Multi-objective production scheduling system for smart factory
By constructing a multi-objective production scheduling system for smart factories, real-time monitoring of equipment status and process data, dynamic adjustment of production task priorities, and optimization of resource allocation, the problems of collaborative accuracy and latency in multi-objective collaborative control in smart factories are solved, thereby improving resource utilization and process stability.
Patent Information
- Application Number
- CN202611345970.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-01
- Publication Date
- 2026-11-20
AI Technical Summary
Existing technologies suffer from insufficient coordination accuracy and latency issues in multi-objective collaborative control processes in smart factories, making it difficult to meet the needs of lean manufacturing.
The monitoring module collects real-time data on the operating status of production equipment and multi-objective processing technology, and constructs a monitoring network based on graph algorithms and loosely coupled algorithms. The task control module decomposes production tasks into multi-objective sub-task spaces and implements dynamic priority control. The production process planning module uses multi-objective optimization algorithms combined with equipment resource status to perform process planning and conflict resolution. The evaluation and feedback module uses twin simulation technology to achieve dynamic closed-loop optimization of production priorities and resource allocation.
It enables intelligent scheduling of multi-objective production tasks, improves resource utilization and process stability in complex production scenarios of smart factories, and reduces the risk of task delays and resource conflicts.
Smart Images

Figure CN123140519A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of lean manufacturing, and in particular relates to a multi-objective production scheduling system for smart factories. Background Technology
[0002] With the transformation of manufacturing towards intelligence, smart factories have become a development trend. Production scheduling, as a core component, is crucial. Chinese patent CN115034420B discloses an intelligent scheduling system and method for collaborative production smart factories. While it considers the association between equipment and workstations to optimize scheduling, it does not address multi-objective collaboration. Chinese patent CN117522085B discloses a big data-based smart factory production scheduling optimization method, mainly addressing the scheduling loss problem of emergency tasks, but not comprehensively considering multiple objectives. Furthermore, Chinese patent CN114594744B discloses a distributed factory production and distribution integrated scheduling method and system, focusing on integrated production and distribution scheduling, but paying insufficient attention to the accuracy and delay issues of multi-objective collaboration in the manufacturing process. Especially in the manufacturing of seamless steel pipes and other steel pipe parts, existing technologies suffer from insufficient accuracy and delays in multi-objective control processes, making it difficult to meet the needs of lean manufacturing. Therefore, this invention provides a multi-objective production scheduling system for smart factories. Summary of the Invention
[0003] To address the shortcomings of existing technologies, this invention proposes a multi-objective production scheduling system for smart factories. This system uses a monitoring module to collect real-time data on the operating status of production equipment and multi-objective processing techniques, constructing a monitoring network based on graph algorithms and loosely coupled algorithms. A task control module decomposes production tasks into multi-objective sub-task spaces and implements dynamic priority control. A production process planning module uses multi-objective optimization algorithms combined with equipment resource status for process planning and conflict resolution. An evaluation and feedback module uses process diagnosis and equipment status analysis, employing twin simulation technology to achieve dynamic closed-loop optimization of production priorities and resource allocation. All modules work collaboratively to form a closed-loop control system encompassing monitoring, planning, execution, and evaluation. Through real-time data-driven intelligent scheduling of multi-objective production tasks, this system effectively improves resource utilization and process stability in complex production scenarios within smart factories.
[0004] To achieve the above objectives, the present invention provides the following technical solution:
[0005] A multi-objective production scheduling system for smart factories includes: a monitoring module, a task control module, and a production process planning module;
[0006] The monitoring module includes an equipment status monitoring unit and a processing status monitoring unit;
[0007] The task control module includes a multi-objective task parsing unit and a sub-task management unit;
[0008] The production process planning module includes a multi-objective dynamic programming unit and a planning control unit;
[0009] Based on the network of operating status monitoring nodes configured by the equipment status monitoring unit and the network of cross-monitoring nodes for multi-objective processing technology configured by the processing status monitoring unit, combined with the task conflict resolution space constructed by the graph algorithm, a two-layer non-conflict generation scheduling space is constructed.
[0010] The task conflict resolution space uses a multi-objective optimization algorithm to adjust production conflicts between tasks by combining the priority sequence of tasks, the probability and magnitude of loss corresponding to each generation priority resource allocation strategy.
[0011] The multi-objective priority sub-task space is obtained based on the multi-objective task parsing unit and the sub-task management unit, and the multi-objective optimization configuration parameter set is obtained by combining the multi-objective dynamic programming unit.
[0012] Based on a multi-objective optimization configuration parameter set, a planning control unit is combined with a two-layer non-conflict generation scheduling space to perform resource scheduling configuration and production process control for each subtask in the multi-objective priority subtask space.
[0013] Specifically, the multi-objective production scheduling system also includes an evaluation and feedback module; the evaluation and feedback module includes a process evaluation and detection unit, an operating status detection unit, and a feedback unit;
[0014] The process evaluation and detection unit and the operation status detection unit perform real-time evaluation of the equipment operation status set and multi-target processing technology monitoring dataset obtained by the equipment status monitoring unit and the processing status monitoring unit. The evaluation results are fed back to the two-layer non-conflict generation and scheduling space, and the multi-target device production process is adjusted in real time through simulation algorithm.
[0015] Specifically, the two-layer non-conflict generation scheduling space is configured with a two-layer non-conflict simulation interaction node network; the two-layer non-conflict simulation interaction node network includes a resource node subnet, a pre-scheduled resource pool, a conflict resolution model, and a processing task node subnet.
[0016] The resource node subnet is used to store the current operating status, processing status, processing device type, processing device technology, and processing time interval of each processing device in each resource node for each production equipment.
[0017] The processing task node subnet is used to store the production sub-task information of each device to be processed, the processing priority and consumption cost of different processing devices under the same resource node, and the processing technology parameters of the sub-tasks corresponding to different processing devices.
[0018] The pre-scheduled resource pool is used to store the idle resources corresponding to the resource node subnet at each point in time, as well as the non-idle resources after conflict resolution by the conflict resolution model;
[0019] The conflict resolution model is used to resolve conflicts between subtasks of devices to be processed that have resource conflicts, so that the probability of loss and the actual loss of the subtask to be processed are minimized after resolution.
[0020] Specifically, the process of constructing the resource node subnet includes:
[0021] Obtain the location and number of all production equipment within the production area, and use a graph node algorithm to obtain an initial resource node graph;
[0022] Based on the historical processing time information of the processing device corresponding to each resource node, combined with the health assessment score of the corresponding resource node and the preset time series prediction model, the processing time prediction model corresponding to each resource node is obtained.
[0023] Configure the processing time prediction model corresponding to each resource node to the corresponding resource node to obtain the initial prediction resource node map.
[0024] Based on the order of processing tasks and the transmission direction of processing control data of each resource node in the sub-task sequence of each device to be processed in the initial predicted resource node graph, a directed resource node connection is constructed for each device to be processed.
[0025] Based on the directed resource node connections and the initial predicted resource node graph, the resource node subnet is obtained.
[0026] Specifically, the construction process of the resource node subnet also includes:
[0027] Based on the resource node sequence corresponding to each device to be processed in the resource node subnet, predict the number of non-current device to be processed subtasks in the remaining processing time interval of each resource node in the current processing subtask of each resource node, and obtain the set of non-conflicting resource nodes and the set of potentially conflicting resource nodes at each time point.
[0028] The process of distinguishing between non-conflicting resource node sets and potentially conflicting resource node sets includes:
[0029] If there are no non-current processing device subtasks within the predicted remaining processing time interval of the currently processing subtask, or if the conflict probability between the existing non-current processing device subtasks and the currently processing subtasks or non-current processing device subtasks is less than the preset conflict probability threshold, then the corresponding resource node is determined to be a non-conflicting resource node.
[0030] When the corresponding resource node is a non-conflicting resource node, the corresponding resource node information is mapped to the pre-scheduled resource pool, and the corresponding information is mapped to the subtask with the same processing technology type.
[0031] If there is at least one non-current processing device subtask within the predicted remaining processing time interval of the currently processing subtask, and the conflict probability between the non-current processing device subtask and the currently processing subtask or the non-current processing device subtask is at least greater than or equal to a preset conflict probability threshold, then the corresponding resource node is determined to be a potential conflict resource node.
[0032] The resource node subnet and the operation status monitoring node network have the same structure.
[0033] Specifically, the construction process of the processing task node subnet includes:
[0034] Based on the task information of the device to be processed at the current moment, the processing sub-task sequence corresponding to each device to be processed is obtained by combining the pre-set task decomposition model with the processing process node sequence of the device to be processed.
[0035] Based on the constraint time interval, timeout loss information, and predicted time length from the start time to the end time of each processing sub-task sequence corresponding to each processing device, the processing priority of sub-tasks of the same process type corresponding to different processing devices for the same resource node is constructed.
[0036] The processing technology chain for each device to be processed is constructed based on the processing order of the subtasks in the processing subtask sequence corresponding to each device to be processed.
[0037] Based on the processing priority of sub-tasks of the same process type corresponding to different devices to be processed for the same resource node, construct conflict connections corresponding to sub-tasks for the same resource node.
[0038] Based on the processing technology chain corresponding to each device to be processed and the conflicting connections corresponding to the sub-tasks facing the same resource node, a subnet of processing task nodes is constructed, and the corresponding resource node is marked in each sub-task node.
[0039] The subnet of processing task nodes has the same structure as the cross-monitoring node network of multi-objective processing technology.
[0040] Specifically, the construction process of the two-layer non-collision simulated interactive node network includes:
[0041] Based on the labels of the subnet of processing task nodes facing the same resource node, a mapping relationship between each sub-task node and each resource node is constructed. Through the established mapping relationship, the processing priority of the sub-task facing the same resource node is mapped to the corresponding resource node.
[0042] Based on the processing priority of the subtasks mapped on each resource node, the processing time prediction model configured on the resource node predicts the processing time period of the mapped subtasks corresponding to each resource node under the current priority.
[0043] Based on the predicted processing time period information of each resource node corresponding to the mapped subtask and the constraint time interval of the corresponding subtask, the time conflict length of each resource node corresponding to all subtasks is obtained.
[0044] The time conflict length is the difference between the total length of the predicted processing time period and the intersection length of the predicted processing time period and the constraint time interval.
[0045] Specifically, the construction process of the two-layer non-collision simulated interactive node network also includes:
[0046] Based on the time conflict length of all subtasks corresponding to each resource node, and combined with the priority information of the subtasks currently mapped to the corresponding resource node, the Bayesian algorithm in the conflict resolution model is used to obtain the conflict probability between all subtasks under each resource node under the current task priority.
[0047] Based on the conflict probability among all subtasks under each resource node at the current task priority, the remaining resource node information monitored in real time by the running status monitoring node network, the pre-scheduled resource pool information, and each resource node, a multi-objective optimization algorithm is used to combine the constraint combination constructed by the constraint time interval of each subtask, the corresponding predicted processing time period, the timeout loss cost, and the preset conflict probability threshold to adjust the priority of subtasks under each resource node in real time, so that the time conflict length corresponding to each subtask is minimized and the timeout loss corresponding to each subtask sequence of devices to be processed is minimized.
[0048] Specifically, the construction process of the two-layer non-collision simulated interactive node network also includes:
[0049] Based on the equipment operation status set and multi-objective processing technology monitoring dataset obtained from the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network, the multi-objective optimization algorithm and constraint combination are solved by simulation algorithm to obtain the priority of the corresponding sub-task updated at each resource node at each time.
[0050] Based on the updated priority of the corresponding subtask under each resource node at each time, construct a competitive connection between each resource node and the subtask node containing the subtask of each resource node at the current time.
[0051] Based on the constructed competitive connection, the resource node subnet is connected to the processing task node subnet. At the same time, the conflict resolution model is configured to the competitive connection, and the pre-scheduled resource pool is connected to both the conflict resolution model and the resource node subnet to obtain a two-layer non-conflict simulated interactive node network.
[0052] Specifically, the process of real-time synchronous adjustment of the production process of multiple target devices through simulation algorithms includes:
[0053] Based on a two-layer non-conflict simulation interactive node network combined with simulation algorithms, the multi-objective generation process is simulated in real time. The equipment operation status set and multi-objective processing technology monitoring dataset are obtained in real time through the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network.
[0054] Based on the equipment operation status set and the multi-objective processing technology monitoring dataset, the conflict resolution model in the two-layer non-conflict simulation interaction node network determines in real time whether each resource node in the resource node subnet is a non-conflict resource node at the corresponding time point. If so, the label corresponding to the resource node is saved to the pre-scheduled resource pool.
[0055] If not, it is determined to be a potential conflicting resource node. Then, by combining the number of resource nodes of the same processing technology type remaining in the pre-scheduled resource pool at the current moment and the corresponding equipment operation evaluation results, the processing priority of all sub-tasks corresponding to the potential conflicting resource nodes is adjusted, and the adjusted processing priority is mapped to the corresponding sub-task nodes through competitive connection.
[0056] When the processing flow of the corresponding device reaches the corresponding subtask, the processing priority of the device subtask is adjusted to process it.
[0057] Compared with the prior art, the beneficial effects of the present invention are:
[0058] This invention addresses the shortcomings of existing technologies by integrating equipment status monitoring units and processing status monitoring units to construct a real-time operational status monitoring node network. Combined with dynamic data acquisition from a multi-objective processing technology cross-monitoring node network, it accurately captures equipment operating status and process parameter deviations. Utilizing graph algorithms, it constructs a two-layer non-conflict generation scheduling space, deeply integrating task priority sequences, resource allocation strategy loss probabilities, and multi-objective optimization algorithms to dynamically generate conflict resolution strategies. Through the mapping relationship between resource node subnets and processing task node subnets, and the calculation of time conflict probability using the Bayesian algorithm in the conflict resolution model, it quantifies the time of resource nodes in real time. By combining conflict length and timeout loss costs with a multi-objective optimization algorithm to dynamically adjust the priority of sub-tasks, the resource competition among multiple tasks can be effectively balanced. Furthermore, through simulation algorithms and real-time data interaction between a two-layer non-conflict simulation interactive node network, the virtual model and the actual production status are synchronized. Based on the idle resource allocation and priority elastic preemption mechanism of the pre-scheduled resource pool, the dynamic reconstruction of the processing chain and the rapid redirection of conflicting resource nodes are realized. Thus, in multi-objective collaborative control, equipment load balancing, precise matching of process timing, and maximization of resource utilization are achieved, significantly reducing the risk of task delays and resource conflicts in multi-process coupling scenarios. Attached Figure Description
[0059] Figure 1 This is a block diagram of a multi-objective production scheduling system for a smart factory according to Embodiment 1 of the present invention;
[0060] Figure 2 This is a unit workflow diagram corresponding to the multi-objective production scheduling system for smart factories in Embodiment 2 of the present invention. Detailed Implementation
[0061] Example 1:
[0062] Please see Figure 1 The present invention provides an embodiment of a multi-objective production scheduling system for smart factories, comprising: a monitoring module, a task control module, a production process planning module, and an evaluation and feedback module;
[0063] The monitoring module is used to monitor the operating status and processing status of the production equipment corresponding to each production component in a multi-target production process, and to obtain a monitoring dataset.
[0064] The task control module is used for the input, splitting, and priority control of production tasks.
[0065] The production process planning module is used to decompose the production line process for each production component, and to perform production process planning and configuration, as well as production process conflict analysis and control based on the decomposed production process and tasks.
[0066] The evaluation and feedback module evaluates the anomalies of the devices to be processed and predicts the anomaly losses based on the monitoring dataset obtained by the monitoring module. It then feeds back the predicted anomaly losses to the task control module and the production process planning module to adjust the task priorities and production processes in real time, so as to minimize the anomaly rate and losses of the devices to be processed.
[0067] The monitoring module includes an equipment status monitoring unit and a processing status monitoring unit;
[0068] The equipment status monitoring unit is used to monitor the operating status information of each production equipment and the interaction information between multiple target production equipment in real time using a preset operating status monitoring node network, and to obtain the equipment operating status set.
[0069] The pre-defined network of operation status monitoring nodes is constructed using a graph algorithm, consisting of each processing device, its operation data, and monitoring information between processing devices.
[0070] In this embodiment, the preset operating status monitoring node network is constructed using a directed attribute graph structure, specifically implemented as follows:
[0071] The first step is to abstract each processing device in the production area as an independent monitoring node in a graph structure. Each monitoring node has a built-in unique identifier field, which is completely consistent with the globally unique device number of the corresponding device. For example, the monitoring node identifier corresponding to the punching machine GG-CK-CKJ-001 is also GG-CK-CKJ-001, to ensure that the node identifier is globally unique and can be traced back to the same source. The node attribute structure adopts a fixed-length structured data format and contains four core modules: First, the equipment basic information module, which stores four types of fixed attribute information: equipment model, commissioning date, processing technology range, and rated parameter range. The attribute information is kept in millisecond-level synchronization with the attribute information of the corresponding equipment in the resource node subnet. Second, the real-time operation data field, which stores real-time monitoring parameters such as vibration, temperature, current, and pressure in key-value pair format. The data refresh cycle is perfectly matched with the sensor sampling cycle. Third, the data acquisition frequency configuration module, which configures the acquisition frequency differently according to the sensor type. The vibration sensor is fixed at 10,000 times per second, the temperature sensor is fixed at 1 time per second, and the current and voltage sensors are fixed at 100 times per second. It also supports dynamic adjustment of the acquisition frequency according to the abnormal status of the equipment. Fourth, the abnormal alarm threshold module, which is divided into two levels of storage: primary warning threshold and secondary alarm threshold. Each threshold corresponds to three fields: sensor type, threshold value, and alarm level. The threshold value is jointly determined by the equipment specification and historical fault data and cannot be modified arbitrarily.
[0072] The second step involves the monitoring information between processing equipment described in this embodiment. Specifically, this refers to four core types of related information: process interlock control relationships, upstream and downstream start-stop linkage relationships, logistics transmission dependency relationships, and safety interlock protection relationships. These four types of monitoring information are weighted according to their importance, with a total weight of 1. Process interlock control relationships have the highest weight, followed by upstream and downstream start-stop linkage relationships, then logistics transmission dependency relationships, and finally, safety interlock protection relationships have the lowest weight. Based on this monitoring information, the Dijkstra graph algorithm, consistent with the resource node subnet construction, is used to calculate the correlation tightness between any two monitoring nodes. The correlation tightness value ranges from 0 to 1, with higher values indicating a tighter correlation between the two devices. When the correlation between two nodes is greater than or equal to a preset threshold of 0.6, a directed monitoring edge is established between the two nodes. The direction of the directed monitoring edge is completely consistent with the process flow direction and the interlocking control signal transmission direction. The attribute structure of the edge is fixed to include four fields: monitoring information type, correlation, signal transmission protocol, and data synchronization period. The signal transmission protocol is Profinet industrial Ethernet protocol by default, and the data synchronization period is fixed at 100 milliseconds, thereby realizing the computable and traceable mapping of the correlation between devices.
[0073] The third step involves initializing and constructing the nodes and edges. Then, the Prim minimum spanning tree algorithm is used to prune and optimize redundant monitoring edges, removing invalid edges with a correlation density below 0.3 and eliminating redundant ring connections. This ensures the simplest topology and optimal transmission path for the operational status monitoring node network. The node network adopts a distributed deployment mode, with the computational logic of each monitoring node deployed on the corresponding edge acquisition gateway. A single gateway supports up to 128 sensor data inputs. Monitoring data between nodes is exchanged in real-time via the workshop's gigabit industrial ring network. The topology status update cycle for the entire node network is set to 100 milliseconds, synchronized with the equipment operational status data acquisition cycle, ensuring the operational status monitoring node network can map the changes in equipment operational status and correlation relationships in real time.
