An industrial park soil-groundwater pollution prevention and control method

By using multi-factor quantitative evaluation and pollution plume boundary identification, combined with continuous permeable reactive barriers and soil remediation technology, the problems of inaccurate zoning identification and unreasonable resource allocation in the prevention and control of soil-groundwater pollution in industrial parks have been solved, achieving efficient and economical pollution prevention and control.

CN123140635APending Publication Date: 2026-11-20NANJING INST OF ENVIRONMENTAL SCI MINIST OF ECOLOGY & ENVIRONMENT OF THE PEOPLES REPUBLIC OF CHINA
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611282064.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-20

AI Technical Summary

Technical Problem

Existing technologies for soil and groundwater pollution control in industrial parks suffer from problems such as insufficient accuracy in identifying pollution zones, unreasonable allocation of monitoring resources, and fragmented treatment of soil and groundwater, resulting in high treatment costs and low efficiency.

Method used

A multi-factor quantitative evaluation method is used to classify pollution levels. Combined with pollution plume boundary identification and zoned prevention and control, continuous permeable reactive barriers and soil remediation technologies are used to achieve accurate identification of pollution sources and optimized utilization of resources.

Benefits of technology

It has enabled precise prevention and control of soil and groundwater pollution in industrial parks, reduced treatment costs, improved resource utilization efficiency, and ensured environmental safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123140635A_ABST
    Figure CN123140635A_ABST
Patent Text Reader

Abstract

The application discloses an industrial park soil-groundwater pollution prevention and control method, comprising the following steps: S1, pollution grade division; S2, pollution plume boundary division; S3, prevention and control zoning: the whole to be prevented and controlled industrial park is divided into the following three kinds of prevention and control zones: key prevention and control zone; general prevention and control zone; daily monitoring area; S4, groundwater partition prevention and control: S4-1, key prevention and control zone prevention and control; S4-2, general prevention and control zone prevention and control; S4-3, daily monitoring area prevention and control; S5, soil prevention and control. The application establishes a whole-chain technical system of multi-factor quantitative evaluation, risk grade division, pollution plume accurate positioning and partition differentiation prevention and control, solves the industry common problem that the key prevention and control area is not accurately identified under the multi-source scattered pollution scene of the industrial park by introducing pollution load index, pollution status index, migration condition index and sensitive distance index into a unified quantitative evaluation framework, and realizes accurate putting of prevention and control resources to high-risk areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of soil and groundwater remediation technology, specifically to a method for preventing and controlling soil and groundwater pollution in industrial parks. Background Technology

[0002] Industrial parks are important carriers of economic development, but they are also high-risk areas for soil and groundwater pollution. The high density of enterprises, diverse raw materials, and complex underground pipelines within these parks lead to widespread leaks and spills, resulting in the long-term accumulation of various pollutants, such as heavy metals, volatile organic compounds, and petroleum hydrocarbons, in the vadose zone of the soil and aquifers, creating a complex pollution pattern. Unlike single-contaminated sites, pollution in industrial parks is characterized by dispersed pollution sources, complex pollutant components, strong spatial heterogeneity, and variable migration and transformation patterns, posing significant challenges to pollution control efforts.

[0003] Currently, the main shortcomings of technologies for preventing and controlling soil and groundwater pollution in industrial parks are as follows: First, most existing pollution zoning methods are based on a single indicator and lack a multi-factor quantitative evaluation system that comprehensively considers pollution load, current degree of exceedance, hydrogeological migration conditions and distribution of sensitive receptors. This results in insufficient accuracy in identifying key prevention and control areas, either being overly conservative and wasting treatment costs, or being too lenient and leaving environmental safety hazards.

[0004] Secondly, the deployment of monitoring networks lacks specificity. Traditional monitoring schemes typically employ a uniform grid layout, failing to consider the differences in risk levels across different areas. This results in insufficient monitoring density in high-risk areas and excessive monitoring in low-risk areas, leading to inefficient allocation of monitoring resources and difficulty in timely capturing the dynamic changes of pollution plumes.

[0005] Third, soil pollution remediation and groundwater pollution remediation are often carried out separately. Soil remediation focuses on ex-situ treatment, while groundwater remediation focuses on in-situ treatment, with a lack of coordinated design in terms of materials and processes. In particular, for low-contaminated soil excavated during monitoring in low- and medium-risk areas, the current mainstream practice is to transport it off-site for landfill or disposal, which increases disposal costs and wastes potential engineering filler resources.

[0006] In existing research, the invention patent with patent publication number CN118297410B relates to a comprehensive treatment method for soil and groundwater pollution in industrial parks, including the following steps: S1, risk level classification; S1-1, soil risk classification in industrial parks; S1-2, groundwater risk classification in industrial parks; S1-3, comprehensive risk level classification; S2, treatment mode selection. This invention simplifies the technical regulations for risk screening and risk classification of industrial enterprise sites, deriving a set of standards suitable for soil and groundwater treatment in industrial parks. It comprehensively considers and assigns values ​​to various risk items in both soil and groundwater risks in industrial parks, ultimately obtaining a scientifically reasonable comprehensive risk level score S for the industrial park. This score can define the comprehensive risk of the industrial park and establish a classification and evaluation index system and method for soil-groundwater pollution zoning in industrial pharmaceutical and chemical industrial parks. However, this method still suffers from problems such as missing pollution plume boundary identification and insufficient zoning accuracy, and there is no correlation between soil and groundwater treatment.

[0007] In summary, there is an urgent need to establish a collaborative prevention and control method for soil and groundwater in industrial parks that integrates "risk identification, three-dimensional monitoring, zoning, material linkage, and dynamic regulation" to achieve the technical goals of accurate identification of pollution sources, graded utilization of resources, and long-term stable prevention and control. Summary of the Invention

[0008] To address the aforementioned problems, this invention provides a method for preventing and controlling soil and groundwater pollution in industrial parks.

