasks.
[0256] After adjusting the target monitoring nodes or node tasks, an updated network configuration is generated. The updated network configuration may include a new configuration version identifier, a list of member nodes, node task correspondences, task unit associations, sampling parameters, data reporting parameters, data transmission paths, and task validity periods.
[0257] For newly added target monitoring nodes or target monitoring nodes whose node tasks have changed, send updated node tasks. For target monitoring nodes that are replaced or removed from the monitoring subnet, send a task termination command. To reduce data loss during monitoring subnet updates, node tasks can be sent to newly added target monitoring nodes first, and the corresponding tasks of the original target monitoring nodes can be terminated only after confirming that the new target monitoring nodes have started collecting or transmitting valid data.
[0258] After completing the partial repair, the original task identifier for the carbon pollution monitoring task and the corresponding carbon pollution associated monitoring unit identifier are retained, so that the data obtained before and after the update can continue to belong to the same port area operation event. The updated monitoring subnet continues to execute step S400, and the association requirements and association integrity are re-verified for subsequent association time windows.
[0259] When local repair cannot restore the integrity of the pollution and carbon correlation monitoring unit, multiple pollution and carbon correlation monitoring units have correlation gaps at the same time, or when the operation location, participating equipment, operation stage and energy measurement object of the port operation event have changed significantly, step S300 can be re-executed to reselect the target monitoring node and form a new monitoring subnet.
[0260] Step S500 can be repeated according to a preset evaluation cycle, or it can be triggered when the target monitoring node is offline, the communication link is interrupted, continuous data is missing, the associated integrity status changes, or the port operation event information changes.
[0261] When a port operation event concludes and the carbon monitoring task meets the task termination conditions, the node task corresponding to the current carbon monitoring task in the monitoring subnet is terminated, and the task correspondence between the target monitoring node and the current task is severed. For target monitoring nodes that simultaneously undertake other carbon monitoring tasks, only the node task corresponding to the current port operation event is terminated.
[0262] Step S500 establishes a feedback loop based on the actual quality of multidimensional monitoring data, the integrity of the pollution and carbon correlation monitoring units, and the real-time operational status of the monitoring subnetwork. When node status, communication conditions, operational locations, or data attribution relationships change, it can identify specific missing data dimensions or unmet correlation conditions and restore the operational event correspondence between pollutant monitoring data and carbon emission-related data by locally adjusting target monitoring nodes or node tasks. Compared to rebuilding the entire monitoring network after an anomaly occurs, local repair of correlation gaps reduces unnecessary node switching and task reallocation, lowers monitoring interruption time, and improves the continuity, correlation accuracy, and reliability of port area pollution and carbon co-monitoring data.
[0263] See Figure 2 This application also provides a multi-dimensional integrated network monitoring system for pollution and carbon in port areas, including an information acquisition module, a monitoring task generation module, a monitoring sub-network construction module, a collaborative monitoring module, and a feedback adjustment module.
[0264] The information acquisition module is used to acquire port operation event information and node resource information of multiple heterogeneous monitoring nodes. The heterogeneous monitoring nodes are used to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data, or carbon emission-related data.
[0265] The monitoring task generation module is used to determine the corresponding target monitoring area and carbon pollution monitoring requirements based on port operation event information, and to generate carbon pollution monitoring tasks based on the target monitoring area and carbon pollution monitoring requirements. The carbon pollution monitoring tasks include the association requirements of mapping pollutant monitoring data and carbon emission related data to the same port operation event.
[0266] The monitoring subnet construction module is used to determine the task matching relationship between heterogeneous monitoring nodes and pollution monitoring tasks based on pollution and carbon monitoring tasks and node resource information. Under the condition of meeting the association requirements, it selects target monitoring nodes and assigns node tasks based on the task matching relationship to form a monitoring subnet for performing pollution and carbon monitoring tasks.
[0267] The collaborative monitoring module is used to control the target monitoring nodes in the monitoring subnet to execute the assigned node tasks, acquire multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon collaborative monitoring results corresponding to port operation events.