[0074] As a specific example, in the Φ273 seamless steel pipe production workshop of this embodiment, 21 core production equipment correspond to 21 monitoring nodes. Taking the piercing mill GG-CK-CKJ-001 and the continuous rolling mill GG-ZZ-ZZJ-001 as examples, the two types of equipment have three types of monitoring relationships: process interlock control, upstream and downstream start-stop linkage, and logistics transmission dependence. The calculated correlation tightness is 0.9, which is greater than the threshold of 0.6. Therefore, a directed monitoring edge is established from GG-CK-CKJ-001 to GG-ZZ-ZZJ-001. The edge attribute marks the monitoring information type as process interlock control plus start-stop linkage plus logistics transmission dependence, correlation tightness of 0.9, transmission protocol as Profinet, and data synchronization period of 100 milliseconds. After pruning by the Prim algorithm, the final generated operation status monitoring node network contains 21 monitoring nodes and 37 effective directed monitoring edges. Its topology completely corresponds to the resource node subnet, ensuring the consistency of monitoring data and resource scheduling data. It should be noted that the numerical values and specific operating parameters in this example are merely exemplary descriptions to facilitate understanding of the principles of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production testing based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose any specific limitations on this.
[0075] The processing status monitoring unit is used to monitor the processing process data of each device to be processed at each process node in real time based on a preset multi-target processing process cross-monitoring node network, and obtain a multi-target processing process monitoring dataset.
[0076] It should be further explained that the multi-target processing technology cross-monitoring node network in this embodiment is constructed by a loosely coupled algorithm using the process flow nodes and process flow sequence of all devices to be processed and the corresponding processing equipment information. The specific implementation method is as follows:
[0077] Furthermore, in this embodiment, the multi-target processing technology cross-monitoring node network is constructed using a loosely coupled algorithm, adopting a three-layer architecture of "process node layer - mapping association layer - equipment resource layer," specifically implemented as follows:
[0078] The first step is to abstract each standard process flow corresponding to all the devices to be processed into an independent process node at the process node layer. Each process node has a unique process code, with the coding rule being "process type code - national standard process number - 3-digit serial number". For example, the process code for the piercing process of seamless steel pipe is CK-GB / T8163-001, where CK is the piercing process type code, GB / T8163 is the corresponding national standard process number, and 001 is the serial number. The node attribute structure adopts a standardized format and contains five core fields: First, the process name field, which is fixed as the standard name of the process and cannot be customized; second, the execution standard field, which stores the national standard, industry standard, or enterprise internal control standard number corresponding to the process; third, the parameter reference range field, which stores the upper and lower limit reference ranges of the core process parameters of the process; fourth, the quality acceptance standard field, which stores the finished product quality judgment indicators and qualified range of the process; and fifth, the process sequence identifier field, which stores the predecessor process code and the successor process code to clarify the sequential logic of process execution and does not allow circular dependencies. The process node layer is completely decoupled from specific processing equipment, defining only the standardized requirements of the process itself without binding it to specific production equipment, thus achieving the separation of process standards and production resources at the architectural level.
[0079] The second step involves abstracting all processing equipment capable of executing the corresponding process within the production area into independent equipment nodes in the equipment resource layer. The unique identifier of each equipment node is completely consistent with the globally unique device number in the operation status monitoring node network and the resource node subnet. The node attribute information maintains millisecond-level synchronization with these two node networks. The core rule of the loosely coupled algorithm is: a single process node can be mapped to multiple equipment nodes with the same processing capability simultaneously; a single equipment node can be associated with multiple process nodes of the same type simultaneously; and process nodes and equipment nodes are connected through dynamically updatable mapping edges. The attribute structure of the mapping edge contains three core quantified fields: first, the equipment process adaptability, ranging from 0 to 1; the higher the overlap between the equipment's processable parameter range and the process node's baseline parameter range, the higher the adaptability value; second, the processing accuracy matching level, divided into five levels from IT6 to IT10; the smaller the level value, the higher the matching accuracy; and third, the historical processing pass rate, which is the finished product pass rate of the corresponding process for the equipment over the past 12 months, ranging from 0 to 100%. The dynamic update triggering conditions for the mapped edges include four categories: equipment status change, process parameter adjustment, new order access, and equipment fault alarm. The update process does not require modification of the basic definition of the process node layer, thereby achieving complete decoupling between process standards and equipment resources.
[0080] The third step involves establishing directed process flow edges between upstream and downstream process nodes in the process node layer, based on the process flow sequence of the devices to be processed. The direction of the edges corresponds to the process execution sequence, and the edge attributes store the process buffer duration and data transmission specifications. Based on the mapping and association edges between process nodes and equipment nodes, a cross-collection link for process data and equipment monitoring data is established, clarifying the sources of process parameter collection and the feedback path for equipment status. This ultimately forms a three-layer architecture of a multi-objective processing technology cross-monitoring node network: "process node layer - mapping and association layer - equipment resource layer." This node network supports parallel process monitoring of multiple types and specifications of devices to be processed. When a new type of device to be processed is added, only the corresponding process node needs to be added in the process node layer. The mapping and association edges can quickly adapt to the existing equipment resource layer without reconstructing the entire node network. Its flexible adaptation capability can meet the synchronous production monitoring needs of more than 100 specifications of seamless steel pipes.
[0081] As a specific example, in this embodiment, for three parallel seamless steel pipe orders, a total of 9 standard process nodes are constructed in the process node layer, corresponding to the billet preparation, heating, piercing, rolling, sizing, straightening, flaw detection, cutting, and packaging processes, respectively. Among them, the piercing process node is connected to 3 piercing machine equipment nodes GG-CK-CKJ-001, GG-CK-CKJ-002, and GG-CK-CKJ-003 through mapping association edges. According to calculations, the equipment process adaptability of GG-CK-CKJ-001 is 0.98, the processing accuracy matching level is IT8, and the historical processing qualification rate is 99.2%, making it the optimal adapted equipment. The finally constructed multi-objective processing technology cross-monitoring node network includes 9 process nodes, 21 equipment nodes, 42 mapping association edges, and 8 directed process flow edges, which can simultaneously realize the cross-monitoring of the entire process of the 3 orders. It should be noted that the numerical values and specific operating parameters in this example are merely exemplary descriptions to facilitate understanding of the principles of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production testing based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose any specific limitations on this.
[0082] The task control module includes a multi-objective task parsing unit and a sub-task management unit;
[0083] The multi-objective task parsing unit is used to decompose the production process task of each device to be processed based on the production process information of each device to be processed and the information of each processing node, so as to obtain the multi-objective task decomposition space.
[0084] The multi-target decomposition task space is constructed from the sequence of decomposition subtasks for each device to be processed;
[0085] In this embodiment, the multi-objective splitting task space is constructed using a tree-structured hierarchical data structure, specifically implemented as follows:
[0086] The first step, when the multi-objective task parsing unit performs task decomposition, strictly adheres to the minimum decomposition granularity rule of "single equipment, single process, single batch." The core constraints are: each decomposed subtask must correspond to a unique batch of components to be processed, a unique standard process, and a unique type of compatible processing equipment, ensuring that each decomposed subtask is the smallest production unit that can be independently scheduled, executed, and traced. The decomposition process is subject to the following rigid constraints: merged subtasks across processes, equipment, or batches are not allowed; the maximum weight of steel pipes in a single batch decomposed does not exceed 50 tons to ensure the controllability of the subtask execution cycle; the decomposition results must pass process integrity verification, and no process node in the standard process route must be omitted to ensure the executability and integrity of the decomposition results.
[0087] The second step involves a three-level tree structure for the multi-objective task splitting space. The root node represents all total production tasks within the current scheduling cycle. First-level child nodes represent independent order tasks corresponding to a single device to be processed. Second-level child nodes represent the sub-tasks of each process after splitting a single order task, i.e., the sequence of split sub-tasks. Each sub-task node has a globally unique task ID, encoded as "order number - process code - 3-digit serial number". For example, the punching sub-task ID for order 1 is DD20240508001-CK-001, ensuring that each sub-task has a unique identifier within the entire system. The node attribute structure contains seven core fields: First, the order information field, storing the order number, order priority, and delivery deadline; second, the specifications field for the parts to be processed, storing the steel type, outer diameter, wall thickness, fixed length, and execution standard of the steel pipe; third, the corresponding process node field, storing the unique code of the process node corresponding to this subtask, which maps one-to-one with the process node layer; fourth, the constraint time interval field, storing the earliest allowed start time and the latest required completion time, with time precision down to the minute; fifth, the quality requirement field, storing the process quality acceptance standard corresponding to this subtask; sixth, the compatible equipment type field, storing the equipment type code that can execute this subtask, corresponding to the equipment resource layer; and seventh, the timeout loss information field, storing the comprehensive loss amount corresponding to each hour of timeout for this subtask, including breach of contract compensation, equipment idle time, and material retention.
[0088] Thirdly, the multi-objective task space is stored using the Neo4j graph database. This database natively supports high-concurrency queries and relational traversal of graph structures. The stored content covers all attributes of all sub-task nodes, parent-child dependencies between nodes, and predecessor-successor relationships of process sequences. The task space update mechanism is divided into two types: a full reconstruction cycle is set to be executed once a day at 8:00 AM after the production plan is issued, completing the full splitting and tree structure reconstruction of all order tasks for the day; the incremental update cycle is set to 5 minutes. When events such as new orders, emergency orders, order changes, or equipment malfunctions are triggered, the corresponding sub-task node addition, modification, or deletion operations are immediately executed. The response time of incremental updates does not exceed 1 second, thereby ensuring that the task space remains synchronized with actual production needs in real time.
[0089] As a specific example, in this embodiment, the total task within the current scheduling cycle consists of 3 parallel seamless steel pipe orders, corresponding to the root node of a tree structure. Under the root node, there are 3 first-level child nodes, each corresponding to one of the 3 orders. Each first-level child node is further divided into 9 second-level sub-task nodes, each corresponding to one of the 9 standard processes. The entire task space contains 1 root node, 3 first-level child nodes, and 27 second-level sub-task nodes. The perforation sub-task node for order 1 has a time constraint interval of 8:00-12:00 on the day the order is placed, with an overtime penalty of 1200 yuan per hour. The compatible equipment type is a perforation machine. The parent-child relationships and predecessor-successor relationships of all nodes are fully stored in the Neo4j graph database, supporting millisecond-level queries by order number, process type, and equipment type. It should be noted that the numerical values and specific operating parameters in this example are merely illustrative descriptions to facilitate understanding of the principle of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production testing based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose specific limitations in this regard.
[0090] The subtask management unit is used to evaluate the processing priority of the corresponding subtasks of different devices to be processed on the same processing equipment based on the constraint information of each subtask in the multi-objective subtask space, and obtain the multi-objective priority subtask space.
[0091] In this embodiment, the subtask management unit uses a weighted scoring model combining the analytic hierarchy process (AHP) and the entropy weighting method to quantitatively evaluate the processing priority of subtasks. The specific implementation method is as follows:
[0092] The first step is to select four core constraints as primary indicators for priority assessment: delivery urgency, cost of delay, estimated processing time, and order value. Delivery urgency and cost of delay are subjectively weighted indicators, while estimated processing time and order value are objectively weighted indicators. All four indicators are positive; a higher score indicates a higher processing priority.
[0093] The second step involves using the analytic hierarchy process (AHP) to determine subjective weights. A fourth-order judgment matrix is constructed, and after consistency checks confirm it meets industry standards, the weights for delivery urgency (40%) and overdue cost (30%) are determined. Next, the entropy weight method is used, based on at least 10,000 sets of historical production scheduling data from the workshop over the past 12 months, to calculate the coefficients of variation for each indicator to determine objective weights. The weights for estimated processing time (15%) and order value (15%) are then determined. Finally, a fixed combined weight coefficient matrix is formed to ensure the consistency and reproducibility of priority assessment.
[0094] The third step is to normalize the four primary indicators, mapping each indicator value to a scoring range of 0 to 100. The calculation logic for each indicator is defined as follows:
[0095] Delivery urgency score = (1 - remaining delivery time / total order production cycle) × 100. The shorter the remaining delivery time, the higher the score. When the remaining delivery time is 0, the score is fixed at 100.
[0096] Timeout cost score = (timeout cost per unit hour for the current subtask / maximum timeout cost per unit hour for all subtasks on the same device) × 100. The higher the timeout cost, the higher the score.
[0097] Estimated processing time score = (1 - estimated total processing time of the current subtask / maximum estimated processing time of all subtasks on the same device) × 100, the shorter the processing time, the higher the score;
[0098] Order value score = (total amount of orders belonging to the current subtask / maximum total amount of orders belonging to all subtasks on the same device) × 100. The higher the order value, the higher the score.
[0099] The fourth step involves calculating and ranking priority scores. The normalized scores of the four indicators are multiplied by their corresponding weights and then summed to obtain a comprehensive priority score for each subtask. The comprehensive score ranges from 0 to 100, with higher scores indicating higher processing priority. For all subtasks mapped to the same processing equipment, they are arranged in descending order of comprehensive score, forming a priority queue for that equipment. All priority queues for all equipment together constitute a multi-objective priority subtask space. The update cycle of this space is consistent with that of the multi-objective task decomposition space to ensure the real-time nature of the priority evaluation results.
[0100] As a specific example, in this embodiment, for the punching sub-tasks of the three orders mapped to punching machine GG-CK-CKJ-001, the comprehensive score of the punching sub-task of order 1 is calculated to be 90 points, the comprehensive score of the punching sub-task of order 3 is 82 points, and the comprehensive score of the punching sub-task of order 2 is 75 points. These scores are used to form a sub-task priority queue for the punching machine. The priority queues of the three punching machines together constitute the multi-objective priority sub-task space of this embodiment. It should be noted that the numerical values and specific operating parameters in this example are merely exemplary descriptions to facilitate understanding of the principle of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production testing based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose specific limitations in this regard.
[0101] The production process planning module includes a multi-objective dynamic programming unit and a planning control unit;
[0102] The multi-objective dynamic programming unit is used to obtain a multi-objective optimization configuration parameter set based on the multi-objective priority sub-task space, the equipment operating state set, and the preset task conflict resolution space, through a preset multi-objective optimization algorithm.
[0103] In this embodiment, the preset multi-objective optimization algorithm is a non-dominated sorting genetic algorithm with an elitist strategy, namely the NSGA-II algorithm, which is specifically implemented as follows:
[0104] The first step involves using real-number encoding for the algorithm. Decision variables include three categories: subtask priority ranking, subtask processing time allocation, and the mapping relationship between subtasks and equipment resources. The core parameters of the algorithm are fixed as follows: population size 100, maximum number of iterations 200, crossover probability 0.8, mutation probability 0.05, and elite retention rate 10%. An early stopping mechanism is also implemented, terminating the iteration prematurely when the Pareto front shows no significant improvement after 20 consecutive iterations, thereby improving efficiency while maintaining solution accuracy.
[0105] The second step is to set three minimization optimization objectives: the first optimization objective is to minimize the total time conflict length of all sub-tasks, which is used to minimize the deviation between the processing time of sub-tasks and the constraint time interval; the second optimization objective is to minimize the total comprehensive loss of the entire production process, which includes the sum of the overtime loss cost of all sub-tasks, the idle cost of equipment, and the rework cost of the process; the third optimization objective is to minimize the load imbalance of all production equipment, that is, to minimize the standard deviation of the load rate of each piece of equipment, so as to make balanced use of production resources and avoid some equipment being overloaded while some equipment is idle.
[0106] The third step involves setting inviolable hard constraints and penalizing and eliminating solutions that violate these constraints during the fitness evaluation process to ensure that the solution meets engineering production requirements. The hard constraints specifically include four aspects: first, time constraints—the processing time of all subtasks must be completely contained within their constrained time intervals and cannot exceed the deadline; second, conflict constraints—the processing time windows of any two subtasks mapped to the same equipment cannot overlap, and the probability of conflict between subtasks must be less than a preset threshold of 0.75; third, load constraints—the maximum load rate of a single production equipment must not exceed 90%; and fourth, process constraints—the process parameters of the subtasks must be within the rated parameters of the corresponding equipment, conforming to national standards and order quality requirements, and must not exceed process tolerances.
[0107] Fourth, the algorithm iteratively solves the problem within the boundaries of the hard constraints, outputting a Pareto optimal solution set. No solution in this set can improve any objective without worsening at least one other objective. A linear fuzzy membership method is used to evaluate the comprehensive performance of each solution in the set, selecting the solution with the highest comprehensive membership degree as the global optimal solution. A multi-objective optimization configuration parameter set is then output to ensure the global optimality and engineering feasibility of the optimization results.
[0108] As a specific example, in this embodiment, for the 27 sub-tasks of 3 orders, the algorithm takes the above three types of decision variables as the optimization objects and the three minimization objectives as the optimization directions, and iteratively solves the problem within hard constraints. The final output of the optimal solution reduces the total time conflict length from 386 minutes to 18 minutes, reduces the total production loss from 2860 yuan to 0 yuan, optimizes the average equipment load rate from 82% to 76%, improves the load balance among equipment, and achieves the global equilibrium optimality of the three optimization objectives.
[0109] It should be noted that the numerical values and specific operating parameters in this example are merely exemplary descriptions to facilitate understanding of the principles of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production testing based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose any specific limitations on this.
[0110] The planning and control unit, based on the multi-objective optimization configuration parameter set and the remaining configurable production equipment resources obtained by the equipment status monitoring unit, performs resource scheduling and configuration and production process control for each subtask in the multi-objective priority subtask space.
[0111] The evaluation and feedback module includes a process evaluation and detection unit, an operating status detection unit, and a feedback unit;
[0112] The process evaluation and testing unit evaluates and diagnoses the real-time processing technology of each production device based on a multi-target processing technology monitoring dataset, and obtains a sequence of processing technology evaluation results for each production device.
[0113] The operation status detection unit evaluates and diagnoses the real-time operation status of each production device based on the device operation status set, and obtains a sequence of device operation status results.
[0114] The feedback unit feeds back the process evaluation result sequence and equipment operation status result sequence to the multi-objective dynamic programming unit, and makes real-time synchronous adjustments to the multi-objective device production process through simulation algorithms.
[0115] Furthermore, based on the units corresponding to the monitoring module, task control module, production process planning module, and evaluation feedback module, the following multi-objective production scheduling system workflow is constructed, specifically including:
[0116] Based on the network of operating status monitoring nodes configured by the equipment status monitoring unit and the network of cross-monitoring nodes for multi-objective processing technology configured by the processing status monitoring unit, combined with the task conflict resolution space constructed by the graph algorithm, a two-layer non-conflict generation scheduling space is constructed.
[0117] The task conflict resolution space uses a multi-objective optimization algorithm to adjust production conflicts between tasks by combining the priority sequence of tasks, the probability and magnitude of loss corresponding to each generation priority resource allocation strategy.
[0118] The multi-objective priority sub-task space is obtained based on the multi-objective task parsing unit and the sub-task management unit, and the multi-objective optimization configuration parameter set is obtained by combining the multi-objective dynamic programming unit.
[0119] Based on a multi-objective optimization configuration parameter set, resource scheduling and production process control are performed on each subtask in the multi-objective priority subtask space by combining a planning control unit with a two-layer non-conflict generation scheduling space.
[0120] The process evaluation and detection unit and the operation status detection unit perform real-time evaluation of the equipment operation status set and multi-target processing technology monitoring dataset obtained by the equipment status monitoring unit and the processing status monitoring unit. The evaluation results are fed back to the two-layer non-conflict generation and scheduling space, and the multi-target device production process is adjusted in real time through simulation algorithm.
[0121] In this embodiment, the task conflict resolution space is constructed using a constrained directed graph structure, specifically implemented as follows:
[0122] The first step is to define four types of core production conflicts and their judgment conditions, specifically including: equipment resource conflict, where two or more subtasks are mapped to the same production equipment within the same time period; time window conflict, where the predicted processing time of a subtask exceeds its constraint time interval, or overlaps with the time windows of preceding or succeeding subtasks; process compatibility conflict, where the process parameters of a subtask do not match the rated processing range of the mapped equipment, failing to meet quality requirements; and auxiliary resource conflict, where two or more subtasks simultaneously occupy the same set of non-shareable tooling fixtures or cranes. The nodes in the task conflict resolution space are divided into two categories: conflict source nodes and resolution strategy nodes. Conflict source nodes correspond to processing equipment and subtasks with conflict risks, and their attributes include equipment number, subtask ID, conflict type, and risk level. Resolution strategy nodes correspond to four preset standardized conflict resolution schemes: priority adjustment, task migration, schedule buffer, and resource expansion. Each resolution strategy node has a built-in strategy execution process, applicable scenarios, and constraints.