[0009] The technical solution of this invention is: A method for preventing and controlling soil and groundwater pollution in industrial parks includes the following steps: S1. Pollution Level Classification: The area occupied by each independent enterprise in the industrial park to be controlled is defined as an evaluation unit. Soil sampling points are set up at 30~50m×30~50m. The pollution load index L, pollution status index P, migration condition index T, and sensitive distance index S of each evaluation unit are measured respectively. The range of each index is normalized to the range of 0~10. Then, the comprehensive control index R of each evaluation unit is calculated by formula (1): R=0.35×L+0.30×P+0.20×T+0.15×S (1) Pollution levels of assessment units are classified according to R-values: High-risk assessment units: R ≥ 7.5; Medium-risk assessment units: 4.5 ≤ R < 7.5; Low-risk assessment units: R < 4.5. S2. Delineation of pollution plume boundaries: Within the medium-risk assessment unit, groundwater monitoring wells are set up at 30~50m×30~50m intervals. Based on the measured concentrations of major characteristic pollutants in the groundwater at each sampling point, a contour map of the spatial distribution of the concentrations of major characteristic pollutants is drawn using the ordinary Kriging interpolation method. The boundary of the area enclosed by the contour lines with concentrations equal to 1.5~2 times the groundwater quality standard limit is determined as the pollution plume boundary. S3. Prevention and Control Zone Delineation: The entire industrial park to be controlled will be divided into the following three types of prevention and control zones: Key prevention and control area: the area occupied by all high-risk assessment units; the area of ​​the buffer zone extending 30-50m outward from the boundary of all high-risk assessment units; the area of ​​the buffer zone extending 10-30m outward from the boundary of the pollution plume; the union of the three. General prevention and control zone: the area occupied by all medium-risk assessment units; the area of ​​the buffer zone extending 10-30m outward from the boundary of the medium-risk assessment unit; the union of the two. Routine monitoring area: All remaining areas within the industrial park under control, excluding key control areas and general control areas; S4. Groundwater Zoning Control: S4-1. Prevention and control in key prevention and control areas: Downstream of the boundary of the pollution plume in the key prevention and control area, a continuous permeable reactive wall is installed in a direction perpendicular to the groundwater flow direction. The continuous permeable reactive wall extends 5-15m beyond the width boundary of the pollution plume at both ends. S4-2. General control zone control: Sampling and testing of groundwater monitoring wells in each evaluation unit every 30-90 days. The testing items are all major characteristic pollutants. When the concentration of any major characteristic pollutant in any groundwater monitoring well exceeds the standard limit by 1.5 to 2 times, the evaluation unit is upgraded to a key control zone and a continuous permeable reactive barrier is deployed in accordance with the method described in S4-1. S4-3, Daily monitoring and control: Sampling and testing of groundwater monitoring wells in each evaluation unit every 3 to 6 months, with testing items including pH, conductivity, COD and all major characteristic pollutants; S5. Soil control: In any soil sampling point where the concentration of any major characteristic pollutant exceeds 1.2 times the standard value, excavation shall be carried out in an area of ​​5~10m×5~10m centered on the soil sampling point, with the excavation depth extending 0.2~0.5m outward from the surface to the lower limit of the pollution depth.

[0010] Furthermore, in S1, if the area of ​​a single evaluation unit is greater than 3 hectares, it is divided into several sub-units according to a 50m×50m grid, and each sub-unit is an independent evaluation unit.

[0011] Note: To avoid the homogenization of risk levels across large areas of land by a single enterprise, and to ensure that no high-risk areas are missed in the assessment.

[0012] Furthermore, in S1, the pollution load index L is calculated using formula (2): L=(Q l / 5)+(Q w / 500) (2) Among them, Q l Q represents the average annual total amount of toxic and hazardous liquid leaks in this evaluation unit over the past three years, expressed in kg / a. w The average annual total wastewater discharge of this evaluation unit over the past three years, in cubic meters (m³). 3 / a; The pollution status index P is calculated using formula (3): P=(C max1 / S 1 )+(C max2 / S 2 ) (3) Among them, C max1 S1 represents the maximum measured concentration of any pollutant in the soil of this evaluation unit, and C represents the soil pollution risk screening value for the corresponding pollutant. max2 S1 represents the maximum measured concentration of any pollutant in the groundwater of the evaluation unit, and S2 represents the groundwater quality standard limit for the corresponding pollutant. Both units are in mg / L. When no soil or groundwater samples are collected in a certain evaluation unit, the ratio of the corresponding item is set to 0. The migration condition index T is calculated using formula (4): T = (10 / H) + (K × 1000) (4) Where H is the average thickness of the vadose zone in the evaluation unit, in meters; K is the vertical permeability coefficient of the vadose zone in the evaluation unit, in meters per second; when H ≤ 0.5 m, 10 / H is calculated as 20; when H > 30 m, 10 / H is calculated as 0.3. The sensitivity distance index S is calculated using formula (5): S=1000 / D (5) Where D is the shortest distance from the boundary of the evaluation unit to the nearest residential area, school or hospital outside the park, in meters; when D≥1000m, S is counted as 1; when D<50m, S is counted as 20.

[0013] Note: The four elements of enterprise leakage and emission, pollution status, geological conditions, and sensitive targets are incorporated into the same quantitative framework.

[0014] Furthermore, in S1, the range normalization method is as follows: Each of the aforementioned indices is converted to the 0~10 interval according to formula (6): X = (XX) min ) / (X max -X min )×10 (6) Where X is the measured value of a certain index of the evaluation unit, X min X is the minimum value of this index among all evaluation units. max This is the maximum value of the index across all evaluation units.