[0268] The feedback adjustment module is used to evaluate the execution status of pollution and carbon monitoring tasks based on the monitoring quality of multidimensional monitoring data and the network operation status of the monitoring subnet. When the execution status does not meet the preset monitoring requirements, the module adjusts the target monitoring nodes or node tasks according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
[0269] In this embodiment, the information acquisition module is connected to both the monitoring task generation module and the monitoring subnet construction module. It provides port operation event information to the monitoring task generation module and node resource information for multiple heterogeneous monitoring nodes to the monitoring subnet construction module. The monitoring task generation module is connected to the monitoring subnet construction module and provides carbon pollution monitoring tasks to it. The monitoring subnet construction module is connected to the collaborative monitoring module and provides monitoring subnet configuration results and node task allocation results to it. The collaborative monitoring module is connected to the feedback adjustment module and provides multi-dimensional monitoring data, carbon pollution collaborative monitoring results, and monitoring subnet operation records to it. The feedback adjustment module is connected to the monitoring subnet construction module and, when the execution status does not meet preset monitoring requirements, feeds back the target monitoring node adjustment results or node task adjustment results to the monitoring subnet construction module to update the monitoring subnet. Thus, a processing link is formed between the modules, from information acquisition, task generation, monitoring subnet construction, collaborative monitoring to feedback adjustment, and a closed-loop feedback relationship is formed for monitoring subnet updates.
[0270] In some embodiments, the information acquisition module includes a job event information acquisition unit and a node resource information acquisition unit. The job event information acquisition unit is used to acquire event identifier, job type, job location, job time, job object, and equipment information participating in the job. The node resource information acquisition unit is used to acquire information about the node type, monitorable data type, spatial location, monitoring coverage, allowed sampling frequency, online status, task load, communication link quality, and data attribution of heterogeneous monitoring nodes.
[0271] Data attribution information is used to indicate the spatial area, operating equipment, vehicle, energy metering loop, or production unit corresponding to the data acquired by heterogeneous monitoring nodes. The information acquisition module can also be used to standardize port operation event information and node resource information, unifying the time base, spatial coordinates, equipment identifiers, and operation unit identifiers.
[0272] In some embodiments, the monitoring task generation module includes a target monitoring area determination unit, a monitoring requirement determination unit, and a task generation unit.
[0273] The target monitoring area determination unit is used to determine the core operation area based on the operation location of port operation events, and to determine the associated monitoring area based on the operation type, operation intensity and meteorological data, and to determine the core operation area and associated monitoring area as the target monitoring area.
[0274] The monitoring requirements determination unit is used to determine at least one of the following: pollutant monitoring requirements, carbon emission-related monitoring requirements, meteorological monitoring requirements, and equipment operating condition monitoring requirements. It also determines the correlation requirements between different monitoring data and the same port area operational events. The correlation requirements include at least event correlation requirements and temporal correlation requirements, and also at least one of spatial correlation requirements and equipment attribution requirements.
[0275] The task generation unit is used to generate pollution and carbon monitoring tasks that include task identifiers, associated event identifiers, target monitoring areas, dimensions of data to be monitored, spatial coverage requirements, sampling time sequence requirements, data quality requirements, and association requirements.
[0276] In some embodiments, the monitoring subnet construction module includes a node matching unit, a node selection unit, and a subnet configuration unit.
[0277] The node matching unit is used to determine the task matching relationship between heterogeneous monitoring nodes and pollution and carbon monitoring tasks based on the data type to be monitored, spatial coverage, sampling time sequence, node operating status, and data attribution information.
[0278] The node selection unit is used to select target monitoring nodes based on task matching relationships. The selected target monitoring nodes include at least those used to acquire pollutant monitoring data within the target monitoring area, and those used to acquire carbon emission-related data that can be attributed to the current port area operation event.