[0123] The second step involves calculating the conflict probability between any two subtasks using real-time data from a two-layer non-conflict simulated interactive node network through a conflict resolution model. When the conflict probability reaches or exceeds a preset threshold of 0.75, a conflict edge is established between the corresponding conflict source nodes. The attribute structure of the conflict edge is fixed and includes four fields: conflict type, conflict probability, conflict time interval, and expected loss amount. For each conflict edge, multiple optional resolution paths are constructed based on the resolution strategy nodes. Each path corresponds to a preset resource configuration strategy, and its path attributes include three core evaluation indicators: strategy execution cost, conflict resolution success rate based on historical data statistics, and expected loss reduction rate.
[0124] The third step involves using core conflict resolution rules that aim to minimize conflict probability, production losses, and order delivery timeliness. A multi-objective optimization algorithm is employed to solve all conflict resolution paths, selecting the optimal strategy based on overall performance. Strategy priorities are set according to risk level: high-risk conflicts prioritize task migration strategies, medium-risk conflicts prioritize priority adjustment strategies, and low-risk conflicts prioritize schedule buffer strategies. The conflict resolution triggering mechanism is divided into two categories: timed scan triggering and event triggering. Timed scans perform a full conflict scan of all quantum tasks and equipment every 5 minutes, identifying potential conflicts and automatically resolving them. Event triggers occur when events such as equipment malfunctions, order changes, process deviations, or emergency order insertions occur, immediately triggering a full scan and resolution process for the relevant conflict sources, with a response time of no more than 2 seconds.
[0125] In this embodiment, when constructing conflict resolution paths, the task conflict resolution space uses an ant colony algorithm for initial optimization to obtain a set of candidate resolution paths, which are then used by the non-dominated sorting genetic algorithm NSGA-II with an elitist strategy for Pareto optimization. The specific implementation is as follows:
[0126] Each conflict edge is abstracted as a node to be processed in the ant colony algorithm. Ants visit each conflict edge node sequentially, selecting a resolution strategy for each conflict edge during the visit. The resolution strategies include four pre-defined standardized conflict resolution schemes: priority adjustment, task migration, time buffering, and resource expansion. For each conflict edge, the cost of selecting the resolution strategy is the weighted sum of the conflict probability, the expected loss amount, and the strategy execution cost of the path corresponding to the selected resolution strategy. The conflict probability has a weight of 0.4, the expected loss amount has a weight of 0.3, and the strategy execution cost has a weight of 0.3. The ant colony algorithm parameters are set as follows: number of ants 30, pheromone evaporation coefficient 0.1, pheromone intensity constant 100, heuristic factor 1, expected heuristic factor 2, and maximum number of iterations 50. Each ant starts from the first conflict edge and selects a resolution strategy for each conflict edge sequentially according to the state transition probability until all conflict edges have completed strategy selection, forming a candidate resolution path covering all conflict edges. After each iteration, the pheromones on the path are updated, and the optimal path for each generation is recorded. After the iteration terminates, the top 5 candidate elimination paths with the highest pheromone concentrations are selected to form a candidate elimination path set, which serves as the input for the subsequent NSGA-II multi-objective optimization algorithm.
[0127] For example, regarding the conflict between the punching subtasks of Order 1 and Order 3 on punching machine GG-CK-CKJ-001, after initial optimization using the ant colony algorithm, five candidate resolution paths are output. Path 1 involves migrating the task to the backup punching machine GG-CK-CKJ-002, Path 2 involves priority adjustment combined with schedule buffering, and Path 3 involves resource expansion combined with priority adjustment. Subsequently, the NSGA-II algorithm performs Pareto optimization within this candidate path set and ultimately determines that task migration is the globally optimal resolution strategy.
[0128] It should be noted that the numerical values and specific parameters in this embodiment are merely illustrative descriptions and can be adjusted by those skilled in the art according to the actual situation during implementation.
[0129] As a specific example, in this embodiment, regarding the conflict between the punching subtasks of Order 1 and Order 3 on punching machine GG-CK-CKJ-001, the calculated conflict probability is 0.82, which is greater than or equal to the threshold of 0.75. A conflict edge is established, with the edge attributes marked as conflict type as equipment resource conflict, conflict probability of 0.82, conflict time interval of 8:00-11:30 on the same day, and estimated loss of 2860 yuan. For this conflict edge, three resolution paths are constructed: priority adjustment, task migration, and schedule buffer. After solving the problem using a multi-objective optimization algorithm, the task migration strategy is determined to be the optimal resolution strategy. The system automatically migrates the Order 3 subtask to the backup punching machine, thus completing the conflict resolution.
[0130] It should be noted that the numerical values and specific operating parameters in this example are merely exemplary descriptions to facilitate understanding of the principle of this solution. The specific parameter values in actual implementation should be determined by those skilled in the art through on-site calibration and production tests based on the actual production conditions of the workshop, equipment specifications, and product process requirements. This application does not impose any specific limitations on this.
[0131] Furthermore, the two-layer non-conflict generation scheduling space in this embodiment is configured with a two-layer non-conflict simulation interaction node network; the two-layer non-conflict simulation interaction node network includes a resource node subnet, a pre-scheduled resource pool, a conflict resolution model, and a processing task node subnet;
[0132] The resource node subnet is used to store the current operating status, processing status, processing device type, processing device technology, and processing time interval of each processing device in each resource node for each production equipment.
[0133] The processing task node subnet is used to store the production sub-task information of each device to be processed, the processing priority and consumption cost of different processing devices under the same resource node, and the processing technology parameters of the sub-tasks corresponding to different processing devices.
[0134] Furthermore, the resource node subnet in this embodiment has the same structure as the operation status monitoring node network.
[0135] Furthermore, the processing task node subnet in this embodiment has the same structure as the multi-target processing technology cross-monitoring node network.
[0136] The pre-scheduled resource pool is used to store the idle resources corresponding to the resource node subnet at each point in time, as well as the non-idle resources after conflict resolution by the conflict resolution model;
[0137] The conflict resolution model is used to resolve conflicts between subtasks of devices to be processed that have resource conflicts, so that the probability of loss and the actual loss of the subtask to be processed are minimized after resolution.
[0138] Furthermore, the conflict resolution model in this embodiment is constructed using a Bayesian function combined with a multi-objective optimization algorithm. Specifically, it works as follows: First, using the time conflict length of all subtasks under a resource node, the priority difference between subtasks, the current load rate of the resource node, and the process compatibility score of the subtasks as input features, a prior probability table trained based on at least 5000 sets of historical production conflict data from the seamless steel pipe production workshop over the past 24 months is generated. The Bayesian algorithm is then used to calculate and generate a subtask conflict probability matrix with values ranging from 0 to 1 between every two subtasks under the resource node. Then, using the subtask conflict probability matrix, the remaining available processing capacity information of equipment collected in real time by the operating status monitoring node network, and the health status score and available processing time period information of idle resource nodes of the same process type in the pre-scheduled resource pool as input, an insurmountable hard constraint is set as... The subtask processing time is completely contained within its constrained time interval, the probability of conflict between subtasks is less than the preset probability threshold of 0.75, and the maximum load rate of a single resource node does not exceed 90%. The optimization objective soft constraints are set as the shortest sum of time conflict lengths of all subtasks, the minimum total timeout loss cost of subtasks, and the optimal load balance of all production equipment. The NSGA-II algorithm with a population size of 100, a maximum number of iterations of 200, a crossover probability of 0.8, a mutation probability of 0.05, an elite retention ratio of 10%, and an early termination mechanism that terminates early if there is no significant improvement in the Pareto front for 20 consecutive generations is adopted to solve for the Pareto optimal solution set. The linear fuzzy membership method is used to select the scheme with the highest comprehensive membership degree as the global optimal solution, and the optimal scheduling scheme for subtask priority adjustment and task migration is output to achieve proactive resolution of production conflicts and global optimal scheduling.
[0139] Furthermore, the construction process of the resource node subnet in this embodiment includes:
[0140] Obtain the location and number of all production equipment within the production area, and use a graph node algorithm to obtain an initial resource node graph;
[0141] Based on the process history processing time information of the processing device corresponding to each resource node, combined with the health assessment score of the corresponding resource node and the preset time series prediction model, the processing time prediction model corresponding to each resource node is obtained; furthermore, the time series prediction model in this embodiment is preferably the BiLSTM algorithm.
[0142] Furthermore, in this embodiment, the information of the production equipment includes, but is not limited to: equipment number, location coordinates, types of processes that can be processed, historical processing time data, and equipment health status score.
[0143] Configure the processing time prediction model corresponding to each resource node to the corresponding resource node to obtain the initial prediction resource node map.
[0144] Based on the order of processing tasks and the transmission direction of processing control data of each resource node in the sub-task sequence of each device to be processed in the initial predicted resource node graph, a directed resource node connection is constructed for each device to be processed.
[0145] Based on the directed resource node connections and the initial predicted resource node graph, the resource node subnet is obtained.
[0146] Furthermore, the detailed implementation details of resource node subnet construction in this embodiment include:
[0147] A101. In the steel pipe production area, the location information and unique serial numbers of all production equipment are obtained in real time through IoT sensors, equipment management systems, and other means. These equipment include, but are not limited to, steel pipe rolling mills, welding equipment, heat treatment furnaces, piercing mills, and testing equipment.
[0148] A102. A graph node algorithm is adopted, treating each production equipment as a node. Edges between nodes are determined based on their physical location, material transport paths, or technological logic. For example, there is a sequential process between the steel pipe rolling mill and the subsequent welding equipment. A directed edge can be established in the graph from the steel pipe rolling mill node to the welding equipment node, thus obtaining an initial resource node graph. This graph visually illustrates the initial connection structure between production equipment. Furthermore, the preferred graph node algorithm is Dijkstra's algorithm, used to construct the initial connection relationships.
[0149] A103. Collect historical processing time information for each production equipment for different processable components. This data can be obtained from the production record database, which records the start and end times of each production task, as well as information such as the equipment and product specifications involved. Simultaneously, obtain equipment health assessment data for corresponding resource nodes through the equipment health management system, such as the equipment's operating status and the wear level of key components. In this embodiment, the equipment's operating status is set to normal, minor fault, and severe fault.
[0150] A104. Using time series algorithms, combined with historical processing time information and equipment health assessment data, a corresponding processing time prediction model is established for each resource node; the model input includes historical processing time series, equipment health indicators, and possible external factors; after training, the model can predict the processing time for a specific processable device based on the current equipment status and historical data; in this embodiment, the preferred time series algorithm is the ARIMA model or the LSTM time series model.
[0151] A105. Configure the processing time prediction model corresponding to each resource node established above onto the corresponding resource node. Based on the initial resource node diagram, each resource node, in addition to containing basic information such as equipment location and number, also includes information related to the processing time prediction model, thereby obtaining the initial prediction resource node diagram. In this way, in subsequent analysis, the time prediction results for different processing tasks can be directly obtained through the resource nodes.
[0152] A106. For each device to be processed, determine the order of processing tasks in the resource node subnet according to its production process; at the same time, clarify the transmission direction of processing control data between different resource nodes. For example, after the piercing mill completes the piercing task, it needs to transmit the processing data to the subsequent steel pipe rolling mill to guide the adjustment of rolling process parameters; based on these processing task sequences and data transmission directions, construct directed resource node connections for each device to be processed; for the above seamless steel pipe production process, establish a series of directed edges on the initial predicted resource node graph, such as from the heat treatment furnace node to the piercing mill node, and from the piercing mill node to the rolling mill node, forming a directed resource node connection structure for seamless steel pipe production.
[0153] A107. Merge the directed resource node connections with the initial predicted resource node graph. During the fusion process, check and optimize the connections between nodes to ensure that the entire network structure accurately reflects the production process and resource utilization relationships of different devices to be processed. For example, if conflicts or inconsistencies are found in the connections between certain devices in different product production processes, adjustments are made. The final result is a resource node subnet that details the connection relationships between different devices, processing time predictions, and production paths for different products during the steel pipe production process.
[0154] A108. Based on the resource node sequence corresponding to each device to be processed in the resource node subnet, predict the number of non-current device to be processed subtasks in the remaining processing time interval of each resource node in the current processing subtask of each resource node, and obtain the set of non-conflicting resource nodes and the set of potentially conflicting resource nodes at each time point.
[0155] It should be further explained that the process for distinguishing between the non-conflicting resource node set and the potentially conflicting resource node set in this embodiment includes:
[0156] A1081. If there are no non-current processing device subtasks within the predicted remaining processing time interval of the currently being processed subtask, or if the conflict probability between the existing non-current processing device subtasks and the currently being processed subtasks or non-current processing device subtasks is less than the preset conflict probability threshold, then the corresponding resource node is determined to be a non-conflicting resource node.
[0157] A1082. When the corresponding resource node is a non-conflicting resource node, the corresponding resource node information is mapped to the pre-scheduled resource pool, and the corresponding information is mapped to the subtask with the same processing technology type.
[0158] A1083. If there is at least one non-current device subtask within the predicted remaining processing time interval of the currently being processed subtask, and the conflict probability between the non-current device subtask and the currently being processed subtask or the non-current device subtask is at least greater than or equal to a preset conflict probability threshold, then the corresponding resource node is determined to be a potential conflict resource node.
[0159] Furthermore, the detailed implementation of the discrimination between the non-conflicting resource node set and the potentially conflicting resource node set corresponding to the steel pipe production process in this embodiment includes:
[0160] For each resource node in the resource node sequence corresponding to each device to be processed in the resource node subnet, the predicted remaining processing time interval of the currently being processed subtask is calculated based on the processing subtask it is currently executing, combined with the previously established processing time prediction model.
[0161] Within the predicted remaining processing time interval, count the number of subtasks for non-currently pending devices. For example, during the remaining processing time of processing equipment S001, query the production task scheduling table and find that processing tasks for other specifications of steel pipes are also in progress. Count the number of these non-currently pending devices' subtasks on equipment S001 or related equipment.
[0162] Check the existence of subtasks: Determine whether there are any non-current device subtasks within the predicted remaining processing time interval of the currently being processed subtask. If not, directly determine the corresponding resource node as a non-conflicting resource node.
[0163] If there are subtasks involving devices not currently being processed, the conflict probabilities between these subtasks and the currently processed subtask or other non-currently processed subtasks are further calculated. Conflicts may include equipment resource conflicts, time conflicts, process conflicts, etc. For example, a conflict probability model can be established, considering factors such as equipment usage frequency, task urgency, and process compatibility to calculate the conflict probability; a preset conflict probability threshold is set, and if all conflict probabilities are less than this threshold, the corresponding resource node is determined to be a non-conflicting resource node.
[0164] When a resource node is determined to be non-conflicting, its corresponding information (such as equipment number, location, current status, processing time prediction model, etc.) is mapped to the pre-scheduled resource pool. Simultaneously, this information is mapped to the subtask corresponding to the processable technology type for subsequent production scheduling. It should be noted that the resource node information includes equipment number, location, current status, and processing time prediction model.
[0165] If, within the predicted remaining processing time interval of the currently being processed subtask, there exists at least one non-currently-processed component subtask, and the conflict probability between this non-currently-processed component subtask and either the currently being processed subtask or the non-currently-processed component subtask is at least greater than or equal to a preset conflict probability threshold, then the corresponding resource node is determined to be a potential conflict resource node. For example, if, within the remaining processing time of S001, a processing task for a different specification of steel pipe is found to have a conflict probability greater than the conflict probability threshold with the current task using the same auxiliary equipment, then S001 is determined to be a potential conflict resource node. These potential conflict resource nodes require further conflict resolution strategies, such as adjusting the production task sequence or increasing resources, to ensure the smooth progress of the production process.
[0166] In this embodiment, A101 is implemented as follows: Within the designated production area of the seamless steel pipe production workshop, a spatial positioning reference is established with the southwest corner of the workshop as the origin of a Cartesian coordinate system, the east direction as the X-axis, and the north direction as the Y-axis. UWB positioning tags are installed at fixed points on each production device, and 16 positioning base stations are evenly deployed at 8-meter intervals throughout the workshop. The three-dimensional coordinate information of the devices is collected in real time at a sampling frequency of 50 milliseconds, with positioning accuracy controlled within ±5 centimeters. Simultaneously, the OPCUA unified architecture protocol is used to obtain the data from the equipment ledger of the workshop equipment management system. The module reads the globally unique equipment number for each production device. This number follows a four-level coding rule: "Workshop Code - Process Code - Equipment Type Code - 3-digit Serial Number". The workshop code is fixed as GG, the piercing process code as CK, the rolling process code as ZZ, the heat treatment process code as RC, the welding process code as HJ, and the inspection process code as JC. The equipment type codes correspond to CKJ for piercing mills, ZZJ for rolling mills, RCL for heat treatment furnaces, HJE for welding equipment, and JCE for inspection equipment, ensuring that each equipment number is globally unique throughout the entire plant. For newly added or relocated equipment, the system automatically triggers an update and verification of the location and equipment number information. The updated equipment metadata is then synchronized to the equipment information registry on the edge computing node via the MQTT message queue telemetry transmission protocol, with a registry data update latency of no more than 100 milliseconds.
[0167] In this embodiment, A102 is implemented as follows: Each production equipment obtained from A101 is abstracted as a vertex v∈V in a directed attribute graph G=(V,E), where V is the vertex set and E is the edge set. Each vertex has a built-in attribute structure containing four fixed fields: unique equipment number, planar coordinates, equipment type, and process range. Then, based on the process sequence logic defined in the seamless steel pipe production standard, process priority weights are set. The process weights for billet heat treatment → piercing → rolling → welding → inspection are assigned 5, 4, 3, 2, and 1 respectively. Higher weights indicate a higher degree of correlation between upstream and downstream processes. The Dijkstra shortest path algorithm is used to calculate the optimal process path between any two equipment vertices. The path cost function is calculated by weighted summation of physical distance cost and process logic cost. The physical distance weight is set to 0.3, and the process logic weight is set to 0.7. The physical distance cost is the Euclidean distance between the two equipment vertices, and the process logic cost is the absolute value of the weight difference between the corresponding processes of the two equipment. When the path cost between two vertices is less than the preset connection threshold of 12, a directed edge is established between the two vertices. The direction of the edge strictly follows the process flow direction of steel pipe production. The edge's attribute structure stores three fields: path cost, process association type, and data transmission specification. The final generated initial resource node graph is stored using a dual-mode approach of adjacency matrix and adjacency list. The matrix element value is the path cost of the corresponding edge; when there is no connection, the element value is 0, ensuring fast traversal and querying of the graph structure.
[0168] In this embodiment, A103 is implemented as follows: from the production record database of the workshop production execution system, using the unique equipment number and steel pipe product specification as the joint primary key, the full production task closed-loop records of the past 18 months are retrieved. The core fields such as task start time stamp, task end time stamp, steel pipe type, outer diameter, wall thickness, and fixed length in each record are extracted. The actual processing time of a single piece of steel pipe for a specific specification is calculated by the difference between the end time stamp and the start time stamp. After removing invalid data corresponding to abnormal shutdowns, rework, and repairs, the data is partitioned and stored according to the equipment number and product specification to build a processing time feature library. Simultaneously, health assessment data for each piece of equipment is acquired from the Equipment Health Management System (PHM) at an hourly granularity. This includes characteristic parameters such as spindle vibration RMS, motor current fluctuation rate, hydraulic system pressure deviation, wear of key components, and equipment operating time. The fuzzy comprehensive evaluation method is used to classify the equipment operating status into three levels: normal state corresponds to an overall health status score ≥90 points and an equipment operating efficiency range of 95%-100%; minor fault state corresponds to a health status score of 70-89 points and an equipment operating efficiency range of 70%-94%; and severe fault state corresponds to a health status score <70 points and an equipment operating efficiency below 70%. The thresholds for the three levels are jointly calibrated by the specifications provided by the equipment manufacturer and historical operating data from the workshop.