[0015] Note: Range normalization is used to unify all indicators to the 0-10 score range, eliminating the impact of dimensional differences on weighted summation and ensuring the objective comparability of R-value calculation results.

[0016] Furthermore, in S2, the groundwater monitoring well is constructed to a depth of 1-2m above the bottom of the aquifer, and the screen tube is located below the groundwater level fluctuation zone to the bottom of the well. The main characteristic pollutants include heavy metals arsenic, lead, hexavalent chromium, cadmium, and mercury, volatile organic pollutants benzene, toluene, trichloroethylene, tetrachloroethylene, semi-volatile organic compounds polycyclic aromatic hydrocarbons, polychlorinated biphenyls, and petroleum hydrocarbons.

[0017] Note: The depth of the monitoring well and the location of the screen tube are limited, and the list of major characteristic pollutants is clearly defined to ensure the representativeness of groundwater sampling and the comprehensiveness of the testing items.

[0018] Furthermore, in S3, the area occupied by the general prevention and control zone is reduced by the portion that overlaps with the key prevention and control zone.

[0019] Note: The area of ​​the general prevention and control zone is reduced by the portion that overlaps with the key prevention and control zone to avoid unclear management boundaries and duplicate investment of governance resources caused by overlapping zones.

[0020] Furthermore, in S4-1, the continuous permeable reactive barrier, along the groundwater flow direction from upstream to downstream, is as follows: First quartz sand transition layer: thickness 0.2~0.5m, quartz sand particle size 0.5~1mm; Zero-valent iron-quartz sand mixed reaction layer: 1~2m thick, zero-valent iron and quartz sand are uniformly mixed at a mass ratio of 1:4~5, zero-valent iron particle size is 50~150μm, quartz sand particle size is 0.25~0.5mm, and compaction density is 1.6~1.8g / cm³. 3 ; Activated carbon-zeolite adsorption layer: thickness 0.5~1m, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:7~10, with a particle size of 1~3mm; Second quartz sand transition layer: thickness 0.1~0.5m, quartz sand particle size 0.5~1mm.

[0021] Note: This study defines the four-layer structure of the PRB wall and the material ratio, particle size, thickness, and compaction density of each layer, providing operable engineering parameters for groundwater pollution interception.

[0022] Furthermore, in S4-3, when any test item changes by more than ±50% compared to the last test, the monitoring frequency is increased to once every 1 to 3 months. When at least 3 test items change by more than ±50% compared to the last test, the evaluation unit is upgraded to a general prevention and control area.

[0023] Note: Set dynamic escalation trigger thresholds for monitoring indicators in daily monitoring areas to give the prevention and control system a sensitive adaptive response capability.

[0024] Furthermore, in S5, the excavated soil is remediated in situ using a low-temperature thermal desorption method, with a heating temperature of 150~350℃ and a heating time of 10~30min. The remediated soil is then sieved to obtain coarse recycled soil with a particle size of 0.5~5mm and fine recycled soil with a particle size of <0.5mm. After being washed 2-3 times, the coarse recycled soil replaces 20-40% of the quartz sand in the zero-valent iron-quartz sand mixed reaction layer. The fine recycled soil is mixed with sodium bentonite and silicate cement at a mass ratio of 80~85:10~15:3~5, water is added and stirred until the moisture content is 18~22%, and granulation is carried out using a granulator with the particle size controlled at 2~5mm. After natural curing for 7~10 days, recycled composite particles are formed. The recycled composite particles replace 20~40% of the quartz sand in the first quartz sand transition layer and the second quartz sand transition layer. The remaining coarse and fine recycled soil was backfilled to the excavation site.

[0025] Explanation: After low-temperature thermal desorption remediation, the excavated contaminated soil is used in stages—coarse particles replace quartz sand in the PRB reaction layer, and fine particles are granulated and then replaced with quartz sand in the transition layer, realizing the closed-loop recycling of soil resources in low- and medium-risk areas.

[0026] The beneficial effects of this invention are: (1) This invention establishes a full-chain technical system of multi-factor quantitative evaluation → risk level classification → precise location of pollution plume → differentiated prevention and control in different areas. By incorporating pollution load index, pollution status index, migration condition index and sensitive distance index into a unified quantitative evaluation framework, it solves the common problem of inaccurate identification of key prevention and control areas in industrial parks under multi-source dispersed pollution scenarios, and realizes the precise allocation of prevention and control resources to high-risk areas.

[0027] (2) This invention unifies four evaluation indicators of different dimensions to a comparable scale through range normalization processing, divides the entire park into three risk levels: high, medium and low, and then combines spatial topology operations that extend the pollution plume interpolation boundary outward by 30~50m and 10~30m buffer zones respectively, to achieve accurate mapping of risk level to spatial prevention and control zoning, avoiding the defects of subjective classification and ambiguous boundaries in traditional methods, and making the zoning results reproducible and objective.