[0279] The node selection unit is also used to determine whether the data provided by the target node combination meets the correlation requirements. When the monitoring coverage of one or more candidate monitoring nodes used to provide pollutant monitoring data cannot jointly cover the corresponding monitoring spatial range required by the pollution and carbon monitoring task, or when the data provided by the candidate monitoring nodes used to provide carbon emission-related data cannot be attributed to the operating equipment, vehicles, energy metering loops, or production operation units involved in the current port operation event, the corresponding node combination will not be determined as the target node combination for performing the pollution and carbon monitoring task.
[0280] The subnet configuration unit is used to assign sampling tasks, data preprocessing tasks, data aggregation tasks, or data relay tasks to target monitoring nodes, and to generate the network configuration of the monitoring subnet. The network configuration includes subnet identifier, associated event identifier, member node list, node task correspondence, sampling parameters, data reporting parameters, and data transmission path.
[0281] In some embodiments, the collaborative monitoring module includes a node control unit, a data association unit, and a result generation unit.
[0282] The node control unit is used to control the target monitoring nodes to perform node tasks according to the network configuration, and to receive pollutant monitoring data, meteorological monitoring data, equipment operating data and carbon emission related data uploaded by the target monitoring nodes.
[0283] The data association unit is used to configure associated event identifiers, time identifiers, spatial identifiers, equipment identifiers, or energy metering objects for multidimensional monitoring data, perform time alignment and spatial association of multidimensional monitoring data, and verify the data attribution relationship between equipment operating data and carbon emission related data and current port area operation events.
[0284] When pollutant monitoring data and carbon emission-related data can be correlated to the same port area operation event, are located in the same monitoring period, and respectively meet the target monitoring area coverage requirements and equipment attribution requirements, the data association unit will determine the corresponding data as multidimensional pollution and carbon correlation data that meets the correlation requirements.
[0285] The results generation unit is used to generate pollution-carbon co-monitoring results, including pollutant emission status and carbon emission-related status, based on multidimensional pollution-carbon correlation data that meets the correlation requirements.
[0286] In some embodiments, the feedback adjustment module includes a quality evaluation unit, a network status evaluation unit, an execution status determination unit, and a subnet update unit.
[0287] The quality evaluation unit is used to determine the monitoring quality of the pollution and carbon monitoring task based on at least one of the following: data completeness, data timeliness, data continuity, spatiotemporal coverage, and correlation completeness of the multidimensional monitoring data.
[0288] The network status evaluation unit is used to determine the network operation status of the monitoring subnet based on the online status of the target monitoring nodes, node task load, communication link status, and data transmission status.
[0289] The execution status determination unit is used to determine whether the pollution and carbon monitoring task meets the preset monitoring requirements based on the monitoring quality and network operation status, and to identify the missing monitoring data dimensions or unmet correlation requirements when the preset monitoring requirements are not met.
[0290] The subnet update unit is used to retain target monitoring nodes that can still provide valid data and meet correlation requirements. For missing monitoring data dimensions or unmet correlation requirements, it selects supplementary or replacement nodes, or adjusts the sampling tasks, data reporting tasks, and data transmission paths of target monitoring nodes to update the monitoring subnet.
[0291] In some embodiments, the port area pollution and carbon multi-dimensional integrated network monitoring system further includes multiple heterogeneous monitoring nodes and at least one network control device. The information acquisition module, monitoring task generation module, monitoring subnetwork construction module, collaborative monitoring module, and feedback adjustment module can be located in the network control device, or they can be distributed among the network control device, edge computing device, and data processing device.
[0292] Multiple heterogeneous monitoring nodes include one or more of the following: pollutant monitoring nodes, meteorological monitoring nodes, equipment condition monitoring nodes, and carbon emission-related data acquisition nodes. They interact with the network control device through wired or wireless communication networks.