[0169] In this embodiment, the specific implementation of A104 is as follows: a dedicated processing time prediction model is established for each production equipment. For equipment with less than 500 historical processing data points for a single specification, an ARIMA differential integrated moving average autoregressive model is adopted. The order of the model is automatically optimized and determined by the AIC Akaike Information Criterion, where the p-order autoregressive term ranges from 1 to 5, the d-order differential term ranges from 0 to 1, and the q-order moving average term ranges from 1 to 5. For equipment with more than or equal to 500 historical processing data points for a single specification, an LSTM long short-term memory time series model is adopted. The model adopts a two-layer LSTM network structure, with 64 hidden units in each layer. The input feature dimension is 28 dimensions, specifically including 24 dimensions of the processing time series of the past 24 hours, 1 dimension of equipment health status score, 1 dimension of equipment operating efficiency, 1 dimension of workshop ambient temperature, and 1 dimension of billet Brinell hardness. The output layer is the predicted processing time for a single steel pipe of a specific specification processed by the equipment. The model was trained using the Adam adaptive moment estimator optimizer with an initial learning rate of 0.001, a batch size of 32, and 100 training epochs. An early stopping mechanism was implemented to prevent overfitting; training terminated when the loss on the validation set did not decrease for 10 consecutive epochs. The trained model was serialized and stored in pickle format, with model files named "device number-product specification-model type.pkl" to ensure quick access and management of the model.
[0170] In this embodiment, A105 is implemented as follows: Using a containerized model deployment engine, the processing time prediction models trained in A104 are batch deployed to independent Docker containers corresponding to the device vertices in the initial resource node graph. Each container is assigned an independent model call RESTful interface and a real-time data transmission channel, with an interface response time not exceeding 10 milliseconds. Simultaneously, three extended fields are added to the vertex attribute structure of the initial resource node graph: model_path (model file storage path), model_type (model type), and supported_specs (list of supported product specifications), completing the one-to-one binding between the model and the resource node. In the adjacency list structure of the initial resource node graph, a built-in method for predicting processing time is added to each vertex object. This method receives product specifications, device health parameters, and environmental parameters as input parameters, automatically calls the time prediction model in the corresponding container to complete the inference calculation, and returns the predicted processing time result for a single steel pipe. After completing the model configuration for all nodes, a full availability traversal test is performed on all nodes to ensure that each node can call the model normally and output reasonable prediction results. After the test is passed, a complete initial prediction resource node graph is generated and serialized and stored in JSON format, which includes the complete topology, all vertex attributes and built-in prediction methods.
[0171] In this embodiment, A106 is implemented as follows: For each seamless steel pipe billet to be processed, a corresponding standard process route template is first matched from the process knowledge base. The template clearly defines the process type, process sequence, and data interaction specifications between processes. Taking a Φ273×8mm seamless steel pipe for fluid transportation as an example, the standard process route is billet heat treatment, piercing, continuous rolling, sizing, straightening, welding, and non-destructive testing. Subsequently, in the initial predicted resource node graph, a set of available resource nodes is matched for each process type. A depth-first search algorithm is used to construct a directed process path according to the sequence of the process route. In addition to storing the path cost, each directed edge in the path has a new data flow field, data_flow, which clearly defines the data content, communication protocol, and transmission frequency between the processes corresponding to the edge. For example, for a directed edge from the piercing mill node to the rolling mill node, the data_flow field is defined as: transmitting process parameters such as the outer diameter, wall thickness, and discharge temperature of the pierced tube, using the OPCUA protocol, with a transmission frequency of once per single steel pipe. Finally, a unique directed resource node connection subgraph is generated for each steel pipe to be processed. The unique ID of the subgraph is bound to the production task number of the corresponding steel pipe to achieve a one-to-one correspondence between the product and the process path.
[0172] In this embodiment, A107 is implemented as follows: a multi-subgraph fusion algorithm is used to fully fuse the directed resource node connection subgraphs corresponding to all steel pipes to be processed generated by A106 with the initial predicted resource node graph generated by A105. The fusion process consists of three core steps: the first step is vertex merging, merging vertices with the same device number, retaining all attribute fields and built-in methods of the original vertex, and adding a subgraph list field to record all product subgraph IDs to which the vertex belongs; the second step is edge conflict detection, for directed edges connecting the same pair of vertices but from different product subgraphs, verifying the protocol compatibility and data flow consistency of their data_flow field, if there is a data transmission conflict, the edge is marked as a conflict edge and the conflict type is recorded; the third step is network structure optimization, using the minimum spanning tree algorithm to prune redundant connection edges, and using an order priority arbitration mechanism for marked conflict edges, retaining the connection edges corresponding to high-priority orders, and rerouting the path for the connection edges corresponding to low-priority orders. After merging, a unified resource node subnet is generated. This subnet adopts a weighted directed graph data structure, which supports parallel querying, conflict detection and path optimization of multi-product process paths, and fully maps the equipment association, processing time prediction capability and product production path of the entire steel pipe production process.
[0173] In this embodiment, A108 is implemented as follows: For each device resource node in the resource node subnet, the node's built-in predicted processing time method is first invoked to calculate the predicted total processing time of the currently processing subtask. Then, the percentage of completion of the subtask is collected through the corresponding device's PLC programmable logic controller. The predicted remaining processing time is calculated using the formula "Remaining processing time = Predicted total processing time × (1 - Percentage of completion)". A sliding time window is established with the current system time as the starting point and the sum of the current system time and the predicted remaining processing time as the ending point. Within this time window, the production scheduling task queue is traversed, and the number of subtasks corresponding to all non-currently-processed steel pipes that are planned to occupy the resource node within this time window is counted. At the same time, the resource overlap between each subtask and the current subtask is calculated. A sliding window mechanism is adopted to perform a full scan of the scheduling cycle for the next 24 hours in 5-minute increments, generating a resource occupancy heatmap for each time point. Finally, based on the calculation results of the number of subtasks and the probability of conflict, all resource nodes are divided into a set of non-conflicting resource nodes and a set of potentially conflicting resource nodes. The division results of the two sets are updated every 15 minutes, and real-time updates triggered by abnormal events are also supported.
[0174] In this embodiment, A1081 is implemented as follows: First, a subtask existence check is performed to determine whether there is a subtask corresponding to a steel pipe that is not currently being processed within the predicted remaining processing time window of the current node. If not, the resource node is directly determined to be a non-conflicting resource node. If a non-current subtask exists, the conflict probability between each pair of subtasks is calculated using a pre-trained conflict resolution model. The model input features include equipment resource overlap (weight 0.4), time window overlap rate (weight 0.3), process compatibility score (weight 0.2), and task priority difference (weight 0.1). The weighted sum of each feature is input into the Sigmoid function to map the conflict probability value in the 0-1 interval. In this embodiment, the preset conflict probability threshold is 0.75. When the conflict probability value between all pairs of subtasks within the time window is less than 0.75, the resource node is determined to be a non-conflicting resource node, and the determination result is written into the conflict status field conflict_status of the node. The validity period of the result is consistent with the current predicted remaining processing time window.
[0175] In this embodiment, A1082 is implemented as follows: Once a resource node is determined to be a non-conflicting resource node, an atomic resource mapping transaction is immediately triggered. First, all information about the resource node, including its unique device ID, planar coordinates, current operating status, health status score, operating efficiency, supported product specification list, and processing time prediction model call address, is copied to the available resource hash table in the pre-scheduled resource pool. The pre-scheduled resource pool uses a Redis in-memory database for storage, with the hash table key named "available_resource: unique device ID," and the key's expiration time set to the node's currently predicted remaining processing time. Simultaneously, based on the processing technology types supported by the resource node, a reference pointer to the resource node is added to the process type index table. The process type index table is indexed independently for five major processes: piercing, rolling, heat treatment, welding, and inspection, allowing the scheduling system to perform millisecond-level queries of available resources through process types. The entire resource mapping operation is executed in a single transaction to ensure the consistency of resource status in concurrent scheduling scenarios.
[0176] In this embodiment, A1083 is implemented as follows: When a non-current subtask to be processed is detected within the predicted remaining processing time window, and the conflict probability value between any pair of subtasks calculated by the conflict probability model is greater than or equal to a preset probability threshold of 0.75, the judgment process for potential conflict resource nodes is immediately triggered. First, all information of the conflicting subtask is recorded, including task number, steel pipe specifications, order priority, planned start time, and overtime loss cost. Then, the risk level of the conflict is calculated using the formula "conflict severity = conflict probability × task priority coefficient", where the priority coefficient for A-level orders is 1.2, for B-level it is 1.0, and for C-level it is 0.8. Finally, the resource node is marked as a potential conflict resource node and written into the conflict resource monitoring table. At the same time, an audible and visual alarm and a pop-up notification are triggered through the workshop production scheduling system to notify the scheduler that the resource node needs to be resolved. For marked potential conflict resource nodes, the system increases the monitoring frequency to once per minute until the conflict is completely resolved or the corresponding subtask is completed.
[0177] The beneficial effects of the resource node subnet construction and conflict node classification mechanism in this embodiment are as follows: In traditional seamless steel pipe production scenarios, production resource modeling mostly adopts static process flow diagrams and fixed equipment ledgers, lacking quantitative modeling and dynamic updating capabilities for equipment relationships, and cannot adapt to the flexible adjustment requirements of process paths for multi-variety, small-batch mixed-line production; at the same time, production conflict detection is mostly reactive after the fact, lacking advance prediction and hierarchical control based on processing time forecasts, resulting in frequent equipment resource conflicts, a disconnect between production plans and actual execution, and a high order delivery delay rate. This embodiment constructs a dynamic resource node subnet that integrates equipment attributes, process logic, and predictive capabilities, achieving digital twin mapping and computable modeling of all plant production resources. This addresses industry pain points such as insufficient resource visualization and difficulty in network reconstruction in discrete steel pipe production scenarios. Through quantitative calculation of conflict probability based on prediction time windows and a hierarchical discrimination mechanism for non-conflict / potential conflict nodes, it enables early prediction and hierarchical control of production resource conflicts, significantly improving the response speed and stability of the scheduling system. This ensures the rationality of resource allocation and the continuity of the production process throughout the entire lifecycle of steel pipe production, avoiding production interruptions and order delays caused by resource conflicts.
[0178] As a specific example, in this embodiment, a Φ273 seamless steel pipe production workshop is used as the application carrier. The workshop is equipped with a total of 21 core production equipment, including 3 piercing machines (numbered GG-CK-CKJ-001, GG-CK-CKJ-002, GG-CK-CKJ-003), 5 rolling mills (GG-ZZ-ZZJ-001 to GG-ZZ-ZZJ-005), 4 heat treatment furnaces (GG-RC-RCL-001 to GG-RC-RCL-004), 6 welding equipment (GG-HJ-HJE-001 to GG-HJ-HJE-006), and 3 testing equipment (GG-JC-JCE-001 to GG-JC-JCE-003). The preset conflict probability threshold is set to 0.75.
[0179] In A101, the plane coordinates of the piercing machine GG-CK-CKJ-001 are (12.5m, 45.2m) and the plane coordinates of the rolling mill GG-ZZ-ZZJ-001 are (28.3m, 45.2m) obtained through the UWB positioning system. The unique numbers of the two machines correspond one-to-one with the equipment ledger, and the data synchronization delay to the edge node registry is 82 milliseconds.
[0180] In A102, the 21 devices are abstracted into 21 vertices. Using Dijkstra's algorithm, the path cost from GG-CK-CKJ-001 to GG-ZZ-ZZJ-001 is calculated to be 15.8×0.3+0×0.7=4.74, which is less than the connection threshold of 12. Therefore, a directed edge is established from GG-CK-CKJ-001 to GG-ZZ-ZZJ-001. The final generated initial resource node graph contains 21 vertices and 37 directed edges.
[0181] In A103, 1862 production records of GG-CK-CKJ-001 processing Φ273×8mm steel pipes over the past 18 months were extracted from the MES system. The average processing time under normal conditions was calculated to be 19.2 minutes per pipe. At the same time, the current health status score of the equipment obtained from the PHM system was 92 points, which was determined to be a normal operating condition.
[0182] In A104, an LSTM model was trained on 1862 historical data points of GG-CK-CKJ-001. After training, the mean absolute error on the test set was 1.1 minutes, and the prediction accuracy reached over 95%. The model file was named GG-CK-CKJ-001-Φ273×8-LSTM.pkl.
[0183] In A105, the trained LSTM model is deployed to an independent container in the GG-CK-CKJ-001 node. Model-related fields are added to the node attributes, and a method for predicting processing time is configured. When the method is called with the input of Φ273×8mm specifications, a health status score of 92 points, and an ambient temperature of 26℃, the predicted processing time is 19.8 minutes / piece.
[0184] In A106, for the production task of Φ273×8mm steel pipe with batch number P20240508001, the directed resource node connection is constructed as GG-RC-RCL-002→GG-CK-CKJ-001→GG-ZZ-ZZJ-001→GG-HJ-HJE-003→GG-JC-JCE-002, and the data_flow data transmission specification of each edge is defined.
[0185] In A107, the directed resource node connection subgraph of this batch is merged with the initial predicted resource node graph, duplicate vertices are merged, and conflict-free edges are verified to generate a resource node subnet containing 21 vertices and 42 directed edges.
[0186] In A108, the current system time is 2024-05-08 14:30:00. GG-ZZ-ZZJ-001 is currently processing batch P20240508001 steel pipes, with 60% completion. The predicted total processing time is 32.6 minutes, and the calculated remaining processing time is 13.04 minutes. The predicted remaining processing time window is [14:30:00, 14:43:04]. Within this window, the number of non-current pending subtasks is 2.
[0187] In A1081, for device GG-JC-JCE-001, there is one non-current subtask to be processed within its predicted remaining processing time window. The calculated conflict probability is 0.55, which is less than the threshold of 0.75. Therefore, GG-JC-JCE-001 is determined to be a non-conflicting resource node.
[0188] In A1082, the full information of GG-JC-JCE-001 is written into the available resource hash table of the pre-scheduled resource pool, and the expiration time is set to 6.5 minutes. At the same time, a reference pointer for the device is added to the process index table of the inspection process. When the scheduling system queries the available resources of the inspection process, it can retrieve the device within 1 millisecond.
[0189] In A1083, for device GG-ZZ-ZZJ-001, the calculated conflict probability of its subtasks within its window is 0.82, which is greater than the threshold of 0.75. Therefore, GG-ZZ-ZZJ-001 is determined to be a potential conflict resource node, and the conflict severity is calculated to be 0.82 × 1.2 = 0.984, triggering a high-priority alarm and simultaneously entering the conflict resolution process.
[0190] In this embodiment, the execution frequency of the resource node subnet construction and conflict node discrimination operations of A101 to A1083 is determined by those skilled in the art based on the scheduling cycle of steel pipe production, the frequency of equipment status changes, and system computing resources. The update cycle of basic equipment information can be set to once a day, the retraining cycle of the processing time prediction model can be set to once a month, and the division and discrimination of non-conflict / potential conflict resource node sets can be set to be executed once every 15 minutes, or triggered immediately when a new order is entered, the equipment status is abnormal, or the production task is changed. All of these can meet the engineering scheduling accuracy requirements of seamless steel pipe production. The specific implementation will not be elaborated further.
[0191] Furthermore, the construction process of the processing task node subnet in this embodiment includes:
[0192] B101. Based on the task information of the device to be processed obtained at the current moment, the processing sub-task sequence corresponding to each device to be processed is obtained by combining the processing process node sequence of the device to be processed with the preset task decomposition model.
[0193] B102. Based on the constraint time interval, timeout loss information, and predicted time length from the start time to the end time of each processing sub-task sequence corresponding to each processing device, construct the processing priority of sub-tasks of the same process type for different processing devices of the same resource node.
[0194] B103. Construct the processing technology chain for each device based on the processing order of the subtasks in the processing subtask sequence corresponding to each device to be processed.
[0195] B104. Based on the processing priority of sub-tasks of the same process type corresponding to different devices to be processed for the same resource node, construct conflict connections corresponding to sub-tasks for the same resource node.
[0196] B105. Based on the processing technology chain corresponding to each device to be processed and the conflicting connections corresponding to the sub-tasks of the same resource node, construct a subnet of processing task nodes and mark the corresponding resource node number in each sub-task node.
[0197] Furthermore, to more clearly illustrate the process of constructing the subnet for processing task nodes, a specific example is given below, using steel pipe production as a background:
[0198] In the steel pipe production workshop, the production management system obtains real-time task information for all components awaiting processing. This information includes, but is not limited to, the specifications of the steel pipes, order quantity, and delivery deadline.
[0199] For steel pipes of different specifications, the sequence of their processing steps should be clearly defined. Taking ordinary seamless steel pipes as an example, the common process sequence is: billet preparation, heating, piercing, rolling, sizing, straightening, flaw detection, cutting, and packaging.
[0200] Using a pre-defined task decomposition model, the task of the device to be processed is decomposed according to the sequence of processing technology nodes; the entire production task is broken down into a series of processing sub-task sequences. For example, for the production task of a steel pipe with an outer diameter of 'a', the decomposed processing sub-task sequence might be: preparing a billet of a specific size, feeding the billet into a heating furnace and heating it to a specified temperature, performing piercing operation on a piercing mill, rolling it using a rolling mill, sizing it using a sizing mill, straightening the steel pipe, flaw detection, hydrostatic testing, cutting it to the required length, finished product inspection, and packaging. The task decomposition model in this embodiment is based on a rule-based expert system model and trained using historical task decomposition data.
[0201] Based on order delivery deadlines and production experience, set constraint time intervals for the processing sub-task sequence corresponding to each device to be processed.
[0202] Assess the losses incurred due to timeouts for each subtask, including order default compensation, increased equipment idle costs, and additional costs resulting from production process interruptions.
[0203] Using historical production data and time series prediction models, the time length from the start time point to the start time point of each sub-task sequence is predicted.
[0204] Based on the above information, processing priorities are established for sub-tasks of the same process type corresponding to different devices to be processed on the same resource node. Priority calculation can use a weighted scoring method, taking into account factors such as the remaining time in the constraint time interval, timeout penalty, and expected processing time.
[0205] Based on the processing sequence of the subtasks in the processing subtask sequence corresponding to each component to be processed obtained from the previous decomposition, a processing technology chain is constructed for each component to be processed. For example, for a steel pipe with an outer diameter of 'a', its processing technology chain is: Subtask 1 → Subtask 2 → Subtask 3 → Subtask 4 → Subtask 5 → Subtask 6 → Subtask 7 → Subtask 8 → Subtask 9 → Subtask 10 → Subtask 11. Each subtask has a clear predecessor and successor relationship in the technology chain.
[0206] Presenting the process chain visually facilitates viewing and management for production managers. Tools such as flowcharts or Gantt charts can be used to clearly identify the name, estimated start time, estimated end time, and connections to other subtasks for each subtask. For example, in a Gantt chart, the horizontal axis represents time, and the vertical axis represents subtasks. Each subtask is represented by a bar, with the start and end positions of the bar corresponding to its estimated time, and arrows indicating the sequence of subtasks.
[0207] Based on the processing priority of subtasks targeting the same resource node, potential conflicts are identified. For example, if multiple subtasks involving the piercing of steel pipes of different specifications need to be processed on the same piercing machine, a conflict will occur because the piercing machine can only process one subtask at a time. By comparing the priorities of different subtasks, the probability of conflict and the combination of conflicting subtasks are determined.
[0208] For subtasks that conflict, conflict connections are constructed within the task node subnet. Graphically, in the task node subnet, conflicting subtask nodes are connected by special lines, with the conflict type and related information labeled.
[0209] The processing technology chain corresponding to each device to be processed and the conflicting connections corresponding to the subtasks facing the same resource node are integrated to construct a processing task node subnet. In the subnet, each subtask is a node, and the edges between nodes represent the order or conflict relationship between the subtasks.
[0210] Each sub-task node is labeled with the corresponding resource node number. For example, the sub-task node for piercing a steel pipe with an outer diameter of 'a' is labeled with the corresponding piercing machine resource node number GG-CK-CKJ-001; the sub-task node for heating is labeled with the corresponding heating furnace resource node number GG-RC-RCL-001. In this way, through the processing task node subnet, the production process of different devices to be processed, the conflicts between tasks, and the resources involved in each task can be clearly seen, providing a comprehensive information foundation for production scheduling and optimization.