[0028] (3) This invention breaks the technical separation between soil remediation and groundwater treatment at the material level. The contaminated soil excavated during the monitoring of medium and low risk areas is remediated by low-temperature thermal desorption and then treated differently according to particle size classification. The coarse particles are washed with water and directly replace 20-40% of the commercial quartz sand in the PRB zero-valent iron reaction layer. The fine particles are granulated with bentonite and cement and replace 20-40% of the quartz sand at both ends of the PRB. This forms an on-site material circulation closed loop of soil excavation → ex-situ remediation → graded pretreatment → PRB filler replacement. This not only eliminates the pollution source and reduces the cost of off-site disposal, but also significantly reduces the amount of commercial materials used in PRB construction, thus achieving a unity of environmental and economic benefits. Attached Figure Description

[0029] Figure 1 This is a schematic diagram comparing the concentration of benzene in the effluent in Experiment Example 2; Figure 2 This is a schematic diagram comparing the concentration of vinyl chloride in the effluent from Experiment Example 2; Figure 3 This is a schematic diagram comparing the retention rate of the permeability coefficient after 180 days of operation in Experiment Example 2. Detailed Implementation

[0030] Example 1: A method for preventing and controlling soil and groundwater pollution in industrial parks, comprising the following steps: S1. Pollution level classification: The area occupied by each independent enterprise in the industrial park to be controlled is defined as an evaluation unit. If the area of ​​a single evaluation unit is greater than 3 hectares, it is divided into several sub-units according to a 50m×50m grid. Each sub-unit is an independent evaluation unit. Soil sampling points are set up according to a 40m×40m grid. Soil sampling, preservation and testing are carried out in accordance with the "Technical Guidelines for Monitoring and Control of Soil Pollution Risk in Construction Land" (HJ 25.2-2019). The pollution load index L, pollution status index P, migration condition index T and sensitive distance index S of each evaluation unit are measured respectively. The pollution load index L is calculated by formula (2): L=(Q l / 5)+(Q w / 500) (2) Among them, Q lQ represents the average annual total amount of toxic and hazardous liquid leaks in this evaluation unit over the past three years, expressed in kg / a. w The average annual total wastewater discharge of this evaluation unit over the past three years, in cubic meters (m³). 3 / a; The pollution status index P is calculated using formula (3): P=(C max1 / S 1 )+(C max2 / S 2 ) (3) Among them, C max1 S1 represents the maximum measured concentration of any pollutant in the soil of this evaluation unit, and C represents the soil pollution risk screening value for the corresponding pollutant (the screening value for Class II land use in the "Soil Environmental Quality Standard for Construction Land Soil Pollution Risk Control (Trial)" (GB 36600-2018)). max2 S1 represents the maximum measured concentration of any pollutant in the groundwater of the evaluation unit, and S2 represents the groundwater quality standard limit for the corresponding pollutant (Class III standard limit in the "Groundwater Quality Standard" (GB / T 14848-2017)). The units are both mg / L. When no soil or groundwater samples are collected in a certain evaluation unit, the ratio of the corresponding item is counted as 0. The migration condition index T is calculated using formula (4): T = (10 / H) + (K × 1000) (4) Where H is the average thickness of the vadose zone in the evaluation unit, in meters; K is the vertical permeability coefficient of the vadose zone in the evaluation unit, in meters per second; when H ≤ 0.5 m, 10 / H is calculated as 20; when H > 30 m, 10 / H is calculated as 0.3. The sensitivity distance index S is calculated using formula (5): S=1000 / D (5) Where D is the shortest distance from the boundary of the evaluation unit to the nearest residential area, school or hospital outside the park, in meters; when D ≥ 1000m, S is counted as 1; when D < 50m, S is counted as 20. Each index is converted to the 0~10 range by range normalization. The range normalization method is as follows: convert each index to the 0~10 range according to formula (6): X = (XX) min ) / (X max -X min )×10 (6) Where X is the measured value of a certain index of the evaluation unit, X min X is the minimum value of this index among all evaluation units. max This is the maximum value of the index across all evaluation units; Then, the comprehensive prevention and control index R of each evaluation unit is calculated using formula (1): R=0.35×L+0.30×P+0.20×T+0.15×S (1) Pollution levels of assessment units are classified according to R-values: High-risk assessment units: R ≥ 7.5; Medium-risk assessment units: 4.5 ≤ R < 7.5; Low-risk assessment units: R < 4.5. S2. Pollution Plume Boundary Delineation: Within the medium-risk assessment unit, groundwater monitoring wells are deployed at 30-50m x 30-50m intervals. The construction, sample collection, and preservation of groundwater monitoring wells shall be carried out in accordance with the "Technical Specification for Groundwater Environmental Monitoring" (HJ 164-2020). Based on the measured concentrations of major characteristic pollutants in the groundwater at each sampling point, a spatial distribution contour map of the major characteristic pollutant concentrations is drawn using ordinary kriging interpolation. Concentrations equal to 1.5-2 times the groundwater quality standard limit ("Groundwater Quality Standard" (GB / T 164-2020) are considered. The boundary of the area enclosed by the contour lines of the Class III standard limits in (14848-2017) is determined as the boundary of the pollution plume. The well depth of the groundwater monitoring well is 1m above the bottom of the aquifer, and the screen tube is located below the groundwater level fluctuation zone to the bottom of the well. The main characteristic pollutants include heavy metals arsenic, lead, hexavalent chromium, cadmium, mercury, volatile organic pollutants benzene, toluene, trichloroethylene, tetrachloroethylene, semi-volatile organic compounds polycyclic aromatic hydrocarbons, polychlorinated biphenyls, and petroleum hydrocarbons. S3. Prevention and Control Zone Delineation: The entire industrial park to be controlled will be divided into the following three types of prevention and control zones: Key prevention and control area: the area occupied by all high-risk assessment units; the area of ​​the buffer zone extending 40m outward from the boundary of all high-risk assessment units; the area of ​​the buffer zone extending 20m outward from the boundary of the pollution plume; the union of the three. General prevention and control area: the area occupied by all medium-risk assessment units; the area of ​​the buffer zone extending 20m outward from the boundary of the medium-risk assessment unit; the union of the two, the area occupied by the general prevention and control area minus the part that overlaps with the key prevention and control area; Routine monitoring area: All remaining areas within the industrial park under control, excluding key control areas and general control areas; S4. Groundwater Zoning Control: S4-1. Prevention and Control in Key Control Areas: Downstream of the pollution plume boundary within the key control area, a continuous permeable reactive barrier is deployed perpendicular to the groundwater flow direction. Each end of the continuous permeable reactive barrier extends 10m beyond the width boundary of the pollution plume. The continuous permeable reactive barriers, from upstream to downstream along the groundwater flow direction, are as follows: First quartz sand transition layer: 0.3m thick, quartz sand particle size 0.5~1mm; Zero-valent iron (ZVFe)-quartz sand mixed reaction layer: 1.5m thick, ZVFe and quartz sand are uniformly mixed at a mass ratio of 1:4.5, with ZVFe particle size of 50~150μm and quartz sand particle size of 0.25~0.5mm, and a compacted density of 1.7g / cm³. 3 ; Activated carbon-zeolite adsorption layer: 0.7m thick, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:8, with a particle size of 1~3mm; Second quartz sand transition layer: thickness 0.25m, quartz sand particle size 0.5~1mm; S4-2, General Control Zone Control: Groundwater monitoring wells in each evaluation unit shall be sampled and tested every 60 days. The test items shall be all major characteristic pollutants. When the concentration of any major characteristic pollutant in any groundwater monitoring well exceeds 1.6 times the standard limit (Class III standard limit in the Groundwater Quality Standard (GB / T 14848-2017)), the evaluation unit shall be upgraded to a key control zone and a continuous permeable reactive barrier shall be deployed in accordance with the method in S4-1. S4-3, Daily monitoring and control: Groundwater monitoring wells in each evaluation unit shall be sampled and tested every 4 months. The test items are pH, conductivity, COD and all major characteristic pollutants. When any test item changes by more than ±50% compared with the last test, the frequency of monitoring shall be increased to once every 2 months. When at least 3 test items change by more than ±50% compared with the last test, the evaluation unit shall be upgraded to a general control area. S5. Soil control: In any soil sampling point, if the concentration of any major characteristic pollutant exceeds the standard value (the screening value for Class II land use in the "Soil Environmental Quality Construction Land Soil Pollution Risk Control Standard (Trial)" (GB 36600-2018)) by 1.2 times, an excavation shall be carried out in a 6m×6m range centered on the soil sampling point. The excavation depth shall extend from the surface to the lower limit of the pollution depth and then outward by 0.3m. The excavated soil shall be remediated in situ using a low-temperature thermal desorption method. The heating temperature shall be 350℃ and the heating time shall be 10min. The remediated soil shall be sieved to obtain coarse recycled soil with a particle size of 0.5~5mm and fine recycled soil with a particle size of <0.5mm. After being washed three times, the coarse recycled soil replaced 30% of the quartz sand in the zero-valent iron-quartz sand mixed reaction layer; Fine recycled soil is mixed with sodium bentonite and silicate cement at a mass ratio of 82:12:4. Water is added and stirred until the moisture content is 20%. Granulation is carried out using a granulator, and the particle size is controlled to be 3~5mm. After natural curing for 8 days, recycled composite particles are formed. The recycled composite particles replace 30% of the quartz sand in the first quartz sand transition layer and the second quartz sand transition layer. The remaining coarse and fine recycled soil was backfilled to the excavation site.