[0293] It should be noted that, in order to simplify the description of this application and thus aid in the understanding of one or more embodiments of the invention, the foregoing description of the embodiments of this application sometimes combines multiple features into one embodiment, drawing, or description thereof. However, this does not mean that the technical solution claimed in this application must simultaneously possess all the described features. For those skilled in the art, the technical features in the above embodiments can be combined, substituted, or adjusted without departing from the concept of this application, and such combinations, substitutions, or adjustments should all fall within the protection scope of this application.
Claims
1. A multi-dimensional integrated network monitoring method for pollution and carbon in port areas, characterized in that, include: The system acquires information on port operation events and node resource information of multiple heterogeneous monitoring nodes, which are used to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data, or carbon emission-related data. Based on the port area operation event information, the corresponding target monitoring area and pollution carbon monitoring requirements are determined. Based on the target monitoring area and the pollution carbon monitoring requirements, a pollution carbon monitoring task is generated. The pollution carbon monitoring task includes the association requirement of mapping pollutant monitoring data and carbon emission related data to the same port area operation event. Based on the pollution and carbon monitoring task and the node resource information, the task matching relationship between the heterogeneous monitoring node and the pollution and carbon monitoring task is determined. Under the condition of meeting the association requirements, the target monitoring node is selected and the node task is assigned based on the task matching relationship to form a monitoring subnet for performing the pollution and carbon monitoring task. The target monitoring nodes in the monitoring subnet are controlled to execute the assigned node tasks, acquire multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon co-monitoring results corresponding to the port operation event. The execution status of the pollution and carbon monitoring task is evaluated based on the monitoring quality of the multidimensional monitoring data and the network operation status of the monitoring subnet. If the execution status does not meet the preset monitoring requirements, the target monitoring node or node task is adjusted according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
2. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 1, characterized in that, The process of determining the corresponding target monitoring area and carbon pollution monitoring needs based on the port area operation event information includes: The core operation area is determined based on the operation location of the port operation event, and the associated monitoring area is determined based on the operation type, operation intensity and meteorological data of the port operation event. The core operation area and the associated monitoring area are then determined as the target monitoring area. Based on the operation type, operation object, equipment involved in the operation, and target monitoring area of the port operation event, determine at least one of the following: pollutant monitoring needs, carbon emission-related monitoring needs, meteorological monitoring needs, and equipment operating condition monitoring needs. The association requirements are determined based on the event identifier, operation time, operation location, and equipment involved in the operation of the port area operation event. The association requirements include at least event association requirements and time association requirements, and also include at least one of spatial association requirements and equipment affiliation requirements.
3. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 2, characterized in that, The generation of pollution and carbon monitoring tasks based on the target monitoring area and the pollution and carbon monitoring requirements includes: The pollution and carbon monitoring task is divided into multiple task units according to the dimensions of the monitoring data, the spatial range of the monitoring, and the associated time window; Multiple task units that correspond to the same port area operation event and the same associated time window, and have a corresponding relationship in terms of target monitoring area, operation equipment or energy measurement object, are combined into a pollution and carbon association monitoring unit. Each pollution and carbon correlation monitoring unit includes at least a pollutant monitoring task unit and a carbon emission related monitoring task unit. The pollutant monitoring task unit is used to acquire pollutant monitoring data within the corresponding target monitoring area, and the carbon emission related monitoring task unit is used to acquire energy consumption data or activity level data that can be attributed to the corresponding port area operation event.
4. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 1, characterized in that, Determining the task matching relationship between the heterogeneous monitoring nodes and the pollution and carbon monitoring task includes: Based on the data type to be monitored corresponding to the pollution and carbon monitoring task, initial candidate monitoring nodes with corresponding data acquisition capabilities are selected from multiple heterogeneous monitoring nodes. Candidate monitoring nodes are determined from the initial candidate monitoring nodes based on their monitoring coverage, sampling capability, online status, current task load, communication link quality, and data reliability. For candidate monitoring nodes used to obtain equipment operating data or carbon emission-related data, it is determined whether the data obtained by the candidate monitoring node can be attributed to the port area operation event, based on the operating equipment, vehicle, energy metering object or production operation unit corresponding to the candidate monitoring node. The task matching relationship is determined based on the monitoring capability adaptability, spatial coverage, sampling timing adaptability, data attribution adaptability, node operating status, and communication status of the candidate monitoring nodes.
5. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 4, characterized in that, The step of selecting a target monitoring node based on the task matching relationship under the condition of satisfying the association requirements includes: Multiple candidate node combinations are formed based on the task matching relationship; From the plurality of candidate node combinations, feasible node combinations that satisfy the association requirements are determined, wherein each feasible node combination satisfies at least the following: Pollutant monitoring data and carbon emission-related data are each provided by at least one candidate monitoring node; The monitoring coverage of one or more candidate monitoring nodes used to provide the pollutant monitoring data collectively covers the corresponding monitoring spatial range required by the pollution and carbon monitoring task; The operating equipment, vehicles, energy metering objects, or production units corresponding to the candidate monitoring nodes used to provide the carbon emission-related data have a data attribution relationship with the port area operation events. The pollutant monitoring data and the carbon emission related data correspond to the same port area operation event, and the corresponding sampling period or statistical period can form a corresponding relationship within a preset associated time window; The node task load of each candidate monitoring node does not exceed the corresponding node load limit, and each candidate monitoring node has an available data transmission path; Based on the monitoring coverage, data reliability, number of node calls, node task load, and communication resource consumption, a target node combination is selected from the feasible node combinations, and the candidate monitoring nodes in the target node combination are determined as the target monitoring nodes.
6. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 1, characterized in that, The process of assigning node tasks to the target monitoring nodes to form a monitoring subnetwork for performing the pollution and carbon monitoring tasks includes: Assign at least one of the following to each target monitoring node: sampling task, data preprocessing task, data aggregation task, and data relay task; and configure task identifier, associated event identifier, monitoring parameters, sampling period, and data reporting period for each node task. Based on the communication reachability of each target monitoring node, the data transmission path between each target monitoring node and the data processing node is determined; A network configuration is generated based on the target monitoring node, the node task, and the data transmission path. The network configuration includes a subnet identifier, an associated event identifier, a list of member nodes, a node task correspondence, and a data transmission path. The monitoring subnet is formed based on the network configuration. The monitoring subnet is a logical network that organizes the target monitoring nodes through the subnet identifier and the node task correspondence.
7. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 1, characterized in that, The spatiotemporal correlation processing of the multidimensional monitoring data includes: Configure associated event identifiers, time identifiers, and spatial identifiers for the multidimensional monitoring data, and determine the data ownership object of equipment operating condition data and carbon emission related data based on equipment identifiers, vehicle identifiers, energy metering objects, or work unit identifiers; Based on the monitoring period and sampling sequence requirements corresponding to the port area operation events, associated time windows are set, and multi-dimensional monitoring data from different sampling periods are aligned to the corresponding associated time windows. The spatial correlation between pollutant monitoring data and the target monitoring area is determined based on the spatial identifiers. Based on equipment identification, vehicle identification, energy metering object or work unit identification, data attribution verification is performed on equipment operating condition data and carbon emission related data. When pollutant monitoring data and carbon emission-related data can be correlated to the same port area operation event, are located in mutually related monitoring periods, and respectively meet the target monitoring area coverage requirements and equipment attribution requirements, the corresponding data are identified as data that meets the correlation requirements. Multidimensional monitoring data that meets the correlation requirements are then organized according to the correlation event identifier, correlation time window, and spatial identifier to form multidimensional pollution and carbon correlation data corresponding to the port area operation event.
8. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 7, characterized in that, The pollution and carbon monitoring task includes at least one pollution and carbon-related monitoring unit, and each pollution and carbon-related monitoring unit includes at least a pollutant monitoring task unit and a carbon emission-related monitoring task unit corresponding to the same port area operation event and the same associated time window; The method of obtaining the pollution and carbon co-monitoring results corresponding to the port area operation events includes: According to the monitoring data dimensions and correlation requirements corresponding to each pollution and carbon correlation monitoring unit, the correlation integrity of the corresponding data is checked. When the pollution and carbon correlation monitoring unit obtains at least valid pollutant monitoring data and carbon emission-related data, and the corresponding data meets the correlation requirements in terms of event, time, space and equipment attribution, the pollution and carbon correlation monitoring unit is determined to be in a complete correlation state. When the pollution and carbon correlation monitoring unit lacks the monitoring data dimensions required for the task, or when the corresponding data has been obtained but the data does not meet the correlation requirements, the pollution and carbon correlation monitoring unit is determined to be in an incomplete correlation state, and the missing data dimensions or unmet correlation conditions are recorded. Based on the multidimensional pollution and carbon correlation data corresponding to the pollution and carbon correlation monitoring units in the complete correlation state, the pollutant emission status and carbon emission correlation status are determined to generate the pollution and carbon collaborative monitoring results.
9. The port area pollution and carbon multi-dimensional integrated network monitoring method according to claim 1, characterized in that, When the execution state does not meet the preset monitoring requirements, the target monitoring node or node task is adjusted according to the missing monitoring data dimensions or unmet correlation requirements, including: Based on the execution status, a data dimension gap or a correlation condition gap is determined. The data dimension gap is used to indicate that necessary data is missing in pollutant monitoring data, carbon emission related data, meteorological monitoring data, or equipment operating condition data. The correlation condition gap is used to indicate that the multidimensional monitoring data does not meet the event correlation requirements, time correlation requirements, spatial correlation requirements, or equipment attribution requirements. Retain the target monitoring nodes and their node tasks that can continue to provide effective monitoring data and meet the aforementioned association requirements; To address the data dimension gaps, select supplementary or alternative monitoring nodes that can provide the missing monitoring data and whose provided monitoring data meets the correlation requirements; To address the gaps in the correlation conditions, adjust the sampling period, sampling location, or data transmission path of the target monitoring node, or select an alternative monitoring node that can restore the event correlation, temporal correlation, spatial correlation, or device affiliation. The monitoring subnet is updated based on the adjusted target monitoring nodes and node tasks.
10. A multi-dimensional integrated network monitoring system for pollution and carbon in port areas, characterized in that, include: The information acquisition module is used to acquire port operation event information and node resource information of multiple heterogeneous monitoring nodes. The heterogeneous monitoring nodes are used to acquire pollutant monitoring data, meteorological monitoring data, equipment operating data or carbon emission related data. The monitoring task generation module is used to determine the corresponding target monitoring area and carbon pollution monitoring requirements based on the port area operation event information, and generate carbon pollution monitoring tasks based on the target monitoring area and the carbon pollution monitoring requirements. The carbon pollution monitoring tasks include the association requirement of mapping pollutant monitoring data and carbon emission related data to the same port area operation event. The monitoring subnet construction module is used to determine the task matching relationship between the heterogeneous monitoring nodes and the pollution and carbon monitoring tasks based on the pollution and carbon monitoring tasks and the node resource information. Under the condition of meeting the association requirements, the module selects target monitoring nodes and assigns node tasks based on the task matching relationship to form a monitoring subnet for performing the pollution and carbon monitoring tasks. The collaborative monitoring module is used to control the target monitoring nodes in the monitoring subnet to execute the assigned node tasks, acquire multi-dimensional monitoring data corresponding to the target monitoring area, and perform spatiotemporal correlation processing on the multi-dimensional monitoring data to obtain the pollution and carbon collaborative monitoring results corresponding to the port operation event. The feedback adjustment module is used to evaluate the execution status of the pollution and carbon monitoring task based on the monitoring quality of the multidimensional monitoring data and the network operation status of the monitoring subnet. When the execution status does not meet the preset monitoring requirements, the module adjusts the target monitoring node or node task according to the missing monitoring data dimensions or unmet correlation requirements to update the monitoring subnet.