[0211] In this embodiment, B101 is implemented as follows: At the start of the production scheduling cycle, or according to a preset task update cycle of no more than 5 minutes, the full task information of all seamless steel pipes to be processed at the current moment is read in real time from the production order module of the workshop production execution system (MES) through the OPCUA unified architecture protocol. The task information fields include order number, steel pipe type, outer diameter, wall thickness, fixed length, execution standard, order quantity, delivery deadline, order priority, process requirements, and quality acceptance standards. At the same time, the standard processing process node sequence corresponding to the specifications and execution standards of the steel pipes to be processed is matched from the enterprise process knowledge base. The process node sequence strictly follows the national standards for seamless steel pipe production and the enterprise's internal control specifications. Taking seamless steel pipes for ordinary fluid transportation as an example, the standard process node sequence is: billet preparation, billet heating, piercing, continuous rolling, sizing, straightening, non-destructive testing, hydrostatic testing, fixed length cutting, finished product inspection, and packaging and warehousing. In this embodiment, the preset task decomposition model adopts a rule-based expert system and is trained and optimized by combining historical task decomposition data from the past 36 months. The model has built-in strict rules on the minimum decomposition granularity of a single device, single process, and single batch, which clearly stipulates that the maximum weight of the steel pipe to be decomposed in a single batch shall not exceed 50 tons. The minimum decomposition granularity is the smallest process unit that can be independently completed by a single production device. The model is decomposed hierarchically according to the standard processing process nodes corresponding to the device to be processed. The decomposition process must meet four requirements: no overlap, no omission, executable, and traceable. Each decomposition subtask must correspond to a unique process type, a unique adaptable resource node type, a clear range of process parameters, and quality acceptance standards. Finally, the model outputs a sequence of processing subtasks arranged in the order of process sequence. Each subtask sequence is uniquely bound to the corresponding order number and steel pipe batch number. For example, for a 500-ton order of Φ108×4.5mm seamless steel pipes for fluid transportation with order number DD20240508001, which complies with the GB / T8163-2018 standard, the model breaks it down into 10 production batches of 50 tons each. Each batch is further broken down into 11 processing sub-tasks: billet preparation, billet heating, piercing, continuous rolling, sizing, straightening, non-destructive testing, hydrostatic testing, length cutting, finished product inspection, and packaging and warehousing. The final output is a sequence of processing sub-tasks arranged in the order of the processes. Each processing sub-task sequence is uniquely bound to the order number and steel pipe batch number of the corresponding device to be processed, thus constructing a multi-objective task space.
[0212] In this embodiment, B102 is implemented as follows: For each processing sub-task sequence corresponding to the steel pipe to be processed output by B101, a reverse scheduling method is first used based on the order delivery deadline to set a constraint time interval for each sub-task. The constraint time interval includes the earliest allowed start time and the latest required completion time. The earliest allowed start time is the shortest processing completion time of all predecessor sub-tasks of this sub-task, and the latest required completion time is the order delivery deadline minus the sum of the longest processing time of all successor sub-tasks of this sub-task and the process buffer time. The process buffer time is set at 10% of the predicted processing time of the sub-task to offset small fluctuations in the production process. At the same time, the timeout loss information of each sub-task is evaluated. The timeout loss includes the amount of breach of contract compensation for late order delivery, the cost of idle equipment hours, the cost of material retention caused by production process interruption, and the cost of process rework and repair. All loss items are quantified in yuan / hour, and the calibration is based on the order contract terms, the equipment hourly cost calculated by the enterprise's financial accounting, and historical production abnormal loss data. Then, using the processing time prediction model of the corresponding equipment in the resource node subnet, the cumulative time length from the start time point to the end time point of each subtask is predicted, which is the expected completion period of the subtask. For all subtasks mapped to the same resource node and corresponding to the same process type, a weighted scoring method combining the analytic hierarchy process (AHP) and the entropy weight method is used to construct processing priorities. The subjective weight is determined by the AHP, with a delivery urgency weight of 40% and a late payment penalty weight of 30%. The objective weight is determined by the entropy weight method based on historical production data from the past 12 months, with an expected processing time weight of 15% and an order value weight of 15%. After the indicators are normalized by min-max, they are weighted and summed to obtain a priority score in the range of 0-100. The higher the score, the higher the processing priority. Subtasks under the same resource node are sorted from high to low priority scores to form a standardized subtask priority queue.
[0213] In this embodiment, B103 is implemented as follows: For each processing subtask sequence corresponding to the steel pipe to be processed, a processing chain is constructed using a directed acyclic graph (DAG) structure according to the execution order of the process nodes. In the processing chain, each subtask is an independent node in the graph. The node attributes include subtask number, order number, steel pipe specification, process type, constraint time interval, priority score, timeout loss information, process parameter requirements, and quality acceptance standards. Nodes are connected by directed edges, with the starting point of the directed edge being the predecessor subtask node and the ending point being the successor subtask node. The attributes of the directed edges include process dependency, process buffer time, and processing control data transmission specifications. It is clearly stated that the qualified completion status of the predecessor subtask is a necessary prerequisite for the start of the successor subtask, and skipping processes is not allowed. The starting point of the processing chain is the billet preparation subtask node, and the ending point is the finished product packaging subtask node, completely covering the entire production process of the steel pipe to be processed from raw materials to finished products. Each processing chain is assigned a unique chain ID, which is bound to the production batch number of the corresponding steel pipe to achieve full-process process path traceability of the product. The process chain can be visualized in two forms: flowchart and Gantt chart. In the flowchart, rectangles represent sub-task nodes and straight lines with arrows represent process dependencies. In the Gantt chart, time is the horizontal axis and sub-tasks are the vertical axis. Horizontal bars represent the planned processing time of sub-tasks, and arrows mark the sequential constraints between sub-tasks. The visualization interface refresh cycle is set to 1 second, allowing production managers to view, adjust, and control it in real time.
[0214] In this embodiment, B104 is implemented as follows: First, the nodes are grouped according to their resource node numbers. All sub-task nodes mapped to the same resource node and corresponding to the same process type are selected. The planned processing time interval for each sub-task node is extracted. The overlap between any two sub-tasks is calculated as follows: Overlap = Intersection of the two sub-task time intervals / Union of the two sub-task time intervals. When the overlap is greater than 0, it is determined that there is a risk of resource contention between the two sub-tasks. Combining the sub-task processing priorities obtained in B102, the priority difference between the two sub-tasks is calculated. The smaller the priority difference and the higher the overlap between the time intervals, the greater the likelihood of a conflict. For sub-task node pairs with resource preemption risks, conflict connections are constructed in the task node subnet. These connections are in the form of undirected edges, linking the two conflicting sub-task nodes. The attributes of each undirected edge include conflict type, conflict time interval, time interval overlap, conflict probability, priority scores of the two sub-tasks, and priority difference. Conflict types are categorized into four types: equipment resource conflict, time window conflict, process compatibility conflict, and auxiliary resource conflict. The conflict probability is calculated using a pre-trained conflict resolution model, whose prior probability is calibrated using historical production conflict data from the past 12 months. All conflict connections are highlighted with red dashed lines in the visualization interface, and conflict details are noted in the edge attributes to facilitate quick identification and proactive handling by schedulers.
[0215] In this embodiment, B105 is implemented as follows: a directed attribute graph structure is used to construct a subnet of processing task nodes. First, all sub-task nodes in the processing technology chain corresponding to the steel pipes to be processed are used as the basic vertex set of the subnet. Each vertex has a built-in full set of sub-task attribute structures. At the same time, a fixed field resource_id is added to the attribute structure to mark the resource node number corresponding to the sub-task. The resource node number is completely consistent with the globally unique number of the equipment in the resource node subnet to ensure that the mapping relationship between tasks and resources can be accurately matched. Then, the directed edges that mark the process dependencies in the processing technology chain are used as the process dependency edge set of the subnet; the conflict connection undirected edges constructed in B104 are used as the conflict edge set of the subnet. The two types of edges together constitute the complete edge set of the subnet. A full compliance check is performed on all vertices and edges of the subnet, removing duplicate vertices and redundant edges. The logical loops of the directed acyclic graph are verified to ensure there are no erroneous connections with circular dependencies. Simultaneously, the consistency between the resource node labels on subtask nodes and the device numbers of the resource node subnet is verified to ensure accurate mapping between tasks and resources. After successful verification, a complete processing task node subnet is generated, serialized and stored in JSON format, and simultaneously synchronized to the workshop digital twin scheduling platform. This enables full-dimensional visualization, queryability, and scheduling of production tasks, providing a complete task network model to support intelligent scheduling of multi-order mixed-line production of seamless steel pipes.
[0216] The technical significance of the processing task node subnet construction mechanism in this embodiment is that: under the traditional multi-variety, small-batch mixed production mode of seamless steel pipes, production tasks are mostly managed in a rough batch manner, which has industry pain points such as coarse task splitting granularity, priority division relying on manual experience, and production conflicts can only be handled passively after the fact. This directly leads to problems such as low order delivery timeliness, uneven equipment resource utilization, and delayed response to production anomalies. This embodiment achieves refined decomposition of production tasks through a rule-based expert system, ensuring that each sub-task can be independently scheduled and accurately traced. A weighted scoring method combining subjective and objective factors is used to quantitatively assess the priority of sub-tasks, avoiding subjective biases from human experience and guaranteeing priority processing rights for high-urgency, high-value orders. A processing chain constructed using a directed acyclic graph fully maps the process dependencies throughout the product lifecycle, achieving standardized control and full-process traceability of the production path. Conflict connections based on time overlap and priority enable early prediction and visualization of production resource conflicts, reserving sufficient processing time for proactive conflict resolution. The final constructed processing task node subnet achieves full-element digital modeling of production tasks across multiple orders, specifications, and processes, forming a "task-resource" two-layer linkage architecture with the resource node subnet. This provides core data model support for intelligent scheduling, conflict resolution, and closed-loop optimization in seamless steel pipe production, solving the problem of task and resource mismatch in mixed-line production.
[0217] As a specific example, this embodiment uses three parallel production orders from a seamless steel pipe production workshop as the application carrier. The specific order information is as follows: Order 1, number DD20240508001, is for Φ108×4.5mm seamless steel pipes for fluid transportation, conforming to GB / T8163-2018 standard, with an order quantity of 500 tons, a delivery deadline of 72 hours after order placement, and an order priority of A; Order 2, number DD20240508002, is for Φ219×6mm seamless steel pipes for high-pressure boilers, conforming to GB / T5310-2017 standard, with an order quantity of 300 tons, a delivery deadline of 120 hours after order placement, and an order priority of B; Order 3, number DD20240508003, is for Φ57×3.5mm seamless steel pipes for structural use, conforming to GB / T8162-2018 standard, with an order quantity of 200 tons, a delivery deadline of 96 hours after order placement, and an order priority of B. The corresponding resource node numbers in the workshop are: piercing mill GG-CK-CKJ-001, GG-CK-CKJ-002, GG-CK-CKJ-003, continuous rolling mill GG-ZZ-ZZJ-001, GG-ZZ-ZZJ-002, heating furnace GG-RC-RCL-001, GG-RC-RCL-002, with a preset conflict probability threshold of 0.75.
[0218] In B101, the system reads the full task information of the above three orders from the MES system in real time, matches the corresponding standard process node sequence from the process knowledge base, and decomposes the production task of each order into a sequence of 11 smallest process units through a pre-trained task decomposition model. The processing sub-task sequence of order 1 is as follows: sub-task 1 billet preparation, sub-task 2 billet heating, sub-task 3 piercing, sub-task 4 continuous rolling, sub-task 5 sizing, sub-task 6 straightening, sub-task 7 non-destructive testing, sub-task 8 hydrostatic test, sub-task 9 length cutting, sub-task 10 finished product inspection, and sub-task 11 packaging and warehousing. Each sub-task corresponds to a unique process type and adaptable resource node type, and the sub-task sequence is uniquely bound to the order number DD20240508001.
[0219] In B102, the reverse scheduling method is used to set the constraint time interval for the punching subtask of order 1 as 8:00-12:00 on the day the order is placed, with an overtime penalty of 1200 yuan / hour. Using the processing time prediction model of the punching machine in the resource node subnet, the estimated processing time for this subtask is 3.2 hours, and the cumulative time to reach the end time of this subtask is 11.5 hours. For the punching subtasks of the three orders mapped to punching machine GG-CK-CKJ-001, priority scores are calculated using a combined weighted scoring method: the priority score for the punching subtask of order 1 is 90 points, the priority score for the punching subtask of order 3 is 82 points, and the priority score for the punching subtask of order 2 is 75 points. Subtask priority queues for this resource node are formed according to the scores from highest to lowest. For example, in this embodiment, 11.5 hours is the cumulative time from the order placement time to the expected end time of the punching sub-task. The specific calculation process is as follows: the order placement time is 0:00 on the same day. The earliest allowed start time of the punching sub-task is set to 8:00 on the same day after the order is placed, which is 8 hours. The expected processing time of the punching sub-task is 3.2 hours, obtained by the processing time prediction model of the punching machine in the resource node subnet. At the same time, a process buffer time of 0.3 hours is set according to 10% of the predicted processing time of the sub-task. The earliest allowed start time, the expected processing time, and the process buffer time of the punching sub-task are added together to finally obtain the cumulative time to the end time of the punching sub-task, which is 11.5 hours.
[0220] In B103, for the 11 processing subtasks of order 1, a directed acyclic graph structure is constructed according to the process sequence, with the chain ID being GYL-DD20240508001. The process chain is: Subtask 1 → Subtask 2 → Subtask 3 → Subtask 4 → Subtask 5 → Subtask 6 → Subtask 7 → Subtask 8 → Subtask 9 → Subtask 10 → Subtask 11. The directed edges between each node mark the process dependencies and process buffer durations. At the same time, the corresponding Gantt chart and flowchart are generated in the scheduling platform to display the planned time period and dependencies of each subtask in real time, with the interface refresh cycle being 1 second.
[0221] In B104, for the three punching sub-tasks mapped to punching machine GG-CK-CKJ-001, the time interval overlap between the punching sub-tasks of order 1 and order 3 is calculated to be 65%, and the priority difference is 8 points. The conflict probability calculated by the conflict resolution model is 0.82, which is greater than the preset probability threshold of 0.75. Therefore, a conflict connection is constructed between the two sub-task nodes. The conflict connection is an undirected edge, and the attributes are marked as conflict type as device resource conflict, conflict time interval as 8:00-11:30 on the day the order is placed, time interval overlap of 65%, conflict probability of 0.82, and priority difference of 8 points. It is highlighted with a red dashed line in the visualization interface.
[0222] In B105, the 33 sub-task nodes of the processing technology chain corresponding to the three orders are used as the set of subnet vertices, and the process-dependent directed edges and conflict-connecting undirected edges are used as the set of subnet edges. The resource_id field of each sub-task node is marked with the corresponding resource node number. For example, the perforation sub-task node of order 1 is marked with resource node number GG-CK-CKJ-001, and the heating sub-task node is marked with resource node number GG-RC-RCL-001. After full verification to ensure there are no logical errors or mapping deviations, a processing task node subnet containing 33 vertices, 36 process-dependent edges, and 4 conflict edges is generated. After serialization and storage, it is synchronized to the digital twin scheduling platform to provide a complete task network model for production scheduling.
[0223] In this embodiment, the frequency of the construction operation of the processing task node subnets B101 to B105 is determined by those skilled in the art based on the order placement frequency, production scheduling cycle and system computing resources for seamless steel pipe production. The full quantum network reconstruction can be set to be executed once after the daily production plan is issued. The update of sub-task priority and conflict connection can be set to be executed once every 5 minutes, or triggered in real time when new orders are entered, emergency orders are inserted, equipment status is abnormal, or production tasks are changed. All of these can meet the engineering scheduling accuracy requirements of mixed production of seamless steel pipes. The specific implementation will not be described in detail.
[0224] Furthermore, the construction process of the two-layer non-collision simulated interactive node network in this embodiment includes:
[0225] C101. Based on the labels of the subnet of processing task nodes facing the same resource node, construct the mapping relationship between each sub-task node and each resource node. Through the established mapping relationship, map the processing priority of the sub-task facing the same resource node to the corresponding resource node.
[0226] C102. Based on the processing priority of the subtasks mapped on each resource node, the processing time prediction model configured on the resource node predicts the processing time period of the mapped subtasks corresponding to each resource node under the current priority according to the priority information.
[0227] C103. Based on the predicted processing time period information of each resource node corresponding to the mapped subtask and the constraint time interval of the corresponding subtask, obtain the time conflict length corresponding to all subtasks of each resource node; where the time conflict length refers to the total duration of the part of the predicted processing time period of the subtask that exceeds its constraint time interval, that is, the difference between the total length of the predicted processing time period and the intersection duration of the predicted processing time period and the constraint time interval; when the predicted processing time period falls completely within the constraint time interval, the time conflict length is 0, and when the predicted processing time period partially or completely exceeds the constraint time interval, the time conflict length is greater than 0, and its value directly reflects the degree of time window conflict of the subtask.
[0228] C104. Based on the time conflict length of all subtasks corresponding to each resource node, and combined with the priority information of the subtasks currently mapped to the corresponding resource node, the Bayesian algorithm in the conflict resolution model is used to obtain the conflict probability between all subtasks under each resource node under the current task priority.
[0229] C105. Based on the conflict probability among all subtasks under each resource node at the current task priority, the remaining resource node information monitored in real time by the running status monitoring node network, the pre-scheduled resource pool information, and each resource node, a multi-objective optimization algorithm is used to combine the constraint combination constructed by the constraint time interval of each subtask, the corresponding predicted processing time period, the timeout loss cost, and the preset conflict probability threshold to adjust the priority of subtasks under each resource node in real time, so that the time conflict length corresponding to each subtask is minimized and the timeout loss corresponding to each subtask sequence of devices to be processed is minimized.
[0230] C106. Based on the equipment operation status set and multi-objective processing technology monitoring dataset obtained from the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network, the multi-objective optimization algorithm and constraint combination are solved by simulation algorithm to obtain the priority of the corresponding sub-task updated at each resource node at each time.
[0231] C107. Based on the updated priority of the corresponding subtask under each resource node at each time, construct a competitive connection between each resource node and the subtask node containing the subtask of each resource node at the current time.
[0232] C108. Based on the constructed competitive connection, the resource node subnet is connected to the processing task node subnet. At the same time, the conflict resolution model is configured to the competitive connection, and the pre-scheduled resource pool is connected to both the conflict resolution model and the resource node subnet to obtain a two-layer non-conflict simulated interactive node network.
[0233] In this embodiment, C101 is implemented as follows: At the start of the production scheduling cycle, or according to a preset mapping relationship update cycle of no more than 5 minutes, all sub-task nodes in the processing task node subnet are traversed, and the resource_id resource node label field marked in the attribute structure of each sub-task node is extracted. This field is completely consistent with the globally unique number of the device in the resource node subnet. Using the resource node label as the grouping primary key, all sub-task nodes marked with the same resource node label are clustered to construct a many-to-many mapping relationship between sub-task nodes and resource nodes. That is, a single sub-task node can be mapped to multiple resource nodes with the same process capability, and a single resource node can be mapped to multiple sub-task nodes corresponding to the same process type. The mapping relationship is stored in a key-value pair structure, with the key name being the resource node label and the key value being a list of all sub-task node IDs mapped to that resource node and the full attribute information of the corresponding sub-task. By establishing a mapping relationship, the subtask processing priority score calculated in the processing task node subnet is synchronously assigned to the priority attribute field of the corresponding subtask mapped on the resource node, realizing a full mapping from subtask processing priority to the corresponding resource node. The mapping process uses the MQTT message queue telemetry transmission protocol to complete data synchronization, with a data synchronization delay of no more than 50 milliseconds, ensuring that the subtask priority obtained by the resource node side is consistent with the processing task node subnet in real time.