[0031] Example 2: The difference between this example and Example 1 is that in S1, soil sampling points are set up in a 30m×30m pattern, and in S5, excavation is carried out in a 5m×5m pattern, with the excavation depth extending 0.2m beyond the lower limit of the pollution depth from the surface.

[0032] Example 3: The difference between this example and Example 1 is that in S1, soil sampling points are set up in a 50m×50m pattern, and in S5, excavation is carried out in a 10m×10m range, with the excavation depth extending 0.5m outward from the surface to the lower limit of the pollution depth.

[0033] Example 4: The difference between this example and Example 1 is that in S1, soil sampling points are set up in a 45m×35m pattern, and in S5, excavation is carried out in a 7m×7m pattern, with the excavation depth extending 0.4m outward from the surface to the lower limit of the pollution depth.

[0034] Note: For key prevention and control areas, the excavation area should be appropriately increased.

[0035] Example 5: This example differs from Example 1 in that, in S2, the groundwater monitoring well is constructed to a depth of 2m above the bottom of the aquifer. Example 6: This example differs from Example 1 in that, in S3, the key prevention and control area is the area occupied by all high-risk assessment units; the area of ​​the buffer zone extending 30m outward from the boundary of all high-risk assessment units; and the area of ​​the buffer zone extending 10m outward from the boundary of the pollution plume; the union of these three is taken. The general prevention and control area is the area occupied by all medium-risk assessment units; and the area of ​​the buffer zone extending 10m outward from the boundary of the medium-risk assessment units; the union of these two is taken. The area occupied by the general prevention and control area is minus the portion that overlaps with the key prevention and control area.

[0036] Example 7: This example differs from Example 1 in that, in S3, the key prevention and control area is the area occupied by all high-risk assessment units; the area of ​​the buffer zone extending 50m outward from the boundary of all high-risk assessment units; and the area of ​​the buffer zone extending 30m outward from the boundary of the pollution plume; the union of these three is taken. The general prevention and control area is the area occupied by all medium-risk assessment units; and the area of ​​the buffer zone extending 30m outward from the boundary of the medium-risk assessment units; the union of these two is taken. The area occupied by the general prevention and control area is minus the portion that overlaps with the key prevention and control area.

[0037] Example 8: This example differs from Example 1 in that the continuous permeable reactive barrier extends 5m beyond the boundary of the contamination plume at both ends. The continuous permeable reactive barrier, along the groundwater flow direction from upstream to downstream, is as follows: First quartz sand transition layer: thickness 0.2m, quartz sand particle size 0.5~0.8mm; Zero-valent iron-quartz sand mixed reaction layer: 1m thick, zero-valent iron and quartz sand are uniformly mixed at a mass ratio of 1:4, with zero-valent iron particle size of 50~100μm and quartz sand particle size of 0.25~0.4mm, and a compacted density of 1.6g / cm³. 3 ; Activated carbon-zeolite adsorption layer: 0.5m thick, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:7, with a particle size of 1~2mm; Second quartz sand transition layer: 0.1m thick, quartz sand particle size 0.5~0.8mm.