[0234] In this embodiment, C102 is implemented as follows: For each resource node, all subtasks mapped to that node are sorted in descending order of processing priority score to form a subtask priority queue for that resource node. Using the current system time of the resource node as a reference, and combining the real-time monitoring of equipment operation status, the occupied time window of scheduled tasks, and equipment health status score within the resource node's subnet, the built-in processing time prediction model of the resource node is called sequentially in descending order of priority score. The model inputs characteristic parameters such as the specifications of the steel pipe to be processed, steel type, process type, equipment health indicators, and workshop ambient temperature to predict the processing time of a single steel pipe for each subtask. Combined with the total order processing volume corresponding to the subtask, the total predicted processing time for that subtask is calculated. Following the priority queue, each subtask is assigned a continuous processing time window in sequence. High-priority subtasks take priority to occupy the optimal available time interval of the resource node. Finally, the processing time period information corresponding to all mapped subtasks under the resource node is generated. The processing time period information of each subtask includes four core fields: planned start timestamp, planned end timestamp, total predicted processing time, and time window occupancy status. The time precision of the processing time period is accurate to the minute.
[0235] In this embodiment, C103 is implemented as follows: For each subtask under each resource node, the preset constraint time interval for the subtask is first extracted. The constraint time interval includes the earliest allowed start time T_start and the latest required completion time T_end. The length of the constraint time interval for the subtask is calculated using the formula "total length of constraint time interval L = T_end - T_start", with the time unit uniformly set to minutes. Then, the predicted processing time period for the subtask is extracted, and the intersection length between the predicted processing time period and the constraint time interval is calculated, i.e., the crossover length L_cross. When the predicted processing time period is completely contained within the constraint time interval, L_cross equals the total predicted processing time of the subtask; when the predicted processing time period and the constraint time interval partially overlap, L_cross equals the intersection length of the two time intervals; when the predicted processing time period and the constraint time interval do not overlap, L_cross equals 0. Finally, the time conflict length corresponding to the subtask is calculated using the formula "Time conflict length L_conflict=L-L_cross". The larger the value of L_conflict, the higher the degree of conflict between the processing time of the subtask and the constraint requirements. When L_conflict equals 0, it means that the processing time period of the subtask fully meets the constraint time interval requirements and there is no time conflict.
[0236] In this embodiment, C104 is implemented as follows: For each resource node, the time conflict length of all subtasks under that node, the priority difference between subtasks, the current load rate of the resource node, and the process compatibility score of the subtasks are used as input features. Through a conflict resolution model, the conflict probability between any two subtasks under that resource node at the current task priority is calculated. The prior probability table of this Bayesian algorithm is trained and calibrated using historical production conflict data from the seamless steel pipe production workshop over the past 24 months, with a training sample size of no less than 5000 sets. The conflict probability output by the model ranges from 0 to 1; a higher value indicates a higher probability of resource contention, project delays, or production interruptions between the two subtasks under the current priority ranking. After the model calculation is completed, a subtask conflict probability matrix corresponding to the resource node is generated. The rows and columns of the matrix are mapped to the subtasks of that resource node, and the matrix element values are the conflict probabilities between the corresponding two subtasks, providing a quantitative basis for subsequent priority adjustment and conflict resolution.
[0237] In this embodiment, C105 is implemented as follows: For each resource node, the subtask conflict probability matrix calculated by C104, the remaining available processing capacity of the equipment collected in real time by the operation status monitoring node network, and the idle resource information of the same process type in the pre-scheduled resource pool are used as basic inputs. The non-dominated sorting genetic algorithm (NSGA-II) with elitist strategy is used as the preset multi-objective optimization algorithm, and the constraint combination is constructed in combination with the subtask constraints to complete the solution. The constraint combination is divided into two categories: hard constraints and soft constraints. The hard constraints include: the subtask processing time period must be completely contained within the constraint time interval, the subtask conflict probability must be less than the preset conflict probability threshold of 0.75, and the resource node load rate must not exceed the upper limit of 90%. The soft constraints include: the sum of the time conflict lengths of all subtasks is the shortest, the sum of the timeout loss costs of all subtasks is the smallest, and the resource node load balance is optimal. The multi-objective optimization algorithm has a population size of 100, an iteration count of 200, a crossover probability of 0.8, and a mutation probability of 0.05. It uses hard constraints as insurmountable boundary conditions and soft constraints as optimization objectives to adjust the priority of subtasks under resource nodes in real time, outputs a Pareto optimal solution set, and selects the solution with the best overall performance as the priority adjustment scheme to ensure that the adjusted subtask sequence simultaneously satisfies the dual optimization objectives of minimizing time conflict length and minimizing timeout loss.
[0238] In this embodiment, C106 is implemented as follows: the equipment operation status set obtained from the operation status monitoring node network and the multi-objective processing technology monitoring dataset obtained from the multi-objective processing technology cross-monitoring node network are used as simulation boundary conditions and input into a preset simulation algorithm. This simulation algorithm adopts a Monte Carlo-based discrete event simulation algorithm. The algorithm has a built-in virtual production simulation model that is mapped 1:1 to the physical steel pipe production workshop, which can completely reproduce the entire process of equipment operation, process processing, and task scheduling. The priority adjustment scheme and constraint combination conditions output by the multi-objective optimization algorithm in C105 are synchronously input into the simulation model. 1000 Monte Carlo iterations are set to simulate random events such as equipment fluctuations, process anomalies, and material delays during the production process. The core indicators such as production period, timeout loss, conflict occurrence rate, and equipment utilization rate corresponding to different priority adjustment schemes are statistically analyzed. The sub-task priority adjustment scheme with the best robustness and comprehensive performance is selected through iterative simulation. Finally, the priority score and ranking results of the corresponding sub-tasks after the update are output at each time and at each resource node. The response time of the simulation solution is no more than 2 seconds to ensure the feasibility and anti-interference of the priority adjustment scheme.
[0239] In this embodiment, C107 is implemented as follows: For each resource node, based on the updated priority of the subtask output by C106, a competitive connection is constructed between the resource node and the corresponding subtask node. The competitive connection is constructed using directed edges, with the starting point of the directed edge being a subtask node in the processing task node subnet and the ending point being the corresponding resource node in the resource node subnet. The attribute structure of the competitive connection includes five core fields: updated priority score of the subtask, predicted processing time of the subtask, constraint time interval of the subtask, conflict probability, and competition weight. Among them, the competition weight is linearly positively correlated with the updated priority score of the subtask. The higher the priority score, the greater the competition weight, which means that the subtask has a higher priority allocation right in the resource node's resource competition. The value range of the competition weight is 0 to 1, and the sum of the competition weights of all subtasks mapped to the same resource node is 1. After the construction of the competitive connection is completed, the full attribute information of the connection is stored synchronously in the processing task node subnet and the resource node subnet, realizing the digital and visual presentation of the competitive relationship between the subtask and the resource node.
[0240] In this embodiment, C108 is implemented as follows: A competitive connection constructed by C107 serves as the interaction bridge between the two-layer networks. The resource node subnet acts as the lower-level resource layer network, and the processing task node subnet acts as the upper-level task layer network. Bidirectional data interaction and dynamic coupling between the two layers are achieved through the competitive connection. Priority information and processing requirement information of sub-task nodes are transmitted to the resource node subnet in real time via the competitive connection. The status information and available resource information of resource nodes are fed back to the processing task node subnet in real time via the competitive connection. Simultaneously, a conflict resolution model is deployed throughout the entire competitive connection. All resource requests and scheduling instructions through the competitive connection must undergo real-time conflict detection and resolution processing by the conflict resolution model, ensuring that production conflicts during resource competition can be identified and proactively resolved in real time. Furthermore, a bidirectional real-time data connection is established between the pre-scheduled resource pool and the resource node subnet and the conflict resolution model, respectively. Information on non-conflicting resource nodes in the resource node subnet is synchronized to the pre-scheduled resource pool in real time. The conflict resolution model can call upon idle resources in the pre-scheduled resource pool in real time to complete conflict resolution and task reallocation. After all connections and model deployments are completed, a two-layer non-conflict simulation interaction node network with a four-layer linkage architecture of "resource layer - task layer - conflict resolution layer - resource pool layer" is generated. The node network uses adjacency list and attribute graph dual-mode storage, and the full data update cycle is set to 100 milliseconds to keep it synchronized with the status data of the physical production site in real time.
[0241] The technical significance of the dual-layer non-conflict simulation interactive node network construction mechanism in this embodiment is that: in the traditional multi-order mixed-line production scheduling mode of seamless steel pipe, there is a common problem that the production task network and the equipment resource network are disconnected from each other, and the two-layer network can only achieve static binding and cannot achieve dynamic coupling. This results in the inability to predict production resource conflicts in advance, and conflict resolution is mostly handled passively after the fact. This directly causes industry pain points such as uneven equipment resource utilization, high order delivery delay rate, and large losses due to production anomalies. This embodiment achieves precise synchronization of task priorities to the resource layer by constructing a many-to-many mapping relationship between subtasks and resource nodes, thus solving the problem of information asymmetry between tasks and resources. It enables early identification and digital representation of production conflicts through priority-based processing time prediction and quantitative calculation of time conflict length. Furthermore, it achieves proactive conflict resolution and global optimization of the scheduling scheme through Bayesian algorithm-based conflict probability calculation and multi-objective optimization algorithm-based dynamic priority adjustment. Monte Carlo simulation verifies the feasibility of the adjustment scheme, avoiding execution deviations after the scheduling scheme is implemented. By constructing competitive connections with competitive weights, it achieves dynamic coupling between the resource node subnet and the processing task node subnet, embedding the conflict resolution model into the competitive connection link to realize real-time conflict control during resource competition. Finally, the bidirectional connection of the pre-scheduled resource pool provides elastic resource support for conflict resolution. The final constructed two-layer non-conflict simulation interactive node network realizes the full-element digital mapping of "task-resource" in the seamless steel pipe production process, the full-process conflict prediction and active resolution, and the full-cycle dynamic scheduling optimization. It solves the resource conflict problem in the multi-variety mixed production mode, and while ensuring the on-time delivery rate of orders, it significantly improves the utilization rate of equipment resources and reduces production abnormal losses.
[0242] As a specific example, this embodiment uses three parallel production orders and corresponding core equipment in a seamless steel pipe production workshop as the application carriers. Specific parameters are as follows: Order 1, number DD20240508001, Φ108×4.5mm seamless steel pipe for fluid transportation, order priority A, the perforation sub-task constraint time interval is 8:00-12:00 on the day the order is placed, with a penalty of 1200 yuan / hour for overdue orders; Order 2, number DD20240508002, Φ219×6mm seamless steel pipe for high-pressure boilers, order priority B. The perforation task has a time constraint of 10:00-16:00 on the day the order is placed, with a penalty of 800 yuan / hour for exceeding the time limit; Order 3, number DD20240508003, is for Φ57×3.5mm seamless steel pipe for structural use, with order priority level B. The perforation task has a time constraint of 9:00-14:00 on the day the order is placed, with a penalty of 900 yuan / hour for exceeding the time limit; The core resource node is perforation machine GG-CK-CKJ-001, with a health status score of 92, indicating that it is in normal operation, and the preset conflict probability threshold is 0.75.
[0243] In C101, the system traverses the three punching sub-task nodes in the processing task node subnet, extracts the resource_id of each sub-task (GG-CK-CKJ-001), and constructs a mapping key-value pair with the resource node number as the key. The key value is the list of IDs and full attribute information of the three punching sub-tasks. At the same time, the priority scores of the three sub-tasks (order 1 is 90 points, order 3 is 82 points, and order 2 is 75 points) are synchronously mapped to the node attributes of punching machine GG-CK-CKJ-001. The data synchronization delay is 32 milliseconds.
[0244] In C102, the three punching sub-tasks mapped on the punching machine GG-CK-CKJ-001 are sorted in descending order of priority to form a priority queue of Order 1 → Order 3 → Order 2. Taking 8:00 on the day the order is placed as the base time, the LSTM processing time prediction model built into the punching machine is called to calculate the total predicted processing time of the punching sub-tasks of the three orders: Order 1 is 3.2 hours, Order 3 is 2.5 hours, and Order 2 is 3.8 hours. The processing time slots are allocated according to priority, resulting in the processing time slots of Order 1 being 8:00-11:12, Order 3 being 11:12-13:42, and Order 2 being 13:42-17:30.
[0245] In C103, the time conflict lengths of the three subtasks are calculated separately: Order 1 has a constraint time interval of 8:00-12:00, a total length of 240 minutes, and its processing time is 8:00-11:12, with an overlap time of 192 minutes with the constraint interval. The time conflict length is 240-192=48 minutes. Order 3 has a constraint time interval of 9:00-14:00, a total length of 300 minutes, and its processing time is 11:12-13:42, with an overlap time of 150 minutes with the constraint interval. The time conflict length is 300-150=150 minutes. Order 2 has a constraint time interval of 10:00-16:00, a total length of 360 minutes, and its processing time is 13:42-17:30, with an overlap time of 138 minutes with the constraint interval. The time conflict length is 360-138=222 minutes.
[0246] In C104, the time conflict length, priority difference, current load rate of the punching machine (78%), and process compatibility score of the three sub-tasks are used as inputs. The sub-task conflict probability matrix is calculated by a pre-trained Bayesian algorithm. The conflict probability between order 1 and order 3 is 0.82, the conflict probability between order 3 and order 2 is 0.78, and the conflict probability between order 1 and order 2 is 0.65. The conflict probability of two sets of sub-tasks exceeds the preset conflict threshold of 0.75.
[0247] In C105, the subtask conflict probability matrix, the remaining available resources of punching machine GG-CK-CKJ-001, and the idle information of backup punching machine GG-CK-CKJ-002 in the pre-scheduled resource pool are used as inputs. A non-dominated sorting genetic algorithm (NSGA-II) with an elitist strategy is employed, combined with constraint combinations, to solve the problem. Hard constraints include: the conflict probability between subtasks is less than a preset conflict threshold of 0.75; the processing time of each subtask is completely contained within its constraint time interval; and the maximum load rate of a single resource node does not exceed 90%. Soft constraints include: minimizing the sum of time conflict lengths of all subtasks and minimizing the total timeout loss cost of subtasks. After solving, the subtask priorities are adjusted. For Order 1 (90 points) → Order 2 (80 points) → Order 3 (78 points), the punching sub-task of Order 3 is rescheduled to the backup punching machine GG-CK-CKJ-002. After the adjustment, the processing time of the punching sub-task of Order 1 is 8:00-11:12 with a time conflict length of 0 minutes; the processing time of the punching sub-task of Order 2 is 11:12-15:00 with a time conflict length of 0 minutes; and the processing time of the punching sub-task of Order 3 is 9:00-11:30 with a time conflict length of 18 minutes. The total time conflict length of the three sub-tasks is reduced from 420 minutes before the adjustment to 18 minutes, and the total overtime loss is reduced from 2860 yuan before the adjustment to 0 yuan.
[0248] In C106, the real-time operating status set of the piercing machine and the steel pipe process monitoring dataset are input into the Monte Carlo discrete event simulation algorithm. The adjusted priority scheme is simulated 1000 times to simulate random events such as equipment fluctuations and process anomalies. The results show that the scheme has a conflict rate of 0, an order delivery on-time rate of 100%, and an average equipment utilization rate of 82%, making it the optimal scheme. Finally, the updated subtask priorities are output.
[0249] In C107, based on the updated priority, a competitive connection is constructed between punching machine GG-CK-CKJ-001 and the punching sub-task nodes of Order 1 and Order 2, and a competitive connection is constructed between punching machine GG-CK-CKJ-002 and the punching sub-task node of Order 3. The competitive connection is a directed edge, with the starting point being the sub-task node and the ending point being the resource node. The competitive weight of the order 1 sub-task is 0.53, the competitive weight of the order 2 sub-task is 0.47, and the competitive weight of the order 3 sub-task is 1.0.
[0250] In C108, the resource node subnet and the processing task node subnet are bidirectionally coupled through competitive connections. The conflict resolution model is deployed in the competitive connection link. The pre-scheduled resource pool is bidirectionally connected with the resource node subnet and the conflict resolution model, and finally a complete two-layer non-conflict simulation interactive node network is generated. The full data update cycle of the node network is 100 milliseconds, and it is kept in real time synchronized with the physical production site.
[0251] In this embodiment, the execution frequency of the two-layer non-conflict simulated interactive node network construction operation (C101 to C108) is determined by those skilled in the art based on the order placement frequency, production scheduling cycle, and system computing resources for seamless steel pipe production. Full node network reconstruction can be set to be performed once after the daily production plan is issued. Incremental updates of mapping relationships, subtask priorities, and competing connections can be set to be performed every 5 minutes, or real-time updates can be performed when new orders are entered, emergency orders are inserted, equipment status is abnormal, production tasks are changed, or conflict events are triggered. All of these can meet the engineering scheduling accuracy requirements of mixed-line production of seamless steel pipes. Specific implementation details are omitted. It should be noted that the values and specific parameters in this embodiment are merely illustrative and can be adjusted by those skilled in the art according to the actual situation during implementation.
[0252] Furthermore, the process of real-time synchronous adjustment of the multi-target device manufacturing process using simulation algorithms in this embodiment includes:
[0253] D101. Based on a two-layer non-conflict simulation interaction node network combined with simulation algorithm, the multi-objective generation process is simulated in real time, and the equipment operation status set and multi-objective processing technology monitoring dataset are obtained in real time through the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network.
[0254] D102. Based on the equipment operation status set and the multi-target processing technology monitoring dataset, the conflict resolution model in the two-layer non-conflict simulation interaction node network determines in real time whether each resource node in the resource node subnet is a non-conflict resource node at the corresponding time point. If so, the label corresponding to the resource node is saved to the pre-scheduled resource pool.
[0255] D103. If not, it is determined to be a potential conflicting resource node. Then, by combining the multi-objective optimization algorithm and constraint combination with the number of resource nodes of the same processing technology type remaining in the pre-scheduled resource pool at the current time and the corresponding equipment operation evaluation results, the processing priority of all sub-tasks corresponding to the potential conflicting resource nodes is adjusted, and the adjusted processing priority is mapped to the corresponding sub-task node through competitive connection.
[0256] D104. When the processing flow of the corresponding device to be processed reaches the corresponding subtask, the processing priority of the device to be processed is adjusted to process the subtask.
[0257] In this embodiment, D101 is implemented as follows: Throughout the entire lifecycle of the production scheduling system, based on a pre-built two-layer non-conflict simulation interaction node network, and equipped with a full-element industrial digital simulation algorithm, a virtual digital twin space is constructed that is precisely mapped 1:1 to the physical seamless steel pipe production workshop. The virtual digital twin space contains digital twins of all production equipment, product twin models of the steel pipes to be processed, production process twin models, and logistics and distribution twin models. The attribute parameters, operating status, and execution logic of each twin are completely consistent with the physical entity. The simulation algorithm, with a fixed period of 100 milliseconds, drives the virtual space to perform real-time synchronous simulation of the parallel production process of multi-specification, multi-order seamless steel pipes, completely replicating the entire process of task execution, equipment operation, and process processing in the physical workshop. Simultaneously, the operating status parameters of all production equipment and the interlocking signals between equipment are acquired in real time through the operation status monitoring node network with a 10-millisecond acquisition cycle, and the data is summarized to form an equipment operation status set; the multi-target processing technology cross-monitoring node network is acquired in real time through the processing technology parameters and quality inspection data of each steel pipe to be processed at each process node with a 50-millisecond acquisition cycle, and the data is summarized to form a multi-target processing technology monitoring dataset; the two datasets are synchronized in real time to the virtual digital twin space through the Profinet industrial Ethernet bus, realizing full-element, full-cycle virtual-real synchronization between the virtual simulation process and the physical production process, with an end-to-end data synchronization delay of no more than 200 milliseconds.