[0038] Example 9: This example differs from Example 1 in that the continuous permeable reactive barrier extends 15m beyond the width boundary of the contamination plume at both ends. The continuous permeable reactive barrier, along the groundwater flow direction from upstream to downstream, is as follows: First quartz sand transition layer: 0.5m thick, quartz sand particle size 0.6~1mm; Zero-valent iron-quartz sand mixed reaction layer: 2m thick, zero-valent iron and quartz sand are uniformly mixed at a mass ratio of 1:5, with zero-valent iron particle size of 100~150μm and quartz sand particle size of 0.3~0.5mm, and a compacted density of 1.8g / cm³. 3 ; Activated carbon-zeolite adsorption layer: 1m thick, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:10, with a particle size of 2~3mm; Second quartz sand transition layer: 0.5m thick, quartz sand particle size 0.6~1mm.

[0039] Example 10: This example differs from Example 1 in that the continuous permeable reactive barrier extends 12m beyond the width boundary of the contamination plume at both ends. The continuous permeable reactive barrier, along the groundwater flow direction from upstream to downstream, is as follows: First quartz sand transition layer: 0.4m thick, quartz sand particle size 0.8~1mm; Zero-valent iron (ZVFe)-quartz sand mixed reaction layer: 1.6m thick, ZVFe and quartz sand are uniformly mixed at a mass ratio of 1:4.8, with ZVFe particle size of 120~150μm and quartz sand particle size of 0.4~0.5mm, and a compacted density of 1.65g / cm³. 3 ; Activated carbon-zeolite adsorption layer: 0.85m thick, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:9, with a particle size of 2~3mm; Second quartz sand transition layer: 0.22m thick, quartz sand particle size 0.8~1mm.

[0040] Example 11: This example differs from Example 1 in that, in S4-2, general control zone control: groundwater monitoring wells in each evaluation unit are sampled and tested every 30 days. The test items are all major characteristic pollutants. When the concentration of any major characteristic pollutant in any groundwater monitoring well exceeds 1.5 times the standard limit (Class III standard limit in the "Groundwater Quality Standard" (GB / T 14848-2017)), the evaluation unit is upgraded to a key control zone and a continuous permeable reactive barrier is deployed in accordance with the S4-1 method. S4-3, Routine monitoring and control: Groundwater monitoring wells in each evaluation unit shall be sampled and tested every 3 months. The test items are pH, conductivity, COD and all major characteristic pollutants. When any test item changes by more than ±50% compared with the last test, the frequency of monitoring shall be increased to once a month. When at least 3 test items change by more than ±50% compared with the last test, the evaluation unit shall be upgraded to a general control and control area.

[0041] Example 12: This example differs from Example 1 in that, in S4-2, general control zone control: groundwater monitoring wells in each evaluation unit are sampled and tested every 90 days. The test items are all major characteristic pollutants. When the concentration of any major characteristic pollutant in any groundwater monitoring well exceeds twice the standard limit (Class III standard limit in the "Groundwater Quality Standard" (GB / T 14848-2017)), the evaluation unit is upgraded to a key control zone and a continuous permeable reactive barrier is deployed in accordance with the method in S4-1. S4-3, Routine monitoring and control: Groundwater monitoring wells in each evaluation unit shall be sampled and tested every 6 months. The test items are pH, conductivity, COD and all major characteristic pollutants. When any test item changes by more than ±50% compared with the last test, the frequency of monitoring shall be increased to once every 3 months. When at least 3 test items change by more than ±50% compared with the last test, the evaluation unit shall be upgraded to a general control and control area.

[0042] Example 13: The difference between this example and Example 1 is that in S5, the low-temperature thermal desorption method is used for ex-situ repair, the heating temperature is 150°C and the heating time is 30 minutes.

[0043] Example 14: The difference between this example and Example 1 is that in S5, the coarse recycled soil is washed twice with water and then replaces 20% of the quartz sand in the zero-valent iron-quartz sand mixed reaction layer. Fine recycled soil is mixed with sodium bentonite and silicate cement at a mass ratio of 80:10:3. Water is added and stirred until the moisture content is 18%. Granulation is carried out using a granulator, and the particle size is controlled to be 2~3mm. After natural curing for 7 days, recycled composite particles are formed. The recycled composite particles replace 20% of the quartz sand in the first quartz sand transition layer and the second quartz sand transition layer.

[0044] Example 15: The difference between this example and Example 1 is that in S5, the coarse recycled soil is washed with water three times and then replaces 40% of the quartz sand in the zero-valent iron-quartz sand mixed reaction layer. Fine recycled soil is mixed with sodium bentonite and silicate cement at a mass ratio of 85:15:5. Water is added and stirred until the moisture content is 22%. Granulation is carried out using a granulator, and the particle size is controlled to be 4~5mm. After natural curing for 10 days, recycled composite particles are formed. The recycled composite particles replace 40% of the quartz sand in the first quartz sand transition layer and the second quartz sand transition layer.

[0045] Experimental Examples: The following experimental examples are used to verify the impact of key parameters on the control effect of the soil-groundwater pollution control method for industrial parks described in this invention. All experimental examples were conducted in a chemical industrial park (approximately 2.8 km²). 2 On-site verification was conducted at a facility comprising 17 independent companies. The groundwater type in the industrial park is loose rock pore water, with an average aquifer thickness of 8.5m, an average vadose zone thickness of 6.2m, and a groundwater flow velocity of 0.15 m / d. The main characteristic pollutants are benzene (C6H6) and vinyl chloride (VC). The groundwater quality standard limits are based on Class III standards (benzene ≤ 10 μg / L, vinyl chloride ≤ 5 μg / L) in the "Groundwater Quality Standard" (GB / T 14848-2017).

[0046] Experimental Example 1: Six evaluation units (A-F) with significant differences in pollution characteristics within the park were selected. The comprehensive risk score of each unit was calculated using the evaluation method in Example 1. The results are shown in Table 1.

[0047] Table 1 Evaluation Results

[0048] It can be seen that by unifying the four indicators to a comparable scale of 0-10 through range normalization, and then weighting them according to a scientific weighting of 0.35:0.30:0.20:0.15, the risk scores for units D and F are 4.96 and 2.00, respectively, which are consistent with the actual survey results. This indicates that range normalization is a key prerequisite for ensuring the objectivity and accuracy of the comprehensive evaluation results of multiple indicators. Without range normalization, because the original values ​​of L and P are much larger than those of T and S, L and P contribute more than 85% to the R value, while T and S have almost no effect. Unit D, due to its extremely high original L value, has an extremely high R value, and unit F, due to its extremely high original T value, also has an extremely high R value, both of which are misjudged as having the highest risk level. However, in reality, the P value of unit D is only at a medium level, and the S value of unit F is extremely low, meaning the overall risk may not be the highest. This demonstrates that the lack of normalization will lead to serious distortion of the evaluation results.

[0049] Experimental Example 2: Based on the scheme in Example 1, different proportions of coarse recycled soil were used to replace the quartz sand in the zero-valent iron-quartz sand mixed reaction layer, and different proportions of recycled composite particles were used to replace the quartz sand in the first / second quartz sand transition layer. After 180 days of operation, the effluent concentration, wall permeability coefficient, and material cost were compared. Both the coarse recycled soil and the recycled composite particles were derived from contaminated soil excavated in step S5 of the park and remediated by low-temperature thermal desorption. The scheme comparison is shown in Table 2.

[0050] Table 2 Comparison of Schemes

[0051] The comparison results from the perspective of material costs are shown in Table 3.

[0052] Table 3 Comparison of Material Costs

[0053] It can be seen that the effluent concentrations of 20% to 40% reused in Examples 1, 14, and 15 all met the standards, and the cost was significantly lower than that of Comparative Example 1, which used all externally purchased quartz sand. Among them, the 30% reuse in Example 1 is the optimal ratio, achieving the greatest cost savings while ensuring the interception effect.

[0054] In Comparative Example 2, the permeability coefficient retention rate of the unscreened and ungranulated native soil used for direct reuse dropped sharply to 52.3%, and the effluent exceeded the standard (benzene 15.3 μg / L), indicating that direct reuse of soil without screening and granulation will lead to severe clogging of PRB.

[0055] Comparative Example 3 showed that replacing 60% of the coarse recycled soil resulted in an effluent concentration close to the critical value for exceeding the standard (benzene 8.5 μg / L), and the permeability coefficient retention rate also decreased to 71.2%. This indicates that excessive replacement ratios can damage the gradation structure of the reaction layer, reducing the permeability of the wall and the reaction efficiency. Considering both interception effect and cost, 30% is the optimal reuse ratio.

Claims

1. A method for preventing and controlling soil and groundwater pollution in industrial parks, characterized in that, Includes the following steps: S1. Pollution Level Classification: The area occupied by each independent enterprise in the industrial park to be controlled is defined as an evaluation unit. Soil sampling points are set up at 30~50m×30~50m. The pollution load index L, pollution status index P, migration condition index T, and sensitive distance index S of each evaluation unit are measured respectively. The range of each index is normalized to the range of 0~10. Then, the comprehensive control index R of each evaluation unit is calculated by formula (1): R=0.35×L+0.30×P+0.20×T+0.15×S (1) Pollution levels of assessment units are classified according to R-values: High-risk assessment units: R ≥ 7.5; Medium-risk assessment units: 4.5 ≤ R < 7.5; Low-risk assessment units: R < 4.

5. S2. Delineation of pollution plume boundaries: Within the medium-risk assessment unit, groundwater monitoring wells are set up at 30~50m×30~50m intervals. Based on the measured concentrations of major characteristic pollutants in the groundwater at each sampling point, a contour map of the spatial distribution of the concentrations of major characteristic pollutants is drawn using ordinary Kriging interpolation. The boundary of the area enclosed by the contour lines with concentrations equal to 1.5~2 times the groundwater quality standard limit is determined as the pollution plume boundary. S3. Prevention and Control Zone Delineation: The entire industrial park to be controlled will be divided into the following three types of prevention and control zones: Key prevention and control area: the area occupied by all high-risk assessment units; the area of ​​the buffer zone extending 30-50m outward from the boundary of all high-risk assessment units; the area of ​​the buffer zone extending 10-30m outward from the boundary of the pollution plume; the union of the three. General prevention and control zone: the area occupied by all medium-risk assessment units; the area of ​​the buffer zone extending 10-30m outward from the boundary of the medium-risk assessment unit; the union of the two. Routine monitoring area: All remaining areas within the industrial park under control, excluding key control areas and general control areas; S4. Groundwater Zoning Control: S4-1. Prevention and control in key prevention and control areas: Downstream of the boundary of the pollution plume in the key prevention and control area, a continuous permeable reactive wall is installed in a direction perpendicular to the groundwater flow direction. The continuous permeable reactive wall extends 5-15m beyond the width boundary of the pollution plume at both ends. S4-2. General control zone control: Sampling and testing of groundwater monitoring wells in each evaluation unit every 30-90 days. The testing items are all major characteristic pollutants. When the concentration of any major characteristic pollutant in any groundwater monitoring well exceeds the standard limit by 1.5 to 2 times, the evaluation unit is upgraded to a key control zone and a continuous permeable reactive barrier is deployed in accordance with the method described in S4-1. S4-3, Daily monitoring and control: Sampling and testing of groundwater monitoring wells in each evaluation unit every 3 to 6 months, with testing items including pH, conductivity, COD and all major characteristic pollutants; S5. Soil control: In any soil sampling point where the concentration of any major characteristic pollutant exceeds 1.2 times the standard value, excavation shall be carried out in an area of ​​5~10m×5~10m centered on the soil sampling point, with the excavation depth extending 0.2~0.5m outward from the surface to the lower limit of the pollution depth.