[0258] In this embodiment, D102 is specifically implemented as follows: the equipment operation status set and multi-target processing technology monitoring dataset acquired in real time by D101 are synchronized as input parameters to the conflict resolution model built into the two-layer non-conflict simulation interactive node network. The conflict resolution model uses a preset sliding time window as the unit, with a window length of 5 minutes and a sliding step size of 1 minute. For each resource node in the resource node subnet, non-conflict resource node determination is performed point by point. The determination rule is completely consistent with the non-conflict resource node discrimination criteria mentioned above: when a resource node has no non-current processing device subtasks within the predicted remaining processing time interval at the corresponding time point, or when the conflict probability between all subtasks is less than the preset conflict probability threshold of 0.75, the resource node is determined to be a non-conflict resource node. Once the non-conflicting resource node is determined, its globally unique identifier, equipment health status score, available processing time period, adaptable process type, and processing time prediction model call address are immediately written into the Redis in-memory database of the pre-scheduled resource pool as key-value pairs. The key name is set to available_resource:resource node identifier, and the key-value expiration time is consistent with the available duration of the resource node. At the same time, a reference pointer to the resource node is added to the process type index table of the pre-scheduled resource pool to realize the fast retrieval and scheduling of non-conflicting resources. In this embodiment, the preset conflict probability threshold of 0.75 is set based on the following: based on the full historical production conflict records and normal scheduling records accumulated in the seamless steel pipe production workshop over the past 24 months, the statistical distribution of conflict probability is calculated using the Bayesian algorithm in the conflict resolution model. Receiver operating characteristic curve analysis is used, and the boundary value is selected based on maximizing the Youden index. This ensures that the sensitivity and specificity of conflict identification reach an optimal balance at this threshold. This avoids both setting the threshold too high, which could lead to missed potential conflicts and production interruptions, and setting the threshold too low, which could result in a large number of non-conflict nodes being misjudged, increasing unnecessary scheduling interventions. Statistical verification shows that the F1 score for conflict detection reaches its highest level at this threshold. Therefore, 0.75 is set as the preset conflict probability threshold.
[0259] In this embodiment, D103 is implemented as follows: when the conflict resolution model determines that a resource node does not meet the non-conflict resource node standard at the corresponding time point, the resource node is directly marked as a potential conflict resource node, and core parameters such as the conflict sub-task list, conflict probability, conflict type, and time conflict length of the node are recorded. This triggers a multi-objective optimization solution process, using the Non-Dominated Sorting Genetic Algorithm with Elite Strategy (NSGA-II) as the core multi-objective optimization algorithm, with the previously unified constraint combination as the solution boundary. The hard constraints are: the sub-task processing time period must be within the constrained time interval; the adjusted conflict probability between sub-tasks must be less than 0.75; and the resource node load rate must not exceed 90%. The soft constraints are: the sum of the time conflict lengths of all sub-tasks is the shortest; the total timeout loss cost of sub-tasks is the minimum; and the equipment load balance is optimal. During the algorithm's solution process, data such as the number of idle resource nodes of the same processing technology type in the pre-scheduled resource pool at the current time, the health status score of the corresponding equipment, the operation evaluation results, and the available processing time period are synchronously read as a resource scheduling candidate set during the solution process. After the algorithm completes the solution, it outputs the subtask processing priority adjustment scheme with the best overall performance in the Pareto optimal solution set. The scheme includes the adjusted subtask priority score, ranking result, processing time allocation, and alternative resource node scheduling plan. Through the pre-built competitive connection in the two-layer non-conflict simulated interactive node network, the adjusted processing priority and resource allocation scheme are mapped to the corresponding subtask nodes in the processing task node subnet in real time. The priority attributes, competition weights, and mapped resource node labels of the subtask nodes are updated synchronously, with a data synchronization delay of no more than 50 milliseconds, ensuring that the parameters of the task layer and the resource layer are completely consistent.
[0260] In this embodiment, D104 is implemented as follows: For each seamless steel pipe to be processed, the production process progress is tracked in real time through the processing technology chain in the processing task node subnet. When the process progresses to the planned start node of the corresponding subtask, the system automatically reads the latest updated processing priority, mapped resource node number, and process parameter configuration information within that subtask node. For multiple subtasks mapped to the same resource node, processing execution instructions are issued sequentially according to the adjusted processing priority from high to low, with higher-priority subtasks having priority access to resources. The processing instructions are directly issued to the PLC programmable logic controller of the production equipment at the corresponding resource node via the Profinet industrial Ethernet bus, simultaneously issuing the corresponding steel pipe processing technology parameters and quality control standards. Upon receiving the instructions, the equipment starts the processing flow as required. During processing, execution data is collected in real time through the running status monitoring node network and the multi-target processing technology cross-monitoring node network, and synchronously fed back to the simulation algorithm to complete the closed-loop control of "simulation-judgment-adjustment-execution-feedback".
[0261] The technical significance of this embodiment in achieving real-time synchronous adjustment of the production process through simulation algorithms lies in the fact that in the traditional multi-variety mixed production mode of seamless steel pipes, the adjustment of the production process generally relies on manual on-site inspection to discover abnormalities and the delayed mode of passive scheduling afterward. This mode suffers from industry pain points such as slow response to abnormalities, lack of prediction of scheduling and adjustment, lack of verification of adjustment plans, and large execution deviations, which can easily lead to problems such as equipment failure and downtime, order delivery delays, and increased production losses. This embodiment constructs a digital twin space that maps 1:1 to the physical workshop, combined with a two-layer non-conflict simulation interaction node network, to achieve real-time synchronous simulation and virtual-physical interaction of the entire production process. Millisecond-level data acquisition through the dual monitoring node network enables real-time, multi-dimensional perception of equipment status and process quality. Real-time judgment via a sliding window of the conflict resolution model allows for the early prediction and hierarchical identification of production conflicts. A multi-objective optimization algorithm combined with the elastic resource support of a pre-scheduled resource pool achieves the globally optimal solution for conflict resolution. Competitive connections enable real-time synchronization and mapping of adjustment schemes, ensuring dynamic collaboration between the task and resource layers. Ultimately, a full-process adaptive adjustment mechanism of "virtual-physical synchronization - real-time perception - conflict prediction - optimization solution - closed-loop execution" is formed, solving the lag problem of traditional scheduling modes. This ensures the continuity, stability, and optimality of the production process throughout the entire lifecycle of seamless steel pipe production, effectively reducing production anomaly rates and order delay losses, and significantly improving equipment resource utilization and order delivery on-time rate.
[0262] As a specific example, this embodiment uses three parallel production orders and core production equipment in a seamless steel pipe production workshop as the application carrier, with specific parameters completely consistent with the previous example: Order 1, number DD20240508001, Φ108×4.5mm seamless steel pipe for fluid transportation, priority level A, the perforation sub-task is constrained to a time interval of 8:00-12:00 on the same day, with a penalty of 1200 yuan / hour for overdue; Order 2, number DD20240508002, Φ219×6mm seamless steel pipe for high-pressure boilers, priority level B. Level 1, the perforation sub-task is constrained to 10:00-16:00 on the same day, with a penalty of 800 RMB / hour for overtime; Order 3, No. DD20240508003, Φ57×3.5mm seamless steel pipe for structure, Level B priority, the perforation sub-task is constrained to 9:00-14:00 on the same day, with a penalty of 900 RMB / hour for overtime; the core resource node is perforation machine GG-CK-CKJ-001, the backup resource node of the same process is perforation machine GG-CK-CKJ-002, and the preset conflict probability threshold is 0.75.
[0263] In D101, the system is based on a two-layer non-conflict simulation interactive node network. It uses digital simulation algorithms to simulate the entire production process of seamless steel pipes for three orders in real time. The synchronization period between the virtual space and the physical workshop twin data is 100 milliseconds. At the same time, the system collects operating parameters such as the main motor current, bearing temperature, and roll speed of the piercing machine GG-CK-CKJ-001 at a 10-millisecond cycle through the operation status monitoring node network, forming a set of equipment operation status. The system also collects the piercing process parameters of the steel pipes for the three orders at a 50-millisecond cycle through the multi-objective processing technology cross-monitoring node network, forming a multi-objective processing technology monitoring dataset. Both types of data are synchronized to the twin simulation space in real time.
[0264] In D102, the system inputs the collected dataset into the conflict resolution model. Through a 5-minute sliding window, it is found that the temperature of the drive end bearing of the punching machine GG-CK-CKJ-001 has risen to 78℃, and the equipment health status score has dropped to 72 points. Within the predicted remaining processing time interval of the current processing sub-task, the calculated conflict probability of the three order punching sub-tasks is 0.86, which is greater than the preset threshold of 0.75 and does not meet the non-conflict resource node judgment standard. At the same time, it is determined that the standby punching machine GG-CK-CKJ-002 has no production tasks scheduled between 8:00 and 18:00 on the same day, and the conflict probability between all sub-tasks is 0, which meets the non-conflict resource node standard. The resource node number, available time period, and health status score of 94 points of GG-CK-CKJ-002 are immediately written into the pre-scheduled resource pool, with the key name set to available_resource:GG-CK-CKJ-002 and the expiration time set to 10 hours.
[0265] In D103, the system marks GG-CK-CKJ-001 as a potential conflicting resource node, triggering the NSGA-Ⅱ multi-objective optimization algorithm to solve the problem. Combining the idle resource information of the backup punching machine GG-CK-CKJ-002 in the pre-scheduled resource pool with the equipment operation evaluation results, the system completes the solution with hard constraints as boundaries and soft constraints as optimization objectives, outputting the optimal adjustment scheme: the priority of the punching subtask of order 3 is adjusted to 85 points, mapped to the backup punching machine GG-CK-CKJ-002, and the processing time is set to 9:00-11:30 on the same day; the priority of order 1 (90 points) and order 2 (80 points) are retained, still mapped to GG-CK-CKJ-001, with processing time periods of 8:00-11:12 and 11:12-15:00 respectively; after the adjustment, the conflict probability of all subtasks is reduced to below 0.3, which is less than the threshold of 0.75, the total time conflict length is reduced to 0, and the total timeout loss is 0. By competing for connections, the adjusted processing priority and mapping resource node information are synchronized in real time to the three corresponding perforated sub-task nodes in the processing task node subnet, updating the node priority attributes and competition weights.
[0266] In D104, the system tracks the process progress of the steel pipes in three orders in real time. When the process of order 1 progresses to the starting node of the piercing sub-task, the piercing processing instruction and process parameters are issued to GG-CK-CKJ-001 according to the adjusted highest priority. When the process of order 3 progresses to the starting node of the piercing sub-task, the processing instruction is issued to GG-CK-CKJ-002 according to the adjusted priority. When the process of order 2 progresses to the starting node of the piercing sub-task, the processing is carried out sequentially on GG-CK-CKJ-001 according to the adjusted priority. In the end, the piercing sub-tasks of all three orders are successfully completed within the constrained time range without equipment conflicts or order delays.
[0267] In this embodiment, the frequency of real-time synchronous adjustment operations for the production processes of D101 to D104 is determined by those skilled in the art based on the frequency of equipment status changes, production scheduling cycle, and system computing resources in seamless steel pipe production. The full-process twin simulation and resource node status determination can be set to be executed once every 1 minute, and the real-time monitoring of equipment operating status and process data can be set to be executed once every 100 milliseconds, or immediate adjustments can be performed when events such as equipment abnormal alarms, process parameter deviations, new order entry, and emergency order insertion are triggered. All of these can meet the engineering scheduling accuracy requirements of mixed-line production of seamless steel pipes. The specific implementation will not be elaborated further.
[0268] In addition to the real-time synchronization adjustment described above, the two-layer non-collision simulated interactive node network constructed in this embodiment can also realize the following production scenario processes, including:
[0269] E101. The system collects real-time status parameters such as equipment vibration, temperature, and current through a network of operational status monitoring nodes, and uses a pre-defined fault diagnosis model for anomaly detection. When equipment status parameters exceed a safety threshold, a fault alarm is triggered and the node is marked as a potential faulty resource node. In this embodiment, the fault diagnosis model is constructed based on a threshold-based rule engine or machine learning classifier.
[0270] E102. After receiving a fault alarm, the pre-scheduled resource pool matching conflict resolution model selects equipment with the same process capability and a health status score greater than the faulty resource node from the pre-scheduled resource pool, based on the process type and processing accuracy requirements of the faulty equipment.
[0271] E103, a multi-objective optimization algorithm for priority dynamic adjustment and task migration, recalculates the priorities of affected subtasks, raises the priority of in-process subtasks on the faulty equipment, and allocates them to alternative resource nodes. The adjustment logic follows this principle: the processing time prediction error of the alternative resource node must be less than the allowable error corresponding to the subtask node resource mapping relationship updated through competitive connection after adjustment. For example, when punching machine GG-CK-CKJ-001 experiences a sudden failure and is marked as a potential faulty resource node, the pre-scheduled resource pool selects alternative punching machine GG-CK-CKJ-003 based on its processable technology type. At this time, the processing time prediction error of GG-CK-CKJ-003 needs to be checked: if the allowable error threshold for the punching subtask in the original resource mapping relationship is 5 minutes, and the prediction error of GG-CK-CKJ-003 for the current task is calculated to be 3 minutes, then the migration condition is met. The multi-objective optimization algorithm will increase the priority of the subtasks on the original punching machine GG-CK-CKJ-001, migrate them to GG-CK-CKJ-003 through competitive connection, and update the resource mapping relationship of the subtask nodes.
[0272] The production process reconfiguration planning and control unit generates equipment switching instructions and process parameter adaptation schemes based on the new resource allocation scheme, sends them to the production equipment via industrial Ethernet, and updates the resource status of the two-layer non-conflicting analog interactive node network.
[0273] In this embodiment, E101 is implemented as follows: Throughout the entire operating cycle of the production system, distributed IoT sensor groups deployed on each production device in the operating status monitoring node network collect equipment operating status parameters in real time at differentiated sampling frequencies. The vibration sensor sampling frequency is set to 10kHz to collect the effective values of radial and axial vibration acceleration, velocity, and displacement of the equipment's main shaft, bearings, and transmission mechanism; the temperature sensor sampling frequency is set to 1Hz to collect the real-time temperature values of the equipment's motor windings, bearings, hydraulic system, and reducer; and the current and voltage sensor sampling frequency is set to 100Hz to collect the three-phase current, voltage, and power factor parameters of the equipment's main motor and auxiliary motor. All collected data are preprocessed by power frequency filtering and outlier removal through the edge acquisition gateway and then synchronized to the system core server and digital twin space at a period of 100 milliseconds. The preset fault diagnosis model supports two configurable modes. The first is a threshold-based rule engine mode. The safety thresholds for equipment parameters within the rule engine are jointly calibrated based on the equipment manufacturer's specifications, equipment safety operating procedures, and historical fault data from the workshop over the past 24 months. This is divided into a primary warning threshold and a secondary alarm threshold. When the equipment status parameter exceeds the primary warning threshold, a warning is triggered; when it exceeds the secondary alarm threshold, a fault alarm is immediately triggered. The second mode is a machine learning classifier mode, constructed using a CNN-LSTM hybrid deep learning model. The model takes the time-series parameters of equipment operating status collected by the operating status monitoring node network at differentiated sampling frequencies as input. The sampling frequency for vibration parameters is 10kHz, temperature parameters are 1Hz, and current and voltage parameters are 100Hz. The outputs are equipment fault type, fault probability, and fault severity. The training data comes from the complete historical fault records and corresponding normal operating status data from the seamless steel pipe production workshop over the past 24 months. The sample size is no less than 15,000 sets, covering 12 common fault scenarios in seamless steel pipe production equipment, such as bearing wear, gear failure, motor overload, and hydraulic system failure. After training, the model's fault diagnosis accuracy is no less than a preset minimum fault diagnosis threshold of 95%. When the model detects that the equipment's operating status parameters exceed the preset secondary alarm threshold, a fault alarm is immediately triggered. The system immediately marks the corresponding equipment as a potential fault resource node and synchronously updates the node status in the resource node subnet, the two-layer non-conflict simulation interactive node network, and the digital twin space, highlighting it in red. At the same time, the new task scheduling permission of the node is frozen, and the addition of subtasks mapped to the node is prohibited. For example, when the effective value of the radial vibration acceleration of the transmission end bearing of the piercing machine GG-CK-CKJ-001 reaches 12.5 m / s² and the temperature of the drive end bearing reaches 88°C, exceeding the secondary alarm threshold, the model determines that the bearing wear is severely faulty with a fault probability of 94%, immediately triggering a secondary fault alarm and executing the above marking and freezing operations.
[0274] In this embodiment, E102 is implemented as follows: the pre-scheduled resource pool and the conflict resolution model establish a bidirectional real-time communication link through the MQTT message queue telemetry transmission protocol. After a fault alarm is triggered, the alarm message is pushed to the conflict resolution model and the pre-scheduled resource pool with a delay of no more than 50 milliseconds. Upon receiving the fault alarm, the system first extracts the core adaptation parameters of the faulty device from its resource node attributes, including the processable type, the range of compatible seamless steel pipe specifications, the processing accuracy level, the rated process parameter range, and the model of the matching tooling fixture. Subsequently, a three-level screening logic is executed through the process type index table built into the pre-scheduled resource pool: The first level is process capability matching screening, which traverses all non-conflicting idle resource nodes in the pre-scheduled resource pool to select candidate resource nodes whose process type is completely consistent with the faulty equipment, whose adaptable steel pipe specifications completely cover the current steel pipe specifications to be processed, and whose processing accuracy level is not lower than that of the faulty equipment; The second level is health status screening, which sorts the candidate resource nodes after the first level screening in descending order according to the equipment health status score, and selects nodes whose health status score is higher than the current health status score of the faulty equipment and not lower than the preset minimum health threshold of 80 points, to ensure the operational stability of the candidate equipment; The third level is processing capability verification, which verifies whether the idle available time window of the candidate resource nodes after the second level screening covers the constraint time interval of the affected subtask, and removes nodes with insufficient available time, finally forming a list of candidate equipment that meets the requirements. The list is sorted by a combination of equipment health status score and processing adaptability, providing quantitative support for subsequent task migration.
[0275] In this embodiment, E103 is implemented as follows: For all unfinished in-process subtasks on the faulty equipment, the NSGA-II multi-objective optimization algorithm is used to recalculate the processing priority of the subtasks. The priority adjustment follows the emergency protection rules: the in-process subtasks affected by the fault are multiplied by an emergency weighting coefficient of 1.2 on the basis of the original priority score. The upper limit of the weighted score is 100 points, ensuring that the subtasks on the faulty equipment have priority scheduling authority. The subtasks with adjusted priorities are assigned sequentially to the candidate resource nodes selected from E102. The assignment process strictly follows error verification rules: First, the preset allowable error threshold for processing time of the subtask is extracted from the original resource mapping relationship of the subtask node. This threshold is 10% of the predicted processing time of the subtask, and the maximum is no more than 5 minutes. Then, the LSTM processing time prediction model built into the candidate resource node is called, and the specifications, steel type, and process parameters of the steel pipe to be processed are input. The predicted processing time of the candidate resource node for the current subtask and the average absolute prediction error of the model are calculated. Only when the average absolute prediction error of the candidate resource node is less than the allowable error threshold of the subtask is the candidate resource node determined to meet the migration conditions, and the mapping and binding of the subtask and the candidate resource node are completed. After completing the subtask priority adjustment and resource allocation, the adjusted processing priority and new resource mapping relationship are synchronized in real time to the corresponding subtask nodes in the processing task node subnet through the pre-built competitive connection in the two-layer non-conflict simulation interaction node network. The priority attribute, competition weight, mapped resource node number, and planned processing time period of the subtask node are updated synchronously, and the data synchronization delay is no more than 50 milliseconds.
[0276] In the production process reconfiguration phase, the planning and control unit executes a full-process reconfiguration operation based on the finalized resource allocation plan. First, standardized equipment switching instructions are generated, including start / stop control instructions for alternative equipment, tooling and fixture switching prompts, and equipment operating mode switching parameters. Then, based on the rated parameters and processing characteristics of the alternative equipment, suitable process parameter schemes are generated, adjusting core process parameters such as piercing roll gap, heating temperature, and rolling speed to ensure processing quality meets corresponding national standards and order requirements. All instructions and schemes are sent via the Profinet industrial Ethernet bus with a latency of no more than 200 milliseconds to the PLC programmable logic controller and the on-site human-machine interface terminal of the corresponding production equipment. Simultaneously, the planning and control unit updates the full resource status of the two-layer non-conflicting analog interactive node network, including the locked status of faulty equipment, the task mapping status of alternative equipment, and the available resource status of the pre-scheduled resource pool. It also simultaneously updates the equipment status and production process simulation logic within the digital twin space, ensuring complete consistency between the virtual space and the physical site.
[0277] The technical significance of the equipment failure emergency response mechanism based on the two-layer non-conflict simulated interactive node network in this embodiment is that: In the traditional seamless steel pipe production mode, the handling process after a sudden equipment failure generally relies on a lagging mode of manual inspection to find the fault, offline communication and coordination of backup equipment, manual adjustment of production plan, and manual issuance of process instructions. This has industry pain points such as untimely fault detection, lack of quantitative standards for backup equipment selection, long plan adjustment cycle, large process adaptation deviation, and high risk of order delivery delay. Unplanned equipment failure is one of the core factors leading to capacity loss and order default in steel pipe production workshops. This embodiment achieves early detection, early warning, and early labeling of equipment failures through millisecond-level data acquisition from the operational status monitoring node network and real-time inference from the fault diagnosis model. Through the linkage of the pre-scheduled resource pool and the conflict resolution model, it achieves automated and quantitative screening of backup equipment, ensuring the process adaptability and operational stability of the alternative equipment. A multi-objective optimization algorithm dynamically prioritizes affected subtasks and migrates compliant tasks, while strict prediction error verification rules ensure controllable processing time and quality after task migration. The planning and control unit enables automated reconfiguration of the production process and command issuance, synchronously updating the full state of the two-layer non-conflict simulation interaction node network, forming a fully closed-loop automated emergency response mechanism of "fault detection - resource screening - task migration - process reconfiguration - state synchronization." This mechanism can shorten the production adjustment cycle after equipment failure from the traditional several hours to minutes, significantly reducing capacity loss and order default risks caused by unplanned downtime. It ensures the continuity, stability, and reliability of the multi-objective steel pipe production process throughout the entire equipment lifecycle, solving the problems of lag and uncertainty in traditional fault handling modes.
[0278] As a specific example, in this embodiment, in the seamless steel pipe production workshop, order number DD20240508001 is for Φ108×4.5mm seamless steel pipe for fluid transportation, with priority level A. It is currently executing a piercing sub-task on piercing machine No. 1, equipment number GG-CK-CKJ-001. The original time constraint for this sub-task is 8:00-12:00 on the same day. The preset allowable error threshold for processing time in the original resource mapping relationship is 5 minutes. The LSTM processing time prediction model built into piercing machine GG-CK-CKJ-001 predicts the processing time for this task to be 192 minutes, with an average absolute prediction error of 2.1 minutes.
[0279] In E101, the operational status monitoring node network, through the vibration sensor at the transmission end of GG-CK-CKJ-001, collected in real time the effective value of the bearing radial vibration acceleration, which reached 12.5 m / s², exceeding the preset secondary alarm threshold of 8 m / s². At the same time, the bearing temperature at the drive end reached 88℃, exceeding the secondary alarm threshold of 75℃. The fault diagnosis model, through inference using a CNN-LSTM classifier, determined that the bearing was severely worn, with a fault probability of 94%, and immediately triggered a secondary fault alarm. The system marked GG-CK-CKJ-001 as a potential fault resource node, froze the node's new task scheduling permission in the two-layer non-conflict simulation interactive node network, and simultaneously highlighted the device in red in the digital twin space.
[0280] In E102, after receiving a fault alarm, the pre-scheduled resource pool and conflict resolution model extract the process type of GG-CK-CKJ-001 as seamless steel pipe piercing, which can be adapted to specifications with an outer diameter of 60mm-300mm, a processing accuracy level of IT8, and a current health status score of 62. Subsequently, a three-level screening is performed through the process type index table of the pre-scheduled resource pool. The first-level screening obtains three candidate resource nodes for piercing machines of the same process type. The second-level screening selects nodes with a health status score higher than 62 and not... Two pieces of equipment, GG-CK-CKJ-002 and GG-CK-CKJ-003, scored below 80 points. After a three-level verification of the available time window, it was confirmed that GG-CK-CKJ-003 had no production tasks scheduled between 8:00 and 14:00 on the same day, fully covering the constraint time interval of the affected sub-tasks. Ultimately, GG-CK-CKJ-003 was determined as the optimal alternative equipment. Its current health status score is 94 points, and its processing accuracy level is IT8, which fully matches the process capability requirements of the faulty equipment.
[0281] In E103, the NSGA-II multi-objective optimization algorithm recalculates the priority of the affected order 1 perforation subtask. The original priority score was 90 points. After multiplying by an emergency weighting coefficient of 1.2, the priority score is updated to 100 points (the upper limit). Subsequently, the processing time prediction error of the alternative equipment GG-CK-CKJ-003 is checked. Its built-in LSTM processing time prediction model is called. The specifications, steel type, and process parameters of the steel pipe of order 1 are input, and the predicted processing time is calculated to be 188 minutes. The model's average absolute prediction error is 3 minutes, which is less than the allowable error threshold of 5 minutes in the original resource mapping relationship, thus meeting the migration conditions. The system updates the mapping resource node of the order 1 perforation subtask from GG-CK-CKJ-001 to GG-CK-CKJ-003 through competitive connection, and synchronously updates the priority score, competition weight, and planned processing time period of the subtask node. The data synchronization delay is 36 milliseconds.
[0282] In the production process reconfiguration phase, the planning and control unit generates equipment start commands and tooling switch prompts for GG-CK-CKJ-003 based on the new resource allocation scheme. Simultaneously, based on the equipment characteristics of GG-CK-CKJ-003, it generates suitable piercing process parameter schemes, including adjusting the roll speed to 120 r / min, the push rod feed speed to 85 mm / s, and the piercing temperature to 1220℃. All commands and parameter schemes are sent to the PLC controller and field terminals of GG-CK-CKJ-003 via Profinet industrial Ethernet. At the same time, the system updates the resource status of the two-layer non-conflicting analog interactive node network, locks the scheduling permissions of GG-CK-CKJ-001, updates the task mapping status of GG-CK-CKJ-003, and synchronously adjusts the available resource information of the pre-scheduled resource pool, completing the full-process production reconfiguration.
[0283] In this embodiment, the execution frequency of emergency response operations for equipment failures of E101 to E103 is determined by those skilled in the art based on the failure frequency of seamless steel pipe production equipment, the real-time requirements of production scheduling, and system computing resources. The real-time acquisition of equipment status parameters and the inference calculation of the fault diagnosis model can be set to be executed once every 100 milliseconds. The selection of candidate equipment in the pre-scheduled resource pool and the priority calculation of the multi-objective optimization algorithm are executed immediately after the fault alarm is triggered. The production process reconfiguration instruction is issued within 1 second after the scheme is determined. Under normal conditions, it can be set to perform a health status inspection and potential fault prediction on all equipment every 5 minutes. All of these can meet the engineering emergency response and scheduling accuracy requirements of seamless steel pipe production. The specific implementation will not be described in detail.
[0284] This embodiment constructs a two-layer non-conflict simulated interactive node network, dynamically coupling the resource node subnet and the processing task node subnet through competitive connections. It combines real-time data interaction between the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network. Based on equipment health status scoring, processing time prediction models, and conflict resolution models, it achieves dynamic modeling of production resources and quantitative analysis of conflict probabilities. In the resource node subnet, the process chain paths and resource dependencies of different devices to be processed are accurately mapped through the fusion of directed resource node connections and the initial predicted resource node graph. The processing task node subnet uses conflict connections to mark the priority competition of multiple tasks on the same resource node. Combining time constraints, timeout loss costs, and predicted processing time with a multi-objective optimization algorithm, it ensures the resource preemption capability of high-value tasks. The conflict resolution model, based on time conflict length and Bayesian probability calculations, assesses the conflict risk of resource nodes in real time and dynamically adjusts the sub-task priorities through a multi-objective optimization algorithm to generate a Pareto optimal solution with the goal of minimizing timeout losses and time conflicts. The pre-scheduled resource pool dynamically maps non-conflicting resource nodes and elastically reallocates potentially conflicting nodes, combined with simulation algorithms to simultaneously verify adjustment schemes in both virtual and real-world scenarios, forming a closed-loop feedback mechanism. The process evaluation and monitoring unit and the operational status monitoring unit collect multi-dimensional data such as equipment vibration, temperature, and energy consumption in real time. Through fault diagnosis models and quality traceability chains, they identify the root causes of anomalies, triggering adaptive parameter adjustments or load migration strategies to ensure the coordinated optimization of process parameters and equipment status. The synergistic effect of these technologies enables the system to maximize resource utilization, minimize conflict risk, enhance process stability, and control energy costs under multi-objective constraints, ultimately forming a lean production scheduling system with adaptability, robustness, and economy.
[0285] Example 2:
[0286] Please see Figure 2 Another embodiment of the present invention provides a workflow for a corresponding unit in a multi-objective production scheduling system for smart factories, specifically including:
[0287] First, based on the production process information of each device to be processed and the information of each processing node, the production process task of each device to be processed is decomposed through the multi-objective task parsing unit to obtain the multi-objective task decomposition space.
[0288] Second, based on the multi-objective task space, the sub-task management unit combines the constraint information of each sub-task to evaluate the processing priority of the corresponding sub-tasks of different devices to be processed on the same processing equipment, thereby obtaining the multi-objective priority sub-task space.
[0289] Third, based on the multi-objective priority sub-task space, the multi-objective optimization configuration parameter set is obtained by combining the equipment operating status set with the preset task conflict resolution space through the multi-objective dynamic programming unit;
[0290] Fourth, based on the multi-objective optimization configuration parameter set and the remaining configurable production equipment resources obtained by the equipment status monitoring unit, the planning and control unit performs resource scheduling and configuration and production process control for each sub-task in the multi-objective priority sub-task space.
[0291] Fifth, the processing status monitoring unit and equipment status monitoring unit monitor the processing and production process of multi-target equipment in real time to obtain a multi-target processing technology monitoring dataset and equipment operating status dataset;
[0292] Sixth, the multi-target processing technology monitoring dataset and equipment operating status dataset are fed back to the corresponding process evaluation and detection units and operating status detection units to obtain the processing technology evaluation result sequence and equipment operating status result sequence for each production equipment;
[0293] Seventh, the process evaluation result sequence and equipment operation status result sequence of each production equipment are fed back to the multi-objective dynamic programming unit and sub-task control unit through the feedback unit. Simulation algorithms are used to synchronously adjust the production priority and resource scheduling of multi-objective devices, so that the abnormality rate and loss of the devices to be processed are minimized.
[0294] The embodiments of the present invention have been described above with reference to the accompanying drawings. However, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments under the guidance of the present invention without departing from the spirit and scope of the claims. All of these variations are within the protection scope of the present invention.
Claims
1. A multi-objective production scheduling system for smart factories, characterized in that, include: Monitoring module, task control module, production process planning module; The monitoring module includes an equipment status monitoring unit and a processing status monitoring unit; The task control module includes a multi-objective task analysis unit and a sub-task management unit; The production process planning module includes a multi-objective dynamic planning unit and a planning control unit; Based on the operating status monitoring node network configured by the equipment status monitoring unit and the multi-target processing technology cross-monitoring node network configured by the processing status monitoring unit, combined with the task conflict resolution space constructed by the graph algorithm, a two-layer non-conflict generation scheduling space is constructed. The task conflict resolution space uses the ant colony algorithm to initially optimize the conflict resolution path and obtain a set of candidate resolution paths; By acquiring the multi-objective priority subtask space, a multi-objective optimization configuration parameter set is obtained, and combined with the two-layer non-conflict generation scheduling space, resource scheduling configuration and production process control are performed on each subtask in the multi-objective priority subtask space. The two-layer non-conflict generation scheduling space is configured with a two-layer non-conflict simulation interaction node network; the two-layer non-conflict simulation interaction node network includes a resource node subnet, a pre-scheduled resource pool, a conflict resolution model, and a processing task node subnet. The resource node subnet is used to store the current operating status, processing status, processing device type, processing device technology, and processing time interval of each processing device in each resource node for each production equipment. The processing task node subnet is used to store the production sub-task information of each device to be processed, the processing priority and consumption cost of different processing devices under the same resource node, and the processing process parameters of the sub-tasks corresponding to different processing devices. The pre-scheduled resource pool is used to store the idle resources corresponding to the resource node subnet at each time point and the non-idle resources after conflict resolution by the conflict resolution model; The conflict resolution model is used to resolve conflicts between subtasks of devices to be processed that have resource conflicts, so that the probability of loss and the actual loss of the subtask to be processed after resolution are minimized.
2. The multi-objective production scheduling system for smart factories as described in claim 1, characterized in that, The multi-objective production scheduling system also includes an evaluation and feedback module; the evaluation and feedback module includes a process evaluation and detection unit, an operating status detection unit, and a feedback unit. The process evaluation and detection unit and the operation status detection unit perform real-time evaluation of the equipment operation status set and multi-target processing technology monitoring dataset obtained by the equipment status monitoring unit and the processing status monitoring unit, and feed the evaluation results back to the two-layer non-conflict generation and scheduling space. The simulation algorithm is then used to make real-time synchronous adjustments to the multi-target device production process.
3. The multi-objective production scheduling system for smart factories as described in claim 2, characterized in that, The construction process of the resource node subnet includes: Obtain the location and number of all production equipment within the production area, and use a graph node algorithm to obtain an initial resource node graph; Based on the historical processing time information of the processing device corresponding to each resource node, combined with the health assessment score of the corresponding resource node and the preset time series prediction model, the processing time prediction model corresponding to each resource node is obtained. Configure the processing time prediction model corresponding to each resource node to the corresponding resource node to obtain the initial prediction resource node map. Based on the order of processing tasks and the transmission direction of processing control data of each resource node in the sub-task sequence of each device to be processed in the initial predicted resource node graph, a directed resource node connection is constructed for each device to be processed. Based on the directed resource node connections and the initial predicted resource node graph, the resource node subnet is obtained.
4. The multi-objective production scheduling system for smart factories as described in claim 3, characterized in that, The construction process of the resource node subnet also includes: Based on the resource node sequence corresponding to each device to be processed in the resource node subnet, the number of non-current device to be processed subtasks in the remaining processing time interval is predicted for each resource node currently processing subtask, and the set of non-conflicting resource nodes and the set of potentially conflicting resource nodes corresponding to each moment are obtained. The process of distinguishing between the set of non-conflicting resource nodes and the set of potentially conflicting resource nodes includes: If there are no non-current processing device subtasks within the predicted remaining processing time interval of the currently processing subtask, or if the conflict probability between the existing non-current processing device subtasks and the currently processing subtasks or non-current processing device subtasks is less than the preset conflict probability threshold, then the corresponding resource node is determined to be a non-conflicting resource node. When the corresponding resource node is a non-conflicting resource node, the corresponding resource node information is mapped to the pre-scheduled resource pool, and the corresponding information is mapped to the sub-task with the same processing technology type. If there is at least one non-current processing device subtask within the predicted remaining processing time interval of the currently processing subtask, and the conflict probability between the non-current processing device subtask and the currently processing subtask or the non-current processing device subtask is at least greater than or equal to a preset conflict probability threshold, then the corresponding resource node is determined to be a potential conflict resource node. The resource node subnet and the operation status monitoring node network have the same structure.
5. The multi-objective production scheduling system for smart factories as described in claim 4, characterized in that, The construction process of the processing task node subnet includes: Based on the task information of the device to be processed at the current moment, the processing sub-task sequence corresponding to each device to be processed is obtained by combining the pre-set task decomposition model with the processing process node sequence of the device to be processed. Based on the constraint time interval, timeout loss information, and predicted time length from the start time to the end time of each processing sub-task sequence corresponding to each processing device, the processing priority of sub-tasks of the same process type corresponding to different processing devices for the same resource node is constructed. The processing technology chain for each device to be processed is constructed based on the processing order of the subtasks in the processing subtask sequence corresponding to each device to be processed. Based on the processing priority of sub-tasks of the same process type corresponding to different devices to be processed for the same resource node, construct conflict connections corresponding to sub-tasks for the same resource node. Based on the processing technology chain corresponding to each device to be processed and the conflicting connections corresponding to the sub-tasks facing the same resource node, a subnet of processing task nodes is constructed, and the corresponding resource node is marked in each sub-task node. The processing task node subnet has the same structure as the multi-target processing technology cross-monitoring node network.
6. The multi-objective production scheduling system for smart factories as described in claim 5, characterized in that, The construction process of the two-layer non-collision simulated interactive node network includes: Based on the labels of the subnet of processing task nodes facing the same resource node, a mapping relationship between each sub-task node and each resource node is constructed. Through the established mapping relationship, the processing priority of the sub-task facing the same resource node is mapped to the corresponding resource node. Based on the processing priority of the subtasks mapped on each resource node, the processing time prediction model configured on the resource node predicts the processing time period of the mapped subtasks corresponding to each resource node under the current priority. Based on the predicted processing time period information of each resource node corresponding to the mapped subtask and the constraint time interval of the corresponding subtask, the time conflict length of each resource node corresponding to all subtasks is obtained. The time conflict length is the difference between the total length of the predicted processing time period and the intersection length of the predicted processing time period and the constraint time interval.
7. The multi-objective production scheduling system for smart factories as described in claim 6, characterized in that, The construction process of the two-layer non-collision simulated interactive node network also includes: Based on the time conflict length of all subtasks corresponding to each resource node, and combined with the priority information of the subtasks currently mapped to the corresponding resource node, the Bayesian algorithm in the conflict resolution model is used to obtain the conflict probability between all subtasks under each resource node under the current task priority. Based on the conflict probability among all subtasks under each resource node at the current task priority, the remaining resource node information monitored in real time by the running status monitoring node network, the pre-scheduled resource pool information, and each resource node, the priority of subtasks under each resource node is adjusted in real time through a multi-objective optimization algorithm combined with the constraint time interval of each corresponding subtask, the corresponding predicted processing time period, the timeout loss cost, and the preset conflict probability threshold. This results in the shortest time conflict length for each subtask and the minimum timeout loss for each sequence of subtasks for the device to be processed.
8. The multi-objective production scheduling system for smart factories as described in claim 7, characterized in that, The construction process of the two-layer non-collision simulated interactive node network also includes: Based on the equipment operation status set and multi-objective processing technology monitoring dataset obtained from the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network, the multi-objective optimization algorithm and constraint combination are solved by simulation algorithm to obtain the priority of the corresponding sub-task updated at each resource node at each time. Based on the updated priority of the corresponding subtask under each resource node at each time, construct a competitive connection between each resource node and the subtask node containing the subtask of each resource node at the current time. Based on the constructed competitive connection, the resource node subnet is connected to the processing task node subnet. At the same time, the conflict resolution model is configured to the competitive connection, and the pre-scheduled resource pool is connected to both the conflict resolution model and the resource node subnet to obtain a two-layer non-conflict simulated interactive node network.
9. The multi-objective production scheduling system for smart factories as described in claim 8, characterized in that, The process of real-time synchronous adjustment of the multi-target device manufacturing process through simulation algorithms includes: Based on the dual-layer non-conflict simulation interaction node network combined with the simulation algorithm, the multi-objective generation process is simulated in real time, and the equipment operation status set and multi-objective processing technology monitoring dataset are obtained in real time through the operation status monitoring node network and the multi-objective processing technology cross-monitoring node network. Based on the equipment operation status set and the multi-target processing technology monitoring dataset, the conflict resolution model in the double-layer non-conflict simulation interaction node network determines in real time whether each resource node in the resource node subnet is a non-conflict resource node at the corresponding time point. If so, the label corresponding to the resource node is saved to the pre-scheduled resource pool. If not, it is determined to be a potential conflicting resource node. Then, by combining the multi-objective optimization algorithm and constraint combination with the number of resource nodes of the same processing technology type remaining in the pre-scheduled resource pool at the current time and the corresponding equipment operation evaluation results, the processing priority of all sub-tasks corresponding to the potential conflicting resource nodes is adjusted, and the adjusted processing priority is mapped to the corresponding sub-task nodes through competitive connection. When the processing flow of the corresponding device reaches the corresponding subtask, the processing priority of the device subtask is adjusted to process it.
Citation Information
Patent Citations
A Distributed Factory Production and Distribution Integrated Scheduling Method and System
CN114594744B
An intelligent scheduling system and method for collaborative production of intelligent factories
CN115034420B
Smart factory production scheduling optimization method based on big data
CN117522085B