2. The method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S1, if the area of ​​a single evaluation unit is greater than 3 hectares, it is divided into several sub-units according to a 50m×50m grid, and each sub-unit is an independent evaluation unit.

3. The method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S1, the pollution load index L is calculated using formula (2): L=(Q l / 5)+(Q w / 500) (2) Among them, Q l Q represents the average annual total amount of toxic and hazardous liquid leaks in this evaluation unit over the past three years, expressed in kg / a. w The average annual total wastewater discharge of this evaluation unit over the past three years, in cubic meters (m³). 3 / a; The pollution status index P is calculated using formula (3): P=(C max1 / S 1 )+(C max2 / S 2 ) (3) Among them, C max1 S1 represents the maximum measured concentration of any pollutant in the soil of this evaluation unit, and C represents the soil pollution risk screening value for the corresponding pollutant. max2 S1 represents the maximum measured concentration of any pollutant in the groundwater of the evaluation unit, and S2 represents the groundwater quality standard limit for the corresponding pollutant. Both units are in mg / L. When no soil or groundwater samples are collected in a certain evaluation unit, the ratio of the corresponding item is set to 0. The migration condition index T is calculated using formula (4): T = (10 / H) + (K × 1000) (4) Where H is the average thickness of the vadose zone in the evaluation unit, in meters; K is the vertical permeability coefficient of the vadose zone in the evaluation unit, in meters per second; when H ≤ 0.5 m, 10 / H is calculated as 20; when H > 30 m, 10 / H is calculated as 0.

3. The sensitivity distance index S is calculated using formula (5): S=1000 / D (5) Where D is the shortest distance from the boundary of the evaluation unit to the nearest residential area, school or hospital outside the park, in meters; when D≥1000m, S is counted as 1; when D<50m, S is counted as 20.

4. The method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S1, the range normalization method is as follows: convert each of the aforementioned indices to the 0~10 interval according to formula (6): X = (XX) min ) / (X max -X min )×10 (6) Where X is the measured value of a certain index of the evaluation unit, X min X is the minimum value of this index among all evaluation units. max This is the maximum value of the index across all evaluation units.

5. A method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S2, the groundwater monitoring well is constructed to a depth of 1-2m above the bottom of the aquifer, and the screen tube is located below the groundwater level fluctuation zone to the bottom of the well. The main characteristic pollutants include heavy metals arsenic, lead, hexavalent chromium, cadmium, mercury, volatile organic pollutants benzene, toluene, trichloroethylene, tetrachloroethylene, semi-volatile organic compounds polycyclic aromatic hydrocarbons, polychlorinated biphenyls, and petroleum hydrocarbons.

6. The method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S3, the area occupied by the general prevention and control zone is reduced by the portion that overlaps with the key prevention and control zone.

7. A method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S4-1, the continuous permeable reactive barrier, along the groundwater flow direction from upstream to downstream, is as follows: First quartz sand transition layer: thickness 0.2~0.5m, quartz sand particle size 0.5~1mm; Zero-valent iron-quartz sand mixed reaction layer: 1~2m thick, zero-valent iron and quartz sand are uniformly mixed at a mass ratio of 1:4~5, zero-valent iron particle size is 50~150μm, quartz sand particle size is 0.25~0.5mm, and compaction density is 1.6~1.8g / cm³. 3 ; Activated carbon-zeolite adsorption layer: thickness 0.5~1m, activated carbon and zeolite are uniformly mixed at a mass ratio of 3:7~10, with a particle size of 1~3mm; Second quartz sand transition layer: thickness 0.1~0.5m, quartz sand particle size 0.5~1mm.

8. A method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 1, characterized in that, In S4-3, when any test item changes by more than ±50% compared to the last test, the monitoring frequency is increased to once every 1 to 3 months. When at least 3 test items change by more than ±50% compared to the last test, the evaluation unit is upgraded to a general prevention and control area.

9. A method for preventing and controlling soil and groundwater pollution in industrial parks according to claim 7, characterized in that, In S5, the excavated soil is remediated in situ using a low-temperature thermal desorption method. The heating temperature is 150~350℃ and the heating time is 10~30min. The remediated soil is then sieved to obtain coarse recycled soil with a particle size of 0.5~5mm and fine recycled soil with a particle size of <0.5mm. After being washed 2-3 times, the coarse recycled soil replaces 20-40% of the quartz sand in the zero-valent iron-quartz sand mixed reaction layer. The fine recycled soil is mixed with sodium bentonite and silicate cement at a mass ratio of 80~85:10~15:3~5, water is added and stirred until the moisture content is 18~22%, and granulation is carried out using a granulator with the particle size controlled at 2~5mm. After natural curing for 7~10 days, recycled composite particles are formed. The recycled composite particles replace 20~40% of the quartz sand in the first quartz sand transition layer and the second quartz sand transition layer. The remaining coarse and fine recycled soil was backfilled to the excavation site.

Citation Information

Patent Citations

  • A comprehensive treatment method for soil and groundwater pollution in production parks

    CN118297410B